Project : BABU JAGEEVAN RAM UTTARANDHRA SUJALA SRAVANTHI PROJECT

PACKAGE -1 PHASE – II

Canal : LIFT CANAL Job : DESIGN OF SUPER PASSAGE (SP) Chainage : @ Km : 5.085

Reach : 1 Subject : CONTENTS Date : May 5, 2021

CONTENTS
S.No DESCRIPTION Page No
I CHECK SLIP
II NOTE ON DESIGN FEATURES 1
III DESIGN CALCULATIONS

1. HYDRAULIC PARTICULARS OF CANAL 7

2. HYDRAULIC PARTICULARS OF STREAM 7

3. MFL CALCULATIONS 8

4. VENTWAY CALCULATIONS 9
5. TRANSITIONS CALCULATIONS 12

6. TAIL CHANNEL CALCULATIONS 12

7. T.E.L. CALCULATIONS 13

8. SCOUR DEPTH CALCULATIONS 22

9. DESIGN OF TROUGH SLAB 23

10. DESIGN OF TROUGH SIDE WALL 29

11. DESIGN OF TROUGH MIDDLE WALL 38


12. DESIGN OF TROUGH ABUTMENT 44

13. DESIGN OF DECK SLAB - ROAD BRIDGE 102

14. DESIGN OF ABUTMENT - ROAD BRIDGE 111

15. DESIGN OF SLAB – FOOT BRIDGE 118

16. DESIGN OF ABUTMENT- FOOT BRIDGE 122

17. DESIGN OF WING WALLS & RETURN WALLS 125


IV DRAWINGS
1. INDEX & CATCHMENT AREA MAP

2. GRID PLAN

3. LS & CS OF STREAM

4. GENERAL ALIGNMENT DRAWING

5. DETAILS OF SECTIONS

6. R C C DETAILS OF DECK SLRB – ROAD BRIDGE

7. R C C DETAILS OF FOOT BRIDGE


8. R C C DETAILS OF TROUGH
Subject : CHECK LIST Type : RCC TROUGH Chainage : Km : 5.085

Sl. No. Description Remarks


Has an Index Map to a scale of 1:25000 showing the location and
1 Yes
any alternatives been enclosed?
Has the contour survey plan to a scale of 1:400 covering 200m
2 Yes
around the structure been enclosed?
Has site plan to a scale of 1:3500 giving the following information
3 Yes
been enclosed.
a. Has the names of roads or drains with direction been given? Yes
b. Has the canal proposals been shown? Yes
c. If the structure is in skew, have the angle and direction of skew
Yes
been given?
d. Has the reference to B.M been given? No
e. Are the levels and identification number of C.S given? Yes
f. Are the trial pit particulars given? Yes
g. Have the spot levels of adjacent country been given? No
4 i. Has the L.S of the drain been given? Yes
ii. Is the scale adopted as 1:5000 horizontal & 1:200 vertical ? Yes
5 Has the L.S of canal showing the site of crossing been enclosed? Yes
Has a note on the important details of masonry works along the
6 Nil
drain enclosed?
ii.If so, are the hydraulic particulars furnished? N.A
Is a list of Masonry works for 3 kms U/s and D/s of structure
7 Yes
furnished?
Structure is proposed in view of canal
8 Is the necessity for the structure explained clearly?
interrupting existing drain.
9 Have the canal chainages been given? As per Approved H.Ps
10 Have the leads for materials of construction been given? N.A
11 Has any proposal depending on site conditions been marked? Yes
Have the possibilities or diversion been examined? It is a major
12 Yes
stream cannot be diverted.
13 Has the catchment map of the drain been furnished? Yes
14 Have the Hydraulic particulars of the drain furnished? Yes
15 Has any special features or relevant information been furnished? Nil
16 Has certificate of levels given? ---
17 Have plans been indexed and Numbered? Yes
18 Are the L.S and C.S levels of corresponding points tallying? Yes
19 Are the north points and scales noted in the plans? Yes
Subject : NOTE ON DESIGN FEATURS
Chainage : Km : 5.085

INTRODUCTION:

The lift canal alignment of Uttarandra Sujala srawanthi Project crosses the stream @ Km.5.08500. As
seen from canal bed and stream bed a Super passage is feasible and is designed with the following
Hydraulic Particulars.

HYDRAULIC PARTICULARS OF CANAL:

Sl.No. Description Units Particulars


1 Discharge (R / D) cumecs 162.600 / 163.032
2 Bed Width m 37.500
3 F.S.D m 4.150
4 Free board m 0.750
5 Bed fall --- 1 in 20000
6 Value of rugosity --- 0.018
7 Side Slopes --- 1.5 : 1 / 2.0 : 1
8 Velocity m/sec 0.898
9 Top Width of banks R/L m 8.000 / 5.000
10 C.B.L m + 64.855
11 F.S.L m + 69.005
12 T.B.L m + 69.755
13 Stream bed level @ crossing m + 83.719

STREAM PARTICULARS
Sl.No. Description Units Particulars
1 Catchment Area Sq.Km 1.136
2 M.F.D by Dicken’s formula Cumecs 21.457
3 Bed level of stream crossing m + 83.719
4 Bed fall --- 1 in 30
5 Value of n (assumed) --- 0.030
6 Avg. depth of flow m 0.659
7 Avg. velocity m/s 2.983
8 MFL's
i. at crossing m + 84.082
M.F.L at 50.0 m U/S m + 84.920
M.F.L at 50.0 m D/S m + 82.997

VENT WAY & AFFLUX


The stream bed level at crossing is + 83.719 and the trough sill level fixed @+81.87. The vertical
clearance over the FSL is 12.525 m. Hence 7 vents of 13m clear span is proposed with intermediate piers
of 1.5 m thick uniform. There is an afflux of 1.465 cm. To convey the stream discharge over the canal
trough consisting 3 bay of 2.3 x 1.2 m size with 0.4 m free board is proposed. The velocity in the trough
is 2.598 m/s.

TRANSITIONS

1
Subject : NOTE ON DESIGN FEATURS
Chainage : Km : 5.085

Transition widths are proposed considering 60% Laceys width. In this case, for the discharge of 21.457
cumecs, 60% laceys width is worked out to be 13.34m. Hence on U/S the transition width is proposed as
13.340 m with transition length of 6m in 1 : 2 flare and on D/s width is 13.34m with 9 m transition length
in 1 : 3 flare .

RCC TROUGH

The section of the trough consists of 2 RCC side walls ( L – beams). The thickness of trough slab is 0.3mm
and is designed for the bending moment for self weight and water load combined with direct pull due to
water thrust.

A water proof sealing coat of 40 mm thickness is provided in CC M35 with suitable admixtures added to it
over the trough slab which is to be laid monolithic with the floor slab. The side walls of the trough are
designed as beams between the Abutments to support vertical loads due to own weight and the reaction
from the floor slab. The side wall is also checked for cantilever moment due to water thrust from inside
and wind force from outside. The trough is proposed in VRCC M30. 150 x 150 mm fillets with fillet bars
are proposed at the junction slab and beam for fixidity. 100 x 300 mm haunches are proposed at the
bottom to avoid contact over the support. Similarly intermediate wall if any is designed as a T-Beam.

Mix proposed M30 Modular ratio 9.333


Stress in concrete 100.0 kg/cm2 Lever arm coefficient 0.861
Stress in steel 1300 kg/cm2 Neutral axis coefficient 0.418
M.R coefficient 17.985

TOTAL ENERGY LEVELS:

The total energy levels are worked out from D/S of the structure. The coefficients for sudden expansion
and sudden contraction considered are 0.5 and 0.3 respectively. Similarly the coefficients for gradual
expansion and contraction considered as 0.3 and 0.2 respectively. The head over the drop is found by
trial and error.

FLOOR CONCRETE

On U/s and D/S & U/S of the trough 600 mm thick floor concrete in CC M20 is proposed with 75 mm
wearing coat in CC M25 over it. On U/s cut off is proposed at +81.295 and on D/S at +79.87 at a slope of
0.25:1 in VCCM20. Cutoff shall be extended under the returns also.

ABUTMENT

The abutment is proposed away from the water prism in burried condition, Hence the abutment
foundation level is +81.7 which is well below the Ground level. The top width of abutment is 1.00m and
the bottom width is 1.60m. Abutments are designed for direct loads from trough and earth pressures
behind the abutment computed as per TVA procedure. Unit Weight of saturated earth as 2.0 t/m³,
water as 1.0 t/m³ and weight of plain concrete as 2.5 t/m³.

The angle of repose and angle of friction of soil considered are 28° and 14° respectively. The maximum
stress in the concrete is 7.86 t/m² and on soil is 7.018 t/m². The abutments are founded on 600 mm
thick in VCC M20 using 40 MSA.

BED BLOCKS

2
Subject : NOTE ON DESIGN FEATURS
Chainage : Km : 5.085

300 mm thick RCC bed blocks under side walls and intermediate walls over abutments & piers shall be
provided in M30. Top of bed blocks are proposed to be plastered smooth in CM 1:3 mix and a thick kraft
paper in layers is to be laid over it before laying the side walls.

WINGS & RETURNS

The Wings & Returns are designed for saturated earth pressures keeping the water face vertical and rear
batter and stability calculations are done as per T.V.A procedure. Wing walls & returns are proposed in
CC M20 using 40 MSA with top thickness of 500mm. Foundation level for wings on U/S is kept at +81.2
and foundation level for wing walls at D/S is kept at +81.2. The thickness of foundation under wings is
kept as 500 mm in CC M20.

It is assumed that the soil met with at foundation level can take up the designed stresses. However
during execution if the soils met with at foundation level cannot take the designed stress then, the
design needs revision.

Sl. Soil (t/m²)


STRESS STABLE
No. Max Min

1 Section (1-1 & 2-2 ) 7.356 5.552

2 Section (3 -3 ) 7.356 5.552

3 Section (5-5 ) 4.907 4.565

4 Section (7 – 7) 4.818 4.609

5 Section (9-9) 6.202 5.500

6 Section (10-10 & 11-11) 6.675 3.446

TAIL CHANNEL
A tail channel of bed width equal to transition width on D/S is to be excavated with side slopes in 1.5:1
till the barrel floor level meets the natural stream bed level at a bed fall of 1 in 1300m. The tail channel
is proposed to be protected with rough stone pitching.

SCOUR DEPTHS:
The widths of transitions for stream flow @ entry and exit are 13.34m and 13.34m respectively. With silt
factor of 1, the maximum scour levels on D/S abd U/S works out to be at + 80.419 and +81.491
respectively. On D/S the foundation level is + 81.295 and a cutoff of 2 m below floor level is provided at
+79.87 in slope of 0.25:1. similarly cutoff at U/S is provided at +81.295.

EXPANSION JONTS

12 mm thick expansion joints with 225 mm wide PVC rubber water stoppers are proposed over
abutments and pier at the free ends of trough and will continued vertically in the side walls.

3
Subject : NOTE ON DESIGN FEATURS
Chainage : Km : 5.085

WEEP HOLES

Weep holes of size 100 mm dia are proposed in the stream wings above low water level at spacing of 1 m
c/c bothways in staggered fashion both horizontally & vertically with Filters(with graded material) at
the rear end to prevent piping of the backfill earth.

PROTECTION WORKS
300mm thick rough stone pitching to bed and sides is proposed for a length of 5.0m on U/S & 5.0m on
D/S. 450 mm x 450 mm profile wall is proposed at either ends in VCCM20.

Blocks of 150mmx150mmx600mm are provided along the span at equal intervals to obstruct vehicles
entering trough as it is not designed for vehicular loads.

SINGLE LANE ROAD BRIDGE

DECK – SLRB

The Clear water way is 6.9m. And the width of the trough is 7.6 m including intermediate beams. Hence
the bridge is proposed for a span of 3.3m. The bottom level of deck is fixed at +83.397 keeping the
vertical clearance under the bridge as 0.4 m. The deck is designed for on lane of class a loading with the
carriage way of 4.25 m in between kerbs and is proposed in VRCC M25 using 20 MSA.

The thickness of deck works out to 600mm. 75 mm thick wearing coat is proposed over the deck in CC
M30 with 8mm dia bars @ 200c/c both ways. 20 mm thick expansion joints are proposed at the free ends
of deck over the abutments and they are proposed to be filled with Asphaltic joint filler.

Mix proposed M 25 Modular ratio 10.980


Stress in concrete 85.0 kg/cm2 Lever arm coefficient 0.894
Stress in steel 2000 kg/cm2 Neutral axis coefficient 0.318
M.R coefficient 12.088

ABUTMENT – SLRB

Abutments are designed for direct load from deck & live load reaction for class-A loading. Earth
pressures behind the abutments are calculated as per TVA procedure. 1.2m height of surcharge over
back fill is considered as per bridge code. Horizontal forces due to braking and temperate variation are
also considered as per IRC bridge codes. Abutments are proposed in VCC M 20 using 40 MSA.

The top width of Abutment is proposed as 1 m and bottom width as 3.9 m. The maximum & minimum
stresses at the base works out to 15.847 t/m² and 2.052t/m² in concrete and 13.61 t/m² and 5.804t/m²
in soil respectively.

BED BLOCK – SLRB

300 mm thick RCC bed blocks under side walls and intermediate walls over abutments & piers shall be
provided in M25. Top of bed blocks are proposed to be plastered smooth in CM 1:3 mix and a thick kraft
paper in layers is to be laid over it an the bearing surfaces should be made smooth by rubbing with
Carborandam stones before laying the deck.

4
Subject : NOTE ON DESIGN FEATURS
Chainage : Km : 5.085

APPROACH SLAB – SLRB

3500 mm length approach slab of 150 mm thick is to be laid on either side of bridge in VRCC M30 using
12 mm Ø bars @ 150 c/c both ways @ top & bottom. The approach slab to be laid over 225 mm thick
well compacted gravel base.

FOOT BRIDGE

Foot Bridge is proposed on right side of canal for continuity of bank. It is also designed for 3.3 m clear
span. The width of Foot Bridge is 1.5 m in between beams. It is designed for crowd load of 400 kg/m ².
The slab is designed for 3.3 m clear span in between beams and the beams are designed in between the
supports. The beam & slab are proposed in VRCC M25 using 20 MSA. The same stresses and constants
adopted for SLRB are considered for Foot Bridge. The thickness of slab is 100 mm .

ABUTMENT – FOOT BRIDGE

Abutments under Foot Bridge are designed for deck and earth pressures due to back fill computed as per
T.V.A procedure. They are proposed in VCC M20. 500 mm thick foundation are also proposed under
them in VCC M20

The top width of Abutment is proposed as 1 m and bottom width as 2.5 m. The maximum & minimum
stresses at the base works out to 15.736 t/m² and 2.042t/m² in concrete and 13.952 t/m² and 4.253t/m²
in soil respectively.

The expansion joints at the free ends of deck over abutments are as same as for Road bridge. Bed blocks
are also as of SLRB.

STANDARDS AND REFERENCES:


1 IS 456 - 2000 4 IS 3370 part-II – 2009
2 IS 7784 Part-I – 1993 5 CWC Manual on Drops
3 IS 7784 Part-II sec-II – 2000

5
Subject : HYDRAULIC PARTICULARS
Chainage : Km : 5.085

1.0 Hydraulic Particulars Of Canal At The Location Of The Structure

Sl DESCRIPTION UNITS PARTICULARS

1 Discharge R / D cumecs 162.600 / 163.032


2 Bed width m 37.500
3 Full supply depth m 4.150
4 Free board m 0.750
5 Side slopes --- 1.5 : 1 / 2.0 : 1
6 Bed fall --- 1 in 20000
7 Value of Rugosity (n) --- 0.0180
8 Velocity m/s 0.898
9 Top width of banks (R/L) m 8.000 / 5.000
10 Canal bed level m + 64.855
11 Full supply level m + 69.005
12 Top of bank m + 69.755
13 G.L. / Stream Bed level m + 83.719

2.0 Stream Particulars:

I) Catchment Area = 1.136 Sq. Km


ii) Dickens Formula Q = 3/4
CM
where C = 19.5 for catchment areas from < 2.5 Sq. Kms
M = Catchment area
Q = 21.457 cumecs
iii) Stream bed level at crossing = + 83.719 m HENCE O
iv) Stream bed level at 50m U/s = + 85.429 m
v) Stream bed level at 50m D/s = + 81.875 m

7
Subject : M.F.L Calculations
Chainage : Km : 5.085

3.1 M.F.L. Calculations :-

3.1 Bed fall of Stream:


1. Bed level at Km 0.000 (Crossing) + 83.719
Slope 1 in 25.9
Bed level at 75 m U/S + 86.610

2. Bed level at Km 0.000 (Crossing) + 83.719


Slope 1 in 29.2
Bed level at 50 m U/S + 85.429

3. Bed level at Km 0.000 (Crossing) + 83.719


Slope 1 in 15.5
Bed level at 25 m U/S + 85.330

4. Bed level at Km 0.000 (Crossing) + 83.719


Slope 1 in 20.3
Bed level at 25 m D/S + 82.490

5. Bed level at Km 0.000 (Crossing) + 83.719


Slope 1 in 27.1
Bed level at 50 m D/S + 81.875

6. Bed level at Km 0.000 (Crossing) + 83.719


Slope 1 in 36.7
Bed level at 75 m D/S + 81.677

Average of 1-6 = ( 25.9 + 29.2 + 15.5 + 36.7+27.1+20.3 = 25.81


Adopt a bed fall of 1 in 30.0 and the value of n as 0.0300 for calculating M.F.L's

3.2.0 MFL of the Cross sections:


M.F.L at 50.0 m U/S : + 84.920
M.F.L at Crossing : + 84.082
M.F.L at 50.0 m D/S : + 82.997

3.2.1 M.F.L at 50.0 m U/S : Assuming the MFL as + 84.920

Stream bed Average Area Cross


M.F.L. Cal Depth Distance
levels Depth (Sq.m) Chainage

84.920
84.920 87.050 84.920 0.00 0.000 0.000 0.000 -50
84.920 86.887 84.920 0.00 0.000 0.000 0.000 -40
84.920 86.622 84.920 0.00 0.000 0.000 0.000 -30
84.920 85.464 84.920 0.00 0.000 0.000 0.000 -20
84.920 85.429 84.920 0.00 0.000 0.000 0.000 -10
8.1
84.920 84.695 84.695 0.23 0.113 3.071 0.346 0
84.920 85.562 84.920 0.00 0.113 2.600 0.293 10
Subject : VENTWAY CALCULATIONS FOR STREAM & CANAL
Chainage : Km : 5.085

4. Ventway for Stream & Canal:

Max. flood discharge = 21.457 cumecs


Max permissible velocity in RCC Trough = 4.0 m/s
Allowable velocity in stream in barrel = 3.0 m/s

21.457 = 7.152 m2
A =
3
Providing 0.15 m x 0.15 m Fillet , Area = 0.011 m2

Provide 3 bay of 2.30 x 1.20 m

Area of Flow = 8.26 sqm > 7.2 sqm HENCE OK


The velocity in the trough = 2.598 m/s < 3.00 m/s HENCE OK

SBL is 14.714 m above FSL of canal


Sill of trough is kept at = + 81.870

Free board in trough = 0.40 m


Thickness of side walls = 0.35 m
Thickness of bottom slab = 0.300 m
Sealing Coat = 40 mm
Haunches = 300 mm x 100 mm

Thickness of intermediate wall = 0.35 m


Bottom of trough = + 81.530
Trough top level = + 83.470

vertical clearance = Bottom level of trough – F.S.L


= + 81.530 - 69.005
= 12.525 m > 0.450 m HENCE OK

Provide 7 Vents of 13 m clear span


with intermediate pier of 6 No of 1.5 m thick

No. of Berms = 2

1st Berm level = + 69.755 Width of 1st berm = 3.00


Height of 1st Berm = 4.90 Total Width of 1st berm = 6.00
Canal side slope = 1.5 : 1 Canal Width at 1st berm = 58.20 m

2nd Berm level = + 74.755 Width of 2nd berm = 3.00


Height of 2nd Berm = 5.00 Total Width of 2nd berm = 6.00
Canal side slope = 1.5 : 1 Canal Width at 2nd berm = 79.20 m

Sill level = 81.870 Width of 3rd berm = 0.00


Height = 7.12 Total Width of 3rd berm = 0.00
Canal side slope = 1.5 : 1 Canal Width at 3rd berm = 100.55 m

Bottom of Trough = + 81.530


Canal side slope = 1.5 : 1

Width at TBL/GL = 99.525 m

9
Subject : VENTWAY CALCULATIONS FOR STREAM & CANAL
Chainage : Km : 5.085

Bed width = 37.50 m


Width at under side of trough = ( 81.530 - 64.855 ) x 3.0 + 37.500
87.525 m

Thickness of Bearing = 0.494 m


Thickness of Expansion joint = 0.012 m
Length of trough provided = 100.988 m > 87.525 m

Afflux

The middle 2 piers obstructing the flow whereas 2 side piers obstructing partially.

Height of pier (water level) above CBL = 69.005 - 64.855


= 4.151 m

Width of pier = 1.50 m

For bed width of = 37.500 m


A = ( 37.50 + 2x 1.5 x 4.15 + 37.50 ) x 0.5 x 4.15
= 181.459 m 2

Obstruction due to piers in the canal = 2.000 x 1.500 4.150 = 12.45 sqm
= 2.000 x 1.500 x 2.075 = 6.23 sqm
Total area = 18.675 2
m
Normal area of flow (A) = 181.459 m2

Net area of flow (a) = 181.459 - 18.68 sqm


162.784 m2

Afflux = ((v2/17.86)+0.01524)*((A/a)2-1)

Afflux = [ ( 0.90² / 17.86 ) 0.0152 181.46 162.784) ² - 1 ]


= 0.01465 m or 1.465 cm
Afflux = 1.4651 cm < 3 cm HENCE OK

Scour Depth In Canal

Width of canal at FSL = 37.500 + (2 x 4.150 x 1.500 )


= 49.950 m

As para 110.1.3 of IRC : 5-1998, the Mean depth of scour is calculated by formula

1/ 3
Dsm = 1.340 x D 2b
( Ksf )
Where, Db = discharge / m width
= 163.032 = 3.729 Cumecs/m
37.50 + 49.950
2

Ksf = Silt factor = 1.25

10
Subject : VENTWAY CALCULATIONS FOR STREAM & CANAL
Chainage : Km : 5.085

Dsm = 1.34 3.729² = 1.34 x 2.232


1.25
Dsm = 2.991 m

Provide abutment foundation @ 1.5 times of scour depth as it is fully buried and away from side slopes
= 1.5 x 2.991 = 4.487
Then abutment foundation level = FSL - 1.5 Dsm
= 69.005 - 4.487
64.519

Or provide Abutment foundation level at Sill level - 2.000 m as they are fully buried and
away from canal slopes
= 83.719 - 2.000
81.719

Therefore abutment(trough) foundation level = + 81.700

Scour Depth In Stream


Width of stream = 7.600 m

As para 110.1.3 of IRC : 5-1998, the Mean depth of scour is calculated by formula
1/ 3
Dsm D2b
Where, Db = discharge / m width
= 1.340 x
( ) Ksf
= 21.457 = 2.823 Cumecs/m
7.600

Ksf = Silt factor = 1.25

Dsm = 1.34 2.823² = 1.34 x 1.854


1.25
Dsm = 2.485 m

Maximum Scour depth for Abutments = 1.5 Dsm


= 1.50 x 2.485
= 3.728 m say 3.730 m

Scour Level = FSL - Max. Scour depth


= + 83.070 - 3.730
= + 79.340

Scour depth from Sill level = Sill level - Max scour Level
= 81.870 - 79.340
= 2.530 m

However provide Abutment foundation level at Sill level 1.500 (SLRB)


= + 81.870 - 1.500
= + 80.370

11
Subject : VENTWAY CALCULATIONS FOR STREAM & CANAL
Chainage : Km : 5.085

Therefore abutment(SLRB) foundation level = + 80.300

However provide Return foundation level at Sill level 1.500 (SLRB)


= + 81.870 - 1.500
= + 80.370

Therefore Return foundation level = + 80.300

However provide Abutment foundation level at Sill level 1.500 (FB)


= + 81.870 - 1.500
= + 80.370

Therefore abutment(FB) foundation level = + 80.300

12
Subject : TEL CALCULATIONS

Chainage : Km : 5.085

5.0 Transitions:

Discharge = 21.457 cumecs

Lacey's Perimeter = 4.8 Q 0.5


= 22.234 m
60% of 22.234 = 13.34 m
However the transitions can be further flumed for rigid floors duly considering the permissible velocity

3 bay of 2.30 m x 1.20 m Trough is Provided

5.1 U/S Transition:


Length of U/s transition is proposed as 6.000 m. The width at the transition at end works out
to be 13.340 m with a splay of 2 : 1.

7.600 m 13.340 m
2
1
6.0

5.1 D/S Transition:


Length of D/s transition proposed as 9.000 m. The width at the transition at end works out
to be 13.340 m with a splay of 3 : 1.

13.340 m 7.60 m

1
3
9.0

The depth of flow at the end of transition arrived is adopting BYWASH WEIR formula.
Q= 1.05 d3/2 x L
21.457 = 1.050 x d3/2 x 13.340
d3/2 = 1.53
say d = 1.33 m

12
Subject : TEL CALCULATIONS

Chainage : Km : 5.085

6.0 Tail Channel:

Sill level of Trough = +81.870


Stream Bed level at 50m U/S = +85.429
Difference in levels = 3.559 m
Hence a drop of 3.600 m is provided at U/S
Hence a drop of 0.000 m is provided to meet GL at D/S
Bed level of tail channel = sill level of trough - D/S Drop Height
= +81.870 - 0.000 m
= + 81.870
Depth in the tail channel @ the exit of D/s transition = 1.329 m
Side slopes ( for inner side ) are proposed as 1.5: 1
Maximum flow level = + 81.870 + 1.329 = +83.199 m

Bed width is kept same as the width of D/s transition at the end i.e. 13.340 m

17.327 +83.199

1.329 1.5 : 1

+81.870
13.340 m

Area of flow = ( 13.340 + 1.5 x 1.329) x 1.329


= 20.378 sq.m.
Velocity (V) = 21.457 / 20.378
= 1.000 m/s < 1.2 m/s HENCE OK
From Manning's formula
V = (1/n) R2/3 S1/2
where n = 0.030
P 13.340 m + 2√3.25 x 1.329
= 18.132 m
R = 20.378 18.132
= 1.124 m
S
1/2
= Vxn/R 2/3

= 1.000 x 0.030
1.124 2/3

= 0.0278
S = 0.0008 or 1 in 1298.7
Say 1 in 1300
Provide a bed fall of 1 in 1300.0 for the tail channel till it meets the natural stream bed level.

13
Subject : TEL CALCULATIONS

Chainage : Km : 5.085

7.0 T.E.L. Calculations:

U/S D/S 2 1

7.60 m
13.34

13.34
FLOW SLRB FOOT BRIDGE

2 :1 3 :1

12 11 6.0 10 9 8 7 6 5 43 9.0

Section 1 - 1 : Just outside the transition( at the exit end)


+83.199

1.329 1.5 : 1

+81.870
13.340 m

Max. flood discharge = 21.457 cumecs


Max. Flood Level = 83.199 m
Floor level = 81.870 m
Depth of flow available = 1.329 m
Area of flow = ( 13.3 + 1.5 x 1.329 ) x 1.329
= 20.378 sq.m.
Velocity = 21.457 = 1.053 m/s
20.378
V2/2g = 1.053 2
/ (2 x 9.81 )
= 0.0565 m
MFL at 1 - 1 = 83.199
TEL at 1 - 1 = 83.199 + 0.0565
= 83.256

Wetted Perimeter = 13.340 + 2 √ 3.250 x 1.329


= 18.132 m

Section 2 – 2 : (Just inside the transition at the exit end)


+83.189

1.319

+81.870
13.34

14
Subject : TEL CALCULATIONS

Chainage : Km : 5.085

Assume depth of flow = 1.319 m


A = 13.34 x 1.319 = 17.595 sq.m.
Wetted Perimeter P = 13.3 + 2 x 1.319
= 15.978 sq.m. > 13.340 m.
V = 21.457 / 17.6 = 1.219 m/s
V2/2g = 1.219 2
/ (2 x 9.81 )
= 0.0758 m
Loss of head due to = 0.5 x ( 0.0758 - 0.0565)
sudden expansion = 0.0096

(Due to change in velocity from section 2 - 2 to section 1 – 1)


TEL @ 2-2 wrt section 1-1 = 83.256 + 0.0096
= 83.265
TEL at section 2 - 2 wrt assumed depth
= 81.870 + 1.319 + 0.0758
= 83.265
HENCE O.K.

Section 3 – 3 : (Just outside the trough at the exit end)

+83.044

1.174

+81.870
7.60

Assume depth of flow = 1.174 m


A = 7.60 x 1.174 = 8.922 sq.m.

p = 7.60 + 2 x 1.1740 = 9.95 m

V = 21.457 / 8.922 = 2.405 m/s


3.000
V2/2g = 2.405 2
/ ( 2 x 9.81 ) = 0.295 m

Friction losses on D/s transition


average Area = ( 17.595 + 8.922) / 2 = 13.259 sq.m.
Average Perimeter = ( 13.340 + 9.948) / 2 = 11.644 m

Mean Depth “R” = 13.259 / 11.644 = 1.139


Velocity = ( 1.219 + 2.405) / 2 = 1.812 m/s

15
Subject : TEL CALCULATIONS

Chainage : Km : 5.085

S1/2 = V x n / R2/3
= 1.812 x 0.018
1.139 2/3

S1/2 = 0.0299
S = 0.00089 or 1 in 1124

Friction losses = 0.00089 x 9.00


= 0.0080
Loss of head due to gradual expansion = 0.3 x (0.2948 - 0.0758)
= 0.0657
(Due to change in velocity from section 3-3 to section 2-2)
TEL@ 3-3 wrt section 2-2 = = 83.265 + 0.0657 + 0.0080
= 83.339
TEL at section 3-3 wrt assumed depth = 81.870 + 1.174 + 0.2948
= 83.339
HENCE O.K.

Section 4 – 4 : (Just inside the transition at Road Bridge)

6.900
+82.997

1.127

+81.870
6.900

Assume depth of flow = 1.127 m


Area of Trough = ( 6.900 x 1.127 ) = 7.779 sq.m.
Wetted Perimeter P = 6.9 + 2 x 1.127
= 9.155 m < 13.340 m.
Velocity = 21.457 / 7.779 = 2.758 m/s
< 3.000 m/s

V2/2g = 2.758 2
/ ( 2 x 9.81 ) = 0.3877 m

Loss of head due to sudden expansion = 0.5 x (0.3877 - 0.295 )


= 0.0465
TEL@ 4-4 wrt section 3-3 = = 83.339 + 0.046
= 83.385
TEL at section 4-4 wrt assumed depth = 81.870 + 1.127 + 0.3877
= 83.385

16
Subject : TEL CALCULATIONS

Chainage : Km : 5.085

Section 5 – 5 : (Just outside the Trough at Road Bridge)


6.900
+82.997

1.127

+81.870
6.900

Friction Losses:
Hydraulic radius R = A/P
= 7.779 / 9.155 = 0.850 m
Total width of Road Bridge = 5.100 m
n = 0.0180
hf = n V2L/(R)4/3
2

= 0.0156
TEL @ 5 - 5 wrt section 4 - 4 = 83.385 + 0.016
= 83.401

Section 6 – 6 : (Just inside the Trough at Road Bridge)

6.900
+82.997

1.127

+81.870
6.900

Assume depth of flow = 1.127 m


Area of Trough = 6.90 1.127 ) - ( 2 x 0.5 x 0.15 x 0.15 )
= 7.757 sq.m.
Wetted Perimeter P = 6.90 + 2 x 1.127
= 9.155 m < 13.340 m.
Velocity = 21.457 / 7.757 = 2.766 m/s
< 3.000 m/s

V2/2g = 2.766 2
/ ( 2 x 9.81 ) = 0.3900

Friction Losses:
Hydraulic radius R = A/P
= 7.757 / 9.155 = 0.847 m
Total width of Road Bridge = 4.293 m

17
Subject : TEL CALCULATIONS

Chainage : Km : 5.085

n = 0.0180
hf = n V2L/(R)4/3
2

= 0.0133
TEL@ 6 - 6 wrt section 5 – 5 = 83.401 + 0.0133
= 83.414

Section 7 – 7 : (Just inside the trough at the entrance end)

6.900
+82.997

1.127

+81.870
6.900

Friction Losses:
A = ( 6.900 x 1.13 - 2 x 0.5 x 0.15 x 0.15 )
= 7.757 sq.m.

P = 6.90 x1 + 2 x 1.127 = 9.155 m


R = A/P
= 7.757 / 9.155 = 0.847 m

Length of trough = 100.988 m


n = 0.0180
hf = n V2L/(R)4/3
2

= 0.3123

TEL @ 7 – 7 wrt = 83.414 + 0.312


to previous section 83.726

Section 8 – 8 : (Just outside the trough at the entrance end at Foot Bridge)

6.900
+82.997

1.127

+81.870
6.900

18
Subject : TEL CALCULATIONS

Chainage : Km : 5.085

Assume depth of flow = 1.127 m


Area of Trough = 6.90 1.127 ) = 7.779 sq.m.
Wetted Perimeter P = 6.90 + 2 x 1.127
= 9.155 m < 13.340 m.
Velocity = 21.457 / 7.779 = 2.758 m/s
< 3.000 m/s
Friction Losses:
Hydraulic radius R = A/P
= 7.779 / 9.155 = 0.850 m
Total width of Road Bridge = 4.727 m
n = 0.0180
hf = n2V2L/(R)4/3
= 0.0145
TEL @ 8 - 8 wrt section 7 - 7 = 83.726 + 0.014
= 83.741

Section 9 – 9 : (Just inside the Foot Bridge at end of U/S transition)

6.900
+82.997

1.127

+81.870
6.900

Velocity of flow = 21.457 / 7.779 = 2.758 m/sec


V2/2g = 2.758 2
/ ( 2 x 9.81 ) = 0.3877 m

Friction Losses:
Hydraulic radius R = A/P
= 7.779 / 9.155 = 0.850 m
Total width of Road Bridge = 1.950 m
n = 0.0180
hf = n2V2L/(R)4/3
= 0.0060
TEL @ 9 - 9 wrt section 8 - 8 = 83.741 + 0.0060
= 83.747

19
Subject : TEL CALCULATIONS

Chainage : Km : 5.085

Section 10 – 10 : (Just outside the Foot Bridge at the entrance end)

7.60 +83.706

1.836

+81.870
7.6

Assume depth of flow of = 1.836 m


A = 7.6 x 1.836 = 13.954 sq.m.
P = 7.600 +2 x 1.836 = 11.272 m
V = 21.5 / 13.954 = 1.538 m/s
< 3.000 m/s
V /2g
2
= 1.538 2
/ (2 x 9.81 )
= 0.1210 m
Loss of head due to sudden contraction
= 0.3 x ( 0.3877 - 0.1210) = 0.0800
(Due to change in velocity from section 10 - 10 to section 9 – 9)
TEL at 10 - 10 wrt section 9 – 9 = 83.747 + 0.0800
= 83.827

TEL at section 10 – 10 wrt assumed depth = 81.870 + 1.836 + 0.121


= 83.827
HENCE O.K.

Section 11 – 11 : Just inside the transition( at the entrance)


13.340
+83.811

1.941
+81.870
13.340

Assume a depth of flow of 1.941 m


A = 13.340 x 1.94 = 25.893 sq.m.
P = 13.340 +2 x 1.941 = 17.22 m
V = 21.457 / 25.893 = 0.829 m/s
V2/2g = 0.829 2
/ (2 x 9.81 )
= 0.0350 m
Friction losses on u/s transition
average Area = ( 13.954 + 25.893) / 2 = 19.923 sq.m.
Average Perimeter = ( 11.272 + 17.222) / 2 = 14.247 m
Mean Depth “R” = 19.923 / 14.247 = 1.398

20
Subject : TEL CALCULATIONS

Chainage : Km : 5.085

Velocity = ( 1.538 + 0.829) / 2 = 1.183 m/s

S1/2 = V x n / R2/3
= 1.183 x 0.018 = 0.0170
1.398 2/3

S = 0.00029 or 1 in 3448
Friction losses = 0.00029 x 6.00
= 0.0017
Loss of head due to gradual contraction
= 0.2 x ( 0.1210 - 0.0350 ) = 0.0172

(Due to change in velocity from section 11 – 11 to section 10 – 10)


TEL at 11 - 11 wrt section 10 – 10 = 83.827 + 0.0172 + 0.0017
= 83.846
TEL at section 11 – 11 wrt assumed depth
= 81.870 + 1.941 + 0.0350
= 83.846
HENCE O.K.

Section 12 – 12 : Just outside the transition( at the entrance)

+83.826

1.956 1.5 : 1

+81.870
13.340 m

First Drop height is Provided as 1.800 m

84.611

0.941 +0.800
0.141
83.670
+83.811

1.800 m 1.941 75 mm wearing coat

+81.795 +81.870
+81.120

q = 22.234
13.340
= 1.667 Cumecs / running metre
Q = 1.705 h 3/2
+ 0.8 √(2gh) x H

1.667 = 1.705 h3/2 + 0.8 √(2g) h1/2 x 0.141


= 1.705 h3/2 + 0.500 x h1/2

21
Subject : TEL CALCULATIONS

Chainage : Km : 5.085

0.978 = h3/2 + 0.293 h1/2

Solving for h, h = 0.800


0.978 = 0.9780 ( LHS =RHS )
Hence Assumed Depth of flow is Correct

MFL over the drop wall = 83.670 + 0.941


+84.611 m

Second Drop height is Provided as 1.800 m

86.306

0.836 +0.836
0.000
85.470
+84.611

1.800 m 0.941 75 mm wearing coat

+83.595 +83.670
+83.670

q = 22.234
13.340
= 1.667 Cumecs / running metre
Q = 2.18 h3/2 + 0.8 √(2gh) x H

1.667 = 2.180 h3/2 + 0.8 √(2g) h1/2 x 0.000


= 2.180 h3/2 + 0.000 x h1/2
0.765 = h3/2 + 0.000 h1/2

Solving for h, h = 0.836


0.765 = 0.7650 ( LHS =RHS )
Hence Assumed Depth of flow is Correct

MFL over the drop wall = 85.470 + 0.836


+86.306 m

8.0 Design of Drop wall at section 8-8 :

a) Top Width of drop wall :

Top Width of drop wall = d/√(ρ)


where d = Maximum depth of flow over drop wall
ρ = Density of C.C = 2.500

Top Width of drop wall = 0.941 √2.5


= 0.595

22
Subject : TEL CALCULATIONS

Chainage : Km : 5.085

However provide 0.600 m top width

b) Base width of drop wall :

Base width of drop wall = H + d + (W.C)/√(ρ)


where
d = Max. depth of flow over drop wall = 0.941 m
H = Height of drop wall = 1.800 m
W.C = Thickness of wearing coat = 0.075 m
ρ = Density of Masonry / concrete = 2.500 m

Base width = 1.800 + 0.941 + 0.075 √ 2.5


= 1.781 m
However provide the base width of drop wall = 1.800 m

c) Thickness of Apron:
Thickness of apron t = 0.55 √ (d + h)
where d = Max. depth of flow over drop wall = 0.941 m
h = difference of u/s & d/s water levels = 0.800 m

t = 0.55 √ 0.941 + 0.800


= 0.726 m

However provide 0.750 m thick including 0.075 m wearing coat

d) Length of Apron:
Length = 2 x d c + 2 x √ d ch
= 2x 0.941 +2x √ 0.941 x 0.800
= 3.617 m
However provide 3.700 m < 6.00

8.0 Design of Drop wall at section 8-8 :

a) Top Width of drop wall :

Top Width of drop wall = d/√(ρ)


where d = Maximum depth of flow over drop wall
ρ = Density of C.C = 2.500

Top Width of drop wall = 0.836 √2.5


= 0.529

However provide 0.550 m top width

b) Base width of drop wall :

Base width of drop wall = H + d + (W.C)/√(ρ)


where
d = Max. depth of flow over drop wall = 0.836 m
23
Subject : TEL CALCULATIONS

Chainage : Km : 5.085

H = Height of drop wall = 83.670 m


W.C = Thickness of wearing coat = 0.075 m
ρ = Density of Masonry / concrete = 2.500 m

Base width = 83.670 + 0.836 + 0.075 √ 2.5


= 53.494 m
However provide the base width of drop wall = 53.500 m

c) Thickness of Apron:
Thickness of apron t = 0.55 √ (d + h)
where d = Max. depth of flow over drop wall = 0.836 m
h = difference of u/s & d/s water levels = 1.695 m

t = 0.55 √ 0.836 + 1.695


= 0.875 m

However provide 0.900 m thick including 0.075 m wearing coat

d) Length of Apron:
Length = 2 x d c + 2 x √ d ch
= 2x 0.836 +2x √ 0.836 x 1.695
= 4.054 m
However provide 4.100 m

Exit Gradient
Exit Gradient: Condition upstream water level upto crest , downstream dry.
H = R .L of crest-D/S bed level = 1.329 m
d = depth of D/S curtain wall = 2.000 m
b = floor length = 9.000 m
α = b/d = 4.500
λ ={1+sqrt(1+α2)} / 2 = 2.805
GE = 1 * H/( sqrt(λ) * Π * d ) = 0.126 < 0.3
Hence O.K
Uplift Pressures :
I) at U/S face of drop wall
α = b/d = 4.500
λ ={1+sqrt(1+α2)} / 2 = 2.805
ØE =1/Π x cos x (λ-2/λ)
-1
= 41 %
Øc = 100-ØE = 59 %
ii) End of floor
α = b/d = 4.500
λ ={1+sqrt(1+α )}/2
2
= 2.805
ØE =1/Π x cos-1 x (λ-2/λ) = 41 %

Floor thickness:
a) At D/S face of crest wall
Percentage pressure = 41.61 %
Absolute pressure = 0.81 m

24
Subject : TEL CALCULATIONS

Chainage : Km : 5.085

75 % pressure = 0.61 m
Thickness of floor,t = 0.41 m
Say 0.500 m floor thickness excluding 75 mm thick wearing coat
However provide minimum of 500mm thick floor

9 Scour Depth In Stream

on D/s side:
Width of apron at exit end = 13.34 m
q = 21.457 / 13.34
= 1.608 cumecs/m.run
Scour depth (D') = 1.35 (q /f)
2 1/3

where f = silt factor = 1


Nominal scour depth = 1.35 (q2/f)1/3 = 1.853 m
= 1.35 ( ( 1.608 )2 / ( 1 ) )1/3

Maximum Scour depth = 1.5 D' = 1.50 x 1.853


=
= 2.780 m Say 2.780 m
D/s MFL = + 83.199
Scour Level = + 80.419
Floor level = + 81.870
Foundation level = + 81.295
Provide cutoff wall up to = + 79.870 HENCE OK
I.e, 2.00 m below Floor level

on U/S side:
Width of apron at entrance = 13.34 m
q = 21.457 / 13.34
= 1.608 cumecs/m.run
Scour depth (D') = 1.35 (q /f)
2 1/3

where f = silt factor = 1


Nominal scour depth = 1.35 (q2/f)1/3 = 1.853 m
= 1.35 ( ( 1.608 ) 2
/ ( 1 ) )1/3

Maximum Scour depth = 1.25 D' = 1.25 x 1.853


=
= 2.317 m Say 2.320 m
U/s MFL = + 83.811 m
Scour Level = + 81.491 m
Floor level = + 83.670 m
Foundation level = + 81.295 m
Provide cutoff wall up to = + 81.295 m HENCE OK
I.e, 2.38 m below Floor level

25
Subject : DESIGN OF TROUGH BOTTOM SLAB

Chainage : Km : 5.085

0.35 0.35
0.35 0.35
0.40 0.40

2.040 1.20 1.20


2.30 2.30

0.04
0.30 0.30
0.100 0.100
0.300 0.300
8.300

The following stresses are adopted on the face away from liquid
Grade of Concrete = M 30
Grade of Reinforcement = Fe 415

Permissible stress in steel 's st' = 1300 Kg/cm2 (As per IS3370 -Part II 2009)
Permissible Direct Comp. Stress 'scc' = 80 Kg/cm2 (As per IS3370 -Part II 2009)
Permissible Bending Comp. Stress 'scbc' = 100 Kg/cm2 (As per IS3370 -Part II 2009)
2
Unit weight of R .C .C = 2500 Kg/m (As per IRC 6 -2014)
Unit Weight of water = 1000 Kg/m2

The other standard co-efficients are


Modular Ratio = 9.333
k = m scbc/(mscbc +sst) = 0.418
j = 1-k/3 = 0.861
Q = 0.5 k j scbc = 17.985

Size of trough = 3 bays of 2.300 m width


depth of flow in the trough = 1.200 m
Free board = 0.40 m

Depth of water considered = depth of flow in the trough + free board


Depth of water considered = 1.200 + 0.400 = 1.600 m
Total Depth of trough = 1.600 m

The trough bottom slab is designed as spanning between beams


Assuming thickness of slab = 300 mm with
Thickness of sealing coat = 40 mm
Assuming clear cover = 40 mm
Adopting = 16 mm bars as main reinforcement

Effective depth of slab = 300 - 40 -8


= 252 mm or 25.2 cm

23
Subject : DESIGN OF TROUGH BOTTOM SLAB

Chainage : Km : 5.085

Fillet = 0.15 m x 0.15

Effective span of slab = clear span + deff


= 2.300 + 0.252
= 2.552 m
Loads per metre length:

1) Self weight of slab = 0.300 x 2500 = 750 kg/m


2) Weight of sealing coat = 0.040 x 2500 = 100 kg/m
Total weight ( W) = 850 kg/m
Let the depth of water in the trough be 'h' metres

1) Sagging moment due to weight of water = (w h) l2/8


= ( 1000 h ) x 2.552 ² / 8
= 814.09 h Kgm '-------------- (1)
2) Sagging moment due to weight of slab = Wl2/8
= 850 x 2.552 ² / 8
= 691.975 Kgm '-------------- (2)
3) Water pressure on side wall for 1metre length = 1000 h2 / 2
= 500 h2 kg
This acts at h/3 + ( 0.300 / 2) + 0.04 m above the centre of bottom slab

Hogging moment due to lateral water pressure


= 500 h² {( h/3)+ ( 0.300 / 2 ) + 0.040 }
= 500 h² {( h/3)+ 0.190 } '-------------- (3)

Net Positive moment at Centre of bottom of slab (M) = (1) + (2) - (3)

M = 814.09 h + 691.975 - 500 h2 {( h/3)+ 0.190 } }


M = 814.09 h + 691.975 - 166.7 h 3
- 95 h2
Rearranging the terms
M = 166.67 h3 + 95 h2 - 814.09 h - 691.975

dM/dh = 0 for maximum moment


dM/dh = ( 3 x 166.67 h2 ) + ( 2 x 95 ) h - 814.09 = 0
= 500 h 2
+ 190 h - 814.09 =0

dividing with 500


h2 + 0.38 h - 1.628 =0

a = 1
b = 0.38
c = -1.63

24
Subject : DESIGN OF TROUGH BOTTOM SLAB

Chainage : Km : 5.085

By solving equation 'h' = 1.100 against 1.600 m depth of trough


By solving equation 'h' = 1.100 m

Maximum Sagging Moment


M = 814.09 h + 691.975 - 166.67 h3 - 95.00 h²
= 895.50 + 691.975 - 221.83 - 114.95
= 1250.69 kgm

Pull (P) for 1.10 m depth of water = 1000 x 1.100 ² / 2


= 605.000 Kg

Moment due to pull = load x ( effective depth of slab - half of depth of slab)
= 605.00 x (0.25 - 0.15 )
= 61.71 Kg m

Net Bending Moment = Maximum sagging moment - moment due to pull


= 1250.69 - 61.71
= 1188.98 Kg m

M = √Q b d2
d = sqrt ( M/Q b)

Effective depth required 'd' = √(1188.98 x 100 ) / ( 18.0 x 100 )


= 8.131 < 25 cm available
HENCE SAFE
Main reinforcement:
Ast = M / tjd
Area of steel required = (1188.98 x 100 )/ ( 1300 x 0.861 x 25.20 )
2
= 4.217 cm

Ast = pull / t
Area of steel for pull = 605.000 / 1300 = 0.465 cm2
Total area required = 4.217 + 0.465 = 4.682 cm2

Spacing :(As per 26.3.3 of IS 456 - 2000)


spacing = calculated spacing }
= 300 mm } whichever is less
= 3 x effective depth }

Provide 16 mm dia,spacing of Main Reinforcement


= 42.5 cm }
30 cm } whichever is less
75.6 cm }
spacing = 30.00 cm

25
Subject : DESIGN OF TROUGH BOTTOM SLAB

Chainage : Km : 5.085

Minimum reinforcement : As per IS3370- PartII-2009 Para 8.1.1 minimum reinforcement

Asmin = 0.240
x 100 x 30.0
100
= 7.200 sq.cm < 7.50 cm2
Spacing req for min r/f = 27 cm
HENCE SAFE

Provide 16 mm dia 27.0 cm c/c, which gives an area of 7.500 cm2


against 4.68 cm2 (A)
HENCE SAFE

Distribution Steel

Provide distribution steel as worked out above for Min area of steel required = 7.200 cm2
Spacing :(As per 26.3.3 of IS 456 - 2000)

spacing = calculated spacing }


= 300 mm } whichever is less
= 5 x effective depth }

Provide 12 mm dia, spacing of Main Reinforcement


15.0 cm }
30 cm } whichever is less
126 cm }
spacing = 15.0 cm
Provide 12 mm dia@ 15.0 cm c/c, which gives an area of (B)
2 2
7.60 cm > 7.20 cm
HENCE SAFE

Check for shear

Load = 850 x + 1600 = 2450 Kg


Shear force (V) = wl/2
= ( 2450 x 2.300 ) / 2 = 2817.5 Kg
Shear stress (t v) = V / bd
= 2817.5 / ( 100 x 25.20 ) = 1.118 Kg/cm2

% of tensile steel = 100 Ast/bd


= ( 100 x 7.500) /(100 x 25.20 )
= 0.298 %
For 0.298 % of tensile reinforcement the permissible shear stress (tc) in M30 grade concrete

100As/bd M30 For 0.298 % =

% tc = ( 0.30 - 0.25 ) x (0.31 - 0.23 )


