Workbook Contents

U.S. liquids pipeline projects

Click worksheet name or tab at bottom for data


Worksheet Name Description Units
Pipeline_projects Liquids pipeline projects from 2010 to present, quarterly basis Barrels per day (b/d)
Definitions Data classification definitions
Regions Region definitions

Release date: 12/10/2020


Excel file name: EIA_liquids_pipeline_projects.xlsx 1/27/2012 10:56:38 AM
Available from webpage: https://www.eia.gov/petroleum/data.php
Sources: Company websites and presentations, trade press, U.S. Federal Energy Regulatory Commission (FERC), U.S. Department of
State, Canadian National Energy Board (NEB)

For help, contact: James.O'Sullivan@eia.gov


(202) 586-2728

Note: This file contains a list of liquids pipeline projects slated to commence operations in coming years, and completed in past years.
"Liquids" include crude oil, petroleum products, and hydrocarbon gas liquids. The data are not collected on an EIA survey. This
information was compiled from various sources including trade press, pipeline company websites, and government agencies.
The amount of capacity additions that come online may be significantly different from that reflected in accompanying data.
These data are not a forecast, and represent last-known public information on a project, including the start date. Projects that
are announced, but have no start date, capacity, or route information are not included. Projects that are under indefinite legal or
regulatory holds are included, but without start dates. For further information, see the “Definitions” tab.
ID Project Name
1 Hawthorn Pipeline
2 Keystone Pipeline
3 Keystone Pipeline Cushing extension
4 Overland Pass Pipeline expansion 1
5 Freedom Pipeline
6 Liberty Pipeline (NGL)
7 Mesa Pipeline System expansion
8 White Cliffs Pipeline line 1 expansion
9 Sterling I expansion
10 Roxpat (Roxanna-to-Patoka) conversion
11 Arbuckle I Pipeline expansion
12 Kinder Morgan Crude and Condensate (KMCC) Pipeline
13 Seaway Pipeline reversal
14 Overland Pass Pipeline expansion 2
15 Bakken North Project
16 Great Salt Plains Pipeline
17 Justice NGL Pipeline
18 Romulus-to-Detroit Pipeline
19 Basin Pipeline expansion 1
20 Eagle Ford Joint Venture (JV) Pipeline
21 Ohio River Valley Pipeline
22 Patoka-to-Catlettsburg Pipeline expansion
23 Seaway Pipeline expansion
24 West Texas Gateway Pipeline
25 Bakken NGL Pipeline
26 Double Eagle Pipeline
27 Longhorn Pipeline reversal and conversion
28 Overland Pass Pipeline expansion 3
29 Permian Express 1 Pipeline
30 Sand Hills NGL Pipeline
31 Southern Hills Pipeline
32 Mississippian Lime Crude Oil Pipeline Project
33 Cajun-Sibon Phase I
34 Sterling I conversion
35 Texas Express Pipeline
36 Zydeco Pipeline reversal
37 Appalachia to Texas Express (ATEX) Pipeline
38 Front Range Pipeline
39 Glass Mountain Pipeline
40 Mariner West conversion
41 Mars Pipeline expansion
42 Permian Express 1 expansion
43 Southern Hills Pipeline expansion 1
44 Cline Shale Pipeline
45 Keystone Gulf Coast Expansion
46 Mid-American Pipeline—Rocky Mountain expansion
47 OneOK ethane header interconnection
48 South Texas Crude Oil Pipeline System expansion phase 1
49 Sterling III Pipeline
50 Vantage Pipeline
51 Wascana Pipeline reversal
52 Aegis Ethane Pipeline—Mont Belvieu to Beaumont
53 Alberta Clipper Pipeline (Line 67) pump upgrade phase 1—Ca
54 Alberta Clipper Pipeline (Line 67) pump upgrade phase 1—Unit
55 Bakken Oil Express (BOE) II Pipeline
56 BridgeTex Pipeline
57 Cochin Reversal Project
58 Rio Bravo Pipeline
59 Southern Access (Line 61) Upgrade Project expansion 1
60 Sterling II conversion
61 White Cliffs Pipeline line 2
62 Bakken NGL Pipeline expansion
63 Cajun-Sibon Phase II
64 Flanagan South Pipeline
65 Granite Wash Extension
66 Mariner East 1 conversion
67 Seaway Pipeline twin/loop
68 Eaglebine Express Pipeline
69 Longhorn Pipeline expansion
70 Mississippian Lime Crude Oil extension
71 Pony Express Pipeline
72 Double H Pipeline
73 South Texas Crude Oil Pipeline System expansion phase 2
74 Cactus I Pipeline
75 Hutchinson-to-Medford NGL Pipeline
76 Mariner South Pipeline
77 Pony Express Northeast Colorado lateral
78 Sand Hills NGL Pipeline expansion 1
79 Southern Access (Line 61) Upgrade Project expansion 2
80 Thunder Creek NGL Pipeline
81 Aegis Ethane Pipeline—Beaumont to Lake Charles
82 Alberta Clipper Pipeline (Line 67) pump upgrade phase 2—Ca
83 Alberta Clipper Pipeline (Line 67) pump upgrade phase 2—Unit
84 Permian Express 2 Pipeline
85 Rancho II Pipeline
86 Southern Access (Line 61) Upgrade Project expansion 3
87 Aegis Ethane Pipeline—Lake Charles to Napoleonville
88 Line 78 Chicago Connectivity
89 Southern Access Pipeline extension
90 Basin Pipeline expansion 2
91 Eagle Ford Joint Venture (JV) Pipeline expansion 1
92 Heidelberg Oil Pipeline
93 Bayou Bridge Pipeline phase 1
94 Lone Star Express Pipeline phase II
95 Permian Longview and Lousiana Extension
96 Sand Hills NGL Pipeline expansion 2
97 Cornerstone Pipeline
98 Cornerstone Pipeline
99 Delaware Basin Extension
100 Saddlehorn/Grand Mesa Pipeline–Platteville to Cushing
101 Cactus I Pipeline expansion 1
102 Caddo Pipeline
103 Cornerstone Pipeline expansion
104 Express Pipeline
105 Lone Star Express Pipeline phase I
106 NST Express Pipeline
107 Platte Pipeline expansion
108 Red River Pipeline
109 Robinson-Indiana-Ohio (RIO) Pipeline reversal
110 Vantage Pipeline expansion
111 Patoka-to-Lima expansion
112 Pinon Pipeline expansion
113 Zydeco (Ho-Ho) Pipeline—Houma-to-Clovelly expansion
114 Zydeco (Ho-Ho) Pipeline—Port-Neches-to-Houma expansion
115 Harpster-to-Lima Pipeline
116 Saddlehorn/Grand Mesa Pipeline—Carr to Platteville
117 BridgeTex Pipeline expansion 1
118 Cajun-Sibon Ascension Pipeline
119 Dakota Access Pipeline
120 Energy Transfer Crude Oil Pipeline (ETCO)
121 Cactus I Pipeline expansion 2
122 White Cliffs Pipeline line 2 expansion
123 Appalachia to Texas Express (ATEX) expansion
124 Diamond Pipeline
125 Permian Express 3 Pipeline
126 Sand Hills NGL Pipeline expansion 3
127 STACK Pipeline expansion
128 Alberta Clipper Pipeline (Line 67) border expansion
129 Stampede Oil Pipeline
130 Utopia Pipeline
131 EPIC NGL Pipeline—Loving to Orla
132 EPIC NGL Pipeline—Orla to Crane
133 Midland-to-Sealy Pipeline
134 Pony Express Pipeline Platteville Extension
135 Sand Hills NGL Pipeline expansion 4
136 Woodpat (Wood-River-to-Patoka) Pipeline expansion
137 Loving County Pipeline
138 Ozark Pipeline expansion
139 Spearhead Pipeline
140 West Texas LPG Delaware Basin expansion 1
141 Aegis Expansion Project
142 Big Foot Oil Pipeline
143 BridgeTex Pipeline expansion 2
145 Pony Express pump upgrades
146 Sand Hills NGL Pipeline expansion 5
147 Southern Hills Pipeline expansion 2
148 Sterling III expansion
149 Sunrise Pipeline expansion (Sunrise II)
150 Midland-to-Sealy pipeline expansion
151 Seaway Pipeline expansion 2
152 Seminole Red Pipeline conversion
153 Shin Oak Pipeline
154 Bayou Bridge Pipeline phase 2
155 EPIC NGL Pipeline—Crane to Corpus Christi (Crude)
156 Falcon Ethane Pipeline Project
157 Iron Horse Pipeline
158 Laurel Pipeline reversal
159 Revolution System
160 Shin Oak Pipeline Waha lateral
161 Burgos (Dos Paises) Pipeline conversion and expansion
162 Cactus II Pipeline
163 EPIC Crude Pipeline
164 Front Range Pipeline expansion
165 Grand Prix Pipeline—Carlsbad lateral
166 Grand Prix Pipeline—North Texas to Mont Belvieu
167 Grand Prix Pipeline—Reeves County to Johnson County
168 Magellan South System expansion
169 New Burgos Pipeline
171 Texas Express Pipeline expansion
172 Cherry Creek Pipeline
173 Elk Creek Pipeline phase 1
174 Grand Prix Extension—Southern Oklahoma
175 Gray Oak Pipeline
176 Gray Wolf Crude Connector
177 Mariner East 2X
178 Matador Pipeline
179 Shin Oak Pipeline expansion
180 White Cliffs conversion
181 Diamondback Pipeline
182 Arbuckle II Pipeline
183 Elk Creek Pipeline phase 2
184 EPIC Purity Pipeline
185 West Texas LPG Delaware Basin expansion 2
186 Plantation Pipeline Roanoke Expansion
187 Sand Hills NGL Pipeline expansion 6
188 Capline reversal
189 Diamond Pipeline expansion
190 Pony Express Pipeline expansion
191 Bluestem Pipeline
192 Compañero Pipeline
193 Jupiter Pipeline
194 Lone Star Express Pipeline expansion
195 Red Oak Pipeline
196 Voyager Pipeline
197 Ace Pipeline System
198 Enbridge Line 3 Replacement Project
199 Southern Access (Line 61) Upgrade Project expansion 4
200 Swordfish Pipeline
201 Arbuckle II Pipeline expansion
202 Grand Prix Extension—Central Oklahoma and STACK
203 Wink-to-Webster Pipeline
204 Seahorse Pipeline
205 Southern Lights Pipeline reversal
206 Keystone XL Pipeline Project
207 Keystone Houston Lateral
208 Rangeland Intergrated Oil System (Rio) pipeline
209 Sacagawea Pipeline
210 Keystone HoustonLink Pipeline
211 Mariner East 2 Pipeline (Hybrid)
212 Delaware Express Pipeline
