You are on page 1of 1

Project : SME RESIDENTIAL APARTMENTS QUALITY MANAGEMENT SYSTEM

Client : SREE MAHALAKSMI ENTERPRISES Date : 26.07.2017

PMC : FACILITIES AND BUILDING SOLUTION PVT LTD. Pour Start Time : 8.30AM

Contractor : CG BUILD TECH PVT LTD Pour End Time : 5.00PM

CHECKLIST FOR PLASTERING

Document No: M Location / Structure External Plastering

Building: Tower -B No of cement bag 45.00

External Plastering - 10th to 1st Floor - South side - 1st &


Area / Grid Line: Mix rartio CM: 1.5
2nd Coat - Set 9

Total Consumption

S.No Description Unit Qty/Bag Material Consumption (Kg) Remarks

1 Cement (kg) Kg 50.00 2250

3 Sand Cft 6.25 281

6 CICA NO 1 litre 1.00 45

7 Water litre As Per Site Condition As Per Site Condition

QA/QC Engineer FABS