You are on page 1of 16

Abort and Contingencies

1
PASSAGE PLANNING
4. PLANNING (2)

o Aborts and Contingencies

> Aborts= « Point of no return »*

> Contingencies*

2
PASSAGE PLANNING
Position fixing*
> Radar Conspicuous
4. PLANNING (3) objects and Visual
Navaids*
> Landfall lights
> Primary method
> Radar targets*
> Secondary > Buoyage*
method > Fix frequency*
> Fix regularity*
> Reporting points to
relevant authority
> Anchor clearance*
> Pilot Boarding areas
> Tug engagement
> Traffic areas

3
PASSAGE PLANNING
Position fixing

4. PLANNING (4)
o Transits (Ranges)* o Echo sounder
o Compass error o Chart overcrowding
o Leading lines o Planning book*
o Clearing marks o Conning Notebook*
o Head marks* o Master’s approval
o Clearing bearings o Plan changes*
o Range of lights* o AIS
o Geographical
range*

4
PASSAGE PLANNING

5. EXECUTING ETA for tide

ETA for Daylight

Traffic conditions
Tactics: Destination ETA

Tidal Streams

Plan modification

Additional Personnel

Briefing

Fatigue

Passage/Voyage preparation

Bridge preparation
5
PASSAGE PLANNING
Bridge preparation
> Passage plan and supporting info in hand*
> Chart table equipment in order and to hand*
> Ancillary watchkeeping equipment in order and to hand*
> Monitoring and recording equipment*
> Master gyro fully operational and repeaters aligned
> Magnetic compass checked
> All instrument illumination lamps operational*
> Navigation and signal lights
> Electronic navigational equipment
> Echo sounder and logs equipment
> Check the scanners are clear, switching on radars*
> Control equipment ie telegraph/combinator/thrusters/steering gear
> Communication equipment*
> Testing the whistle
> Windows wipers operational and windows clean
> Clocks synchronisation
> Worplace in order
> AIS ship’s data
> Any relevant new on Telex/Fax/Navtex
> Advise Master that the bridge is ready

6
PASSAGE PLANNING
o Fixing method
o Visual bearings
Monitoring o
o
Regularity
Estimated position
the ship’s progress o Soudings
o Cross track error
= o Colreg
o Non-navigational emergency
o Time management (ETA)
o Look-out
o UKC
Ensuring the ship is o Way points
o Transits (Ranges)
following the o Leading lines
pre-determined o Clearing marks and bearings
o Rising/dipping distances (lights)
Passage Plan o Light sectors
o The use of GPS*

7
PASSAGE PLANNING

In the end of passage plan training trainee will require to give answers on the
questions mentioned in the beginning of the training:

1.What is passage plan?


2.What is the use of it ?
3.Who is responsible for preparations, issuing, checking,
reading, confirming of PP?
4. What is responsibility of every OOW concerning PP?
5. Where information for PP can be found?

13/05/2021 8
PASSAGE PLANNING
Own ship characteristics on departure
CMA CGM THALASSA 11000 TEU

> LOA= 347.20 m


> BREADTH= 45.20 m
> FSAH speed: 24.3 Knots
> GM= 2 m
> Max draught: 15.5 m

Owned Fleet Weekly Status 9


PASSAGE PLANNING
Main SMS Bridge Procedures

> Bridge-010-Organization of the watch at sea


> Bridge-020-Master s standing orders
> Bridge-030-Watch at sea
> Bridge-040-Taking over the watch
> Bridge-045-Taling over the watch check-list
> Bridge-075-Passage Plan-Example
> Bridge-120-Coastal And Restricted Waters Navigation
> Bridge-180-Under Keel Clearance
> Bridge-200-Position Fixing Intervals
> Bridge-210 Safe Passing Distance
> Bridge-220-Air Draft Clearance

Owned Fleet Weekly Status 10


PASSAGE PLANNING
Bridge 200-Position Fixing Intervals (1)

> Grounding line: The contour of water depths on


passage equal to 1.2 x Draft.

> Coastal Waters: Coastal waters are defined as


the waters between 5 and 20 miles from any
grounding line.

> Restricted Waters: Restricted waters are


within 5 miles from any grounding line.

Owned Fleet Weekly Status 11


PASSAGE PLANNING
Bridge 200-Position Fixing Intervals (2)

PFI < 15 KNOTS > 15 KNOTS


OPEN SEA 1 HOUR 1 HOUR

CONSTRAINED 20 MIN 12 MIN


WATERS
RESTRICTED <= 6 MIN <= 6 MIN
WATERS

Owned Fleet Weekly Status 12


PASSAGE PLANNING
FMCL 053-012 UKC

Owned Fleet Weekly Status 13


PASSAGE PLANNING*
CMA CGM PORT CARDS

Owned Fleet Weekly Status 14


PASSAGE PLANNING DEVELOPMENT
FOLLOW UP
Module
VRB 3.40 PASSAGE
PLAN
VRB-
PASSAGE
PLAN
V1.0

VRS

SHIP TRACKING

Owned Fleet Weekly Status 15


THANK YOU FOR YOUR
ATTENTION

Together sailing to the brigther future

13/05/2021 16

You might also like