213 Permian Crude System
214 Valley Pipeline
215 Permian Express 4 expansion
216 EPIC NGL Pipeline—Crane to Corpus Christi
217 Ingleside Pipeline
218 Mariner East 2 Pipeline (Bypass)
219 Baymark Pipeline
220 Equality Pipeline
221 Midland-to-ECHO 3 pipeline system
222 Saddlehorn Pipeline expansion
223 Red River Pipeline expansion
224 Cushing Connect Pipeline
225 Liberty Pipeline
226 Belvieu Alternative for NGLs (BANGL)
227 South Bend Pipeline
228 Western Corridor Pipeline System
229 Midland-to-ECHO 4 pipeline system
230 Appalachia to Texas Express (ATEX) expansion
231 Dakota Access Pipeline expansion
232 Taft connector
233 Nuevo Laredo Project
234 South Texas Crude System connector
235 Ted Collins Pipeline
236 Pony Express Carpenter Extension
237 Badger Pipeline
238 Freedom Pipeline
239 Stateline-to-Riverview Tioga Lateral
240 Augustus Pipeline
241 EPIC Purity Pipeline expansion
242 Bluewater Texas Terminal (BWTX)
243 Keystone Pipeline Project - Motiva Extension
244 Texas Gulflink Project
Project Developer(s) Project Type Status Start Year
Hawthorn Oil Transportation New Completed 2010
TC Energy New Completed 2010
TC Energy Expansion Completed 2011
Williams; OneOK Expansion Completed 2011
Energy Transfer Partners New Completed 2011
Energy Transfer Partners New Completed 2011
Plains All American Expansion Completed 2011
SemGroup; Plains All American; Anadarko; Samedan Pipe L Expansion Completed 2011
OneOK Expansion Completed 2011
Marathon Pipeline (MPLX) Conversion Completed 2012
OneOK Expansion Completed 2012
Kinder Morgan Conversion, Expansion Completed 2012
Enbridge; Enterprise Products Partners Reversal Completed 2012
Williams; OneOK Expansion Completed 2012
Plains All American New Completed 2012
Parnon Gathering New Completed 2012
Energy Transfer Partners New Completed 2012
Marathon Pipeline (MPLX) New Completed 2012
Plains All American Expansion Completed 2012
Enterprise Products Partners; Plains All American New Completed 2012
EnLink New Completed 2012
Marathon Pipeline (MPLX) Expansion Completed 2012
Enbridge; Enterprise Products Partners Expansion Completed 2013
Energy Transfer Partners New Completed 2013
OneOK New Completed 2013
Kinder Morgan; Magellan New Completed 2013
Magellan Conversion, Reversal Completed 2013
Williams; OneOK Expansion Completed 2013
Energy Transfer Partners, ExxonMobil (Permian Express ParNew Completed 2013
DCP Midstream; Enbridge; Phillips 66 New Completed 2013
DCP Midstream; Enbridge; Phillips 66 New Completed 2013
Plains All American New Completed 2013
EnLink Expansion Completed 2013
OneOK Conversion Completed 2013
Anadarko; ArcLight; DCP Midstream; Enterprise Products PaNew Completed 2013
Shell Midstream Partners Reversal Completed 2013
Enterprise Products Partners New Completed 2014
Anandarko, DCP Midstream, Enterprise Products Partners (FNew Completed 2014
SemGroup; Gavilon New Completed 2014
Energy Transfer Partners Conversion Completed 2014
Shell Midstream Partners; BP Expansion Completed 2014
Energy Transfer Partners, ExxonMobil (Permian Express ParExpansion Completed 2014
DCP Midstream; Enbridge; Phillips 66 Expansion Completed 2014
Centurion Pipeline New Completed 2014
TC Energy Expansion Completed 2014
Enterprise Products Partners Expansion Completed 2014
OneOK New Completed 2014
NuStar Expansion Completed 2014
OneOK New Completed 2014
Vantage Pipeline Canada New Completed 2014
Plains Midstream Canada Reversal Completed 2014
Enterprise Products Partners New Completed 2014
Enbridge Expansion Completed 2014
Enbridge Expansion Completed 2014
BOE Midstream New Completed 2014
Magellan; Occidental Petroleum New Completed 2014
Kinder Morgan Expansion Completed 2014
Energy Transfer Partners Conversion Completed 2014
Enbridge Expansion Completed 2014
OneOK Conversion Completed 2014
SemGroup Expansion Completed 2014
OneOK Expansion Completed 2014
EnLink Expansion Completed 2014
Enbridge New Completed 2014
Sunoco Logistics Partners New Completed 2014
Energy Transfer Partners Conversion Completed 2014
Enbridge; Enterprise Products Partners Expansion Completed 2014
Sunoco Logistics Partners Conversion, Expansion, ReveCompleted 2014
Magellan Expansion Completed 2014
Plains All American Expansion Completed 2014
Tallgrass Energy Conversion, Expansion Completed 2014
Kinder Morgan New Completed 2015
NuStar Expansion Completed 2015
Plains All American New Completed 2015
OneOK New Completed 2015
Energy Transfer Partners New Completed 2015
Tallgrass Energy Expansion Completed 2015
DCP Midstream; Enbridge; Phillips 66 Expansion Completed 2015
Enbridge Expansion Completed 2015
Meritage Midstream New Completed 2015
Enterprise Products Partners New Completed 2015
Enbridge Expansion Completed 2015
Enbridge Expansion Completed 2015
Energy Transfer Partners, ExxonMobil (Permian Express ParNew Completed 2015
Enterprise Products Partners New Completed 2015
Enbridge Expansion Completed 2015
Enterprise Products Partners New Completed 2015
Enbridge Expansion Completed 2015
Enbridge Expansion Completed 2015
Plains All American Expansion Completed 2015
Enterprise Products Partners; Plains All American Expansion Completed 2015
Enbridge New Completed 2016
Energy Transfer; Phillips 66 New Completed 2016
Energy Transfer Partners New Completed 2016
ExxonMobil; Sunoco Logistics Partners, Vitol (SunVit PipelinExpansion, Reversal Completed 2016
DCP Midstream; Enbridge; Phillips 66 Expansion Completed 2016
Marathon Pipeline (MPLX) New Completed 2016
Marathon Pipeline (MPLX) New Completed 2016
Sunoco Logistics Partners Expansion Completed 2016
Andarko; Magellan; Plains All American New Completed 2016
Plains All American Expansion Completed 2016
Plains All American; Delek New Completed 2016
Marathon Pipeline (MPLX) Expansion Completed 2016
Enbridge Expansion Completed 2016
Energy Transfer Partners New Completed 2016
NorthStar Midstream New Completed 2016
Enbridge Expansion Completed 2016
Plains All American New Completed 2016
Marathon Pipeline (MPLX) Reversal Completed 2016
Vantage Pipeline Canada Expansion Completed 2016
Marathon Pipeline (MPLX) Expansion Completed 2016
Plains All American Expansion Completed 2016
Shell Midstream Partners Expansion Completed 2016
Shell Midstream Partners Expansion Completed 2016
Marathon Pipeline (MPLX) New Completed 2017
Andarko; Magellan; Plains All American New Completed 2017
Magellan; Plains All American Expansion Completed 2017
EnLink; Marathon Petroleum Expansion Completed 2017
Energy Transfer Partners, MarEn Bakken Company (owned New by Completed 2017
Energy Transfer Partners, MarEn Bakken Company (owned Conversion,
by New Completed 2017
Plains All American Expansion Completed 2017
SemGroup Expansion Completed 2017
Enterprise Products Partners Expansion Completed 2017
Plains All American; Valero New Completed 2017
Energy Transfer Partners, ExxonMobil (Permian Express ParNew Completed 2017
DCP Midstream; Enbridge; Phillips 66 Expansion Completed 2017
Phillips 66, Plains All American (STACK JV) Expansion Completed 2017
Enbridge Expansion Completed 2017
Enbridge New Completed 2018
Kinder Morgan New Completed 2018
EPIC Pipeline New Completed 2018
EPIC Pipeline New Completed 2018
Enterprise Products Partners New Completed 2018
Tallgrass Energy Expansion Completed 2018
DCP Midstream; Enbridge; Phillips 66 Expansion Completed 2018
Marathon Pipeline (MPLX) Expansion Completed 2018
Enterprise Products Partners New Completed 2018
Marathon Pipeline (MPLX) Expansion Completed 2018
Enbridge Other Completed 2018
OneOK Expansion Completed 2018
Enterprise Products Partners Expansion Completed 2018
Enbridge New Completed 2018
Magellan; Plains All American Expansion Completed 2018
Tallgrass Energy Expansion Completed 2018
DCP Midstream; Enbridge; Phillips 66 Expansion Completed 2018
DCP Midstream; Enbridge; Phillips 66 Expansion Completed 2018
OneOK Expansion Completed 2018
Plains All American Expansion Completed 2018
Enterprise Products Partners Expansion Completed 2019
Enbridge; Enterprise Products Partners Expansion Completed 2019
Enterprise Products Partners Conversion Completed 2019
Enterprise Products Partners New Completed 2019
Energy Transfer; Phillips 66 New Completed 2019
EPIC Pipeline New Completed 2019
Shell Midstream Partners New Construction 2020
Tallgrass Energy; Silver Creek Midstream (Powder River Ga Conversion, New Completed 2019
Buckeye Partners Reversal Completed 2019
Energy Transfer Partners New Construction 2020
Enterprise Products Partners Expansion Completed 2019
NuStar Conversion, Expansion Completed 2019
Plains All American New Completed 2019
EPIC Pipeline New Completed 2020
DCP Midstream, Enterprise Products Partners (Front Range Expansion Completed 2020
Targa Resources Expansion Completed 2019
Targa Resources New Completed 2019
Targa Resources New Completed 2019
