You are on page 1of 16
PROJECT MANAGEMENT (C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW. Note: The daily contractor activities planning review must be conducted between the SA project team, SA HSE representative and main contractor and cover all planned and unplanned activities for the respective day. The review must also cover all work being conducted by sub-contractors and work that is planned outside of SA facilities (boundaries) Reference: 001886 Date (02-05-2021 Division: HO & UPD Bi BI-28-15011-01 Main ENision Contractor: ‘Shine Solution, Sahet Guan ‘Sub: Contractors: Daily Activities Control High Risk | Measures in Place Yes | No | Yes | No Downspout installation and repair-35,36,37 No | YES Bathtub repair-143,145,104,103 Activities Roof drain strainer installation-inside villa- 180,182,184,186 ZONE-C | Bathtub testing-inside villa-144 ~ ZONEC | Waterline repair and testing-66,68,70 angle valve installations and cosmetic WORK ~INSIDE villa-116 118 Local mosque | Drainage pipe installation Firefighting pipe installation Friday mosque | Drainage pipe installation Firefighting pipe installation 2D This Form must be retained and logged within the project activities planning log book PROJECT MANAGEMENT (C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW Departments Name Signofure MFC~ E-Vision-Mechanical t we Saal fwd HSE- Hameed Saeed HCO: Mechanical Engineer Engr Ahmed Abbas SAPMT-Project Engineer engr.mahmoud al hawsah ee ZL PROJECT MANAGEMENT. (C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW " Note: The daily contractor activities planning review must be conducted between the SA project team, SA HSE representative and main contractor and cover all planned and unplanned activities for the respective day. The review must also cover all work being conducted by sub-contractors and work that is planned outside of SA facilities (boundaries) Reference: 00 18 87 Date: 02/may/2021 Division: | HO & UPD. Bi BI-28-15011-01 Main Contractor: _| SYSTEM SECURITY SOLUTIONS COMPANY Sub-Cont: Daily Activities Control Activities High Risk | seasuresin INSIDE WORK: PVC Conduit Rectification for Intercom, Door Bell Frame, No Villa No. 4-043, 052, 053. EXTERNAL WORK: HOPE Conduit Rectification with Mandrel Checking, Villa No. 4-003, 004, 096, 007. EXTERNAL WORK: U-Guard & Fiber Box Installation & Preparation. Villa No. 4-088, 090, 092, 094, 097, 099, 101. INSIDE WORK: Door Bell Push Button Installation & Termination, Villa No. 4-044, 046, 048, 050. INSIDE WORK: Outlet Devices Installation & Termination for DATA/IPTW/TEL & SMATV. Villa No. 4-059, 061, 064. EXTERNAL WORK: HH Inside Cleaning & Painting H.H~ 024 & 25, This Form must be retained and logged within the project activities planning log book Departments Name Signature MFC - 35 ~ Ibrahim Abu Anz Eng. Hamid Saeed Engr. Venkat / MA KHAN Engr. Marvin Canite Saudi Aramco: Company General Use (ar) PROJECT MANAGEMENT (C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW Note: The daily contractor activities planning review must be conducted between the SA project team, SA HSE representative and main contractor and cover all planned and unplanned activities for the respective day. The review must also cover all work being conducted by sub-contractors and work that is planned outside of SA facilities (boundaries) Reference: 001888 Date : May 2, 2021 1 Division HO & UPD Bi: BI-28-15011-01 Main Contractor: ‘ABDULLA AL-MISHAL ‘Sub-Contracto Daily Activities Control High Risk | Measures in Place Yes | No | Yes | No Activities Zone-C: 153 ~ 159, 70 SPLIT UNIT INSTALLATION viv Zone-A: 76, 78, 91, 93 ‘Aluminium Cladding Zone-A: $0, $1 Fresh Air Filter Installation | Zone-C: 69, 70, 77, 154 Grilles installation inside villa / Zone-C: 147, 152 ‘Termination of ACCU Connections 2 Saudi Aramco: Company General Use (ar) PROJECT MANAGEMENT (C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW This Form must be retained and logged within the project activities planning log book Departments ‘Signature MFC Eng. Wagar | WA HSE Eng, Hamid Saeed Hco Eng. Mohamed Ashraf | eng, Mahmood Alhawsah fF“ ‘Saudi Aramco: Company General Use (ar) PROJECT MANAGEMENT (C&PPD) -DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW Note: The daily contractor activi ies planning review must be conducted between the SA project team, SA HSE representative and main contractor and cover all planned and unplanned activities for