You are on page 1of 11

CL-601-3A/3R (CIMMS)

Status Report S/N 5164 N113SR


OWNER: PMH LAND & OFFSHORE OPERATOR: PMH LAND & OFFSHORE
ADDRESS: VIRREYES 830 COL LOMAS DE ADDRESS: BLVD. MIGUEL ALEMAN 433-N1
CHAPULTEPEC TOLUCA EDO DE MEXICO 50226
1000
PHONE: 555-503-8771 PHONE:
FAX: FAX:

ANALYST: MAURICIO ALVAREZ +1-316-462-2410 (DIRECT) 800-787-9749 (EFAX-CARDS) PLEASE RECORD CHANGES TO ADDRESS, LAST
EMAIL: MALVAREZ@AVTRAK.COM 1-866-581-2267 (OFFICE) 631-980-4222 (EFAX-CARDS) ACTUALS (IF ANY) AND FAX THIS SHEET BACK TO
WWW.CAMPSYSTEMS.COM CAMP.
Filter Criteria: Special Requirement: INCLUDE SPECIAL REQUIREMENTS; With: WARRANTY;
AIRCRAFT SERIAL/REGNO: 5164/N113SR MODEL: CL-601-3A/3R (CIMMS) MANUFACTURER: BOMBARDIER INCORPORATED
DATES LAST ACTUALS CURRENT ACTUAL
CERTIFICATION DATE: 20-SEP-1994 8904.9 A/C HRS as of 08-JUL-2020 ______________ A/C HRS as of ____/____/________

6090 AFL as of 08-JUL-2020 ______________ AFL as of ____/____/________

6993 APH as of 02-MAR-2020 ______________ APH as of ____/____/________

APU SERIAL/PART: P-322C/3800804-1 MODEL: GTCP 36-150(CL) MANUFACTURER: HONEYWELL


INSTALLED ON 08-DEC-2006 LAST ACTUALS CURRENT ACTUAL
4357 APU HRS 6993 APU HRS as of 02-MAR-2020 ______________ APU HRS as of ____/____/________

0 APUS 0 APUS as of 02-MAR-2020 ______________ APUS as of ____/____/________

ENGINE NO. 1 SERIAL/PART: 807187/6078T27G01 MODEL: CF34-3A1 (CIMMS) MANUFACTURER: GENERAL ELECTRIC
INSTALLED ON 01-SEP-1994 LAST ACTUALS CURRENT ACTUAL
0 ENG. HRS 0 A/C HRS 8904.9 ENG. HRS as of 08-JUL-2020 ______________ ENG. HRS as of ____/____/________

0 ENC 6090 ENC as of 08-JUL-2020 ______________ ENC as of ____/____/________

ENGINE NO. 2 SERIAL/PART: 807180/6078T27G01 MODEL: CF34-3A1 (CIMMS) MANUFACTURER: GENERAL ELECTRIC
INSTALLED ON 23-MAY-2002 LAST ACTUALS CURRENT ACTUAL
3672.9 ENG. HRS 3799.6 A/C HRS 8756.9 ENG. HRS as of 08-JUL-2020 ______________ ENG. HRS as of ____/____/________

2681 ENC 6012 ENC as of 08-JUL-2020 ______________ ENC as of ____/____/________

BOMBARDIER¿ AND CHALLENGER¿ ARE TRADEMARKS OF BOMBARDIER, INC.

28-NOV-2020 © CAMP SYSTEMS

1 Of 11
Status Report ENGINE#1: S/N 807187
CL-601-3A/3R (CIMMS) S/N 5164 (N113SR): 8904.9 HRS, 6090 AFL as of 08-Jul-2020 8904.9 HRS, 6090 ENC
Owner/Operator: PMH LAND & OFFSHORE
Report Date: 28-NOV-2020
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ WARR COMPLIANCE NEXT DUE MAX
PART/SERIAL EXP (ENG/APU) A/C LIMIT
CHAPTER 72 ENGINE
ENGINE NO. 1 Model : CF34-3A1 (CIMMS) Serial # 807187 Part # 6078T27G01
72-00-00-207 NO. 1 ENGINE - VISUAL CHECK GENERAL -ENGINE EXTERNAL LINES,PORTS,FLANGES,CLAMPS,
BRACKETS,ELECTRICAL CONNECTORS,ENGINE SURFACE AND
ACCESSORIES.
(EFFECTIVITY: 5001 TO 5134)
MOS 20-SEP-1994
72.005 HRS/MSC N/A 0
MRB REF: See Workcard ENC 0