Magellan Expansion Completed 2019
NuStar New On Hold
ArcLight; DCP Midstream; Enterprise Products Partners; Oc Expansion Completed 2020
OneOK Conversion Completed 2019
OneOK New Completed 2019
Targa Resources Expansion Completed 2019
Andeavor; Phillips 66 New Completed 2019
Wolf Midstream New Construction 2020
Energy Transfer Partners New Construction 2020
ARB Midstream New Completed 2020
Enterprise Products Partners Expansion Completed 2019
DCP Midstream; Energy Transfer Conversion Completed 2019
TransMontaigne Conversion Announced 2021
OneOK New Completed 2020
OneOK New Completed 2019
EPIC Pipeline New Completed 2020
OneOK Expansion Completed 2020
Kinder Morgan Expansion Completed 2020
DCP Midstream; Enbridge; Phillips 66 Expansion Completed 2020
Marathon Pipeline (MPLX) Reversal Construction 2021
Plains All American; Valero Expansion Announced 2021
Tallgrass Energy Expansion Construction 2020
Williams New Construction 2020
Permico Energia New Construction 2020
Jupiter New On Hold
Energy Transfer Partners Expansion Completed 2020
Phillips 66 New On Hold
Magellan; Navigator Energy Services New On Hold
Harvest Midstream; PBF Logistics; Phillips 66 New On Hold
Enbridge Expansion Construction 2020
Enbridge Expansion Construction 2020
Marathon Pipeline (MPLX); Crimson Midstream Other On Hold
OneOK Expansion Announced 2021
Targa Resources Expansion Announced 2021
ExxonMobil, Lotus Midstream, Delek US, Plains All America New Completed 2020
Tallgrass Energy New Announced 2021
Enbridge Conversion, Reversal Announced 2023
TC Energy New Construction 2023
TC Energy Expansion Completed 2016
Rangeland Energy/Tesoro Refining & Marketing New Completed 2016
Paradigm, Phillips 66 (Paradigm Midstream JV) New Completed 2016
TC Energy, Magellan (HoustonLink JV) Expansion Completed 2017
Energy Transfer Partners New Completed 2018
Medallion Pipeline New Completed 2019
NuStar New Completed 2019
NuStar Expansion Completed 2019
Energy Transfer Partners, ExxonMobil (Permian Express ParExpansion Completed 2019
EPIC Pipeline Conversion Completed 2020
Harvest Midstream New Completed 2020
Energy Transfer Partners New Construction 2021
Enterprise Products Partners; Lavaca Pipe Line Company Expansion Construction 2020
Bridger Pipeline (True Companies) New Completed 2020
Enterprise Products Partners New Completed 2020
Black Diamond Gathering; Magellan; Plains All American; Expansion Construction 2020
Plains All American; Delek Logistics Expansion Completed 2020
Holly Energy, Plains All American (Cushing Connect PipelineNew Announced 2021
Phillips 66; Bridger Pipeline (True Companies) New On Hold
Marathon Logistics; WhiteWater Midstream New Canceled
Bridger Pipeline (True Companies) New Announced 2021
Plains All American Expansion Announced 2021
Enterprise Products Partners New Canceled
Enterprise Products Partners Expansion Announced 2022
Energy Transfer Partners, MarEn Bakken Company (owned Expansion
by On Hold 2021
NuStar New Completed 2019
NuStar Expansion Completed 2019
NuStar New Completed 2019
Energy Transfer Partners New Construction 2021
Tallgrass Energy Expansion Completed 2020
ARB Midstream New Completed 2019
ARB Midstream New Completed 2020
OneOK Expansion Announced 2020
Centurion Pipeline New, Other Completed 2020
EPIC Pipeline Expansion, Conversion Announced 2021
Phillips 66 and Trafigura JV New Announced
TC Energy New Announced
Sentinel Midstream New Announced
Start State(s) Beg_State End_State Beg_Region End_Region Miles Pipeline D
Q1 OK OK OK PADD 2 PADD 2 18 12
Q2 AB, SK, MB, ND, AB IL Western Canada PADD 2 1,853 30
Q1 NE, KS, OK NE OK PADD 2 PADD 2 298
Q2 WY, CO, KS WY KS PADD 4 PADD 2 1,035 16, 14
Q3 TX TX TX PADD 3 PADD 3 43 8
Q3 TX TX TX PADD 3 PADD 3 93 12
Q3 TX TX TX PADD 3 PADD 3 80
Q3 CO, KS, OK CO OK PADD 4 PADD 2 527 12
Q4 OK, TX OK TX PADD 2 PADD 3
Q1 IL IL IL PADD 2 PADD 2 57 12
Q2 OK, TX OK TX PADD 2 PADD 3 440 16
Q2 TX TX TX PADD 3 PADD 3 264 24, 12
Q2 OK, TX OK TX PADD 2 PADD 3 500 30
Q3 WY, CO, KS WY KS PADD 4 PADD 2 1,035 16, 14
Q4 ND, MT ND MT PADD 2 PADD 4 80 12
Q4 OK OK OK PADD 2 PADD 2 115 8
Q4 TX TX TX PADD 3 PADD 3 127 20
Q4 MI MI MI PADD 2 PADD 2 17 16
TX, OK TX OK PADD 3 PADD 2 520 24, 22, 20
TX TX TX PADD 3 PADD 3 175
WV,OH WV OH PADD 1 PADD 2 200 8, 6
IL, IN, KY IL KY PADD 2 PADD 2 406 24, 22
Q1 OK, TX OK TX PADD 2 PADD 3 500 30
Q1 TX TX TX PADD 3 PADD 3 570 16
Q2 MT, WY, CO MT CO PADD 4 PADD 4 600 12
Q2 TX TX TX PADD 3 PADD 3 194 16, 14, 12
Q2 TX TX TX PADD 3 PADD 3 450 18
Q2 WY, CO, KS WY KS PADD 4 PADD 2 1,035 16, 14
Q2 TX TX TX PADD 3 PADD 3
Q2 TX TX TX PADD 3 PADD 3 720 20
Q2 KS, OK, TX KS TX PADD 2 PADD 3 800 20–8
Q3 OK OK OK PADD 2 PADD 2 135
Q4 TX, LA TX LA PADD 3 PADD 3 139 12
Q4 OK, TX OK TX PADD 2 PADD 3
Q4 TX TX TX PADD 3 PADD 3 580 20
Q4 TX, LA TX, LA LA PADD 3 PADD 3 350 24, 22, 20
Q1 PA, WV, OH, IN, PA TX PADD 1 PADD 3 1,205 20, 16, 14
Q1 CO, OK, TX CO TX PADD 4 PADD 3 435 16
Q1 OK OK OK PADD 2 PADD 2 210
Q1 PA, OH, MI, ON PA ON PADD 1 Eastern Canada 350 10, 8
Q1 GM GM GM Offshore Offshore 41 18, 16
Q1 TX TX TX PADD 3 PADD 3
Q1 KS, OK KS OK PADD 2 PADD 2 140 20–8
Q2 TX TX TX PADD 3 PADD 3 91 12
Q2 OK, TX OK TX PADD 2 PADD 3 485 36
Q2 CO, UT, NM, TX CO UT PADD 4 PADD 4 264 16
Q2 TX TX TX PADD 3 PADD 3 285 12
Q2 TX TX TX PADD 3 PADD 3
Q2 OK, TX OK TX PADD 2 PADD 3 550 16
Q2 ND, SK, AB ND AB PADD 2 Western Canada 435 10
Q2 SK SK SK Western Canada Western Canada 107 12
Q3 TX TX TX PADD 3 PADD 3 60 20
Q3 AB, SK, MB AB MB Western Canada Western Canada 786 36
Q3 ND, MN, WI ND WI PADD 2 PADD 2 323 36
Q3 ND ND ND PADD 2 PADD 2 38 16
Q3 TX TX TX PADD 3 PADD 3 400
Q3 IL, IA, MN, ND, SIL AB PADD 2 Western Canada 1,900 12
Q3 TX TX TX PADD 3 PADD 3 84
Q3 WI, IL WI IL PADD 2 PADD 2 454 42
Q3 OK, TX OK TX PADD 2 PADD 3
Q3 CO, KS, OK CO OK PADD 4 PADD 2 527 12
Q4 MT, WY, CO MT CO PADD 4 PADD 4 600 12
Q4 LA LA LA PADD 3 PADD 3 306 12
Q4 IL, MO, KS, OK IL OK PADD 2 PADD 2 593 36
Q4 TX, OK, TX TX TX PADD 3 PADD 3 200 12
Q4 PA PA PA PADD 1 PADD 1 300 12, 8
Q4 OK, TX OK TX PADD 2 PADD 3 512 30
TX TX TX PADD 3 PADD 3 12
TX TX TX PADD 3 PADD 3 18
KS, OK KS OK PADD 2 PADD 2 55
WY, NE, CO, NE, WY OK PADD 4 PADD 2 760
Q1 ND, MT, WY ND, MT WY PADD 2, PADD 4 PADD 4 511
Q1 TX TX TX PADD 3 PADD 3
Q2 TX TX TX PADD 3 PADD 3 298 20
Q2 KS, OK KS OK PADD 2 PADD 2 95 16
Q2 TX TX TX PADD 3 PADD 3 62 16
Q2 CO CO CO PADD 4 PADD 4 66
Q2 TX TX TX PADD 3 PADD 3 180 20
Q2 WI, IL WI IL PADD 2 PADD 2 454 42
Q2 WY WY WY PADD 4 PADD 4 108 8, 6
Q3 TX, LA TX LA PADD 3 PADD 3 48 20
Q3 AB, SK, MB AB MB Western Canada Western Canada 786 36
Q3 ND, MN, WI ND WI PADD 2 PADD 2 323 36
Q3 TX TX TX PADD 3 PADD 3 334 24, 20
Q3 TX TX TX PADD 3 PADD 3 88 36
Q3 WI, IL WI IL PADD 2 PADD 2 454 42
Q4 TX TX TX PADD 3 PADD 3 162 20
Q4 IL, IN IL IN PADD 2 PADD 2 81 36
Q4 IL IL IL PADD 2 PADD 2 167 24
TX TX TX PADD 3 PADD 3 24, 20
TX TX TX PADD 3 PADD 3 175
Q1 GM GM GM Offshore Offshore 34 20
Q2 TX, LA TX LA PADD 3 PADD 3 49 30
Q2 TX TX TX PADD 3 PADD 3 273 24
Q2 TX, LA TX LA PADD 3 PADD 3 380
Q2 TX TX TX PADD 3 PADD 3 260 20
Q3 OH OH OH PADD 2 PADD 2 50 16
Q3 OH OH OH PADD 2 PADD 2 50 16
Q3 TX, NM, TX TX TX PADD 3 PADD 3 125
Q3 CO, KS, OK CO OK PADD 4 PADD 2 538 20
Q4 TX TX TX PADD 3 PADD 3 298 20
Q4 TX, LA TX LA PADD 3 PADD 3 80 12
Q4 OH OH OH PADD 2 PADD 2 8 16
Q4 AB, MT, WY AB WY Western Canada PADD 4 785 24
Q4 TX TX TX PADD 3 PADD 3 260 30
Q4 ND ND ND PADD 2 PADD 2 23
Q4 WY, NE, KS, MO,WY IL PADD 4 PADD 2 932 20
Q4 OK, TX OK TX PADD 2 PADD 3
Q4 OH, IN, IL OH IL PADD 2 PADD 2 250 8
Q4 ND, SK, AB ND AB PADD 2 Western Canada 50 8
IL, IN, OH IL OH PADD 2 PADD 2 302 22, 20
TX TX TX PADD 3 PADD 3 63 20
LA LA LA PADD 3 PADD 3 34 24
TX, LA TX LA PADD 3 PADD 3 213 22
Q1 OH OH OH PADD 2 PADD 2 50 12
Q1 CO CO CO PADD 4 PADD 4 50 16
Q2 TX TX TX PADD 3 PADD 3
Q2 LA LA LA PADD 3 PADD 3 30 10
Q2 ND, SD, IA, IL ND IL PADD 2 PADD 2 1,172 30
Q2 IL, KY, TN, MS, L IL TX PADD 2 PADD 3 754 30
Q3 TX TX TX PADD 3 PADD 3 298 20
Q3 CO, KS, OK CO OK PADD 4 PADD 2 527 12
Q4 PA, WV, OH, IN, PA TX PADD 1 PADD 3 1,205 20, 16, 14
Q4 OK, AR, TN OK TN PADD 2 PADD 2 440 20
Q4 TX TX TX PADD 3 PADD 3
Q4 TX TX TX PADD 3 PADD 3 140 20
Q4 OK OK OK PADD 2 PADD 2 90
MB, ND MB ND Western Canada PADD 2 3 36
Q1 GM GM GM Offshore Offshore 16 18
Q1 OH, MI, ON OH ON PADD 2 Eastern Canada 270 12
Q2 NM, TX NM TX PADD 3 PADD 3 65 10
Q2 TX TX TX PADD 3 PADD 3 205 16
Q2 TX TX TX PADD 3 PADD 3 418 24
Q2 CO CO CO PADD 4 PADD 4 55
Q2 TX TX TX PADD 3 PADD 3 50 20
Q2 IL IL IL PADD 2 PADD 2 58 22
Q3 NM, TX NM TX PADD 3 PADD 3
Q3 OK, MO, IL OK IL PADD 2 PADD 2 433 22
Q3 IL, MO, KS, OK IL OK PADD 2 PADD 2 650
Q3 TX TX TX PADD 3 PADD 3 120 16
Q4 TX, LA TX LA PADD 3 PADD 3 299 20
Q4 GM GM GM Offshore Offshore 40 20
Q4 TX TX TX PADD 3 PADD 3
Q4 WY, NE, CO, NE, WY OK PADD 4 PADD 2 760
Q4 TX TX TX PADD 3 PADD 3 50 20
