Toolbox talk (stage 3 RA) has been conducted with all personnel involved in the operation
The Rockwater 2 has been mobilized in accordance with mobilization procedure and has
completed DP trials in accordance with Rockwater 2 standard operating procedure.
Saturation Divers are ready to perform the job.
Vessel is in DP at correct position for transponder stand deployment.
All required survey data is displayed on the ship Navigation screen.
A beacon is attached to the crane wire.
Sub – Task #1 Divers Deployment
1. Position vessel at work location BR
2. Bell to be deployed at location. DS
Diver to go out of the bell and look at the work location, using nav DS
3.
data and mini beacon
Sub – Task #2 Temporary frame preparatory work on deck
Insert a transponder fitted with a centralizing collar in frame
4. DF
receptacle. Secure transponder with rope.
5. Connect tag lines to the transponder frame as required DF
6. Attach light stick and strobe to the rigging. DF
Sub – Task #2 Temporary frame deployment
“This document is the property of TEPNG. It must not be reproduced or transmitted to others without written authorization from
the Company”
DSV Rockwater 2 – Survey and Positioning Document Identification Number
Procedure NG-018-XX-GLO-203012
Revision: 00 Status: IFR
Document Type: PRC System/Subsystem: 00 Discipline: PLR Rev. Date: 14-April-2014
“This document is the property of TEPNG. It must not be reproduced or transmitted to others without written authorization from
the Company”
TRANSPONDER TEMPORARY STRUCTURE TYPE.2
RI-01
11.6T WLL MASTER LINK
RI-04 RI-04
4T WLL 2m EWL FIBER SOFT SLING 4T WLL 2m EWL FIBER SOFT SLING
RI-03
4.75T WLL SHACKLE RI-03
4.75T WLL SHACKLE
PIPELINE FLANGE
SUPPORT BRACKET
FORMAT/
NG-018-SK-00001-02 SCALE REV.AA 21/05/12
TRANSPONDER TEMPORARY STRUCTURE TYPE.3
RI-01
11.6T WLL MASTER LINK
RI-04 RI-04
4T WLL 2m EWL FIBER SOFT SLING 4T WLL 2m EWL FIBER SOFT SLING
RI-03
4.75T WLL SHACKLE RI-03
4.75T WLL SHACKLE
PIPELINE FLANGE
SADDLE BRACKET
FORMAT/
NG-018-SK-00001-03 SCALE REV.AA 21/05/12
TRANSPONDER TEMPORARY STRUCTURE TYPE.1
RI-01
11.6T WLL MASTER LINK
RI-02 RI-02
10T MBL 2m EWL WIRE ROPE SLING 10T MBL 2m EWL WIRE ROPE SLING
RI-03
4.75T WLL SHACKLE RI-03
4.75T WLL SHACKLE
SEABED FRAME
ASSEMBLY
FORMAT/
NG-018-SK-00001-01 SCALE REV.AA 21/05/12
Figure 1: Metrology female receptacle on riser side.
DETAILS
Approver MSV_Rockwater2 OCM Reference Procedures/Task IMCA 010 Diving from a DP vessel
Plans Metrology Procedure
Reference No R028669
Local Reference
Project Total - OFON Phase 2
Operation Diving
Location Rockwater 2
Description of Activity Deploying Transponders for metrology
Area on Site Vessel - Dive Control
MEETING DETAILS
Page 1 of 3
HSE Risk Assessment 30/05/2014
TASKS
Page 2 of 3
HSE Risk Assessment 30/05/2014
Page 3 of 3