72-00-00-301 (s) NO. 1 ENGINE - COMPRESSOR WASH GENERAL - ENGINE PKG


PKG 5 MOS 30-JAN-2018
HRS/MSC 300 +40/-40 8746.7
REF: EMM 72-00-00 ENC 6015

+ 72-00-00-302 NO. 1 ENGINE - POWER ASSURANCE CHECK ENGINE - GENERAL (ENGINE MODEL CF34-1A/-3A/-3A2 ONLY).
MOS 03-JUN-2013
HRS/MSC N/A 8330.28
OPTIONAL REF: GENERIC NO REF ENC 5792

+ 72-21-00-233 (s) NO. 1 ENGINE - DETAILED INSPECTION ENGINE FAN BLADES FOR EVIDENCE OF FOD, PAYING SPECIAL ATTENTION PKG
TO BLADE LEADING EDGES
PKG 5 MOS 30-JAN-2018
HRS/MSC 300 +40/-40 8746.7
REF: See Workcard ENC 6015

72-21-00-234 (s) NO. 1 ENGINE - GENERAL VISUAL INSPECTION FAN ROTOR ASSEMBLY - ENGINE FAN SPINNER AND ATTACHING PKG
HARDWARE
PKG 5 MOS 30-JAN-2018
HRS/MSC 300 +40/-40 8746.7
REF: See Workcard ENC 6015

+ 72-23-00-238 (s) NO. 1 ENGINE - DETAILED INSPECTION FAN STATOR - ENGINE FAN STATOR FORWARD ENGINE MOUNTS FOR PKG
MOUNT CRACKS OR DISTORTION, AFT FAN CASE FOR CRACKS OR DISTORTION, SECURITY AND CONDITION OF
ATTACHING HARDWARE AND CONDITION OF ANTI-CORROSION COATING. (REF. G.E. M.M. SEI-780)
PKG 6 MOS 06-DEC-2017
HRS/MSC 600 +40/-40 8746.7
REF: See Workcard ENC 6015

?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W
(ENG/APU) = Engine/APU Units 2 Of 11
© CAMP SYSTEMS
Status Report ENGINE#1: S/N 807187
CL-601-3A/3R (CIMMS) S/N 5164 (N113SR): 8904.9 HRS, 6090 AFL as of 08-Jul-2020 8904.9 HRS, 6090 ENC
Owner/Operator: PMH LAND & OFFSHORE
Report Date: 28-NOV-2020
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ WARR COMPLIANCE NEXT DUE MAX
PART/SERIAL EXP (ENG/APU) A/C LIMIT
72-23-00-239 (s) NO. 1 ENGINE - GENERAL VISUAL INSPECTION FAN SHROUD - ENGINE FAN SHROUD CORE MATERIAL FOR PKG
CONDITION, SECURITY, HEAVY RUBS AND DAMAGE. (REF G.E. M.M. SEI-780)
PKG 5 MOS 30-JAN-2018
HRS/MSC 300 +40/-40 8746.7
REF: See Workcard ENC 6015

72-23-00-240 (s) NO. 1 ENGINE - DETAILED INSPECTION FAN CASE - EXTERIOR ENGINE FAN CASE FOR EVIDENCE OF CRACKS OR PKG
DISTORTION, PHYSICAL DAMAGE AND CORROSION.
PKG 6 MOS 06-DEC-2017
HRS/MSC 600 +40/-40 8746.7
REF: See Workcard ENC 6015