Q4 OK OK OK PADD 2 PADD 2 940 20–8
Q4 OK, TX OK TX PADD 2 PADD 3 570 16
Q4 TX TX TX PADD 3 PADD 3 24
Q1 TX TX TX PADD 3 PADD 3 418 24
Q1 OK, TX OK TX PADD 2 PADD 3 500 30
Q1 TX TX TX PADD 3 PADD 3 440 16
Q1 TX TX TX PADD 3 PADD 3 624 24
Q2 LA LA LA PADD 3 PADD 3 163 24
Q3 TX TX TX PADD 3 PADD 3 430 24
Q4 OH, WV, PA OH, PA PA PADD 2, PADD 1 PADD 1 97 16, 12, 10
Q2 WY WY WY PADD 4 PADD 4 80 16
Q2 PA PA PA PADD 1 PADD 1
PA PA PA PADD 1 PADD 1 15 12
Q2 TX TX TX PADD 3 PADD 3 34 20
Q3 TX, TAM TX TAM PADD 3 Mexico 47 8
Q3 TX TX TX PADD 3 PADD 3 575 26
Q2 TX TX TX PADD 3 PADD 3 730 30
Q2 CO, OK, TX CO TX PADD 4 PADD 3 435 16
Q3 NM, TX NM TX PADD 3 PADD 3 90 24
Q3 TX TX TX PADD 3 PADD 3 320 30
Q3 TX TX TX PADD 3 PADD 3 400 24
Q3 TX TX TX PADD 3 PADD 3 205 16, 12
TX, TAM TX TAM PADD 3 Mexico 47 10
Q2 TX TX TX PADD 3 PADD 3 580 20
Q4 ND ND ND PADD 2 PADD 2 45 12
Q3 WY, CO, KS WY KS PADD 4 PADD 2 300 20
Q3 OK, TX OK TX PADD 2 PADD 3 320 24–12
Q4 TX TX TX PADD 3 PADD 3 850
TX TX TX PADD 3 PADD 3 55 16
Q4 OH, WV, PA, DE,OH, WV PA PADD 2, PADD 1 PADD 1 350 16
Q2 CO CO CO PADD 4 PADD 4 38
Q4 TX TX TX PADD 3 PADD 3 624 24
Q4 CO, KS, OK CO OK PADD 4 PADD 2 564 12
Q1 TX, TAM TX TAM PADD 3 Mexico 16 8, 6
Q1 OK, TX OK TX PADD 2 PADD 3 530 30, 24
Q4 MT, WY MT WY PADD 4 PADD 4 600 20
Q3 TX TX TX PADD 3 PADD 3 131 12
Q1 TX TX TX PADD 3 PADD 3 240 16
Q2 LA, MS, AL, GA, LA, MS VA PADD 2 PADD 1 8
Q2 TX TX TX PADD 3 PADD 3 400 20
Q2 IL, KY, TN, MS, L IL LA PADD 2 PADD 3 632 40
Q2 OK, AR, TN OK TN PADD 2 PADD 2 440 20
WY, NE, CO, NE, WY OK PADD 4 PADD 2 760 12
Q4 KS, OK KS OK PADD 2 PADD 2 189 16
Q4 TX TX TX PADD 3 PADD 3 510 24
TX TX TX PADD 3 PADD 3 650 36
Q3 TX TX TX PADD 3 PADD 3 352 24
OK, TX OK TX PADD 2 PADD 3
OK, TX OK TX PADD 2 PADD 3 500 20
LA LA LA PADD 3 PADD 3
AB, SK, MB, ND, AB WI Western Canada PADD 2 1,031 36
WI, IL WI IL PADD 2 PADD 2 454 42
LA LA LA PADD 3 PADD 3 60 30, 20, 16
Q1 KS, OK, TX KS OK PADD 2 PADD 2 120 24
Q1 OK OK OK PADD 2 PADD 2 110 16
Q4 TX TX TX PADD 3 PADD 3 650 36
Q3 OK, TX, AR, LA OK LA PADD 2 PADD 3 700 30
AB, SK, MB, ND, AB IL Western Canada PADD 2
AB, SK, MT, SD, AB NE Western Canada PADD 2 1,180 36
Q3 TX TX TX PADD 3 PADD 3 48
Q3 TX TX TX PADD 3 PADD 3 110 12
Q4 ND ND ND PADD 2 PADD 2 91 16
Q1 TX TX TX PADD 3 PADD 3 9 24
Q4 OH, WV, PA, DE OH, WV PA PADD 2, PADD 1 PADD 1 350 20, 16, 12
Q3 TX TX TX PADD 3 PADD 3 60 16
Q3 TX TX TX PADD 3 PADD 3 8 30
Q3 TX TX TX PADD 3 PADD 3 75 12
Q4 TX TX TX PADD 3 PADD 3 400 24
Q1 TX TX TX PADD 3 PADD 3 430 24
Q2 TX TX TX PADD 3 PADD 3 24 24
Q1 OH, WV, PA, DE,OH, WV PA PADD 2, PADD 1 PADD 1 350 20
Q4 TX TX TX PADD 3 PADD 3 91 12
Q3 WY WY WY PADD 4 PADD 4 190 24
Q3 TX TX TX PADD 3 PADD 3
Q4 CO, KS, OK CO OK PADD 4 PADD 2 538
Q3 OK, TX OK TX PADD 2 PADD 3 16
Q1 OK OK OK PADD 2 PADD 2 50
WY, CO, KS, OK WY OK PADD 2 PADD 3
TX TX TX PADD 3 PADD 3 525 24
Q3 MT, ND, WY ND, MT WY PADD 2, PADD 4 PADD 4 137 16
Q2 MT, WY MT WY PADD 4 PADD 4 555
TX TX TX PADD 3 PADD 3
PA, WV, OH, IN, PA TX PADD 1 PADD 3 1,205 20, 16, 14
Q3 ND, SD, IA, IL ND IL PADD 2 PADD 2 1,172 30
Q3 TX TX TX PADD 3 PADD 3 8 30
Q3 TX, TAM TX TAM PADD 3 Mexico 11 8
Q3 TX TX TX PADD 3 PADD 3 16
Q4 TX TX TX PADD 3 PADD 3 80
Q2 WY, CO WY CO PADD 4 PADD 4 25 12
Q4 CO CO CO PADD 4 PADD 4 32 12
Q1 CO CO CO PADD 4 PADD 4 12
Q4 ND ND ND PADD 2 PADD 2 75 16
Q4 TX TX TX PADD 3 PADD 3 20,18
Q3 TX TX TX PADD 3 PADD 3 12
TX, GM TX GM PADD 3 Offshore 55 30, 30
TX TX TX PADD 3 PADD 3 5 36,30
TX, GM TX GM PADD 3 Offshore 42 37
Product Type Added Capacity Interstate Flow Direction
CRD 90,000 F NW
CRD 435,000 T SE
CRD 156,000 T S
HGL 35,200 T SE
HGL 40,000 F S
HGL 90,000 F S
CRD 420,000 F N
CRD 40,300 T SE
HGL 15,000 T S
CRD 84,000 F E
HGL 60,000 T S
CRD 300,000 F E
CRD 150,000 T S
HGL 30,000 T SE
CRD 50,000 T NW
CRD 20,000 F SE
HGL 375,000 F E
CRD 180,000 F E
CRD 50,000 T NE
CRD 300,000 F SW
CRD 10,000 T N
CRD 14,000 T E
CRD 250,000 T S
HGL 220,000 F SE
HGL 60,000 T S
CRD 100,000 F NE
CRD 225,000 F E
HGL 70,000 T SE
CRD 90,000 F SE
HGL 200,000 F E
HGL 150,000 T SE
CRD 175,000 F SE
HGL 70,000 T E
HGL T S
HGL 280,000 F SE
CRD 360,000 T E
HGL 125,000 T SW
HGL 150,000 T SE
CRD 140,000 F E
HGL 50,000 T NW
CRD 100,000 F NW
CRD 60,000 F SE
HGL 25,000 T SE
CRD 75,000 F N
CRD 700,000 T S
HGL 75,000 T SE
HGL 40,000 F S
CRD 35,000 F E
HGL 190,000 T S
HGL 40,000 T NW
CRD 40,000 F N
HGL 360,000 F E
CRD 120,000 T SE
CRD 120,000 T SE
CRD 165,000 F S
CRD 300,000 F E
HGL 95,000 T NW
CRD 100,000 F E
CRD 160,000 T SE
HGL T S
CRD 74,000 T SE
HGL 75,000 T S
HGL 50,000 F E
CRD 585,000 T SW
CRD 70,000 T SE
HGL 70,000 F E
CRD 450,000 T S
CRD 60,000 F SE
CRD 50,000 F E
CRD 75,000 T SE
CRD 320,000 T SE
CRD 84,000 T S
CRD 65,000 F E
CRD 250,000 F N
HGL 120,000 T S
HGL 200,000 F E
CRD 90,000 F E
HGL 50,000 F E
CRD 240,000 T SE
HGL 15,000 F S
HGL 360,000 T E
CRD 230,000 T SE
CRD 230,000 T SE
CRD 230,000 F SE
CRD 1,000,000 F E
CRD 150,000 T SE
HGL 360,000 F E
CRD 570,000 T NE
CRD 300,000 F S
CRD 360,000 F NE
CRD 300,000 F SW
CRD 120,000 F NE
CRD 480,000 T E
HGL 375,000 F E
CRD 160,000 T SE
HGL 30,000 F E
HGL 180,000 F N
CRD 180,000 F NW
CRD 100,000 T E
CRD 340,000 T SE
CRD 50,000 F N
CRD 80,000 T E
HGL 50,000 F NW
CRD 30,000 T S
HGL 495,000 F E
CRD 40,000 F SW
CRD 21,000 T E
CRD 150,000 T SE
PRD 50,000 T W
HGL 28,000 T NW
CRD 18,000 T NE
CRD 200,000 F NE
CRD 100,000 F E
CRD 15,000 T E
PRD 50,000 F W
CRD 340,000 F S
CRD 100,000 F E
HGL 130,000 F E
CRD 525,000 T SE
CRD 525,000 T SW
CRD 90,000 F N
CRD 65,000 T SE
HGL 20,000 T SW
CRD 200,000 T E
CRD 140,000 F E
HGL 85,000 F E
CRD 150,000 F E
CRD 350,000 T SE
CRD 100,000 F SE
HGL 50,000 T NW
HGL 220,000 T SE
HGL 220,000 F SE
CRD 575,000 F E
CRD 40,000 F N
HGL 60,000 F E
CRD 145,000 F E
CRD 200,000 T SE
CRD 130,000 T NE
CRD 190,000 T SW
HGL 110,000 F E
HGL 40,000 T E
CRD 100,000 F N
CRD 40,000 F E
CRD 80,000 T SE
HGL 60,000 F E
HGL 17,000 F SE
HGL 60,000 T S
CRD 500,000 F NE
CRD 45,000 F E
CRD 100,000 T S
CRD 200,000 F SE
HGL 250,000 F SE
CRD 480,000 F E
CRD 400,000 F SE
HGL 107,000 T N
CRD 100,000 F SE
PRD 40,000 F E
HGL 60,000 F S
HGL 445,000 F SE
PRD 64,000 T S
CRD 670,000 F SE
CRD 600,000 F SE
HGL 100,000 T SE
HGL 300,000 T SE
HGL 450,000 F SW
HGL 300,000 F W
PRD 140,000 F N
PRD 108,000 T S
HGL 90,000 F SE
HGL 50,000 F N
HGL 240,000 T SE
HGL 200,000 T SE
CRD 900,000 F SE
CRD 120,000 F NE
PRD 250,000 T E
CRD 220,000 F N
HGL 300,000 F SE
HGL 90,000 T SE
PRD 32,000 T SW
HGL 400,000 T SE
HGL 240,000 T S
HGL 120,000 F NE
HGL 80,000 F E
PRD 21,000 T NE
HGL 15,000 F E
CRD 300,000 T S
CRD 220,000 T E
CRD 300,000 T SE
HGL 120,000 T S
HGL 300,000 F SE
CRD 1,000,000 F SE
HGL 400,000 F E
CRD 400,000 T S
CRD 250,000 T S
CRD 400,000 F E
CRD 370,000 T SE
CRD 250,000 T SE
CRD 170,000 F SE
HGL 100,000 T S
HGL 120,000 F S
CRD 1,500,000 F SE
CRD 800,000 T SE
CRD 150,000 T SE
CRD 830,000 T SE
CRD 700,000 F SW
CRD 125,000 F E
CRD 200,000 F N
CRD F W
HGL 150,000 T E
CRD 250,000 F E
CRD F S
PRD 45,000 F S
CRD 120,000 F SE
HGL 220,000 F SE
CRD 600,000 F W
HGL 125,000 T E
HGL 100,000 F W
CRD 200,000 F S
CRD 450,000 F SE
CRD 100,000 T SE
CRD 85,000 T SE
CRD 160,000 F E
CRD 350,000 T S
HGL 500,000 F SE
CRD 150,000 T S
CRD 70,000 T S
CRD 450,000 F SE
HGL 45,000 T SW
CRD 500,000 T SE
CRD 720,000 F SW
PRD 28,000 T SW
CRD 240,000 F W
CRD 275,000 F E
CRD T S
CRD 90,000 F N
CRD 150,000 F
HGL 90,000 F E
CRD 150,000 F SW
HGL F E
CRD F E
CRD F E
CRD F S
Notes
Carries crude from a rail facility in Stroud to Cushing (both in Oklahoma)
Goes from Hardisty in Alberta, Canada, down through Steele City, Nebraska, and to Patoka,
Illinois
Extended existing pipeline from Steele City, Nebraska, to Cushing, Oklahoma, and brought
capacity of theadded
Pump stations entire Q1system
2010up to Q2
and 591,000
2011.b/dCapacity increased from 109,800 b/d to 145,000
b/d
Connects LaGrange/Chisholm plant complex to West Texas Gateway pipeline
Provides connectivity between Freedom/Liberty Pipelines and fractionators at Mont Belvieu,
Texas,
Feederand Sweeny,
for West Texas
Texas Gulf System and Basin Pipeline
Capacity increased from 29,700 b/d to about 70,000 b/d
Installation of seven additional pump stations along the existing Sterling I natural gas liquids
product
Converted distribution pipeline
from a refined product pipeline. Leased from a third party by MPLX
Capacity increased from 180,000 b/d to 240,000 b/d of unfractionated natural gas liquids as a
result of additional
Converted 109 milespump stations
of natural gas pipeline to flow liquids, and the rest was new pipeline.
Initially originated in Dewitt county
Reversal of the existing Seaway Pipeline and went to itHouston
so that now flows (both in Texas).
north to southThe 27-mile (12-inch
diameter) Sweeney Lateral came online in January 2014 and created a new endpoint at the
Pump
Sweeney stations
Refineryadded in Q1
in Old 2012Texas.
