You are on page 1of 1

A 14-09-2020 ISSUED FOR PROPOSAL MA MA SAM

Date Description Drawn Checked Approved


REV. Issue
COMPUTER REFERENCE:-
PC-93

IZHAR STEEL (PVT) LTD.


GROUP OF COMPANIES
DATE CLIENT:-

14-09-2020
MARI PETROLEUM COMPANY LIMITED
SCALE
PROJECT:-

DRAWN
NTS GAS PROCESSING FACILITY FOR TIPU/GORU-B

MA TITLE:-
ENGINEER PIPING & INSTRUMENTATION DIAGRAM
FOR FLARE KNOCK OUT DRUM
NAM
CHECKED DRAWING No. SHEET No.
PROPOSAL No.
MA 1 OF 1
APPROVED
ISPL-0665 ISPL.0665-20-PE-01-000
REV. A
SAM

FILE NAME ISPL.0665-20-PE-01-000-A-01 OF 01 SHEET A3

THIS DRAWING IS THE PROPERTY OF IZHAR STEEL (PVT) LTD IT MUST NOT BE
COPIED, REPRODUCED IN ANY FORM NOR LENT WITHOUT THE WRITTEN CONSENT OF
IZHAR STEEL (PVT) LTD

You might also like