+ 72-23-00-241 (s) NO. 1 ENGINE - DETAILED INSPECTION FRONT FRAME - ENGINE FRONT FRAME FOR EVIDENCE OF CRACKING OR PKG
STRUCTURAL DETERIORATION
PKG 1 MOS 09-JUN-2009
HRS/MSC 3000 +40/-40 6888.6
REF: See Workcard ENC 4860

72-32-00-242 (s) NO. 1 ENGINE - DETAILED INSPECTION COMPRESSOR STATOR - ENGINE VGV ACTUATING ASSEMBLY UNISON PKG
RINGS AND LINKAGE
PKG 1 MOS 09-JUN-2009
HRS/MSC 3000 +40/-40 6888.6
REF: See Workcard ENC 4860

72-32-00-243 (s) NO. 1 ENGINE - DETAILED INSPECTION COMPRESSOR STATOR - ENGINE VGV'S AND STATIONARY VANES FOR PKG
RUBS AND INTERNAL DAMAGE USING BORESCOPE (AS FAR AS VISIBLE THROUGH EXISTING BORESCOPE PORTS).
PKG 1 MOS 30-DEC-2010
HRS/MSC 3000 +40/-40 7494.8
REF: See Workcard ENC 5279

72-32-00-244 (s) NO. 1 ENGINE - LUBRICATION COMPRESSOR STATOR - ENGINE VGV LINKAGE ROD END BEARINGS PKG
PKG 6 MOS 05-DEC-2017
HRS/MSC 600 +40/-40 8746.7
REF: See Workcard ENC 6015

?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W
(ENG/APU) = Engine/APU Units 3 Of 11
© CAMP SYSTEMS
Status Report ENGINE#1: S/N 807187
CL-601-3A/3R (CIMMS) S/N 5164 (N113SR): 8904.9 HRS, 6090 AFL as of 08-Jul-2020 8904.9 HRS, 6090 ENC
Owner/Operator: PMH LAND & OFFSHORE
Report Date: 28-NOV-2020
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ WARR COMPLIANCE NEXT DUE MAX
PART/SERIAL EXP (ENG/APU) A/C LIMIT
72-32-00-244 (s) NO. 1 ENGINE - LUBRICATION COMPRESSOR STATOR - ENGINE VGV LINKAGE ROD END BEARINGS PKG
PKG 6 MOS 05-DEC-2017
HRS/MSC 600 +40/-40 8746.7
REF: See Workcard ENC 6015

72-32-00-245 (s) NO. 1 ENGINE - DETAILED INSPECTION COMPRESSOR STATOR - ENGINE COMPRESSOR CASE FOR EVIDENCE PKG
OF CRACKS, DISCOLORATION OR DAMAGE. SPECIAL ATTENTION TO FLANGE AREAS.
PKG 1 MOS 09-JUN-2009
HRS/MSC 3000 +40/-40 6888.6
REF: See Workcard ENC 4860

72-32-00-246 (s) NO. 1 ENGINE - DETAILED INSPECTION COMPRESSOR STATOR - ENGINE BLEED AIR BOSS PKG
PKG 1 MOS 09-JUN-2009
HRS/MSC 3000 +40/-40 6888.6
REF: See Workcard ENC 4860

72-33-00-247 (s) NO. 1 ENGINE - DETAILED INSPECTION COMPRESSOR ROTOR - ENGINE COMPRESSOR BLADES FOR PKG
EVIDENCE OF FOD DAMAGE, CRACKS, RUBS, AND TIP CURLS, USING BORESCOPE.
PKG 1 MOS 09-JUN-2009
HRS/MSC 3000 +40/-40 6888.6
REF: See Workcard ENC 4860

72-41-00-249 (s) NO. 1 ENGINE - VISUALLY INSPECT COMBUSTOR SECTION FRAME - ENGINE COMBUSTER OVERBOARD DRAIN FOR PKG
EVIDENCE OF OIL LEAKAGE
PKG 5 MOS 30-JAN-2018
HRS/MSC 300 +40/-40 8746.7
REF: See Workcard ENC 6015

