CONTOH DESIGN CASING

BORNEO PETROLEUM COMPANY BORNEO PETROLEUM COMPANY


CASING DESIGN
CASING DESIGN
Mawar-1 Well
Bara-10 Well

30" Pile Driven

± 80 ft
20" Pile Driven
± 100 ft

26" hole @710 ft ± 700 ft


20", 94 K-55, R-3, BTC, Casing

± 2,200 ft
17 1/2" hole @2,210 ft
13 3/8", 54.5 ppf, K-55, R-3, BTC, Casing
± 4,200 ft
17 1/2" hole @4,210 ft
13 3/8", 54.5 ppf, K-55, R-3, BTC, Casing

± 3,500 ftMD/ 3,430 ftTVD


12 1/4" hole @3,510 ft
± 7,000 ftMD/ 6,850 ftTVD
9 5/8", 43.5 ppf, L-80, R-3, BTC, Casing
12 1/4" hole @7,010 ft
9 5/8", 43.5 ppf, L-80, R-3, BTC, Casing

8 1/2" hole @5,810 ft ± 5,800 ftMD/ 5,680 ftTVD


8 1/2" hole @8,010 ft ± 8,000 ftMD/ 7,680 ftTVD

7", 26 ppf, L80, R-3, BTC, Casing 7", 26 ppf, L80, R-3, BTC, Casing