Field Density Test for Soil ASTM D 1556

‫نام پروزه‬ )‫متر‬1145 ‫سرک قلعه موسی الی برج برق چار قلعه (طول‬

Contract No. Date of Testing 5/6/2013

Layer Base Course Location Qala-e- Mosa, Kabul

Client Kabul Municipality Contractor Fawad Hashimi

Location 0+270-0+800 Road # 1 0+500-0+600 0+600-0+700 0+700-0+800 0+800-0+900

Station (m) 0+270 0+380 0+800 0+150 0+050 0+600 0+700 0+800 0+900
Offset from center C/L L/S R/S R/S C/L C/L L/S R/S C/L
Depth of hole (cm) 15 15 15 10 10 15 15 15 15

Moisture content

container No. AB4 AB5 AB6 AB7 AB8 AB9

Wt. of container (g)


p e e d
60.2
y M o61.3isture58.7 56.1 58.5 59.3 62.5 55.7 58.6

M.(g)C By S M321.7
wet siol+container 337.8
eter 327.0 300.0
309.4 313.8 329.7 390.6 339.8 426.1 440.0

Dry soil+container (g) 312.1 302.0 313.6 370.1 319.7 398.9 417.4

wt.of water (g) 9.6 10.8 9.4 11.8 16.1 20.5 20.1 27.2 22.6

wt. of dry soil (g) 251.9 265.7 241.3 245.9 255.1 310.8 257.2 343.2 358.8

% M.C 3.8 4.1 3.9 4.8 6.3 6.6 7.8 7.9 6.3

Field Density

Wt. of wet material from hole (g) 6268 6330 6140 2715 2995 5473 5418 5490 5566
wt. of sand +cylinder before Pouring (g) 7140 7090 7009 8055 7995 8225 8221 8220 8220
wt. of sand +cylinder after Pouring (g) 1812 1810 1780 4736 4522 3342 3454 3455 3333

Wt. sand in cone (g) 1668 1668 1668 1590 1590 1612 1612 1612 1612

Wt. sand in Hole (g) 3660 3612 3561 1729 1883 3271 3155 3153 3275

Bulk density of sand (g/cm³) 1.379 1.379 1.379 1.394 1.394 1.39 1.39 1.39 1.39

Volume of sand in hole (cc) 2654 2619 2582 1240 1351 2353 2270 2268 2356

Wet density of material (g/cm³) 2.362 2.417 2.378 2.189 2.217 2.326 2.387 2.420 2.362

Dry density of material (g/cm³) 2.275 2.322 2.289 2.089 2.086 2.182 2.214 2.243 2.222

Lab M.D.D (g/cm³) 2.312 2.312 2.312 2.161 2.161 2.268 2.268 2.268 2.268

% O.M.C 4.10 4.10 4.10 6.30 6.30 7.10 7.10 7.10 7.10

% Compaction Obtained 98.4 100 99 96.7 96.5 96.2 97.6 98.9 98.0
% Compaction Required 97 97 98 98 98 95