72-41-00-250 (s) NO. 1 ENGINE - DETAILED INSPECTION COMBUSTOR SECTION FRAME - ENGINE COMBUSTER OUTER CASE FOR PKG
CRACKS OR EVIDENCE OF DAMAGE
PKG 1 MOS 09-JUN-2009
HRS/MSC 3000 +40/-40 6888.6
REF: See Workcard ENC 4860

?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W
(ENG/APU) = Engine/APU Units 4 Of 11
© CAMP SYSTEMS
Status Report ENGINE#1: S/N 807187
CL-601-3A/3R (CIMMS) S/N 5164 (N113SR): 8904.9 HRS, 6090 AFL as of 08-Jul-2020 8904.9 HRS, 6090 ENC
Owner/Operator: PMH LAND & OFFSHORE
Report Date: 28-NOV-2020
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ WARR COMPLIANCE NEXT DUE MAX
PART/SERIAL EXP (ENG/APU) A/C LIMIT
72-42-00-251 (s) NO. 1 ENGINE - DETAILED INSPECTION COMBUSTION LINER AND STAGE 1 NOZZLE TO DETECT CRACKS, PKG
FRAGMENTATION, PHYSICAL OR THERMAL STRESS RELATED DAMAGE USING BORESCOPE.
PKG 1 MOS 30-DEC-2010
HRS/MSC 3000 +40/-40 7494.8
REF: See Workcard ENC 5279

72-42-00-252 (s) NO. 1 ENGINE - DETAILED INSPECTION THERMAL BLANKET - ENGINE THERMAL BLANKET COMPONENTS TO PKG
ENSURE INTEGRITY (REF. G.E. M.M. SEI-780)
PKG 5 MOS 30-JAN-2018
HRS/MSC 300 +40/-40 8746.7
REF: See Workcard ENC 6015

72-44-00-253 (s) NO. 1 ENGINE - DETAILED INSPECTION ENGINE MOUNTS - ENGINE REAR MAIN MOUNT FOR EVIDENCE OF DAMAGE PKG
AND CORROSION.
PKG 6 MOS 06-DEC-2017
HRS/MSC 600 +40/-40 8746.7
REF: See Workcard ENC 6015

+ 72-52-00-01 (s) NO. 1 ENGINE - SPECIAL DETAILED INSPECTION OF ENGINE STAGE 1 AND STAGE 2 ROTOR BLADES USING PKG
BORESCOPE
PKG 1 MOS 20-SEP-1994
HRS/MSC 3000 +50/-50 0
SYSTEM REF: AMM 72-52-00 ENC 0

72-52-00-256 (s) NO. 1 ENGINE - DETAILED INSPECTION HIGH PRESSURE TURBINE - ENGINE STAGE 1 AND 2 ROTOR BLADES USING PKG
BORESCOPE
PKG 1 MOS 30-DEC-2010
HRS/MSC 3000 +40/-40 7494.8
REF: See Workcard ENC 5279

72-53-00-257 (s) NO. 1 ENGINE - DETAILED INSPECTION TURBINE TRANSITION ASSEMBLY - EXTERIOR OF ENGINE TURBINE PKG
TRANSITION DUCT (REF. G.E. M.M. SEI-780)
PKG 1 MOS 09-JUN-2009
HRS/MSC 3000 +40/-40 6888.6
REF: See Workcard ENC 4860

?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W
(ENG/APU) = Engine/APU Units 5 Of 11
© CAMP SYSTEMS
Status Report ENGINE#1: S/N 807187
CL-601-3A/3R (CIMMS) S/N 5164 (N113SR): 8904.9 HRS, 6090 AFL as of 08-Jul-2020 8904.9 HRS, 6090 ENC
Owner/Operator: PMH LAND & OFFSHORE
Report Date: 28-NOV-2020
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ WARR COMPLIANCE NEXT DUE MAX
PART/SERIAL EXP (ENG/APU) A/C LIMIT
72-56-00-259 (s) NO. 1 ENGINE - GENERAL VISUAL INSPECTION EXHAUST COMPONENTS - ENGINE EXHAUST CENTER BODY FOR PKG
SECURITY AND EVIDENCE OF CRACKS, FRAGMENTATION, THERMAL DEFORMATION AND DAMAGE.
PKG 5 MOS 30-JAN-2018
HRS/MSC 300 +40/-40 8746.7
REF: See Workcard ENC 6015