Ocean, and Q3The 2012; capacity
15-mile increased
(24-inch to 160,000
diameter) Gonzales b/dExtension
and 175,000
b/d,
came respectively,
online in up
March from
2014 145,000
and b/d
created a new origin in Gonzales
New construction from Trenton, North Dakota, to Sheridan County, Montana, near the County, Texas. The 30-mile
(24-inch diameter)
Montana-Saskatchewan Helena Extension
border. came
Volumes
Goes from Cherokee to Cushing (both Oklahoma) online
are in
delivered September
to the 2014
existingand created
Poplar a new
Pipeline, origin
which
in Karnes to
connects County, Texas (which
the Wascana wasinconnected
Pipeline Saskatchewan.to theThe Double EagleWascana
Canadian Pipeline Pipeline
in 2015).was
The 10-
Provides
reversed connectivity
mile (10-inch
as part of thisbetween
diameter) Marshall
project Freedom/Liberty
so Lateral camevolumes
that crude Pipelines
online in and
theWest
December
from Texas
2015
Bakken and
playGateway
extended
are Pipeline
the
ultimately
and fractionators
Gonzales County
delivered to Regina
Samaria-to-Detroit at Mont
origin Belvieu,
northeast
in Saskatchewan
pipeline Texas, and Sweeny,
into Gonzales County
and Romulus-to-Detroit Texas
pipeline together make up the Detroit
Crude
Segment System
from Wink/Hendrick Texas, to Midland, Texas, had its capacity increased from
144,000 b/d toservice
Began partial 240,000 b/d.second
in the Segment halffrom Colorado
of 2012, with City, Texas, by
full service to the
Cushing,
end ofOklahoma, had its
2013. 140-mile
capacity
segment increased from 400,000 b/d to 450,000 b/d
About 120from miles Gardenadale to Three
of 8-inch pipeline in Rivers and then10,000
Ohio (capacity on to Corpus
b/d) andChristi
about(all80inmiles
Texas). A 35-
of 6-inch
mile segment
pipeline goes from Three Rivers to Enterprise's Lyssy Station in Wilson County, Texas
Capacityin West Virginia
increased (capacityb/d
from 256,000 7,000 b/d)
to 270,000 b/d. 20-inch diameter from Patoka to
Owensboro, Kentucky (140 miles), 24-inch
Capacity increased fromm 150,000 b/d to 400,000 b/d diameter fromas aOwensboro to Catlettsburg,
result of pump Ohio
station additions
(266
and miles)modifications
other
Originating in Winkler County, Texas, and terminating in Jackson County, Texas

140 miles of new (12-inch diameter) pipeline connected to 50 miles of existing (16- and 14-inch
diameter)
Convertedpipeline.
to crude Expandable to refined
from carrying 150,000products,
b/d. Oneand
segment goes from
also reversed. Gardendale,
Goes Texas,
from Crane to to
Three Rivers,
Houston (bothTexas.
in Another segment goes from Three Rivers to northern Karnes County,
Texas)
Capacity increased
Texas. A third fromgoes
segment 175,000
fromb/d to 245,000
Three Rivers tob/d to accommodate
Corpus Christi, Texas.Bakken NGL(12-inch
A 10-mile pipeline
deliveries. Five pump stations added, with some in service during Q1 2013
diameter) lateral was completed in Q1 2015 that connects the Double Eagle Pipeline to the
Kinder
NaturalMorgan Crude
gas liquids and Condensate
pipeline (KMCC) Pipeline
providing takeaway in Kernes
service from DCP County
Midstream, LLC and third-
party
Was still ramping up to full capacity in April 2014, as pump stations werealong
plants in the Permian and the Eagle Ford to fractionation facilities beingthe Texas Gulf
completed
Coast and the Mont Belvieu market hub
Goes from Byron to Cushing (both in Oklahoma)

Reconfiguration of Sterling I pipeline such that it can carry both mixed and purity natural gas
liquids
Includes(instead
gatheringof just purity
system products)
into Anadarko and Barnett basins. Captures volumes from Front
Range and Mid-American Pipeline
Reversal of the 250,000 b/d Houston, Texas, to Port Neches, Texas, segment (20-inch diameter,
87 miles)369
Includes so itmiles
now of
flows
neweast. Reversal
20-inch pipe, of theremainder
with 360,000 b/d Port Neches,
composed Texas,repurposed
of 14-inch to Houma, TE
Louisiana,
Products segment (22-inch
Pipeline pipe diameter, 213 miles) so it now flows east. The 260,000 b/d Houma
Pipeline originates
to Saint James, in Weldsegment
Louisiana, County, (18-inch
Colorado, and terminates
diameter, in remained
48 miles) Skellytown, Texas.north.
flowing There, it can
connect
Reversal
Flows fromwith
of thethe Mid-America
400,000
western Pipeline
b/d Houma
Oklahoma or the
to Clovelly
to Cushing, Texas Express
segment
Oklahoma Pipeline,
(24-inch with Mont
diameter, Belvieu
34 miles) so itinnow
Texas
flows as theThe
east. final destination
125,000 b/d for the natural
segment from gasoffshore
the plant liquid
Boxer mix
pipeline system to Houma (16-
Converted from product pipeline to carry only HGL
inch diameter) remained flowing north
New 100,000 b/d segment from Olympus platform to West Delta 143 platform (both in the Gulf
of Mexico)
Capacity increased from 90,000 b/d to 150,000 b/d
Capacity increased from 150,000 b/d to 175,000 b/d
Goes from near Barnhart to near Colorado City (both in Texas), where it connects to the
Centurion and BridgeTex pipelines
Extension of Keystone Pipeline that goes from Cushing, Oklahoma, to refineries in Port Arthur,
Texas. Expandable
Capacity increased to 830,000
from b/db/d to 350,000 b/d. Pipeline and pump modifications made to
275,000
accommodate 10-year ship-or-pay
A new interconnection commitments
point between on Mid-American
OneOK's Mont Belvieu, Texas,Pipeline
naturalto Hobbs,
gas liquidTexas
facilities
and several customers in the region
Capacity increased from 240,000 b/d to 275,000 b/d between Gardendale and Corpus Christi
(both in Texas)

Reversed the existing 40,000 b/d Wascana pipeline so that it flows north from the
Saskatchewan-Montana
Whole pipeline goes fromborder. ReversalTexas,
Mont Belvieu, done in tocoordination
Napoleonville, with the construction
Louisiana. This is theoffirst
the
Bakken
segment North Project, which connects to the Poplar Pipeline in Montana that in turn flows
Line
crude67over goesthe from Alberta,
border ontoCanada
the Wascanato Wisconsin.
pipelineUpgrading of pumps brought Canadian
capacity up from 450,000 b/d to
Line 67 goes from Alberta, Canada to Wisconsin. 570,000 b/d (north of the 3-mile
Upgrading of pumpssegment
broughtin North Dakota up
U.S. capacity
that
from connects the U.S. and Canadian pipeline)
Flows450,000
from Kildeerb/d toto570,000 b/d (south
a rail terminal westofofthe 3-mile segment
Dickinson in North
(both in North Dakota that connects
Dakota)
the U.S. and Canadian pipeline)
Goes from Colorado City to East Houston (both in Texas). Plains All American bought out
Occidental's
Reversed segment share ofhasthe projectof 95,000 b/d. The full pipeline stretches from Alberta, Canada,
capacity
through
Converted thefrom United States,
natural gasthen back into Canada at the Michigan-Ontario border. The reversal
was intially for only part of the pipeline, from Kankakee, Illinois to Fort Saskatchewan, Alberta,
Capacity
Canada. Later increased from
a short 400,000
section b/d to
to Saint 560,000
Anne, b/dwas
Illinois as areactivated
result of additional
to allow for pumping
interconnect
horsepower
with MPLX, sourcing diluent from eastern Ohio through the Cornerstone
Reconfiguration of Sterling II pipeline such that it can carry both mixed and purity natural gas project
liquids
Addition (instead
of second, of just purity)
parallel pipeline brought toal capacity up to about 150,000 b/d from
76,000
Capacity increased from 60,000Rose
b/d. SemGroup bought b/d to Rock Midstream
135,000 in 2016,installation
b/d through and is nowofthe project operator
additional pumping
Capacity increased from 70,000 b/d to 120,000 b/d as a result of adding pumps
Goes from Enbridge's Flanagan Terminal near Pontiac, Illinois, to Cushing, Oklahoma
Begins in Texas, goes through Oklahoma, then ends in Texas
Converted products pipeline to carry only HGL. Initially delivered propane; began shipping
ethane
Constructionin Q1 of 2016. 51 miles pipeline,
a loop/twin of 12-inch line toalong
mostly connect 8-inchroute
the same repurposed productsSeaway
as the existing line to
Houston,
Pipeline Pennsylvania
Pipeline goes from Hearne to Aldine to Nederland (all in Texas). Pipeline is a conversion and
reversal
Capacityof the old MagTex
increased from 225,000(whichb/d carried refinedb/d.
to 275,000 petroleum
New originproducts) product
point added in pipeline.
Barnhart,The
last
Texas five miles
(in addition to Nederland
to the Crane, are new construction
Extension of Mississippian Lime Texas,
Pipeline, origin). Goes to Houston
with capacity of 75,000 b/d, from Coldwater, Kansas,
to Byron, Oklahoma
Converted a natural gas pipeline and extended it. Capacity from Guernsey, Wyoming, to
Sterling,
Origins inColorado,
both North is 230,000
Dakota and b/d.Montana
Capacity from Sterling, Colorado, to Cushing, Oklahoma is
320,000 b/d. Starting in 2015, the Colorado lateral (capacity 90,000 b/d) interconnects with
Capacity
the main increased from 275,000
line at Sterling, Coloradob/d to 340,000 b/d between Gardendale and Corpus Christi
(both in Texas)
Goes from McCamey to Gardendale (both in Texas)
95-mile natural gas liquid (NGL) pipeline between existing NGL fractionation at Hutchinson,
Kansas,
Originating andat Medford,
the LoneOklahoma
Star terminal at Mont Belvieu and terminating at the Sunoco Logistics
Nederland liquefied
Goes from Weld County, petroleum
Colorado, gas export terminal
to Sterling, Colorado. This 90,000 b/d lateral joins the
230,000 b/d Pony Express Pipeline
Capacity increased from 200,000 b/d to 250,000 b/d segment from Guernsey, Wyoming,
"by managing to Sterling,
hydraulics where they
and pressure
both
flows feed
in the into the 320,000
pipeline". New b/d segment
laterals totoRed from Sterling
Bluff Lake to Cushing, Oklahoma
Capacity increased from 560,000 b/d 800,000 b/d and Lea County (both in Texas)
The pipeline has a preliminary design capacity of 15,000 b/d (expandable to 30,000 b/d). The
first
Whole 108-mile
pipeline leggoes
of the
frompipeline came into
Mont Belvieu, service
Texas, in April 2015. This
to Napoleonville, pipelineThis
Louisiana. originates at the
is the second
50 Buttes
segment Natural Gas Processing Complex near Gillette, Wyoming, and terminates at an
Line 67 goes from
interconnect Alberta,66’s
with Phillips Canada Powderto Wisconsin.
River Pipeline Upgrading of pumps
near Douglas, brought The
Wyoming. Canadian
Phillips 66
capacity
Powder
Line up from
Riverfrom
67 goes 570,000
Pipeline b/d
delivers
Alberta, Canadato 800,000
natural b/d (north
gas liquidsUpgrading
to Wisconsin. of the 3-mile
to Phillips 66’s segment
fractionation
of pumps in
broughtand North Dakota up
U.S.refining
capacity
that
complex
from connects
near
570,000 the U.S.
Borger, and
Texas.
b/d toto800,000 Canadian
The 50
b/dCity, pipeline).
Buttes
(south Plant
of the Capacity
is owned
3-milehas is bassed
by
segment on
Thunder heavy
Creek
in North Dakota crude;
Gas the totalLLC,
Services,
that Colorado
connects
Garden
capacity City, Texas,
can Canadian
be almost Colorado
890,000 of b/d ifTexas,
the is segment
pipeline ison 20-inch
carrying lightdiameter
crude pipeline,
also
the
City a
U.S. wholly
and
to Corsicana, owned subsidiary
pipeline).
