Project : SHRIRAM SHANKARI APARTMENTS QUALITY MANAGEMENT SYSTEM

Client : SHRIRAM Date : 26.07.2017


Pour Start Time : 3.15 PM
Contractor : MFAR CONSTRUCTION PVT LTD
Pour End Time : 6.45 PM
CHECKLIST FOR BATCHING SLIP

Document No: 590 A Location / Structure Terrace

Building: Tower - A2 Grade of Concrete M25

LMR Col: 71, 70, Fc1, Fc1, Fc2, 77, 75


Area / Grid Line: Total No.of Batch 15.00
& L.M.R wall

Per One Batch 0.35 Cu.m Poured Concrete Qty 7.50 Cu.m

No.of Cube Taken = nos

Theriotical Different b/w Percentage


S.No Description Unit Qty Actual Qty Remarks
Qty The/Actual (%)

1 Cement Kg 103.00 1545 1545 0 0.000

2 GGBS Kg 103.00 1545 1545 0 0.000

3 Sand Kg 444.00 6660 6681 21 0.315

4 20mm Metal Kg 328.00 4920 4871 -49 -0.996

5 12mm Metal Kg 219.00 3285 3556 271 8.250

6 Admixtures Kg 0.90 13.5 13.5 0 0.000

7 Water Kg 80.00 1200 1200 0 0.000

MFAR QA/QC Engineer