0.230 +
26
Subject : DESIGN OF TROUGH BOTTOM SLAB

Chainage : Km : 5.085

0.230 +
0 0.00 ( 0.50 - 0.25 )
0.15 0.20
0.25 0.23 = 0.245 N/mm2
0.5 0.31
0.75 0.37
1 0.41
tc = 2.452 kg/cm2

k = factor for tc
overall depth of
>=300 275 250 225 200 175 <=150
slab(mm)
k 1 1.05 1.1 1.150 1.2 1.25 1.3

k.tc = 1.100 x 2.452


2
= 2.70 kg/cm > 1.118 kg/cm2
HENCE SAFE

Check for bond:


Sb = V/[jd∑o]
Where ∑o = Perimeter of the bar X number of bars

Dia of Main reinforcement = 1.6 cm & Spacing = 27.0 cm c/c


= p x 2 x( 100 27 )
= 18.617 cm
Sb = 2817.5 / ( 0.861 x 25 x 18.617 )
= 6.978 Kg/cm2 < 12.8 Kg/cm2
HENCE SAFE (for deformed bars)
Maximum hogging moment = 1000 h2 / 2 ( h/3 + 0.30 / 2 + 0.040 )
= 500 x 1.200 ² x (1.200/ 3 + 0.30 / 2 + 0.040 )
= 424.80 Kgm

Pull (P) for 1.600 m depth of water


= 1000 x 1.60 2
/ 2
= 1280.00 Kg

Moment due to pull = Load x (effective depth of slab-half of depth of slab)


= 1280.0 x ( 0.25 - 0.15 )
= 130.56 Kg m

Net Bending Moment = Maximum hogging moment + moment due to pull


= 424.80 + 130.56
= 555.36 Kg m

Bending moment 'M' = √ Q b d2

27
Subject : DESIGN OF TROUGH BOTTOM SLAB

Chainage : Km : 5.085

Effective depth required 'd' = sqrt ( M/Q b)


= √( 555.36 x 100 ) / ( 17.98 x 100 )
= 5.557 < 25 cm available
Main reinforcement:

Ast = M / tjd
Area of steel required = ( 555.36 x 100)/ ( 1300 x 0.861 x 25.20)
2
= 1.970 cm

Ast = pull / t
Area of steel for pull = 1280.00 1300
= 0.985 cm2

Total area of steel required = 1.970 + 0.985


2
= 2.954 cm

Provide 10 mm dia @ 25.0 cm c/c, which gives an area of ( C)


3.200 cm2 > 2.954 cm2
HENCE SAFE

28
Subject : DESIGN OF SIDE WALL
Chainage : Km : 5.085

0.35
0.40

1.20
2.040 2.300

0.04
0.300
0.100
0.300

The following stresses are adopted on the face away from liquid
Grade of Concrete = M 30
Grade of Reinforcement = Fe 415

Permissible stress in steel 's st' = 1300 Kg/cm2


Permissible Direct Comp. Stress 'scc' = 80 Kg/cm2
Permissible Bending Comp. Stress 'scbc' = 100 Kg/cm2
Unit weight of R .C .C = 2500 Kg/m3
Unit Weight of water = 1000 Kg/m3

The other standard co-efficients are


Modular Ratio = 9.333
k = m scbc/(mscbc +sst) = 0.418
j = 1-k/3 = 0.861
Q = 0.5 k j scbc = 17.985

Total height of side wall = 0.40 + 1.200 + 0.040 + 0.300 + 0.100


= 2.04 m (or) 204 cm

The side wall is designed as a simply supported beam in between the abutment & piers with
clear span of 13 m to support the vertical load due to own weight and
The load coming from the trough slab and the water in the trough. The side wall is also checked for the water thrust

Assuming the width of beam = 35 cm


Clear span = 13.000 m
Top width of abutment = 1.000 m
Width of pier = 1.500 m
Width of bearing = 0.494 m
Clear cover to beam = 50 mm
assume the dia of Main reinforcement = 25 mm

Effective depth of beam = 2040 - 50 - 13


= 1977.5 mm / 197.8 cm
Effective span = 13.000 + 0.494
= 13.494 m

29
Subject : DESIGN OF SIDE WALL
Chainage : Km : 5.085

Slenderness limits for beams to ensure lateral stability :


To ensure lateral stability, The clear distance between the lateral supports
according to para 23.3 of IS:456-2000 should not exceed.
i) 60b (or) } whichever is less
ii) 250 b2/d }
Where 'd' is the effective depth of the beam and
'b' the breadth of the compression face

The clear distance between lateral supports


clear span = 13.0 m = 1300 cm

i) 60b = 60 x 35 = 2100 cm
ii) 250 b / d
2
= 250 x 6.19 = 1549 cm
Minimum of above i and ii = 1549 cm > 1300 cm
HENCE SAFE

Check for vertical deflection:


As per para 23.2.1 of IS 456 : 2000 the vertical deflection limits may generally be assumed to be satisfied provided that
the span to depth ratio is less than 20 for Simply supported spans up to 10 m
20x 10/span for Simply supported spans greater than 10 m
Span = 1300.00
Eff. depth 197.75
= 6.57 < 20 HENCE SAFE

LOADS (per m run) :


Dead load of side wall = 2.040 x 0.350 2500 = 1785.00 Kg
Weight of trough slab = 0.300 x 2.300 /2 x 2500 = 862.50 Kg
Wt. of sealing coat = 0.040 x 2.300 /2 x 2500 = 115.00 Kg
weight of haunches = 0.100 x 0.300 /2 x 2500 = 37.50 Kg
weight of fillets = 0.150 x 0.150 /2 x 2500 = 28.13 Kg
weight of water = 1.200 x 2.300 /2 x 1000 = 1380.00 Kg
Total weight: 4208.13 Kg
Bending moment BM = wl2 / 8
= ( 4208.13 x 13.494² 8 x 100
= 9578115.206 Kgcm
Moment of Resistance = Q bd2
d(req.) = √M/Qb
= √ 9578115 / ( 17.985 x 35 )
= 123.4 cm
d = 123.35 cm < 197.8 cm HENCE SAFE
Main reinforcement:
Ast required = M / [tjd]
= √ 9578115 / ( 1300 x 0.861 x 197.8 )
2
= 43.04 cm

Assume 25 mm dia bars required


No. of bars = 43.04 / 4.909 = 8.77
Say 10 Nos.
Ast provided = 49.087 cm2 (3 bar will be bent upwards)

30
Subject : DESIGN OF SIDE WALL
Chainage : Km : 5.085

Ast provided at the = 34.361 cm2 (7 bars) (E & E')


bottom of the side wall

Check for Min. Reinforcement


(As per para 26.5.1.1. Of IS 456-2000)
As = 0.850
bd fy

Where, As = Minimum area of tension reinforcement


b = Breadth of beam = 350 mm
d = effective depth = 1977.5 mm
fy = 415 N/mm2 = 4150 kg/cm2

There fore, As = 1417.605 mm2


= 43.038 cm2 < 49.087 cm2
HENCE SAFE
Check for shear
Shear force (V) = wl/2
= 4208.13 x ( 13.0 2 = 27352.8 Kg
Shear stress (t v) = V / bd
= 27352.8 / ( 35 x 197.75 ) = 3.952 Kg/cm2
% of tensile steel = 100 Ast/bd
= 100 x 49.087 = 0.709 %
35 x 197.75
y
100As/b 30 For 0.709%
d tc = ( 0.71 - 0.50 ) x (0.37 - 0.31 )
0.310 +
0 0.00 ( 0.75 - 0.50 )
0.15 0.20
0.25 0.23 = 0.360 N/mm2 = 3.602 Kg/cm2

0.5 0.31 tv > tc


0.75 0.37 3.952 > 3.602
1 0.41 Provide reinforcement for unbalanced shear

Permissible shear stress (tc) with out shear reinforcement


= 3.952 Kg/cm2 < (tv) i.e. 3.602 Kg/cm2
Balance shear stress = 3.952 - 3.602
= 0.350 Kg/cm2 will take care by stirrups
Balanced shear force ( Vs) = 0.350 ( 35.0 x 197.75 )
= 2421.5 Kg
Spacing of vertical stirruips 'Sv ' = ssv x Asv x d / Vs
Sv = spacing of vertical stirrups
ssv = Permissible tensile stress in shear reinforcement = 1300 kg/cm2
Asv = Total cross sectional area of strirrups

Provide 10 mm dia 2 legged stirrups


Asv = 1.571 cm2

31
Subject : DESIGN OF SIDE WALL
Chainage : Km : 5.085

d = Effective depth = 197.75 cm


Vs = balanced shear force

Sv = 1300 x 1.571 x 197.75


2421.47
= 166.8 cm c/c or say 166 cm

(As per para 26.5.1.5. Of IS 456-2000)


The maximum spacing of vertical strirrups
= 0.75 d mm }
300 mm } whichever is less
1660 mm }
The maximum spacing of vertical strirrups
= 148.3 cm }
30.0 cm }
166.0 cm }
Provide 10 mm dia 2 legged stirrups @ 30 cm c/c (F)
= 2x( 0.786 x 100 / 30 )
= 5.237 cm2
Minimum Shear Reinforcement:
As per para 26.5.1.6 of IS 456-2000 minimum shear reinforcement in the form of stirrups shall be provide such that
Asv >= 0.4
b Sv 0.87fy
Asv = Total C.S. of stirrup legs (10 dia – 2L) = 1.572 cm2
Sv = Stirrup spacing = 30 cm
b = Breadth of beam = / ( 35 x cm
fy = 415 N/mm2 = 4150 kg/cm2
1.572 ≥ 0.4
1050 3611
0.0015 ≥ 0.0001
HENCE SAFE

Check for bond:


Sb = V/[jd∑o]
Where ∑o = Perimeter of the bar x number of bars
= p x 2.5 x 7
= 54.978 cm
Sb = 27353 / ( 0.892 x 198 x 54.978 )
2
= 2.821 Kg/cm < 12.8 Kg/cm2 (for deformed bars)
HENCE SAFE (as per cl: 26.2.1.1 of IS:456-2000)
Side face reinforcement:
As per para 26.5.1.3 of IS 456-2000 side face reinforcement is to be provided along the two faces when the depth of web
in a beam exceeds 750mm. The total area of such reinforcement shall not be less than 0.10% of cross sectional area
and shall be distributed

32
Subject : DESIGN OF SIDE WALL
Chainage : Km : 5.085

Ast = ( 0.1 x 35 x 204 ) 100


2
= 7.14 cm
Ast (on each face) = 3.57 cm2
spacing of side reinforcement bars = Depth x Area of 1 bar / area of Reinforcement required
Provide 10 mm dia bars = 197.75 x 0.7855
3.57
= 43.51 cm c/c
Spacing of side reinforcement bars shall be min of = 300 mm }
350 mm (webthk) } whichever is less
435.1 mm }
Therefore spacing shall be = 300.0 mm
= 30 cm
Provide 10 mm dia bars 9 Nos. (G)
each face which gives an area of = 7.07 cm2 > 3.570 cm2
HENCE SAFE

Design of side wall for water thrust:


Moment at top of the floor due to water thrust = Wh2/2 x h/3
= wh /6
3

= 1000 x 1.60 ³ / 6
= 682.667 Kg.m
d(req.) = √M/Qb
Effective depth required = √( 683 x 100 ) / ( 17.98 x 100 )
= 6.161 cm
assume the dia of Main reinforcement = 10 mm for the side wall for water thrust
clear cover = 50 mm
width of side wall = 350 mm
Effective Depth availble = 350 - 50 - 5
= 295 mm
= 29.5 cm > 6.2 cm
HENCE SAFE
Ast required = M / [tjd]
Ast required = 683 x 100
( 1300 x 0.861 x 29.5 )
2
= 2.068 cm
Min. reinforcement as per para 26.5.2.1 of IS 456-2000
= 0.12 x 100 x 35 = 4.2 cm2
100
Area of reinforcement on water face = Half of the area of stirrups + area of top reinforcement from
trough slab carried into side wall
= 2.62 + 3.200
= 5.82 cm2 > 4.20 cm2
HENCE SAFE
Distribution available
(Side face reinforcement) = 7.07 cm2 > 4.2 cm2
HENCE SAFE (Min. steel required)

33
Subject : DESIGN OF SIDE WALL
Chainage : Km : 5.085

Check for wind force :

Calculation of wind pressure by Gust Factor Method (As per IS: 875(Part 3) 1987, cl.8.2.1)
Basic wind speed (Vb) = 44.00 m/sec (IRC 6 -2010, Fig. No.6)
The variation of hourly mean wind speed (Vz) = Vb * k1 * k2 * k3
where
Risk co-efficient factor (k1) = 1.05 (IS: 875(Part 3) 1987, Table No.1)
Different heights & terrain factor (k2) = 0.78 (IS: 875(Part 3) 1987, Table no.33)
Topography factor (k3) = 1.0286 (IS: 875(Part 3) 1987, cl.5.3.3)

Design wind pressure (Pz) = 0.6 * Vz2

S.No. Height Vb k1 k2 k3 Vz Pz
(m) (m/sec) (m/sec) (N/m2)
1 10.00 44.00 1.05 0.78 1.0286 37.07 824.36
2 15.00 44.00 1.05 0.82 1.0286 38.97 911.08
3 20.00 44.00 1.05 0.85 1.0286 40.39 978.96
4 30.00 44.00 1.05 0.88 1.0286 41.82 1049.29
5 50.00 44.00 1.05 0.93 1.0286 44.19 1171.91
6 100.00 44.00 1.05 0.99 1.0286 47.05 1328.00

Height of trough 2.04 m, H= 2.040 m


Pz = 82.436 kg/m2

Horizontal pressure = 82.436 Kg/m2


The height of trough = 2.040 m
Bending moment = 171.533 Kgm

Ast required = 171.533 x 100


( 1300 x 0.861 x 29.5 )
= 0.520 cm2

Area available in the form of stirrups = 2.62 cm2 > 0.520 cm2
HENCE O.K.

34
Subject : DESIGN OF TROUGH MIDDLE WALL

Chainage : Km : 5.085

0.35

1.20
2.300 2.300

0.04
0.30
0.100
0.300

The following stresses are adopted on the face away from liquid
Grade of Concrete = M 30
Grade of Reinforcement = Fe 415
Permissible stress in steel 'sst' = 1300 Kg/cm2
Permissible Direct Comp. Stress 'scc' = 80 Kg/cm2
Permissible Bending Comp. Stress 'scbc' = 100 Kg/cm2
Unit weight of R .C .C = 2500 Kg/m2
Unit Weight of water = 1000 Kg/m2

The other standard co-efficients are


Modular Ratio = 9.333
k = m scbc/(mscbc +sst) = 0.418
j = 1-k/3 = 0.861
Q = 0.5 k j scbc = 17.985

Height of Intermediate wall = 1.200 + 0.040


= 1.240 m

The central beam is designed as a T-beam spanning in between the abutment & pier.
Clear span = 13.00 m
Top width of abutment = 1.00 m
Width of pier = 1.50 m
Effective span = 13.000 + 0.494 = 13.494 m
width of middle beam = 350 mm (or) 0.35 m

overall depth = 1.200 + 0.040 + 0.300 + 0.100


= 1.64 m (or) 164 cm
Dia meter of bar = 32 mm
Clear cover = 40 mm

38
Subject : DESIGN OF TROUGH MIDDLE WALL

Chainage : Km : 5.085

Eff depth available = 164 - 4 - 1.60 = 158.4 cm

Weight of middle beam = 0.350 x 1.640 x 2500 = 1435.00 Kg


Weight of trough slab = 0.300 x 2.300 x 2500 = 1725.00 Kg
Wt. of sealing coat = 0.040 x 2.300 x 2500 = 230.00 Kg
weight of haunches = 3.0 x 0.011 x 2500 = 84.38 Kg
weight of fillets = 3.0 x 0.011 x 2500 = 84.38 Kg
weight of water = 1.200 x x 2.300 x 1000 = 2760.00 Kg
Total weight: 6318.75 Kg

Bending moment BM = wl2 / 8


= 6318.75 x ( 13.494² x 100 ) / 8
= 14382109.72 Kgcm

Moment of Resistance = Q bd2


d(req.) = √M/Qb
= √ 14382110 / ( 17.985 x 35 )
= 151.16 cm
d(req.) = 151.16 cm < 158.400 cm
HENCE SAFE

Main reinforcement:
Ast required = M / [tjd]
= 14382109.72 / ( 1300 x 0.861 x 158.4 )
= 81.15 cm2
No. of 32 mm dia bars required
= 81.15 / 8.042 = 10.09
Say 12 Nos. J
2
Ast provided = 96.500 cm (3 bar will be bent upwards)
2
Ast provided at the = 72.382 cm (9 bars)
bottom of the wall

Width of flange:
Width of flange will be least of the following:
i) Spacing of beams = 2.300 m (or) 2300 mm

ii) bf = l/6+br+6ds = 13494 + 350 + 6 x 300


6
= 4399.000 mm
Width of flange 'bf' = 4399 mm

39
Subject : DESIGN OF TROUGH MIDDLE WALL

Chainage : Km : 5.085

Assuming that neutral axis is situated outside the flange, taking moments about neutral axis

B ds (n - ds/2) = m Ast (d - n)
439.9 x 30 ( n - 30 / 2 ) = 9.333 x 96.500 158.400 - n )
13197 n - 197955 = 900.67 158.400 - n )
13197 n - 197955 = 142665.60 - 900.667 n
14097.67 n = 340620.6
n = 340620.6 14097.6667
= 24.16 cm
Thickness of flange = 30 cm
Neutral axis lies with in the flange.

Lever arm (a) = d - n/3


= 158.4 - ( 24.16 / 3 )
= 150 cm
Ast required = M / [tjd]
Actual stress in steel = 14382109.72 / ( 96.5 x 0.861 x 150.0 )
= 1154.39 Kg/cm2 < 1300 Kg/cm2
HENCE SAFE
compressive stress in concrete
= 1154.39 24.16
x
9.33 150 24.160 )
= 23.746 Kg/cm 2
< 80 Kg/cm2
HENCE SAFE
Check for shear
Shear force (V) = wl/2
= 6318.75 x ( 13.0 2 = 41071.9 Kg
Shear stress (t v) = V / bd
= 41071.9 / ( 35 x 158.40 ) = 7.408 Kg/cm2
% of tensile steel = 100 Ast/bd
tc = 100 x 72.382 = 1.306 %
35 x 158.40
for M25 For 1.306%
100Ast bd tc = ( 1.31 - 1.00 ) x (0.00 - 0.41 )
0.410 +
0 0.00 ( 0.00 - 1.00 )
0.15 0.20
0.25 0.23 = 0.535 N/mm2 = 5.353 Kg/cm2
0.5 0.31 tv > tc
0.75 0.37 7.408 > 5.353
1 0.41 Provide reinforcement for unbalanced shear

40
Subject : DESIGN OF TROUGH MIDDLE WALL

Chainage : Km : 5.085

Permissible shear stress (tc) with out shear reinforcement


= 5.353 Kg/cm2 < (tv) i.e. 7.408 Kg/cm2
Balance shear stress = 7.408 - 5.353
= 2.055 Kg/cm will take care by stirrups
2

Balanced shear force ( Vs) = 2.055 ( 35.0 x 158.40 )


= 11395.1 Kg

Spacing of vertical stirruips 'Sv ' = ssv x Asv x d / Vs

Sv = spacing of vertical stirrups


ssv = Permissible tensile stress in shear reinforcement
= 1300 kg/cm2
Asv = Total cross sectional area of strirrups

Provide 10 mm dia 2 legged stirrups


Asv = 1.571 cm2
d = Effective depth = 158.40 cm
Vs = balanced shear force

Sv = 1300 x 1.571 x 158.400


11395.13
= 28.4 cm c/c

(As per para 26.5.1.5. Of IS 456-2000)


The maximum spacing of vertical strirrups
= 0.75 d mm }
300 mm } whichever is less
284.00 mm }
The maximum spacing of vertical strirrups
= 118.8 cm }
30.0 cm }
28.0 cm }
Provide 10 mm dia 2 legged stirrups @ 28 cm c/c
27.5 cm c/c K
= 2x( 0.786 x 100 / 28 )
2
= 5.713 cm
Minimum Shear Reinforcement:
As per para 26.5.1.6 of IS 456-2000 minimum shear reinforcement in the form of stirrups shall be provide such that
Asv >= 0.4
b Sv 0.87fy

41
Subject : DESIGN OF TROUGH MIDDLE WALL

Chainage : Km : 5.085

Asv = Total C.S. of stirrup legs = 1.571 cm2


Sv = Stirrup spacing = 27.5 cm
b = Breadth of beam = / ( 35 x cm
2
fy = 415 N/mm = 4150 kg/cm2
1.571 ≥ 0.4
962.5 3611
0.0016 ≥ 0.0001 HENCE SAFE
Check for bond:
Sb = V/[jd∑o]
Where ∑o = Perimeter of the bar x number of bars
= p x 3.2 x 9
= 90.478 cm
Sb = 41072 / ( 0.892 x 158 x 90.478 )
2
= 3.213 Kg/cm < 12.8 Kg/cm2
(as per cl: 26.2.1.1 of IS:456-2000) (for deformed bars)
HENCE SAFE
Side face reinforcement:
As per para 26.5.1.3 of IS 456-2000 side face reinforcement is to be provided along the two faces when the
depth of web in a beam exceeds 750mm. The total area of such reinforcement shall not be less than 0.10% of
cross sectional area and shall be distributed
Ast = ( 0.1 x 35 x 158 ) 100
2
= 5.544 cm
Ast (on each face) = 2.772 cm2
spacing of side reinforcement bars = Depth x Area of 1 bar / area of Reinforcement required
Provide 10 mm dia bars = 158.40 x 0.7855
2.772
= 44.89 cm c/c
Spacing of side reinforcement bars shall be min of
= 300 mm }
350 mm (webthk) } whichever is less
448.9 mm }
Therefore spacing shall be = 300.0 mm
= 30 cm
Provide 10 mm dia bars 7 Nos. on each face L
each face which gives an area of
= 5.50 cm2 > 2.772 cm2 HENCE SAFE
Design ofwater thrust:
The water thrust on both sides get neglected.
However, Ast provided in the form of 10 mm dia 2 legged stirrups as shear reinforcement
is sufficient.

42
Subject : DESIGN OF CANAL ABUTMENT
Chainage : Km : 5.085

83.470
W5 (Section 6-6)
1.60
W2 W1 +81.870
0.440
0.494 +81.130 +81.430
0.494 m
W6
P1 W3 0.35 0.35
0.40
-0.430

1.200
P2 W4 2.040
0.04
0.30 0.440
0.300
0.4 1.000 0.600 +82.300 2.300
W7
0.600
+81.700
B 1.600
2.400

Width of bearing = 0.494 m


Unit weight of water = 1.000 t/m3
unit weight of soil = 2.00 t/m3
unit weight of PCC = 2.50 t/m3
No. of bays = 3
Load from Trough W1

From side walls = 0.35 x 2.040 x 13.988 x 2.500 x 2 = 49.937 t


From Middle wall = 0.35 x 1.640 x 13.988 x 2.500 x 2 = 40.146 t
Trough slab = 2.30 x 0.30 x 13.988 x 2.500 x 3 = 72.388 t
Sealing coat = 2.30 x 0.04 x 13.988 x 2.500 x 3 = 9.652 t
Haunches (2 nos) = 0.300 x 0.100 x 13.988 x 2.500 x 6 = 6.295 t
Fillets (2nos) = 0.150 x 0.15 x 13.988 x 2.500 x 6 = 4.721 t
Weight of water = 2.30 x 1.20 x 13.988 x 1.000 x 3 = 115.821 t
Total Load = 298.959 t

Load shared on abutment = 149.479 t


Length of abutment = 3 x 2.300 + 2 x 0.350 + 2 x 0.35
= 8.30 m

load / m run W1 = 149.479 / 8.300 = 18.010 t/m

Total Moments about 'A' at the base level


Load (t) Moment
Load Description L.A
(t-m)
44
Subject : DESIGN OF CANAL ABUTMENT
Chainage : Km : 5.085
Moment
Load Description L.A
Hor. Ver. (t-m)

W1 As calculated above 18.010 0.753 13.561


W2 0.506 x 0.300 x 2.500 0.379 0.247 0.094
0.494 x 0.665 x 2.500 0.821 0.741 0.609
W3 1.000 x -1.170 x 2.500 -2.925 0.500 -1.463
W4 0.500 x 0.600 x -1.170 x 2.500 -0.878 1.200 -1.053
W5 0.494 x 1.600 x 1.000 0.790 0.247 0.195
Pv 0.0395 x -0.430^2 x 2.000 0.015 ----
Ph 0.1580 x -0.430^2 x 2.000 0.058 -0.172 -0.010
P1 0.500 x 1.600 x -0.430 x 1.000 -0.344 -0.215 0.074
P2 0.250 x -0.430 x -0.430 x 1.000 0.046 -0.143 -0.007
∑V = 16.213 t ∑M = 12.001
lever arm = 12.001 = 0.740 m
16.213
e = 0.740 - 0.800 = -0.060 m
Allowable e = 0.267 > -0.060 HENCE OK
Stress in concrete = 16.213 1 + 6 -0.060 )
1.60 1.600
= 10.133 1 + -0.224 )
Max = 7.860 t/m2
Min = 12.406 t/m2

Total Moments about 'B' at the foundation level


Load (t) Moment
Load Description L.A
Hor. Ver. (t-m)
W1 As calculated above 18.010 1.153 20.765
W2 0.506 x 0.300 x 2.500 0.379 0.647 0.246
0.494 x 0.665 x 2.500 0.821 1.141 0.937
W3 1.000 x -1.170 x 2.500 -2.925 0.900 -2.633
W4 0.500 x 0.600 x -1.170 x 2.500 -0.878 1.600 -1.404
W5 0.494 x 1.600 x 1.000 0.7904 0.647 0.511
W6 0.400 x -0.430 x 2.000 -0.344 0.200 -0.069
0.400 x 1.600 x 1.000 0.640 0.200 0.128
W7 2.400 x 0.600 x 2.500 3.600 1.200 4.320
Pv 0.0395 x 0.170^2 x 2.000 0.002 ----
Ph 0.1580 x 0.170^2 x 2.000 0.009 0.068 0.001
P1 0.500 x 1.600 x 0.170 x 1.000 0.136 0.085 0.012
P2 0.250 x 0.170 x 0.170 x 1.000 0.007 0.057 0.000
∑V = 20.097 t ∑M = 22.814

lever arm = 22.814 = 1.135 m


20.097
e = 1.135 - 1.200 = -0.065 m

45
Subject : DESIGN OF CANAL ABUTMENT
Chainage : Km : 5.085

Allowable e = 0.400 > -0.065 HENCE OK

Stress in concrete = 20.097 ( 1 + 6 -0.065 )


2.40 2.400
= 8.374 ( 1 + -0.162 )

Max = 7.018 t/m2


Min = 9.729 t/m2

Design of Bed Blocks under Trough Abutments:

Total Load on bed Block = 18.010 t


Providing a bed block of = 0.506 x 8.300 x 0.30 size
Weight of bed block = 0.506 x 8.300 x 0.300 x 2.5
= 3.150 t

Total load on the abutment under the bed block


= 18.010 + 3.150 = 21.159 t

Intensity of pressure under the bed block 0.494


= 21.16
0.506 x 8.3 12Φ 275 C/c
= 5.038 t/m2 0.740 0.506 8 nos. of 12 mm dia
= 0.504 Kg /cm 2

2L-12Φ @ 225 c/c


0.3
(As per IS 456:2000
1.00

Adopting the bed blocks in RCC M 20


Providing 1% of G.S.A. = 1 x 30 x 50.6
100
= 15.18 Sq. cm
No.of 12 mm Φ bars 15 No.s
Provide 8 bars at top and 8 bars at bottom
Total area provided = 18.10 Sq. cm HENCE OK

Area of 2L Stirrups = 7.59 cm² Volume of steel/rm= 759 cm3


Length of each stirrup 161.2 cm

Adopting 12 mm dia 2L stirrups 182.220 cm3


No. of Stirrups/rm = 4.17 Spacing = 24.01 cm
However Provide 12 mm dia bars 225 c/c,

2.Design of the DirtWall :


Height of the dirt wall 'H” = 0.740 m
Earth pressure at the bottom of the dirt wall Epre = 0.333 x H x ø
= 0.333 x 0.740 x 20
= 4.928 KN/m2

46
Subject : DESIGN OF CANAL ABUTMENT
Chainage : Km : 5.085

Neglecting the vertical component of the load to be on conservative side


Horizontal load on the wall/m length of the wall = 0.5 x Epre x H
= 0.500 x 4.928 x 0.740
= 1.824 KN/m
Moment at the bottom of the dirt wall
= 1.824 x 0.494 x 0.740 = 0.667 KN m/m
Surcharge pressure on the wall Spre = 0.333 x 1.2 x ø
= 0.333 x 1.200 x 20
= 7.992 KN/m2
Surcharge load on the dirt wall Sload = Spre x H
= 7.992 x 0.740
5.914 KN/m
Moment at the bottom of the dirt wall M = 0.5 x Sload x H
= 0.500 x 5.914 x 0.740
2.188 KN m/m

Total design moment at the bottom of the dirt wall = 2.188 + 0.667
= 2.855 KN m/m

For M 30 grade concrete and fe415 steel (As Per IRC 6: 2014)
Modular ratio = 9.33 k = 0.318
σcbc = 10 N/mm 2
j = 0.894
σst = 200 N/mm 2
Q = 1.422

Depth required = Sqrt(BM/Qb)


= 2.855 X 10^6 = 63.75 mm
1.422 x 494
Depth provided = 740 - 50 -6
= 684 mm > 63.75 mm
Hence the provided section is adequate

Area of steel required = BM/σst x j x d


= 2.855 x 10^6
200 x 0.894 x 64
= 250.490 Sq.mm

Minimum area of steel (0.12%) = 0.12 x 684 x 494


100
= 405.4752 Sq.mm

Provide 12 mm Φ bars @ 275 c/c


Ast Provided = 411.06 mm² HENCE OK

Distribution steel = 0.3 x Ast


= 121.643 sqmm

ie Provide 10 Φ bars @ 300 c/c


Required Ast = 261.667 mm² HENCE OK
47
Subject : DESIGN OF CANAL ABUTMENT
Chainage : Km : 5.085

Hence provide TOR 12 @ 275 mm c/c 411.3 mm2/m


Dist. reinforcement TOR 10 @ 300 mm c/c 261.8 mm2/m

48
Subject : DESIGN OF CANAL PIER
Chainage : Km : 5.085

Sill level + 81.870


0.040 (Section 7-7)
0.300 TROUGH SLAB SCL + 81.830
0.100 BOT + 81.430
0.3 BED BLOCK 1.000 BB + 81.130
1.000
FSL + 69.005

18.130 PIER
CBL + 64.855
1.9
0.50 0.50
0.5 1.000 FTL + 63.000
FBL + 62.500
2.000

10.3 8.3 1.000


9.3
1.000

2.000

Dead load due to Super structure = 298.959 t

Moment due to wind force:

Exposed height of Trough = 0.340 m


Wall = 1.600 m
Height from the bottom of the deck to Centre of railing = 0.97 m
1.
(a) The wind force on the bridge superstructure will be computed (as per clause 209.2 of IRC:6 – 2010)
Height of wall = 1.600 m
Height on which wind force acts = 0.340 + 1.600 = 1.94m
Exposed height of pier over FSL = + 81.430 - 69.005 = 12.43m
Avg height at centre of deck = 12.425 + 0.340 + 1.600 / 2 = 13.57m

49
Subject : DESIGN OF CANAL PIER
Chainage : Km : 5.085

Exposed height of pier above CBL = + 81.430 - 64.855 = 16.58m


Avg height at centre of deck = 16.58 + 0.340 + 1.600 / 2 = 17.72m

As per Table- 5 of wind pressures in clause 209.2 of IRC:6-2014,


For wind speed of 33 m/sec
"H" in m VZ in m/s "pz" in N/sqm
10 27.80 463.700
15 29.20 512.500
20 30.30 550.600
30 31.40 590.200

project location = Mahbubnagar, Telangana, India


basic wind speed, Vb = 44 m/sec( Fig.6 of IRC:6-2014)
PZ
for 13.565 m = 82.436 kg/sqm
for 17.715 m = 82.436 kg/sqm

Area of superstructure acted upon by wind pressure(on each span)


= 0.340 +(1.600 / 2 ) x 13.988
= 15.946 m2

The Transverse wind force is given by FT = PZ x At x CD x G


CD Value from Table 6 IRC:6-2014 = 1.1
G = 2 (for spans upto 150m )
For Canal Full Condition
Total Wind Force on deck slab FT = 2.892 t

This force acts at the centre of Area of pressure from lvl = + 63.000
Therefore Lever arm from bottom of pier ie at level = + 63.000
= 18.430 + ( 0.34 + 0.800 )/2
= 19.000 m
Moment due to Wind Force at + 63.000 = 2.892 x 19.0
= 54.948 t-m
Therefore Lever arm from bottom of foundation ie at level + 62.500
= 18.930 + ( 0.34 + 0.80 )/2
= 19.500
Moment due to Wind Force at + 62.500 = 2.892 x 19.5
= 56.394 t-m

For Canal Empty Condition


Total Wind Force on deck slab FT = 2.892
Therefore Lever arm from bottom level of pier ie at level + 63.000
= 18.430 + ( 0.34 + 0.800 )/2
= 19.000 m

50
Subject : DESIGN OF CANAL PIER
Chainage : Km : 5.085

Moment due to Wind Force at +63.000 = 2.892 x 19.000


= 54.948 t-m

Therefore Lever arm from bottom level of foundation i.e., at level +62.500
= 18.930 + ( 0.34 + 0.800 )/2
= 19.500 m

Moment due to wind force at + 62.500 = 2.892 x 19.500


= 56.394 t-m

(b) Wind force in longitudinal direction is taken as 25 to 50 % of wind force in transverse direction
(as per clause 209.3.4 of IRC:6-2014)
Moment due to water currents:
(a) In canal flow direction:
(As per clause 210.2 of IRC:6-2014 ) Force due to water currents in the direction of canal flow is given by:

p = 52 k V²
V = 1.414 v
v = Velocity of flow in canal
= Q / A
= 163.032 / 181.459
= 0.898 m/s
V = 1.414 X v
= 1.414 x 0.898
= 1.270 m/s
p = 52 x 0.660 x 1.270²
= 55.391 kg/sqm
Pressure due to water currents at FSL = 55.391 kg/sqm
Pressure due to water currents at CBL = 0.00 kg/sqm

Area of pier profile immersed in water = 0.785 x 4.150


= 3.259 m²

Total Pressure due to water currents = (55.391 + + 0.00 )/2x 1/1000 x 3.259
= 0.090 t

Water pressure is acting at 2h/3 from CBL = 2/3 x 4.150


= 2.767 m
Depth of pier from CBL to the foundation top = 1.855 m

Moment at + 63.000 = 0.090 ( 2.767 + 1.855 )


= 0.417 t-m
Moment at + 62.500 = 0.090 ( 2.767 + 1.9 + 0.5 )
= 0.462 t-m

51
Subject : DESIGN OF CANAL PIER
Chainage : Km : 5.085

(b) In road way direction:


(As per clause 210.4 (b) of IRC:6-2014) Force due to water currents in the direction of road way is given by:

p = 52 k V²
V = 1.414 v cosƟ
v = Velocity of flow in canal
= Q / A
= 163.032 / 181.459
= 0.898 m/s
Assume that the water is striking the pier at an angle of Ɵ= 20o
V = 1.414 x v x cos20o
= 1.414 x 0.898 x 0.940
= 1.194 m/s

p = 52 x 0.660 x 1.194²
= 48.911 kg/sqm

Pressure due to water currents at FSL = 48.911 kg/sqm


Pressure due to water currents at CBL = 0.000 kg/sqm

Area of pier profile immersed in water = 9.300 x 4.150


= 38.595 m²
Total Pressure due to water currents = (48.911 + 0.0 )/2x 1/1000 x 38.595
= 0.944 t

Water pressure is acting at 2h/3 from CBL = 2/3 x 4.150


= 2.767 m
Depth of pier from CBL to the foundation top = 1.855 m

Moment at + 63.000 = 0.944 ( 2.767 + 1.9 )


= 4.362 t-m
Moment at + 62.500 = 0.944 ( 2.767 + 1.9 + 0.5 )
= 4.834 t-m

Total moments in road way direction:


Canal Full Condition
A) at + 63.000 ( on concrete)
water currents = 4.362 = 4.362 t-m
B) at + 62.500 ( on soil)
water currents = 4.834 = 4.834 t-m
Total moments in canal flow direction:
Canal Full Condition
A) at + 63.000 ( on concrete)
wind force + water currents = 54.948 + 0.417 = 55.366 t-m

52
Subject : DESIGN OF CANAL PIER
Chainage : Km : 5.085

B) at + 62.500 ( on soil)
wind force + water currents = 56.394 + 0.462 = 56.857 t-m

Canal empty condition


A) at + 63.000 ( on concrete)
wind force = + 54.948 = 54.948 t-m

B) at + 62.500 ( on soil)
wind force = + 56.394 = 56.394 t-m

Self weight of pier:

Wt of bed block = 1.00 x 0.30 x 8.30 x 2.5 = 6.225 t

Weight of CC pier from + 81.130 to + 63.00


= ( 1.000 + x 18.13 x 8.300 x 2.500 = 376.198 t
Cut & ease waters between + 81.130 & + 63.000
' 2

= p/4( 1.000 + x 18.13 x 2.50 = 17.799 t

Weight of displaced water due to pier (with 100% buoyancy)


= ( 2.617 + 1.000 ) / 2 x 6.51 x 8.30 x 1.00 = 97.635 t

Weight of displaced water due to cut and ease water(with 100% buoyancy)
' 2

= p/4( 2.617 x 6.51 x 1.00 = 17.491 t

Canal full condition


Self weight of pier(with 100% bouyancy)
= 376.20 + 17.799 + 6.225 -(97.63 + 17.491 ) = 285.096 t
Canal empty condition
Self weight of pier = 376.198 + 17.799 + 6.225 = 400.222 t

Total direct loads at + 63.000


Canal full condition = 285.096 + 298.959 = 584.055 t

Canal empty condition = 400.222 + 298.959 = 699.180 t


Weight of foundation = 2.000 x 10.300 x 0.500 x 2.5 = 25.750 t

Weight of foundation (considering 100% buoyancy)


= 25.750 x 2.5 x 1.4 = 14.420 t
Total direct loads at + 62.500
Canal full condition = 584.055 + 14.420 = 598.475 t
Canal empty condition = 699.180 + 25.750 = 724.930 t

53
Subject : DESIGN OF CANAL PIER
Chainage : Km : 5.085

Sectional properties:

At the base of the pier i.e. at + 63.000


Area (a) = 8.300 x 1.000 + p/4 x ( 1.000 ²) = 9.085 Sqm
Equivalent length of pier
= 8.300 + p/4 x ( 1.000 ²) / 1.00 ) = 9.0854 m

Section modulus:
Zxx = 9.085 x 1.000 2
/ 6 = 1.514 m3
Zyy = 1.000 x 9.085 2
/ 6 = 13.757 m3
At the base of the foundation i.e. at + 62.500
Area (a) = 2.000 x 10.300 = 20.600 Sqm

Section modulus:
Zxx = 10.300 x 2.000 2
/ 6 = 6.867 m3
Zyy = 2.000 x 10.300 2
/ 6 = 35.363 m3

CANAL FULL CONDITION

STRESSES IN FOUNDATION CONCRETE ie AT + 63.000 :


CASE (I) = 584.055 + 4.362 + 55.366
9.085 1.514 13.757
= 64.285 + 2.881 + 4.024

= 71.190 t/sqm (Max) Compressive stress


= 57.380 t/sqm (Min) Compressive stress

STRESSES ON SOIL ie AT + 62.500 :


CASE (I) = 598.475 + 4.834 + 56.857
20.600 6.867 35.363
= 29.052 + 0.704 + 1.608

= 31.364 t/sqm (Max) Compressive stress


= 26.740 t/sqm (Min) Compressive stress

ABSTRACT OF STRESSES
Max. Min.
Details Stress Stress Type Of Stress
t/sq.m. t/sq.m.

Stress in Concrete: 71.190 57.380 Compressive stress

Stress on Soil: 31.364 26.740 compressive stress

54
Subject : DESIGN OF CANAL PIER
Chainage : Km : 5.085

CANAL EMPTY CONDITION

STRESSES IN FOUNDATION CONCRETE ie AT + 63.000 :

CASE (I) 699.180 56.394


= ------------ + ---------
9.085 13.757

= 76.956 + 4.099

= 85.155 t/sqm (Max) Compressive stress


= 68.758 t/sqm (Min) Compressive stress

STRESSES ON SOIL ie AT 62.500 :

CASE (I) 724.930 56.394


= ------------ + ---------
20.600 35.363

= 35.191 + 1.595

= 36.785 t/sqm (Max) Compressive stress


= 33.596 t/sqm (Min) Compressive stress

ABSTRACT OF STRESSES

Max. Min.
Details Stress Stress Type Of Stress
t/sq.m. t/sq.m.

Stress in Concrete: 85.155 57.380 Compressive stress

Stress on Soil: 36.785 26.740 compressive stress

55
Subject : DESIGN OF DECK SLAB (5M CLEAR SPAN)
Chainage : Km : 5.085

The Single lane road bridge is to be designed for IRC Class 'A' Loading (Clause 204.1.3 , IRC 6-2014)
Clear Span = 3.300 m
Clear width of Carriage way = 4.250 m
Width of Kerbs = 0.225 m
Width of Parapet = 0.200 m
Overall width of deck slab = 5.100 m
Width of Bearing = 490 mm
Mix Proposed = M 25
Allowable stresses : MR = Qbd2
C = 85 Kg/cm2
m = 10.98
n = 0.318
Q = 12.088
t = 2000 Kg/cm2
j = 0.894

Dead Loads
Assume the thickness of deck slab = 600 mm
Clear cover = 40 mm
Thickness of wearing coat = 75 mm
Main reinforcement = 20 mm dia Hysd bars
Effective depth = 600 - 40.00 - 20
2
= 550 mm

Effective Span (L)


(I) C/C of Supports = 3.300 + 0.49
= 3.79 m
(ii) Clear span + Effective depth = 3.300 + 0.55
= 3.850 m
Adopt effective span as least of above two = 3.790 m

Carriage way = 4.250 m


Width of Deck slab = 5.100 m
Impact factor = 4.500
( As per Cl 211.1 of IRC 6 -2014) 6.000 + L
= 4.500
Impact factor 6.000 + 3.790
= 0.460

BENDING MOMENT DUE TO DEAD LOAD


Weight of slab + Wearing coat = 0.600 + 0.075 x 2.5
= 1.688 t
Bending Moment due to Dead load = w l2
8

102
Subject : DESIGN OF DECK SLAB (5M CLEAR SPAN)
Chainage : Km : 5.085

Bending Moment due to Dead load = 1.688 x ( 3.79 ) 2

8
= 3.03 t-m
or 302993 kgcm

BENDING MOMENT DUE TO LIVE LOAD


Live load B.M as per I.R.C.21-2000 : clause 305.16.2 of section III
Effective dispersion width (bef) =  a ( 1 - a/lo) + b1
Where
bef = The effective width of slab on which the load acts

 = A Constant having the following values depending upon the ratio of b/lo
a = The distance of the centre of gravity of the concentrated load
from the nearer support
l0 = The effective span
b1 = The breadth of concentration area of the load . I.e., The dimension of the
tyre or track contact area over the road surface of the slab in a direction
at right angles to the span plus twice the thickness of wearing coat or
surface finish above the structural slab
b/lo = width of slab
effective span
5.100 = 1.346
3.790
1.300 ---- 2.720
1.400 ---- 2.800  for 1.346 = 2.720 + 0.037
0.100 ---- 0.080  = 2.757

For maximum B.M the wheel loads 11.4 t should be kept such that the resultant of the
loads and one of the loads are equidistant from the centre of the span.
The position of loads are as shown in the sketch

C/L Mid Span


0.0 11.4 11.4
1.20
0.300 0.995
1.595 0.900
A D E Resultant of Loads F B
1.895 1.895
3.790

Centre of Gravity of Loads "D" = ( 11.400 x 1.20 ) 11.40x 0.00)


11.40 + 11.40
= 13.68
22.800
= 0.600 m

103
Subject : DESIGN OF DECK SLAB (5M CLEAR SPAN)
Chainage : Km : 5.085

C.G of loads = 0.600 m


The distance between C.G of loads = 0.600 - 1.20
and 11.4 T load = 0.600 m
The distance between centre of span = 0.600 /2
and 11.4 T load = 0.300 m

DISPERSION UNDER 'D' (11.4 t)

bef = α a (1 - a/lo) + b1
α = 2.757
a = 1.595
lo = 3.790 m
b1 = 500 + 2 x 75
= 650 mm or 0.65 m

bef = 2.757 x 1.595 ( 1 - 1.595 / 3.79 ) + 0.65


= 3.197 m > 1.800 m
Hence ,Dispersion width over laps

= 0.225 + 0.15 + 0.25 + 1.8 + 3.197


2
= 2.425 + 1.599
= 4.024 m

Intensity of load = 11.4 x 1.46


4.024
= 4.136 t

DESPERSION UNDER ' E ' (11.4 t)


bef =  a ( 1 - a/lo) + b1
 = 2.757
a = 0.995
lo = 3.790 m
b1 = 500 +2x 75.0
= 0.650 m
bef = ( 2.757 x 0.995) 1- 0.995 + 0.65
3.790
= 2.743 x (1- 0.263) + 0.65
Effective dispersion width ( bef ) = 2.673 > 1.800 m
Hence ,The Dispersion width overlaps

Therefore combined width of dispersion = 0.225 + 0.150 + 0.25 + 1.800 + 2.673


2
= 2.425 + 1.337
= 3.762 m

104
Subject : DESIGN OF DECK SLAB (5M CLEAR SPAN)
Chainage : Km : 5.085

Intensity of load = 11.4 x 1.460


2.0 x 3.762
= 4.425 t

For the maximum bending moment the position of load system is as shown below:

0.000 4.136 4.425


1.2
0.000 1.595 0.300 0.900 0.995
A D E B
1.895 1.895
3.790

Taking moments about B


RA x 3.790 = ( 4.425 x 0.995 ) +( 4.136 x 2.195 ) +( 0.000 x 3.790 )
RA = 4.40 + 9.08 + 0.00
3.790

RA = 3.557 t
RB = 5.004 t

Maximum live load bending moment Under load "D" = ( 3.557 x 1.595 ) ( 0.000 x 1.595 )
= 5.673 tm
= 567349.011 Kg-cm

Maximum live load bending moment Under load "E" = ( 5.004 x 0.995 )
= 4.979 tm
= 497874.661 Kg-cm

Total B.M = Live Load BM + Dead Load BM


= 567349 + 302993
= 870342 Kgcm

Effective depth required = sqrt 870342


100.0 x 12.088
= 26.83 < 55.0 cm
HENCE OK

MAIN REINFORCEMENT
Area of Steel (Ast) = MR
tjd
= 870342
2000.0 x 0.9 x 55.000
(Ast) required = 8.85 cm2
Provide 20 mm dia bars @ 10.0 cm c/c which gives an area of

105
Subject : DESIGN OF DECK SLAB (5M CLEAR SPAN)
Chainage : Km : 5.085

(Ast) Provided = 31.42 cm2 HENCE OK


∑O = 62.83 cm

Every third bar is bent upwards, ie., ½ bars are carried on support

Ast on support at bottom = 1/2 * Ast = 15.708 cm2


∑O = 31.42 cm

Ast on support at top = ½ * Ast = 15.708 cm2


∑O = 31.42 cm

DISTRIBUTION STEEL
As per clause 305.18.1 of IRC 21 : 2000 section III

BM Considered for distribution steel = 0.300 x LLBM + 0.2 x DLBM


= ( 0.3 x 567349 ) + ( 0.2 x 302993 )
= 230803.25 Kgcm

Area of steel = 230803


2000.0 x 0.9 x 55.000
= 2.347 2
cm

Minimum area of steel required = 0.12 x 100 x 60.00


100
= 7.200 cm2
Provide Minimum area of steel = 7.200 cm2

Provide 12 mm dia bars @ 15.0 cm c/c which gives an area of


(Ast) Provided = 7.54 cm2 HENCE OK

CHECK FOR SHEAR


Maximum shear due to dead load = WL
2
= 1687.5 x 3.3
2
Maximum shear due to dead load = 2784.4 Kgs

Maximum shear due to live load as per clause 305.12.2 of I.R.C 21 -2000 Section III
Longitudinal dispersion = 0.250 + ( 2.0 x ( 0.60+ 0.075))
= 1.600

Therefore load of 11.4 tons may be kept @ 1.600 / 2


= 0.800 from support for maximum shear

106
Subject : DESIGN OF DECK SLAB (5M CLEAR SPAN)
Chainage : Km : 5.085

11.4 t 11.4 t 0.0 t

0.800 1.200 1.790 0.000


A D E B
3.790

DISPERSION UNDER ' C ' (11.4 t)


bef =  a ( 1 - a/lo) + b1
 = 2.757
a = 0.800
lo = 3.790 m
b1 = 500 +2x 75.0
= 0.65 m
bef = ( 2.757 x 0.80 ) 1- 0.800 + 0.65
3.790
Effective dispersion width ( bef ) = 2.390 > 1.8 m
Hence ,The Dispersion width overlaps

Therefore combined width of dispersion = 0.225 + 0.150 + 0.25 + 1.80 + 2.390


2
= 2.425 + 1.195
= 3.620 m

Intensity of load = 11.400 x 1.460


3.620
= 4.598 t

DISPERSION UNDER ' D ' (11.4 t)


bef =  a ( 1 - a/lo) + b1
 = 2.757
a = 2.000
lo = 3.790 m
b1 = 500 +2x 75.0
= 0.65 m
bef = ( 2.757 x 2.0 ) 1- 2.000 + 0.65
3.790
= 3.254 m > 1.800 m
Hence ,The Dispersion width overlaps

Therefore combined width of dispersion = 0.225 + 0.150 + 0.25 + 1.80 + 3.254


2
= 2.425 + 1.627
= 4.052 m

107
Subject : DESIGN OF DECK SLAB (5M CLEAR SPAN)
Chainage : Km : 5.085

Intensity of load = 11.400 x 1.460


4.052
= 4.107 t

4.598 t 4.107 t

0.800 1.200 1.790


A D E B
3.790

Taking moments about B


RA x 3.790 = ( 4.598 x 2.990 ) +( 4.107 x 1.790 ) +( 0.000 x 0.000 )
RA = 13.75 + 7.35 + 0.00
3.790
RA = 5.567 t
RB = 3.138 t

Total Shear = Shear due to Dead Load + Live Load


= 2784.4 + 5567
= 8351.6 Kgs

Shear stress = 8351.6


100 x 55.000
= 1.518 2
Kg/cm

The permissible shear stress in concrete without shear reinforcement from table '12B' of 1RC-21-2000

100 As = 100 x 15.708


bd 100 x 55.000
= 0.286 %

0.250 ---- 0.230


0.500 ---- 0.310 0.286 ?