72-60-00-260 (s) NO. 1 ENGINE - VISUAL CHECK ACCESSORY DRIVE - FOR PRESENCE OF OIL AT ENGINE SIX O'CLOCK DRAIN MAST. PKG
(REF. G.E. M.M. SEI-780)
PKG 5 MOS 30-JAN-2018
HRS/MSC 300 +40/-40 8746.7
REF: See Workcard ENC 6015

72-60-00-261 (s) NO. 1 ENGINE - DETAILED INSPECTION ACCESSORY DRIVE - ENGINE ACCESSORY GEARBOX MOUNTS (REF. G.E. PKG
M.M. SEI-780)
PKG 1 MOS 09-JUN-2009
HRS/MSC 3000 +40/-40 6888.6
REF: See Workcard ENC 4860

720070 NO. 1 ENGINE - LUBRICATE FAN BLADE TANGS


MOS 25-APR-2001
HRS/MSC A/R 3466
REF: ENC 2524

724010 NO. 1 ENGINE - DETAILED INSPECTION (FLUORESCENT PENETRANT) COMBUSTION CHAMBER FRAME
MOS 20-SEP-1994
HRS/MSC 0
REF: ENC 15000 0 (15000) 15000

724020 NO. 1 ENGINE - DETAILED INSPECTION (BORESCOPE) LPT BLADES AND VANES THRU BORESCOPE PORTS
MOS 24-FEB-2000
HRS/MSC A/R 2865
REF: ENC 2159

ENGINE NO. 2 Model : CF34-3A1 (CIMMS) Serial # 807180 Part # 6078T27G01

?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W
(ENG/APU) = Engine/APU Units 6 Of 11
© CAMP SYSTEMS
Status Report ENGINE#2: S/N 807180
CL-601-3A/3R (CIMMS) S/N 5164 (N113SR): 8904.9 HRS, 6090 AFL as of 08-Jul-2020 8756.9 HRS, 6012 ENC
Owner/Operator: PMH LAND & OFFSHORE
Report Date: 28-NOV-2020
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ WARR COMPLIANCE NEXT DUE MAX
PART/SERIAL EXP (ENG/APU) A/C LIMIT
72-00-00-207 NO. 2 ENGINE - VISUAL CHECK GENERAL -ENGINE EXTERNAL LINES,PORTS,FLANGES,CLAMPS,
BRACKETS,ELECTRICAL CONNECTORS,ENGINE SURFACE AND
ACCESSORIES.
(EFFECTIVITY: 5001 TO 5134)
MOS 01-SEP-1994
72.005 HRS/MSC N/A 0
MRB REF: See Workcard ENC 0

+ 72-00-00-301 (s) NO. 2 ENGINE - COMPRESSOR WASH GENERAL - ENGINE PKG


PKG 5 MOS 06-DEC-2017
HRS/MSC 300 +40/-40 8598.7
REF: EMM 72-00-00 ENC 5937

+ 72-00-00-302 (s) NO. 2 ENGINE - POWER ASSURANCE CHECK ENGINE - GENERAL (ENGINE MODEL CF34-1A/-3A/-3A2 ONLY). PKG
PKG 6 MOS 30-JAN-2018
HRS/MSC 300 +40/-40 8598.7
OPTIONAL REF: GENERIC NO REF ENC 5937

+ 72-21-00-233 (s) NO. 2 ENGINE - DETAILED INSPECTION ENGINE FAN BLADES FOR EVIDENCE OF FOD, PAYING SPECIAL ATTENTION PKG
TO BLADE LEADING EDGES
PKG 5 MOS 06-DEC-2017
HRS/MSC 300 +40/-40 8598.7
REF: See Workcard ENC 5937

72-21-00-234 (s) NO. 2 ENGINE - GENERAL VISUAL INSPECTION FAN ROTOR ASSEMBLY - ENGINE FAN SPINNER AND ATTACHING PKG
HARDWARE
PKG 5 MOS 06-DEC-2017
HRS/MSC 300 +40/-40 8598.7
REF: See Workcard ENC 5937

