(套接拉耳详图)

REFERENCE DOCUMENTS:
DOCUMENT NO. TITLE

EMPLOYER : CONSULTANT : CONTRACTOR :

MOE & EDSA TRACTEBEL ENGINEERING S.A. SINOTEC-GTSCC JV


PROJECT:

LOT 2 - DESIGN, SUPPLY, INSTALLATION, AND COMMISSIONING OF ONE 66KV


OVERHEAD TRANSMISSION LINE BETWEEN BO AND KENEMA AND REHABILITATION OF

PROJECT NO.: P-SL-F00-007

TITLE:
66kV 直线型 SS3-15
66kV SUSPENSION STEEL POLE SS3-15

REVISION
B BAWA. A W.D. GANG.LI ERIC.WANG 29/04/2021 Included details on page 5/7&6/7

A W.D. W.D. GANG.LI ERIC.WANG 26/12/2019 ISSUED FOR APPROVAL

NO. DRAWN DESIGNED CHECKED APPROVED DATE NOTES/DESCRIPTIONS

SCALE: DRAWING NO.: SIZE PAGE NO. PAGE TOTAL


1:40 A3 6/7 3