= 0.230+ 0.080 x 0.036


0.250
= 0.2414 N/mm2
or 2.414 Kg/cm2 > 1.518 Kg/cm2
HENCE OK

108
Subject : DESIGN OF DECK SLAB (5M CLEAR SPAN)
Chainage : Km : 5.085

CHECK FOR BOND

Max shear = 8351.6 Kgs

Bond stress = 8351.6


0.894 x 55.000 x 31.416
= 5.407 Kg/m2 < 18.200 Kg/m2
HENCE OK

109
Subject : DESIGN OF DECK SLAB (8M CLEAR SPAN)
Chainage : Km : 5.085

The Single lane road bridge is to be designed for IRC Class 'A' Loading (Clause 204.1.3 , IRC 6-2014)
Clear Span = 3.300 m
Clear width of Carriage way = 4.250 m
Width of Kerbs = 0.225 m
Width of Parapet = 0.200 m
Overall width of deck slab = 5.100 m
Width of Bearing = 490 mm
Mix Proposed = M 25
Allowable stresses : MR = Qbd2
C = 85 Kg/cm2
m = 10.98
n = 0.318
Q = 12.088
t = 2000 Kg/cm2
j = 0.89

Dead Loads
Assume the thickness of deck slab = 520 mm
Clear cover = 40 mm
Thickness of wearing coat = 75 mm
Main reinforcement = 20 mm dia Hysd bars
Effective depth = 520 - 40.00 - 20
2
= 470 mm
Effective Span (L)
(I) C/C of Supports = 3.300 + 0.49
= 3.79 m
(ii) Clear span + Effective depth = 3.300 + 0.47
= 3.770 m
Adopt effective span as least of above two = 3.770 m

Carriage way = 4.250 m


Width of Deck slab = 5.100 m
Impact factor = 4.500
( As per Cl 211.1 of IRC 6 -2014) 6.000 + L
= 4.500
Impact factor 6.000 + 3.770
= 0.461

BENDING MOMENT DUE TO DEAD LOAD


Subject : DESIGN OF DECK SLAB (8M CLEAR SPAN)
Chainage : Km : 5.085

Weight of slab + Wearing coat = 0.520 + 0.075 x 2.5


= 1.488 t

Bending Moment due to Dead load = w l2


8
Bending Moment due to Dead load = 1.488 x 3.77 2
8
= 2.64 t-m
or 264271 kgcm

BENDING MOMENT DUE TO LIVE LOAD

Live load B.M as per I.R.C.21-2000 : clause 305.16.2 of section III


Effective dispersion width (bef) =  a ( 1 - a/lo) + b1

Where
bef = The effective width of slab on which the load acts
 = A Constant having the following values depending upon the ratio of b/lo

a = The distance of the centre of gravity of the concentrated load


from the nearer support
l0 = The effective span
b1 = The breadth of concentration area of the load . I.e., The dimension of the
tyre or track contact area over the road surface of the slab in a direction
at right angles to the span plus twice the thickness of wearing coat or
surface finish above the structural slab

 = b/lo = width of slab


effective span
 = 5.100
3.770
= 1.353

1.300 ---- 2.720


1.400 ---- 2.800 a for 1.353 = 2.720 + 0.042
0.100 ---- 0.080  = 2.762

For maximum B.M the wheel loads 11.4 t should be kept such that the resultant of the
loads and one of the loads are equidistant from the centre of the span.
The position of loads are as shown in the sketch
C/L Mid Span
2.7 11.4 11.4
Subject : DESIGN OF DECK SLAB (8M CLEAR SPAN)
Chainage : Km : 5.085

-1.414 3.20 1.20 0.784


0.099
1.101
A C D E Resultant of Loads B
1.885 1.885
3.770

Centre of Gravity of Loads "C" = ( 11.400 x 3.20 ) ( 11.40 x 4.40 ) 0.000 x 5.18 )
2.700 + 11.40 + 11.40 + 0.00
= 86.64
25.500
= 3.398 m

C.G of loads = 3.398 m


The distance between C.G of loads = 3.398 - 3.20
and 11.4 T load = 0.198 m
The distance between centre of = 0.198 /2
span and 11.4 T load = 0.099 m

DISPERSION UNDER ' C ' (2.7 t)


bef =  a ( 1 - a/lo) + b1

 = 2.762
a = -1.414
lo = 3.770 m
b1 = 200.0 +2x 75.0
= 0.350 m

bef = ( 2.762 -x 1.4 ) 1- -1.414 + 0.35


3.770
= -3.906 x (1- -0.375) + 0.35

Effective dispersion width ( bef ) = -5.021 < 1.800 m


Hence ,The Dispersion width does not overlap

Combined width of dispersion = (thickness of kerb + distance between kerb and wheel+ half of contact
width+axle length)+( half of dispersion width of second wheel)
Subject : DESIGN OF DECK SLAB (8M CLEAR SPAN)
Chainage : Km : 5.085

200
1800
b b
225 150
75
520

Therefore combined width of disperssion = 0.225 + 0.150 + 0.100 + 1.800


2
= 0.475 + 0.900
= 1.375 m

Intensity of load = 2.7 x 1.461


2.0 x 1.375
= 1.434 t

DISPERSION UNDER ' D ' (11.4 t)


bef =  a ( 1 - a/lo) + b1

 = 2.762
a = 1.786
lo = 3.770 m
b1 = 500 +2x 75.0
= 0.650 m
bef = ( 2.762 x 1.8 ) 1- 1.786 + 0.65
3.770
= 4.933 x (1- 0.474) + 0.65

Effective dispersion width ( bef ) = 3.246 m > 1.800 m


Hence ,The Dispersion width overlaps

Therefore combined width of dispersion = 0.225 + 0.150 + 0.25 + 1.800 + 3.246


2
= 2.425 + 1.623
= 4.048 m

Intensity of load = 11.4 x 1.461


4.048
= 4.113 t
Subject : DESIGN OF DECK SLAB (8M CLEAR SPAN)
Chainage : Km : 5.085

DISPERSION UNDER ' E ' (11.4 t)


bef =  a ( 1 - a/lo) + b1

 = 2.762
a = 2.986
lo = 3.770 m
b1 = 500 +2x 75.0
= 0.650 m
bef = ( 2.762 x 3.0 ) 1- 2.986 + 0.65
3.770
= 8.248 x (1- 0.792) + 0.65

Effective dispersion width ( bef ) = 2.365 > 1.800 m


Hence ,The Dispersion width overlaps

Therefore combined width of dispersion = 0.225 + 0.150 + 0.25 + 1.800 + 2.365


2
= 2.425 + 1.183
= 3.608 m
Intensity of load = 11.4 x 1.461
1.0 x 3.608
= 4.615 t

For the maximum bending moment the position of load system is as shown below:

1.434 4.113 4.615


1.2
-1.414 3.200 0.099 1.101 0.784
A C D E B
1.885 1.885
3.770

Taking moments about B


RA x 3.77 = ( 4.615 x 0.8 ) + ( 4.113 x 2.0 ) +( 1.434 x 5.2 ) +( 3.390 x 0.0 )

RA = 3.62 + 8.16 + 7.43


3.770
RA = 5.096 t
RB = 5.067 t

Maximum live load bending moment Under load "D" = ( 5.096 x 1.786 ) - ( 1.434 x 3.200 )
Subject : DESIGN OF DECK SLAB (8M CLEAR SPAN)
Chainage : Km : 5.085

= 4.512 tm
= 451228.807 Kg-cm
Maximum live load bending moment Under load "E" = ( 5.067 x 0.784 ) ( 3.390 x 0.784 )
= 3.972 tm
= 397151.083 Kg-cm

Total B.M = Live Load BM + Dead Load BM


= 451229 + 264271
= 715500 Kgcm

Effective depth required = sqrt 715500


100.0 x 12.088
= 24.33 < 47.0 cm
HENCE OK

MAIN REINFORCEMENT
Area of Steel (Ast) = MR
tjd
= 715500
2000.0 x 0.9 x 47.000
(Ast) required = 8.51 cm2

Provide 20 mm dia bars @ 12.0 cm c/c which gives an area of


(Ast) Provided = 26.18 cm2 HENCE OK
∑O = 52.36 cm

Every Alternate bar is bent upwards, ie., ½ bars are carried on support
Ast on support at bottom = ½ * Ast = 13.090 cm2
∑O = 26.18 cm
Ast on support at top = ½ * Ast = 13.090 cm2
∑O = 26.18 cm

DISTRIBUTION STEEL
As per clause 305.18.1 of IRC 21 : 2000 section III
BM Considered for distribution steel = 0.300 x LLBM + 0.2 x DLBM
= ( 0.3 x 451229 )+ ( 0.2 x 264271 )
= 188222.864 Kgcm

Area of steel = 188223


2000.0 x 0.9 x 47.000
Subject : DESIGN OF DECK SLAB (8M CLEAR SPAN)
Chainage : Km : 5.085

= 2.240 cm2

Minimum area of steel required = 0.12 x 100 x 52.00


100
= 6.240 cm2
Provide Minimum area of steel = 6.240 cm2

Provide 12 mm dia bars @ 15.0 cm c/c which gives an area of


(Ast) Provided = 7.54 cm2 HENCE OK

CHECK FOR SHEAR

Maximum shear due to dead load = WL


2
= 1487.5 x3
2
Maximum shear due to dead load = 2454.4 Kgs

Maximum shear due to live load as per clause 305.12.2 of I.R.C 21 -2000 Section III
Longitudinal dispersion = 0.250 + ( 2.0 x ( 0.52+ 0.075))
= 1.440

Therefore load of 11.4 tons may be kept @ 1.440 / 2


= 0.720 from support for maximum shear

11.4 t 11.4 t 6.8 t 6.8 t


0.720 1.200 4.30 -2.450
A C D E
3.770

DISPERSION UNDER ' C ' (11.4 t)

bef =  a ( 1 - a/lo) + b1

 = 2.762
a = 0.720
lo = 3.770 m
b1 = 500 +2x 75.0
= 0.65 m
bef = ( 2.762 x 0.7 ) 1- 0.720 + 0.65
3.770
Subject : DESIGN OF DECK SLAB (8M CLEAR SPAN)
Chainage : Km : 5.085

Effective dispersion width ( bef ) = 2.259 > 1.8 m


Hence ,The Dispersion width overlaps

Therefore combined width of dispersion = 0.225 + 0.150 + 0.25 + 1.80 + 2.259


2
= 2.425 + 1.129
= 3.554 m
Intensity of load = 11.400 x 1.461
3.554
= 4.684 t

DISPERSION UNDER ' D ' (11.4 t)


bef =  a ( 1 - a/lo) + b1

 = 2.762
a = 1.920
lo = 3.770 m
b1 = 500 +2x 75.0
= 0.65 m
bef = ( 2.762 x 1.9 ) 1- 1.920 + 0.65
3.770
= 3.253 m > 1.800 m
Hence ,The Dispersion width overlaps

Therefore combined width of dispersion = 0.225 + 0.150 + 0.25 + 1.80 + 3.253


2
= 2.425 + 1.626
= 4.051 m
Intensity of load = 11.400 x 1.461
4.051
= 4.110 t
DISPERSION UNDER ' E ' (6.8 t)

b1 = 0.380 + 2.000 x 0.075


= 0.530 m
 = 2.762
a = -2.450
lo = 3.770 m
b1 = 380 +2x 75.0
= 0.53 m
Subject : DESIGN OF DECK SLAB (8M CLEAR SPAN)
Chainage : Km : 5.085

bef = ( 2.762 -x 2.5 ) 1- -2.450 + 0.53


3.770
bef = -10.635 < 1.800 m
Hence ,The Disperssion width does not overlap

Therefore dispersion width of the wheel near to the kerbs


Width of disperssion = (thickness of kerb+distance between kerb and wheel+ half of contact width + (half of
dispersion width of first wheel)

Therefore combined width of dispersion = 0.225 + 0.150 + 0.38 + 1.800 -+ 10.635


2 2
= 2.365 -+ 5.318
= -2.953 m

Intensity of load = 6.800 x 1.461


-2.953
= -3.364 t

4.684 t 4.110 t -3.364 t

0.720 1.200 4.30 -2.450


A C D E B
3.770

Taking moments about B

RA x 3.77 = ( 4.684 x 3.1 ) + ( 4.110 x 1.9 ) - + ( 3.364 -x 2.5 )

RA = 14.29 + 7.60 + 8.24


3.770
RA = 7.993 t
RB = -2.562 t

Total Shear = Shear due to Dead Load + Live Load


= 2454.4 + 7993
= 10447.0 Kgs

Shear stress = 10447.0


100 x 47.000
= 2.223 Kg/cm2
Subject : DESIGN OF DECK SLAB (8M CLEAR SPAN)
Chainage : Km : 5.085

The permissible shear stress in concrete without shear reinforcement from table '12B' of 1RC-21-2000
100 As = 100 x 13.090
bd 100 x 47.000
= 0.279 %

0.250 ---- 0.230


0.500 ---- 0.310 0.279 ?
0.250 ---- 0.080

= 0.230+ 0.080 x 0.029


0.250
2
= 0.239 N/mm
or 2.391 Kg/cm2 > 2.223 Kg/cm2
HENCE OK

CHECK FOR BOND

Max shear = 10447.0 Kgs


Bond stress = 10447.0
0.894 x 47.000 x 26.180
= 9.498 Kg/m2 < 18.200 Kg/m2
HENCE OK
Subject : DESIGN OF DECK SLAB (8M CLEAR SPAN)
Chainage : Km : 5.085

The Single lane road bridge is to be designed for IRC Class 'A' Loading (Clause 204.1.3 , IRC 6-2014)
Clear Span = 7.60 m
Clear width of Carriage way = 4.250 m
Width of Kerbs = 0.225 m
Width of Parapet = 0.200 m
Overall width of deck slab = 5.100 m
Width of Bearing = 490 mm
Mix Proposed = M 25
Allowable stresses : MR = Qbd2
C = 85 Kg/cm2
m = 10.98
n = 0.318
Q = 12.088
t = 2000 Kg/cm2
j = 0.89

Dead Loads
Assume the thickness of deck slab = 750 mm ###
Clear cover = 40 mm
Thickness of wearing coat = 75 mm
Main reinforcement = 25 mm dia Hysd bars
Effective depth = 750 - 40.00 - 25
2
= 698 mm
Effective Span (L)
(I) C/C of Supports = 7.600 + 0.49
= 8.09 m
(ii) Clear span + Effective depth = 7.600 + 0.70
= 8.298 m
Adopt effective span as least of above two = 8.090 m

Carriage way = 4.250 m


Width of Deck slab = 5.100 m
Impact factor = 4.500
( As per Cl 211.1 of IRC 6 -2014) 6.000 + L
= 4.500
Impact factor 6.000 + 8.090
= 0.319

BENDING MOMENT DUE TO DEAD LOAD


Subject : DESIGN OF DECK SLAB (8M CLEAR SPAN)
Chainage : Km : 5.085

Weight of slab + Wearing coat = 0.750 + 0.075 x 2.5


= 2.063 t

Bending Moment due to Dead load = w l2


8
Bending Moment due to Dead load = 2.063 x 8.09 2
8
= 16.87 t-m
or 1687334 kgcm

BENDING MOMENT DUE TO LIVE LOAD

Live load B.M as per I.R.C.21-2000 : clause 305.16.2 of section III


Effective dispersion width (bef) =  a ( 1 - a/lo) + b1

Where
bef = The effective width of slab on which the load acts
 = A Constant having the following values depending upon the ratio of b/lo

a = The distance of the centre of gravity of the concentrated load


from the nearer support
l0 = The effective span
b1 = The breadth of concentration area of the load . I.e., The dimension of the
tyre or track contact area over the road surface of the slab in a direction
at right angles to the span plus twice the thickness of wearing coat or B/L0
surface finish above the structural slab ###
###
 = b/lo = width of slab ###
effective span ###
 = 5.100 ###
8.090 ###
= 0.630 ###
###
0.600 ---- 1.960 ###
0.700 ---- 2.120 a for 0.630 = 1.960 + 0.049 ###
0.100 ---- 0.160  = 2.009 ###
###
For maximum B.M the wheel loads 11.4 t should be kept such that the resultant of the ###
loads and one of the loads are equidistant from the centre of the span. ###
The position of loads are as shown in the sketch ###
C/L Mid Span ###
2.7 11.4 11.4 6.800 ###
Subject : DESIGN OF DECK SLAB (8M CLEAR SPAN)
Chainage : Km : 5.085

-0.298 3.20 1.20 4.300 -0.312 ###


1.143 ###
0.057 ###
A C D E Resultant of Loads B
4.045 4.045
8.090

Centre of Gravity of Loads "C" = ( 11.400 x3.20) +( 11.40x x4.40 ) + ( 6.800 x 8.70 )
2.700 + 11.40 + 11.40 + 6.80
= 145.80
32.300
= 4.514 m

C.G of loads = 4.514 m


The distance between C.G of loads = 4.514 - 4.40
and 11.4 T load = 0.114 m
The distance between centre of = 0.114 /2
span and 11.4 T load = 0.057 m

DISPERSION UNDER ' C ' (2.7 t)


bef =  a ( 1 - a/lo) + b1

 = 2.009
a = -0.298
lo = 8.090 m
b1 = 200.0 +2x 75.0
= 0.350 m

bef = ( 2.009 -x 0.3 ) 1- -0.298 + 0.35


8.090
= -0.599 x (1- -0.037) + 0.35

Effective dispersion width ( bef ) = -0.271 < 1.800 m


Hence ,The Dispersion width does not overlap

Combined width of dispersion = (thickness of kerb + distance between kerb and wheel+ half of contact
width+axle length)+( half of dispersion width of second wheel)
Subject : DESIGN OF DECK SLAB (8M CLEAR SPAN)
Chainage : Km : 5.085

200
1800
b b
225 150
75
750

Therefore combined width of disperssion = 0.225 + 0.150 + 0.100 + 1.800 ###


2 ###
= 0.475 + 0.900
= 1.375 m

Intensity of load = 2.7 x 1.319


2.0 x 1.375
= 1.295 t

DISPERSION UNDER ' D ' (11.4 t)


bef =  a ( 1 - a/lo) + b1

 = 2.009
a = 2.902
lo = 8.090 m
b1 = 500 +2x 75.0
= 0.650 m
bef = ( 2.009 x 2.9 ) 1- 2.902 + 0.65
8.090
= 5.829 x (1- 0.359) + 0.65

Effective dispersion width ( bef ) = 4.388 m > 1.800 m


Hence ,The Dispersion width overlaps

Therefore combined width of dispersion = 0.225 + 0.150 + 0.25 + 1.800 + 4.388


2
= 2.425 + 2.194
= 4.619 m

Intensity of load = 11.4 x 1.319


4.619
= 3.256 t
Subject : DESIGN OF DECK SLAB (8M CLEAR SPAN)
Chainage : Km : 5.085

DISPERSION UNDER ' E ' (11.4 t)


bef =  a ( 1 - a/lo) + b1

 = 2.009
a = 4.102
lo = 8.090 m
b1 = 500 +2x 75.0
= 0.650 m
bef = ( 2.009 x 4.1 ) 1- 4.102 + 0.65
8.090
= 8.239 x (1- 0.507) + 0.65

Effective dispersion width ( bef ) = 4.712 > 1.800 m


Hence ,The Dispersion width overlaps

Therefore combined width of dispersion = 0.225 + 0.150 + 0.25 + 1.800 + 4.712


2
= 2.425 + 2.356
= 4.781 m
Intensity of load = 11.4 x 1.319
4.781
= 3.146 t

DESPERSION UNDER ' F ' (6.8 t)

bef =  a ( 1 - a/lo) + b1

 = 2.009
a = -0.312
lo = 8.090 m
b1 = 380 +2x 75
= 530 m

bef = ( 2.009 -x 0.3 ) 1- -0.312 + 0.53


8.090
= -0.627 x (1- -0.039) + 0.53
Effective dispersion width ( bef ) = -0.121 < 1.800 m
Hence ,The Dispersion width does not over laps
Subject : DESIGN OF DECK SLAB (8M CLEAR SPAN)
Chainage : Km : 5.085

Therefore combined width of dispersion = 0.225 + 0.150 + 0.190 + 1.800


2
= 0.565 + 0.900
= 1.465 m
Intensity of load = 6.8 x 1.319
2.0 x 1.465
= 3.062 t

For the maximum bending moment the position of load system is as shown below:

1.295 3.256 3.146 3.062


1.2
-0.298 3.200 1.143 0.057 4.300 -0.312
A C D E B
4.045 4.045
8.090

Taking moments about B


RA x 8.09 = ( 3.146 x 4.3 ) +( 3.256 x 5.2 ) +( 1.295 x 8.4 ) +( 3.062 -x 0.3 )

RA = 13.53 + 16.89 + 10.87 -+ 0.96


8.090
RA = 4.985 t
RB = 5.774 t

Maximum live load bending moment Under load "D" = ( 4.985 x 2.902 ) - ( 1.295 x 3.200 )
= 10.323 tm
= 1032250.72 Kg-cm
Maximum live load bending moment Under load "E" = ( 5.774 x 3.988 ) - ( 3.062 x 4.300 )
= 9.861 tm
= 986141.823 Kg-cm

Total B.M = Live Load BM + Dead Load BM


= 1032251 + 1687334
= 2719585 Kgcm
Subject : DESIGN OF DECK SLAB (8M CLEAR SPAN)
Chainage : Km : 5.085

Effective depth required = sqrt 2719585


100.0 x 12.088
= 47.43 < 69.8 cm
HENCE OK

MAIN REINFORCEMENT
Area of Steel (Ast) = MR
tjd
= 2719585
2000.0 x 0.9 x 69.750
2
(Ast) required = 21.81 cm

Provide 25 mm dia bars @ 10.0 cm c/c which gives an area of


(Ast) Provided = 49.09 cm2 HENCE OK
∑O = 78.54 cm

Every Alternate bar is bent upwards, ie., ½ bars are carried on support
Ast on support at bottom = ½ * Ast = 24.544 cm2
∑O = 39.27 cm
Ast on support at top = ½ * Ast = 24.544 cm2
∑O = 39.27 cm

DISTRIBUTION STEEL
As per clause 305.18.1 of IRC 21 : 2000 section III
BM Considered for distribution steel = 0.300 x LLBM + 0.2 x DLBM
= ( 0.3 x 1032251 )+ ( 0.2 x 1687334 )
= 647141.983 Kgcm

Area of steel = 647142


2000.0 x 0.9 x 69.750
2
= 5.189 cm

Minimum area of steel required = 0.12 x 100 x 75.00


100
= 9.000 cm2
Provide Minimum area of steel = 9.000 cm2

Provide 12 mm dia bars @ 12.5 cm c/c which gives an area of


(Ast) Provided = 9.05 cm2 HENCE OK
Subject : DESIGN OF DECK SLAB (8M CLEAR SPAN)
Chainage : Km : 5.085

CHECK FOR SHEAR

Maximum shear due to dead load = WL


2
= 2062.5 x8
2
Maximum shear due to dead load = 7837.5 Kgs

Maximum shear due to live load as per clause 305.12.2 of I.R.C 21 -2000 Section III
Longitudinal dispersion = 0.250 + ( 2.0 x ( 0.75+ 0.075))
= 1.900

Therefore load of 11.4 tons may be kept @ 1.900 / 2


= 0.950 from support for maximum shear

11.4 t 11.4 t 6.8 t 6.8 t


0.950 1.200 4.30 3.000 -1.360
A C D E
8.090

DISPERSION UNDER ' C ' (11.4 t)

bef =  a ( 1 - a/lo) + b1

 = 2.009
a = 0.950
lo = 8.090 m
b1 = 500 +2x 75.0
= 0.65 m
bef = ( 2.009 x 1.0 ) 1- 0.950 + 0.65
8.090
Effective dispersion width ( bef ) = 2.334 > 1.8 m
Hence ,The Dispersion width overlaps

Therefore combined width of dispersion = 0.225 + 0.150 + 0.25 + 1.80 + 2.334


2
= 2.425 + 1.167
= 3.592 m
Subject : DESIGN OF DECK SLAB (8M CLEAR SPAN)
Chainage : Km : 5.085

Intensity of load = 11.400 x 1.319


3.592
= 4.187 t

DISPERSION UNDER ' D ' (11.4 t)


bef =  a ( 1 - a/lo) + b1

 = 2.009
a = 2.150
lo = 8.090 m
b1 = 500 +2x 75.0
= 0.65 m
bef = ( 2.009 x 2.2 ) 1- 2.150 + 0.65
8.090
= 3.821 m > 1.800 m
Hence ,The Dispersion width overlaps

Therefore combined width of dispersion = 0.225 + 0.150 + 0.25 + 1.80 + 3.821


2
= 2.425 + 1.910
= 4.335 m
Intensity of load = 11.400 x 1.319
4.335
= 3.469 t
DISPERSION UNDER ' E ' (6.8 t)

b1 = 0.380 + 2.000 x 0.075


= 0.530 m
 = 2.009
a = 1.640
lo = 8.090 m
b1 = 380 +2x 75.0
= 0.53 m

bef = ( 2.009 x 1.6 ) 1- 1.640 + 0.53


8.090
bef = 3.156 > 1.800 m
Hence ,The Dispersion width overlaps
Subject : DESIGN OF DECK SLAB (8M CLEAR SPAN)
Chainage : Km : 5.085

Therefore dispersion width of the wheel near to the kerbs


Width of disperssion = (thickness of kerb+distance between kerb and wheel+ half of contact width + (half of
dispersion width of first wheel)

Therefore combined width of dispersion = 0.225 + 0.150 + 0.38 + 1.800 + 3.156


2 2
= 2.365 + 1.578
= 3.943 m

Intensity of load = 6.800 x 1.319


3.943
= 2.275 t

DISPERSION UNDER ' F ' (6.8 t)

b1 = 0.380 + 2.000 x 0.075


= 0.530 m
 = 2.009
a = -1.360
lo = 8.090 m
b1 = 380 +2x 75.0
= 0.53 m

bef = ( 2.009 -x 1.4 ) 1- -1.360 + 0.53


8.090
bef = -2.661 < 1.800 m
Hence ,The Dispersion width does not overlap

Therefore dispersion width of the wheel near to the kerbs


Width of disperssion = (thickness of kerb+distance between kerb and wheel+ half of contact width + (half of
dispersion width of first wheel)

Therefore combined width of dispersion = 0.225 + 0.150 + 0.38 + 1.80 ###


2 2
= 0.565 + 0.900
= 1.465 m
Intensity of load = 6.800 x 1.319
2 x 1.465
= 3.062 t

4.187 t 3.469 t 2.275 t 3.062 t


Subject : DESIGN OF DECK SLAB (8M CLEAR SPAN)
Chainage : Km : 5.085

0.950 1.200 4.30 3.000 -1.360


A C D E B
8.090

Taking moments about B

RA x 8.09 = ( 4.187 x 7.1 ) + ( 3.469 x 5.9 ) + ( 2.275 x 1.6 ) + ( 3.062 -x 1.4 )

RA = 29.90 + 20.61 + 3.73 -+ 4.16


8.090
RA = 6.189 t
RB = 6.804 t

Total Shear = Shear due to Dead Load + Live Load


= 7837.5 + 6804
= 14642.0 Kgs

Shear stress = 14642.0


100 x 69.750
= 2.099 Kg/cm2

The permissible shear stress in concrete without shear reinforcement from table '12B' of 1RC-21-2000
100 As = 100 x 24.544
bd 100 x 69.750
= 0.352 %

0.250 ---- 0.230


0.500 ---- 0.310 0.352 ?
0.250 ---- 0.080

= 0.230+ 0.080 x 0.102


0.250
2
= 0.263 N/mm
or 2.626 Kg/cm2 > 2.099 Kg/cm2
HENCE OK
Subject : DESIGN OF DECK SLAB (8M CLEAR SPAN)
Chainage : Km : 5.085

CHECK FOR BOND

Max shear = 14642.0 Kgs


Bond stress = 14642.0
0.894 x 69.750 x 39.270
2
= 5.980 Kg/m < 18.200 Kg/m2
HENCE OK

REINFORCEMENT SCHEDULE

Clearspan = 7600 mm
Effective span = 8090 mm
Bearing Width = 490 mm
Overall length of slab = 8580 mm
Overall Width of slab = 5100 mm
Overall depth of slab = 750 mm
Clear cover = 40 mm

TYPE Dia (mm) Spacing No. of X (mm) Y(mm) Z(mm) Length of Total length
(mm) bars each bar (m)
(mm)

Type a 25 100 26 8480 220.480


BOTTOM REINFORCEMENT

8480
(Long)
###
Type b 25 200 26 910 948 5320 9235 240.110
(Long)
###
Type c 12 125 69 5000 345.000
5000
(Trans)
###
Type d 12 200 26 8480 220.480
REINFORCEMENT

8480
(Long)
###
TOP

Type e 12 250 35 5000 175.000


5000
(Trans)
###
200
600 225

225
300
KERB FOR MAIN SLAB

750

375
275
KERB FOR MAIN SLAB
Subject : DESIGN OF DECK SLAB (8M CLEAR SPAN)
Chainage : Km : 5.085

Type f 993
12 300 2 *29 2358 136.770
(Trans) 715

Type g 8480
12 6 8480 50.880
(Long)

Type h 150
SOLID PARAPET

10 300 2 *29 2636 152.888


(Trans)
888 1598
###
Type I 8480
10 12 8480 101.760
(Long)
###
###
APPROACH SLAB

TYPE 5000
12 150 23 5100 469.200
A(Long)
50

50
###
TYPE 3420
12 150 34 3520 478.720
B(Trans)
50

50
Subject : DESIGN OF ROAD BRIDGE PIER
Chainage : Km : 5.085

RCL + 83.992
0.075 WCL + 83.917
0.520 DECK SLAB BOD + 83.397
0.3 BED BLOCK 1.000 BB + 83.097
1.000
MWL + 82.997

1.797 1.000
PIER Trough Level + 81.870

1.00 1.000 1.00


0.6
PBL + 81.300
1.0 FL + 80.300

3.000
1.57

1.000
7.6
6.1 5.1 m

3.000

I. Braking force
(As per IRC:6-2010, para 211.2(a)), the braking force is 20% of the train loading on the span

Class "A" loading


Effective span of the Bridge = 3.790 m

Hence loads coming on to the span = 11.4 + 11.4 + 6.8


= 25.50 t

Braking Load = 20 x 25.5 = 5.100 t


100

The braking force will be acting at a height of 1.20m above road level.(as per clause 211-3 of IRC 6: 2010).
Lever arm = 1.2 + 0.595 = 1.795 m

Change in vertical reaction = 5.100 x 1.795 = 2.415 t


3.790

Lever arm at bottom of pier i.e., + 81.300


= 83.397 - 81.300 = 2.097 m
Moment due to braking force @ top of foundation + 81.300
= 5.100 x 2.10 = 10.695 t-m
Moment due to braking force @ Top of the soil + 80.300
= 5.100 x 3.10 = 15.795 t-m

Live load
1.100 3.200 1.200 4.300 3.00 3.000 3.000

2.7 t 2.7t 11.4t 11.4t 6.8t 6.8t 6.8t 6.8t

2.7 2.7 11.4 11.4 6.8

1.1 3.2 1.2 4.3 3.0

3.790 m 0.510 3.790


C Ra Rb D
0.690

Reaction Calculations:

Taking moments about C

Ra x 3.790 = 11.4 x 3.10 + 2.7 x 0.00 + 2.7 x 0.00


Ra = 9.325 t

Taking moments about D

Rb x 3.790 = 11.4 x 3.79 + 6.800 x 0.00


Rb = 11.400 t

Ra+Rb = 20.725 t and Ra-Rb = 2.075 t


Live load reaction on the pier:

Case(i):
load moving in direction away from the pier: = 20.725 - 2.415 = 18.310 t
Case(ii):
load moving in a direction towards the pier: = 20.725 + 2.415 = 23.140 t

Case(i):
load moving in direction away from the pier: = 2.075 - 2.415 = 0.340 t
Case(ii):
load moving in a direction towards the pier: = 2.075 + 2.415 = 4.490 t

II(a) Moment due to eccentricity of live load reaction:(in Stream flow direction):

0.15
0.5 e

0.9

1.8
4.25

Eccentricity of loading with respect to of carriage way(class A loading)


(as per clause :204.1.3 of IRC:6-2010) e = 0.825 m

Moments
Case(1) = 18.310 x 0.825 = 15.106 t-m
Case(II) = 23.140 x 0.825 = 19.091 t-m

II(b). Moment due to eccentricity of live load reaction: (in roadway direction):

Case(1) = 0.340 x 0.510 / 2 = 0.087 t-m


Case(II) = 4.490 x 0.510 / 2 = 1.145 t-m

III. Moment due to Frictional Force:

unit weight of earth = 2.0 t/m3


unit weight of PCC = 2.5 t/m3 From IRC 6- 2010 clause 203.
unit weight of water = 1.0 t/m3

Dead load due to super structure:

Weight of slab = 4.280 x 4.920 x 0.52 x 2.500 = 27.375 t


Wt of wearing Coat = 4.280 x 4.250 x 0.08 x 2.500 = 3.411 t
Weight of kerbs = 2 x 4.280 x 0.425 x 0.23 x 2.500 = 2.046 t
Wt of Parapet = 2 x 4.280 x 0.200 x 0.60 x 2.500 = 2.568 t
Dead load due to Super structure = 35.400 t

Rg = 35.400 / 2 = 17.700 t
Friction Coefficient = 0.5

Frictional force = 0.5 x 17.700 = 8.850 t


Right side bearing resistance = 0.9 x 8.850 = 7.965 t
(10% variation from left side)
Unbalanced force = 8.850 - 7.965 = 0.885 t

Moment at level + 81.300 = 0.885 x 2.097 = 1.856 t-m


top of foundation
Moment at level + 80.300 = 0.885 x 3.097 = 2.741 t-m
top of soil

IV. Moment due to wind force:


Exposed height of Deck = 0.595 m
Kerb = 0.225 m
Parapet Ht = 0.600 m
Height from the bottom of the deck to Centre of railing = 1.12 m
1.
(a) The wind force on the bridge superstructure will be computed (as per clause 209.2 of IRC:6 – 2010)

Height of Parapet = 0.600 m


Height on which wind force acts = 0.595 + 0.225 + 0.600 = 1.420
Case – 1 :- MWL Condition :-
Exposed height of pier over MWL = + 83.397 - 82.997 = 0.400
Avg height at centre of deck = 0.400 + 0.595 + 0.225 + 0.600 / 2 = 1.520

Calculation of wind pressure by Gust Factor Method (As per IS: 875(Part 3) 1987, cl.8.2.1)
Basic wind speed (Vb) = 44.00 m/sec (IRC 6 -2010, Fig. No.6)
The variation of hourly mean wind speed (Vz) = Vb * k1 * k2 * k3
where
Risk co-efficient factor (k1) = 1.05 (IS: 875(Part 3) 1987, Table No.1)
Different heights & terrain factor (k2) = 0.78 (IS: 875(Part 3) 1987, Table no.33)
Topography factor (k3) = 1.0286 (IS: 875(Part 3) 1987, cl.5.3.3)

Design wind pressure (Pz) = 0.6 * Vz2

S.No. Height Vb k1 k2 k3 Vz Pz
(m) (m/sec) (m/sec) (N/m2)
1 10.00 44.00 1.05 0.78 1.0286 37.07 824.36
2 15.00 44.00 1.05 0.82 1.0286 38.97 911.08
3 20.00 44.00 1.05 0.85 1.0286 40.39 978.96
4 30.00 44.00 1.05 0.88 1.0286 41.82 1049.29
5 50.00 44.00 1.05 0.93 1.0286 44.19 1171.91
6 100.00 44.00 1.05 0.99 1.0286 47.05 1328.00
MWL condition,for a height of 1.52 m, H= 1.520 m
Pz = 82.436 kg/m2

Case – 2 :- Trough Level Condition :-

Exposed height of pier above T L = + 83.397 - 81.870 = 1.527


Avg height at centre of deck = 1.527 + 0.595 + 0.225 + 0.600 / 2 = 2.647

PZ
for 1.520 m = 82.436 kg/sqm
for 2.647 m = 82.436 kg/sqm

Area of superstructure acted upon by wind pressure(on each span)

= ( ( 0.595 + 0.225 ) + ( 0.600 2.0 4.280 )


= 4.794 m2
As per Cl. 209.3.3 of IRC:6-2010 ;The Transverse wind force is given by the formula

FT = PZ * At * CD * G
where, PZ = Hourly mean wind pressure in N/m2
A1 = Solid area in m2
G = Gust factor
CD = Drag coefficient depending upon the geometric shape of the Bridge Deck

CD = 1.4615 (Table 5 of IRC:6-2010)


G = 2

For Stream Full Condition

Total Wind Force on deck slab FT = 1.155 t


This force acts at the centre of Area of pressure from level + 81.300

Therefore Lever arm from bottom of pier ie at level + 81.300


= 2.097 + ( 0.595 + 0.225 + 0.30 ) / 2
= 2.657 m
Moment due to Wind Force at + 81.300 = 1.155 x 2.657
= 3.069 t-m

Therefore Lever arm from bottom of foundation ie at level + 80.300


= 3.097 + ( 0.595 + 0.225 + 0.30 ) / 2
= 3.657

Moment due to Wind Force at + 80.300 = 1.155 x 3.657


= 4.224 t-m
For Stream Empty Condition
Total Wind Force on deck slab FT = 1.155
Therefore Lever arm from bottom level of pier ie at level + 81.300
= 2.097 + ( 0.595 + 0.225 + 0.30 ) / 2
= 2.657 m
Moment due to Wind Force at +81.300 = 1.155 x 2.657
= 3.069 t-m

Therefore Lever arm from bottom level of foundation i.e., at level + 80.300
= 3.097 + ( 0.595 + 0.225 + 0.30 ) / 2
= 3.657 m
Moment due to wind force at + 80.300 = 1.155 x 3.657
= 4.224 t-m

(b) Wind force in longitudinal direction is taken as 25 to 50 % of wind force in transverse direction
(as per clause 209.3.4 of IRC:6-2010)
V. Moment due to water currents:
(a) In Stream flow direction:
(As per clause 210.2 of IRC:6-2010 ) Force due to water currents in the direction of Stream flow is given by:

p = 52 k V²
V = 1.414 v
v = Velocity of flow in Stream
= Q / A
= 21.457 / 8.258
= 2.598 m/s
V = 1.414 X v
= 1.414 x 2.598
= 3.674 m/s
p = 52 x 0.660 x 3.674
= 463.326 kg/sqm

Pressure due to water currents at MWL = 463.326 kg/sqm


Pressure due to water currents at T L = 0.0

Area of pier profile immersed in water = 0.785 x 1.200


= 0.942 m²
Total Pressure due to water currents = ( 463.326 + 0.00 )/2x 1/1000 x 0.942
= 0.218 t

Water pressure is acting at 2h/3 from T L = 2/3 x 1.200


= 0.800 m
Depth of pier from T L to the foundation top = 0.57 m

Moment at + 81.300 = 0.218 x ( 0.800 + 0.57 )


= 0.299 t-m
Moment at + 80.300 = 0.218 x ( 0.800 + 0.57 + 1.00 )
= 0.517 t-m
(b) In road way direction:
Force due to water currents in the direction of road way is given by:
(As per clause 210.4 (b) of IRC:6-2010)
p = 52 k V²
V = 1.414 v cosƟ
v = Velocity of flow in Stream
= Q / A
= 21.457 / 8.258
= 2.598 m/s
Assume that the water is striking the pier at an angle of Ɵ= 20o
V = 1.414 x v x cos20o
= 1.414 x 2.598 x 0.940
= 3.453 m/s

p = 52 x 0.660 x 3.453
= 409.127 kg/sqm

Pressure due to water currents at MWL = 409.127 kg/sqm


Pressure due to water currents at T L = 0.000
Area of pier profile immersed in water = 29.225 x 1.200
= 35.070 m²
Total Pressure due to water currents = (409.127 + 0.000 )/2x 1/1000 x 35.070
= 7.174 t

Water pressure is acting at 2h/3 from T L = 2/3 x 1.200


= 0.800 m
Depth of pier from T L to the foundation top = 0.57 m

Moment at + 81.300 = 7.174 x ( 0.800 + 0.57 )


= 9.828 t-m
Moment at + 80.300 = 7.174 x ( 0.800 + 0.57 + 1.00 )
= 17.002 t-m
Total moments in road way direction:
Stream Full Condition

A) at + 81.870 ( on concrete)
Moments due to braking + live load eccentricity + friction force + water currents
Case(I) = 10.695 + 0.087 + 1.856 + 9.828 = 22.466 t-m
Case(II) = 10.695 + 1.145 + 1.856 + 9.828 = 23.524 t-m

B) at + 80.270 ( on soil)
Moments due to braking + live load eccentricity + friction force + water currents
Case(I) = 15.795 + 1.145 + 3.097 + 17.002 = 37.039 t-m
Case(II) = 15.795 + 1.145 + 3.097 + 17.002 = 37.039 t-m

Stream empty condition


A) at + 81.870 ( on concrete)
Moments due to braking + live load eccentricity + friction force
Case(I) = 10.695 + 0.087 + 1.856 = 12.637 t-m
Case(II) = 10.695 + 1.145 + 1.856 = 13.695 t-m

B) at + 80.270 ( on soil)
Moments due to braking + live load eccentricity + friction force
Case(I) = 15.795 + 1.145 + 3.097 = 20.037 t-m
Case(II) = 15.795 + 1.145 + 3.097 = 20.037 t-m
Total moments in Stream flow direction:
Stream Full Condition
A) at + 81.270 ( on concrete)
Moments due to live load eccentricity + wind force + water currents
Case(I) = 15.106 + 3.069 + 0.299 = 18.474 t-m
Case(II) = 19.091 + 4.224 + 0.299 = 23.614 t-m

B) at + 80.270 ( on soil)
Moments due to live load eccentricity + wind force + water currents
Case(I) = 15.106 + 3.069 + 0.517 = 18.692 t-m
Case(II) = 19.091 + 4.224 + 0.517 = 23.832 t-m

Stream empty condition


A) at + 81.870 ( on concrete)
Moments due to live load eccentricity + wind force
Case(I) = 15.106 + 3.069 = 18.175 t-m
Case(II) = 19.091 + 4.224 = 23.315 t-m

B) at + 80.270 ( on soil)
Moments due to live load eccentricity + wind force
Case(I) = 15.106 + 3.069 = 18.175 t-m
Case(II) = 19.091 + 4.224 = 23.315 t-m

Self weight of pier:

Wt of bed block = 1.00 x 0.30 x 5.10 2.5 = 3.825 t

Weight of CC pier from + 83.097 to + 81.30


= ( 1.000 + x 1.80 x 5.100 x 2.500 = 22.912 t

Cut & ease waters between + 83.097 & + 81.300


' 2

= P/4 ( 1.000 x 1.80 x 2.50 = 1.764 t

Weight of displaced water due to pier (with 100% buoyancy)


= ( 1.013 + 1.000 ) / 2 x 2.70 x 5.10 x 1.00 = 13.846 t

Weight of displaced water due to cut and ease water(with 100% buoyancy)
2

= p/4( 1.000 x 2.70 x 1.00 = 1.059 t

Stream full condition


Self weight of pier(with 100% bouyancy)
= 22.912 + 1.764 + 3.825 13.846 + 1.059 ) = 13.595 t

Stream empty condition


Self weight of pier = 22.912 + 1.764 + 3.825 = 28.501 t
Total direct loads at + 81.870

Stream full condition


Case(1) = 13.595 + 18.310 + 35.400 = 67.305 t
Case(II) = 13.595 + 23.140 + 35.400 = 72.135 t
Stream empty condition
Case(1) = 28.501 + 18.310 + 35.400 = 82.211 t
Case(II) = 28.501 + 23.140 + 35.400 = 87.041 t

Weight of foundation = 3.000 x 7.600 x 1.000 x 2.500 = 57.000 t

Weight of foundation (considering 100% buoyancy)


= 57.000 x 2.500 x 1.400 = 31.920 t
Therefore direct loads at + 80.270

Stream full condition


Case( I ) = 67.305 + 31.920 = 99.225 t
Case(II) = 72.135 + 31.920 = 104.055 t
Stream empty condition
Case( I ) = 82.211 + 57.000 = 139.211 t
Case(II) = 87.041 + 57.000 = 144.041 t

Sectional properties:
At the base of the pier i.e. at + 81.870
Area (a) = 5.100 x 3.000 + p/4 x ( 1.000 ²) = 16.085 Sqm
Equivalent length of pier
= 5.100 + p/4 x ( 1.000 ²) / 1.00 ) = 5.8854 m

Section modulus:
Zxx = 5.885 x 3.000 2
/ 6 = 8.828 m3

Zyy = 3.000 x 5.885 2


/ 6 = 17.319 m3

At the base of the foundation i.e. at + 80.270


Area (a) = 3.000 x 7.600 = 22.800 Sqm

Section modulus:
Zxx = 7.600 x 3.000 2
/ 6 = 11.400 m3
Zyy = 3.000 x 7.600 2
/ 6 = 28.880 m3

Stream FULL CONDITION


STRESSES IN FOUNDATION CONCRETE ie AT + 81.870 :

CASE (I) 67.305 22.466 18.474


= ----------- + ----------- + -----------
16.085 8.828 17.319

= 4.184 + 2.545 + 1.067


= 7.796 t/sqm (Max) Compressive stress
= 0.573 t/sqm (Min) Compressive stress

CASE (II) = 72.135 23.524 23.614


------------ + ----------- + -----------
16.085 8.828 17.319

= 4.485 + 2.665 + 1.363

= 8.513 t/sqm (Max) Compressive stress


= 0.456 t/sqm (Min) Compressive stress

STRESSES ON SOIL ie AT + 80.300 :

CASE (I) 99.225 37.039 18.692


= ------------ + ----------- + -----------
22.800 11.400 28.880

= 4.352 + 3.249 + 0.647

= 8.248 t/sqm (Max) Compressive stress


= 0.456 t/sqm (Min) Compressive stress

CASE (II) 104.055 37.039 23.832


= ------------ + ----------- + -----------
22.800 11.400 28.880

= 4.564 + 3.249 + 0.825

= 8.638 t/sqm (Max) Compressive stress


= 0.490 t/sqm (Min) Compressive stress

ABSTRACT OF STRESSES

Max. Min.
Details Stress Stress Type Of Stress
t/sq.m. t/sq.m.
Stress in Concrete:
Case - 1 7.796 0.573 Compressive stress
Case - 2 8.513 0.456 Compressive stress
Stress on Soil:
Case - 1 8.248 0.456 compressive stress
Case - 2 8.638 0.490 compressive stress

Stream EMPTY CONDITION


STRESSES IN FOUNDATION CONCRETE ie AT + 81.870 :
CASE (I) 82.211 12.637 18.175
= ------------ + --------- + ---------
16.085 8.828 17.319

= 5.111 + 1.431 + 1.049

= 7.592 t/sqm (Max) Compressive stress


= 2.630 t/sqm (Min) Compressive stress

CASE (II) 87.041 12.637 23.315


= ------------ + --------- + ---------
16.085 8.828 17.319

= 5.411 + 1.431 + 1.346

= 8.189 t/sqm (Max) Compressive stress


= 2.634 t/sqm (Min) Compressive stress

STRESSES ON SOIL ie AT 80.300 :

CASE (I) 139.211 20.037 18.175


= ------------ + --------- + ---------
22.800 11.400 28.880

= 6.106 + 1.758 + 0.629

= 8.493 t/sqm (Max) Compressive stress


= 3.719 t/sqm (Min) Compressive stress

CASE (II) 144.041 20.037 18.175


= ------------ + --------- + ----------
22.800 11.400 28.880

= 6.318 + 1.758 + 0.629

= 8.705 t/sqm (Max) Compressive stress


= 3.931 t/sqm (Min) Compressive stress

ABSTRACT OF STRESSES

Max. Min.
Details Stress Stress Type Of Stress
t/sq.m. t/sq.m.
Stress in Concrete:
Case - 1 7.796 0.573 Compressive stress
Case - 2 8.513 0.456 Compressive stress
Stress on Soil:
Case - 1 8.493 0.456 compressive stress
Case - 2 8.705 0.490 compressive stress
Subject : DESIGN OF ROAD BRIDGE ABUTMENT
Chainage : Km : 5.085

1 unit wt of concrete = 2.500 t/m³


2 unit wt of earth = 2.000 t/m³

Details of the deck


1 Carriage width = 4.250 m
2 Bottom width of deck = 4.920 m
3 Thickness of the deck = 0.520 m
4 Thickness of wearing coat = 0.075 m
5 Width of Kerb = 0.225 m
6 Height of Kerb = 0.225 m
7 Width of Parapet = 0.200 m
8 Height of parapet = 0.600 m
9 Parapet + kerb top width = 0.425 m
10 length of abutment = 5.100 m

1.0 Loads on Abutments

i) Deck = 4.28 x 4.920 x 0.520 x 2.50 = 27.375 t


ii) Wearing coat = 4.28 x 4.250 x 0.075 x 2.50 = 3.411 t
iii) Kerbs = 4.28 x 0.300 x 0.425 x 2.50 = 2.729 t
iv) Parapet = 4.28 x 0.200 x 0.600 x 2.50 = 2.568 t
Total = 36.08 t
Dead load on abutment = 36.082
2
= 18.041 t

2.0 Live Load Reaction:

11.4 11.4 6.8

1.2 4.3 -1.71

A 3.79 B

Taking moments about - B


RA x 3.79 = 11.4 x 3.790 + 11.40 x 2.59 + 6.80 -x 1.71 + 0.00 -x 1.71
= 43.206 + 29.53 -+ 11.63 + 0.00

= 61.104 = 16.12 t
3.79

3.0 Braking Force:


As per the Clause 211.2 of IRC 6: 2010 the braking effect on a simply supported slab is
20 % of the actual total load on span

111
Subject : DESIGN OF ROAD BRIDGE ABUTMENT
Chainage : Km : 5.085

Total load on the span = 22.8 t


Braking force = 0.2 x 22.80 = 4.560 t

Force felt by each bearing = 2.28 t ( considering two bearings)

Force / m run of abutment = 2.28 = 0.447 t


5.100

4.0 Change in vertical reaction due to braking effect.

As per Clause 211.3 of IRC 6 : 2010 the force due to braking effect shall be assumed to act at
Force acting at 1.20 m above the road level.