+ 72-23-00-238 (s) NO. 2 ENGINE - DETAILED INSPECTION FAN STATOR - ENGINE FAN STATOR FORWARD ENGINE MOUNTS FOR PKG
MOUNT CRACKS OR DISTORTION, AFT FAN CASE FOR CRACKS OR DISTORTION, SECURITY AND CONDITION OF
ATTACHING HARDWARE AND CONDITION OF ANTI-CORROSION COATING. (REF. G.E. M.M. SEI-780)
PKG 6 MOS 06-DEC-2017
HRS/MSC 600 +40/-40 8598.7
REF: See Workcard ENC 5937

?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W
(ENG/APU) = Engine/APU Units 7 Of 11
© CAMP SYSTEMS
Status Report ENGINE#2: S/N 807180
CL-601-3A/3R (CIMMS) S/N 5164 (N113SR): 8904.9 HRS, 6090 AFL as of 08-Jul-2020 8756.9 HRS, 6012 ENC
Owner/Operator: PMH LAND & OFFSHORE
Report Date: 28-NOV-2020
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ WARR COMPLIANCE NEXT DUE MAX
PART/SERIAL EXP (ENG/APU) A/C LIMIT
72-23-00-239 (s) NO. 2 ENGINE - GENERAL VISUAL INSPECTION FAN SHROUD - ENGINE FAN SHROUD CORE MATERIAL FOR PKG
CONDITION, SECURITY, HEAVY RUBS AND DAMAGE. (REF G.E. M.M. SEI-780)
PKG 5 MOS 06-DEC-2017
HRS/MSC 300 +40/-40 8598.7
REF: See Workcard ENC 5937

72-23-00-240 (s) NO. 2 ENGINE - DETAILED INSPECTION FAN CASE - EXTERIOR ENGINE FAN CASE FOR EVIDENCE OF CRACKS OR PKG
DISTORTION, PHYSICAL DAMAGE AND CORROSION.
PKG 6 MOS 06-DEC-2017
HRS/MSC 600 +40/-40 8598.7
REF: See Workcard ENC 5937

+ 72-23-00-241 (s) NO. 2 ENGINE - DETAILED INSPECTION FRONT FRAME - ENGINE FRONT FRAME FOR EVIDENCE OF CRACKING OR PKG
STRUCTURAL DETERIORATION
PKG 1 MOS 09-JUN-2009
HRS/MSC 3000 +40/-40 6741.1
REF: See Workcard ENC

72-32-00-242 (s) NO. 2 ENGINE - DETAILED INSPECTION COMPRESSOR STATOR - ENGINE VGV ACTUATING ASSEMBLY UNISON PKG
RINGS AND LINKAGE
PKG 1 MOS 09-JUN-2009
HRS/MSC 3000 +40/-40 6741.1
REF: See Workcard ENC

72-32-00-243 (s) NO. 2 ENGINE - DETAILED INSPECTION COMPRESSOR STATOR - ENGINE VGV'S AND STATIONARY VANES FOR PKG
RUBS AND INTERNAL DAMAGE USING BORESCOPE (AS FAR AS VISIBLE THROUGH EXISTING BORESCOPE PORTS).
PKG 1 MOS 30-DEC-2010
HRS/MSC 3000 +40/-40 7346.3
REF: See Workcard ENC 5201

72-32-00-244 (s) NO. 2 ENGINE - LUBRICATION COMPRESSOR STATOR - ENGINE VGV LINKAGE ROD END BEARINGS PKG
PKG 6 MOS 05-DEC-2017
HRS/MSC 600 +40/-40 8598.7
REF: See Workcard ENC 5937