Texas, has 24-inch Meritage
Capacity
diameter pipeline and the converted Red Seminolebe
bassed heavy crude; the total capacity can
Currently
almost 890,000 connects b/dEnterprise's
if the pipeline Midland-to-Sealy
is carrying lightPipeline
crude
Pipeline
Capacityto the Enterprise
increased Crude Houston
from 800,000 b/d to 950,000(ECHO)b/d. terminal
ThereinareHouston,
plans to Texas.
expandPart of theto
further
Midland-to-ECHO
1,200,000 pipeline system
b/d goes from Mont Belvieu, Texas, to Napoleonville, Louisiana. This is the third
Whole pipeline
and final segment
Connects Flanagan, Illinois, terminal to Griffith, Indiana, terminal (the latter was formerly the
beginning
Goes fromof Line 78)to a petroleum terminal hub near Patoka (both in Illinois)
Flanagan
Mainline loop from Wink to Midland (both in Texas) looped with 24-inch diameter pipeline to
bring total
Capacity capacity from
increased from300,000
240,000 b/d b/dto to600,000
600,000 b/d. b/d Expansion included a 20-inch loop of the
entire system, more pumping capacity, and a connection to the Cactus Pipeline in Gardendale,
Texas
Phase 1 (30-inch diameter) from Nederland, Texas, to Lake Charles, Louisiana. Phase 2 (24-inch
diameter)
Baden Storage completed
in Martin January
County,2019 fromtoLake
Texas CharlesTexas
Meridien, to Saint James, Louisiana
Project has three parts: new pipeline from Midland Hub, Texas, to Garden City, Texas (100,000
b/d, builtincreased
Capacity by SunVit), fromnew250,000
pipelineb/d from to Garden
280,000City b/dtoasLongview,
a result ofTexasa new(100,000
pump station b/d, built by
Sunoco), and reversal of existing pipeline so it flows from Longview, Texas, to Saint James,
Provides connectivity
Louisiana (160,000 b/d, fromdone MarkWest
by Exxon)Energy Partners, L.P.’s condensate stabilizer in Cadiz,
Ohio, and Utica
Goes from EastCounty,
Harrison Ohio’s fractionator
Ohio, to a Marathonin Scio, Ohio, which
refinery will serveOhio
in Canton, as Cornerstone’s initial
two origination points, to MPLX’s tank farm in East Sparta, Ohio, which then connects both to
Goes from Petroleum
Marathon Texas through Lea, New Mexico,
Corporation’s Canton, and Ohio, back into Texas
refinery and towhereother itpipelines
ends at Midland.
that service
Expandable
the Midwest
This to 200,000 b/d
segment goes from Platteville, Colorado, to Cushing, Oklahoma. 190,000 b/d is considered
to be theexpanded
Capacity Saddlehorn fromPippeline, and theb/d
from 250,000 other 150,000
to about b/d is b/d.
300,000 considered
Goes from to be the Grand
McCamey toMesa
Pipeline.
Gardendale The(both
second in segment, from Carr, Colorado, to Platteville came online in Q1 2017
Texas)
Goes from Longview, Texas, to Shreveport, Louisiana
Construction of another 8-mile stretch of pipeline, connecting MarkWest’s Hopedale, Ohio,
fractionation
Capacity increasedfacilityfromto Cornerstone.
around 250,000 This b/d
allowed more natural
to 280,000 b/d. In gasoline to flow
service since 1997,intopurchased
the
Cornerstone
by SpectraTexas, Pipeline,
in 2013. and increasing total capacity from 180,000 b/d to 230,000 b/d
Meridien, to Spectra
Mont Belvieu,mergedTexas with Enbridge in 2017. Connects to Platte Pipeline; the two
are sometimes thought of as one system
Goes from Alexander to East Fairview (both in North Dakota). Bidirectional, but initially flows
southwest.
164,000 b/dExpandable
capacity fortothe 100,000
first ~100 b/d miles (Casper, Wyoming, to Guernsey, Wyoming), then
down to 145,000
Goes from Cushing, b/dOklahoma,
for the remainder
to Longview, (Guernsey,
Texas Wyoming, to Wood River, Illinois).
Originally constructed in 1952
In December 2016, MPLX reversed the 50,000 b/d RIO Pipeline (250 miles, 8-inch diameter) to
provide
Capacityfurther
increased distribution
from 40,000 to theb/dMidwest
to 68,000 from b/dLima, Ohio. of
as a result MPLX is currently
additional pumps. constructing
Also added
additional
lateral to connectivity
Stateline gas and
plant expanding pipelines to provide diluent service to western Canada,
Capacity increasedtofrom
which is expected 249,000 b/d
be complete to 267,000 b/d
in 2017
Expanded pipeline segment between Reeves County, Texas, and Wink, Texas
Increased capacity of Houma, Louisiana, to Clovelly, Louisiana, segment from 400,000 b/d to
500,000
Increasedb/d capacity of Port Neches, Texas, to Houma, Louisiana, segment from 360,000 b/d to
375,000 b/d
The new 49-mile Harpster-to-Lima Pipeline is designed to transport condensate and natural
gasoline in a batched
This segment goes from system
Carr,from
Colorado,Harpster, Ohio, to aColorado.
to Platteville, tank farm190,000 in Lima,b/d Ohio, where it can
is considered to
then
be thecontinue
Saddlehorn on to refineries
Pippeline, in
and Ohio,
the Michigan,
other 150,000 Indiana,
b/d isand Illinois.
considered As
to part
be of
the the Utica
Grand MesaBuild-
Capacity
Out scope,increased
MPLX from also300,000 b/dcapacity
to 400,000 b/d product pipelines, including the East
Pipeline. The first has
segment, expanded
from Platteville toofCushing,
two Oklahoma, came online in Q3 2016
Sparta-to-Heath
Goes from EnLink’s andRiverside
Heath-to-Harpster
fractionatorpipelines
to Marathon to deliver into the Garyville
Petroleum’s new pipeline at Harpster
refinery (both in
Louisiana). EnLink constructed and operates the pipeline
Along with the Energy Transfer Crude Oil Pipeline, makes up the Bakken Pipeline. Expandable
to
686570,000 b/d
miles converted from natural gas pipeline, with 68 miles of new build. Along with the
Dakota
Capacity increased frommakes
Access Pipeline, 300,000 upb/d theto Bakken
390,000 Pipeline.
b/d. GoesExpandable
from McCameyto 570,000 b/d
to Gardendale (both
in Texas)
Expansion assumed on line 2. Total capacity of both White Clifff pipelines increased from
150,000
Capacity b/d to 215,000
increased fromb/d 125,000 b/d to 145,000 b/d. The first 5,000 b/d of the expansion came
online sometime between 2014 and late 2017. Increased volume comittments kicking in in
early 2018 spurred the capacity expansion, which was achieved with additional pumping
Partial service of 100,000 b/d in Q4 2017, with the final 40,000 b/d of capacity online in Q3
2018
Capacity increased from 280,000 b/d to 365,000 b/d as a result of adding three pump stations
and
JointaVenture
lateral between Plains all American and Phillips 66, sometimes called "STACK JV".
Expansion brought 2017;
Approved October capacity to 250,000
capacity already b/d (up from
exisited from100,000
previous b/d), and extended
upgrades, and was a portion
awaitingof
the pipeline
Presidential for 35 miles
permit. Line in Oklahoma
67 goes from Alberta, Canada to Wisconsin. Thisfirst
segment is the last 3
Completed according to Enbridge infrastructure map. Hess platform had oil in January
miles
2018 thatthree
and connect wellsNorth Dakota in
completed toQ1the2018;
Canadian
pipelineborder.
assumedIt brought the capacity
completed at the of thetime
same
Expandable
pipeline at the to 75,000
border b/d to about 800,000 b/d, up from 450,000 b/d, allowing the entire pipeline
to then flow
Segment at 800,000
of the EPIC NGLb/d. Capacity
Pipeline going is bassed on heavy
from Loving, Newcrude;
Mexico, thetototal
Orla,capacity
Texas. Two can beout of
almost
three of890,000
the b/d
project's if the
phases pipeline
(from is
DLKcarrying
Black light
River crude
Midstream
Segment of the EPIC NGL Pipeline going from Orla, Texas, to Crane, Texas. Two out of three of in Loving, New Mexico, to
Crane,
the Texas)phases
are complete and operating. The third phaseTexas)goes from Crane toand Corpus Christi,
Goesproject's
Texas, from Midland
andsegment
is slatedgoesto(from
for Sealy, Loving,
whereNew
completion by
Mexico,
it connects
Q3
tothe
to
2019.Christi,
Crane,
Rancho
Initially, that and
are complete
II pipeline
segment that
will goes
carry
operating.
down
crude, to will
and the
The third
Enterprise Crude Houston from Crane
(ECHO) to Corpus
terminal in Hereford,
Houston Texas,
(all in Texas).is slated
Togetherfor completion
with the the by Q3
Rancho
revert
Extension
2019. back ofto
Initially, Y-grade
Northeast
that segmentservice
Colorado in Q1 2020
lateral
willMidland-to-ECHO when
from
carry crude, and will the EPIC Crude
Colorado
revert System. Pipeline
to is finished
Platteville,
back to Y-grade and
Colorado.
serviceofin540,000 EPIC
Q1 2020
II
NGLpipeline,
Extension this
fractionator
to is is
have known
online
initial as the
capacity of aboutand 40,000 1b/d,
Pipeline
which Partial service
will eventually be increased to
when
b/d the
began EPIC Crude Pipeline is finished the EPIC NGL fractionator is online
80,000 b/din April 2018, with full service of 575,000 b/d in May 2018
Capacity increased from 365,000 b/d to 425,000 b/d as a result of partial looping of the
pipeline
Capacityand the addition
expanded of sevenb/d
from 215,000 newtopump 360,000 stations
b/d. The expansion was in steps; capacity first
increased to 345,000 b/d in mid-2018,
Goes from Lea County, New Mexico, to Midland, Texas. and was up to 360,000
Expandableb/d bytothe end ofb/d
350,000 the year.
Crude oil flows onto Woodpat from the Ozark Pipeline in Wood River, Illinois. Ozark had its
Capacity increased
capacity expandedto from aboutb/d
360,000 230,000
at theb/d same to time
360,000 b/d. Expansion
as Woodpat. Woodpat was runs
in steps; capacity
parallel to the
first
Roxpatincreased
Originally built to
Pipeline, 345,000
inwhich
2006, isclosed b/d of
part in Q2
the2018,
2015 samespill,
after and was
pipeline up to 360,000
system
reopened in 2018 b/d by the end of the year.
Connects to the Woodpat pipeline in Wood River, Illinois, which also had its capacity increased
110,000
to 360,000 b/db/d pipeline
at thelateral
same time. into Delaware
MPLX aquired Basin, theand expansion
Ozark Pipeline offrom
existing mainline
Enbridge system
in 2017
from
Capacity expansion through pumping and "related appurtenances" plus new lateral from and
285,000 b/d to 395,000 b/d to accommodate the lateral volumes using looping and
two new pumpLouisiana,
Napoleonville, stations to "nearby chemical plant"
Big Foot platform produced first oil in November 2018
Capacity increased from 400,000 b/d to 440,000 b/d
Pump enhancements expand capacity from 320,000 b/d to 400,000 b/d on the Guernsey,
Wyoming, to Cushing,
Capacity increased from Oklahoma
425,000 segment
b/d to 485,000 b/d as a result of partial looping of the
pipeline and the addition
Capacity increased from 175,000 b/d of seven new topump
192,000 stations
b/d
Capacity increased from 190,000 b/d to 250,000 b/d. Included additional natural gas liquids
gathering
Sunrise had system
an initialexpansion.
capacityConnects
of 350,000 Arbuckle
b/d from Pipeline
Midland, to Cajun-Sibon PipelineCity,
Texas, to Colorado in southeast
Texas. The
Texas
expansion
Capacity increased from 575,000 b/d to 620,000 b/d. Goes from Midland to Sealy, whereand
increases the capacity of the Midland-Colorado segment City by 500,000 b/d, it
adds a 500,000
connects to the b/d
Rancho segmentII from Colorado
pipeline that goes City
down totoWichita
the Falls, Texas
Enterprise Crude Houston (ECHO)
Capacity increased from 850,000 b/d to 950,000 b/d
terminal in Houston (all in Texas)
Converted part of 280,000 b/d natural gas liquid system (Seminole Red) to carry 200,000 b/d
crude. Began on-stream
Line brought partial service earlyintoFebruary
accommodate 2019, and is expected
volumes previouslyto becarried
running onatSeminole
full capacity
Red in
April 2019.
pipeline, This
which was project is
repurposedthe Midland-to-Sealy
to carry crude segment of the Midland-to-ECHO 2 Pipeline
Phase
System1project
(30-inch diameter)
(the Sealy-to-ECHOcompleted segmentApril 2016
usingfromexistingNederland,
capacityTexas,on theto Lake Charles,
Rancho II pipeline)
Louisiana. Phase 2 (24-inch diameter) from Lake Charles to Saint
Crane to Corpus Christi, Texas, will carry crude (capacity of 400,000 b/d) initially, and will revert James, Louisiana
back
97 mileto Y-grade service in Q1
system originating 2020at
in Ohio when the EPIC
MarkWest Crude
Cadiz andPipeline
Utica East is finished
Ohio Scio andfacilities
the EPICand NGL in
fractionator
Pennsylvania isatonline.
