PROJECT MANAGEMENT
(C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW.
Note: The daily contractor activities planning review must be conducted between the SA project team,
SA HSE representative and main contractor and cover all planned and unplanned activities for the
respective day. The review must also cover all work being conducted by sub-contractors and work that
is planned outside of SA facilities (boundaries)
Reference: 001886
Date (02-05-2021
Division: HO & UPD
Bi BI-28-15011-01
Main ENision
Contractor:
‘Shine Solution, Sahet Guan
‘Sub:
Contractors:
Daily Activities
Control
High Risk | Measures
in Place
Yes | No | Yes | No
Downspout installation and repair-35,36,37 No | YES
Bathtub repair-143,145,104,103
Activities
Roof drain strainer installation-inside villa-
180,182,184,186
ZONE-C | Bathtub testing-inside villa-144
~ ZONEC | Waterline repair and testing-66,68,70
angle valve installations and cosmetic WORK ~INSIDE
villa-116 118
Local mosque | Drainage pipe installation
Firefighting pipe installation
Friday mosque | Drainage pipe installation
Firefighting pipe installation
2D
This Form must be retained and logged within the project activities planning log bookPROJECT MANAGEMENT
(C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW
Departments Name Signofure
MFC~ E-Vision-Mechanical
t
we Saal fwd
HSE- Hameed Saeed
HCO: Mechanical Engineer Engr Ahmed Abbas
SAPMT-Project Engineer engr.mahmoud al hawsah ee ZLPROJECT MANAGEMENT.
(C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW
"
Note: The daily contractor activities planning review must be conducted between the SA project team,
SA HSE representative and main contractor and cover all planned and unplanned activities for the
respective day. The review must also cover all work being conducted by sub-contractors and work
that is planned outside of SA facilities (boundaries)
Reference: 00 18 87
Date: 02/may/2021
Division: | HO & UPD.
Bi BI-28-15011-01
Main
Contractor: _| SYSTEM SECURITY SOLUTIONS COMPANY
Sub-Cont:
Daily Activities
Control
Activities High Risk | seasuresin
INSIDE WORK: PVC Conduit Rectification for Intercom,
Door Bell Frame, No
Villa No. 4-043, 052, 053.
EXTERNAL WORK: HOPE Conduit Rectification with
Mandrel Checking,
Villa No. 4-003, 004, 096, 007.
EXTERNAL WORK: U-Guard & Fiber Box Installation &
Preparation.
Villa No. 4-088, 090, 092, 094, 097, 099, 101.
INSIDE WORK: Door Bell Push Button Installation &
Termination,
Villa No. 4-044, 046, 048, 050.
INSIDE WORK: Outlet Devices Installation &
Termination for DATA/IPTW/TEL & SMATV.
Villa No. 4-059, 061, 064.
EXTERNAL WORK: HH Inside Cleaning & Painting
H.H~ 024 & 25,
This Form must be retained and logged within the project activities planning log book
Departments Name Signature
MFC - 35 ~ Ibrahim Abu Anz
Eng. Hamid Saeed
Engr. Venkat / MA KHAN
Engr. Marvin Canite
Saudi Aramco: Company General Use
(ar)PROJECT MANAGEMENT
(C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW
Note: The daily contractor activities planning review must be conducted between the SA project
team, SA HSE representative and main contractor and cover all planned and unplanned activities for
the respective day. The review must also cover all work being conducted by sub-contractors and work
that is planned outside of SA facilities (boundaries)
Reference: 001888
Date : May 2, 2021 1
Division HO & UPD
Bi: BI-28-15011-01
Main Contractor: ‘ABDULLA AL-MISHAL
‘Sub-Contracto
Daily Activities
Control
High Risk | Measures
in Place
Yes | No | Yes | No
Activities
Zone-C: 153 ~ 159, 70
SPLIT UNIT INSTALLATION viv
Zone-A: 76, 78, 91, 93 ‘Aluminium Cladding
Zone-A: $0, $1 Fresh Air Filter Installation
| Zone-C: 69, 70, 77, 154 Grilles installation inside villa
/
Zone-C: 147, 152 ‘Termination of ACCU Connections
2
Saudi Aramco: Company General Use
(ar)PROJECT MANAGEMENT
(C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW
This Form must be retained and logged within the project activities planning log book
Departments ‘Signature
MFC Eng. Wagar | WA
HSE Eng, Hamid Saeed
Hco Eng. Mohamed Ashraf
| eng, Mahmood Alhawsah fF“
‘Saudi Aramco: Company General Use
(ar)PROJECT MANAGEMENT
(C&PPD) -DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW
Note: The daily contractor activi
ies planning review must be conducted between the SA project team,
SA HSE representative and main contractor and cover all planned and unplanned activities for the
respective day. The review must
also cover all work being conducted by sub-contractors and work that
is planned outside of SA facilities (boundaries)
Reference: 0018
Date: (02-MAY-2021
Prepared by KHWAJA AMMAN JAN
8 9 | Contractor ‘ABSAR |
Division:
HO & UPD ARAMCO (INC-2)
BI:
Br-28-15011
Main Contractor:
‘ABSAR
‘Sub-Contractors:
NA
Daily Activities
‘Area
Control
High Risk | Measures
Activities ities
Yes | No | Yes | No
ZoNEC
och(23,2734,35,3637)
CANT STRIP/MASONARY WORK ON MAIN ROOF
a e
This Form must be retained and logged within the project activities planning log book
Reviewing part
Reviewed by
Position ‘Company Signature
Eng. KHWAJA AMMAN JAN
SITE ENGINEER ‘ABSAR
HAMID SAEED
SAFETY SUPERVISOR HCO
Eng. MOHAMMED IMRAN
CIVIL ENGINEER HCO
Eng. BANDER MOHAMMED
SAPMT ‘ARAMCO_
PROJECT ENGINEER FPROJECT MANAGEMENT
(C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW
Note: The daily contractor activities planning review must be conducted between the SA project
team, SA HSE representative and main contractor and cover all planned and unplanned activities for
the respective day, The review must also cover all work being conducted by sub-contractors and work
that is planned outside of SA facilities (boundaries).
