Blast Id:P4185_005F4
Project Information
Site Name: CONSTANCIA Date: 9/05/2021 12:30: Shotfirer: JOSE CALAPUJA
Country: PERU Location: CUSCO d&b Resp.: EDGAR MAMANI
Explosive Ordering
Explosive Product Density Type Quantity
3
HA73G 1.15 g/cm bulk 11500.0 Kg
3
HA 55G 1.27 g/cm bulk 45450.0 Kg
3
HA 55 1.29 g/cm bulk 18600.0 Kg
Total 75550.0 Kg
Accessories Ordering
Product Type Quantity
Booster 450 Booster 118
Electronic Detonator Electronic 154
Detonating Cord
Product Gramature (g/m) Meters
Blast Resume
Bench High 15.01 m Volume 0.0 m3 Powder Factor 0.000 Kg/m3
Total of Holes 154 Tonnes 0.0 t Powder Factor INF Kg/t
3
Rock Density 2.50 g/cm Drilled Meters 2312 m Specific Drilling 0.0000 m/m3
Comments
Project Information
Site Name: CONSTANCIA Date: 9/05/2021 12:30: Shotfirer: JOSE CALAPUJA
Country: PERU Location: CUSCO d&b Resp.: EDGAR MAMANI
Project Information
Site Name: CONSTANCIA Date: 9/05/2021 12:30: Shotfirer: JOSE CALAPUJA
Country: PERU Location: CUSCO d&b Resp.: EDGAR MAMANI
Project Information
Site Name: CONSTANCIA Date: 9/05/2021 12:30: Shotfirer: JOSE CALAPUJA
Country: PERU Location: CUSCO d&b Resp.: EDGAR MAMANI
Project Information
Site Name: CONSTANCIA Date: 9/05/2021 12:30: Shotfirer: JOSE CALAPUJA
Country: PERU Location: CUSCO d&b Resp.: EDGAR MAMANI
Project Information
Site Name: CONSTANCIA Date: 9/05/2021 12:30: Shotfirer: JOSE CALAPUJA
Country: PERU Location: CUSCO d&b Resp.: EDGAR MAMANI
Project Information
Site Name: CONSTANCIA Date: 9/05/2021 12:30: Shotfirer: JOSE CALAPUJA
Country: PERU Location: CUSCO d&b Resp.: EDGAR MAMANI
Project Information
Site Name: CONSTANCIA Date: 9/05/2021 12:30: Shotfirer: JOSE CALAPUJA
Country: PERU Location: CUSCO d&b Resp.: EDGAR MAMANI
Project Information
(*)
America/Lima
Site Name: CONSTANCIA Date: 9/05/2021 12:30: Shotfirer: JOSE CALAPUJA
Country: PERU Location: CUSCO d&b Resp.: EDGAR MAMANI
Borehole Information
(*) Stemming Subdrillin o Azimuth Diameter Bulk Exp. Cartridge Total Exp.
Nr. Label User Date Depth (m) Angle ( ) o
(m) g (m) () (mm) (Kg) Exp. (Kg) (Kg)
3519 - - 15.0 4.0 0.0 0 0 270 0.0 0.0 0.0
3520 - - 15.0 4.0 0.0 0 0 270 0.0 0.0 0.0
3521 - - 15.0 4.0 0.0 0 0 270 0.0 0.0 0.0
3523 - - 15.0 4.0 0.0 0 0 270 0.0 0.0 0.0
3524 - - 15.0 4.0 0.0 0 0 270 0.0 0.0 0.0
3525 - - 15.0 4.0 0.0 0 0 270 0.0 0.0 0.0
3530 - - 15.0 4.0 0.0 0 0 270 0.0 0.0 0.0
3532 - - 15.0 4.0 0.0 0 0 270 0.0 0.0 0.0
3533 - - 15.0 4.0 0.0 0 0 270 0.0 0.0 0.0
3535 - - 15.0 4.0 0.0 0 0 270 0.0 0.0 0.0
3539 - - 15.0 4.0 0.0 0 0 270 0.0 0.0 0.0
3540 - - 15.0 4.0 0.0 0 0 270 0.0 0.0 0.0
3541 - - 15.0 4.0 0.0 0 0 270 0.0 0.0 0.0
3542 - - 15.0 4.0 0.0 0 0 270 0.0 0.0 0.0
3543 - - 15.0 4.0 0.0 0 0 270 0.0 0.0 0.0
3547 - - 15.0 4.0 0.0 0 0 270 0.0 0.0 0.0
3548 - - 15.0 4.0 0.0 0 0 270 0.0 0.0 0.0
3549 - - 15.0 4.0 0.0 0 0 270 0.0 0.0 0.0
3553 - - 15.0 4.0 0.0 0 0 270 0.0 0.0 0.0
3557 - - 15.0 4.0 0.0 0 0 270 0.0 0.0 0.0
Project Information
Site Name: CONSTANCIA Date: 9/05/2021 12:30: Shotfirer: JOSE CALAPUJA
Country: PERU Location: CUSCO d&b Resp.: EDGAR MAMANI
Explosive Cost
Explosive Product Quantity Unit Price Total
HA73G 11500.0 0.00 0.00
HA 55G 45450.0 0.00 0.00
HA 55 18600.0 0.00 0.00
Total 0.00
Accessories Cost
Accessories Product Quantity Unit Price Total
Booster 450 118 0.00 0.00
Electronic Detonator 154 0.00 0.00
Total 0.00
Drilling Cost
Diameter Meters Unit Price Total
270 2311.80 0.00 0.00
Total 0.00
Inputed Manually
Product Quantity Unit Price Total
Total 0.0
Extra Costs
Description Price Qty Total
Total 0.00
Cost Resume
Per hole 0.00 Per m3 NaN Per tons NaN
Explosive % NaN Accessories % NaN Drilling % NaN