Hairini Link project history

The problem
In 2007 the NZTA and Tauranga City Council agreed the traffic flow from Cameron Road
to the Maungatapu and Hairini roundabouts needed to be improved.

The answer
Four possible solutions were identified:

2008 - signalising roundabouts 2010 - 15th Avenue / Fraser Street


The first part of the process was to signalise the intersection upgrade
Maungatapu and Hairini roundabouts. These The second part was improving pedestrian and cyclist
were commissioned in December 2008 and are safety and improving intersection traffic flows. The
working well. upgrade was completed in March 2011 and has made
a significant improvement on the route.

15th Avenue/Turret Road four-laning SH29 and SH2A future performance


The investigations identified this project is and issues at Maungatapu
not required in the short to medium term.
The NZTA, Tauranga City Council, Western Bay of Plenty
Street

KAITEMAKO
oad

STREAM
Hammond

District Council and the Bay of Plenty Regional Council


atapu R
ng
Mau

are now working on the Tauranga Urban Network Study


Welcome Bay Road
29
way
High

to develop a better understanding of how the transport


e
Stat

network within Tauranga (and therefore Hairini Link)


needs to develop in the long term.
MAUNGATAPU
ROUNDABOUT
STORMWATER
POND
Gr
ee
nw
oo

ad
dP

Ro
ar

y
k

e Ba
om
elc
W
Wickham Place

HAIRINI
Oh
au

ROUNDABOUT
iti
Ro
ad

t
SH

ee
Str
29

i
irin
Ha
Ste
phe
ns P
Strekore

lace
et
Hau

You might also like