Reference: vote 90
Date 05200
Sion! HO & UPD
al 8128-1501 01
main Within
Contractor:
Sub:
Contractors
Daly Anion
Control
‘Area (ZONE A) Activites ee nea
Yes | No_| Yes | No
50525657 Cosmetic Repair ey)
136] Tataotion of Sareate Marble Envancos& Internal) Wet
wats Ceram es lalial
55-53 Fabrication of celling access panels V V
see Final coat paints of walls and ing IW
88-84-86, Installation of false wall gypsum board J y
Departments Nome Signature
mc ARMED NAGUIB eee ere
vse amo
wico RonIT
sAPMT MOHAMMAD DARWISH pA
audi Avarco: Company General Use
(ap)PROJECT MANAGEMENT
(C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW
Note: The daily contractor activities planning review must be conducted between the SA project team, SA
HSE representative and main contractor and cover all planned and unplanned activities for the respective
day. The review must also cover all work being conducted by sub-contractors and work that is planned
outside of SA facilities (boundaries)
References 001891
Date : (02/05 / 2021
Diviston: HO & UPD
8: BI-28-15011-01
Main Contractor: WITHIN / ZONE B
Sub-Contractors:
Dally Activities
Control
High Risk | Measures
We Activities in Place
Yes | No | Yes | No
6-175,177,018,009
,01,186,187,204,017 CLEANING viv
/205,215,185,014,069
025,022,016,014,182
170, 172, 174, 176, 178, 181, 183, 185, v
187, 66, 188, 190, 67, 69, 188, Internal painting v
206, 207, 192, 193, 194, 195, 12, 14, 16, a v
11, 173, 175, 177, 202, 203, 204, 205 | FLOOR @wall tiles v
213, 215, 21, 66, 67, 69, 68, 209, 198, | Stairmarble v
189, 200, 201, 195, 194 |v
195, 194, 193, 192, 197, 190 Plaster repair @housekeeping v |
v
(lap)PROJECT MANAGEMENT
(C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW
This Form must be retained and logged within the project activities planning log book
Departments Name
MFC- SHERIF
HSE HAMID
BUSHRA
DARWISHPROJECT MANAGEMENT
(C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW.
Note: The daily contractor activities planning review must be conducted between the SA project team,
SA HSE representative and main contractor and cover all planned and unplanned activities for the
respective day. The review must also cover all work being conducted by sub-contractors and work
that is planned outside of SA facilities (boundaries)
“Referens 001892
Date: 02/05/2021
Division: HO & UPD a
Bi: BI-28-15011-01 Z
Main Contractor:
Within construction co. ZONE C
‘Sub-Contractors:
Daily Activities
Control
High Risk | Measures in
Area Activities sinh
Yes [No | Yes | No
154, 161, 165, 156,
167, 168, 160, 158,
153, 155, 07, 157, 06,
166, 159, 87, 82, 65,
67, 44, 146
Internal wet area, External
ceiling
v
v
139, 168, 166, 140,
141,142, 143, 157,
15
Dry and wet area tiles and
marble work
43,44, 45, 46, 47,48, |
49, 50, 80, 82, 103,
105, 19, 18, 17, 15, 65
Repair plaster @housekeeping
39, 40, 41, 130, 129,
128, 127, 126, 139,
140, 144, 142, 143
Internal wall and ceiling painting
BOUNDRY WALL PAINT
20, 21, 23, 24, 25, 26,
28, 29, 30, 41, 40, 39,
37, 36, 35, 34, 33, 32
Interlock work
“_| <<) <<) <
a| a] <4/ =
= |
jaudi Aramco: Company General Use
(ap)PROJECT MANAGEMENT
(C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW _
‘WThis Form must be retained and logged within the project activities planning log book
Departments, Name _ Senature?