MarkWest The other
Houstontwo of the
facilty project's
connecting three
to phases
Monaca (from
Shell Loving,
Plant in New Mexico,
Pennyslvania
80-mile,
to Crane,16-inch
Texas) are Ironcomplete
Horse pipeline will consist
and operating andofdelivering
40 miles of new-build and 40 miles of gas-to-
HGL.
oil conversion pipeline running from Silver
Make segement of pipeline between Altoona, Pennsylvania and Pittsburgh, Creek’s Pronghorn Terminal to Guernsey (both bi-
Pennsylvania, in
Wyoming)
directional to access
(currently, Tallgras
it flowsgas Energy
west) Pony Express
with capacity crude
of 40,000 pipeline system.
b/d. Original The pipeline
capacity will have
of theinentire
Revolution
an is a system—wet
initialiscapacity ofb/dabout 100,000 in, barrels
liquids and residue
per day (bbl/d)gas andout—with a major
is expandable gastoplant
up 200,000 the
pipeline
middle and 180,000
a fractionator
bbl/d.Oak,
Shin In-service
which began in Q2 2019 operations earlier this year, completed the interconnection toethane
at Marcus Hook in southeast Pennsylvania. 30,000 b/d for Waha in
and
June, another
and began 30,000 moving b/d for propanes
Y-grade barrels plus estimated,
from that hubbut to not
Mont confirmed.
Belvieu. 110 miles and various
Conversion
diameters are of pipeline
for the wet that previously
gas carried
system delivering just
feednaphtha
gas toto thecarry refined products. The U.S.
gas plant
portion of the pipeline
Partial service in Q3 2019, is approximately
full service by34 Aprilmiles (Peñitas,
1, 2020. From Texas
Winkand to the
CorpusNuStar terminal
Christi and
approximately
Ingleside (all in 6 miles
Texas) north of downtown Edinburg, Texas). The pipeline crosses under the Rio
Construction
Grande. of the 30-inch
The border segmentdiameter subject to crude pipelinewould
the permit was completed
extend from onthe
February
center26, line2020
of theand
entered
Rio Grande
Addition into full service
of approximately
pumps alongon April
1.6
pipeline 1,increased
miles 2020.
to theCrude first
total will
mainlineflow shut-off
capacity on the 150,000
from dedicated
valve inb/d EPIC
the CrudeStates.
United
to 250,000 pipeline
b/d The
at an initial
Mexican capacity
portion of 600,000
ofCarlsbad,
the pipeline b/d
runs (and the EPIC NGL
approximately 12.5Crane
miles tobetween
Corpus Christi Riopipeline
theReeves Grande will
Interconnect
convert to from
natural gas liquids New Mexico,
service). natural
Capacity gas
will be processing
expandable plants
with to
additional County,
pumping to
crossing
Texas, and the
Grand PrixPEMEX
interconnectBurgos Gas Plant. Project will expand product range from naphtha to
900,000
From North
naphtha b/d. Remaining
plusTexas
liquefiedto Mont construction
Belvieugases
petroleum onof thethe
and project
Texas
other Gulf isCoast.
primarily
natural focused
Expandable
gas liquids. on installing
to 950,000
Presidential an
b/d
permit
additional
granted
From Reeves May 2.12017
million barrels
County, Texas, to of Johnson
operational County,storage,
Texas, bringing
wheretotal it willstorage
join thetoSouthern
7.5 million
barrels, as well as completing the East Dock that is
Oklahoma leg. Both will flow into the North Texas to Mont Belvieu leg, terminating expected to be operational in theatsecond
Targa's
half of 2020 adding
fractionation and storage hub the capability of loading Suezmax vessels
Presidential Permit granted June 2017 and extended on July 29, 2020. Will go 34 miles from
NuStar
Capacityterminal
increased at Peñitas,
from 280,000 Texas,b/d through the NuStar
to 370,000 b/d asterminal
a result at of Edinburg,
additionalTexas,
pumping thento12.5
miles south
accommodate of the Rio
increased Grande to
volumesto PEMEX terminal
onhydrocarbon
the Front Range at Reynosa,
Pipeline Mexico. Planned
and production to be
Converting aparallel
constructed natural gasthe
to pipeline
existing Burgos Pipeline gas
asliquid
muchpipeline
as possible to connectgrowth in the
the Lonesome
Anadarko
Creek gas regionNorth
plant, Dakota, to Stateline Gas Plant, North Dakota with through-access to
This is southern section of the Elk Creek Pipeline, going from the Powder River Basin in eastern
OneOK's
Wyoming Elk Creek
to pipeline pipeline
ONEOK’sdiameter existing Mid-Continent natural gas liquids facilities in Bushton, Kansas.
Telescoping with varying capacities along its length. Pipeline will diverge east
Intitial
in capacity
Kingfisher 240,000,
County to expansion
connect with capability
natural up
gas to 400,000
plants in Coalb/d with
County additional
and pump
Pittsburg facilities.
County,
Pipeline
Completed goes Julyfrom 2019 the Permian Basin in West Texas to both Corpus Christi and the
Oklahoma
Sweeney/Freeport area (both on the
Will go from near Midland to near BigTexas
SpringGulf Coast).
(both in Texas), where it will connect to the
proposed Red Wolf Crude Connector
According to project sponsors, the pipeline is expected to be completed by the end of 2020. To
be built roughly
Orignates in Adams parallel
County,to Mariner
Colorado East and2. connects
Once complete, pipelinePipeline
to Saddlehorn will complement the rest of
in Platteville,
the Mariner
Colorado, Eastflows
which system, allowingtofor
southeast shipment
Cushing, of condensate, Y-grade, and a slate of products
Oklahoma
Pumping
from ethane stations brought online throughout 2019, reaching 550,000 b/d total pipeline capacity
to distillate
by Q4 2019
Conversion from 70,000 b/d crude oil pipeline. SemGroup, the operator of White Cliffs,
converted
Conversionaof portion
an 8-inch of their pipeline
diameter systempipeline
propane to natural gas liquids
(capacity 20,000 (NGL)
b/d)service and
and a parallel, idle 6-
interconnected
inch diameter pipeline (capacity 12,000 b/d) to carry gasoline and diesel. Pipelines willwith
with Southern Hills Pipeline. The pipeline conversion and connection go from
Southern
Brownsville, Hills provides
Texas, to the anUnited
additional option for NGL
States-Mexico border takeaway
(Matamoros,to meet the growing needs of
Mexico)
Colorado’s Denver-Julesburg (DJ) Basin. Expandable to 120,000 b/d. As part of the project,
SemGroup constructed a 12-mile extension of White Cliffs Pipeline south of Cushing, Oklahoma
to interconnect with Southern Hills. DCP also constructed a 25-mile pipeline in the DJ Basin,
connecting its system to White Cliffs
530-mile natural gas liquids pipeline from the Mid-Continent to the Gulf Coast with initial
capacity of 400,000
This is northern b/d.ofExpandable
section the Elk Creek up to 1,000,000
Pipeline, going b/dfromwiththe additional
Willistonpump Basinfacilities.
(RichlandMore
than
County, 50% of initial
Montana) capacity
to the Powder is contracted
Rivernew under long-term,
BasinRobestown,
in eastern Wyoming. fee-based agreements
Connectsand to Elk Creek Phase
Ethane purity line originating at EPIC's Texas, fractionator terminating at
Ia(completed
Markham, in
Texas,Q3 2019).
HGL Intitial
storage capacity
hub 240,000, expansion capability up to 400,000 b/d with
Capacity increased
additional from 395,000 b/d to 475,000 b/d as a result of additional pumping stations
pump facilities
and complete
Increased looping
capacity on the Plantation Pipeline by 21,000 b/d from the Baton Rouge, Louisiana,
and Collins,
Capacity Mississippi,
increased fromorigin485,000 points
b/d to to the
500,000Roanoke,b/d as Virginia,
a resultareaof full looping of the pipeline
Reversal of 1,300,000 b/d pipeline so that it flows south. Initial capacity will be 300,000 b/d.
Light crude
Capacity willservice
increase expected
from 200,000 to beginb/d in to
"mid-2021"
420,000 b/d and an extension of the pipeline from
Memphis,
Planned to come online in stages, and be fully in where
Tennessee, to Collierville, Tennessee, serviceitby will
Q3connect
2020. The with300,000
the Capline
b/d pipeline.
This expansion
expansion is
will be in being done
addition at the same
to the existing time as the Capline
400,000 b/dFractionation reversal.
capacity Targeting light-service
189-mile,
mid-2021 16-inch
and heavy pipeline
service originating
in early 2022 at Mid-Continent & Storage LLC’s (MCF&S)
facility in Conway, Kansas, to Kingfisher County, Oklahoma.
510 mile 24 inch pipeline will orginate in Permian Basin in Texas and terminating Designed to transportat120,000
inlet tob/d
El
of natural
Centro gas liquids,
Fractionator nearexpandable
Corpus to 225,000
Christi, Texas. b/dInitial capacity 300,000 b/d
Will go from Crane to a terminal in Three Rivers then to Brownsville (all in Texas)
Pipeline extension completed ahead of schedule in Q3 2020 instead of Q4 2020 like originally
reported. Extensionannounced
Plains All American of the Lonethe Starproject's
NGL pipeline into the
suspension Permian
(not Basin, with
cancellation) originations
on 4/9/2020. Would
near
go fromWink, Texas,
Cushing, connecting
Oklahoma, to
to 30-inch
Corpus mainline
Christi, near
Houston, Fort
and Worth,
Beaumont Texas (all in Texas)
On hold as of January 2020. Proposed Voyager pipeline would comprise nearly 500 miles of
new 20-inch
Phillips diameter in
66 announced pipe linking
March 2020 thethatcompany’s terminals in
it was postponing Cushing,
making Oklahoma,
a final investment and decision
East
Houston,
on the Texas.Would
project. At Cushing,
connect Voyager
Saint would link
James, to the hub
Louisiana, Rockiesto and Bakken
muiltple via theinMMP-
refineries southern
Restoration
operated of line to historical
Saddlehorn Pipeline and capacity by replacingbasins
to Midcontinent the pipe by wayalong ofmost of the route.
Navigator’s Glass Only
Louisiana
365 miles in the United States. Goes from Edmonton, Alberta, Canada, to Superior, Wisconsin.
Mountainincrease
Capacity Pipelinefrom 950,000 b/d to 1,200,000 b/d. Expand pump stations to increase
Currently
capacity. seeking regulatory approvals. Expected second half of 2020
As of JuneAlso 2019, might needwas
pipeline to wait until Line
expected to be 3 (Replacement\Expansion)
in service in Q2 2020 with to get to full
a capacity of1.2 million
up to
b/d capacity.