the respective day. The review must also cover all work being conducted by sub-contractors and work that is planned outside of SA facilities (boundaries) Reference: 0018 Date: (02-MAY-2021 Prepared by KHWAJA AMMAN JAN 8 9 | Contractor ‘ABSAR | Division: HO & UPD ARAMCO (INC-2) BI: Br-28-15011 Main Contractor: ‘ABSAR ‘Sub-Contractors: NA Daily Activities ‘Area Control High Risk | Measures Activities ities Yes | No | Yes | No ZoNEC och(23,2734,35,3637) CANT STRIP/MASONARY WORK ON MAIN ROOF a e This Form must be retained and logged within the project activities planning log book Reviewing part Reviewed by Position ‘Company Signature Eng. KHWAJA AMMAN JAN SITE ENGINEER ‘ABSAR HAMID SAEED SAFETY SUPERVISOR HCO Eng. MOHAMMED IMRAN CIVIL ENGINEER HCO Eng. BANDER MOHAMMED SAPMT ‘ARAMCO_ PROJECT ENGINEER F PROJECT MANAGEMENT (C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW Note: The daily contractor activities planning review must be conducted between the SA project team, SA HSE representative and main contractor and cover all planned and unplanned activities for the respective day, The review must also cover all work being conducted by sub-contractors and work that is planned outside of SA facilities (boundaries). Reference: vote 90 Date 05200 Sion! HO & UPD al 8128-1501 01 main Within Contractor: Sub: Contractors Daly Anion Control ‘Area (ZONE A) Activites ee nea Yes | No_| Yes | No 50525657 Cosmetic Repair ey) 136] Tataotion of Sareate Marble Envancos& Internal) Wet wats Ceram es lalial 55-53 Fabrication of celling access panels V V see Final coat paints of walls and ing IW 88-84-86, Installation of false wall gypsum board J y Departments Nome Signature mc ARMED NAGUIB eee ere vse amo wico RonIT sAPMT MOHAMMAD DARWISH pA audi Avarco: Company General Use (ap) PROJECT MANAGEMENT (C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW Note: The daily contractor activities planning review must be conducted between the SA project team, SA HSE representative and main contractor and cover all planned and unplanned activities for the respective day. The review must also cover all work being conducted by sub-contractors and work that is planned outside of SA facilities (boundaries) References 001891 Date : (02/05 / 2021 Diviston: HO & UPD 8: BI-28-15011-01 Main Contractor: WITHIN / ZONE B Sub-Contractors: Dally Activities Control High Risk | Measures We Activities in Place Yes | No | Yes | No 6-175,177,018,009 ,01,186,187,204,017 CLEANING viv /205,215,185,014,069 025,022,016,014,182 170, 172, 174, 176, 178, 181, 183, 185, v 187, 66, 188, 190, 67, 69, 188, Internal painting v 206, 207, 192, 193, 194, 195, 12, 14, 16, a v 11, 173, 175, 177, 202, 203, 204, 205 | FLOOR @wall tiles v 213, 215, 21, 66, 67, 69, 68, 209, 198, | Stairmarble v 189, 200, 201, 195, 194 |v 195, 194, 193, 192, 197, 190 Plaster repair @housekeeping v | v (lap) PROJECT MANAGEMENT (C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW This Form must be retained and logged within the project activities planning log book Departments Name MFC- SHERIF HSE HAMID BUSHRA DARWISH PROJECT MANAGEMENT (C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW. Note: The daily contractor activities planning review must be conducted between the SA project team, SA HSE representative and main contractor and cover all planned and unplanned activities for the respective day. The review must also cover all work being conducted by sub-contractors and work that is planned outside of SA facilities (boundaries) “Referens 001892 Date: 02/05/2021 Division: HO & UPD a Bi: BI-28-15011-01 Z Main Contractor: Within construction co. ZONE C ‘Sub-Contractors: Daily Activities Control High Risk | Measures in Area Activities sinh Yes [No | Yes | No 154, 161, 165, 156, 167, 168, 160, 158, 153, 155, 07, 157, 06, 166, 159, 87, 82, 65, 67, 44, 146 Internal wet area, External ceiling v v 139, 168, 166, 140, 141,142, 143, 157, 15 Dry and wet area tiles and marble work 43,44, 45, 46, 47,48, | 49, 50, 80, 82, 103, 105, 19, 18, 17, 15, 65 Repair plaster @housekeeping 39, 40, 41, 130, 129, 128, 127, 126, 139, 140, 144, 142, 143 Internal wall and ceiling painting BOUNDRY WALL PAINT 20, 21, 23, 24, 25, 26, 28, 29, 30, 41, 40, 39, 37, 36, 35, 34, 33, 32 Interlock work “_| <<) <<) < a| a] <4/ = = | jaudi Aramco: Company General Use (ap) PROJECT MANAGEMENT (C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW _ ‘WThis Form must