Height of this force above the abutment = 1.795


(Assuming depth of Bed Block = 0.3

Change in vertical load = 2.28 x 1.795


3.79
= 1.080 t

5.0 Impact Load:


0.500
Impact multiplying factor (As per clause 208 of IRC : 6 – 2010) + 83.097

0.500 = x
3.00 3-h
3.00 (h) = 2.20 m
x = 0.500 0.803
3.000
x = 0.134 (X)
0 + 80.900

As per IRC:6-2010, section(II), Cl. 208.7, the abutment height is less than 3m below
the bed block, hence, impact multiplying factor is = 0.134

Total load over the abut = L.L. + C V.R. + D.L. + Impact load
= 16.122 + 1.080 + 18.04 ( 16.122 x 0.46 x 0.134 )
= 36.236 t

Load per meter run = 36.24 = 7.105 t


5.100

112
Subject : DESIGN OF ROAD BRIDGE ABUTMENT
Chainage : Km : 5.085

(Section 8 – 8)
+83.992 0.02 +83.992
W1 +83.917
+83.767 W7 W3
+83.397
W20.49 +83.097

MFL +82.997
3.092 W8 W6
W4 1.127
W5
Trough sill level +81.870

0.4 2.90 1.00 0.4 +80.900 1.0

0.6
W9 3.900 +80.300
B
4.700
Taking moments about A
Load Particulars Force LA Moment
Height Breadth Density V H
W1 As Calculated 7.105 3.655 25.969
W2 0.510 x 0.300 x 2.5 0.382 3.400 1.300
W3 0.595 x 0.490 x 2.5 0.729 3.145 2.292

W4 2.197 x 1.000 x 2.5 5.493 3.400 18.675


W5 0.500 x 2.197 x 2.900 x 2.5 7.964 1.933 15.397
W6 0.500 x 2.197 x 2.900 x 2.0 6.371 0.967 6.159
W7 0.225 x 2.900 x 2.5 1.631
0.670 x 2.900 x 2.0 3.886 1.450 8.000
Pv 0.0395 x 4.292 1.2 x 2.0 1.342
Ph 0.1580 x 4.292 1.2 x 2.0 5.366 1.237 6.637

Bf Braking force 0.447 2.497 1.116


∑V= 34.903 ∑ M = 85.545

lever arm = 85.545 = 2.451 m


34.903
e = 2.451 - 1.95 = 0.501 m
Allowable e = 0.650 > 0.501 HENCE SAFE
Stress in concrete
= 34.903 ( 1.00 + 6 0.501 )
3.900 3.900
= 8.950 ( 1.00 + 0.771 )
Max = 15.847 t/m 2

Min = 2.052 t/m2

113
Subject : DESIGN OF ROAD BRIDGE ABUTMENT
Chainage : Km : 5.085

Taking moments about B


Load Particulars Force LA Moment
Height Breadth Density V H
W1 As calculated 7.105 4.055 28.811
W2 As calculated 0.382 3.800 1.453
W3 As calculated 0.729 3.545 2.584

W4 As calculated 5.493 3.800 20.872


W5 As calculated 7.964 2.333 18.583
W6 As calculated 6.371 1.367 8.707
W7 0.225 x 3.300 x 2.5 1.856
0.670 x 3.300 x 2.0 4.422 1.850 11.615
0.225 x 0.400 x 2.0 0.180 0.200 0.036
W8 2.867 x 0.400 x 2.0 2.294 0.200 0.459
W9 0.600 x 4.700 x 2.5 7.050 2.350 16.567
Pv 0.0395 x 4.892 1.2 x 2.0 1.777
Ph 0.1580 x 4.892 1.2 x 2.0 7.107 1.477 10.496
Bf As calculated 0.447 3.097 1.385

∑V= 45.623 7.554 ∑M= 121.568

I) Check For Over Turning :


safety factor against overturning = 109.69 11.88
= 9.200 > 1.5 HENCE SAFE

II) Check Against Sliding : Neglecting passive earth pressure


Total horizontal force on wall = H0 = 7.554 t/m.
safety factor against sliding = V0 x m/H0 = 45.623 x 0.500
7.554
= 3.100 > 1.5
HENCE SAFE
III) Check For Pressure :
lever arm = 121.568 = 2.665 m
45.623
e = 0.315 m
Allowable e = 4.700 = 0.783 > 0.315 m
6 HENCE SAFE
Stress on soil = 45.623 ( 1.00 + 6 0.315 )
4.70 4.700
= 9.707 ( 1.00 + 0.402 )

Max = 13.610 t/m2


Min = 5.804 t/m2

114
Subject : DESIGN OF ROAD BRIDGE ABUTMENT
Chainage : Km : 5.085

2. Design of Bed Blocks under Road Abutments:

Total Load on bed Block = 36.236 t


Providing a bed block of = 0.510 x 2.500 x 0.30 size
Weight of bed block = 0.510 x 2.500 x 0.300 x 2.5
= 0.956 t

Total load on the abutment under the bed block


= 36.236 + 0.956 = 37.192 t

Intensity of pressure under the bed block 0.490


= 37.19
0.51 x 2.5 12Φ 150 C/c
= 29.170 t/m2 0.670 0.510 4 nos. of 16 mm dia
= 2.917 Kg /cm2
0.3 2L-10Φ @ 150 c/c
(As per IS 456:2000

1.00
Adopting the bed blocks in RCC M 20
Providing 1% of G.S.A. = 1 x 30 x 51
100
= 15.30 Sq. cm

No.of 16 mm Φ bars 7.610 ≈ 8 No.s


Provide 4 bars at top and 4 bars at bottom
Hence provide 16 mm Φ bars 8 Nos of top & Bottom reinforcement

Area of Stirrups = 7.65 cm² Volume of steel/rm= 765 cm3


Length of each stirrup 162 cm

Adopting 10 mm dia 2L stirrups 127.17 cm3


No. of Stirrups/rm = 6.02 Spacing = 16.62 cm

Hence Provide 10 mm dia bars 150 c/c,

3. Design of the DirtWall :

Height of the dirt wall 'H” = 0.670 m

Earth pressure at the bottom of the dirt wall Epre = 0.333 x H x ø


= 0.333 x 0.670 x 20
= 4.462 KN/m2

115
Subject : DESIGN OF ROAD BRIDGE ABUTMENT
Chainage : Km : 5.085

Neglecting the vertical component of the load to be on conservative side


Horizontal load on the wall/m length of the wall = 0.5 x Epre x H
= 0.500 x 4.462 x 0.670
= 1.495 KN/m
Moment at the bottom of the dirt wall
= 1.495 x 0.490 x 0.670 = 0.491 KN m/m

Surcharge pressure on the wall Spre = 0.333 x 1.2 x ø


= 0.333 x 1.200 x 20
= 7.992 KN/m2

Surcharge load on the dirt wall Sload = Spre x H


= 7.992 x 0.670
5.355 KN/m

Moment at the bottom of the dirt wall M = 0.5 x Sload x H


= 0.500 x 5.355 x 0.670
1.794 KN m/m

The heavest load may come on the dirt wall = 114.0 kN


Braking force ( 20% load coming) acts at 1.2m above the RCL = 27.360 KN-m
Bending moment due to Braking force = 18.331 KN-m/m

Total design moment at the bottom of the dirt wall = 1.794 + 0.491 + 18.331
= 20.616 KN m/m

For M 30 grade concrete and fe415 steel (As Per IRC 6: 2014)
Modular ratio = 9.33 k = 0.318
σcbc = 10 N/mm 2 j = 0.894
σst = 200 N/mm2 Q = 1.422

Depth required = Sqrt(BM/Qb)


= 20.616 X 10^6 = 172.00 mm
1.422 x 490
Depth provided = 670 - 50 -6
= 614 mm > 172.00 mm
Hence the provided section is adequate
Area of steel required = BM/σst x j x d
= 20.616 x 10^6
200 x 0.894 x 172
= 670.404 Sq.mm

Minimum area of steel (0.12%) = 0.12 x 614 x 490


100
= 361.032 Sq.mm

116
Subject : DESIGN OF ROAD BRIDGE ABUTMENT
Chainage : Km : 5.085

Provide 12 mm Φ bars @ 150 c/c


Ast Provided = 753.60 mm² HENCE OK

Distribution steel = 0.3 x Ast


= 201.121 sqmm

ie Provide 10 Φ bars @ 300 c/c


Ast Provided = 261.667 mm² HENCE OK

However provide TOR 12 @ 150 mm c/c 754.0 mm2/m


Dist. reinforcement TOR 10 @ 300 mm c/c 261.8 mm2/m

117
Subject : DESIGN OF FOOT BRIDGE
Chainage : Km : 5.085

Design of Slab
225 1500 225

600

75
175
100

100

unit wt of concrete = 2.500 t/cum


unit wt of earth = 2.000 t/cum
Loads
a) Self Wt. of Slab = 0.10 x 2500 = 250 kg/sq.m
b) Wt of Wearing Coat = 0.08 x 2500 = 187.5 kg/sq.m
c) Live Load (As per para 206.1 of IRC 6: 2010) = 400 kg/sq.m
837.5 kg/sq.m

Width of slab = 1.500 m


Thickness of slab = 0.100 m
Size of the kerbs = 225 x 875 mm
Effective width of slab = 1.725 m

Maximum B.M. = wl2/8 = 838 x 1.725 ²


8
= 311.51 kg - m.
Concrete Mix - M 25
Stresses:
C = 85 Kg/cm2 t = 2000 Kg/cm2
m = 10.98 j = 0.894
n = 0.318
Q = 12.088 MR = Qbd2

Effective depth (d) = √M / Q b


= √ 31151 = 5.076 cm
12.088 x 100
Clear cover = 40 mm
Dia of bar = 12 mm
Available effective depth = 100 - 40 - 6
= 5.7 cm > 5.076 cm
HENCE OK

122
Subject : DESIGN OF FOOT BRIDGE
Chainage : Km : 5.085

Area of steel required, Ast = M


tjd

= 31151 = 3.06 Sq.cm


2000 x 0.89 x 5.70

Spacing of the bar = 100 x Area of bar


Ast
= 100 x 1.13 = 37 cm
3.06

However the spacing should not exceed 3d i.e


= 3 x 5.70 = 17.1 cm

Hence provide 12 mm dia bars 15 cm c/c


Ast provided 7.540 Sq.mm HENCE OK

Distribution Steel :
0.12 % of the section = 0.12 x 10 x 100
10
= 1.2 Sq.cm

Spacing of 10 mm dia bar = 100 x Area of bar


Ast
= 100 x 0.79
1.2
= 65.450 cm

However the spacing should not exceed 5d i.e.


= 5 x 5.7 = 28.5 cm
Hence provide 10 mm dia bars 27.5 cm c/c
Ast provided 2.856 sq.cm

Check for Shear:


Shear force (V) = Wl/2 = 838 x 1.500 = 628 kg
2
Shear Stress (Tv) = V/bd = 628 = 1.102 kg/cm2
= 100 x 5.7
Percentage of steel per meter run of slab
= 100 x As / 100 x 5.7
= 100 x 3.77 = 0.661 %
100 x 5.70

123
Subject : DESIGN OF FOOT BRIDGE
Chainage : Km : 5.085

Permissible shear stress = 0.335 N/mm2 = 3.35 kg/cm2


(As per Table 23 of IS 456:2000)
As per Para B - 5.2.1.1. the permissible shear stress
= 1.3 x 0.34 = 0.4355 N/mm2
= 4.355 kg/cm2
NO NEED OF SHEAR REINFORCEMENT

Design of Beam
1. Dead Load
a) Weight of slab = 0.500 x 0.100 x 1.500 x 2500 = 187.5 Kg/m.
b) Weight of WC = 0.500 x 0.075 x 1.500 x 2500 = 140.625 Kg/m.
c) Self Wt. of Beam= 0.225 x 0.875 x 2500 = 492.1875 Kg/m.
820.3125 Kg/m.
Live Load 400 kg/sq.m.
= 400 x 1.5 / 2 = 300 Kg/m.

Total Load = 820.3125 + 300 = 1120.3 Kg/m.


say 1120 Kg/m.

Clear Span = 3.30 m


Clear Cover = 40 mm
Providing 16 mm dia bars
Effective depth = 87.5 - 4.00 - 0.80 = 82.7 cm

Effective Span:
i) Clear Span + Effective Depth = 3.300 + 0.827 = 4.127 m
ii) Clear Span + Bearing Length = 3.300 + 0.370 = 3.670 m

Effective Span = 3.670 m

Max Bending Moment Wl2/8 = 1120 x 3.670 ²


8
= 1885.65 kg - m.
Effective Depth required = √M / Q b
= √ 188565.000
12.088 x 22.50
= 26.33 cm < 87.5 cm
HENCE OK
Area of Steel required = M / txj xd
= 188565
2000 x 0.894 x 82.7
= 1.275 sq.cm.

Minimum steel in beams (As) = (0.85 x bd)/fy


= ( 0.85 x 22.50 x 88 ) / 415
= 4.032 sq. cm.

124
Subject : DESIGN OF FOOT BRIDGE
Chainage : Km : 5.085

Provide 12 mm dia bars 4 No's


Area of steel provided = 4.524 sq.cm.

HENCE STEEL PROVIDED IS SUFFICIENT

Side Face Reinforcement


0.1 % of Cross sectional Area = ( 0.10 x 22.50 x 88 ) / 100
= 1.969 sq.cm.

Provide 8 mm dia bars 4 No's on each face


Area Provided = 0.503 x4
= 2.011 sq.cm. HENCE OK

Design of Horizontal Thrust As per Clause 206.2 of IRC 6: 2010

Horizontal Load per metre width = 750 kg/m.


B.M. due to this force = 750 x 88 x 1
= 65625 kg cm.
Effective depth available = 22.5 - 4.00 - 0.80
= 17.7 cm
Area of steel required = 65625 / ( 2000 x 0.894 x 17.70 )
= 2.074 sq.cm.
Spacing of stirrups = ( 100 x 0.503 ) 2.074
= 24.236 cm
Provide 10 mm dia bars at as vertical links 24 cm c/c

Check for Shear


Shear force (V) = WL/2
= 1120 x 3.30 / 2
= 1848 kgs.
Shear Stress (Tv) = V/bd
= 1848 / 22.5 x 82.7 = 0.993 kg/cm2
% of Steel = 100 x Ast/ bd
= ( 100 x 4.524 ) / ( 22.50 x 82.70 )
= 0.243 %
From Table 23 of IS 456:2000
Permissible Shear Stress = 0.2586 N/mm2 = 2.586 kg/cm2
NO NEED OF SHEAR REINFORCEMENT

125
Subject : DESIGN OF FOOT BRIDGE PIER
Chainage : Km : 5.085

0.075 RCL + 84.281


0.100 DECK SLAB WCL + 84.206
0.100 BOD + 84.106
0.3 BED BLOCK BB + 83.706
1.000
MWL + 83.706

2.906 PIER
Trough Level + 81.870

0.5 1.000 0.5


1.07
PBL + 80.800
0.5 FOOTING FL + 80.300

2.000

1.000 m
3.950

2.950

1.950

2.000

I. LIVE LOAD
5 kN/m2

C D
3.790 0.51 3.790
RA RB

Reaction Calculations:

Taking moments about C


RA x 3.79 = 5 x 3.79 ² / 2
RA = 9.475 kN

Taking moments about D


RB x 3.790 = 5 x 3.79 ² / 2
RB = 9.475 kN

RA + RB = 18.950 kN AND RA - RB = 0.0 kN


Live load reaction on the pier:
Case(i):
load moving in a direction away from the pier: = 1.895 t
Case(ii):
load moving in a direction towards the pier: = 1.895 t

III. Moment due to Frictional Force:


Dead load due to super structure:
Weight of slab = 4.280 x 0.100 x 1.950 x 2.5 = 2.087 t
Wt of wc = 4.280 x 0.100 x 1.500 x 2.5 = 1.605 t
Weight of kerbs = 2 x 4.280 x 0.225 x 0.875 x 2.5 = 4.213 t
Haunches = 2 x 4.280 x 0.500 x 0.023 x 2.5 = 21.400 t
Dead load due to Super structure = 29.305 t

Rg = 29.305 / 2 = 14.652 t
Friction Coefficient = 0.5
Frictional force = 0.5 x 14.652 = 7.326 t
Right side bearing resistance = 0.9 x 7.326 = 6.594 t
(10% variation from left side)
Unbalanced force = 7.326 - 6.594 = 0.73 t
Moment at top of foundation + 80.800
= 0.73 x 3.306 = 2.422 t-m
Moment at top of soil + 80.300
= 0.73 x 3.806 = 2.788 t-m

IV. Moment due to wind force:


Exposed height of Deck = 0.100 m
Wearing coat = 0.100 m
Hanuches = 0.100 m
Parapet Height = 0.600 m
Height from the bottom of the deck to Centre of railing = 0.5 m
1.
(a) The wind force on the bridge superstructure will be computed as per 212.2 of IRC:6 2000,

Height of hand railing = 0.600 m


Height on which the wind force acts = 0.100 + 0.100 + 0.600 = 0.800 m

Exposed height of pier over MWL = 84.106 - 83.706 = 0.400 m


Average height at centre of deck = 0.400 + ( 0.100 + 0.100 ) + 0.600 / 2 = 0.900 m

Exposed height of pier above TL = 84.106 - 81.870 = 2.236 m


Average height at centre of deck = 2.24 + ( 0.100 + 0.100 ) + 0.600 / 2 = 2.736 m

Case –1 :- MWL Condition :-


Exposed height of pier over MWL = + 84.106 - 83.706 = 0.400 m
Avg height at centre of deck = 0.400 + ( 0.100 + 0.100 ) + 0.600 / 2 = 0.900 m

Calculation of wind pressure by Gust Factor Method (As per IS: 875(Part 3) 1987, cl.8.2.1)

Basic wind speed (Vb) = 44.00 m/sec (IRC 6 -2010, Fig. No.6)
The variation of hourly mean wind speed (Vz) = Vb * k1 * k2 * k3
where
Risk co-efficient factor (k1) = 1.05 (IS: 875(Part 3) 1987, Table No.1)
Different heights & terrain factor (k = 0.78 (IS: 875(Part 3) 1987, Table no.33)
Topography factor (k3) = 1.0286 (IS: 875(Part 3) 1987, cl.5.3.3)
Design wind pressure (Pz) = 0.6 * Vz2

S.No. Height Vb k1 k2 k3 Vz Pz
(m) (m/sec) (m/sec) (N/m2)
1 10.00 44.00 1.05 0.78 1.0286 37.07 824.36
2 15.00 44.00 1.05 0.82 1.0286 38.97 911.08
3 20.00 44.00 1.05 0.85 1.0286 40.39 978.96
4 30.00 44.00 1.05 0.88 1.0286 41.82 1049.29
5 50.00 44.00 1.05 0.93 1.0286 44.19 1171.91
6 100.00 44.00 1.05 0.99 1.0286 47.05 1328.00

MWL condition,for a height of 0.90 m, H= 0.900 m


Pz = 82.436 kg/m2

Case – 2 :- Trough Level Condition :-

Exposed height of pier above TL = + 84.106 - 81.870 = 2.236


Avg height at centre of deck = 2.24 + ( 0.100 + 0.100 ) + 0.600 / 2 = 2.736

PZ
for 0.900 m = 82.436 kg/sqm
for 2.736 m = 82.436 kg/sqm

Area of superstructure acted upon by wind pressure(on each span)

= ( 0.100 + 0.100 ) + 0.600 / 2 x 4.280 )


= 2.140 m2
As per Cl. 209.3.3 of IRC:6-2010 ;The Transverse wind force is given by the formula

FT = PZ * At * CD * G
where, PZ = Hourly mean wind pressure in N/m2
A1 = Solid area in m2
G = Gust factor
CD = Drag coefficient depending upon the geometric shape of the Bridge Deck

CD = 1.3 (Table 5 of IRC:6-2010)


G = 2

For Stream Full Condition


Total Wind Force on deck slab FT = 0.459 t

This force acts at the centre of Area of pressure from le = 80.800

Therefore Lever arm from bottom of pier ie at level = + 80.800


= 3.306 + ( 0.100 + 0.100 + 0.300 ) / 2
= 3.556 m
Moment due to Wind Force at + 80.800 = 0.459 3.556
= 1.631 t-m
Therefore Lever arm from bottom of foundation ie at level + 80.300
= 3.806 + ( 0.100 + 0.100 + 0.300 ) / 2
= 4.056

Moment due to Wind Force at + 80.300 = 0.459 x 4.06


= 1.860 t-m
For Stream Empty Condition
Total Wind Force on deck slab FT = 0.459
Therefore Lever arm from bottom level of pier ie at level + 80.800
= 3.306 + ( 0.100 + 0.100 + 0.300 ) / 2
= 3.556 m
Moment due to Wind Force at +80.800 = 0.459 x 3.556
= 1.631 t-m

Therefore Lever arm from bottom level of foundation i.e., at level +80.300
= 3.806 + ( 0.100 + 0.100 + 0.300 ) / 2
= 4.056 m
Moment due to wind force at + 80.300 = 0.459 x 4.056
= 1.860 t-m

(b) Wind force in longitudinal direction is taken as 25 to 50 % of wind force in transverse direction
(as per clause 209.3.4 of IRC:6-2010)

Stream Full condition


Moment due to wind force at + 80.800 = 1.631 t-m
Moment due to wind force at + 80.300 = 1.860 t-m

Stream empty condition


Moment due to wind force at + 80.800 = 1.631 t-m
Moment due to wind force at + 80.300 = 1.860 t-m

IV. Moment due to water currents:


(a) In Stream flow direction:
As per clause 213.2 of IRC:6-2000 force due to water currents in the direction of canal flow is
given by:
p = 52 k V²
V = 1.414 v
v = Velocity of flow in canal
= Q / A = 21.457 / 8.258 = 2.598 m/s
V = 1.414 x v = 1.414 x 2.598 = 3.674 m/s

p = 52 x 0.660 x 3.674 ² = = 463.326 kg/sqm


Pressure due to water currents at MWL = 463.326 kg/sqm
Pressure due to water currents at TL = 0
Area of pier profile immersed in water = ( 1.000 + 1.387 )/2 x 2.906 = 3.469 m²

Total Pressure due to water currents = ( 463.326+ 0 )/2 x 1/1000 x 3.469


= 0.804 t

Water pressure is acting at h/3 from TL = 1/3 x 2.906 = 0.969 m

Depth of pier from TL to the foundation top = 1.070 m

Moment at + 80.800 = 0.8036 ( 0.969 + 1.070 ) = 1.638 t-m


Moment at + 80.300 = 0.8036 ( 0.969 + 1.070 + 0.500 ) = 2.040 t-m
(b) In road way direction:
Water force in road way direction due to 250mm difference in water levels between the opposite
faces of the pier. From clause 213.6 of IRC: 6-2000

250 mm
MWL + 83.706 0
1.836 + 83.456
1.586
TL + 81.870 + 81.870
+ 80.800
+ 80.300
Depth of flow in canal = 1.84 m

Average length of pier = ( 1.950 + 0.000 ) / 2


= 0.975 m
Depth of pier from CBL to the top of foundation = 1.07 m

Moment at + 80.800 = 1/2 x ( 1.836 ² ) ( 1.836 /3 + 1.07 ) x 0.975


M1 = 2.764 t-m

M2 = 1/2 x ( 1.586 ² ) (1.586 /3+ 1.07 ) x 0.975


= 1.960 t-m

M1 - M2 = 0.804 t-m

Moment at + 80.300 = 1/2 x ( 1.836 ² ) ( 1.836 /3 + 1.070 + 0.50 ) x 0.975

M1 = 3.586 t-m

M2 = 1/2 x ( 1.586 ² ) ( 1.586 /3 + 1.070 + 0.50 ) x 0.975


= 2.574 t-m

M1 - M2 = 1.012 t-m

Total moments in road way direction:


Stream Full Condition

A) at + 80.800 ( on concrete)
Moments due to friction force + water currents
Case(I) = 2.422 + 0.804 = 3.226 t-m
Case(II) = 2.422 + 0.804 = 3.226 t-m
B) at + 80.300 ( on soil)
Moments due to friction force + water currents
Case(I) = 2.788 + 1.012 = 3.801 t-m
Case(II) = 2.788 + 1.012 = 3.801 t-m

Stream Empty condition


A) at + 80.800 ( on concrete)
Moments due to friction force
Case(I) = 2.422 = 2.422 t-m
Case(II) = 2.422 = 2.422 t-m
B) at + 80.300 ( on soil)
Moments due to friction force
Case(I) = 2.788 = 2.788 t-m
Case(II) = 2.788 = 2.788 t-m

Total moments in Stream flow direction:


Stream Full Condition
A) at + 80.800 ( on concrete)
Moments due to wind force + water currents
Case(I) = 1.631 + 1.638 = 3.269 t-m
Case(II) = 1.631 + 1.638 = 3.269 t-m
B) at + 80.300 ( on soil)
Moments due to live load eccentricity + wind force + water currents
Case(I) = 1.860 + 2.040 = 3.901 t-m
Case(II) = 1.860 + 2.040 = 3.901 t-m

Stream Empty condition


A) at + 80.800 ( on concrete)
Moments due to wind force
Case(I) = 1.631 = 1.631 t-m
Case(II) = 1.631 = 1.631 t-m
B) at + 80.300 ( on soil)
Moments due to live load eccentricity + wind force
Case(I) = 1.860 = 1.860 t-m
Case(II) = 1.860 = 1.860 t-m

Self weight of pier:

Weight of bed block = 1.95 x 0.30 x 1.00 x 2.5 = 1.463 t


Weight of CC pier from + 83.706 to + 80.800
= ( 1.00 + 1.000 ) /2 x 2.91 x 1.000 x 2.500 = 7.265 t

Cut & ease waters between + 83.706 & + 80.800

= p/4( ( 1.0 ² + 1.0 ² ) )/2 x 2.906 x 2.500 = 5.706 t

Weight of displaced water due to pier (with 100% buoyancy)


= ( 1.000 + 1.00 ) / 2 x 2.906 x 1.000 x 1.5 = 4.359 t

Weight of displaced water due to cut and ease water(with 100% buoyancy)

= p/4( 1.000 ² + 1.000 ² )/2 x 2.906 x 1.0 = 2.282 t

Stream Full Condition


Self weight of pier(with 100% bouyancy)
= 7.265 + 5.706 + 1.463 - ( 4.359 + 2.282 ) = 7.792 t

Stream Empty condition


Self weight of pier = 7.265 + 5.706 + 1.463 = 14.433 t

Total direct loads at + 80.800

Stream Full Condition


Case(1) = 7.792 + 1.895 + 29.305 = 38.992 t
Case(II) = 7.792 + 1.895 + 29.305 = 38.992 t
Stream Empty condition
Case(1) = 14.433 + 1.895 + 29.305 = 45.633 t
Case(II) = 14.433 + 1.895 + 29.305 = 45.633 t

Weight of foundation = 3.950 x 2.000 x 0.500 x 2.500 = 9.875

Weight of foundation (considering 100% buoyancy)


= 9.875 / ( 2.500 x 1.40 ) = 5.530 t
Therefore direct loads at + 80.300
Stream Full Condition
Case( I ) = 38.992 + 5.530 = 44.522 t
Case(II) = 38.992 + 5.530 = 44.522 t
Stream Empty condition
Case( I ) = 45.633 + 9.875 = 55.508 t
Case(II) = 45.633 + 9.875 = 55.508 t
Sectional properties:

At the base of the pier i.e. at + 80.800 2


Area (a) = 1.000 x 2.906 +p/4 x ( 0.50 ) = 3.102 Sqm
Equivalent length of pier 2
= 1.000 + [ p/4 x ( 0.500 ) / 0.50 ] = 1.393 m

Section modulus:
Zxx = 1.393 x 2.906 2
/ 6 = 1.960 m3
Zyy = 2.906 x 1.393 2
/ 6 = 0.939 m3

At the base of the foundation i.e. at + 80.300


Area (a) = 3.950 x 2.000 = 7.900 Sqm

Section modulus:
Zyy = 3.950 x 2.000 2
/ 6 = 2.633 m3
Zxx = 2.000 x 3.950 2
/ 6 = 5.201 m3

Stream Full Condition


STRESSES IN FOUNDATION CONCRETE ie AT + 80.800 :

CASE (I) 38.992 3.226 3.269


= --------- + ------------ + ------------
3.102 1.960 0.939

= 12.568 + 1.646 + 3.480

= 17.694 t/sqm (Max) Compressive stress

= 7.443 t/sqm (Min) Compressive stress

CASE (II) = 38.992 3.226 3.269


------------ + ------------ + ------------
3.102 1.960 0.939

= 12.568434 + 1.646 + 3.480

= 17.694 t/sqm (Max) Compressive stress


= 7.443 t/sqm (Min) Compressive stress
STRESSES ON SOIL ie AT + 80.300 :

CASE (I) 44.522 3.801 3.901


= ------------ + ------------ + ------------
7.900 2.633 5.201

= 5.636 + 1.443 + 0.750

= 7.829 t/sqm (Max) Compressive stress

= 3.442 t/sqm (Min) Compressive stress

CASE (II) 44.522 3.801 3.901


= ------------ + ------------ + ------------
7.900 2.633 5.201

= 5.636 + 1.443 + 0.750

= 7.829 t/sqm (Max) Compressive stress

= 3.442 t/sqm (Min) Compressive stress

ABSTRACT OF STRESSES

Details MIN.
MAX. STRESS t/sq.m. STRESS
t/sq.m.
Stress in Concrete:
Case - 1 17.694 7.443 compressive stress
Case - 2 17.694 7.443 compressive stress
Stress on Soil:
Case - 1 7.829 3.442 compressive stress
Case - 2 7.829 3.442 compressive stress

Stream Empty condition


STRESSES IN FOUNDATION CONCRETE ie AT + 80.800 :

CASE (I) 45.633 2.422 1.860


= ------------ + ------------ + ------------
3.102 1.960 0.939

= 14.709 + 1.236 + 1.980

= 17.925 t/sqm (Max) Compressive stress

= 11.493 t/sqm (Min) Compressive stress

CASE (II) 45.633 2.422 1.860


= ------------ + ------------ + ------------
3.102 1.960 0.939

= 14.709188 + 1.236 + 1.980

= 17.925 t/sqm (Max) Compressive stress

= 11.493 t/sqm (Min) Compressive stress

STRESSES ON SOIL ie AT + 80.300 :


CASE (I) 55.508 2.788 1.860
= ------------ + ------------ + ------------
7.900 2.633 5.201

= 7.027 + 1.059 + 0.358

= 8.444 t/sqm (Max) Compressive stress

= 5.610 t/sqm (Min) Compressive stress

CASE (II) 55.508 2.788 1.860


= ------------ + ------------ + ------------
7.900 2.633 5.201

= 7.026 + 1.059 + 0.358

= 8.443 t/sqm (Max) Compressive stress

= 5.610 t/sqm (Min) Compressive stress

ABSTRACT OF STRESSES

Details MAX. MIN.


STRESS STRESS
t/sq.m. t/sq.m.
Stress in Concrete:
Case - 1 17.925 11.493 compressive stress
Case - 2 17.925 11.493 compressive stress
Stress on Soil:
Case - 1 8.444 5.610 compressive stress
Case - 2 8.443 5.610 compressive stress
SUBJECT : DESIGN OF FOOT BRIDGE ABUTMENT
CHAINAGE : Km : 5.085

Details of the deck


1 Carriage width = 1.500 m
2 Bottom width of deck = 1.500 m
3 Thickness of the deck = 0.100 m
4 Thickness of wearing coat = 0.075 m
5 Height of parapet = 0.600 m
6 Width of parapet = 0.225 m
7 Length of abutment = 1.950 m
8 Haunches = 0.100 m

10.2.1 Loads on Abutments


I) Deck = 4.040 x 1.500 x 0.100 x 2.500 = 1.515 t
Ii) Wearing coat = 4.040 x 1.500 x 0.075 x 2.500 = 1.136 t
Iii) Parapet = 4.040 x 0.225 x 0.600 x 2.500 = 2.727 t
V) Haunches = 4.040 x 0.100 x 0.225 x 2.500 = 0.455 t
Total = 5.83 t
Dead load on abutment = 5.833
2
= 2.916 t

10.2.2 Live Load Reaction:


400 Kg/m2

A B
3.670

Taking moments about - B


TA x 3.670 = 0.4 x 3.670 x 3.670 / 2
= 2.694
= 2.694 = 0.734 t
3.670

Total load per length of the abutment


= 2.916 + 0.73 = 1.872 t
1.950

6.6.0 Frictional Load:


As per Clause 211.5.1.1 of IRC 6 : 2010 the coefficient of friction for concrete over concrete
with bitumen layer in between is
Frictional force = 0.5 x dead load
= 0.500 x 2.916
= 1.458 t

125
SUBJECT : DESIGN OF FOOT BRIDGE ABUTMENT
CHAINAGE : Km : 5.085

Frictonal force/m width = 1.458 = 0.748 t


1.950

Section ( 4 – 4)
0.02 + 84.281
W3 + 84.206
W2 0.49 + 84.106 BOD
+ 83.731 Bed block level
W7 W6

W5 MFL + 83.706
2.83 W4 1.861

+ 81.870 Trough sill level

1.0
0.4 1.50 1.00 0.4 + 80.900
A 2.5
0.6
W8 + 80.300
B 3.3

Taking moments about A

Load Particulars Force LA Moment


Height Breadth Density V H
W1 As Calculated 1.872 2.255 4.221
W2 0.510 x 0.375 x 2.500 0.478 2.000 0.956
W3 0.175 x 0.490 x 2.500 0.214 1.745 0.374
W4 2.831 x 1.000 x 2.500 7.078 2.000 14.155
W5 0.5 3.381 x 1.500 x 2.500 6.339 1.000 6.339
W6 0.5 3.381 x 1.500 x 2.000 5.072 0.500 2.536
Pv 0.0395 x 4.031 x 1.200 x 2.000 1.170
Ph 0.1580 x 4.031 x 1.200 x 2.000 4.68 1.352 6.33
Ff Frictional force 0.748 3.206 2.397
∑V= 22.223 ∑M= 34.911

lever arm = 34.911 = 1.571 m


22.223
e = 1.571 - 1.25 = 0.321 m
Allowable e = 0.417 > 0.321 HENCE OK

Stress in concrete =
22.223 1 + 6 0.321 )
2.5 2.5
= 8.889 ( 1 + 0.770 )

Max = 15.736 t/m2


Min = 2.042 t/m2

126
SUBJECT : DESIGN OF FOOT BRIDGE ABUTMENT
CHAINAGE : Km : 5.085

Taking moments about B

Load Particulars Force LA Moment


Height Breadth Density V H
W1 As calculated 1.872 2.655 4.970
W2 As calculated 0.478 2.400 1.148
W3 As calculated 0.214 2.145 0.460
W4 As calculated 7.078 2.400 16.986
W5 As calculated 6.339 1.400 8.875
W6 As calculated 5.072 0.900 4.564
W7 3.381 x 0.300 x 2.000 2.029 0.200 0.406
W8 0.600 x 3.300 x 2.500 4.950 1.650 8.167
Pv 0.0395 x 5.181 x 1.200 x 2.000 2.007
Ph 0.1580 x 5.181 x 1.200 x 2.000 8.027 1.592 12.783
Ff As calculated 0.748 3.806 2.846
∑V= 30.038 ∑M= 58.359

lever arm = 58.359 = 1.943 m


30.038
e = 0.293 m
Allowable e = 3.3 = 0.550 > 0.293 m
6 HENCE OK

Stress on soil = 30.038 1 + 6 0.293 )


3.3 3.3

= 9.103 ( 1 + 0.533 )

Max = 13.952 t/m2


Min = 4.253 t/m2

127
SUBJECT : DESIGN OF WINGS WALL SECTIONS
CHAINAGE : Km : 5.085

unit wt of concrete = 2.500 t/cum GL U/S = + 85.429


unit wt of earth = 2.000 t/cum GL D/S = + 81.875

1.0 DESIGN OF HORIZONTAL WING WALL & RETURN WALL : U/S Section (1-1 & 2-2 )
+84.281

W3
W4 W1 2.581
W2

0.40 A 1.20 0.5 0.4 +81.700


0.5 W5 1.7
B +81.200
2.50

Taking Moments about (A)


Force L.A. Moment
Load Particulars
V H
W1 x 0.500 x 2.581 x 2.50 3.230 1.450 4.684
W2 0.5 x 1.200 x 2.581 x 2.50 3.900 0.800 3.120
W3 0.5 x 1.200 x 2.581 x 2.00 3.097 0.400 1.239
Pv 0.0395 x 2.000 x 2.581 ^2 0.526 - -
Ph 0.1580 x 2.000 x 2.581 ^2 2.105 1.032 2.173
∑V 10.753 ∑M 11.216
Lever arm = 11.22 / 10.753 = 1.043 m
Eccentricity = 1.043 - 0.85 = 0.193 m
allowable 'e' (b/6) = 0.283 m > 0.193 HENCE OK

stresses = 10.75 (1 + 6 x 0.193 )


1.70 1.700
= 6.33 x (1 + 0.681 )

Max compressive stress = 10.634 t/m2


Min compressive stress = 2.017 t/m2

Taking Moments about (B)


Force L.A. Moment
Load Particulars
V H
W1 x 0.500 x 2.581 x 2.50 3.226 1.850 5.969
W2 0.5 x 1.200 x 2.581 x 2.50 3.872 1.200 4.646
W3 0.5 x 1.200 x 2.581 x 2.00 3.097 0.800 2.478
W4 x 0.400 x 2.581 x 2.00 2.065 0.200 0.413
W5 2.500 x 0.500 x 2.50 3.125 1.250 3.906
Pv 0.0395 x 2.000 x 3.081 ^2 0.750 - -
Ph 0.1580 x 2.000 x 3.081 ^2 3.000 1.232 3.697
∑V 16.135 ∑M 21.108

Lever arm = 21.11 / 16.135 = 1.308 m

125
SUBJECT : DESIGN OF WINGS WALL SECTIONS
CHAINAGE : Km : 5.085

Eccentricity = 1.308 - 1.25 = 0.058 m

allowable 'e' (b/6) = 0.417 m > 0.058 HENCE OK

stresses = 16.135 (1 + 6 x 0.058 )


2.50 2.50
= 6.454 (1 + 0.140 )

Max compressive stress = 7.356 t/m2


Min compressive stress = 5.552 t/m2

2.0 DESIGN OF SLOPED WING WALL at JUNCTION OF FOOT BRIDGE : U/S Section (3 -3 )

+84.281
W3
W4 W1 2.581
W2

0.40 A 1.20 0.5 0.4 +81.700


0.5 W5 1.7
B +81.200
2.50

Taking Moments about (A)


Force L.A. Moment
Load Particulars
V H
W1 x 0.500 x 2.581 x 2.50 3.230 1.450 4.684
W2 0.50 x 1.200 x 2.581 x 2.50 3.900 0.800 3.120
W3 0.50 x 1.200 x 2.581 x 2.00 3.097 0.400 1.239
Pv 0.0395 x 2.000 x 2.581 ^2 0.526 - -
Ph 0.1580 x 2.000 x 2.581 ^2 2.105 1.032 2.173
∑V 10.753 ∑M 11.216

Lever arm = 11.22 / 10.753 = 1.043 m


Eccentricity = 1.043 - 0.85 = 0.193 m

allowable 'e' (b/6) = 0.283 m > 0.193 HENCE OK

stresses = 10.75 (1 + 6 x 0.193 )


1.70 1.700
= 6.33 x (1 + 0.681 )

Max compressive stress = 10.634 t/m2


Min compressive stress = 2.017 t/m2

Taking Moments about (B)


Force L.A. Moment
Load Particulars
V H
W1 x 0.500 x 2.581 x 2.50 3.226 1.850 5.969

126
SUBJECT : DESIGN OF WINGS WALL SECTIONS
CHAINAGE : Km : 5.085

W2 0.50 x 1.200 x 2.581 x 2.50 3.872 1.200 4.646


W3 0.50 x 1.200 x 2.581 x 2.00 3.097 0.800 2.478
W4 x 0.400 x 2.581 x 2.00 2.065 0.200 0.413
W5 x 2.500 x 0.500 x 2.50 3.125 1.250 3.906
Pv 0.0395 x 2.000 x 3.081 ^2 0.750 - -
Ph 0.1580 x 2.000 x 3.081 ^2 3.000 1.232 3.697
∑V 16.135 ∑M 21.108

Lever arm = 21.11 / 16.135 = 1.308 m

Eccentricity = 1.308 - 1.25 = 0.058 m

allowable 'e' (b/6) = 0.417 m > 0.058 HENCE OK

stresses = 16.135 (1 + 6 x 0.058 )


2.50 2.50
= 6.454 (1 + 0.140 )

Max compressive stress = 7.356 t/m2


Min compressive stress = 5.552 t/m2

3.0 DESIGN OF WING WALL BESIDE TROUGH U/S Section (5-5 )


+83.470

W3
W4 W1 1.770
W2

0.40 A 1.00 0.5 0.4 +81.700


0.5 W5 1.5
B +81.200
2.30

Taking Moments about (A)

Force L.A. Moment


Load Particulars
V H
W1 x 0.500 x 1.770 x 2.50 2.210 1.250 2.763
W2 0.50 x 1.000 x 1.770 x 2.50 2.200 0.667 1.467
W3 0.50 x 1.000 x 1.770 x 2.00 1.770 0.333 0.590
Pv 0.0395 x 2.000 x 1.770 ^2 0.247 - -
Ph 0.1580 x 2.000 x 1.770 ^2 0.990 0.708 0.701
∑V 6.427 ∑M 5.520

Lever arm = 5.52 / 6.427 = 0.859 m


Eccentricity = 0.859 - 0.75 = 0.109 m
allowable 'e' (b/6) = 0.250 m > 0.109 HENCE OK
stresses = 6.43 (1 + 6 x 0.109 )
1.50 1.500

127
SUBJECT : DESIGN OF WINGS WALL SECTIONS
CHAINAGE : Km : 5.085

= 4.28 x (1 + 0.435 )
Max compressive stress = 6.150 t/m2
Min compressive stress = 2.420 t/m2

Taking Moments about (B)


Force L.A. Moment
Load Particulars
V H
W1 x 0.500 x 1.770 x 2.50 2.213 1.650 3.651
W2 0.50 x 1.000 x 1.770 x 2.50 2.213 1.067 2.360
W3 0.50 x 1.000 x 1.770 x 2.00 1.770 0.733 1.298
W4 x 0.400 x 1.770 x 2.00 1.416 0.200 0.283
W5 x 2.300 x 0.500 x 2.50 2.875 1.150 3.306
Pv 0.0395 x 2.000 x 2.270 ^2 0.407 - -
Ph 0.1580 x 2.000 x 2.270 ^2 1.628 0.908 1.479
∑V 10.893 ∑M 12.377

Lever arm = 12.38 / 10.893 = 1.136 m

Eccentricity = 1.136 - 1.15 = 0.014 m


allowable 'e' (b/6) = 0.383 m > 0.014 HENCE OK

stresses = 10.893 (1 + 6 x 0.014 )


2.30 2.30
= 4.736 (1 + 0.036 )

Max compressive stress = 4.907 t/m2


Min compressive stress = 4.565 t/m2

4.0 DESIGN OF WING WALL BESIDE TROUGH D/S Section (7 – 7)

+83.470
W3
W4 W1
W2 1.770

0.40 A 0.90 0.5 0.4 +81.700


0.5 W5 1.4
B +81.200
2.200

Taking Moments about (A)

Force L.A. Moment


Load Particulars
V H
W1 x 0.500 x 1.770 x 2.50 2.210 1.150 2.542
W2 0.50 x 0.900 x 1.770 x 2.50 2.000 0.600 1.200
W3 0.50 x 0.900 x 1.770 x 2.00 1.593 0.300 0.478
Pv 0.0395 x 2.000 x 1.770 ^2 0.247 - -

128
SUBJECT : DESIGN OF WINGS WALL SECTIONS
CHAINAGE : Km : 5.085

Ph 0.1580 x 2.000 x 1.770 ^2 0.990 0.708 0.701


∑V 6.050 ∑M 4.920

Lever arm = 4.92 / 6.050 = 0.813 m

Eccentricity = 0.813 - 0.70 = 0.113 m


allowable 'e' (b/6) = 0.233 m > 0.113 HENCE OK

stresses = 6.05 (1 + 6 x 0.113 )


1.40 1.400
= 4.32 x (1 + 0.485 )

Max compressive stress = 6.419 t/m2


Min compressive stress = 2.225 t/m2

Taking Moments about (B)


Force L.A. Moment
Load Particulars
V H
W1 x 0.500 x 1.770 x 2.50 2.213 1.550 3.429
W2 0.50 x 0.900 x 1.770 x 2.50 1.991 1.000 1.991
W3 0.50 x 0.900 x 1.770 x 2.00 1.593 0.700 1.115
W4 x 0.400 x 1.770 x 2.00 1.416 0.200 0.283
W5 x 2.200 x 0.500 x 2.50 2.75 1.100 3.025
Pv 0.0395 x 2.000 x 2.270 ^2 0.407 - -
Ph 0.1580 x 2.000 x 2.270 ^2 1.628 0.908 1.479
∑V 10.370 ∑M 11.322

Lever arm = 11.32 / 10.370 = 1.092 m

Eccentricity = 1.092 - 1.10 = 0.008 m


allowable 'e' (b/6) = 0.367 m > 0.008 HENCE OK

stresses = 10.370 (1 + 6 x 0.008 )


2.20 2.20
= 4.714 (1 + 0.022 )

Max compressive stress = 4.818 t/m2


Min compressive stress = 4.609 t/m2

5.0 DESIGN OF SLOPED WING WALL AT THE JUNCTION OF ROAD BRIDGE : D/S Section (9-9)

+83.992
W3 W1
2.292
W4 W2

0.4 A 1.200 0.50 0.4 +81.700


0.5 W5 1.7
B +81.200

129
SUBJECT : DESIGN OF WINGS WALL SECTIONS
CHAINAGE : Km : 5.085

2.500

Taking Moments about (A)


Force L.A. Moment
Load Particulars
V H
W1 x 0.500 x 2.292 x 2.50 2.870 1.450 4.162
W2 0.50 x 1.200 x 2.292 x 2.50 3.400 0.800 2.720
W3 0.50 x 1.200 x 2.292 x 2.00 2.750 0.400 1.100
Pv 0.0395 x 2.000 x 2.292 ^2 0.415 - -
Ph 0.1580 x 2.000 x 2.292 ^2 1.660 0.9168 1.522
∑V 9.435 ∑M 9.503

Lever arm = 9.50 / 9.435 = 1.007 m

Eccentricity = 1.007 - 0.85 = 0.157 m

allowable 'e' (b/6) = 0.283 m > 0.157 HENCE OK

stresses = 9.435 (1 + 6 x 0.157 )


1.700 1.70

= 5.55 x (1 + 0.555 )

Max compressive stress = 8.630 t/m2


Min compressive stress = 2.470 t/m2

Taking Moments about (B)


Force L.A. Moment
Load Particulars
V H
W1 x 0.500 x 2.292 x 2.50 2.865 1.850 5.300
W2 0.50 x 1.200 x 2.292 x 2.50 3.438 1.200 4.126
W3 0.50 x 1.200 x 2.292 x 2.00 2.750 0.800 2.200
W4 x 0.400 x 2.292 x 2.00 1.834 0.200 0.367
W5 x 2.500 x 0.500 x 2.50 3.125 1.250 3.906
Pv 0.0395 x 2.000 x 2.792 ^2 0.616 - -
Ph 0.1580 x 2.000 x 2.792 ^2 2.463 1.1168 2.751
∑V 14.628 ∑M 18.650

Lever arm = 18.65 / 14.628 = 1.275 m

Eccentricity = 1.275 - 1.25 = 0.025 m


allowable 'e' (b/6) = 0.417 m > 0.025 HENCE OK

stresses = 14.628 x (1 + 6 x 0.025 )


2.50 2.50
= 5.851 x (1 + 0.060 )

Max compressive stress = 6.202 t/m2

130
SUBJECT : DESIGN OF WINGS WALL SECTIONS
CHAINAGE : Km : 5.085

Min compressive stress = 5.500 t/m2

6.0 DESIGN OF WING WALL & RETURN WALL : D/S Section (10-10 & 11-11)

+83.599
W3 W1
1.899
W4 W2

0.4 A 0.900 0.50 0.4 +81.700


W5 1.4
0.5
B +81.200
2.200

Taking Moments about (A)


Force L.A. Moment
Load Particulars
V H
W1 x 0.500 x 1.899 x 2.50 2.370 1.150 2.726
W2 0.50 x 0.900 x 1.899 x 2.50 2.100 0.600 1.260
W3 0.50 x 0.900 x 1.899 x 2.00 1.709 0.300 0.513
Pv 0.0395 x 2.000 x 1.899 ^2 0.285 - -
Ph 0.1580 x 2.000 x 1.899 ^2 1.140 0.7596 0.866
∑V 6.464 ∑M 5.364

Lever arm = 5.36 / 6.464 = 0.830 m


Eccentricity = 0.830 - 0.70 = 0.130 m

allowable 'e' (b/6) = 0.233 m > 0.130 HENCE OK

stresses = 6.464 (1 + 6 x 0.130 )


1.400 1.40
= 4.62 x (1 + 0.556 )

Max compressive stress = 7.186 t/m2


Min compressive stress = 2.048 t/m2

Taking Moments about (B)


Force L.A. Moment
Load Particulars
V H
W1 x 0.900 x 1.899 x 2.50 4.273 1.550 6.623
W2 0.50 x 0.500 x 1.899 x 2.50 1.187 1.000 1.187
W3 0.50 x 0.500 x 1.899 x 2.00 0.950 0.700 0.665
W4 x 0.400 x 1.899 x 2.00 1.519 0.200 0.304
W5 x 2.200 x 0.500 x 2.50 2.75 1.100 3.025
Pv 0.0395 x 2.000 x 2.399 ^2 0.455 - -
Ph 0.1580 x 2.000 x 2.399 ^2 1.819 0.9596 1.745
∑V 11.133 ∑M 13.548

