DENAH MUSHOLLA DARUSSALAM
SKALA 1:60
6.00
0.60
150.
250.
700.
Sloof 15/20
005.
0.15
006.
6.00
3.50
0.25
0.60 Pas.pondasi batukali
0.70 1pc:6psr
1.00
0.50 0.50
6.00
SLOOF 15/20
15
11
2 Ø10
Ø 8 - 150
2 Ø10
2 Ø10
SLOOF 15/20
6.00
6.00 5.00
K.2
6.00
3.50
K.2 K.2
K.2
0.50 0.50
6.00
2 Ø10
Ø 6 - 150
2 Ø10
2 Ø10
KOLOM K2 12/12
KOLOM K1 12/20
6.00
B.12/15
RB.12/15
RB.12/15
B.12/15
6.00
3.50
RB.12/15
B.12/15 RB.12/15
RB.12/15
001.
6.00
12
8
2 Ø10
Ø 6 - 150
2 Ø10
6.00 5.00
6.00
3.50
0.60
1.00
0.50 0.50
Meter Air
6.00
3.50
6.00 5.00
PVC Dia 2. 5"
001.
Septic
Resapan
0.50 0.50
tank PVC Dia 2.5"
6.00
PIPA WC Ø 4 "
SALURAN AIR KOTOR Ø 4 "
BAK KONTROL
PIPA DALAM TEMBOK
AVOUR
6.00
6.35
501.
Dack beton
Kubah
356.
005.
6.00
Stainlist
3.50
6.00
PVC Dia 2.5"
0.50 0.50
1.00
6.00
0.25
0.60
1
2 Kuda - Kuda
501.
005.
Kubah Stainlist
6.00
3.50
Elv.+3.30
Gording 6/12
Lisplank 3/20
0.75
0.25
6.00
Board3.60
005.
006.
1.50
DackBeton+3.25
Grc Board
Grc Board
+ 3.50 + 3.75
Grc Board
6.00
3.50
Dack Beton+3.25
Grc Board+3.60
+ 3.60
Grc Board
+ 3.75
500. 500.
Dack Beton
+ 3.25
1.00
6.00
RENCANA PLAFOND
SKALA 1:60
6.00
Lampu Gantung
6.00 5.00
6.00
3.50
M
1.00
0.50 0.50
6.00
20x20cm
1.50
-0.20
0.10
Keramik20x20cm
6.00
3.50
500.
-0.15
500.
005.
006.
Keramik
50x50cm
±0.00
0.50
1.00
0.50 0.50
6.00
P.2
P.3 J.2
6.00 5.00
6.00
3.50
P.1
J.2
0.50 0.50
6.00
6
Pintu Geser/Sleding
Angkur Ø8" Angkur Ø8" Angkur Ø8"
216
210
216
210
t: 5mm t: 5mm
5 11 45 1010 45 11 5 5 82 5
15
15
5
5
6
6
Angkur Ø8" Angkur Ø8"
1 1
172182
3 3
17
17218
Kaca t: 5mm
170
Kaca t: 5mm Kaca t: 5mm
56
6
2 POT. 2-2
5
4 POT. 4-4
6 60 6
6 60 6 60 6
12
12
10 62 10
POT. 1-1 10 62 62 10
POT. 3-3
TAMPAK DEPAN
SKALA 1:60
TAMPAK SELATAN
SKALA 1:60
TAMPAK UTARA
SKALA 1:60
TAMPAK KIBLAT
SKALA 1:60
+7.67
49.1
Tiang Kuda - Kuda
+6.18
Gording 6/12 3 .9 0
+5.19
Kasau 4/6
+2.00
3.75
Balok Ring12/15
T.Makmum
±0.00
±0.00
-0.35
-0.65
Sloof 15/20
Pas.Pondasi Batukali
-0.85
Pas.Batu Kosong -1.05
1.00 5.00
6.00
POTONGAN X - X
SKALA 1:60
+7.67
Kubah Stainlist
3.67
Kasau 4/6
+6.18
3 .9 0
+5.19
+4.00
3.75
+2.60
Pintu Kaca
±0.00
±0.00
-0.35 Rollag 1 bata
-0.65
Pas.Pondasi Batukali Tanah Urug
-0.85 Pas.Batu Kosong
-1.05
5.00 0.50
5.50
POTONGAN Y - Y
SKALA 1:60
RENCANA ANGGARAN BIAYA
PEMBANGUNAN MUSHOLLA DARUSSALAM
VI PEKERJAAN ATAP
1 Pasangan Kerangka Atap Kayu M² 40,30 Rp 250.000,00 Rp 10.075.000,00
2 Pasangan atap Genteng beton M² 50,44 Rp 190.000,00 Rp 9.583.600,00
3 Pasangan Bumbungan M¹ 20,00 Rp 80.000,00 Rp 1.600.000,00
4 Pembuatan dack atap tbl: 5cm M³ 0,80 Rp 4.500.000,00 Rp 3.600.000,00
5 Pemasangan Kubah Stainlist Unit 1,00 Rp 4.750.000,00 Rp 4.750.000,00
Rp 29.608.600,00
X PEKERJAAN SANITAIR
1 Pemasangan kran diameter 1/2" bh 6,00 Rp 70.000,00 Rp 420.000,00
2 Pemasangan kloset duduk bh 1,00 Rp 2.100.000,00 Rp 2.100.000,00
3 Pasangan afor bh 2,00 Rp 45.000,00 Rp 90.000,00
Rp 2.610.000,00
TOTAL Rp 203.480.339,44
REKAPITULASI ANGGARAN BIAYA
PEMBANGUNAN MUSHOLLA DARUSSALAM