Professional Documents
Culture Documents
===================================================================================
On Hand
===================================================================================
Ingredient/Material
-------------------------------------------------------------------------------
Location: 01 Inventory Period End Date: September 23, 2018
----------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Material Tracking Description On Hand Trucks Low Unit Cost On Hand Cost
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
CIDAHU Location CIDAHU -21,921.30 tne 0.00 / tne 0.00
CONSOL SG Location CONSOL SG 5,348,299.00 g 0.00 / kg 0.00
NORMET Location NORMET -45,000.00 g 0.00 / kg 0.00
PASIR 1 Location PASIR 1 0.00 tne 0.00 / tne 0.00
PONTI Location PONTI -474.88 tne 0.00 / tne 0.00
SPLIT1-2 Location SPLIT TONJONG1 -24,662.98 tne 0.00 / tne 0.00
SPLIT2-3 Location SPLIT TONJONG1 -1,850.17 tne 0.00 / tne 0.00
WATER Location WATER 885,037.70 tne 0.00 / tne 0.00
WBP PTR.CEMENT
SILO01 CEMENT -2,021.83 tne 0.00 / tne 0.00
WBP PTR.CEMENT
SILO02 CEMENT -3,474.84 tne 0.00 / tne 0.00
WBP PTR.CEMENT
SILO03 CEMENT -802.14 tne 0.00 / tne 0.00
WBP PTR.CEMENT
SILO04 CEMENT -0.23 tne 0.00 / tne 0.00
-----------------------------------------------------------------------------------------------------------------------
CEMENT Subtotals: -6,299.05 tne 0.00
-----------------------------------------------------
Total Cost: 0.00