?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W
(ENG/APU) = Engine/APU Units 8 Of 11
© CAMP SYSTEMS
Status Report ENGINE#2: S/N 807180
CL-601-3A/3R (CIMMS) S/N 5164 (N113SR): 8904.9 HRS, 6090 AFL as of 08-Jul-2020 8756.9 HRS, 6012 ENC
Owner/Operator: PMH LAND & OFFSHORE
Report Date: 28-NOV-2020
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ WARR COMPLIANCE NEXT DUE MAX
PART/SERIAL EXP (ENG/APU) A/C LIMIT
72-32-00-244 (s) NO. 2 ENGINE - LUBRICATION COMPRESSOR STATOR - ENGINE VGV LINKAGE ROD END BEARINGS PKG
PKG 6 MOS 05-DEC-2017
HRS/MSC 600 +40/-40 8598.7
REF: See Workcard ENC 5937

72-32-00-245 (s) NO. 2 ENGINE - DETAILED INSPECTION COMPRESSOR STATOR - ENGINE COMPRESSOR CASE FOR EVIDENCE PKG
OF CRACKS, DISCOLORATION OR DAMAGE. SPECIAL ATTENTION TO FLANGE AREAS.
PKG 1 MOS 09-JUN-2009
HRS/MSC 3000 +40/-40 6741.1
REF: See Workcard ENC

72-32-00-246 (s) NO. 2 ENGINE - DETAILED INSPECTION COMPRESSOR STATOR - ENGINE BLEED AIR BOSS PKG
PKG 1 MOS 09-JUN-2009
HRS/MSC 3000 +40/-40 6741.1
REF: See Workcard ENC

72-33-00-247 (s) NO. 2 ENGINE - DETAILED INSPECTION COMPRESSOR ROTOR - ENGINE COMPRESSOR BLADES FOR PKG
EVIDENCE OF FOD DAMAGE, CRACKS, RUBS, AND TIP CURLS, USING BORESCOPE.
PKG 1 MOS 09-JUN-2009
HRS/MSC 3000 +40/-40 6741.1
REF: See Workcard ENC

72-41-00-249 (s) NO. 2 ENGINE - VISUALLY INSPECT COMBUSTOR SECTION FRAME - ENGINE COMBUSTER OVERBOARD DRAIN FOR PKG
EVIDENCE OF OIL LEAKAGE
PKG 5 MOS 10-APR-2017
HRS/MSC 300 +40/-40 8598.7
REF: See Workcard ENC 5937

72-41-00-250 (s) NO. 2 ENGINE - DETAILED INSPECTION COMBUSTOR SECTION FRAME - ENGINE COMBUSTER OUTER CASE FOR PKG
CRACKS OR EVIDENCE OF DAMAGE
PKG 1 MOS 09-JUN-2009
HRS/MSC 3000 +40/-40 6741.1
REF: See Workcard ENC

?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W
(ENG/APU) = Engine/APU Units 9 Of 11
© CAMP SYSTEMS
Status Report ENGINE#2: S/N 807180
CL-601-3A/3R (CIMMS) S/N 5164 (N113SR): 8904.9 HRS, 6090 AFL as of 08-Jul-2020 8756.9 HRS, 6012 ENC
Owner/Operator: PMH LAND & OFFSHORE
Report Date: 28-NOV-2020
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ WARR COMPLIANCE NEXT DUE MAX
PART/SERIAL EXP (ENG/APU) A/C LIMIT
72-42-00-251 (s) NO. 2 ENGINE - DETAILED INSPECTION COMBUSTION LINER AND STAGE 1 NOZZLE TO DETECT CRACKS, PKG
FRAGMENTATION, PHYSICAL OR THERMAL STRESS RELATED DAMAGE USING BORESCOPE.
PKG 1 MOS 30-DEC-2010
HRS/MSC 3000 +40/-40 7346.3
REF: See Workcard ENC 5201

72-42-00-252 (s) NO. 2 ENGINE - DETAILED INSPECTION THERMAL BLANKET - ENGINE THERMAL BLANKET COMPONENTS TO PKG
ENSURE INTEGRITY (REF. G.E. M.M. SEI-780)
PKG 5 MOS 10-APR-2017
HRS/MSC 300 +40/-40 8598.7
REF: See Workcard ENC 5937