Lever arm = 13.55 / 11.133 = 1.217 m

131
SUBJECT : DESIGN OF WINGS WALL SECTIONS
CHAINAGE : Km : 5.085

Eccentricity = 1.217 - 1.10 = 0.117 m


allowable 'e' (b/6) = 0.367 m > 0.117 HENCE OK

stresses = 11.133 x (1 + 6 x 0.117 )


2.20 2.20
= 5.060 x (1 + 0.319 )

Max compressive stress = 6.675 t/m2


Min compressive stress = 3.446 t/m2

Max Min
Sl STRESS TABLE
t/m2 t/m2
HORIZONTAL WING WALL & RETURN WALL : concrete 10.634 2.017
1.0
U/S soil 7.356 5.552
Section (1-1 & 2-2 )
SLOPED WING WALL at JUNCTION OF FOOT concrete 10.634 2.017
2.0
BRIDGE : U/S soil 7.356 5.552
Section (3 -3 )
concrete 6.150 2.420
3.0 WING WALL BESIDE TROUGH U/S
soil 4.907 4.565
Section (5-5 )
concrete 6.419 2.225
4.0 WING WALL BESIDE TROUGH D/S
soil 4.818 4.609
Section (7 – 7)
SLOPED WING WALL AT THE JUNCTION OF concrete 8.630 2.470
5.0
ROAD BRIDGE : D/S soil 6.202 5.500
Section (9-9)
concrete 7.186 2.048
6.0 WING WALL & RETURN WALL : D/S
soil 6.675 3.446
Section (10-10 & 11-11)

132
Job : DESIGN OF SUPER PASSAGE
Subject : DESIGN OF RETURNS Chainage : Km : 5.085

8.1 DESIGN OF RETURN & PARAPET


0.3 +84.817
W1
0.225 +84.217
+83.992 +83.942

W4 W2
W5 W3
3.392 +80.600

0.3 2.300 0.525 0.3 +80.600


0.3 A 2.825 W6 +80.300
B
3.425

Input:- unit wt of concrete = 2.5 t/m3 From IRC 6- 2014 clause 203.
unit wt of earth = 2.0 t/m3

Taking Moments about A


Particulars Force
Load LA Moment
Height Breadth Density V H
W1 0.600 x 0.300 x 2.500 0.450 2.675 1.204
W2 3.617 x 0.525 x 2.500 4.747 2.563 12.165
W3 0.50 x 3.392 x 2.300 x 2.500 9.752 1.533 14.953
W4 0.50 x 3.392 x 2.300 x 2.000 7.802 0.767 5.981
Pv 0.0395 ( 4.592² - 1.20²) x 2.000 1.552
Ph 0.1580 ( 4.592² - 1.20²) x 2.000 6.208 1.357 8.423
∑V= 24.303 ∑M= 42.726

lever arm = 42.726


24.303
= 1.758 m
e = 1.758 - 2.83 / 2
= 0.346 m
allowable eccentricity = 2.83
6
= 0.47 > 0.346 HENCE OK

Stresses in concrete = 24.303 ( 1 + 6 x 0.346 )


2.83 2.83
= 8.603 ( 1 + 0.734 )
Max = 14.917 t/m2
Min = 2.289 t/m2

Taking moments about B


Particulars Force
Load LA Moment
Length Breadth Density V H
W1 As calculated 0.450 2.975 1.339
W2 As calculated 4.747 2.863 13.589
W3 As calculated 9.752 1.833 17.879
W4 As calculated 7.802 1.067 8.322
W5 3.392 x 0.300 x 2.000 2.035 0.150 0.305
W6 0.300 x 3.425 x 2.500 2.569 1.713 4.399
Pv 0.0395 ( 4.892² - 1.20²) x 2.000 1.777
Ph 0.1580 ( 4.892² - 1.20²) x 2.000 7.107 1.477 10.496
∑V = 29.132 ∑M= 56.329

Lever arm = 56.329


29.132
= 1.934 m
eccentricity = 1.934 - 3.43 /2
= 0.221
allowable 'e' = 3.43
6
= 0.571 > 0.22 HENCE OK

Stress on soil = 29.132 ( 1 + 6 x 0.221 )


3.43 3.43
= 8.506 ( 1 + 0.387 )

Max = 11.797 t/m2


Min = 5.214 t/m2

Abstract of Stresses
Max. Min.
Details Stress Stress Type Of Stress
t/sq.m. t/sq.m.
Stress in Concrete 14.92 2.29 Compressive stress
Stress on soil 11.80 5.21 Compressive stress
BABU JAGEEVAN RAM UTTARANDHRA SUJALA SRAVANTHI PROJECT
Job :
PACKAGE -1 PHASE – II
Subject : DESIGN OF RCC PIER AND FOOTING

8.300

+ 81.530 0.35
+ 81.180
1.20
+ 79.980

+ 69.005 FSL

-0.35 9.00 -0.35


10.5 16.68
0.75 0.75
+ 64.855 CBL

+ 63.300 1.8 1.8


0 0.8
+ 62.500 0

14.0
DETAIL OF PIER & FOUNDATION

4.500
1.500

14.000
PLAN

HYDRAULIC PARTICULARS :-
1 Design Discharge of canal = 163.032 Cumecs
2 Effective Linear Water Way @ FSL = 49.950 m
3 Maximum Mean Velocity of Flow at FSL V = 0.898 m/sec.
4 Full Supply Level FSL = + 69.005 m
5 Afflux h = 1.5 m
6 Scour Level = + 63.025 m
7 Foundation level Pier = + 62.500 m
8 Safe Bearing Capacity as per the strata. = 25.0 t/m2

DESIGN DATA :-
1 Number of Spans = 7 no's
2 Clear span of piers = 13.00 m

49
3 Span c/c. of Piers (Length of trough per span) = 13.988 m
4 Effective span length = 13.488 m
5 Total width of trough = 8.300 m
6 Trough Width = 6.900 m
7 Width of side wall = 0.350
8 Height of side wall = 2.040
9 Skew of the Bridge = 0.000 deg.
Cos q = 1.0 Sin q = 0.0
10 Full Supply Level FSL = + 69.005 m
11 Bottom of Trough = + 81.530 m
12 Trough sill level = FSL + Slab Thickness + W.C = RFL = = + 81.870 m
13 Thickness of trough slab = 0.300 m
14 Thickness of Sealing Coat ( PCC M30 Grade concrete ) = 0.040 m
15 Top of RCC Footing .i.e., Bottom of Pier = + 63.300 m
16 Thickness of Footing = 0.800 m
17 Scour levels for Pier = + 63.025 m
18 Bottom of Foundations = + 62.500 m
19 Linear waterway provided for Right Crossing = 49.950 m
20 Max. mean Velocity of water flow at FSL = 0.898 m/sec
21 RCC Pier thickness = 1.500 m
22 Bearing width = 0.494 m
23 Unit Weight of RCC = 2.500 t/m3
24 Unit Weight of PCC = 2.500 t/m3

( I ) DEAD LOADS :-
(i) Calculation of Vertical Loads from Superstructure :-
Span C/C of bearings = 13.488 m
Thickness of Expansion Joints = 12 mm
Total length = Clear Span + ( 2 x Bearing Width )
= 13.000 + 0.988
= 13.988 m
Dead Load on Pier = 298.96 t (From abutment loading calculations)

(ii) Dead weight of Sub Structure :


(a) Dead weight of caping beam

8.300 1.500 m

81.530 0.35

1.20
79.980
10.50 1.500
-0.35 9.00 -0.350000000000001

Caping Beam Section

50
Area of Caping beam = ( 8.300 x 1.500 ) + ( 8.650 x 1.500 ) = 25.43 m²

Wt of Rectangular portion = 8.300 x 1.50 x 0.35 x 2.50 = 10.89375 t

Wt of Tapered portion = 8.300 + 9.00


x 1.50 x 1.20 x 2.50 = 38.925 t
2
Total Weight = 49.81875 t

0.75 9.00 0.75

1.500

Plan of Pier

(b) Dead Weight of pier


Size of Pier = 9.00 x 1.500 with Semi-circular cut waters.
Top of hammer head = 81.530 m
Bottom of Caping Beam = 79.980 m
Bottom of Pier = 63.300 m
FSL = 69.005 m
Height of Pier = 79.980 - 63.300 = 16.680 m

Area of Pier = 0.393 x 1.500 x 1.500 = 1.767 m2


+ 9.0 x 1.500 = 13.500 m2
Total Area of Pier = 1.767 + 13.500 = 15.267 m2

Weight of Pier :-
Dry = 15.27 x 16.68 x 2.50 = 636.64 t
100% Buoyancy = 636.64 - ( 15.27 x 5.71 x 1.00 ) = 549.54 t
In case of submergence 100% Buoyancy
= 636.64 - ( 15.27 x 5.71 x 1.00 ) x 0.15
= 623.58 t
c ) Dead Weight of footing :
Size of Footing = 14.000 m X 4.500 m
Thickness Footing = 0.800 m
Area of Footing = 14.00 x 4.500 = 63.000 sqm
Wt of Rectangular portion = 63.00 x 0.800 x 2.500 = ###
Hence, the weight of footing without buoyancy = ###

Volume of footing = ( 4.50 x 0.800 ) x 14.000


= ( 3.60 14.0000 = 50.400 m3
Weight of Footing: =
Dry = 50.400 x 2.500 = 126.000 t
15% Buoyancy = 50.400 x 2.350 = 118.440 t
100% Buoyancy = 50.400 x 1.500 = 75.600 t

51
Pier Width
9.00 1.500
10.50
14.00 0.75 0.75 0
0 4.500
0.8
0.8

14.000 4.500

A Eccentricities :-
Bearing width = 0.744

0.75 0.750

a). Dead load Eccentricity :-


Along Traffic (Longitudinal ) = 0.750 m - 0.372 - 0.012
= 0.372 m

II) . WATER CURRENT : ( IRC:6-2014 Cl.210)

Presumed to be hitting the Pier at 20 degrees to flow. (As per IRC:6-2014 Cl.210.5)
Shape factor for pier with semi circular ends K = 0.660
Design velocity of Water Current v = 0.898 m / s
Max. Velocity of water @ FSL V = 2^(1/2) v = 1.270 m/s
The Intensity of Pressure on Pier “P” = 52K*V2 = 55.350 kg/m2

As per Clause 210.5 of IRC:6-2014 the variation in the current direction should be taken as 200
Intensity of water pressure parallel to pier
55.35 x Cos20 = 52.01 kg/m2
Intensity of water pressure perpendicular to pier
55.35 x Sin20 = 18.93 kg/m2
Depth of water level = 5.71 m

FSL +69.005

4.150

Bed level +64.855

2.355
Foundation lvl. +62.500

52
a. Water Current Force in longitudinal direction
Intensity of pressure @ Pier bottom level = 6.854 kg/m2
i. Due to Rectangle = 6.854 x 9.000 x 4.150 = 255.979 kg
ii. Due to Triangle = 12.077 x 9.000 x 4.150 = 225.544 kg
Total Force = i + ii = 481.522 kg

b. Water Current Force in transverse direction


Intensity of pressure @ Pier bottom level = 18.830 kg/m2
i. Due to Rectangle = 18.830 x 1.500 x 4.150 = 117.216 kg
ii. Due to Triangle = 33.182 x 1.500 x 4.150 = 103.279 kg
Total Force = i + ii = 220.495 kg

Moments due to Water current : at top of Footing


Longitudinal = ( 255.979 x 0.5x4.2) + ( 225.544 x 0.67 x 4.150 ) = 1.155 t-m
Transverse = ( 117.216 x 0.5x4.2) + ( 103.279 x 0.67 x 4.150 ) = 0.529 t-m

Moments due to Water current : at bottom of Footing


Longitudinal = 481.522 x ( 4.150 + 0.800 ) = 2.384 t-m
Transverse = 220.495 x ( 4.150 + 0.800 ) = 1.091 t-m

III) . WIND FORCE :- ( As per IRC:6-2014, Cl. 209)

CBL = +64.855 m
FSL = +69.005 m
Sill level = +81.870 m
Bottom of trough = +81.530 m
trough Length = 13.988 m
Wind force on trough :
Height of Side wall = 2.040
Thickness of trough slab + Sealing coat = 0.340
Wind force acts at half the Sidewall Height = 1.020 m
Height above on which wind force acts = 0.340 + 1.020
= 1.360 m

Area of super structure acted upon by wind = ( 0.340 + 1.020 ) x 13.988


press = 19.024 m 2

Area of sub structure acted upon by wind = ( 1.500 x 18.230 )


press = 27.345 m2

As per IRC 6-2014 , clause 209.3.3, Transverse Wind Force FT = PZ x A x G x CD


Where,
PZ = Hourly Wind Pressure in N/m2
A= The Solid Area Exposed to Wind
G= Gust Factor = 2.0
CD = Drag Coefficient depending on Geometric shape of Bridge
For Super Structure CD = 1.1
For Live Load CD = 1.2

53
For Sub Structure (Semi Circular) H/b = 11.12 , t/b = 6.00 > 4
CD = 0.8 (Table 6, IRC 6-2014)

Calculation of wind pressure by Gust Factor Method


(As per IS: 875(Part 3) 1987, cl.8.2.1)
Basic wind speed (Vb) = 33.00 m/sec (IRC 6 -2014, Fig. No.6)
Depending on the project Location( Mahbubnagar, Telangana ,India)
wind speed (Vb) = 44.00 m/sec
The variation of hourly mean wind speed (Vz) = Vb * k1 * k2 * k3
where,
Risk co-efficient factor (k1) = 1.05 (IS: 875(Part 3) 1987, Table No.1)
Different heights & terrain factor (k2) = 0.78 (IS: 875(Part 3) 1987, Table no.33)
Topography factor (k3) = 1.029 (IS: 875(Part 3) 1987, cl.5.3.3)

Design wind pressure (Pz) = 0.6 * Vz2


Height Vb k1 k2 k3 Vz Pz
(m) (m/sec) (m/sec) (N/m2)
Upto 10.00 44.00 1.05 0.78 1.0286 37.07 824.36
15.00 44.00 1.05 0.82 1.0286 38.97 911.08
20.00 44.00 1.05 0.85 1.0286 40.39 978.96
30.00 44.00 1.05 0.88 1.0286 41.82 1049.29
50.00 44.00 1.05 0.93 1.0286 44.19 1171.91
100.00 44.00 1.05 0.99 1.0286 47.05 1328.00

1 . FSL CONDITION :
Wind force on Superstructure
Exposed height of pier above FSL = 12.525 m
Average height at centre of trough (FSL) = 13.885 m
Therefore Pz = 91.108 kg/m2
Transverse Wind Force on each pier FT = 1.907 t
Longitudinal Wind Force (25% of trans. Force) = 0.477 t

Wind force on Sub structure


Exposed height of pier above FSL = 12.525 m
Average height at centre of trough (FSL) = 12.525 m
Therefore Pz = 91.108 kg/m2
Transverse Wind Force on each pier FT = 1.993 t
Longitudinal Wind Force (25% of trans. Force) = 0.498 t

On Superstructure
Lever arm from top of foundation i.e., at = 18.230 + 1.360
= 19.59 m
Lever arm from bottom of foundation at = 19.030 + 1.360
= 20.39 m

54
On Sub Structure
Lever arm from top of foundation i.e., at = 18.230 m
= 18.230 m
Lever arm from bottom of foundation at = 19.030 m
= 19.030 m
Moments due to wind force at top of footing
Longitudinal = (0.477 x 19.59) + (0.498 x 18.23) = 18.423 t-m
Transverse = (1.9065 x 19.59) + (1.993 x 18.23) = 73.681 t-m

Moments due to wind force at bottom of footing


Longitudinal = (0.477 x 20.39) + (0.498 x 19.03) = 19.203 t-m
Transverse = (1.9065 x 20.39) + (1.993 x 19.03) = 76.800 t-m

2 . CBL CONDITION :
Wind force on Superstructure
Exposed height of pier above CBL = 16.675 m
Average height at centre of trough (CBL) = 18.035 m
Therefore Pz = 91.108 kg/m2
Transverse Wind Force on each pier FT = 1.907 t
Longitudinal Wind Force (25% of trans. Force) = 0.477 t

Wind force on Sub structure


Exposed height of pier above CBL = 16.675 m
Average height at center of trough = 16.675 m
Therefore Pz = 91.108 kg/m2
Transverse Wind Force on each pier FT = 1.993 t
Longitudinal Wind Force (25% of trans. Force) = 0.498 t

On Superstructure
Lever arm from top of foundation i.e., at = 18.230 + 1.360
= 19.59 m
Lever arm from bottom of foundation at = 19.030 + 1.360
= 20.39 m
On Sub Structure
Lever arm from top of foundation i.e., at = 18.230 m
= 18.230 m
Lever arm from bottom of foundation at = 19.030 m
= 19.030 m

Moments due to wind force at top of footing


Longitudinal = (0.477 x 19.59) + (18.23 x 0.498) = 18.423 t-m
Transverse = (1.9065 x 19.59) + (1.993 x 18.23) = 73.681 t-m

Moments due to wind force at bottom of footing


Longitudinal = (0.477 x 20.39) + (19.03 x 0.498) = 19.203 t-m
Transverse = (1.9065 x 20.39) + (19.03 x 1.993) = 76.800 t-m

55
IV . TEMPERATURE EFFECTS

1 Effects of water currents is same as calculated as before (As per Cl. 215 of IRC:6-2014 )
2 Temperature effect

Thermal Expansion = 12 x 10 -6 /deg. C


Variation in the temperature = 20 deg. (Cl. 215.4, IRC:6-2014 )

Expansion / Contraction of span = 1.20E-05 x 2 x 20 x 13.988 x 100


= 0.671 cm

Force generated @ each bearing = G * A *( D/t )


where,
G = shear modulus = 1.000 kg/cm2
A = Area of Bearing = 490.0 cm2
D = Variation in length = 0.671 cm
t = Thk of Bearing Layer = 10.000 cm
Force = 32.900 kgs
= 0.033 t
B.M Due To Temperature Effect :
At Top of Foundation = 0.033 x ( 81.530 - 63.300 ) = 0.602 t-m

At Bottom of Foundation = 0.033 x ( 81.530 - 62.500 ) = 0.628 t-m

V) EARTHQUAKE LOAD CALCULATIONS


Seismic coefficient method :
Horizontal seismic co efficient αh = β I αo

β = 1
Importance factor I = 1.5
αo = 0.02 ( Zone – II )
αh = 0.03
vertical seismic coefficient may be taken as
αv = (1/2)αh

= 0.015

Total load from Super Structure = 298.959 t (Two spans laid)


Total load from Super Structure = 91.569 t (One spans laid)
Self Wt. Of Pier cap = 49.819 t
Self Wt. Of Pier = 636.640 t

Type of force V(t) L.A.(m) Long. Long.(t-m)


Pier Cap major Rec. portion 10.894 0.175 1.9064
Pier Cap minor Rec. portion 40.500 0.950 38.4750
Pier Cap Triangular portion -1.575 0.750 -1.1813
PIER 636.640 9.890 6296.369
6335.570

56
Lever arm = ΣM
ΣW
= 9.229m (From top of Pier cap)
= 9.001m (From Bottom of Pier cap)
SEISMIC MOMENT AT THE TOP OF THE FOOTING :

Two Spans Laid :


Total Seismic moment in Longitudinal Direction = 266.1 t-m
Total Seismic moment in Transverse Direction = 133.0 t-m
One Span Laid :
Total Seismic moment in Longitudinal Direction = 210.1 t-m
Total Seismic moment in Transverse Direction = 105.0 t-m

SEISMIC MOMENT AT THE BOTTOM OF THE FOOTING :

Two Spans Laid :


Total Seismic moment in Longitudinal Direction = 289.7 t-m
Total Seismic moment in Transverse Direction = 144.9 t-m
One Span Laid :
Total Seismic moment in Longitudinal Direction = 228.8 t-m
Total Seismic moment in Transverse Direction = 114.4 t-m

(VI) DESIGN OF CAPING BEAM :-


8.300
+ 81.530
0.35
+ 81.180 -L1 = 0.668
D = 1.55
1.20
+ 79.980

0.432 0.318
9.00 1.500
-0.35 -0.35 0.75 0.75

4.5 4.5 0.35


1.55

1.500

Center of Gravity of Semi circular Cut waters = ( 0.5756 R )


= 0.5756 x 0.750 = 0.432 m
Check for CORBEL: PIER
D = 1.550 m
L1 = -0.668 m;
L1/D = -0.668 -= 0.431 < 1.00
1.550

57
Calculation of Cantilever Moments about C.G. of Cut-waters :
Moments Due to :
1. Dead Load from Super structure = 298.96 = 298.959 t
Load per m run = 298.959 / 8.300 = 36.019 t/m
Cantilever Moment = 36.019 x 0.223 = 8.044 t-m

2. Weight of caping Beam :- (Cantilever)


a) Rectangular
Weight = 1.50 x 0.35 x -( 0.350 - 0.318 ) x 2.50
= -0.877 t
Moment = -0.88 x -0.668/2
= 0.293 t-m

b) Taper section
Weight = 1.20 - x 0.668 x 1.500 x 2.50 = -1.504 t
2
Moment = -1.504 x -( 0.350 - 0.318 ) / 3
= 0.016 t-m

Total cantilever moment (M) = 8.044 + 0.016 + 0.293


= 8.352 t-m

Total Design Cantilever Moment = 8.352


= 8.352 t-m
Calculation of Resisting Moment :-
The allowable stresses in Concrete :
Direct Compression = 60 kg/cm2.
Bending Stress fc = 85 kg/cm2.
k = 0.329
j = 0.890
Q = 12.463

The allowable Steel Stress :


Tensile stress fs = 1900 kg/cm2.
Percentage of Reinforcement p = 0.30% min. (Cl.710.3.2 IRC:78:2000)
Modular Ratio m = 10.98

Depth of section available with 40mm cover and 32 mm Tor. bars


d = 155 - 4 - 2
= 149.40 cm
Width of section b = 100.00 cm
Resisting Moment = Q x b x d2
= 12.463 x 100 x 149.4 ^2
Resisting Moment = 278.17 t-m > 8.352 t-m
Hence provided depth of section is Safe

58
Calculation of Reinforcement :-
Area of Steel for Caping Beam Cantilever :-
for -ve Moment 8.352 x 10^5
=
1900 x 0.890 x 149.4
= 3.305 cm 2

Works out to be 1 Nos. 32 mm Tor.

Minimum steel @ 0.2% - ( Cl. 305.19 of IRC:21-2000)


= 0.2 -x 35.00 x 155.0
100
= -10.850 cm2

So provide 2 Nos. 32 mm Tor. of area 16.085 cm2


10 Nos of 12 mm Tor. HENCE OK

Provide 2 Nos. of 32mm Tor at Top for Cantilever in One layer A+B
Provide nominal reinforcement of 10 Nos of 12 mm Tor @ bottom for minimum steel F

CHECK FOR SHEAR :- ( for Cantilever ) @ ` d ' from Support.


Caping Beam :
Distance of section from edge of caping beam = Section X - X.
IRC:21-2000 Cl. 304.7.1.2. = -0.350 - 1.494 = -1.844 m

+ 81.530 8.300
+ 81.180 0.35 m
1.55
1.20 m
+ 79.980 -1.844

0.432 0.318
9.00
-0.350 m -0.350 m
X

SKETCH FOR SHEAR DESIGN.

( 0.35 + -1.844 ) x 1.200


Depth`D' at X-X =
-0.782
= 3.181 m
Available depth `d' at X-X = 318.08 - 16.000 - 0.04
= 302.035 cms
Loads on One side of Pier :-
Rect = -1.844 x 1.500 x 0.350 x 2.500 = -2.420
Taper = -1.844 x 1.500 x 1.200 x 2.500 = -4.149
2
Total Shear at X - X = -6.569 t

59
Moment of Loads at X-X = -6.569 x -1.84 / 2 = 6.057 t-m
Total Moment at X-X = 6.057 t-m
M x Tan b
d
Where , M = 6.057 t-m
d = 3.020 m
Tan b = 2.831 = -1.535 t
-1.844
Hence Reduction in Shear = 6.057 x -1.535 = -3.078 t
3.020
Net Design Shear @ X - X = -6.569 - -3.078
= -3.491 t
Shear Stress at X - X as per Cl.304.7.1.1
t = ( V/ bxd)
tv = -3.49 x 1000 = -0.116 kg/cm2
100 x 302.035

IRC:21-2000 Cl. 304.7.1.2.


Max. Shear stress = 19 kg/cm2 ( IRC:21-2000, Table-12A.)
(for M25 concrete) Hence Section need not be changed

(As Per Cl. 304.7.1.3.3., Table – 12B,)


Allowable shear stress for members without shear reinforcement
p = 100 x 16.085 = 0.053
100.0 x 302.035
In this Case :-
for (100As/bd) = 0.053

tc = #N/A ( 0.053 - #N/A #N/A #N/A


#N/A #N/A
= #N/A
t c = #N/A kg/cm2
tv #N/A t c #N/A

Vs = V - t c bd
= -3.491 #N/A x 100 x 302.04 )
= #N/A t
10 mm.Tor 4 Legged Stirrups

Spacing = 1900 x 4.00 x 0.785 x 302.035


#N/A 1000
= #N/A cms c/c.

However Provide Minimum Shear Reinforcement Cl. 304.7.1.5, of IRC:21-2000.


Asw 0.4
Reinforcement = =
b x s 0.87 fy
Using 10 mm.tor. 4 -Legged
60
Spacing - ` s ' = 4 x 0.785 x 0.870 x 415
100 x 0.400
= 28.36 cms ( Not more than 30 cm)

Provide 10 mm 4 Legged Stirrups @ #N/A cm c/c. In Pier.


or #N/A mm c/c C

SIDE FACE REINFORCEMENT :-


@ 0.1% on Each side face.
As the depth of the beam is 1550mm Provide side face reinforcement
However Provide minimum Reinforcement
Ast = 0.100 x 100.0 x 155
100
= 15.5 = 7.750 cm2

Area of each bar of Dia = 12mm = 1.131 cm2 7nos

Provide 7 Nos of 12mm tor. On each side face of Caping Beam. E

(VII) CALCULATION OF STRESSES AT TOP OF FOOTING at +63.300

DESIGN OF RCC PIER AT +63.300 m

The main conditions for the design of Pier are :- Both the Spans Laid and One span Laid.
For Both the spans laid condition :- 1 Service and CBL Condition
2 Service and FSL Condition.
For One span Laid Condition :- No Live load acting.

BOTH THE SPANS LAID CONDITION

Case - 1 : Service and CBL condition :-

Vertical Loads :-
Dead Loads :-
1 Load from Superstructure = 298.959 t
2 Weight of Caping Beam = 49.819 t
3 Weight of Pier ( Dry ) = 636.640 t
Total Dead loads = 985.417 t

Moments about Pier Level +63.300 Moments


S. No. Type of Force Load Long. Trans.
1 Dead Load 985.417 0.000 t-m 0.000
2 Temperature Moment 0.602 t-m
3 Seismic moment 266.082 t-m 133.041 t-m
Moments without Wind 985.417 266.684 t-m 133.041 t-m
4 with Wind Force (horizontal force) 18.423 t-m 73.681 t-m
61
Moments with Wind 985.417 285.107 t-m 206.722 t-m

Section Properties :-
Size of Pier = 9.000 m x 1.500 m
Area A = 3.142 x 0.750 x 0.750 = 0.442 m2.
4
+ 9.000 x 1.500 = 13.500 m2.
Total Area = 13.942 m2.

Considering Equivalent Rectangle - Side = 13.942 = 9.295 m


1.500
Section Modulus =
Long. ZL = 9.295 x 1.500 ^2 = 3.485 m3
6
Trans. ZT = 1.500 x 9.295 ^2 = 21.597 m3
6
Stresses in Pier :-
CBL Condition :-
a). With out wind = 985.417 (+/-) 266.684 (+/-) 133.041
13.942 3.485 21.597
= 70.681 (+/-) 76.514 (+/-) 6.160
= 153.355 / -11.993 t/m . 2

Direct compressive Stress allowable = 500 t/m2 (IRC-21, Clause 303)


Bending compressive Stress allowable = 667 t/m 2
(IRC-21, Clause 303)

(Cl. 303.3, Table - 11, of IRC:21-2000) Hence provide reinforcement.


b). With wind = 985.417 (+/-) 285.107 (+/-) 206.722
13.942 3.485 21.597
= 70.681 (+/-) 81.80 (+/-) 9.57
= 162.052 / -20.690 t/m2

From IRC:78 - 2000, cl.706.1.2 667.000 x 1.333


2
= 889.111 t/m
Case – 2 : Service and FSL condition :-
Vertical Loads :-
Dead Loads :-
1 Load from Superstructure = 298.959 t
2 Weight of Caping Beam = 49.819 t
3 Weight of Pier ( 15% buoyancy ) = 549.541 t
Total Dead loads = 898.318 t

Moments about Pier Level +63.300 Moments


S. No. Type of Force Load Long. Trans.
1 Dead Load 898.318 0.000 t - m 0.000
2 Water Current 1.155 t - m 0.529 t-m
3 Temperature Moment 0.602 t - m
4 Seismic moment 266.082 t - m 133.041 t-m
62
Moments without Wind 898.318 267.839 t - m 133.570 t-m
5 with Wind Force (horizontal force) 18.423 t - m 73.681 t-m
Moments with Wind 898.318 286.262 t - m 207.251 t-m

Stresses in Pier :-
FSL Condition : -
a). Without wind = 898.318 (+/-) 267.839 (+/-) 133.570
13.942 3.485 21.597
= 64.434 (+/-) 76.845 (+/-) 6.185
= 147.463 / -18.596 t/m . 2

Direct compressive Stress allowable = 500 t/m2 (IRC-21, Clause 303)


Bending compressive Stress allowable = 667 t/m 2
(IRC-21, Clause 303)

(Cl. 303.3, Table - 11, of IRC:21-2000) Hence provide reinforcement.


b). With wind = 898.318 (+/-) 286.262 (+/-) 207.251
13.942 3.485 21.597
= 64.434 (+/-) 82.13 (+/-) 9.60
= 156.160 / -27.293 t/m2

From IRC:78 - 2000, cl.706.1.2 = 667.000 x 1.333


2
= 889.111 t/m
ONE SPAN LAID CONDITION
Case - 1 : CBL condition :-
Vertical Loads :-
Dead Loads :-
1 Load from Superstructure = 91.569 t
2 Weight of Caping Beam = 49.819 t
3 Weight of Pier ( Dry ) = 636.640 t
Total Dead loads = 778.028 t

Moments about Pier Level +63.300 Moments


S. No. Type of Force Long. Trans.
1 Dead Load Moment 34.064 t - m
2 Temperature Moment 0.602 t - m
3 Seismic moment 210.083 t - m 105.041 t-m
Moments without Wind 244.748 t - m 105.041 t-m
4 Wind Force 18.423 t - m 73.681 t-m
Moments with Wind 263.171 t - m 178.722 t-m

Size of Pier = 9.000 m x 1.500 m


Area = A = 13.942 m2
ZL = 3.485 m3;
ZT = 21.597 m3 ;

a). Without wind = 778.028 (+/-) 244.748 (+/-) 105.041


13.942 3.485 21.597
= 55.805 (+/-) 70.220 (+/-) 4.864
63
= 130.889 / 19.278 t/m2.

b). With wind = 778.028 (+/-) 263.171 (+/-) 178.722


13.942 3.485 21.597
= 55.805 (+/-) 75.51 (+/-) 8.28
2
= 139.586 / 27.976 t/m
Case – 2 : FSL condition :-

Vertical Loads :-
Dead Loads :-
1 Load from Superstructure = 91.569 t
2 Weight of Caping Beam = 49.819 t
3 Weight of Pier ( 15% buoyancy ) = = 549.541 t
Total Dead loads = 690.929 t

Moments about Pier Level +63.300 Moments


S. No. Type of Force Long. Trans.
1 Dead Load Moment 34.064 t - m
2 Temperature Moment 0.602 t - m
3 Water Current 1.155 t - m 0.529 t - m
4 Seismic moment 210.083 t - m 105.041 t-m
Moments without Wind 245.903 t - m 105.570
5 Wind Force 18.423 t - m 73.681
Moments with Wind 264.326 t - m 179.251 t-m

Size of Pier = 9.000 m x 1.500 m


Area A = 13.942 m2
ZL = 3.485 m3;
ZT = 21.597 m3 ;

a). Without wind = 690.929 (+/-) 245.903 (+/-) 105.570


13.942 3.485 21.597
= 49.558 (+/-) 70.551 (+/-) 4.888
= 124.998 / 25.882 t/m . 2

b). With wind = 690.929 (+/-) 264.326 (+/-) 179.251


13.942 3.485 21.597
= 49.558 (+/-) 75.84 (+/-) 8.30
2
= 133.695 / 34.579 t/m

( III ) CALCULATION OF PIER REINFORCEMENT

From the above the Tensile forces in Pier are more in case of Empty & Full
Section Properties :-
Size of Pier = 9.000 m x 1.500 m
Area A = 139417.86 cm2

64
Service Condition :-
As per Cl.306.1 of IRC:21-2000, Table - 13 , Note (3).

Effective Length of Pier = 1.200 L


In this case `L' = 81.530 - 63.300 = 18.230 m

Effective Length Le = 1.200 x 18.230 = 21.876 m


Least radius of Gyration (r ) = t √12
= 1.500 / √12
= 0.433

Ratio = Effective length = 21.876 = 50.52046


Radius of Gyration 0.433

One span Laid Condition :-


Effective Length of Pier = 1.75 L =
= 1.750 x 18.230 = 31.903 m
Ratio = Effective length
Radius of Gyration
= 31.903
0.433
= 73.676
Hence the Stresse are reduced in this case by 1.5 - L
100 r
= 1.5 - 73.676
100
= 0.763 < 1.000
Hence the permissible stresses are considered.
Design of Reinforcement :-
For M25 grade the allowable stresses in Concrete :-
Direct Compression = 60 kg/cm2.
Bending Stress = fc = 85 kg/cm2.
allowable Steel Stress :Tensile stress = Fs = 1900 kg/cm2.
Percentage of Reinforcement = P = 0.30% min. (Cl.306.2.2 IRC:21:2000)
Modular Ratio = m = 10
Area of Section = A = 139418 cm2.

Min steel as per Cl.306.2.1 = 0.3 % = 420.020 cm2.

Provide 54 Nos. 32 mm.tor. Area = 434.294 cm2.


6 Nos 32 mm. Tor. in Cutwaters 48 Nos. in Straight portion-Eace face side. G

Lateral ties :
According to IS 456 :2000 the diameter of the lateral ties shall not be less than
1) 1/4 th of the diameter of the longitudinal bar
2) 6 mm
The diameter of the lateral ties shall not be less than < 8 mm
6 mm

65
Therefore provide 8 mm as the diameter of the tie bar
Pitch of transverse reinforcement should be least of the following
1) Least lateral dimension of compression member
2) Sixteen times the smallest diameter of the longitudinal bar
3) 300mm
Pitch ot transverse ties
Least of following 1) 150 cm
2) 51.2 cm
3) 30 cm
Pitch of ties = 30.000 cm

Provide 8mm tor. Longitudinal Ties at 200 mm c/c. H+J


Provide 8mm tor.Transeverse Ties at 300 mm c/c. K

(VI) DESIGN OF FOUNDATION @ +62.500 m

The Foundations foundations are designed for Both the Spans Laid and One span Laid conditions.
Foundation Level = +62.500

1.500

1.500 1.50
+ 63.300 m 0 0
+ 63.300 m 4.50
0.8
+ 62.500 m
4.500

DETAIL OF PIER FOUNDATION.

1 Both the Spans laid Condition :-

a). Service + LWL Condition :-


Vertical loads :-
1 Dead Load From Superstructure = 298.959 t
2 Weight of Caping Beam = 49.819 t
3 Weight of Pier = 636.640 t
4 Weight of Footing - with out buoyancy = 126.000 t
Total Dead loads = 1111.417 t

Moments about Footing level +62.500 Moments


S. No. Type of Force Load Long. Trans.
1 Dead Load 1111.417 0.000 t - m 0.000
2 Temperature Moment 0.628 t - m
3 Seismic moment 289.732 t - m 144.866
Moments without Wind 1111.417 290.360 t - m 144.866 t-m
66
4 with Wind Force (horizontal force) 19.203 t - m 76.800 t-m
Moments with Wind 1111.417 309.563 t - m 221.666 t-m

Section Properties :-
Size of Footing = 14.00 m x 4.50 m
Area = A = = 14.00 x 4.50 = 63 m2

Section Moduli
Zl = 14.00 x 4.50 ^2 / 6 = 47.250 m3
Zt = 4.50 x 14.00 ^2 / 6 = 147.000 m3

Foundation Pressures :- Service + LWL.

a). Without Wind : = 1111.42 ( +/- ) 290.360 ( +/- ) 144.87


63 47.25 147.00
= 17.64 ( +/- ) 6.15 ( +/- ) 0.99
2
= 24.772 / 10.511 t/m

b) With Wind : = 1111.42 ( +/- ) 309.563 ( +/- ) 221.67


63 47.25 147.00
= 17.64 ( +/- ) 6.55 ( +/- ) 1.51
2
= 25.701 / 9.582 t/m

a). Service + FSL Condition :-


Vertical loads :-
1 Dead Load From Superstructure = 298.959 t
2 Weight of Caping Beam = 49.819 t
3 Weight of Pier ( 100% buoyancy ) = 549.541 t
4 Weight of Footing - 100% buoyancy = 118.440 t
Total Dead loads = 1016.758 t

Moments about Footing level +62.500 Moments


S. No. Type of Force Long. Trans.
1 Dead Load 0.000 t - m 0.000 t-m
2 Water Current 2.384 t - m 1.091 t-m
3 Temperature Moment 0.628 t - m
4 Seismic moment 289.732 t - m 144.866 t-m
Moments without Wind 292.743 t - m 145.957 t-m
5 with Wind Force (horizontal force) 19.203 t - m 76.800 t-m
Moments with Wind 311.946 t - m 222.758 t-m

67
Foundation Pressures :- Service + LWL.

a). Without Wind : 1016.76 ( +/- ) 292.743 ( +/- ) 145.96


63 47.25 147.00
= 16.14 ( +/- ) 6.20 ( +/- ) 0.99
2
= 23.328 / 8.950 t/m

b) With Wind : 1016.76 ( +/- ) 311.946 ( +/- ) 222.76


63 47.25 147.00
= 16.14 ( +/- ) 6.60 ( +/- ) 1.52
2
= 24.256 / 8.022 t/m

2 One Span laid Condition :-


a). CBL Condition :-
Vertical loads :-
1 Dead Load From Superstructure = 183.14 = 91.569 t
2
2 Weight of Caping Beam = 49.819 t
3 Weight of Pier ( Dry ) = 636.640 t
4 Weight of Footing - 100% buoyancy = 126.000 t
Total Dead loads = 904.028 t

Moments about Footing level +62.500 Moments


S. No. Type of Force Load Long. Trans.
1 Dead Load 904.03 34.064 t - m 0.000 t - m
2 Temperature Moment 0.628 t - m
3 Seismic moment 228.755 t - m 114.378 t - m
Moments without Wind 263.447 t - m 114.378 t - m
4 Wind Force (Unloaded Section) 19.203 t - m 76.800 t - m
Moments with Wind 282.650 t - m 191.178 t - m

Foundation Pressures :-
a) Without Wind : 904.028 ( +/- ) 263.447 ( +/- ) 114.378
63.000 47.250 147.000
= 14.350 ( +/- ) 5.576 ( +/- ) 0.778
= 20.703 / 7.996 t/m2

b) With Wind : 904.028 ( +/- ) 282.650 ( +/- ) 191.178


63.000 47.250 147.000
= 14.350 ( +/- ) 5.982 ( +/- ) 1.301
2
= 21.632 / 7.067 t/m

b). Service + FSL - Condition :-


1 Dead Load From Superstructure = 91.569 t
2 Weight of Caping Beam = 49.819 t
3 Weight of Pier ( 100% buoyancy ) = 549.541 t
4 Weight of Footing - 100% buoyancy = 126.000 t
Total Dead loads = 816.929 t
68
Moments about Footing level +62.500 m
S. No. Type of Force Load Long. Trans.
1 Dead Load Eccentricity 816.929 34.064 t - m 0.000
2 Temperature Moment 0.628 t - m
3 Water Current 2.384 t - m 1.091 t-m
4 Seismic moment 228.755 t - m 114.378 t-m
Moments without Wind 265.830 t - m 115.469 t-m
5 Wind Force (Unloaded Section) 19.203 76.800 t-m
Moments with Wind load 285.033 t - m 192.269 t-m

Foundation Pressures :-
a) Without Wind : 816.929 ( +/- ) 265.830 ( +/- ) 115.469
63.000 47.250 147.000
= 12.97 ( +/- ) 5.626 ( +/- ) 0.786
= 19.379 / 6.556 t/m2

b) With Wind : 816.929 ( +/- ) 285.033 ( +/- ) 192.269


63.000 47.250 147.000
= 12.967 ( +/- ) 6.032 ( +/- ) 1.308
2
= 20.308 / 5.627 t/m

DESIGN OF RCC FOOTING @ +62.500 m

Bp 1.50 m Type of Footing = PAD


Density Of Concrete = 25 kN/m3
0.00 Density Of Soil = 20 kN/m3
d = 0.80 0.80 Depth Of Foundation = 2.40 m
B = 4.5 Net SBC = 250 kN/m2
Gross SBC = 50 + 2.4 x 20
= 298 kN/m2
FC = 25 N/mm2
FY = 415 N/mm2
d/2 Length Of Footing L = 14.00 m
L = 14.0 ### Width Of Footing W = 4.50 m
Thickness Of Fdn T = 0.80 m
Depth @ Edge of fdn D1 = 0.80 m
Width Of Pier wp = 1.50 m
Length Of Pier lp = 10.50 m
PIER s cbc = 8.5 N/mm2.
z L sc = 6.0 N/mm2.
1.500 s st = 200
M = 10.98
Wp
K = 0.318
x x J = 0.894
1.500 Q = 1.209
1.75 z 1.750 effect.depth = 740

69
Load Calculation for Footing & Soil:-
Self Wt. Of Footing
Rectangular Portion = 25 x 14 x 4.5 x 0.8 = 1260 kN
Weight of Soil = [(14 x 4.5) - (10.5 x 1.5)] x (2.4 - 0.8 ) x 20 1512 kN
Weight of Footing + Soil = 1260 + 1512 = 2772 kN
Vertical Load(y-dir) Fy = 985.417 KN

CHECK FOR SHEAR


a) Two Way Shear
Critical Section = At distance d/2 from face of Pier
Concrete Grade = 25 N/mm2
Pier Details
Length = 10500 mm
Width = 1500 mm
Foundation Details
Length = 14000 mm
Width = 4500 mm
Depth = D1 + (T-D1)(L-Lp-T)/2
(L-Lp)/2
= 0.80 + 0 x 1.35
1.75
= 0.800 m
= 800 mm
Effective Depth = 750 mm
Percentage Of Steel = 0.239 %
Punching Load
Maximum Load on Pier = 1478.13
Punching Shear, P = 1478.126 x (( 14 x 4.5 ) - ( 11.25 x 2.25 ))
( 14 * 4.5 )
p = 884.24 kN
Shear Resistance Of Concrete (Vc) = Vc x b c x d ( clause no. 31.6.3.1 of IS 456 )
Where , Vc = ks x t c
ks = 0.5 + βc -----should not be greater than 1
Short Side Of Column
βc =
Long Side Of Column
1500
Βc = = 0.143
10500
ks = 0.643
tc = 0.16 x √fck = 0.80 N/mm2
bc = Periphery at distance d/2 from face of pier
Length of critical section = 11250 mm
Width of critical section = 2250 mm
Perimeter of critical section = 27000 mm
884240 = 40.94 mm
Depth Required =
0.8 x27000
Shear Resistance = 0.8 x 27000 x 750 / 1000
= 16200 kN
70
B) One Way Shear
2 95.82

800
d
203.29

1500

4500
1

750
1 1 230.15

1500
d

750

800
2 257.01
10500
1750
1000
750

800

14000

95.82 257.01

236.862 245.498

At Length
Max Net Pressure = 245 kN/m2
Depth D1 + (T-D1)*(0.5L-0.5Lp-T)
(L-Lp)/2
0.80 + 0.00 x 0.95
1.75
= 0.800 m
= 800 mm
Effective Depth = 750 mm
Length at critical section = 4500 mm
Width at critical section = 1000 mm
Shear Force = 245.5 x 4.5 x 1
= 1104.741 kN
At Width
Maximum Pressure = 230 kN/m2
Depth = D1 + (T-D1)*(0.5W-0.5Wp-T)
(W-Wp)/2
0.80 + 0.00 x 0.7
1.75
= 0.800 m = 800 mm
Effective Depth = 750 mm
Length at critical section = 14000 mm
Width at critical section = 750 mm
Shear Force = 230.15 x 14 x 0.75
= 2416.575 kN

71
Designed Shear Strength = 2417 kN
Corresponding Length = 14000 mm

% Ast = 0.239
Shear Stress = 0.230 N/mm2
Depth Required 2416575
=
0.23 x 14000
= 751 mm
Check For Depth @ Critical Section
Critical section from face of column = 750 mm
h from column face to edge of footing = 1500 mm
Depth @ Edge of fdn D1 = 800 mm
Depth @ face of column D = 800 mm
Depth @ Critical s/c = 800 mm
Effe. Depth @ Critical s/c = 750 mm Revise
Check For transfer of Load @ Column base
A2 = Lp x Wp = 15.75 mm2
A1 = (10.5+2 x (2*0.8))*(1.5+2 x (2*0.8))
= 64.39 mm2
sqrt(A1/A2) = 2.02 </= 2
Allowable Bearing Stress = 0.25 fck sqrt(A1/A2)
= 13 Mpa
Actual Bearing Stress = 1478.126 x 10^3/(15.75 x 10^6)
= 0.09 Mpa
< 13 Mpa

DESIGN OF FOUNDATION

a) Calculation of Reinforcement at Bottom


Maximum Pressure = 257.01 kN/m2
Pressure due to Soil & Fdn wt = ( 1260 + 1512 ) / ( 14 x 4.5 )
= 44
Net causing moment = 213.01 kN/m2
Maximum Projection of fdn = 1.75 m
Bending Moment = 213.011 x 1.75 x 1.75 / 2
= 326.17 kN.m
Ast = √(M/Qb)
= 326170000
0.121 x 1000

Ast Required = 1642.513 mm2


Mini.% of re-bar = 0.2 % ---- Cl. 305.19 of IRC:21-2000
2
Min Ast = 1600 mm
Dia of Bar = 20 mm
Area of bar = 314 mm2
Spacing = 191 mm Revise

72
Provide Spacing = 175 751 750
(More R/f than required is provided to avoid failure in one way shear)
Area Provided = 1794 mm2 HENCE OK

Provide 20 mm dia Bars @ 175 mm spacing in Longitudinal direction L


Provide 12 mm dia Bars @ 125 mm spacing in Transverse direction M

b) Calculation of Reinforcement at Top


Reinforcement at top is checked for overburden load on top of foundation
since 100% of foundation is not in contact with soil.
Wt. Of Soil + Fdn wt. = 2772 kN
Area Load = 2772 / (14 x 4.5) = 44 kN/m2
Maxi. Projection of fdn = 1.75 m
Bending Moment = 44 x 1.75 x 1.75 / 2
= 67.38 kN.m
Ast = √(M/Qb)
Ast = 746.539 mm2

Mini % of Re-bar = 0.12 %


Ast = 870 mm2
Dia of Bar = 12 mm
Area of bar = 113.04 mm2
Spacing = 129 mm
Provide Spacing = 125 mm
Area Provided = 904.32 mm2 HENCE OK

Provide 12 mm dia Bars @ 125 mm spacing in Longitudinal direction N


Provide 12 mm dia Bars @ 125 mm spacing in Transverse direction O

Max. Min.
Details Stress Stress Type Of Stress
t/sq.m. t/sq.m.
Two Spans Laid
Stress in Concrete:
Case – 1 : Service & CBL Condition
With Wind 162.052 -20.690 tensile stress
With out Wind 153.355 -11.993 tensile stress
Case – 2 : Service & FSL Condition
With Wind 156.160 -27.293 tensile stress
With out Wind 147.463 -18.596 tensile stress
One Span Laid
Stress in Concrete:
Case – 1 : Service & CBL Condition
With Wind 139.586 27.976 Compressive stress
With out Wind 130.889 19.278 Compressive stress

73
Case – 2 : Service & FSL Condition
With Wind 133.695 34.579 Compressive stress
With out Wind 124.998 25.882 Compressive stress
Two Spans Laid
Stresses in Soil :
Case – 1 : Service & CBL Condition
With Wind 25.701 9.582 Compressive stress
With out Wind 24.772 10.511 Compressive stress
Case – 2 : Service & FSL Condition
With Wind 24.256 8.022 Compressive stress
With out Wind 23.328 8.950 Compressive stress
One Span Laid
Stresses in Soil :
Case – 1 : Service & CBL Condition
With Wind 21.632 7.067 Compressive stress
With out Wind 20.703 7.996 Compressive stress
Case – 2 : Service & FSL Condition
With Wind 20.308 5.627 Compressive stress
With out Wind 19.379 6.556 Compressive stress

74
BABU JAGEEVAN RAM UTTARANDHRA SUJALA SRAVANTHI PROJECT
Job :
PACKAGE -1 PHASE – II
Subject : DESIGN OF RCC PIER AND FOOTING

8.300

+ 81.530 0.35
+ 81.180
1.20
+ 79.980

+ 69.005 FSL

-0.35 9.00 -0.35


10.5 16.68
0.75 0.75
+ 64.855 CBL

+ 63.300 1.8 1.8


0 0.8
+ 62.500 0

14.0
DETAIL OF PIER & FOUNDATION

4.500
1.500

14.000
PLAN

HYDRAULIC PARTICULARS :-
1 Design Discharge of canal = 163.032 Cumecs
2 Effective Linear Water Way @ FSL = 49.950 m
3 Maximum Mean Velocity of Flow at FSL V = 0.898 m/sec.
4 Full Supply Level FSL = + 69.005 m
5 Afflux h = 1.5 m
6 Scour Level = + 63.025 m
7 Foundation level Pier = + 62.500 m
8 Safe Bearing Capacity as per the strata. = 25.0 t/m2