600,000. Enbridge
Swordfish plans
Pipeline for the
would be full expansion
a multi-diameter to be completed in the second half of 2020
Capacity will increase from 400,000 b/d to 500,000 b/d (16-inch, as a result20-inch,
of adding andpump30-inch) batched
stations.
system
Pipeline with
will the ability
be extended to transport
farther northvarious levels
and additional of capacity,
natural from
gas approximately
liquid gathering 170,000 to
110-mile
600,000 extension
b/d of crude ofoilGrand
based Prix
on from
market southern
demands. Oklahoma
It would into
use “STACK”
mostly region ofpipeline
existing Central
infrastructure
Oklahoma where willitbe added to increase capacitynew between the Pipeline Mid-Continent market hub and
infrastructure
Owners
ArbuckleofII the Winkwill
along
pipeline with connect with
some new-build
to Webster pipeline,Williams’pipeline Bluestem
announced on October 15, 2020, to Conway,
that theKansas.
main
segment of the pipeline system has started transporting
Pipeline will go from the Cushing, Oklahoma hub to the Louisiana Gulf Coast Permian crude and condensate from
Midland, Texas, to Houston, Texas. 650-mile, 36-inch pipeline is designed to transport
Pipeline will be1.5
approximately reversed
milliontob/d flow of southeast
crude and from Alberta,The
condensate. Canada,
projectto will
Illinois.
havePipeline will also
origin points in
be
Winkconverted
Projectandproceedingto carry
Midland, but crude
Texas, with instead
multiple
multiple oflegal
diluent
destinations in the Would
challenges. Houston gomarket, including
from Hardisty, Webster,
Alberta,
Baytown
Canada, to
Lateral from and the Enterprise
Steele
Keystone City, Gulf
Nebraska, CrudeExtension
Coast Houston
where terminal,
it would
mainline inand
connect connectivity
with
Liberty, the
Texas, toHouston,
existing
to Texas CityTexas
Keystone and
system
Beaumont.
110 mile, 12-inch pipe from Loving County Texas to Midland (in Midland County), Texas.
Capacity
ParadigmtoMidstream
transport is 125,000
a JV betweenb/d. Paradigm and Phillips 66. The joint ventures are
developing the Palermo
Connects TC Energy's Houston Terminal Rail Terminal and tothe Sacagawea
Magellan system Pipeline. The terminal began rail-car
loading from truck deliveries at the end of 2015. The pipeline began operations in November
Partially
2016. in Service in Q4 2018 (150,000 b/d). Bypassing an uncompleted section of the pipeline
with smaller-diameter,
60 miles of transportation lower-pressure
pipeline, 50 more pipe. Permitting
of gathering. issues causing
Connects to delay
Medallion to fullWolfcamp
service
Connector System the
NuStar completed (gathering
secondsystem).stage of One its Westreport TexassaysIntermediate
starting at 250,000 export b/d expandable
project, a new 8-to
600,000
mile, b/d pipeline to transport crude oil from a connection to the Plains Cactus II long-haul
30-inch
Increased Valley Pipeline by 45,000 to 90,000 b/d. Expanded capacity by 75 miles loop segment
pipeline
and in Taft, Texas,
improvements to4pumpto NuStar’s
stations Corpus Christi, Texas, terminal
The Permian Express expansion, which adds 120,000 barrels per day of capacity from the
Permian
Goes from Basin
Crane to toGulf CoastChristi,
Corpus markets, both went into full
in Texas. Was service on October
completed Q3 2019 2019but initially carried
crude
24-mile,(capacity
24-inchofoil400,000pipelineb/d). that Converted
originates from to Y-grade serviceMidway
the Harvest in Q1 2020 whenand
Terminal the connects
EPIC Crude to
Pipeline
multiple was
oil finished
export and theinEPIC
terminals the NGL fractionator
Ingleside area, came online
including the Flint Hills Resources Ingleside
Permitting issues need to be resolved before the full capacity (275,000 b/d) is available
Terminal and the South Texas Gateway Terminal being developed by Buckeye Partners (all in
The Baymark
Texas). ethylenePipeline
The Ingleside pipelinealso willconnects
originatetoinmultiple the Bayport area of
terminals in southeast
the Midway Harris
and County,
Taft area.
Texas, and
Final capacity
Equality extend
Pipeline approximately
of 600,000
in Wyoming 90 miles to Markham, Texas,
b/d traverses about 190 miles from Hulett south to Guernsey. Thein Matagorda County
line has a 20-inch
Expansion of pipeline diameter capable of
from Midland, moving
Texas, as much
to the as 200,000
Enterprise Crudeb/d of crude
Houston oil. terminal in
(ECHO)
Construction
Houston, Texas began in November 2019 and was completed in August 2020
The Saddlehorn Pipeline is expanding by 100,000 Bbl/d, to a new total capacity of 290,000
Bbl/d.
Expanded Saddlehorn
existing is Reda group that consist
River Pipeline of Magellan,
capacity from 150,000 Plains to All235,000
American, b/dWestern
throughMidstream,
additions
and
to Black
pumping Diamond.
capacity. Magellan
In-service serves
third as operator
quarter of of
2020. the Saddlehorn
Joint venture pipeline
with Plains All American
Cushing Connect Pipeline & Terminal LLC is JV between Holly Energy and Plains All American,
and
and Delek
will66 Logistics
connect Partners
Holly's Tulsa refinery to Cushing (both in Oklahoma)
Phillips announced that it was deferring (but not canceling) the pipeline on March 24, 2020.
Liberty Pipeline would take crude from
On 5/5/2020 Marathon announced it is no longer persuing the Bakken and Rockies production
BANGL project.to Corpus Christi,
BANGL hadTexas
a
planned initial capacity of approximately 500,000 b/d and was expected to be operational in
late 2021. The pipeline would have moved Y-grade natural gas liquids from the Permian Basin
to the Sweeny, Texas, area
The South Bend Pipeline in North Dakota and Wyoming will run from Johnson Corner, North
Dakota,
Open seasontraveling southwest
annouced to Baker,
July 2019. Would Montana.
expandThe SouthCorridor
Western Bend Pipeline willSystem
Pipeline be aboutup 137
to an
miles long
additional and
70,000the 16-inch
b/d. Serviceline will be
expected capable
in Q2 of
2021 carrying 150,000 barrels of crude oil a day.
On
The9/9/2020
South Bend Enterprise
PipelineProduct
is scheduled announced it cancelled
for completion the project.
sometime in latePreviously,
2021 in May 2020,
Enterprise Product Partners had announced that it was deferring
Enterprise is currently evaluating expansion alternatives that would increase capacity the project by six months
by and
that
45,000it was
b/d. expected
The to start in
incremental the second
capacity is half of to
expected 2021.
be The project
achieved wouldimprovements
through have gone from and
Open
Midland,season started
Texas, to theonEnterprise
July 15, 2019. CrudeOptimizing
Houston (ECHO) the Dakota Access
terminal Pipeline to
in Houston, accommodate
Texas and be
modifications
increased to
volumes existing
could infrastructure
be done byCactus addingIIhorsepower alongTexas,
with atofew modifications and
expandable
Connects to 540,000
from Plains Allb/d
American's Pipeline at Taft, NuStar's North Beach
upgrades
terminal at pump
in Corpus stations along
Christi, Texas. the existing
Connection line. There
is expandable would be no mainline construction or
Reactivation
additional pipe and expansion
needed, andof the existing
maximum pipeline connecting
operating pressureNuStar's
wouldLaredo Terminal in South
not change
Texas
Connects andfrom
its Nuevo
PlainsLaredo TerminalCactus
All American's in Tamaulipas,
II PipelineMexico.
at Taft,The project
Texas, enteredSouth
to NuStar's partial service
Texas
in Q3 2019,
Crude System,andwhich
expansion
flows work
down onto the Odem,
NuStar's Dos Laredos,
North Beach and Nuevo
terminal in Laredo
Corpus pipelines
Christi, Texas
80-mile pipeline make
(which together connecting
up thethe Nederland
Nuevo LaredoTerminal
Project) was to the HoustontoShip
expected Channel (both
be completed in Q1 in2020.
Texas). Project downsized
The Odem and 25-mile,
Approximately Laredo pipelines to 275,000 b/d
carry product
12-inch pipeline in Q1
connecting 2020
from Corpusfrom
Carpenter,500,000-b/d
Christi and
to the Laredo
Wyoming, renamed "Ted
terminal,
to existing Ponyfrom
Collins
which
Express Link".
the
system Expected
Nuevo at Laredo inPipeline
Hereford, service fourth
Coloradobrings quarter
it across
(Platteville 2021
the United
extension) States-Mexico border
Orignates at Badger receipt point in southwest corner of Weld County, Colorado to Platteville,
Colorado
A 12-inch, 150,000 b/d bi-directional pipeline between the Lucerne West terminal in Colorado
and Platteville,
A 75-mile, Colorado.
16-inch diameter Shippers have the
NGL pipeline option
lateral and toassociated
either move barrelswith
facilities south from Lucerne
capacity of up to
West
90,000 to Platteville
barrels of or
NGL move
per barrels gathered on the Badger and Matador systems north from
Approximately
Platteville to 75 miles
Lucerne Westof pipeline connecting Midland, Texas, to Crane, Texas. 30 milesthe
day in Williams County, North Dakota. ONEOK estimates that of
project
new 20-inchbe operational
pipeline from by the fourthtoquarter
Midland Ector, of 2020and 45 miles of existing 18-inch pipeline
Texas,
from Ector to Crane
BWTX project includes two new 30-inch pipelines along 55 miles of onshore, inshore and
offshore
Section ofroutes,
pipelinean permitted
operationsfor facility
Motiva at Harbor
will be 30 Island
inchesandandtwo,theoffshore
sectionsingle
for TCpoint
Energymooring
is 36
buoys.
inches. The
Will mooring
begin at system
the Sunocois located
Logisticsapproximately
terminal on 21
the nautical
Twin miles
City east
Highway ofinthe entrance
Nederland to
and
Texas
the PortGulfLink,
of CorpusLLCChristi.
will transport oil to one of two floating Single Point Mooring (SPM) buoys in
end at Motiva’s
the Gulf of Mexico,terminal in Port Neches
approximately 37 miles(both in Texas),
offshore, via aa distance of nearlyfrom
42-inch pipeline 5 miles
a storage
facility near Jones Creek in Brazoria County, Texas.
Field Category Definition
ID Unique identifier
Project Name Name of the project
Project Developer(s) Name of the company or companies that filed for the project's open season
JV Joint venture
Project Type Conversion Pipelines that were converted from transporting one product to another (considered added capacity)
Expansion Projects that expanded mainline capacity and/or mileage, including pipeline twinning (additional pipes along the same right-of way). For expansions, pipeline
route information reflects the route of the expansion
New New pipeline system
Reversal Reversed pipeline flow (considered added capacity)
Other Unique or uncommon event, described in the Notes column
Status Announced When companies have publically announced projects
Canceled When projects have been canceled/abandoned
Completed When projects have been completed or put into service
Construction When projects are under construction
NNI No new information. When more than a year has elapsed since the announced in-service date, but there is no indication the project has come into service or
been canceled
On Hold Publically available information indicates that the project is postponed, but the company has not canceled the project
Start Year YYYY Announced or actual calendar year pipeline placed into service, based on company sources, government documents, or trade press
Start Quarter Announced or actual quarter pipeline placed into service, based on company sources, government documents, or trade press
Q1 January, February, and March
Q2 April, May, and June
Q3 July, August, and September
Q4 October, November, and December
State(s) States or territories the project passes through. In the case of expansions, this includes only states the where the expansion is built
Beg_State State or territory where the project origin is located. A project can have multiple beginning and end points
End_State State or territory where the project destination is located. A project can have multiple beginning and end points
Beg_Region Petroleum Area for Defense District (PADD) or international region where pipeline begins
End_Region PADD or international region where project ends
Miles Project estimated mileage based on company sources, government documents, or trade press. In the case of expansions, this column reflects only the length of
the expansion. When capacity is increased through addition of pump stations, length of pipeline affected is shown
Pipeline Diameter(s) Pipeline estimated diameter(s) in inches, based on company sources, government documents, or trade press. A number in parentheses indicates multiple
pipeline segments with the same diameter
Product Type CRD Project to carry crude oil and condensate
HGL Project to carry exclusively hydrocarbon gas liquids
PRD Project to carry any combination of batched products. Can include propane and other hydrocarbon gas liquids
Product Detail Further details about the products a pipeline can carry
LPG Liquefied petroleum gas (propane and butanes)
Purity For HGL. HGL product streams shipped and marketed as containing at minimum 90% of one type of HGL
Y-grade
For HGL. A raw mix of hydrocarbon gas liquids originating at natural gas processing facilities that requires further refining through a process called fractionation
Added Capacity New capacity added by the project. For new projects, this is the same as the total capacity. Reversals and conversions are considered added capacity. If different
segements of a pipeline expand by different amounts, this category lists the largest expansion. All volumes are approximate, and can vary based on the density
of the transported material. Units are in barrels per day (b/d).
Interstate T Interstate
F Intrastate
Flow Direction General direction of the flow of product