Fire Tender was 45 minutes At least 2 hours of fire fighting capacity must
away and Hydraulic be available with every commercial and
ladder reached in 45 minutes industrial client.
Ceiling Height was just 5 feet. National Building Code 2016 must be
followed for fire safety compliance.
Makeshift Dome was the build Structure, Wall, Floor, and Roof shall be as
on the terrace where the per National Building Code-2016 which
actual tragedy happened guides on fire rating of each.
Fire Tender did not bring the The emergency Team must equip with the
safety net which could have right equipment, items, and tools. Based on
saved a few more lives the incident it shall be mobilized.