Professional Documents
Culture Documents
Management
1
Learning Objectives
• To define what is hazard, risk and danger
Copyright@NIOSH 2005/1 3
Definitions
Copyright@NIOSH 2005/1 4
Copyright@NIOSH 2005/1 5
Risk Assessment
Copyright@NIOSH 2005/1 6
The Process of
Risk Management
Start
Classify Activities
(Work, Product, Services, Activities)
Identify Hazards
Copyright@NIOSH 2005/1 8
SOURCES OF HAZARDS
Man Unsafe acts
Machinery Installation, layout and design of
equipment
Materials Substances such as chemicals and
gases use in the workplace
Method The way people carry out their work
Media Workplace condition i.e. air quality,
ventilation, lighting, noise, vibration
etc.
Copyright@NIOSH 2005/1 9
Classification and
Potential Sources of Hazards
Classification Example of Potential Sources of
of Hazards Hazards
Copyright@NIOSH 2005/1 10
Classification and
Potential Sources of Hazards
Classification Example of Potential Sources of
of Hazards Hazards
Copyright@NIOSH 2005/1 11
Pre-Assessment –
Information Gathering
• Information on the facilities, processes and
activities of the organization, including:
– Area Map
– Site plan(s); own and neighbour
– Process flow-charts
– Inventory of materials (raw materials,
chemicals, wastes, products, sub-products)
– Toxicology and other health and safety data
– Monitoring data
Copyright@NIOSH 2005/1 12
Pre-Assessment –
Classifying Work Activities
• Geographical areas within/outside the
premises;
• Stages in a production process, or in the
provision of a service;
• Defined the tasks (e.g. driving, window
cleaning);
• Identify the working groups;
• Land use; previous property use, future use.
Copyright@NIOSH 2005/1 13
Methods Of
Identifying Hazards
• Review of documents and publications
• Hazard Analysis
Copyright@NIOSH 2005/1 14
Document Review
Copyright@NIOSH 2005/1 15
Inspection and Observation
• Types of inspections: statutory
inspection, periodic inspection, formal
and informal inspection
Copyright@NIOSH 2005/1 16
TYPE OF INSPECTION
WORKPLACE
INSPECTION
Statutory Scheduled
External Supervisor –
Enforcement planned
Insurance
agency - in-house
Company/
legislative inspections -
Consultant
requirements formal
Executive
Introductory Senior Continuous
Check on new or management Employees/
reconditioned tours supervisors -
equipment formal or
informal
Inspection and Observation
• Activities - to involve supervisors,
managers and employees
Copyright@NIOSH 2005/1 18
Exposure Monitoring
• Types of monitoring: area and personal
monitoring.
• Monitoring of:
– Noise
– Heat
– Radiation
– Air contaminants
– Chemicals etc.
Copyright@NIOSH 2005/1 19
Hazards Analysis
Copyright@NIOSH 2005/1 20
Job Safety Analysis (JSA)
Copyright@NIOSH 2005/1 21
Job Safety Analysis (JSA)
• Note:
– The term JSA includes the formulation
of safe work procedures using written
instructions for workers
Copyright@NIOSH 2005/1 23
Types of Risk Assessment
Approach:
– Harm to health
– Damage to property
– Damage to environment
– Or the combination of the above
Copyright@NIOSH 2005/1 25
Severity
Determine severity categories i.e.:
• Fatality
Copyright@NIOSH 2005/1 27
Likelihood
Copyright@NIOSH 2005/1 28
Qualitative Risk Table
Copyright@NIOSH 2005/1 29
L = Likely
S = Fatality
R=?
2’
B
10’
L= Unlikely
A S = Negligible
R=?
Semi - Quantitative
Risk Assessment
Determine severity categories i.e. :
• 4: Fatality & Permanent Disability
Copyright@NIOSH 2005/1 31
Semi - Quantitative
Risk Assessment
Determining Likelihood of Occurrence of
Hazard
• 4: Daily
• 3: Weekly
• 2: Monthly
• 1: Yearly
Copyright@NIOSH 2005/1 32
Semi-Quantitative
Risk Assessment
LIKELIHOOD
Yearly Monthly Weekly Daily
1 2 3 4
More than
4 days MC 3 3 6 9 12
Fatality &
Permanent 4 4 8 12 16
Disability
Copyright@NIOSH 2005/1 33
HIRARC
• RISK = LIKELIHOOD X SEVERITY
HIRARC GUIDELINE
4 X 5 = 20
2’
B
10’
2 X 1 =2
A
AN EXAMPLE RISK MATRIX
TABLE
HIRARC GUIDELINE
HIRARC GUIDELINE
RISK RANGES
HIRARC FORM
OSHC
Risk Control
Copyright@NIOSH 2005/1 39
Principle of Control
FAIRLY EFFECTIVE
Substitution - use less hazardous one.
Isolation – isolate the work area i.e. X-ray machine in
restricted room
Engineering Control – design, isolation at source,
barricade, guarding,
LEAST EFFECTIVE
Administrative Control – safe work procedure, isolation
i.e. reduce exposure time and limit, training, signage etc
PPE - last resort. Copyright@NIOSH 2005/1 41
Copyright@NIOSH 2005/1 42
Copyright@NIOSH 2005/1 43
▪ Elimination 4X4 = 16
▪ Substitution 3X4 = 12
▪ Isolation 2X4 =8
▪ Engineering/
design
1X3 =3
▪ Administrative
▪ PPE
Copyright@NIOSH 2005/1 45
Copyright@NIOSH 2005/1 46
Control measures according to hierarchy of risk control??