DESIGN DATA :-
1 Number of Spans = 7 no's
2 Clear span of piers = 13.00 m

75
3 Span c/c. of Piers (Length of trough per span) = 13.988 m
4 Effective span length = 13.488 m
5 Total width of trough = 8.300 m
6 Trough Width = 6.900 m
7 Width of side wall = 0.350
8 Height of side wall = 2.040
9 Skew of the Bridge = 0.000 deg.
Cos q = 1.0 Sin q = 0.0
10 Full Supply Level FSL = + 69.005 m
11 Bottom of Trough = + 81.530 m
12 Trough sill level = FSL + Slab Thickness + W.C = RFL = = + 81.870 m
13 Thickness of trough slab = 0.300 m
14 Thickness of Sealing Coat ( PCC M30 Grade concrete ) = 0.040 m
15 Top of RCC Footing .i.e., Bottom of Pier = + 63.300 m
16 Thickness of Footing = 0.800 m
17 Scour levels for Pier = + 63.025 m
18 Bottom of Foundations = + 62.500 m
19 Linear waterway provided for Right Crossing = 49.950 m
20 Max. mean Velocity of water flow at FSL = 0.898 m/sec
21 RCC Pier thickness = 1.500 m
22 Bearing width = 0.494 m
23 Unit Weight of RCC = 2.500 t/m3
24 Unit Weight of PCC = 2.500 t/m3

( I ) DEAD LOADS :-
(i) Calculation of Vertical Loads from Superstructure :-
Span C/C of bearings = 13.488 m
Thickness of Expansion Joints = 12 mm
Total length = Clear Span + ( 2 x Bearing Width )
= 13.000 + 0.988
= 13.988 m
Dead Load on Pier = 298.96 t (From abutment loading calculations)

(ii) Dead weight of Sub Structure :


(a) Dead weight of caping beam

8.300 1.500 m

81.530 0.35

1.20
79.980
10.50 1.500
-0.35 9.00 -0.350000000000001

Caping Beam Section

76
Area of Caping beam = ( 8.300 x 1.500 ) + ( 8.650 x 1.500 ) = 25.43 m²

Wt of Rectangular portion = 8.300 x 1.50 x 0.35 x 2.50 = 10.89375 t

Wt of Tapered portion = 8.300 + 9.00


x 1.50 x 1.20 x 2.50 = 38.925 t
2
Total Weight = 49.81875 t

0.75 9.00 0.75

1.500

Plan of Pier

(b) Dead Weight of pier


Size of Pier = 9.00 x 1.500 with Semi-circular cut waters.
Top of hammer head = 81.530 m
Bottom of Caping Beam = 79.980 m
Bottom of Pier = 63.300 m
FSL = 69.005 m
Height of Pier = 79.980 - 63.300 = 16.680 m

Area of Pier = 0.393 x 1.500 x 1.500 = 1.767 m2


+ 9.0 x 1.500 = 13.500 m2
Total Area of Pier = 1.767 + 13.500 = 15.267 m2

Weight of Pier :-
Dry = 15.27 x 16.68 x 2.50 = 636.64 t
100% Buoyancy = 636.64 - ( 15.27 x 5.71 x 1.00 ) = 549.54 t
In case of submergence 100% Buoyancy
= 636.64 - ( 15.27 x 5.71 x 1.00 ) x 0.15
= 623.58 t
c ) Dead Weight of footing :
Size of Footing = 14.000 m X 4.500 m
Thickness Footing = 0.800 m
Area of Footing = 14.00 x 4.500 = 63.000 sqm
Wt of Rectangular portion = 63.00 x 0.800 x 2.500 = ###
Hence, the weight of footing without buoyancy = ###

Volume of footing = ( 4.50 x 0.800 ) x 14.000


= ( 3.60 14.0000 = 50.400 m3
Weight of Footing: =
Dry = 50.400 x 2.500 = 126.000 t
15% Buoyancy = 50.400 x 2.350 = 118.440 t
100% Buoyancy = 50.400 x 1.500 = 75.600 t

77
Pier Width
9.00 1.500
10.50
14.00 0.75 0.75 0
0 4.500
0.8
0.8

14.000 4.500

A Eccentricities :-
Bearing width = 0.750

0.75 0.750

a). Dead load Eccentricity :-


Along Traffic (Longitudinal ) = 0.750 m - 0.375 - 0.012
= 0.369 m

II) . WATER CURRENT : ( IRC:6-2014 Cl.210)

Presumed to be hitting the Pier at 20 degrees to flow. (As per IRC:6-2014 Cl.210.5)
Shape factor for pier with semi circular ends K = 0.660
Design velocity of Water Current v = 0.898 m / s
Max. Velocity of water @ FSL V = 2^(1/2) v = 1.270 m/s
The Intensity of Pressure on Pier “P” = 52K*V2 = 55.350 kg/m2

As per Clause 210.5 of IRC:6-2014 the variation in the current direction should be taken as 200
Intensity of water pressure parallel to pier
55.35 x Cos20 = 52.01 kg/m2
Intensity of water pressure perpendicular to pier
55.35 x Sin20 = 18.93 kg/m2
Depth of water level = 5.71 m

FSL +69.005

4.150

Bed level +64.855

2.355
Foundation lvl. +62.500

78
a. Water Current Force in longitudinal direction
Intensity of pressure @ Pier bottom level = 6.854 kg/m2
i. Due to Rectangle = 6.854 x 9.000 x 4.150 = 255.979 kg
ii. Due to Triangle = 12.077 x 9.000 x 4.150 = 225.544 kg
Total Force = i + ii = 481.522 kg

b. Water Current Force in transverse direction


Intensity of pressure @ Pier bottom level = 18.830 kg/m2
i. Due to Rectangle = 18.830 x 1.500 x 4.150 = 117.216 kg
ii. Due to Triangle = 33.182 x 1.500 x 4.150 = 103.279 kg
Total Force = i + ii = 220.495 kg

Moments due to Water current : at top of Footing


Longitudinal = ( 255.979 x 0.5x4.2) + ( 225.544 x 0.67 x 4.150 ) = 1.155 t-m
Transverse = ( 117.216 x 0.5x4.2) + ( 103.279 x 0.67 x 4.150 ) = 0.529 t-m

Moments due to Water current : at bottom of Footing


Longitudinal = 481.522 x ( 4.150 + 0.800 ) = 2.384 t-m
Transverse = 220.495 x ( 4.150 + 0.800 ) = 1.091 t-m

III) . WIND FORCE :- ( As per IRC:6-2014, Cl. 209)

CBL = +64.855 m
FSL = +69.005 m
Sill level = +81.870 m
Bottom of trough = +81.530 m
trough Length = 13.988 m
Wind force on trough :
Height of Side wall = 2.040
Thickness of trough slab + Sealing coat = 0.340
Wind force acts at half the Sidewall Height = 1.020 m
Height above on which wind force acts = 0.340 + 1.020
= 1.360 m

Area of super structure acted upon by wind = ( 0.340 + 1.020 ) x 13.988


press = 19.024 m 2

Area of sub structure acted upon by wind = ( 1.500 x 18.230 )


press = 27.345 m2

As per IRC 6-2014 , clause 209.3.3, Transverse Wind Force FT = PZ x A x G x CD


Where,
PZ = Hourly Wind Pressure in N/m2
A= The Solid Area Exposed to Wind
G= Gust Factor = 2.0
CD = Drag Coefficient depending on Geometric shape of Bridge
For Super Structure CD = 1.1
For Live Load CD = 1.2

79
For Sub Structure (Semi Circular) H/b = 11.12 , t/b = 6.00 > 4
CD = 0.8 (Table 6, IRC 6-2014)

Calculation of wind pressure by Gust Factor Method


(As per IS: 875(Part 3) 1987, cl.8.2.1)
Basic wind speed (Vb) = 33.00 m/sec (IRC 6 -2014, Fig. No.6)
Depending on the project Location( Mahbubnagar, Telangana ,India)
wind speed (Vb) = 44.00 m/sec
The variation of hourly mean wind speed (Vz) = Vb * k1 * k2 * k3
where,
Risk co-efficient factor (k1) = 1.05 (IS: 875(Part 3) 1987, Table No.1)
Different heights & terrain factor (k2) = 0.78 (IS: 875(Part 3) 1987, Table no.33)
Topography factor (k3) = 1.029 (IS: 875(Part 3) 1987, cl.5.3.3)

Design wind pressure (Pz) = 0.6 * Vz2


Height Vb k1 k2 k3 Vz Pz
(m) (m/sec) (m/sec) (N/m2)
Upto 10.00 44.00 1.05 0.78 1.0286 37.07 824.36
15.00 44.00 1.05 0.82 1.0286 38.97 911.08
20.00 44.00 1.05 0.85 1.0286 40.39 978.96
30.00 44.00 1.05 0.88 1.0286 41.82 1049.29
50.00 44.00 1.05 0.93 1.0286 44.19 1171.91
100.00 44.00 1.05 0.99 1.0286 47.05 1328.00

1 . FSL CONDITION :
Wind force on Superstructure
Exposed height of pier above FSL = 12.525 m
Average height at centre of trough (FSL) = 13.885 m
Therefore Pz = 91.108 kg/m2
Transverse Wind Force on each pier FT = 1.907 t
Longitudinal Wind Force (25% of trans. Force) = 0.477 t

Wind force on Sub structure


Exposed height of pier above FSL = 12.525 m
Average height at centre of trough (FSL) = 12.525 m
Therefore Pz = 91.108 kg/m2
Transverse Wind Force on each pier FT = 1.993 t
Longitudinal Wind Force (25% of trans. Force) = 0.498 t

On Superstructure
Lever arm from top of foundation i.e., at = 18.230 + 1.360
= 19.59 m
Lever arm from bottom of foundation at = 19.030 + 1.360
= 20.39 m

80
On Sub Structure
Lever arm from top of foundation i.e., at = 18.230 m
= 18.230 m
Lever arm from bottom of foundation at = 19.030 m
= 19.030 m
Moments due to wind force at top of footing
Longitudinal = (0.477 x 19.59) + (0.498 x 18.23) = 18.423 t-m
Transverse = (1.9065 x 19.59) + (1.993 x 18.23) = 73.681 t-m

Moments due to wind force at bottom of footing


Longitudinal = (0.477 x 20.39) + (0.498 x 19.03) = 19.203 t-m
Transverse = (1.9065 x 20.39) + (1.993 x 19.03) = 76.800 t-m

2 . CBL CONDITION :
Wind force on Superstructure
Exposed height of pier above CBL = 16.675 m
Average height at centre of trough (CBL) = 18.035 m
Therefore Pz = 91.108 kg/m2
Transverse Wind Force on each pier FT = 1.907 t
Longitudinal Wind Force (25% of trans. Force) = 0.477 t

Wind force on Sub structure


Exposed height of pier above CBL = 16.675 m
Average height at center of trough = 16.675 m
Therefore Pz = 91.108 kg/m2
Transverse Wind Force on each pier FT = 1.993 t
Longitudinal Wind Force (25% of trans. Force) = 0.498 t

On Superstructure
Lever arm from top of foundation i.e., at = 18.230 + 1.360
= 19.59 m
Lever arm from bottom of foundation at = 19.030 + 1.360
= 20.39 m
On Sub Structure
Lever arm from top of foundation i.e., at = 18.230 m
= 18.230 m
Lever arm from bottom of foundation at = 19.030 m
= 19.030 m

Moments due to wind force at top of footing


Longitudinal = (0.477 x 19.59) + (18.23 x 0.498) = 18.423 t-m
Transverse = (1.9065 x 19.59) + (1.993 x 18.23) = 73.681 t-m

Moments due to wind force at bottom of footing


Longitudinal = (0.477 x 20.39) + (19.03 x 0.498) = 19.203 t-m
Transverse = (1.9065 x 20.39) + (19.03 x 1.993) = 76.800 t-m

81
IV . TEMPERATURE EFFECTS

1 Effects of water currents is same as calculated as before (As per Cl. 215 of IRC:6-2014 )
2 Temperature effect

Thermal Expansion = 12 x 10 -6 /deg. C


Variation in the temperature = 20 deg. (Cl. 215.4, IRC:6-2014 )

Expansion / Contraction of span = 1.20E-05 x 2 x 20 x 13.988 x 100


= 0.671 cm

Force generated @ each bearing = G * A *( D/t )


where,
G = shear modulus = 1.000 kg/cm2
A = Area of Bearing = 490.0 cm2
D = Variation in length = 0.671 cm
t = Thk of Bearing Layer = 10.000 cm
Force = 32.900 kgs
= 0.033 t
B.M Due To Temperature Effect :
At Top of Foundation = 0.033 x ( 81.530 - 63.300 ) = 0.602 t-m

At Bottom of Foundation = 0.033 x ( 81.530 - 62.500 ) = 0.628 t-m

V) EARTHQUAKE LOAD CALCULATIONS


Seismic coefficient method :
Horizontal seismic co efficient αh = β I αo

β = 1
Importance factor I = 1.5
αo = 0.02 ( Zone – II )
αh = 0.03
vertical seismic coefficient may be taken as
αv = (1/2)αh

= 0.015

Total load from Super Structure = 298.959 t (Two spans laid)


Total load from Super Structure = 91.569 t (One spans laid)
Self Wt. Of Pier cap = 49.819 t
Self Wt. Of Pier = 636.640 t

Type of force V(t) L.A.(m) Long. Long.(t-m)


Pier Cap major Rec. portion 10.894 0.175 1.9064
Pier Cap minor Rec. portion 40.500 0.950 38.4750
Pier Cap Triangular portion -1.575 0.750 -1.1813
PIER 636.640 9.890 6296.369
6335.570

82
Lever arm = ΣM
ΣW
= 9.229m (From top of Pier cap)
= 9.001m (From Bottom of Pier cap)
SEISMIC MOMENT AT THE TOP OF THE FOOTING :

Two Spans Laid :


Total Seismic moment in Longitudinal Direction = 266.1 t-m
Total Seismic moment in Transverse Direction = 133.0 t-m
One Span Laid :
Total Seismic moment in Longitudinal Direction = 210.1 t-m
Total Seismic moment in Transverse Direction = 105.0 t-m

SEISMIC MOMENT AT THE BOTTOM OF THE FOOTING :

Two Spans Laid :


Total Seismic moment in Longitudinal Direction = 289.7 t-m
Total Seismic moment in Transverse Direction = 144.9 t-m
One Span Laid :
Total Seismic moment in Longitudinal Direction = 228.8 t-m
Total Seismic moment in Transverse Direction = 114.4 t-m

(VI) DESIGN OF CAPING BEAM :-


8.300
+ 81.530
0.35
+ 81.180 -L1 = 0.668
D = 1.55
1.20
+ 79.980

0.432 0.318
9.00 1.500
-0.35 -0.35 0.75 0.75

4.5 4.5 0.35


1.55

1.500

Center of Gravity of Semi circular Cut waters = ( 0.5756 R )


= 0.5756 x 0.750 = 0.432 m
Check for CORBEL: PIER
D = 1.550 m
L1 = -0.668 m;
L1/D = -0.668 -= 0.431 < 1.00
1.550

83
Calculation of Cantilever Moments about C.G. of Cut-waters :
Moments Due to :
1. Dead Load from Super structure = 298.96 = 298.959 t
Load per m run = 298.959 / 8.300 = 36.019 t/m
Cantilever Moment = 36.019 x 0.223 = 8.044 t-m

2. Weight of caping Beam :- (Cantilever)


a) Rectangular
Weight = 1.50 x 0.35 x -( 0.350 - 0.318 ) x 2.50
= -0.877 t
Moment = -0.88 x -0.668/2
= 0.293 t-m

b) Taper section
Weight = 1.20 - x 0.668 x 1.500 x 2.50 = -1.504 t
2
Moment = -1.504 x -( 0.350 - 0.318 ) / 3
= 0.016 t-m

Total cantilever moment (M) = 8.044 + 0.016 + 0.293


= 8.352 t-m

Total Design Cantilever Moment = 8.352


= 8.352 t-m
Calculation of Resisting Moment :-
The allowable stresses in Concrete :
Direct Compression = 60 kg/cm2.
Bending Stress fc = 85 kg/cm2.
k = 0.329
j = 0.890
Q = 12.463

The allowable Steel Stress :


Tensile stress fs = 1900 kg/cm2.
Percentage of Reinforcement p = 0.30% min. (Cl.710.3.2 IRC:78:2000)
Modular Ratio m = 10.98

Depth of section available with 40mm cover and 32 mm Tor. bars


d = 155 - 4 - 2
= 149.40 cm
Width of section b = 100.00 cm
Resisting Moment = Q x b x d2
= 12.463 x 100 x 149.4 ^2
Resisting Moment = 278.17 t-m > 8.352 t-m
Hence provided depth of section is Safe

84
Calculation of Reinforcement :-
Area of Steel for Caping Beam Cantilever :-
for -ve Moment 8.352 x 10^5
=
1900 x 0.890 x 149.4
= 3.305 cm 2

Works out to be 1 Nos. 32 mm Tor.

Minimum steel @ 0.2% - ( Cl. 305.19 of IRC:21-2000)


= 0.2 -x 35.00 x 155.0
100
= -10.850 cm2

So provide 2 Nos. 32 mm Tor. of area 16.085 cm2


10 Nos of 12 mm Tor. HENCE OK

Provide 2 Nos. of 32mm Tor at Top for Cantilever in One layer A+B
Provide nominal reinforcement of 10 Nos of 12 mm Tor @ bottom for minimum steel F

CHECK FOR SHEAR :- ( for Cantilever ) @ ` d ' from Support.


Caping Beam :
Distance of section from edge of caping beam = Section X - X.
IRC:21-2000 Cl. 304.7.1.2. = -0.350 - 1.494 = -1.844 m

+ 81.530 8.300
+ 81.180 0.35 m
1.55
1.20 m
+ 79.980 -1.844

0.432 0.318
9.00
-0.350 m -0.350 m
X

SKETCH FOR SHEAR DESIGN.

( 0.35 + -1.844 ) x 1.200


Depth`D' at X-X =
-0.782
= 3.181 m
Available depth `d' at X-X = 318.08 - 16.000 - 0.04
= 302.035 cms
Loads on One side of Pier :-
Rect = -1.844 x 1.500 x 0.350 x 2.500 = -2.420
Taper = -1.844 x 1.500 x 1.200 x 2.500 = -4.149
2
Total Shear at X - X = -6.569 t

85
Moment of Loads at X-X = -6.569 x -1.84 / 2 = 6.057 t-m
Total Moment at X-X = 6.057 t-m
M x Tan b
d
Where , M = 6.057 t-m
d = 3.020 m
Tan b = 2.831 = -1.535 t
-1.844
Hence Reduction in Shear = 6.057 x -1.535 = -3.078 t
3.020
Net Design Shear @ X - X = -6.569 - -3.078
= -3.491 t
Shear Stress at X - X as per Cl.304.7.1.1
t = ( V/ bxd)
tv = -3.49 x 1000 = -0.116 kg/cm2
100 x 302.035

IRC:21-2000 Cl. 304.7.1.2.


Max. Shear stress = 19 kg/cm2 ( IRC:21-2000, Table-12A.)
(for M25 concrete) Hence Section need not be changed

(As Per Cl. 304.7.1.3.3., Table – 12B,)


Allowable shear stress for members without shear reinforcement
p = 100 x 16.085 = 0.053
100.0 x 302.035
In this Case :-
for (100As/bd) = 0.053

tc = #N/A ( 0.053 - #N/A #N/A #N/A


#N/A #N/A
= #N/A
t c = #N/A kg/cm2
tv #N/A t c #N/A

Vs = V - t c bd
= -3.491 #N/A x 100 x 302.04 )
= #N/A t
10 mm.Tor 4 Legged Stirrups

Spacing = 1900 x 4.00 x 0.785 x 302.035


#N/A 1000
= #N/A cms c/c.

However Provide Minimum Shear Reinforcement Cl. 304.7.1.5, of IRC:21-2000.


Asw 0.4
Reinforcement = =
b x s 0.87 fy
Using 10 mm.tor. 4 -Legged
86
Spacing - ` s ' = 4 x 0.785 x 0.870 x 415
100 x 0.400
= 28.36 cms ( Not more than 30 cm)

Provide 10 mm 4 Legged Stirrups @ #N/A cm c/c. In Pier.


or #N/A mm c/c C

SIDE FACE REINFORCEMENT :-


@ 0.1% on Each side face.
As the depth of the beam is 1550mm Provide side face reinforcement
However Provide minimum Reinforcement
Ast = 0.100 x 100.0 x 155
100
= 15.5 = 7.750 cm2

Area of each bar of Dia = 12mm = 1.131 cm2 7nos

Provide 7 Nos of 12mm tor. On each side face of Caping Beam. E

(VII) CALCULATION OF STRESSES AT TOP OF FOOTING at +63.300

DESIGN OF RCC PIER AT +63.300 m

The main conditions for the design of Pier are :- Both the Spans Laid and One span Laid.
For Both the spans laid condition :- 1 Service and CBL Condition
2 Service and FSL Condition.
For One span Laid Condition :- No Live load acting.

BOTH THE SPANS LAID CONDITION

Case - 1 : Service and CBL condition :-

Vertical Loads :-
Dead Loads :-
1 Load from Superstructure = 298.959 t
2 Weight of Caping Beam = 49.819 t
3 Weight of Pier ( Dry ) = 636.640 t
Total Dead loads = 985.417 t

Moments about Pier Level +63.300 Moments


S. No. Type of Force Load Long. Trans.
1 Dead Load 985.417 0.000 t-m 0.000
2 Temperature Moment 0.602 t-m
3 Seismic moment 266.082 t-m 133.041 t-m
Moments without Wind 985.417 266.684 t-m 133.041 t-m
4 with Wind Force (horizontal force) 18.423 t-m 73.681 t-m
87
Moments with Wind 985.417 285.107 t-m 206.722 t-m

Section Properties :-
Size of Pier = 9.000 m x 1.500 m
Area A = 3.142 x 0.750 x 0.750 = 0.442 m2.
4
+ 9.000 x 1.500 = 13.500 m2.
Total Area = 13.942 m2.

Considering Equivalent Rectangle - Side = 13.942 = 9.295 m


1.500
Section Modulus =
Long. ZL = 9.295 x 1.500 ^2 = 3.485 m3
6
Trans. ZT = 1.500 x 9.295 ^2 = 21.597 m3
6
Stresses in Pier :-
CBL Condition :-
a). With out wind = 985.417 (+/-) 266.684 (+/-) 133.041
13.942 3.485 21.597
= 70.681 (+/-) 76.514 (+/-) 6.160
= 153.355 / -11.993 t/m . 2

Direct compressive Stress allowable = 500 t/m2 (IRC-21, Clause 303)


Bending compressive Stress allowable = 667 t/m 2
(IRC-21, Clause 303)

(Cl. 303.3, Table - 11, of IRC:21-2000) Hence provide reinforcement.


b). With wind = 985.417 (+/-) 285.107 (+/-) 206.722
13.942 3.485 21.597
= 70.681 (+/-) 81.80 (+/-) 9.57
= 162.052 / -20.690 t/m2

From IRC:78 - 2000, cl.706.1.2 667.000 x 1.333


2
= 889.111 t/m
Case – 2 : Service and FSL condition :-
Vertical Loads :-
Dead Loads :-
1 Load from Superstructure = 298.959 t
2 Weight of Caping Beam = 49.819 t
3 Weight of Pier ( 15% buoyancy ) = 549.541 t
Total Dead loads = 898.318 t

Moments about Pier Level +63.300 Moments


S. No. Type of Force Load Long. Trans.
1 Dead Load 898.318 0.000 t - m 0.000
2 Water Current 1.155 t - m 0.529 t-m
3 Temperature Moment 0.602 t - m
4 Seismic moment 266.082 t - m 133.041 t-m
88
Moments without Wind 898.318 267.839 t - m 133.570 t-m
5 with Wind Force (horizontal force) 18.423 t - m 73.681 t-m
Moments with Wind 898.318 286.262 t - m 207.251 t-m

Stresses in Pier :-
FSL Condition : -
a). Without wind = 898.318 (+/-) 267.839 (+/-) 133.570
13.942 3.485 21.597
= 64.434 (+/-) 76.845 (+/-) 6.185
= 147.463 / -18.596 t/m . 2

Direct compressive Stress allowable = 500 t/m2 (IRC-21, Clause 303)


Bending compressive Stress allowable = 667 t/m 2
(IRC-21, Clause 303)

(Cl. 303.3, Table - 11, of IRC:21-2000) Hence provide reinforcement.


b). With wind = 898.318 (+/-) 286.262 (+/-) 207.251
13.942 3.485 21.597
= 64.434 (+/-) 82.13 (+/-) 9.60
= 156.160 / -27.293 t/m2

From IRC:78 - 2000, cl.706.1.2 = 667.000 x 1.333


2
= 889.111 t/m
ONE SPAN LAID CONDITION
Case - 1 : CBL condition :-
Vertical Loads :-
Dead Loads :-
1 Load from Superstructure = 91.569 t
2 Weight of Caping Beam = 49.819 t
3 Weight of Pier ( Dry ) = 636.640 t
Total Dead loads = 778.028 t

Moments about Pier Level +63.300 Moments


S. No. Type of Force Long. Trans.
1 Dead Load Moment 33.789 t - m
2 Temperature Moment 0.602 t - m
3 Seismic moment 210.083 t - m 105.041 t-m
Moments without Wind 244.474 t - m 105.041 t-m
4 Wind Force 18.423 t - m 73.681 t-m
Moments with Wind 262.896 t - m 178.722 t-m

Size of Pier = 9.000 m x 1.500 m


Area = A = 13.942 m2
ZL = 3.485 m3;
ZT = 21.597 m3 ;

a). Without wind = 778.028 (+/-) 244.474 (+/-) 105.041


13.942 3.485 21.597
= 55.805 (+/-) 70.141 (+/-) 4.864
89
= 130.810 / 19.199 t/m2.

b). With wind = 778.028 (+/-) 262.896 (+/-) 178.722


13.942 3.485 21.597
= 55.805 (+/-) 75.43 (+/-) 8.28
2
= 139.508 / 27.897 t/m
Case – 2 : FSL condition :-

Vertical Loads :-
Dead Loads :-
1 Load from Superstructure = 91.569 t
2 Weight of Caping Beam = 49.819 t
3 Weight of Pier ( 15% buoyancy ) = = 549.541 t
Total Dead loads = 690.929 t

Moments about Pier Level +63.300 Moments


S. No. Type of Force Long. Trans.
1 Dead Load Moment 33.789 t - m
2 Temperature Moment 0.602 t - m
3 Water Current 1.155 t - m 0.529 t - m
4 Seismic moment 210.083 t - m 105.041 t-m
Moments without Wind 245.629 t - m 105.570
5 Wind Force 18.423 t - m 73.681
Moments with Wind 264.052 t - m 179.251 t-m

Size of Pier = 9.000 m x 1.500 m


Area A = 13.942 m2
ZL = 3.485 m3;
ZT = 21.597 m3 ;

a). Without wind = 690.929 (+/-) 245.629 (+/-) 105.570


13.942 3.485 21.597
= 49.558 (+/-) 70.473 (+/-) 4.888
= 124.919 / 25.803 t/m . 2

b). With wind = 690.929 (+/-) 264.052 (+/-) 179.251


13.942 3.485 21.597
= 49.558 (+/-) 75.76 (+/-) 8.30
2
= 133.616 / 34.500 t/m

( III ) CALCULATION OF PIER REINFORCEMENT

From the above the Tensile forces in Pier are more in case of Empty & Full
Section Properties :-
Size of Pier = 9.000 m x 1.500 m
Area A = 139417.86 cm2

90
Service Condition :-
As per Cl.306.1 of IRC:21-2000, Table - 13 , Note (3).

Effective Length of Pier = 1.200 L


In this case `L' = 81.530 - 63.300 = 18.230 m

Effective Length Le = 1.200 x 18.230 = 21.876 m


Least radius of Gyration (r ) = t √12
= 1.500 / √12
= 0.433

Ratio = Effective length = 21.876 = 50.52046


Radius of Gyration 0.433

One span Laid Condition :-


Effective Length of Pier = 1.75 L =
= 1.750 x 18.230 = 31.903 m
Ratio = Effective length
Radius of Gyration
= 31.903
0.433
= 73.676
Hence the Stresse are reduced in this case by 1.5 - L
100 r
= 1.5 - 73.676
100
= 0.763 < 1.000
Hence the permissible stresses are considered.
Design of Reinforcement :-
For M25 grade the allowable stresses in Concrete :-
Direct Compression = 60 kg/cm2.
Bending Stress = fc = 85 kg/cm2.
allowable Steel Stress :Tensile stress = Fs = 1900 kg/cm2.
Percentage of Reinforcement = P = 0.30% min. (Cl.306.2.2 IRC:21:2000)
Modular Ratio = m = 10
Area of Section = A = 139418 cm2.

Min steel as per Cl.306.2.1 = 0.3 % = 420.020 cm2.

Provide 54 Nos. 32 mm.tor. Area = 434.294 cm2.


6 Nos 32 mm. Tor. in Cutwaters 48 Nos. in Straight portion-Eace face side. G

Lateral ties :
According to IS 456 :2000 the diameter of the lateral ties shall not be less than
1) 1/4 th of the diameter of the longitudinal bar
2) 6 mm
The diameter of the lateral ties shall not be less than < 8 mm
6 mm

91
Therefore provide 8 mm as the diameter of the tie bar
Pitch of transverse reinforcement should be least of the following
1) Least lateral dimension of compression member
2) Sixteen times the smallest diameter of the longitudinal bar
3) 300mm
Pitch ot transverse ties
Least of following 1) 150 cm
2) 51.2 cm
3) 30 cm
Pitch of ties = 30.000 cm

Provide 8mm tor. Longitudinal Ties at 200 mm c/c. H+J


Provide 8mm tor.Transeverse Ties at 300 mm c/c. K

(VI) DESIGN OF FOUNDATION @ +62.500 m

The Foundations foundations are designed for Both the Spans Laid and One span Laid conditions.
Foundation Level = +62.500

1.500

1.500 1.50
+ 63.300 m 0 0
+ 63.300 m 4.50
0.8
+ 62.500 m
4.500

DETAIL OF PIER FOUNDATION.

1 Both the Spans laid Condition :-

a). Service + LWL Condition :-


Vertical loads :-
1 Dead Load From Superstructure = 298.959 t
2 Weight of Caping Beam = 49.819 t
3 Weight of Pier = 636.640 t
4 Weight of Footing - with out buoyancy = 126.000 t
Total Dead loads = 1111.417 t

Moments about Footing level +62.500 Moments


S. No. Type of Force Load Long. Trans.
1 Dead Load 1111.417 0.000 t - m 0.000
2 Temperature Moment 0.628 t - m
3 Seismic moment 289.732 t - m 144.866
Moments without Wind 1111.417 290.360 t - m 144.866 t-m
92
4 with Wind Force (horizontal force) 19.203 t - m 76.800 t-m
Moments with Wind 1111.417 309.563 t - m 221.666 t-m

Section Properties :-
Size of Footing = 14.00 m x 4.50 m
Area = A = = 14.00 x 4.50 = 63 m2

Section Moduli
Zl = 14.00 x 4.50 ^2 / 6 = 47.250 m3
Zt = 4.50 x 14.00 ^2 / 6 = 147.000 m3

Foundation Pressures :- Service + LWL.

a). Without Wind : = 1111.42 ( +/- ) 290.360 ( +/- ) 144.87


63 47.25 147.00
= 17.64 ( +/- ) 6.15 ( +/- ) 0.99
2
= 24.772 / 10.511 t/m

b) With Wind : = 1111.42 ( +/- ) 309.563 ( +/- ) 221.67


63 47.25 147.00
= 17.64 ( +/- ) 6.55 ( +/- ) 1.51
2
= 25.701 / 9.582 t/m

a). Service + FSL Condition :-


Vertical loads :-
1 Dead Load From Superstructure = 298.959 t
2 Weight of Caping Beam = 49.819 t
3 Weight of Pier ( 100% buoyancy ) = 549.541 t
4 Weight of Footing - 100% buoyancy = 118.440 t
Total Dead loads = 1016.758 t

Moments about Footing level +62.500 Moments


S. No. Type of Force Long. Trans.
1 Dead Load 0.000 t - m 0.000 t-m
2 Water Current 2.384 t - m 1.091 t-m
3 Temperature Moment 0.628 t - m
4 Seismic moment 289.732 t - m 144.866 t-m
Moments without Wind 292.743 t - m 145.957 t-m
5 with Wind Force (horizontal force) 19.203 t - m 76.800 t-m
Moments with Wind 311.946 t - m 222.758 t-m

93
Foundation Pressures :- Service + LWL.

a). Without Wind : 1016.76 ( +/- ) 292.743 ( +/- ) 145.96


63 47.25 147.00
= 16.14 ( +/- ) 6.20 ( +/- ) 0.99
2
= 23.328 / 8.950 t/m

b) With Wind : 1016.76 ( +/- ) 311.946 ( +/- ) 222.76


63 47.25 147.00
= 16.14 ( +/- ) 6.60 ( +/- ) 1.52
2
= 24.256 / 8.022 t/m

2 One Span laid Condition :-


a). CBL Condition :-
Vertical loads :-
1 Dead Load From Superstructure = 183.14 = 91.569 t
2
2 Weight of Caping Beam = 49.819 t
3 Weight of Pier ( Dry ) = 636.640 t
4 Weight of Footing - 100% buoyancy = 126.000 t
Total Dead loads = 904.028 t

Moments about Footing level +62.500 Moments


S. No. Type of Force Load Long. Trans.
1 Dead Load 904.03 33.789 t - m 0.000 t - m
2 Temperature Moment 0.628 t - m
3 Seismic moment 228.755 t - m 114.378 t - m
Moments without Wind 263.172 t - m 114.378 t - m
4 Wind Force (Unloaded Section) 19.203 t - m 76.800 t - m
Moments with Wind 282.375 t - m 191.178 t - m

Foundation Pressures :-
a) Without Wind : 904.028 ( +/- ) 263.172 ( +/- ) 114.378
63.000 47.250 147.000
= 14.350 ( +/- ) 5.570 ( +/- ) 0.778
= 20.698 / 8.002 t/m2

b) With Wind : 904.028 ( +/- ) 282.375 ( +/- ) 191.178


63.000 47.250 147.000
= 14.350 ( +/- ) 5.976 ( +/- ) 1.301
2
= 21.626 / 7.073 t/m

b). Service + FSL - Condition :-


1 Dead Load From Superstructure = 91.569 t
2 Weight of Caping Beam = 49.819 t
3 Weight of Pier ( 100% buoyancy ) = 549.541 t
4 Weight of Footing - 100% buoyancy = 126.000 t
Total Dead loads = 816.929 t
94
Moments about Footing level +62.500 m
S. No. Type of Force Load Long. Trans.
1 Dead Load Eccentricity 816.929 33.789 t - m 0.000
2 Temperature Moment 0.628 t - m
3 Water Current 2.384 t - m 1.091 t-m
4 Seismic moment 228.755 t - m 114.378 t-m
Moments without Wind 265.556 t - m 115.469 t-m
5 Wind Force (Unloaded Section) 19.203 76.800 t-m
Moments with Wind load 284.759 t - m 192.269 t-m

Foundation Pressures :-
a) Without Wind : 816.929 ( +/- ) 265.556 ( +/- ) 115.469
63.000 47.250 147.000
= 12.97 ( +/- ) 5.620 ( +/- ) 0.786
= 19.373 / 6.561 t/m2

b) With Wind : 816.929 ( +/- ) 284.759 ( +/- ) 192.269


63.000 47.250 147.000
= 12.967 ( +/- ) 6.027 ( +/- ) 1.308
2
= 20.302 / 5.633 t/m

DESIGN OF RCC FOOTING @ +62.500 m

Bp 1.50 m Type of Footing = PAD


Density Of Concrete = 25 kN/m3
0.00 Density Of Soil = 20 kN/m3
d = 0.80 0.80 Depth Of Foundation = 2.40 m
B = 4.5 Net SBC = 250 kN/m2
Gross SBC = 50 + 2.4 x 20
= 298 kN/m2
FC = 25 N/mm2
FY = 415 N/mm2
d/2 Length Of Footing L = 14.00 m
L = 14.0 ### Width Of Footing W = 4.50 m
Thickness Of Fdn T = 0.80 m
Depth @ Edge of fdn D1 = 0.80 m
Width Of Pier wp = 1.50 m
Length Of Pier lp = 10.50 m
PIER s cbc = 8.5 N/mm2.
z L sc = 6.0 N/mm2.
1.500 s st = 200
M = 10.98
Wp
K = 0.318
x x J = 0.894
1.500 Q = 1.209
1.75 z 1.750 effect.depth = 740

95
Load Calculation for Footing & Soil:-
Self Wt. Of Footing
Rectangular Portion = 25 x 14 x 4.5 x 0.8 = 1260 kN
Weight of Soil = [(14 x 4.5) - (10.5 x 1.5)] x (2.4 - 0.8 ) x 20 1512 kN
Weight of Footing + Soil = 1260 + 1512 = 2772 kN
Vertical Load(y-dir) Fy = 985.417 KN

CHECK FOR SHEAR


a) Two Way Shear
Critical Section = At distance d/2 from face of Pier
Concrete Grade = 25 N/mm2
Pier Details
Length = 10500 mm
Width = 1500 mm
Foundation Details
Length = 14000 mm
Width = 4500 mm
Depth = D1 + (T-D1)(L-Lp-T)/2
(L-Lp)/2
= 0.80 + 0 x 1.35
1.75
= 0.800 m
= 800 mm
Effective Depth = 750 mm
Percentage Of Steel = 0.239 %
Punching Load
Maximum Load on Pier = 1478.13
Punching Shear, P = 1478.126 x (( 14 x 4.5 ) - ( 11.25 x 2.25 ))
( 14 * 4.5 )
p = 884.24 kN
Shear Resistance Of Concrete (Vc) = Vc x b c x d ( clause no. 31.6.3.1 of IS 456 )
Where , Vc = ks x t c
ks = 0.5 + βc -----should not be greater than 1
Short Side Of Column
βc =
Long Side Of Column
1500
Βc = = 0.143
10500
ks = 0.643
tc = 0.16 x √fck = 0.80 N/mm2
bc = Periphery at distance d/2 from face of pier
Length of critical section = 11250 mm
Width of critical section = 2250 mm
Perimeter of critical section = 27000 mm
884240 = 40.94 mm
Depth Required =
0.8 x27000
Shear Resistance = 0.8 x 27000 x 750 / 1000
= 16200 kN
96
B) One Way Shear
2 95.82

800
d
203.29

1500

4500
1

750
1 1 230.15

1500
d

750

800
2 257.01
10500
1750
1000
750

800

14000

95.82 257.01

236.862 245.498

At Length
Max Net Pressure = 245 kN/m2
Depth D1 + (T-D1)*(0.5L-0.5Lp-T)
(L-Lp)/2
0.80 + 0.00 x 0.95
1.75
= 0.800 m
= 800 mm
Effective Depth = 750 mm
Length at critical section = 4500 mm
Width at critical section = 1000 mm
Shear Force = 245.5 x 4.5 x 1
= 1104.741 kN
At Width
Maximum Pressure = 230 kN/m2
Depth = D1 + (T-D1)*(0.5W-0.5Wp-T)
(W-Wp)/2
0.80 + 0.00 x 0.7
1.75
= 0.800 m = 800 mm
Effective Depth = 750 mm
Length at critical section = 14000 mm
Width at critical section = 750 mm
Shear Force = 230.15 x 14 x 0.75
= 2416.575 kN

97
Designed Shear Strength = 2417 kN
Corresponding Length = 14000 mm

% Ast = 0.239
Shear Stress = 0.230 N/mm2
Depth Required 2416575
=
0.23 x 14000
= 751 mm
Check For Depth @ Critical Section
Critical section from face of column = 750 mm
h from column face to edge of footing = 1500 mm
Depth @ Edge of fdn D1 = 800 mm
Depth @ face of column D = 800 mm
Depth @ Critical s/c = 800 mm
Effe. Depth @ Critical s/c = 750 mm Revise
Check For transfer of Load @ Column base
A2 = Lp x Wp = 15.75 mm2
A1 = (10.5+2 x (2*0.8))*(1.5+2 x (2*0.8))
= 64.39 mm2
sqrt(A1/A2) = 2.02 </= 2
Allowable Bearing Stress = 0.25 fck sqrt(A1/A2)
= 13 Mpa
Actual Bearing Stress = 1478.126 x 10^3/(15.75 x 10^6)
= 0.09 Mpa
< 13 Mpa

DESIGN OF FOUNDATION

a) Calculation of Reinforcement at Bottom


Maximum Pressure = 257.01 kN/m2
Pressure due to Soil & Fdn wt = ( 1260 + 1512 ) / ( 14 x 4.5 )
= 44
Net causing moment = 213.01 kN/m2
Maximum Projection of fdn = 1.75 m
Bending Moment = 213.011 x 1.75 x 1.75 / 2
= 326.17 kN.m
Ast = √(M/Qb)
= 326170000
0.121 x 1000

Ast Required = 1642.513 mm2


Mini.% of re-bar = 0.2 % ---- Cl. 305.19 of IRC:21-2000
2
Min Ast = 1600 mm
Dia of Bar = 20 mm
Area of bar = 314 mm2
Spacing = 191 mm Revise

98
Provide Spacing = 175 751 750
(More R/f than required is provided to avoid failure in one way shear)
Area Provided = 1794 mm2 HENCE OK

Provide 20 mm dia Bars @ 175 mm spacing in Longitudinal direction L


Provide 12 mm dia Bars @ 125 mm spacing in Transverse direction M

b) Calculation of Reinforcement at Top


Reinforcement at top is checked for overburden load on top of foundation
since 100% of foundation is not in contact with soil.
Wt. Of Soil + Fdn wt. = 2772 kN
Area Load = 2772 / (14 x 4.5) = 44 kN/m2
Maxi. Projection of fdn = 1.75 m
Bending Moment = 44 x 1.75 x 1.75 / 2
= 67.38 kN.m
Ast = √(M/Qb)
Ast = 746.539 mm2

Mini % of Re-bar = 0.12 %


Ast = 870 mm2
Dia of Bar = 12 mm
Area of bar = 113.04 mm2
Spacing = 129 mm
Provide Spacing = 125 mm
Area Provided = 904.32 mm2 HENCE OK

Provide 12 mm dia Bars @ 125 mm spacing in Longitudinal direction N


Provide 12 mm dia Bars @ 125 mm spacing in Transverse direction O

Max. Min.
Details Stress Stress Type Of Stress
t/sq.m. t/sq.m.
Two Spans Laid
Stress in Concrete:
Case – 1 : Service & CBL Condition
With Wind 162.052 -20.690 tensile stress
With out Wind 153.355 -11.993 tensile stress
Case – 2 : Service & FSL Condition
With Wind 156.160 -27.293 tensile stress
With out Wind 147.463 -18.596 tensile stress
One Span Laid
Stress in Concrete:
Case – 1 : Service & CBL Condition
With Wind 139.508 27.897 Compressive stress
With out Wind 130.810 19.199 Compressive stress

99
Case – 2 : Service & FSL Condition
With Wind 133.616 34.500 Compressive stress
With out Wind 124.919 25.803 Compressive stress
Two Spans Laid
Stresses in Soil :
Case – 1 : Service & CBL Condition
With Wind 25.701 9.582 Compressive stress
With out Wind 24.772 10.511 Compressive stress
Case – 2 : Service & FSL Condition
With Wind 24.256 8.022 Compressive stress
With out Wind 23.328 8.950 Compressive stress
One Span Laid
Stresses in Soil :
Case – 1 : Service & CBL Condition
With Wind 21.626 7.073 Compressive stress
With out Wind 20.698 8.002 Compressive stress
Case – 2 : Service & FSL Condition
With Wind 20.302 5.633 Compressive stress
With out Wind 19.373 6.561 Compressive stress

100
BBS_pier

PIER CAP

TOTAL
S NO TYPE DIA SPACING NUMBER LENGTH
LENGTH
mm m
954
1 A+B 32 2 x2 1154 4.616

270
2 B 32 - 1 11760 8220 9.452

00
14
3 C 10 - 4-L #N/A #N/A 1680 Varies y x #N/A

y
4 D 10 - 2-L #N/A #N/A 20880 Varies #N/A
x
10700 - 8220
5 E 12 7 10700 - 8220 Varies 65.94

6 F 12 10 12250 15 8950 1510 122.5


5 0
PIER

7 G 32 54 18730 18430 2022.84


200
9000
1420

y
8 H 10 200 91 21040 1914.64
x
2231

9 J 10 200 91 4562 415.142


1420

10 K 10 300 191 1580 x 301.78

FOOTING

Bottom Reinforcement

14320
11 L 20 175 26 372.32

4820
12 M 12 125 112 539.84

Top Reinforcement

15120
13 N 12 125 36 544.32

4820
14 O 12 125 112 539.84

Page 101
BABU JAGEEVAN RAM UTTARANDHRA SUJALA SRAVANTHI PROJECT
Job :
PACKAGE -1 PHASE – II
Subject : DESIGN OF RCC SIDE PIER AND FOOTING

8.300

+ 81.530 0.25
+ 81.280
0.75
+ 80.530

+ 69.005 FSL

1.7 5.00 1.7


6.5 11.93
0.75 0.75
+ 69.755 2 Berm level
nd

+ 68.600 1.20 1.20


69.005 FSL 0 0
+ 67.800 0.8

64.855 CBL 8.9


DETAIL OF PIER & FOUNDATION

3.500
1.500

8.9
PLAN

HYDRAULIC PARTICULARS :-
1 Design Discharge of canal = 163.032 Cumecs
2 Effective Linear Water Way @ FSL = 49.950 m
3 Maximum Mean Velocity of Flow at FSL V = 0.898 m/sec.
4 Full Supply Level FSL = + 69.005 m
5 Afflux h = 1.5 m
6 Scour Level = + 63.025 m
7 Foundation level Pier = + 62.500 m
8 Safe Bearing Capacity as per the strata. = 25.0 t/m2

DESIGN DATA :-
1 Number of Spans = 7 no's
2 Clear span of piers = 13.00 m

76
3 Span c/c. of Piers (Length of trough per span) = 13.988 m
4 Effective span length = 13.488 m
5 Total width of trough = 8.300 m
6 Trough Width = 6.900 m
7 Width of side wall = 0.350
8 Height of side wall = 2.040
9 Skew of the Bridge = 0.000 deg.
Cos q = 1.0 Sin q = 0.0
10 Full Supply Level FSL = + 69.005 m
11 Bottom of Trough = + 81.530 m
12 Trough sill level = FSL + Slab Thickness + W.C = RFL = = + 81.870 m
13 Thickness of trough slab = 0.300 m
14 Thickness of Sealing Coat ( PCC M30 Grade concrete ) = 0.040 m
15 Top of RCC Footing .i.e., Bottom of Pier = + 68.600 m
16 Thickness of Footing = 0.800 m
17 Scour levels for Pier = + 63.025 m
18 Bottom of Foundations = + 62.500 m
19 Linear waterway provided for Right Crossing = 49.950 m
20 Max. mean Velocity of water flow at FSL = 0.898 m/sec
21 RCC Pier thickness = 1.500 m
22 Bearing width = 0.494 m
23 Unit Weight of RCC = 2.500 t/m3
24 Unit Weight of PCC = 2.500 t/m3

( I ) DEAD LOADS :-
(i) Calculation of Vertical Loads from Superstructure :-
Span C/C of bearings = 13.488 m
Thickness of Expansion Joints = 12 mm
Total length = Clear Span + ( 2 x Bearing Width )
= 13.000 + 0.988
= 13.988 m
Dead Load on Pier = 298.96 t (From abutment loading calculations)

(ii) Dead weight of Sub Structure :


(a) Dead weight of caping beam

8.300 1.500 m

81.530 0.25

0.75
80.530
6.50 1.500
1.65 5.00 1.65

Caping Beam Section

77
Area of Caping beam = ( 8.300 x 1.500 ) + ( 6.650 x 1.500 ) = 23.66 m²

Weight of Rectangular portion = 8.300 x 1.50 x 0.25 x 2.50 = 7.78125 t

Weight of Tapered portion 8.300 + 5.00


x 1.50 x 0.75 x 2.50 = 18.70313 t
2
Total Weight = 26.48438 t

0.75 5.00 0.75

1.500

Plan of Pier

(b) Dead Weight of pier


Size of Pier = 5.00 x 1.500 with Semi-circular cut waters.
Top of hammer head = 81.530 m ;
Bottom of Caping Beam = 80.530 m ;
Bottom of Pier = 68.600 m ;
FSL = 69.005 m ;
Height of Pier = 80.530 - 68.600 = 11.930 m

Area of Pier = 0.393 x 1.500 x 1.500 x 2.00 = 1.767 m2


+ 5.0 x 1.500 = 7.50 m2

Total Area of Pier = 1.767 + 7.500 = 9.27 m2

Weight of Pier :-
Dry = 9.27 x 11.93 x 2.50 = 276.39 t
15% Buoyancy = 9.27 x 11.93 x 2.35 = 259.81 t
100% Buoyancy = 9.27 x 11.93 x 1.50 = 165.84 t

c ) Dead Weight of footing :


Size of Footing = 8.900 m X 3.500 m
Thickness Footing = 0.800 m
Area of Footing = 8.90 x 3.500 = 31.15sqm
Wt of Rectangular portion = 31.15 x 0.800 x 2.500 = 62.300 t
Wt of Tapered portion = 3.500 + 3.500
x 0.000 x 8.900 x 2.500 = 0.000 t
2
Hence, the weight of footing without buoyancy = 62.300 t

78
Volume of footing = 3.500 + 3.500
( 3.50 x 0.800 ) + x 0.000 x 8.900
2
= ( 2.80 x 0.000 ) x 8.900 = 24.92 m3
Weight of Footing: =
Dry = 24.920 x 2.500 = 62.300 t
15% Buoyancy = 24.920 x 2.350 = 58.562 t
100% Buoyancy = 24.920 x 1.500 = 37.380 t

Pier Width
5.00 1.500
6.50
8.90 1.000 1.000
0 3.500
0.8
0.8

8.900 3.500

A Eccentricities :-
Bearing width = 0.740

0.75 0.750

a). Dead load Eccentricity :-


Along Traffic (Longitudinal ) = 0.750 m - 0.37 - 0.012
= 0.374 m
Moment due to DL eccentricity of S.S = 298.96 x 0.374 x 2.000 = 111.810
2 tm

( II ) WIND FORCE :- ( As per IRC:6-2014, Cl. 209)