be retained and logged within the project activities planning log book Departments, Name _ Senature? WFC. Engr Sharef Zo HSE MR Hamid HCO. ENGR M Bushra ‘SAPMT ENGR Yaser Yasir H. Abu Hawzabl Gh engin audi Aramco: Company General Use (wp) PROJECT MANAGEMENT (C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW Note: The daily contractor activities planning review must be conducted between the SA project team, SA HSE representative and main contractor and cover all planned and unplanned activities for the respective day. The review must also cover all work being conducted by sub-contractors and work that is planned outside of SA facilities (boundaries) 001893 02-05-2021 Reference: Date: HO & UPD. BL-28-15011-01 Within Main Contractor: Sub Contractors: Daily Activities Control Measures in Place Yes Yes | No) Area! Activites peaks (Friday mosque ) ‘wot lek wor carted pa | Roof Scaffolding ey Derr rook ‘waterproofing [ro [toot GRC [Toilet fo.3 HVAC Concrete work Pump room Departments Name Signature MFC - AHMED Shouman HSE HAMID HCO ROHIT SAPMT Yaser Saudi Aramco: Company General Use (ar) Saud Aramco Pre! PROJECT MANAGEMENT (C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW Note: The daily contractor activities planning review must be conducted between the SA project team, SA HSE representative and main contacor and cover all planed and unplanned setts for the respective day. The review must also cover all work being condicted by sub-contractors and work tha is planned outside o SA faltigsxyngares) joes Reference Date: 02-05-2021 [ibivsioniiiaiia] HO & UPD [Blin] B-28-15011-01 Main Within Contractor: ‘Sub- Contractors Daily Activities Area Aativities ren (Leal mosque ) Yes Toot TE Thad OA, [Roof Scaffolding avec Lt pernered V Departments Name MFC- AHMED Shouman ise van ss utco Row ees SAPMT Yaser pee Yasir H, Abu Hawzah | faus Aramco: Company General Use Be ee ar) snus eee Pr i PROJECT MANAGEMENT (C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW Note: The daily contractor activities planning review must be conducted between the SA project team, SA HSE representative and main contractor and cover all planned and unplanned activities for the respective day. The review must also cover all work being conducted by sub-contractors and work that is planned outside of $A facilities (boundaries) 5 eran Totes Date 5052001 EXEL TORU Es 3128-1501001 Main Contractor: | Arfed a Sub-Contractors: Daly Actives Cool Areauone 4) Actives HEE esac 8 Yes [No | Yes | No 135-136-138 Installation of Aluminum Doors & windows Viv 1155-158-160 Installation of wooden doors accessories V V | 8-115 — aatin of cave Rana wood | usaiets jooden caps Viv | 92-93 Installation of Steel doors Lexan sheets V V 1 140 Installation of Staircase handrail Viv This Form must be retained and logged within the project activities planning log book Departments Name Signature Mc aaeiNauky cee vst Hamid HCO Be Rohit 6 = ff sAMT Mohammad Darwish 4 Do | laudi Avamco: Company General Use (ap) PROJECT MANAGEMENT (C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW Note: The daily contractor activities planning review must be conducted between the SA project team, SA HSE representative and main contractor and cover all planned and unplanned activities for the respective day. The review must also cover all work being conducted by sub-contractors and work that is planned outside of SA facilities (boundaries) Reference: 001896 Date: 02 /05 /2021 Divisions “HO & UPD Bi BI-28-15011-01 Maincontractor: | ARFAD /zone Cc Sub-Contractors: Daily Activities Control High Risk | Measures in Place Yes [No | Yes | No v 143, 144, 145, 146, Metalideots v 147,149 136, 52, 159, 153, Stair Handrail WORK ¥ 156, 158 iv: ‘Area Activities 76, 78, 80, 82, 81, Vv 180, 115, 117, 119, 120, 121, 112, 113, Stanless steel 114, 124, 125 03, 04, 05, 06, 07, Glass Block t 43, 44, 45, 46, 47, v 48, 49, 50, 52, 53, 124, 125, 132, 170, ‘Aluminum Work v 471, 172, 128, 129, v 130, 70, 72, 71, 75 103, 105, 77, 78, viv pares Wooden doors | 85, 86, 87, 170, m,t72 e (lap) PROJECT MANAGEMENT (C&PPD) - DAILY CONTRACTOR ACTIVITIES EEANNING een 101, 99, 89, 24, 25, 130, 107, 81, 85 Kitchin carcass | This Form must be retained and logged within the project activities planning log book Departments Name Signature MFC Eng. Sharef ae HSE MR Hamid z az HCO ENGR M Bushra EB SAPMT ENGR Yaser (uw) Yasir H. Abu Hawzah Ci Enger

You might also like