72-44-00-253 (s) NO. 2 ENGINE - DETAILED INSPECTION ENGINE MOUNTS - ENGINE REAR MAIN MOUNT FOR EVIDENCE OF DAMAGE PKG
AND CORROSION.
PKG 6 MOS 06-DEC-2017
HRS/MSC 600 +40/-40 8598.7
REF: See Workcard ENC 5937

+ 72-52-00-01 (s) NO. 2 ENGINE - SPECIAL DETAILED INSPECTION OF ENGINE STAGE 1 AND STAGE 2 ROTOR BLADES USING PKG
BORESCOPE
PKG 1 MOS 01-SEP-1994
HRS/MSC 3000 +50/-50 0
SYSTEM REF: AMM 72-52-00 ENC 0

72-52-00-256 (s) NO. 2 ENGINE - DETAILED INSPECTION HIGH PRESSURE TURBINE - ENGINE STAGE 1 AND 2 ROTOR BLADES USING PKG
BORESCOPE
PKG 1 MOS 30-DEC-2010
HRS/MSC 3000 +40/-40 7346.3
REF: See Workcard ENC 5201

72-53-00-257 (s) NO. 2 ENGINE - DETAILED INSPECTION TURBINE TRANSITION ASSEMBLY - EXTERIOR OF ENGINE TURBINE PKG
TRANSITION DUCT (REF. G.E. M.M. SEI-780)
PKG 1 MOS 09-JUN-2009
HRS/MSC 3000 +40/-40 6741.1
REF: See Workcard ENC

?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W
(ENG/APU) = Engine/APU Units 10 Of 11
© CAMP SYSTEMS
Status Report ENGINE#2: S/N 807180
CL-601-3A/3R (CIMMS) S/N 5164 (N113SR): 8904.9 HRS, 6090 AFL as of 08-Jul-2020 8756.9 HRS, 6012 ENC
Owner/Operator: PMH LAND & OFFSHORE
Report Date: 28-NOV-2020
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE ADJ WARR COMPLIANCE NEXT DUE MAX
PART/SERIAL EXP (ENG/APU) A/C LIMIT
72-56-00-259 (s) NO. 2 ENGINE - GENERAL VISUAL INSPECTION EXHAUST COMPONENTS - ENGINE EXHAUST CENTER BODY FOR PKG
SECURITY AND EVIDENCE OF CRACKS, FRAGMENTATION, THERMAL DEFORMATION AND DAMAGE.
PKG 5 MOS 06-DEC-2017
HRS/MSC 300 +40/-40 8598.7
REF: See Workcard ENC 5937

72-60-00-260 (s) NO. 2 ENGINE - VISUAL CHECK ACCESSORY DRIVE - FOR PRESENCE OF OIL AT ENGINE SIX O'CLOCK DRAIN MAST. PKG
(REF. G.E. M.M. SEI-780)
PKG 5 MOS 10-APR-2017
HRS/MSC 300 +40/-40 8598.7
REF: See Workcard ENC 5937

72-60-00-261 (s) NO. 2 ENGINE - DETAILED INSPECTION ACCESSORY DRIVE - ENGINE ACCESSORY GEARBOX MOUNTS (REF. G.E. PKG
M.M. SEI-780)
PKG 1 MOS 09-JUN-2009
HRS/MSC 3000 +40/-40 6741.1
REF: See Workcard ENC

720070 NO. 2 ENGINE - LUBRICATE FAN BLADE TANGS


MOS 01-SEP-1994
HRS/MSC A/R 0
REF: ENC 0

724010 NO. 2 ENGINE - DETAILED INSPECTION (FLUORESCENT PENETRANT) COMBUSTION CHAMBER FRAME
MOS 01-SEP-1994
HRS/MSC 0
REF: ENC 15000 0 (15000) 15078

724020 NO. 2 ENGINE - DETAILED INSPECTION (BORESCOPE) LPT BLADES AND VANES THRU BORESCOPE PORTS
MOS 26-FEB-2000
HRS/MSC A/R 2865
REF: ENC 2159

?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W
(ENG/APU) = Engine/APU Units 11 Of 11
© CAMP SYSTEMS