CBL = 69.755 m
FSL = 69.755 m
Sill level = +81.870 m
Bottom of trough = +81.530 m
trough Length = 13.988 m
Wind force on trough :
Height of Side wall = 2.040
Thickness of trough slab + Sealing coat = 0.340
Wind force acts at half the Sidewall Height = 1.020 m
Height above on which wind force acts = 0.340 + 1.020
= 1.360 m

79
Area of super structure acted upon by wind = ( 0.340 + 1.020 ) x 13.988
press = 19.024 m2

Area of sub structure acted upon by wind = ( 1.500 x 12.930 )


press = 19.395 m 2

As per IRC 6-2014 , clause 209.3.3, Transverse Wind Force FT = PZ x A x G x CD


Where,
PZ = Hourly Wind Pressure in N/m2
A= The Solid Area Exposed to Wind
G= Gust Factor = 2.0
CD = Drag Coefficient depending on Geometric shape of Bridge
For Super Structure CD = 1.1
For Live Load CD = 1.2
For Sub Structure (Semi Circular) H/b = 7.953 , t/b = 3.33 < 4
CD = 0.8 (Table 6, IRC 6-2014)

Calculation of wind pressure by Gust Factor Method


(As per IS: 875(Part 3) 1987, cl.8.2.1)
Basic wind speed (Vb) = 33.00 m/sec (IRC 6 -2014, Fig. No.6)
Depending on the project Location( Mahbubnagar, Telangana ,India)
wind speed (Vb) = 44.00 m/sec
The variation of hourly mean wind speed (Vz) = Vb * k1 * k2 * k3
where,
Risk co-efficient factor (k1) = 1.05 (IS: 875(Part 3) 1987, Table No.1)
Different heights & terrain factor (k2) = 0.78 (IS: 875(Part 3) 1987, Table no.33)
Topography factor (k3) = 1.029 (IS: 875(Part 3) 1987, cl.5.3.3)

Design wind pressure (Pz) = 0.6 * Vz2


Height Vb k1 k2 k3 Vz Pz
(m) (m/sec) (m/sec) (N/m2)
Upto 10.00 44.00 1.05 0.78 1.0286 37.07 824.36
15.00 44.00 1.05 0.82 1.0286 38.97 911.08
20.00 44.00 1.05 0.85 1.0286 40.39 978.96
30.00 44.00 1.05 0.88 1.0286 41.82 1049.29
50.00 44.00 1.05 0.93 1.0286 44.19 1171.91
100.00 44.00 1.05 0.99 1.0286 47.05 1328.00

1. FSL CONDITION :
Wind force on Superstructure
Exposed height of pier above FSL = 11.775 m
Average height at centre of trough (FSL) = 13.135 m
Therefore Pz = 91.108 kg/m2
Transverse Wind Force on each pier FT = 1.907 t
Longitudinal Wind Force (25% of trans. Force) = 0.477 t

80
Wind force on Sub structure
Exposed height of pier above FSL = 11.775 m
Average height at centre of trough (FSL) = 11.775 m
Therefore Pz = 91.108 kg/m2
Transverse Wind Force on each pier FT = 1.414 t
Longitudinal Wind Force (25% of trans. Force) = 0.353 t

On Superstructure
Lever arm from top of foundation i.e., at = 12.930 + 1.360
= 14.29 m
Lever arm from bottom of foundation at 69.005 = 13.730 + 1.360
= 15.09 m
On Sub Structure
Lever arm from top of foundation i.e., at = 12.930 m
= 12.930 m
Lever arm from bottom of foundation at 69.005 = 13.730 m
= 13.730 m
Moments due to wind force at top of footing
Longitudinal = (0.477 x 14.29) + (0.353 x 12.93) = 11.381 t-m
Transverse = (1.9065 x 14.29) + (1.4135 x 12.93) = 45.520 t-m

Moments due to wind force at bottom of footing


Longitudinal = (0.477 x 15.09) + (0.353 x 13.73) = 12.045 t-m
Transverse = (1.9065 x 15.09) + (1.4135 x 13.73) = 48.176 t-m

2 .CBL CONDITION :
Wind force on Superstructure
Exposed height of pier above CBL = 11.775 m
Average height at centre of trough (CBL) = 13.135 m
Therefore Pz = 91.108 kg/m2
Transverse Wind Force on each pier FT = 1.907 t
Longitudinal Wind Force (25% of trans. Force) = 0.477 t

Wind force on Sub structure


Exposed height of pier above CBL = 11.775 m
Average height at center of trough = 11.775 m
Therefore Pz = 91.108 kg/m2
Transverse Wind Force on each pier FT = 1.414 t
Longitudinal Wind Force (25% of trans. Force) = 0.353 t

On Superstructure
Lever arm from top of foundation i.e., at = 12.930 + 1.360
= 14.29 m
Lever arm from bottom of foundation at 69.005 = 13.730 + 1.360
= 15.09 m

81
On Sub Structure
Lever arm from top of foundation i.e., at = 12.930 m
= 12.930 m
Lever arm from bottom of foundation at 69.005 = 13.730 m
= 13.730 m

Moments due to wind force at top of footing


Longitudinal = (0.477 x 14.29) + (12.93 x 0.353) = 11.381 t-m
Transverse = (1.9065 x 14.29) + (1.4135 x 12.93) = 45.520 t-m

Moments due to wind force at bottom of footing


Longitudinal = (0.477 x 15.09) + (13.73 x 0.353) = 12.045 t-m
Transverse = (1.9065 x 15.09) + (13.73 x 1.4135) = 48.176 t-m

(III) TEMPERATURE EFFECTS


As the span is very less; Kraft paper will suffice.
1 Effects of water currents is same as calculated as before (As per Cl. 215 of IRC:6-2014 )
2 As there is no Vehicular load on the trough, so no Braking force
3 Temperature effect

Thermal Expansion = 12 x 10 -6 /deg. C


Variation in the temperature = 20 deg. (Cl. 215.4, IRC:6-2014 )

Expansion / Contraction of span = 1.20E-05 x 2 x 20 x 13.988 x 100


= 0.671 cm

Force generated @ each bearing = G * A *( D/t )


where,
G = shear modulus = 1.000 kg/cm2
A = Area of Bearing = 490.0 cm2
D = Variation in length = 0.671 cm
t = Thk of Bearing Layer = 10.000 cm
Force = 32.900 kgs
= 0.033 t
B.M Due To Temperature Effect :
At Top of Foundation = 0.033 x ( 81.530 - 68.600 ) = 0.427 t-m

At Bottom of Foundation = 0.033 x ( 81.530 - 67.800 ) = 0.453 t-m

82
(IV) DESIGN OF CAPING BEAM :-
8.300
+ 81.530 0.25
+ 81.280 L1 = 1.332
D = 1.00 0.75
+ 80.530
1.500
0.432 0.318 0.75 0.75
5.00
1.65 1.65 0.25
1.00

2.5 2.5 1.500

Center of Gravity of Semi circular Cut waters = ( 0.5756 R )


= 0.5756 x 0.750 = 0.432 m PIER
Check for CORBEL:
D = 1.000 m
L1 = 1.332 m;
L1/D = 1.332 = 1.332 > 1.00
1.000

Calculation of Cantilever Moments about C.G. of Cut-waters :


Moments Due to :
1. Dead Load from Super structure = 298.96 = 298.959 t
Load per m run = 298.959 / 8.300 = 36.019 t/m
Cantilever Moment = 36.02 x x 0.887 = 31.939 t-m

2. Weight of caping Beam :- (Cantilever)


a) Rectangular
Weight = 1.50 x 0.25 x ( 1.650 - 0.318 ) x 2.50
= 1.248 t
Moment = 1.25 x 1.332/2
= 0.831 t-m

b) Taper section
Weight = 0.75 x 1.332 x 1.500 x 2.50 = 1.873 t
2
Moment = 1.873 x ( 1.650 - 0.318 ) / 3
= 1.229 t-m

Total cantilever moment (M) = 31.939 + 1.229 + 0.831


= 33.999 t-m

Total Design Cantilever Moment = 33.999


= 33.999 t-m

83
Calculation of Resisting Moment :-
The allowable stresses in Concrete :
Direct Compression = 60 kg/cm2.
Bending Stress fc = 85 kg/cm2.
k = 0.329
j = 0.890
Q = 12.463

The allowable Steel Stress :


Tensile stress fs = 1900 kg/cm2.
Percentage of Reinforcement p = 0.30% min. (Cl.710.3.2 IRC:78:2000)
Modular Ratio m = 10.98

Depth of section available with 40mm cover and 25 mm Tor. bars


d = 100 - 4 - 1
= 94.75 cm
Width of section b = 100.00 cm
Resisting Moment = Q x b x d2
= 12.463 x 100 x 94.8 ^2
Resisting Moment = 111.89 t-m > 33.999 t-m
Hence provided depth of section is Safe

Calculation of Reinforcement :-
Area of Steel for Caping Beam Cantilever :-
for -ve Moment 33.999 x 10^5
=
1900 x 0.890 x 94.8
= 21.215 cm 2

Works out to be 5 Nos. 25 mm Tor.

84
Minimum steel @ 0.2% - ( Cl. 305.19 of IRC:21-2000)
= 0.2 x 165.00 x 100.0
100
= 33.000 cm2

So provide 8 Nos. 25 mm Tor. of area 39.270 cm2


10 Nos of 12 mm Tor.

Provide 8 Nos. of 25mm Tor at Top for Cantilever in One layer A+B
Provide nominal reinforcement of 10 Nos of 12 mm Tor @ bottom for minimum steel F

CHECK FOR SHEAR :- ( for Cantilever ) @ ` d ' from Support.


Caping Beam :
Distance of section from edge of caping beam = Section X - X.
IRC:21-2000 Cl. 304.7.1.2. = 1.650 - 0.948 = 0.702 m

+ 81.530 8.300
+ 81.280 0.25 m

0.75 m
+ 80.530 0.702

0.432 0.318
5.00
1.650 m 1.650 m
X

SKETCH FOR SHEAR DESIGN.

Depth`D' at X-X ( 0.25 + 0.702 ) x 0.750


=
1.218
= 0.682 m ;
Available depth `d' at X-X = 68.25 - 12.500 - 0.04
= 55.707 cms

Loads on One side of Pier :-


Rect 0.702 x 1.500 x 0.250 x 2.500 = 0.659 t
Taper 0.702 x 1.500 x 0.750 x 2.500 = 0.988 t
2
Total Shear at X - X = 1.646 t

Moment of Loads at X-X = 1.646 x 0.70 / 2 = 0.578 t-m


Total Moment at X-X = 0.578 t-m
M x Tan b
d

85
Where , M = 0.578 t-m
d = 0.557 m
Tan b = 0.432 = 0.616
0.702
Hence Reduction in Shear = 0.578 x 0.616 = 0.639 t
0.557
Net Design Shear @ X - X = 1.646 - 0.639
= 1.007 t
Shear Stress at X - X as per Cl.304.7.1.1
t = ( V/ bxd)
tv = 1.01 x 1000 = 0.181 kg/cm2
100 x 55.707

IRC:21-2000 Cl. 304.7.1.2.


Max. Shear stress = 19 kg/cm2 ( IRC:21-2000, Table-12A.)
(for M25 concrete) Hence Section need not be changed

(As Per Cl. 304.7.1.3.3., Table – 12B,)


Allowable shear stress for members without shear reinforcement
p = 100 x 39.270 = 0.705
100.0 x 55.707
In this Case :-
for (100As/bd) = 0.705

tc = 0.31 + ( 0.705 - 0.500 ) x(0.36 - 0.310 )


( 0.750 - 0.500 )
= 0.351
t c = 0.351 kg/cm2

tv < t c HENCE OK
However Provide Minimum Shear Reinforcement Cl. 304.7.1.5, of IRC:21-2000.

Asw 0.4
Reinforcement = =
b x s 0.87 fy
Using 10 mm.tor. 4 -Legged

Spacing - ` s ' = 4 x 0.785 x 0.870 x 415


100 x 0.400
= 28.36 cms ( Not more than 30 cm)

Provide 10 mm 4 Legged Stirrups @ 27.5 cm c/c. In Pier.


C
or 275 mm c/c

SIDE FACE REINFORCEMENT :-


@ 0.1% on Each side face.
As the depth of the beam is 1000mm Provide side face reinforcement

86
However Provide minimum Reinforcement
Ast = 0.100 x 100.0 x 100
100
= 10 = 5.000 cm2

Area of each bar of Dia = 12mm = 1.131 cm2 5nos

Provide 5 Nos of 12mm tor. On each side face of Caping Beam. E

1 CALCULATION OF STRESSES AT BOTTOM OF FOOTING at +67.8

Length at Bottom of Footing = 8.90 m


Width at Bottom of Footing = 3.50 m
Cross sectional area at Bottom of Footing = 31.150 m2
ZLL = 3.5^2 X 8.9 / 6 = 18.18 m4
ZTT = 8.9^2 X 3.5 / 6 = 46.21 m4

(V) DESIGN OF RCC PIER AT + 68.600 m

The main conditions for the design of Pier are :- Both the Spans Laid and One span Laid.
For Both the spans laid condition :- 1 Service and CBL Condition
2 Service and FSL Condition.
For One span Laid Condition :- No Live load acting.

BOTH THE SPANS LAID CONDITION

Case - 1 : Service and CBL condition :-

Vertical Loads :-
Dead Loads :-
1 Load from Superstructure = 298.959 t
2 Weight of Caping Beam = 26.484 t
3 Weight of Pier ( Dry ) = 276.393 t
Total Dead loads = 601.836 t

Moments about Pier Level +68.600 Moments


S. No. Type of Force Load Long. Trans.
1 Dead Load 601.836 451.377 t - m 0.000
2 Temperature Moment 0.427 t - m
Moments without Wind 601.836 451.804 t - m 0.000 t-m
3 with Wind Force (horizontal force) 11.381 t - m 45.520 t-m
Moments with Wind 601.836 463.184 t - m 45.520 t-m

X = 451.804 ⁄ 601.836
= 0.751

87
e = 0.751 - 0.750
= 0.001
Longitudinal Moment ML = 601.836 x 0.001 = 0.427 tm
Total Moment = 0.427 tm

Section Properties :-

Size of Pier = 5.000 m x 1.500 m


Area A = 0.750 x 3.142 x 0.750 = 0.442 m2.
4
+ 5.000 x 1.500 = 7.500 m2.
Total Area = 7.942 m2.

Considering Equivalent Rectangle - Side = 7.942 = 5.295 m


1.500
Section Modulus =
Long. ZL = 5.295 x 1.500 ^2 = 1.985 m3
6
Trans. ZT = 1.500 x 5.295 ^2 = 7.008 m3
6
Stresses in Pier :-
CBL Condition : -
a). Without wind = 601.836 (+/-) 0.427 (+/-) 0.000
7.942 1.985 7.008
= 75.781 (+/-) 0.215 (+/-) 0.000
= 75.996 / 75.566 t/m2.

Direct compressive Stress allowable = 500 t/m2 (IRC-21, Clause 303)


2
Bending compressive Stress allowable = 667 t/m (IRC-21, Clause 303)

(Cl. 303.3, Table - 11, of IRC:21-2000) Hence provide reinforcement.


b). With wind = 601.836 (+/-) 11.808 (+/-) 45.520
7.942 1.985 7.008
= 75.781 (+/-) 5.95 (+/-) 6.50
2
= 88.223 / 63.338 t/m

From IRC:78 - 2000, cl.706.1.2 667.000 x 1.333


2
= 889.111 t/m
Case – 2 : Service and FSL condition :-
Vertical Loads :-
Dead Loads :-
1 Load from Superstructure = 298.959 t
2 Weight of Caping Beam = 26.484 t
3 Weight of Pier ( 15% buoyancy ) = 259.809 t
Total Dead loads = 585.252 t

88
Moments about Pier Level +68.600 Moments
S. No. Type of Force Load LA Long. Trans.
1 Dead Load 585.252 0.750 438.939 t - m 0.000
585.252 438.939 t - m
4 Water Current 0.000 t - m 0.000 t-m
Moments without Wind 585.252 438.939 t - m 0.000 t-m
2 with Wind Force (horizontal force 11.381 t - m 45.520 t-m
Moments with Wind 585.252 450.320 t - m 45.520 t-m

X = 438.939 ⁄ 585.252
= 0.750
e = 0.750 - 0.750
= 0.000
Longitudinal MomentML = 585.252 x 0.000 = 0 tm
Total Moment = 0.000 tm

Section Properties :-

Size of Pier = 5.000 m x 1.500 m


Area A = 0.750 x 3.142 x 0.750 = 0.442 m2.
4
+ 5.000 x 1.500 = 7.500 m2.
Total Area = 7.942 m2.

Considering Equivalent Rectangle - Side = 7.942 = 5.295 m


1.500
Section Modulus =
Long. ZL = 5.295 x 1.500 ^2 = 1.985 m3
6
Trans. ZT = 1.500 x 5.295 ^2 = 7.008 m3
6
Stresses in Pier :-
CBL Condition : -
a). Without wind = 585.252 (+/-) 0.000 (+/-) 0.000
7.942 1.985 7.008
= 73.693 (+/-) 0.000 (+/-) 0.000
= 73.693 / 73.693 t/m . 2

Direct compressive Stress allowable = 500 t/m2 (IRC-21, Clause 303)


2
Bending compressive Stress allowable = 667 t/m (IRC-21, Clause 303)

(Cl. 303.3, Table - 11, of IRC:21-2000) Hence provide reinforcement.


b). With wind = 585.252 (+/-) 11.381 (+/-) 45.520
7.942 1.985 7.008
= 73.693 (+/-) 5.73 (+/-) 6.50
2
= 85.920 / 61.465 t/m

89
From IRC:78 - 2000, cl.706.1.2 667.000 x 1.333
= 889.111 t/m2
ONE SPAN LAID CONDITION

Case - 1 : CBL condition :-

Vertical Loads :-
Dead Loads :-
1 Load from Superstructure = 91.569 t
2 Weight of Caping Beam = 26.484 t
3 Weight of Pier ( Dry ) = 276.393 t
Total Dead loads = 394.446 t

Moments about Pier Level +68.600 Moments


S. No. Type of Force Long. Trans.
1 Dead Load Moment 147.523 t - m
Moments without Wind 147.523 t - m
2 Wind Force 11.381 t - m 45.520
Moments with Wind 158.903 t - m 45.520 t-m

Size of Pier = 5.000 m x 1.500 m


Area = A = 7.942 m2
ZL = 1.985 m3;
ZT = 7.008 m3 ;

a). Without wind = 394.446 (+/-) 147.523 (+/-) 0.000


7.942 1.985 7.008
= 49.667 (+/-) 74.302 (+/-) 0.000
= 123.969 / 24.635 t/m . 2

b). With wind = 394.446 (+/-) 158.903 (+/-) 45.520


7.942 1.985 7.008
= 49.667 (+/-) 80.03 (+/-) 6.50
2
= 136.197 / 36.862 t/m
Case – 2 : FSL condition :-

Vertical Loads :-
Dead Loads :-
1 Load from Superstructure = 91.569 t
2 Weight of Caping Beam = 26.484 t
3 Weight of Pier ( 15% buoyancy ) = = 259.809 t
Total Dead loads = 377.862 t

90
Moments about Pier Level +68.600 Moments
S. No. Type of Force Long. Trans.
1 Dead Load Moment 141.321 t - m
2 Water Current 0.000 t - m 0.000 t - m
Moments without Wind 141.321 t - m 0.000
3 Wind Force 11.381 t - m 45.520
Moments with Wind 152.701 t - m 45.520 t-m

Size of Pier = 5.000 m x 1.500 m


Area = A = 7.942 m2
ZL = 1.985 m3;
ZT = 7.008 m3 ;

a). Without wind = 377.862 (+/-) 141.321 (+/-) 0.000


7.942 1.985 7.008
= 47.579 (+/-) 71.178 (+/-) 0.000
= 118.757 / 23.599 t/m2.

b). With wind = 377.862 (+/-) 152.701 (+/-) 45.520


7.942 1.985 7.008
= 47.579 (+/-) 76.91 (+/-) 6.50
2
= 130.985 / 35.827 t/m

( III )CALCULATION OF PIER REINFORCEMENT


From the above the Tensile forces in Pier are more in case of Empty & Full

Section Properties :-
Size of Pier = 5.000 m x 1.500 m
2
Area A = 79417.86 cm

Service Condition :-

As per Cl.306.1 of IRC:21-2000, Table - 13 , Note (3).

Effective Length of Pier = 1.200 L


In this case `L' = 81.530 - 68.600 = 12.930 m

Effective Length Le = 1.200 x 12.930 = 15.516 m


Least radius of Gyration (r ) = t √12
= 1.500 / √12
= 0.433

Ratio = Effective length = 15.516 = 35.83267


Radius of Gyration 0.433

91
One span Laid Condition :-
Effective Length of Pier = 1.75 L =
= 1.750 x 12.930 = 22.628 m
Ratio = Effective length
Radius of Gyration
= 22.628
0.433
= 52.256
Hence the Stresse are reduced in this case by 1.5 - L
100 r
= 1.5 - 52.256
100
= 0.977 < 1.000
Hence the permissible stresses are considered.
Design of Reinforcement :-
For M25 grade the allowable stresses in Concrete :
Direct Compression = 60 kg/cm2.
Bending Stress = fc = 85 kg/cm2.
allowable Steel Stress :Tensile stress = fs = 1900 kg/cm2.
Percentage of Reinforcement = p = 0.30% min. (Cl.306.2.2 IRC:21:2000)
Modular Ratio = m = 10
Area of Section = A = 79418 cm2.

Min steel as per Cl.306.2.1 = 0.3 % = 238.254 cm2.

Provide 12 Nos. 25 mm.tor. Area = 58.905 cm2.


2x3=6 Nos 25 mm. Tor. in Cutwaters 2x3=6 Nos. in Straight portion-Eace face side. G

Lateral ties :
According to IS 456 :2000 the diameter of the lateral ties shall not be less than

1) 1/4 th of the diameter of the longitudinal bar


2) 6 mm
The diameter of the lateral ties shall not be less than < 6.25 mm
6 mm
Therefore provide 8 mm as the diameter of the tie bar
Pitch of transverse reinforcement should be least of the following
1) Least lateral dimension of compression member
2) Sixteen times the smallest diameter of the longitudinal bar
3) 300mm
Pitch ot transverse ties
Least of following 1) 150 cm
2) 40 cm
3) 30 cm
Pitch of ties = 30.000 cm

92
Provide 8mm tor. Longitudinal Ties at 200 mm c/c. H+J
Provide 8mm tor.Transeverse Ties at 300 mm c/c. K
(VI) DESIGN OF FOUNDATION @ +67.800 m

The Foundations foundations are designed for Both the Spans Laid and One span Laid conditions.

Foundation Level = +67.800


Scour Level = 2 dsm = +62.500

1.500

1.00 1.00
+ 68.600 m 0 0
3.50
0.8
+ 67.800 m
3.500

DETAIL OF PIER FOUNDATION.

1 Both the Spans laid Condition :-

a). Service + LWL Condition :-


Vertical loads :-
1 Dead Load From Superstructure = 298.959 t
2 Weight of Caping Beam = 26.484 t
3 Weight of Pier = 276.393 t
4 Weight of Footing - with out buoyancy = 62.300 t
Total Dead loads = 664.136 t
Moments about Footing level +67.800 Moments
S. No. Type of Force Load LA Long. Trans.
1 Dead Load 664.136 1.750 1162.237 t - m 0.000
Moments without Wind 664.136 1162.237 t - m 0.000 t-m
4 with Wind Force (horizontal force 12.045 t - m 48.176 t-m
Moments with Wind 664.136 1174.282 t - m 48.176 t-m

X = 1162.24 / 664.14
= 1.750 m
e = 1.750 - 1.75
= 0.000 m
Ml = 664.136 x 0.000
= 0.000 t -m

93
Section Properties :-
Size of Footing = 8.90 m x 3.50 m
Area = A = = 8.90 x 3.50 = 31.15 m2

Section Moduli
Zl = 8.90 x 3.50 ^2 / 6 = 18.171 m3
Zt = 3.50 x 8.90 ^2 / 6 = 46.206 m3

Foundation Pressures :- Service + LWL.

a). Without Wind : = 664.14 ( +/- ) 0.00 ( +/- ) 0.00


31.15 18.17 46.21
= 21.32 ( +/- ) 0.00 ( +/- ) 0.00
2
= 21.321 / 21.321 t/m

b) With Wind : = 664.14 ( +/- ) 12.0 ( +/- ) 48.18


31.15 18.17 46.21
= 21.32 ( +/- ) 0.66 ( +/- ) 1.04
= 23.026 / 19.615 t/m2

a). Service + FSL Condition :-


Vertical loads :-
1 Dead Load From Superstructure = 298.959 t
2 Weight of Caping Beam = 26.484 t
3 Weight of Pier ( 100% buoyancy ) = = 165.836 t
4 Weight of Footing - 100% buoyancy = = 37.380 t
Total Dead loads = 528.658 t
= 528.658 t

Moments about Footing level +67.800 Moments


S. No. Type of Force Long. Trans.
1 Dead Load 925.152 t - m 0.000 t-m
4 Water Current 0.000 t - m 0.000 t-m
Moments without Wind 925.152 t - m 0.000 t-m
4 with Wind Force (horizontal force) 12.045 t - m 48.176 t-m
Moments with Wind 937.197 t - m 48.176 t-m

X = 925.15 / 528.66
= 1.750 m
e = 1.750 - 1.75
= 0.000 m
Ml = 528.658 x 0.000
= 0.000 t -m

94
Section Properties :-
Size of Footing = 8.90 m x 3.50 m
Area = A = = 8.90 x 3.50 = 31.15 m2

Section Moduli
Zl = 8.90 x 3.50 ^2 / 6 = 18.171 m3
Zt = 3.50 x 8.90 ^2 / 6 = 46.206 m3

Foundation Pressures :- Service + LWL.

a). Without Wind : 528.66 ( +/- ) 0.00 ( +/- ) 0.00


31.15 18.17 46.21
= 16.97 ( +/- ) 0.00 ( +/- ) 0.00
2
= 16.971 / 16.971 t/m

b) With Wind : 528.66 ( +/- ) 12.0 ( +/- ) 48.18


31.15 18.17 46.21
= 16.97 ( +/- ) 0.66 ( +/- ) 1.04
= 18.677 / 15.266 t/m2

2 One Span laid Condition :-


a). CBL Condition :-
Vertical loads :-
1 Dead Load From Superstructure 183.14 = 91.569 t
2
2 Weight of Caping Beam = 26.484 t
3 Weight of Pier ( Dry ) = 276.393 t
4 Weight of Footing - 100% buoyancy = 62.300 t
Total Dead loads = 456.746 t
Total DL = 456.746 t
Moments about Footing level +67.800 m Moments
S. No. Type of Force Load LA Long. Trans.
1 Dead Load 456.75 1.750 799.305 0.000
Moments without Wind 799.305 0.000
2 Wind Force (Unloaded Section) 12.045 48.176
Moments with Wind 811.350 48.176

Section Properties :-
Size of Footing = 8.90 m x 3.50 m
2
Area A = 31.150 m
Zl = 18.171 m3
Zt = 46.206 m3
X = 799.31 ⁄ 456.75
= 1.750 m
e = 1.750 - 1.750
= 0.000 m

95
ML = 456.75 x 0.000
= 0.000 tm
Foundation Pressures :-
a) Without Wind : 456.746 ( +/- ) 0.000 ( +/- ) 0.000
31.150 18.171 46.206
= 14.663 ( +/- ) 0.000 ( +/- ) 0.000
2
= 14.663 / 14.663 t/m

b) With Wind : 456.746 ( +/- ) 12.045 ( +/- ) 48.176


31.150 18.171 46.206
= 14.663 ( +/- ) 0.663 ( +/- ) 1.043
2
= 16.368 / 12.957 t/m

b). Service + FSL - Condition :- One span Laid condition.


1 Dead Load From Superstructure = 91.569 t
2 Weight of Caping Beam = = 26.484 t
3 Weight of Pier ( 100% buoyancy ) = = 165.836 t
4 Weight of Footing - 100% buoyancy = = 62.300 t
Total Dead loads = 346.189 t
Total Load = 346.189 t
Moments about +67.800 m Level :-
S. No. Type of Force Load LA Long. Trans.
1 Dead Load Eccentricity 346.189 1.750 605.831 0.000
2 Water Current 0.000 0.000
Moments without Wind 605.831 t - m 0.000
3 Wind Force (OnUnloaded structure) 12.045 48.176
Moments with Wind 617.875 t - m 48.176

X = 605.831 ⁄ 346.189
= 1.750
e = 1.750 - 1.750
= 0.000 m
Moment = 346.19 x 0.000 = 0 t-m

Section Properties :-
Size of Footing = 8.90 x 3.50
2
Area A = 31.150 m
Zl = 18.171 m3
Zt = 46.206 m3

Foundation Pressures :-
a) Without Wind : 346.189 ( +/- ) 0.000 ( +/- ) 0.000
31.150 18.171 46.206
= 11.11 ( +/- ) 0.000 ( +/- ) 0.000
2
= 11.114 / 11.114 t/m

96
b) With Wind : 346.189 ( +/- ) 12.045 ( +/- ) 48.176
31.150 18.171 46.206
= 11.114 ( +/- ) 0.663 ( +/- ) 1.043
2
= 12.819 / 9.408 t/m

DESIGN OF RCC FOOTING @ +67.800 m


Type of Footing = SLOPED
Bp 1.50 m Density Of Concrete = 25 kN/m3
Density Of Soil = 20 kN/m3
0.00 Depth Of Foundation = 2 m
d = 0.80 0.80 Net SBC = 250 kN/m2
B = 3.5 Gross SBC = 250 + 2 x 20
= 290 kN/m2

FC = 25 N/mm2
FY = 415 N/mm2
d/2 Length Of Footing L = 8.90 m
L = 8.9 Lp = 6.5 Width Of Footing W = 3.50 m
Thickness Of Fdn T = 0.80 m
Depth @ Edge of fdn D1 0.80 m
Width Of Pier wp = 1.50 m
Length Of Pier lp = 6.50 m
PIER s cbc 8.5 N/mm2.
L
z 1.000 sc 6 N/mm2.
s st 200
m= 10.98
Wp

x x K= 0.318
J= 0.894
1.2 z 1.2 1.000 Q= 1.209
effect.depth 742

Load Calculation for Footing & Soil:-


Self Wt. Of Footing =
Rectangular Portion = 25 x 8.9 x 3.5 x 0.8 = 623 kN
Tapered Portion =
Wt of Tapered portion = 3.000 + 3.500
x 8.900 x 0.000 x 25.000
2
= 0.00 kN

Weight of Soil = [(8.9 x 3.5) - (6.5 x 1.5)] x (2 - 0.8 ) x 20 = 513.6 kN


Weight of Footing + Soil = + 513.6 = 1136.6 kN
Vertical Load(y-dir) Fy = 601.836 KN

97
CHECK FOR SHEAR
a) Two Way Shear
Critical Section = At distance d/2 from face of Pier
Concrete Grade = 25 N/mm2
Pier Details
Length = 6500 mm
Width = 1500 mm
Foundation Details
Length = 8900 mm
Width = 3500 mm
Depth = D1 + (T-D1)(L-Lp-T)/2
(L-Lp)/2
= 0.80 + 0 0.8
1.2
= 0.800 m
= 800 mm
Effective Depth = 750 mm
Percentage Of Steel = 0.179 %
Punching Load
Maximum Load on Pier = 902.75
Punching Shear, P = 902.753 x (( 8.9 x 3.5 ) - ( 7.25 x 2.25 ))
( 8.9 * 3.5 )
p = 430.01 kN
Shear Resistance Of Concrete (Vc) = Vc x bc x d ( clause no. 31.6.3.1 of IS 456 )
Where , Vc = ks x tc
ks = 0.5 + βc -----should not be greater than 1
Short Side Of Column
βc =
Long Side Of Column
1500
Βc = = 0.231
6500
ks = 0.731
tc = 0.16 x √fck = 0.80 N/mm2
bc = Periphery at distance d/2 from face of pier
Length of critical section = 7250 mm
Width of critical section = 2250 mm
Perimeter of critical section = 19000 mm
430010 = 28.29 mm
Depth Required =
0.8 x19000
Shear Resistance = 0.8 x 19000 x 750 / 1000
= 11400 kN

98
B) One Way Shear
2 196.15

800
d 220.52

1500

3500
1

750
1 1 227.83

1000
d

250

800
2 230.26
6500
1200
450
750

800

8900

196.15 230.26

225.662 228.536

At Length
Max Net Pressure = 229 kN/m2
Depth D1 + (T-D1)*(0.5L-0.5Lp-T)
(L-Lp)/2
0.80 + 0.00 x 0.4
1.2
= 0.800 m
= 800 mm
Effective Depth = 750 mm
Length at critical section = 3500 mm
Width at critical section = 450 mm
Shear Force = 228.54 x 3.5 x 0.45
= 359.944 kN
At Width
Maximum Pressure = 228 kN/m2
Depth = D1 + (T-D1)*(0.5W-0.5Wp-T)
(W-Wp)/2
0.80 + 0.00 x 0.2
1.2
= 0.800 m = 800 mm
Effective Depth = 750 mm
Length at critical section = 8900 mm
Width at critical section = 250 mm
Shear Force = 227.83 x 8.9 x 0.25
= 506.92175 kN

99
Designed Shear Strength = 507 kN
Corresponding Length = 8900 mm

% Ast = 0.179
Shear Stress = 0.230 N/mm2
Depth Required 506921.75
=
0.23 x 8900
= 248 mm
Check For Depth @ Critical Section
Critical section from face of column = 750 mm
h from column face to edge of footing = 1000 mm
Depth @ Edge of fdn D1 = 800 mm
Depth @ face of column D = 800 mm
Depth @ Critical s/c = 800 mm
Effe. Depth @ Critical s/c = 750 mm Depth is O.K.
Check For transfer of Load @ Column base
A2 = Lp x Wp = 9.75 mm2
A1 = (6.5+2 x (2*0.8))*(1.5+2 x (2*0.8))
= 45.59 mm2
sqrt(A1/A2) = 2.16 </= 2
Allowable Bearing Stress = 0.25 fck sqrt(A1/A2)
= 13 Mpa
Actual Bearing Stress = 902.753 x 10^3/(9.75 x 10^6)
= 0.09 Mpa
< 13 Mpa

DESIGN OF FOUNDATION

a) Calculation of Reinforcement at Bottom


Maximum Pressure = 230.26 kN/m2
Pressure due to Soil & Fdn wt = ( + 513.6 ) / ( 8.9 x 3.5 )
= 16.49
Net causing moment = 213.77 kN/m2
Maximum Projection of fdn = 1.2 m
Bending Moment = 213.771 x 1.2 x 1.2 / 2
= 153.92 kN.m
Ast = √(M/Qb)
= 153920000
0.121 x 1000

Ast Required = 1128.325 mm2


Mini.% of re-bar = 0.2 % ---- Cl. 305.19 of IRC:21-2000
2
Min Ast = 1600 mm
Dia of Bar = 16 mm
Area of bar = 200.96 mm2
Spacing = 125 mm Depth is O.K.

100
Provide Spacing = 150 248 750
(More R/f than required is provided to avoid failure in one way shear)
Area Provided = 1340 mm2 NOT OK

Provide 16 mm dia Bars @ 150 mm spacing in Longitudinal direction L


Provide 12 mm dia Bars @ 125 mm spacing in Transverse direction M

b) Calculation of Reinforcement at Top


Reinforcement at top is checked for overburden load on top of foundation
since 100% of foundation is not in contact with soil.
Wt. Of Soil + Fdn wt. = 513.6 kN
Area Load = 513.6 / (8.9 x 3.5) = 16.49 kN/m2
Maxi. Projection of fdn = 1.2 m
Bending Moment = 16.49 x 1.2 x 1.2 / 2
= 11.87 kN.m
Ast = √(M/Qb)
Ast = 313.337 mm2

Mini % of Re-bar = 0.12 %


Ast = 870 mm2
Dia of Bar = 12 mm
Area of bar = 113.04 mm2
Spacing = 129 mm
Provide Spacing = 125 mm
Area Provided = 904.32 mm2

Provide 12 mm dia Bars @ 125 mm spacing in Longitudinal direction N


Provide 12 mm dia Bars @ 125 mm spacing in Transverse direction O

Max. Min.
Details Stress Stress Type Of Stress
t/sq.m. t/sq.m.
Two Spans Laid
Stress in Concrete:
Case – 1 : Service & CBL Condition
With Wind 88.223 63.338 Compressive stress
With out Wind 75.996 75.566 Compressive stress
Case – 2 : Service & FSL Condition
With Wind 85.920 61.465 Compressive stress
With out Wind 73.693 73.693 Compressive stress
One Span Laid
Stress in Concrete:
Case – 1 : Service & CBL Condition
With Wind 136.197 36.862 Compressive stress
With out Wind 123.969 24.635 Compressive stress

101
Case – 2 : Service & FSL Condition
With Wind 130.985 35.827 Compressive stress
With out Wind 118.757 23.599 Compressive stress
Two Spans Laid
Stresses in Soil :
Case – 1 : Service & CBL Condition
With Wind 23.026 19.615 Compressive stress
With out Wind 21.321 21.321 Compressive stress
Case – 2 : Service & FSL Condition
With Wind 18.677 15.266 Compressive stress
With out Wind 16.971 16.971 Compressive stress
One Span Laid
Stresses in Soil :
Case – 1 : Service & CBL Condition
With Wind 16.368 12.957 Compressive stress
With out Wind 14.663 14.663 Compressive stress
Case – 2 : Service & FSL Condition
With Wind 12.819 9.408 Compressive stress
With out Wind 11.114 11.114 Compressive stress

102
BBS_sidepier

PIER CAP

TOTAL
S NO TYPE DIA SPACING NUMBER LENGTH
LENGTH
mm m
2660
1 A+B 25 2 x8 2860 91.52

170
2 B 25 - 4 12560 8220 54.72

00
19
3 C 10 - 4-L 275 16 Varies y x 128.96
4030
y
4 D 10 - 2-L 275 19 11780 Varies 447.64
x
6700 - 8220
5 E 12 5 6700 - 8220 Varies 94.2

19
6 F 12 10 8970 4950 960 179.4
10

PIER

7 G 25 12 13430 13130 644.64


200
5000
1420

y
8 H 10 200 65 13040 1695.2
x
2231

9 J 10 200 65 4562 593.06


1420

10 K 10 300 84 1580 x 265.44

FOOTING

Bottom Reinforcement

9220
11 L 16 150 23 424.12

3820
12 M 12 125 71 542.44

Top Reinforcement

Page 103
BBS_sidepier
9220
13 N 12 125 28 516.32

4820
14 O 12 125 71 684.44

Page 104
BABU JAGEEVAN RAM UTTARANDHRA SUJALA SRAVANTHI PROJECT
Job :
PACKAGE -1 PHASE – II
Subject : DESIGN OF RCC SIDE PIER AND FOOTING

8.300

+ 81.530 0.5
+ 81.030
1.30
+ 79.730

+ 69.005 FSL

-0.35 9.00 -0.35


10.5 11.13
st
+ 69.755 1 Berm lvl 0.75 0.75

+ 69.005 FSL

+ 68.600 1.000 1.000

+ 64.855 CBL 0 0
+ 67.800 0.8

12.500
DETAIL OF PIER & FOUNDATION

3.500
1.500

12.500
PLAN

HYDRAULIC PARTICULARS :-
1 Design Discharge of canal = 163.032 Cumecs
2 Effective Linear Water Way @ FSL = 49.950 m
3 Maximum Mean Velocity of Flow at FSL V = 0.898 m/sec.
4 Full Supply Level FSL = + 69.005 m
5 Afflux h = 1.5 m
6 Scour Level = + 63.025 m
7 Foundation level Pier = + 62.500 m
8 Safe Bearing Capacity as per the strata. = 25.0 t/m2

DESIGN DATA :-
1 Number of Spans = 7 no's
2 Clear span of piers = 13.00 m

76
3 Span c/c. of Piers (Length of trough per span) = 13.988 m
4 Effective span length = 13.488 m
5 Total width of trough = 8.300 m
6 Trough Width = 6.900 m
7 Width of side wall = 0.350
8 Height of side wall = 2.040
9 Skew of the Bridge = 0.000 deg.
Cos q = 1.0 Sin q = 0.0
10 Full Supply Level FSL = + 69.005 m
11 Bottom of Trough = + 81.530 m
12 Trough sill level = FSL + Slab Thickness + W.C = RFL = = + 81.870 m
13 Thickness of trough slab = 0.300 m
14 Thickness of Sealing Coat ( PCC M30 Grade concrete ) = 0.040 m
15 Total depth of Pier cap = + 1.800 m
16 Top of RCC Footing .i.e., Bottom of Pier = + 68.600 m
17 Thickness of Footing = 0.800 m
18 Scour levels for Pier = + 63.025 m
19 Bottom of Foundations = + 62.500 m
20 Linear waterway provided for Right Crossing = 49.950 m
21 Max. mean Velocity of water flow at FSL = 0.898 m/sec
22 RCC Pier thickness = 1.500 m
23 Bearing width = 0.494 m
24 Unit Weight of RCC = 2.500 t/m3
25 Unit Weight of PCC = 2.500 t/m3

( I ) DEAD LOADS :-
(i) Calculation of Vertical Loads from Superstructure :-
Span C/C of bearings = 13.488 m
Thickness of Expansion Joints = 12 mm
Total length = Clear Span + ( 2 x Bearing Width )
= 13.000 + 0.988
= 13.988 m
Dead Load on Pier = 298.96 t (From abutment loading calculations)

(ii) Dead weight of Sub Structure :


(a) Dead weight of caping beam

8.300 1.500 m

81.530 0.5

1.30
79.730
10.50 1.500
-0.35 9.00 -0.350000000000001

Caping Beam Section

77
Area of Caping beam = ( 8.300 x 1.500 ) + ( 9.000 x 1.500 ) + -0.455
= 25.495 m2
Weight of Rectangular portion = 8.300 x 1.50 x 0.50 x 2.50 = 15.5625 t

Weight of Tapered portion 8.300 + 9.00


x 1.50 x 1.30 x 2.50 = 42.16875 t
2
Total Weight = 57.731 t

0.75 9.00 0.75

1.500

Plan of Pier

(b) Dead Weight of pier


Size of Pier = 9.00 x 1.500 with Semi-circular cut waters.
Top of hammer head = 81.530 m
Bottom of Caping Beam = 79.730 m
Bottom of Pier = 68.600 m
FSL = 69.005 m
Height of Pier = 79.730 - 68.600 = 11.130 m

Area of Pier = 0.393 x 1.500 x 1.500 = 1.767 m2


+ 9.0 x 1.500 = 13.50 m2

Total Area of Pier = 1.767 + 13.500 = 15.27 m2

Weight of Pier :-
Dry = 15.27 x 11.13 x 2.50 = 424.81 t

c ) Dead Weight of footing :


Size of Footing = 12.500 m x 3.500 m
Thickness Footing = 0.800 m
Area of Footing = 12.50 x 3.500 = 43.750 sqm
Wt of Rectangular portion = 43.75 x 0.800 x 2.500 = 87.500 t
Hence, the weight of footing without buoyancy = 87.500 t

Volume of footing = ( 3.50 x 0.800 ) x 12.500 = 35.000 m3

Weight of Footing: =
Dry = 35.000 x 2.500 = 87.500 t
15% Buoyancy = 35.000 x 2.350 = 82.250 t
100% Buoyancy = 35.000 x 1.500 = 52.500 t

78
Pier Width
9.00 1.500
10.50
12.50 1.000
0 3.500
0.8
0.8

12.500 3.500

A Eccentricities :-
Bearing width = 0.744

0.75 0.750

a). Dead load Eccentricity :-


Along Traffic (Longitudinal ) = 0.750 m - 0.372 - 0.012
= 0.372 m

Iii ) WIND FORCE :- ( As per IRC:6-2014, Cl. 209)

CBL / Berm Level = + 69.755 m


Sill level = +81.870 m
Bottom of trough = +81.530 m
trough Length = 13.988 m
Wind force on trough :
Height of Side wall = 2.040
Thickness of trough slab + Sealing coat = 0.340
Wind force acts at half the Sidewall Height = 1.020 m
Height above on which wind force acts = 0.340 + 1.020
= 1.360 m
Area of super structure acted upon by wind = ( 0.340 + 1.020 ) x 13.988
pressure
= 19.024 m 2

Area of sub structure acted upon by wind = ( 1.500 x 11.775 )


pressure
= 17.663 m 2

As per IRC 6-2014 , clause 209.3.3, Transverse Wind Force FT = PZ x A x G x CD


Where,
PZ = Hourly Wind Pressure in N/m2
A = The Solid Area Exposed to Wind
G = Gust Factor = 2.0
CD = Drag Coefficient depending on Geometric shape of Bridge

79
For Super Structure CD = 1.1
For Live Load CD = 1.2
For Sub Structure (Semi Circular) H/b = 7.42 , t/b = 6.00 > 4
CD = 0.8 (Table 6, IRC 6-2014)

Calculation of wind pressure by Gust Factor Method


(As per IS: 875(Part 3) 1987, cl.8.2.1)
Basic wind speed (Vb) = 33.00 m/sec (IRC 6 -2014, Fig. No.6)
Depending on the project Location( Mahbubnagar, Telangana ,India)
wind speed (Vb) = 44.00 m/sec
The variation of hourly mean wind speed (Vz) = Vb * k1 * k2 * k3
where,
Risk co-efficient factor (k1) = 1.05 (IS: 875(Part 3) 1987, Table No.1)
Different heights & terrain factor (k2) = 0.78 (IS: 875(Part 3) 1987, Table no.33)
Topography factor (k3) = 1.029 (IS: 875(Part 3) 1987, cl.5.3.3)

Design wind pressure (Pz) = 0.6 * Vz2


Height Vb k1 k2 k3 Vz Pz
(m) (m/sec) (m/sec) (N/m2)
Upto 10.00 44.00 1.05 0.78 1.0286 37.07 824.36
15.00 44.00 1.05 0.82 1.0286 38.97 911.08
20.00 44.00 1.05 0.85 1.0286 40.39 978.96
30.00 44.00 1.05 0.88 1.0286 41.82 1049.29
50.00 44.00 1.05 0.93 1.0286 44.19 1171.91
100.00 44.00 1.05 0.99 1.0286 47.05 1328.00

CBL CONDITION :
Wind force on Superstructure
Exposed height of pier above CBL = 11.775 m
Average height at centre of trough (CBL) = 13.135 m
Therefore Pz = 91.108 kg/m2
Transverse Wind Force on each pier FT = 1.907 t
Longitudinal Wind Force (25% of trans. Force) = 0.477 t

Wind force on Sub structure


Exposed height of pier above CBL = 11.775 m
Average height at center of trough = 11.775 m
Therefore Pz = 91.108 kg/m2
Transverse Wind Force on each pier FT = 1.288 t
Longitudinal Wind Force (25% of trans. Force) = 0.322 t

On Superstructure
Lever arm from top of foundation i.e., at 68.6 = 12.930 + 1.360
= 14.29 m
Lever arm from bottom of foundation at 67.8 = 13.730 + 1.360
= 15.09 m

80
On Sub Structure
Lever arm from top of foundation i.e., at 68.6 = 12.930 m
= 12.930 m
Lever arm from bottom of foundation at 67.8 = 13.730 m
= 13.730 m

Moments due to wind force at top of footing


Longitudinal = (0.477 x 14.29) + (12.93 x 0.322) = 10.980 t-m
Transverse = (1.9065 x 14.29) + (1.2875 x 12.93) = 43.891 t-m

Moments due to wind force at bottom of footing


Longitudinal = (0.477 x 15.09) + (13.73 x 0.322) = 11.619 t-m
Transverse = (1.9065 x 15.09) + (13.73 x 1.2875) = 46.446 t-m

IV) TEMPERATURE EFFECTS

1 As there is no Vehicular load on the trough, so no Braking force


2 Temperature effect

Thermal Expansion = 12 x 10 -6 /deg. C


Variation in the temperature = 20 deg. (Cl. 215.4, IRC:6-2014 )

Expansion / Contraction of span = 1.20E-05 x 2 x 20 x 13.988 x 100


= 0.671 cm

Force generated @ each bearing = G * A *( D/t )


where,
G = shear modulus = 1.000 kg/cm2
A = Area of Bearing = 490.0 cm2
D = Variation in length = 0.671 cm
T = Thk of Bearing Layer = 10.000 cm
Force = 32.900 kgs
= 0.033 t
B.M Due To Temperature Effect :
At Top of Foundation = 0.033 x ( 81.530 - 68.600 ) = 0.427 t-m

At Bottom of Foundation = 0.033 x ( 81.530 - 67.800 ) = 0.453 t-m

V) EARTHQUAKE LOAD CALCULATIONS


Seismic coefficient method :
Horizontal seismic co efficient αh = β I αo

β = 1
Importance factor I = 1.5
αo = 0.02 ( Zone – II )
αh = 0.03
vertical seismic coefficient may be taken as

81
αv = (1/2)αh

= 0.015

Total load from Super Structure = 298.959 t (Two spans laid)


Total load from Super Structure = 91.569 t (One spans laid)
Self Wt. Of Pier cap = 57.731 t
Self Wt. Of Pier = 424.808 t

Type of force V(t) L.A.(m) Long. Long.(t-m)


Pier Cap major Rec. portion 15.563 0.25 3.8906
Pier Cap minor Rec. portion 26.325 1.150 30.2738
Pier Cap Triangular portion -1.706 0.933 -1.5925
PIER 424.808 7.365 3128.713
3161.285

Lever arm = ΣM
ΣW
= 6.799m (From top of Pier cap)
= 6.131m (From Bottom of Pier cap)
SEISMIC MOMENT AT THE TOP OF THE FOOTING :

Two Spans Laid :


Total Seismic moment in Longitudinal Direction = 143.7 t-m
Total Seismic moment in Transverse Direction = 71.9 t-m
One Span Laid :
Total Seismic moment in Longitudinal Direction = 105.6 t-m
Total Seismic moment in Transverse Direction = 52.8 t-m

SEISMIC MOMENT AT THE BOTTOM OF THE FOOTING :

Two Spans Laid :


Total Seismic moment in Longitudinal Direction = 162.5 t-m
Total Seismic moment in Transverse Direction = 81.3 t-m
One Span Laid :
Total Seismic moment in Longitudinal Direction = 119.4 t-m
Total Seismic moment in Transverse Direction = 59.7 t-m

82
(V) DESIGN OF CAPING BEAM :-
8.300
+ 81.530 0.5
+ 81.030 -L1 = 0.668
D = 1.80 1.30
+ 79.730
1.500
0.432 0.318 0.75 0.75
9.00
-0.35 -0.35 0.5
1.80

4.5 4.5 1.500

Center of Gravity of Semi circular Cut waters = ( 0.5756 R ) PIER


= 0.5756 x 0.750 = 0.432 m
Check for CORBEL:
D = 1.800 m
L1 = -0.668 m;
L1/D = -0.668 -= 0.371 < 1.00
1.800

Calculation of Cantilever Moments about C.G. of Cut-waters :


Moments Due to :
1. Dead Load from Super structure = 298.96 = 298.959 t
Load per m run = 298.959 / 8.300 = 36.019 t/m
Cantilever Moment = 36.019 x 0.223 = 8.044 t-m

2. Weight of caping Beam :- (Cantilever)


a) Rectangular
Weight = 1.50 x 0.50 x -( 0.350 - 0.318 ) x 2.50
= -1.253 t
Moment = -1.25 x -0.668/2
= 0.419 t-m

b) Taper section
Weight = 1.30 - x 0.668 x 1.500 x 2.50 = -1.629 t
2
Moment = -1.629 x -( 0.350 - 0.318 ) / 3
= 0.017 t-m

Total cantilever moment (M) = 8.044 + 0.017 + 0.419


= 8.479 t-m

Total Design Cantilever Moment = 8.479


= 8.479 t-m

83
Calculation of Resisting Moment :-
The allowable stresses in Concrete :
Direct Compression = 60 kg/cm2.
Bending Stress fc = 85 kg/cm2.
k = 0.329
j = 0.890
Q = 12.463

The allowable Steel Stress :


Tensile stress fs = 1900 kg/cm2.
Percentage of Reinforcement p = 0.30% min. (Cl.710.3.2 IRC:78:2000)
Modular Ratio m = 10.98

Depth of section available with 40mm cover and 20 mm Tor. bars


d = 180 - 4 - 1
= 175.00 cm
Width of section b = 100.00 cm
Resisting Moment = Q x b x d2
= 12.463 x 100 x 175.0 ^2
Resisting Moment = 381.67 t-m > 8.479 t-m
Hence provided depth of section is Safe

Calculation of Reinforcement :-
Area of Steel for Caping Beam Cantilever :-
for -ve Moment 8.479 x 10^5
=
1900 x 0.890 x 175.0
= 2.865 cm 2

Works out to be 1 Nos. 20 mm Tor.