WFC. Engr Sharef Zo
HSE MR Hamid
HCO. ENGR M Bushra
‘SAPMT ENGR Yaser
Yasir H. Abu Hawzabl
Gh engin
audi Aramco: Company General Use
(wp)PROJECT MANAGEMENT
(C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW
Note: The daily contractor activities planning review must be conducted between the SA project
team, SA HSE representative and main contractor and cover all planned and unplanned activities for
the respective day. The review must also cover all work being conducted by sub-contractors and work
that is planned outside of SA facilities (boundaries)
001893
02-05-2021
Reference:
Date:
HO & UPD.
BL-28-15011-01
Within
Main
Contractor:
Sub
Contractors:
Daily Activities
Control
Measures
in Place
Yes Yes | No)
Area! Activites peaks
(Friday mosque )
‘wot lek wor carted pa
|
Roof Scaffolding ey
Derr
rook
‘waterproofing
[ro
[toot
GRC
[Toilet
fo.3
HVAC
Concrete
work
Pump room
Departments
Name
Signature
MFC -
AHMED Shouman
HSE
HAMID
HCO
ROHIT
SAPMT
Yaser
Saudi Aramco: Company General Use
(ar)
Saud Aramco Pre!PROJECT MANAGEMENT
(C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW
Note: The daily contractor activities planning review must be conducted between the SA project
team, SA HSE representative and main contacor and cover all planed and unplanned setts for
the respective day. The review must also cover all work being condicted by sub-contractors and work
tha is planned outside o SA faltigsxyngares)
joes
Reference
Date: 02-05-2021
[ibivsioniiiaiia] HO & UPD
[Blin] B-28-15011-01
Main Within
Contractor:
‘Sub-
Contractors
Daily Activities
Area Aativities ren
(Leal mosque )
Yes
Toot
TE Thad OA,
[Roof Scaffolding avec
Lt pernered V
Departments Name
MFC- AHMED Shouman
ise van ss
utco Row ees
SAPMT Yaser
pee
Yasir H, Abu Hawzah |
faus Aramco: Company General Use Be ee
ar) snus eee Pr iPROJECT MANAGEMENT
(C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW
Note: The daily contractor activities planning review must be conducted between the SA project team,
SA HSE representative and main contractor and cover all planned and unplanned activities for the
respective day. The review must also cover all work being conducted by sub-contractors and work
that is planned outside of $A facilities (boundaries)
5
eran Totes
Date 5052001
EXEL TORU
Es 3128-1501001
Main Contractor: | Arfed a
Sub-Contractors:
Daly Actives
Cool
Areauone 4) Actives HEE esac 8
Yes [No | Yes | No
135-136-138 Installation of Aluminum Doors & windows Viv
1155-158-160 Installation of wooden doors accessories V V
| 8-115 — aatin of cave Rana wood
| usaiets jooden caps Viv |
92-93 Installation of Steel doors Lexan sheets V V 1
140 Installation of Staircase handrail Viv
This Form must be retained and logged within the project activities planning log book
Departments Name Signature
Mc aaeiNauky cee
vst Hamid
HCO Be Rohit 6 = ff
sAMT Mohammad Darwish 4 Do |
laudi Avamco: Company General Use
(ap)PROJECT MANAGEMENT
(C&PPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW
Note: The daily contractor activities planning review must be conducted between the SA project team, SA
HSE representative and main contractor and cover all planned and unplanned activities for the respective
day. The review must also cover all work being conducted by sub-contractors and work that is planned
outside of SA facilities (boundaries)
Reference: 001896
Date:
02 /05 /2021
Divisions “HO & UPD
Bi BI-28-15011-01
Maincontractor: | ARFAD /zone Cc
Sub-Contractors:
Daily Activities
Control
High Risk | Measures in
Place
Yes [No | Yes | No
v
143, 144, 145, 146, Metalideots v
147,149
136, 52, 159, 153, Stair Handrail WORK ¥
156, 158 iv:
‘Area Activities
76, 78, 80, 82, 81, Vv
180, 115, 117, 119,
120, 121, 112, 113, Stanless steel
114, 124, 125
03, 04, 05, 06, 07, Glass Block t
43, 44, 45, 46, 47, v
48, 49, 50, 52, 53,
124, 125, 132, 170, ‘Aluminum Work v
471, 172, 128, 129, v
130, 70, 72, 71, 75
103, 105, 77, 78, viv
pares Wooden doors |
85, 86, 87, 170,
m,t72 e
(lap)PROJECT MANAGEMENT
(C&PPD) - DAILY CONTRACTOR ACTIVITIES EEANNING een
101, 99, 89, 24, 25,
130, 107, 81, 85
Kitchin carcass
|
This Form must be retained and logged within the project activities planning log book
Departments Name Signature
MFC Eng. Sharef ae
HSE MR Hamid z az
HCO ENGR M Bushra EB
SAPMT ENGR Yaser
(uw)
Yasir H. Abu Hawzah
Ci Enger