Minimum steel @ 0.2% - ( Cl. 305.19 of IRC:21-2000)


= 0.2 -x 35.00 x 180.0
100
= -12.600 cm2

So provide 2 Nos. 20 mm Tor. of area 6.283 cm2


10 Nos of 12 mm Tor.

Provide 2 Nos. of 20mm Tor at Top for Cantilever in One layer A+B
Provide nominal reinforcement of 10 Nos of 12 mm Tor @ bottom for minimum steel F

CHECK FOR SHEAR :- ( for Cantilever ) @ ` d ' from Support.


Caping Beam :
Distance of section from edge of caping beam = Section X - X.
IRC:21-2000 Cl. 304.7.1.2. = -0.350 - 1.750 = -2.100 m

84
+ 81.530 8.300
+ 81.030 0.50 m
-2.100
1.30 m
+ 79.730 zz

0.432 0.318
9.00
-0.350 m -0.350 m
X

SKETCH FOR SHEAR DESIGN.

Depth`D' at X-X ( 0.50 + -2.100 ) x 1.300


=
-0.782
= 3.992 m ;
Available depth `d' at X-X = 399.24 - 10.000 - 0.04
= 389.199 cms

Loads on One side of Pier :-


Rect -2.100 x 1.500 x 0.500 x 2.500 = -3.938 t
Taper -2.100 x 1.500 x 1.300 x 2.500 = -5.119 t
2
Total Shear at X - X = -9.056 t

Moment of Loads at X-X = -9.056 x -2.10 / 2 = 9.509 t-m


Total Moment at X-X = 9.509 t-m

M x Tan b
d
Where , M = 9.509 t-m
d = 3.892 m
Tan b = 3.492 = -1.663
-2.100
Hence Reduction in Shear = 9.509 x -1.663 = -4.063 t
3.892
Net Design Shear @ X - X = -9.056 - -4.063
= -4.993 t
Shear Stress at X - X as per Cl.304.7.1.1
t = ( V/ bxd)
tv = -4.99 x 1000 = -0.128 kg/cm2
100 x 389.199

85
IRC:21-2000 Cl. 304.7.1.2.
Max. Shear stress = 19 kg/cm2 ( IRC:21-2000, Table-12A.)
(for M25 concrete) Hence Section need not be changed

(As Per Cl. 304.7.1.3.3., Table – 12B,)


Allowable shear stress for members without shear reinforcement
p = 100 x 6.283 = 0.016
100.0 x 389.199
In this Case :-
for (100As/bd) = 0.016

tc = #N/A ( 0.016 - #N/A #N/A #N/A


#N/A #N/A
= #N/A
t c = #N/A kg/cm2

tv #N/A t c #N/A
However Provide Minimum Shear Reinforcement Cl. 304.7.1.5, of IRC:21-2000.

Asw 0.4
Reinforcement = =
b x s 0.87 fy
Using 10 mm.tor. 4 -Legged

Spacing - ` s ' = 4 x 0.785 x 0.870 x 415


100 x 0.400
= 28.36 cms ( Not more than 30 cm)

Provide 10 mm 4 Legged Stirrups @ #N/A cm c/c. In Pier. C


or #N/A mm c/c

SIDE FACE REINFORCEMENT :-


@ 0.1% on Each side face.
As the depth of the beam is 1800mm Provide side face reinforcement
However Provide minimum Reinforcement
Ast = 0.100 x 100.0 x 180
100
= 18 = 9.000 cm2

Area of each bar of Dia = 12mm = 1.131 cm2 8nos

Provide 8 Nos of 12mm tor. On each side face of Caping Beam. E

86
1 CALCULATION OF STRESSES AT BOTTOM OF FOOTING AT 67.800 m

Length at Bottom of Footing = 12.50 m


Width at Bottom of Footing = 3.50 m
Cross sectional area at Bottom of Footing = 43.750 m2
ZLL = 3.5^2 X 12.5 / 6 = 25.53 m4
ZTT = 12.5^2 X 3.5 / 6 = 91.15 m4

(V) DESIGN OF RCC PIER AT + 68.600 m

The main conditions for the design of Pier are :- Both the Spans Laid and One span Laid.
For Both the spans laid condition :- Service and CBL Condition
For One span Laid Condition :- No Live load acting.

BOTH THE SPANS LAID CONDITION

Service and CBL condition :-

Vertical Loads :-
Dead Loads :-
1 Load from Superstructure = 298.959 t
2 Weight of Caping Beam = 57.731 t
3 Weight of Pier ( Dry ) = 424.808 t
Total Dead loads = 781.498 t

Moments about Pier Level +68.600 Moments


S. No. Type of Force Load Long. Trans.
1 Dead Load 781.498 0.000 t - m 0.000
2 Temperature Moment 0.427 t - m
3 Seismic moment 143.750 t - m 71.875 t-m
Moments without Wind 781.498 144.177 t - m 71.875 t-m
4 with Wind Force (horizontal force) 10.980 t - m 43.891 t-m
Moments with Wind 781.498 155.157 t - m 115.766 t-m

Section Properties :-

Size of Pier = 9.000 m x 1.500 m


Area A = 0.750 x 3.142 x 0.750 = 0.442 m2.
4
+ 9.000 x 1.500 = 13.500 m2.
Total Area = 13.942 m2.

Considering Equivalent Rectangle - Side = 13.942 = 9.295 m


1.500
Section Modulus =
Long. ZL = 9.295 x 1.500 ^2 = 3.485 m3

87
6
Trans. ZT = 1.500 x 9.295 ^2 = 21.597 m3
6
Stresses in Pier :-
CBL Condition : -
a). Without wind = 781.498 (+/-) 144.177 (+/-) 71.875
13.942 3.485 21.597
= 56.054 (+/-) 41.365 (+/-) 3.328
= 100.748 / 11.361 t/m . 2

Direct compressive Stress allowable = 500 t/m2 (IRC-21, Clause 303)


2
Bending compressive Stress allowable = 667 t/m (IRC-21, Clause 303)

(Cl. 303.3, Table - 11, of IRC:21-2000) Hence provide reinforcement.


b). With wind = 781.498 (+/-) 155.157 (+/-) 115.766
13.942 3.485 21.597
= 56.054 (+/-) 44.52 (+/-) 5.36
= 105.930 / 6.178 t/m2

From IRC:78 - 2000, cl.706.1.2 667.000 x 1.333


2
= 889.111 t/m

ONE SPAN LAID CONDITION

Service and CBL condition :-

Vertical Loads :-
Dead Loads :-
1 Load from Superstructure = 91.569 t
2 Weight of Caping Beam = 57.731 t
3 Weight of Pier ( Dry ) = 424.808 t
Total Dead loads = 574.109 t

Moments about Pier Level +68.600 Moments


S. No. Type of Force Long. Trans.
1 Dead Load 34.064 t - m
2 Temperature Moment 0.427 t - m
3 Seismic moment 105.602 t - m 52.801 t-m
Moments without Wind 140.093 t - m 52.801 t-m
4 with Wind Force (horizontal force) 10.980 t - m 43.891 t-m
Moments with Wind 151.073 t - m 96.692 t-m

Size of Pier = 9.000 m x 1.500 m


Area = A = 13.942 m2
ZL = 3.485 m3;

88
ZT = 21.597 m3 ;

a). Without wind = 574.109 (+/-) 140.093 (+/-) 52.801


13.942 3.485 21.597
= 41.179 (+/-) 40.194 (+/-) 2.445
= 83.818 / 1.460 t/m . 2

b). With wind = 574.109 (+/-) 151.073 (+/-) 96.692


13.942 3.485 21.597
= 41.179 (+/-) 43.34 (+/-) 4.48
= 89.000 / 6.642 t/m2

( III )CALCULATION OF PIER REINFORCEMENT

From the above the Tensile forces in Pier are more in case of Empty & Full
Section Properties :-
Size of Pier = 9.000 m x 1.500 m
Area A = 139417.86 cm2

Service Condition :-

As per Cl.306.1 of IRC:21-2000, Table - 13 , Note (3).

Effective Length of Pier = 1.200 L


In this case `L' = 81.530 - 68.600 = 12.930 m

Effective Length Le = 1.200 x 12.930 = 15.516 m


Least radius of Gyration (r ) = t √12
= 1.500 / √12
= 0.433

Effective length = 15.516 = 36


Ratio =
Radius of Gyration 0.433

One span Laid Condition :-


Effective Length of Pier = 1.75 L
= 1.750 x 12.930 = 22.628 m
Ratio = Effective length
Radius of Gyration
= 22.628
0.433
= 52.256
Hence the Stresse are reduced in this case by = 1.5 - L
100 r
= 1.5 - 52.256
100

89
= 0.977 < 1.000
Hence the permissible stresses are considered.
Design of Reinforcement :-
For M25 grade the allowable stresses in Concrete :
Direct Compression = 60 kg/cm2.
Bending Stress = fc = 85 kg/cm2.
allowable Steel Stress :Tensile stress = fs = 1900 kg/cm2.
Percentage of Reinforcement = p = 0.30% min. (Cl.306.2.2 IRC:21:2000)
Modular Ratio = m = 10
Area of Section = A = 139418 cm2.

Min steel as per Cl.306.2.1 = 0.3 % = 418.254 cm2.

Provide 12 Nos. 25 mm.tor. Area = 58.905 cm2. G


2x3=6 Nos 25 mm. Tor. in Cutwaters 2x3=6 Nos. in Straight portion-Eace face side.

Lateral ties :
According to IS 456 :2000 the diameter of the lateral ties shall not be less than

1) 1/4 th of the diameter of the longitudinal bar


2) 6 mm
The diameter of the lateral ties shall not be less than < 6.25 mm
6 mm
Therefore provide 8 mm as the diameter of the tie bar
Pitch of transverse reinforcement should be least of the following
1) Least lateral dimension of compression member
2) Sixteen times the smallest diameter of the longitudinal bar
3) 300mm
Pitch ot transverse ties
Least of following 1) 150 cm
2) 40 cm
3) 30 cm
Pitch of ties = 30.000 cm

Provide 8mm tor. Longitudinal Ties at 200 mm c/c. H+J


Provide 8mm tor.Transeverse Ties at 300 mm c/c. K

(VI) DESIGN OF FOUNDATION @ +67.800 m

The Foundations foundations are designed for Both the Spans Laid and One span Laid conditions.
Foundation Level = +67.800

1.500

90
1.00 1.00
+ 68.600 m 0 0
3.50
0.8
+ 67.800 m
3.500

DETAIL OF PIER FOUNDATION.

1 Both the Spans laid Condition :-

a). Service + LWL Condition :-


Vertical loads :-
1 Dead Load From Superstructure = 298.959 t
2 Weight of Caping Beam = 57.731 t
3 Weight of Pier = 424.808 t
4 Weight of Footing - with out buoyancy = 87.500 t
Total Dead loads = 868.998 t

Moments about Footing level +67.800 Moments


S. No. Type of Force Load Long. Trans.
1 Dead Load 868.998 0.000 t - m 0.000
2 Temperature Moment 0.453 t - m
3 Seismic moment 162.506 t - m 81.253 t - m
Moments without Wind 868.998 162.959 t - m 81.253 t - m
4 with Wind Force (horizontal force) 11.619 t - m 46.446 t - m
Moments with Wind 868.998 174.578 t - m 127.699 t - m

Section Properties :-
Size of Footing = 12.50 m x 3.50 m
Area = A = = 12.50 x 3.50 = 43.75 m2

Section Moduli
Zl = 12.50 x 3.50 ^2 / 6 = 25.521 m3
Zt = 3.50 x 12.50 ^2 / 6 = 91.146 m3

Foundation Pressures :- Service + LWL.

a). Without Wind : = 869.00 ( +/- ) 162.96 ( +/- ) 81.25


43.75 25.52 91.15
= 19.86 ( +/- ) 6.39 ( +/- ) 0.89
= 27.140 / 12.586 t/m2

b) With Wind : = 869.00 ( +/- ) 174.58 ( +/- ) 127.70


43.75 25.52 91.15
= 19.86 ( +/- ) 6.84 ( +/- ) 1.40
2
= 28.104 / 11.621 t/m

91
2 One Span laid Condition :-
a). CBL Condition :-
Vertical loads :-
1 Dead Load From Superstructure = 183.14 = 91.569 t
2
2 Weight of Caping Beam = 57.731 t
3 Weight of Pier ( Dry ) = 424.808 t
4 Weight of Footing - 100% buoyancy = 87.500 t
Total Dead loads = 661.609 t

Moments about Footing level +67.800 m Moments


S. No. Type of Force Load Long. Trans.
1 Dead Load 91.57 34.064 t - m 0.000
2 Temperature Moment 0.453 t - m
3 Seismic moment 119.381 t - m 59.691 t - m
Moments without Wind 153.898 t - m 59.691 t - m
4 Wind Force (Unloaded Section) 11.619 t - m 46.446 t - m
Moments with Wind 165.517 t - m 106.137 t - m

Foundation Pressures :-
a) Without Wind : 661.609 ( +/- ) 153.898 ( +/- ) 59.691
43.750 25.521 91.146
= 15.122 ( +/- ) 6.030 ( +/- ) 0.655
2
= 21.808 / 8.437 t/m

b) With Wind : 661.609 ( +/- ) 165.517 ( +/- ) 106.137


43.750 25.521 91.146
= 15.122 ( +/- ) 6.486 ( +/- ) 1.164
2
= 22.773 / 7.472 t/m

DESIGN OF RCC FOOTING @ +67.800 m

Type of Footing = PAD


Bp 1.50 m Density Of Concrete = 25 kN/m3
Density Of Soil = 20 kN/m3
0.00 Depth Of Foundation = 2.0 m
d = 0.80 0.80 Net SBC = 250 kN/m2
B = 3.5 Gross SBC = 250 + 2 x 20
= 290 kN/m2

FC = 25 N/mm2
FY = 415 N/mm2
d/2 Length Of Footing L = 12.50 m
L = 12.5 ### Width Of Footing W = 3.50 m
Thickness Of Fdn T = 0.80 m

92
Depth @ Edge of fdn D1 0.80 m
Width Of Pier wp = 1.50 m
Length Of Pier lp = 10.50 m
s cbc = 8.5 N/mm2.
z sc = 6 N/mm2.
1.000 s st = 200
M= 10.98
L K = 0.318
x x J = 0.894
Wp
1.000 Q = 1.209
1 z 1 effect.depth = 742

Load Calculation for Footing & Soil:-


Self Wt. Of Footing
Rectangular Portion = 25 x 12.5 x 3.5 x 0.8 = 875 kN
Weight of Soil = [(12.5 x 3.5) - (10.5 x 1.5)] x (2 - 0.8 ) x 20 = 672 kN
Weight of Footing + Soil = 875+ 672 = 1547 kN
Vertical Load(y-dir) Fy = 781.498 KN

CHECK FOR SHEAR


a) Two Way Shear
Critical Section = At distance d/2 from face of Pier
Concrete Grade = 25 N/mm2
Pier Details
Length = 10500 mm
Width = 1500 mm
Foundation Details
Length = 12500 mm
Width = 3500 mm
Depth = D1 + (T-D1)(L-Lp-T)/2
(L-Lp)/2
= 0.80 + 0.600 x 0
1
= 0.800 m
= 800 mm
Effective Depth = 740 mm
Percentage Of Steel = 0.214 %
Punching Load
Maximum Load on Pier = 1172.25
Punching Shear, P = 1172.247 x (( 12.5 x 3.5 ) - ( 11.24 x 2.24 ))
( 12.5 * 3.5 )
p = 497.64 kN
Shear Resistance Of Concrete (Vc) = V c x bc x d ( clause no. 31.6.3.1 of IS 456 )
Where , Vc = ks x tc
Ks = 0.5 + βc -----should not be greater than 1
Short Side Of Column
Βc =
93
Βc =
Long Side Of Column
1500
Βc = = 0.143
10500
ks = 0.643
tc = 0.16 x √fck = 0.80 N/mm2
bc = Periphery at distance d/2 from face of pier
Length of critical section = 11240 mm
Width of critical section = 2240 mm
Perimeter of critical section = 26960 mm
497640 = 23.07 mm
Depth Required =
0.8 x26960
Shear Resistance = 0.8 x 26960 x 740 / 1000
= 15960 kN
B) One Way Shear
2 74.72

800
d
177.12
1500

3500
750

1 d 1 207.84
1000

250

800

2 218.08
10500
1000
250
750

800

12500

74.72 218.08

206.609 215.21

At Length
Max Net Pressure = 215 kN/m2
Depth D1 + (T-D1)*(0.5L-0.5Lp-T)
(L-Lp)/2
0.80 + 0.00 x 0.2
1
= 0.800 m
= 800 mm
Effective Depth = 750 mm
Length at critical section = 3500 mm
Width at critical section = 250 mm
Shear Force = 215.21 x 3.5 x 0.25

94
= 188.309 kN
At Width
Maximum Pressure = 208 kN/m2
Depth = D1
= 0.800 m = 800 mm
Effective Depth = 750 mm
Length at critical section = 12500 mm
Width at critical section = 250 mm
Shear Force = 207.84 x 12.5 x 0.25
= 649.5 kN
Designed Shear Strength = 650 kN
Corresponding Length = 12500 mm

% Ast = 0.217
Shear Stress = 0.230 N/mm2
Depth Required 649500
=
0.23 x 12500
= 226 mm
Check For Depth @ Critical Section
Critical section from face of column = 750 mm
h from column face to edge of footing = 1000 mm
Depth @ Edge of fdn D1 = 800 mm
Depth @ face of column D = 800 mm
Depth @ Critical s/c = 800 mm
Effe. Depth @ Critical s/c = 750 mm Depth is O.K.
Check For transfer of Load @ Column base
A2 = Lp x Wp = 15.75 mm2
A1 = ( 10.5 + 2 x ( 2 * 0.8 )) * ( 1.5 + 2 x ( 2 * 0.8 ))
= 64.39 mm2
sqrt(A1/A2) = 2.02 </= 2
Allowable Bearing Stress = 0.25 fck sqrt(A1/A2)
= 13 Mpa
Actual Bearing Stress = 1172.247 x 10^3/(15.75 x 10^6)
= 0.07 Mpa
< 13 Mpa

DESIGN OF FOUNDATION

a) Calculation of Reinforcement at Bottom


Maximum Pressure = 218.08 kN/m2
Pressure due to Soil & Fdn wt = ( 875 + 672 ) / ( 12.5 x 3.5 )
= 35.36
Net causing moment = 182.72 kN/m2
Maximum Projection of fdn = 1 m
Bending Moment = 182.716 x 1 x 1 / 2
= 91.36 kN.m

95
Ast = √(M/Qb)
= 91360000
0.121 x 1000

Ast Required = 869.29 mm2


Mini.% of re-bar = 0.2 % ---- Cl. 305.19 of IRC:21-2000
2
Min Ast = 1600 mm
Dia of Bar = 16 mm
Area of bar = 200.96 mm2
Spacing = 125 mm Depth is O.K.
Provide Spacing = 125 226 750
(More R/f than required is provided to avoid failure in one way shear)
Area Provided = 1608 mm2 HENCE OK

Provide 16 mm dia Bars @ 125 mm spacing in Longitudinal direction L


Provide 12 mm dia Bars @ 125 mm spacing in Transverse direction M

b) Calculation of Reinforcement at Top


Reinforcement at top is checked for overburden load on top of foundation
since 100% of foundation is not in contact with soil.
Wt. Of Soil + Fdn wt. = 1547 kN
Area Load = 1547 / (12.5 x 3.5) = 35.36 kN/m2
Maxi. Projection of fdn = 1 m
Bending Moment = 35.36 x 1 x 1 / 2
= 17.68 kN.m
Ast = √(M/Qb)
Ast = 382.409 mm2

Mini % of Re-bar = 0.12 %


Ast = 870 mm2
Dia of Bar = 12 mm
Area of bar = 113.04 mm2
Spacing = 129 mm
Provide Spacing = 125 mm
Area Provided = 904.32 mm2

Provide 12 mm dia Bars @ 125 mm spacing in Longitudinal direction N


Provide 12 mm dia Bars @ 125 mm spacing in Transverse direction O

Max. Min.
Details Stress Stress Type Of Stress
t/sq.m. t/sq.m.
Two Spans Laid
Stress in Concrete:
Service & CBL Condition

96
With Wind 105.930 6.178 Compressive stress
With out Wind 100.748 11.361 Compressive stress
One Span Laid
Stress in Concrete:
Service & CBL Condition
With Wind 89.000 6.642 Compressive stress
With out Wind 83.818 1.460 Compressive stress
Two Spans Laid
Stresses in Soil :
Service & CBL Condition
With Wind 28.104 11.621 Compressive stress
With out Wind 27.140 12.586 Compressive stress
One Span Laid
Stresses in Soil :
Service & CBL Condition
With Wind 22.773 7.472 Compressive stress
With out Wind 21.808 8.437 Compressive stress

97
PIER CAP

TOTAL
S NO TYPE DIA SPACING NUMBER LENGTH CALCULATION
LENGTH
mm m

1 A+B 20 - 2 x2 650 450 2.6

420
2 B 20 - 1 9660 8220 9.66

0
20
y x
3 C 10 - 4-L #N/A #N/A 5080 #N/A

y
4 D 10 - 2-L #N/A #N/A 6380 x #N/A

5 E 12 - 8 10700 - 8220 10700 - 8220 75.68

17
6 F 12 - 10 12780 9000 1760 127.8

90
PIER

7 G 25 300 mm 60 13430 13230 805.8


200

9000

y
1420
8 H 8 200 65 21040 1360.236
x
2231

9 J 8 200 65 4662 303.03


1420

10 K 8 300 135 1580 213.3


x

FOOTING

Bottom Reinforcement

11 L 16 125 28 12620 12420 353.36

12 M 12 125 100 3620 3420 362

Top Reinforcement

13 N 12 125 28 12620 12420 353.36

14 O 12 125 100 3620 3420 362


BAR BENDING SCHEDULE IN TROUGH
0.35m 4.95 0.35m
Hanger Bars Bar Dia Spacing Length Nos
Shape
0.40 0.35 (M) - 2 Nos of 10 mm dia. No mm mm mm
SLAB
(K) - 2L - 10 mm dia @ 275 mm c/c 40mm clear
A 16 270 8200 374
(F) - 2L - 10 mm dia @ 300 mm c/c (C) - 10 mm dia @ 250 mm c/c cover

B 12 150 100888 55
2.30 (L) - 7 Nos of 10 mm dia. (Each face)
(C) - 10 mm dia @ 250 mm c/c
2.040

(G) - 9 Nos of 10 mm dia. (Each face) C 7700 10 250 13080 404


1.20
2.300
D 10 300 100888 28
(H) - 10 mm dia @ 300 mm c/c
150mm x 150mm Fillet (H) - 10 mm dia @ 300 mm c/c SIDE WALL
(C) - 10 mm dia @ 250 mm c/c (D) - 10 mm dia @ 300 mm c/c
E 25 - 100888 7

0.30
E' 9100 25 - 16296 3
0.300 0.10
(B) - 12 mm dia @ 150 mm c/c 0.300 (A) - 16 mm dia @ 270 mm c/c

1940
Haunch Bar (J) - 9 Nos of 32 mm dia. + (E) - 7 Nos of 25 mm dia. + F 10 300 4380 337
(I) - 10 mm dia @ 300 mm c/c (J') - 3 Nos of 32 mm dia. (E') - 3 Nos of 25 mm dia.

G 10 - 100888 18
RCC DETAILS OF TROUGH

(E') - 3 Nos of 25 mm dia.


H 10 300 912 337
(F) - 2L - 10 mm dia @ 300 mm c/c (M) - 2 Nos of 10 mm dia.
+ 83.470 854 Hanger Bars 854

40mm clear I 10 300 938 337


cover
MIDDLE WALL

J 32 - 100888 9
+ 81.530

J' 32 - 15164 3
1.95 1.950 0.494
0.15l Clear Span = 13.00 0.15l

1540
(G) - 9 Nos of 10 mm dia. (Each face) K 10 275 3580 56
(F) - 2L - 10 mm dia @ 300 mm c/c
1.000 (C) - 10 mm dia @ 250 mm c/c 10 Nos of 25mm dia (E & E') Abutment
L 10 - 100888 14

WATER FACE WIND FACE


M 10 - 100888 4

RCC DETAILS OF SIDE WALL

RCC DETAILS OF TROUGH OF SUPER PASSAGE AT KM: 5.085


BAR BENDING SHEDULE

SPACING Total
S. NO DESIGNATION DIA mm SHAPE LENGTH OF BAR mm NO. OF BARS
mm Length

Slab

1 A 16 270 8200 374 3067

2 B 12 150 100888 55 5549

Side wall

3 C 10 7700 250 13080 405 5297

4 D 10 300 100888 27 2724

5 E 25 - 100888 3 605

6 E' 25 9100 - 9446 3 57


1940

7 F 10 300 4380 337 2952

8 G 10 - 100888 18 3632

9 H 10 300 912 336 613

10 I 10 300 1036 336 697

Middle wall

11 J 32 - 100888 9 1816

12 J' 32 9100 - 16364 3 98


1540

13 K 10 275 3580 367 2628

14 L 10 - 100888 14 2825

15 M 10 - 100888 4 807
DETAILED ESTIMATE OF SUPER PASSAGE @ KM. 5.085
S.
Description Unit No. L B D Qty
No.

Excavation for Structures – Mechanical Means Earth


work in excavation in all kinds of soils of foundation
of structures as per drawing and technical specification,
including setting out, construction of shoring and bracing,
1 removal of stumps and other deleterious matter, dressing
of sides and bottom and backfilling with approved material.
Depth upto 3 m complete with all leads and lifts etc
complete for the finished item of work as per the approved
drawings and as directed by the E.I.C

For Abutments under trough 2 9.100 2.400 2.019 88.190


Central Pier 0 14.000 4.500 2.355 0.000
Side pier 0 12.500 3.500 1.955 0.000
abutment under SLRB 2 5.900 4.700 1.575 87.350
Pier under Slrb 1 7.600 2.000 1.575 23.940
Abutments for Foot bridge 2 2.750 3.300 5.129 93.091
Pier under foot bridge 1 3.950 2.000 5.129 40.519
u/s Drop wall 0 13.340 1.800 4.309 0.000
Approach slab 2 3.500 5.000 0.450 15.750
c) For U/S Return walls 2 3.500 3.425 1.575 37.761
d) For D/S Return walls 2 3.500 3.425 1.575 37.761
Up Stream
i) Horizontal wings on trough 2 2.974 2.300 2.519 34.461
ii) Sloped wings 2 1.217 2.500 2.519 15.322
iii) Splayed wings on transistions 2 0.000 2.500 4.229 0.000
iv) horizontal wings 2 6.000 2.500 4.229 126.870
v) Returns 2 1.817 2.500 4.229 38.410
Transition floor U/S 1 6.000 10.470 0.600 37.692
Floor U/s 1 6.243 7.600 0.600 28.468
Pitching 1 5.000 13.340 0.300 20.010
Revetment 2 5.000 2.012 0.300 6.035
Profile wall 1 22.033 0.450 0.450 4.462
Down Stream
i) Horizontal wings on trough 2 2.974 2.200 2.519 32.963
ii) Sloped wings 2 0.783 2.500 0.675 2.643
iii) Splayed wings on transistions 2 0.786 2.500 0.675 2.653
iv) horizontal wings 2 8.214 2.200 0.675 24.396
v) Returns 2 3.494 2.200 0.675 10.376
Transition apron D/S 1 9.000 10.470 0.600 56.538
Floor D/s 1 9.827 7.600 0.600 44.809
Cut off wall 1 13.340 0.450 0.450 2.701
Pitching 1 5.000 13.340 0.300 20.010
Revetment 2 5.000 2.594 0.300 7.781
Profile wall 1 19.574 0.450 0.450 3.964
Total Cum 944.922

Providing and laying insitu vibrated M-20 ( 28 days cube


compressive strength not less than 20 N / sq mm ) grade
cement concrete using 40 mm down size approved, clean,
hard, graded aggregates for sub-structure/ super-
structure works (Foundation, Head walls, wing walls
etc..) including cost of all materials, machinery, labour,
2
formwork, scaffolding, cleaning, batching, mixing, placing in
position, levelling, vibrating, finishing, curing etc., complete
with initial lead upto 50 m and all lifts.(Cement
content: 280 kg / cum with use of super plasticiser
(0.4% by wt. of cement),CA : 0.90cum, Blending
Ratio of CA--50:30:20, FA : 0.40 cum)

For Abutments under trough


Foundation 2 9.100 2.400 0.600 26.208
Body Wall 2 8.300 1.000 -1.170 -19.422
Inner face 2 8.300 -0.351 -5.827
Outer face 2 8.300 0.000 0.000
abutment under SLRB
Foundation 2 5.900 4.700 0.600 33.276
Body Wall 2 5.100 1.000 2.197 22.409
S.
Description Unit No. L B D Qty
No.
outer face 2 5.100 3.186 32.494
Pier under Slrb
Foundation 1 7.600 2.000 0.500 7.600
Straight portion 1 5.100 1.000 1.797 9.165
Cutwaters 2 0.196 1.797 0.706
Return walls
For U/S Return walls 2 3.500 3.425 0.300 7.19
For Body wall U/S Return 2 3.200 5.890 18.85
For D/S Return walls 2 3.500 3.425 0.300 7.19
For Body wall D/S Return 2 3.200 5.890 18.85
abutment under Foot bridge
Foundation 2 2.750 3.300 0.600 10.890
Body Wall 2 1.950 1.000 2.831 11.041
outer face 2 1.950 2.123 8.281
Pier under foot bridge
Foundation 1 3.950 2.000 0.500 3.950
Straight portion 1 1.950 1.000 2.906 5.667
Cutwaters 2 0.196 2.906 1.141
Drop on U/s
Drop Body wall U/s 0 13.340 1.125 1.800 0.000
Foundation 0 13.340 1.800 0.500 0.000
Up Stream
i) Horizontal wings on trough 2 2.974 1.000 1.770 10.528
Foundation 2 2.974 2.300 0.500 6.840
ii) Sloped wings 2 1.217 1.100 2.581 6.908
Foundation 2 1.217 2.500 0.500 3.041
iii) Splayed wings on transistions 2 0.000 1.100 2.581 0.000
Foundation 2 0.000 2.500 0.500 0.000
iv) horizontal wings 2 6.000 1.100 2.581 34.069
Foundation 2 6.000 2.500 0.500 15.000
v) Returns 2 1.817 1.100 2.581 10.314
Foundation 2 1.817 2.500 0.500 4.541
Transition floor U/S 1 6.000 10.470 0.300 18.846
Floor b/w foot bridge and trough 1 6.243 7.600 0.300 14.234
Profile wall 1 22.033 0.450 0.450 4.462
Down Stream
i) Horizontal wings on trough 2 2.974 0.950 1.770 10.002
Foundation 2 2.974 2.200 0.500 6.543
ii) Sloped wings 2 0.783 1.100 2.292 3.948
Foundation 2 0.783 2.500 0.500 1.958
iii) Splayed wings on transistions 2 0.786 1.100 2.292 3.963
Foundation 2 0.786 2.500 0.500 1.965
iv) horizontal wings 2 3.494 0.950 1.899 12.605
S.
Description Unit No. L B D Qty
No.
Foundation 2 3.494 2.200 0.500 7.686
v) Returns 2 3.494 0.950 1.899 12.605
Foundation 2 3.494 2.200 0.500 7.686
Transition apron D/S 1 9.000 10.470 0.300 28.269
Floor Foundation B/n SLRB & Trough 1 9.827 7.600 0.300 22.404
Cut off wall 1 13.340 0.450 1.425 8.554
Profile wall for stream 1 22.033 0.450 0.450 4.462
Total Cum 461.090
Providing and laying insitu vibrated M-25 ( 28 days cube
compressive strength not less than 25 N / sq mm ) grade
cement concrete using 20 mm down size approved, clean,
hard, graded aggregates for Trough Slab, Road Bridge,
Foot Bridge, Bed Blocks, Dirt wall including cost of all
materials, machinery, labour, formwork, scaffolding,
3
cleaning, batching, mixing, placing in position, levelling,
vibrating, finishing, curing etc., complete with initial lead
upto 50 m and all lifts. (Cement content: 407 kg /
cum with use of super plasticiser(0.4% by wt. of
cement), CA : 0.80cum, Blending Ratio of CA--65:35,
FA : 0.45 cum)
Trough Slab 1 100.988 7.600 0.300 230.253
Trough Side Walls 2 100.988 0.350 1.600 113.107
Trough intermediate walls 2 100.988 0.350 1.200 84.830
Haunches 6 100.988 0.015 9.089
Road Bridge
Slab 1 8.580 5.000 0.520 22.308
Solid Parapet For Bridge 2 8.580 0.200 0.600 2.059
Kerbs 2 8.580 0.425 0.225 1.641
Bed Blocks 2 5.100 0.510 0.300 1.561
Dirt walls 2 5.100 0.490 0.670 3.349
Foot Bridge
Slab 1 8.580 1.500 0.100 1.287
Solid Parapet For Bridge 2 8.580 0.225 0.850 3.282
Kerbs 0 8.580 0.425 0.225 0.000
Bed Blocks 2 1.950 0.490 0.375 0.717
Dirt walls 2 1.950 0.510 0.475 0.945
Trough
S.
Description Unit No. L B D Qty
No.
Bed blocks over trough abutments 2 8.300 0.510 0.300 2.540
Dirt walls 2 8.300 0.490 0.740 6.019
Total Cum 482.985
Over trough pier 0 8.300 1.000 0.300 0.000
over foot bridge piers 1 1.950 1.000 0.300 1.000
over Road bridge piers 1 5.000 1.000 0.300 2.000

Providing and laying insitu M- 25 ( 28 days cube


compressive strength not less than 25 N / sqmm ) grade
cement concrete using 20 mm down size approved,
clean, hard, graded aggregates for wearing coat including
cost of all materials, machinery, labour, formwork, cleaning,
4 batching, mixing, placing in position in alternate panels,
levelling, compacting, finishing, curing, packing joints with
asphalt mortar etc., complete with initial lead upto 50 m
and all lifts. (Cement content: 330 kg / cum with use
of super plasticiser(0.4% by wt. of cement),CA :
0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

Over floor 1 31.070 10.470 0.075 24.397


Total Cum 24.397

Providing and laying insitu M-30 ( 28 days cube


compressive strength not less than 30 N / sqmm ) grade
cement concrete using 20 mm down size approved, clean,
hard, graded aggregates for wearing coat including cost of
all materials, machinery, labour, formwork, cleaning,
batching, mixing, placing in position in alternate panels,
5 levelling, compacting, finishing, curing, packing joints with
asphalt mortar etc., complete with initial lead upto 50
m and all lifts. If water is to be brought from other
place add only lead charges @ 500 ltr / cum. to the
data (Cement content: 422 kg / cum with use of
super plasticiser (0.4% by wt. of cement), CA :
0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

For Road Bridge 1 8.580 4.250 0.075 2.735


For foot bridge 1 8.580 1.500 0.075 0.965
For Trough 1 100.988 7.600 0.040 30.700
Total Cum 34.400

Providing and laying insitu M- 30 ( 28 days cube


compressive strength not less than 30 N /sqmm) grade
cement concrete using 20 mm down size approved, clean,
hard, graded aggregates for Approch Slab including cost of
all materials, machinery, labour, formwork, cleaning,
batching, mixing, placing in position in alternate panels,
6 levelling, compacting, finishing, curing, packing joints with
asphalt mortar etc., complete with initial lead upto 50 m. If
water is to be brought from other place add only lead
charges @ 500 ltr / cum. to the data (Cement
content: 407 kg / cum with use of super
plasticiser(0.4% by wt. of cement), CA : 0.80cum,
Blending Ratio of CA--65:35, FA : 0.45 cum)

Approach slab 2 3.050 4.625 0.150 4.232


Total Cum 4.232

Providing and laying insitu M-35 ( 28 days cube


compressive strength not less than 35 N / sqmm ) grade
cement concrete using 20 mm down size approved, clean,
hard, graded aggregates for wearing coat including cost of
all materials, machinery, labour, formwork, cleaning,
batching, mixing, placing in position in alternate panels,
7 levelling, compacting, finishing, curing, packing joints with
asphalt mortar etc., complete with initial lead upto 50
m and all lifts. If water is to be brought from other
place add only lead charges @ 500 ltr / cum. to the
data (Cement content: 422 kg / cum with use of
super plasticiser (0.4% by wt. of cement), CA :
0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

Wearing Coat on Approach slab 2 3.500 4.625 0.075 2.43


Total Cum 2.428
S.
Description Unit No. L B D Qty
No.

Providing, fabricating and placing in position


reinforcement steel bars for RCC works including
cleaning, straightening, cutting, bending, hooking, lapping,
welding wherever required,tying with 1.25 mm dia soft
8 MT 45.399
annealed steel wire, including cost of all materials,
machinery, labour etc., complete with initial lead upto
50 and all lifts. Complete for the finished item of work as
per the approved drawings and as directed by the E.I.C

Providing and filling murum / gravely soil ( CNS soil ) for


foundation or above pipes including breaking clods,
spreading in layers of 10 to 15 cm, watering, compaction by
9 power roller to achieve density control of not less than 98
percent etc., complete roller to achieve density control of not
less than 98 percent etc., complete with all lead and lifts as
directed by Engineer-in-charge
2 3.500 4.625 0.225 7.28
Total Cum 859.813
Supplying fitting and fixing rubber seal (water stop) of
10 approved quality for construction joints complete job as per
specification and direction of E/I.
For Trough slab 8 8.300 66.400
For Road Bridge slab 2 5.000 10.000
Total Rmt 76.400
Supply and Fixing of PVC water stopper 310 mm wide
including cost and conveyance of all materials, labour
11
charges with all leads and lifts complete for finished item
of work as directed by E.I.C
For Road Bridge slab 2 5.000 10.000
For trough slab 8 8.300 66.400
Total Rmt 76.400
Providing and fixing 100 mm dia perforated PVC pipes
40 cm long for Weep holes including cost of all materials,
12
labour, drilling 8 mm dia holes etc. complete with all leads
and lifts.
U/s
i) Horizontal wings on trough 2 3 3 18.000
ii) Sloped wings 2 1 3 6.000
iii) Splayed wings on transistions 2 0 4 0.000
iv) horizontal wings 2 6 4 48.000
v) Returns 2 2 4 16.000
S.
Description Unit No. L B D Qty
No.
D/s
i) Horizontal wings on trough 2 3 3 18.000
ii) Sloped wings 2 1 1 2.000
iii) Splayed wings on transistions 2 1 1 2.000
iv) horizontal wings 2 8 1 16.000
v) Returns 2 3 1 6.000
Total Nos 132.000
Providing and Constructing 30 cm thick dry rubble stone
pitching and Side revetment including cost of all
13
materials, labour, hand packing,finishing etc., complete
( rubble stones : 0.33 cum/sqm)
bed pitching (U/s) 1 5.000 13.340 66.700
bed pitching (D/s) 1 5.000 13.340 66.700
Total Sqm 133.400
Providing 300 mm thick dry stone Revitment to sides of
14
Stream
Side revetment (U/s) 2 5.000 2.012 20.115
side revetment (D/s) 2 5.000 2.594 25.935
Total Sqm 46.050
DETAILED ESTIMATE OF SUPER PASSAGE @ KM. 5.085

S.No Input Description Nos U/S Units D/s


1 Canal Bed Width 37.500 m
2 Canal Side Slopes 1.5 : 1 / 2.0 : 1
3 CBL + 64.855 m
4 FSL + 69.005 m 83.670 +81.870
5 TBL + 69.755 m
6 Top width of banks 8.000 m / 5.000 m
7 Avg GL + 83.719 m
8 GL(U/s) + 85.429 m 599.91
9 GL(D/s) + 81.875 m
10 Sill level of Trough + 81.870 m
11 TOL 69.605 m
12 Total width on trough 100.988 m m
13 No of Vents 7
14 Clear span 13 m
15 No of Bays 3.0
16 width of Bay 2.30 m
17 Height of bay 1.20 m
18 No of Intermediate walls 2.00
19 width of End walls 0.35 m
20 Height of End walls 1.6 m
21 Width of Intermediate walls 0.35 m
22 Height of Intermediate walls 1.2 m
23 Thickness of Trough slab 0.30 m
24 Thickness of sealing coat 0.04 m
25 width of Haunches 0.300 m
26 Height of Haunches 0.100 m
27 width of Fillets 0.15 m m
28 Height of Fillets x 0.15 m m
29 Abutments for Trough
Length 2 8.30 m
Foundation Level +81.700 m
Width of Bottom Foundation 2.400 m
Height of Foundation 0.600 m
Height of abutment above Foundation -1.17 m
Top width of Abutment 1.000 m
Width of Inner Batter 0.600 m
Height of Inner Batter -1.170 m
Width of outer Batter 0 m
Height of outer Batter -0.43 m
Bed Block Depth 0.3 m
Bed Block Width 0.494 m m Berm

31 Road Bridge 1
Deck slab thickness 0.52 m 0.75
Overall length 8.58 m
Carriage width 4.250 m
Kerb width 0.225 m
Parapet wall width 0.200 m
wearing coat 0.075 m
32 Road bridge Abutments
Length 2 5.100 m
Road level +83.992 m
Foundation Level +80.300 m
Width of Bottom Foundation 4.700 m
Height of Foundation 0.6 m
Height above Foundation 2.197 m
Top width of Abutment 1.00 m
Width of outer Batter 2.90 m
Height of outer Batter 2.197 m
Bed Block Depth 0.3 m
Bed Block Width 0.51 m
Dirt Wall width 0.49 m
Dirt Wall depth 0.67 m
33 Road Bridge Pier 1
Foundation Level + 80.300 m
Thickness of pier 1.000 m
Area of cut waters 0.785 m2
Height of pier 1.797 m
Pier foundation thickness 1.0 m
length of pier foundation 7.6 m 3.000
Length of pier above foundation 5.1 m
34 Foot Bridge 1
Deck slab thickness 0.1 m
Overall slab length 8.58 m
Carriage width 1.5 m
Parapet wall width 0.225 m
Parapet wall DEPTH 0.6 m
wearing coat 0.075 m
Overall width 1.95 m
35 Foot Bridge Abutments
Length 2 1.950 m
Road level + 84.281 m
Foundation Level + 80.300 m
Width of Bottom Foundation 3.3 m
Height of Foundation 0.6 m
Height above Foundation 2.83 m
Top width of Abutment 1.00 m
Width of outer Batter 1.50 m
Height of outer Batter 2.83 m
Bed Block Depth 0.375 m
Bed Block Width 0.49 m
Dirt Wall width 0.51 m
Dirt Wall depth 0.475 m
36 Foot Bridge Pier 1
Foundation Level + 80.300 m
Thickness of pier 1.000 m
Area of cut waters 0.785 m2
Height of pier 2.906 m
Pier foundation thickness 0.5 m
length of pier foundation 4.0 m
Length of pier above foundation 1.950 m 2.000

37 Drop wall (entry and exit) entry exit


Length of Drop wall 13.340 m m
Top width 0.600 m
Foundation Level +81.120 m
Thickness of apron 0.750
width of Front Batter 1.05 m
Bottom Width of Drop 1.800 m
Depth of foundation 0.5 m
Height of Drop wall 1.800 m m
38 Horizontal wings on Trough level 2 U/S D/S
Top width of Wing +0.500 m 0.500
Offset of wing 0.400 m 0.400
Depth of foundation 0.500 m 0.500
Foundation level +81.200 m +81.200
Top level +83.470 m +83.470
Base width of outer Batter 1.000 m 0.900
Total Base width 2.300 m 2.200
Length of wings 2.400 m 2.400
Height of Straight portion 1.770 m 1.770
39 Sloped Wings on R.L.to trough U/s & D/s
Length 2 1.2165 m 0.783
Top level +84.281 m +83.992
Height of Straight portion 2.581 m 2.292
Base width of outer Batter 1.20 m 1.20
Top width of Wing 0.50 m 0.50
Total Base width 2.50 m 2.50
Foundation Level +81.200 m +81.200
40 Transitions
Splayed Wings
Length 2 0 m 0.786
Top level +84.281 m +83.992
Foundation Level +81.200 m +81.200
Top width of Wing 0.50 m 0.50
Base width of outer Batter 1.20 m 1.20
Total Base width 2.50 m 2.50
Height above Foundation 2.581 m 2.292
41 Horizontal Wings
Length 2 6 m 8.214
Top level +84.281 m +83.599
Top width 0.5 m 0.50
Height of Stright portion 2.581 m 1.899
Base width of outer Batter 1.20 m 0.900
total base width 2.5 m 2.2
Foundation Level +81.200 m +81.200
42 Return walls
Length 2 1.8165 m 3.4935
Top level +84.281 m +83.599
Top width 0.50 m 0.50
Base width of outer Batter 1.20 m 0.90
Foundation Level +81.200 m +81.200
Depth of foundation 0.50 m 0.50
Total Base width 2.50 m 2.20
height 2.581 m 1.899

43 Transition floor U/S 1 6.000 10.470 0.30


44 Transition floor D/S 1 9.000 10.470 0.30
45 sealing coat 1 100.988 7.600 0.04
46 Floor U/s on Trough area 1 6.243 7.600 0.30 Foot Bridge
47 Floor D/s 1 9.827 7.600 0.30 Road Bridge
48 wearing coat 1 31.070 10.470 0.075
49 wearing coat for SLRB 1 8.580 4.250 0.075
50 wearing coat for Foot Bridge 1 8.580 1.500 0.075
51 cutoff wall (u/s) 1 13.340 0.450 0
52 cutoff wall (D/s) 1 13.340 0.450 1.425
53 Profile walls (for canal) 2 54.626 0.450 0.45
54 Profile walls for stream D/s 1 19.574 0.450 0.45
55 Profile walls (for stream)U/s 1 22.033 0.450 0.45
56 Approach slab 2 3.5 5.000 0.15
57 stream pitching(U/s) 1 5.0 13.340 0.30
58 Revetment (U/s) 2 5.0 2.012 0.30
59 Stream pitching(D/s) 1 5.0 13.340 0.30
60 Revetment (D/s) 2 5.0 2.594 0.30
61 Canal lining in Bed 2 10.0 37.500 0.10
62 Canal lining in Side slope 2 1.2 17.126 0.10

DIA SPACING LENGTH NO


44 Trough slab Reinforcement
38120.55

45 RCC Pier Reinforcement for trough(centre)


0.00
46 RCC Pier Reinforcement for trough(side)
0.00
47 Bed Block Reinforcement for Trough
A 12 - 7.60 15.00 = 202.67
B 12 225 2.19 34.00 = 132.25
Dirt wall Reinforcement for Trough
A 12 275 7.60 2.00 = 54.04
B 10 300 2.59 26.00 = 83.07
48 Bed Block Reinforcement for SLRB
A 16 - 5.10 8.00 = 128.95
B 10 225 2.22 23.00 = 63.04
49 Approach Slab Reinforcement
A 12 150 4.90 24.00 = 209.07
B 12 150 3.50 33.00 = 205.33
Dirt wall Reinforcement for SLRB
A 12 150 5.10 4.00 = 72.53
B 10 300 2.44 17.00 = 51.21
50 Road Bridge Reinforcement
= 3493.41

51 Pier Reinforcement Under Road Bridge


A 8 200 1.797 31 = 22.01
B 8 200 15.34 9 = 54.55
C 8 200 21.2 5 = 41.88

52 Foot Bridge Reinforcement


A 12 300 1.946 13 = 22.49
B 12 300 1.946 13 = 22.49
C 10 275 3.94 7 = 17.02
D 12 - 3.94 4 = 14.01
12 - 5.358 1 = 9.53
E 12 - 3.98 2 = 7.08
F 8 - 3.98 4 = 6.29
g 8 240 2.05 17 = 13.77
h 8 240 0.389 240 = 36.88
53 Bed Block Reinforcement for foot Bridge
A 12 - 1.950 10 = 34.67
B 10 300 2.48 7 = 21.43
54 Pier Reinforcement for foot bridge
A 8 200 2.906 15 = 17.22
B 8 200 9.042 15 = 53.58
C 8 200 13.1 5 = 25.88

5% Extra for laps and wastage 2161.84

Total = 45.40

You might also like