You are on page 1of 13

Scenario

Number Short description


R1.1 Concrete
R1.2 Concrete Advanced
R2.1 Steel
R2.2 Steel Advanced
R3.1 Composite
R3.2 Composite Advanced
O1.1 Concrete
O1.2 Concrete Advanced
O2.1 Steel
O2.2 Steel Advanced
O3.1 Composite
O3.2 Composite Advanced
Design

Lobby floor
Lobby
height depth

Conventional beam+ slab, normal f’c, concrete core 1 4 0.70


Post-tensioned flat slab, high strength f’c, concrete core 1 4 0.25
Rolled beams, columns, braced+ plate core 1 4 0.60
Built up beams, columns, braced+ plate core w/ high-strength steel 1 4 0.60
Rolled beams, columns, concrete core 1 4 0.83
Built up beams, composite columns, concrete shear walls w/ high-strength steel 1 4 0.83
Conventional beam+ slab, normal f’c, core 1 5 0.60
Post-tensioned wide-shallow, high strength f’c, concrete shear walls 1 5 0.50
Rolled beams, columns, braced+ plate core 1 5 0.767
Built up beams, columns, braced+ place core w/ high-strength steel 1 5 0.767
Rolled beams, columns, concrete core 1 5 0.70
Built up beams, composite columns, concrete shear walls w/ high-strength steel 1 5 0.70

* Height from floor to underside of stru


Design Criteria

No Floors floor Total GROSS


core core core TOTAL
above height Floor Height* Width Length TOTAL
width length floors NET area
lobby * Number floor area

44 2.7 45 154.3 32 31 14.0 9.0 45 44640 38970.0


44 2.7 45 134.1 32 31 14.0 9.0 45 44640 38970.0
44 2.7 45 149.8 32 31 14.0 9.0 45 44640 38970.0
44 2.7 45 149.8 32 31 14.0 9.0 45 44640 38970.0
44 2.7 45.0 160.15 32 31 14.0 9.0 45 44640 38970.0
44 2.7 45.0 160.15 32 31 14.00 9.0 45 44640 38970.0
44 3.5 45 186.0 49.5 37 25.5 12.0 45 82418 68647.5
44 3.5 45 181.5 49.5 37 25.5 12.0 45 82418 68647.5
44 3.5 45 193.5 49.5 37 25.5 12.0 45 82418 68647.5
44 3.5 45 193.5 49.5 37 25.5 12.0 45 82418 68647.5
44 3.5 45 190.5 49.5 37 25.5 12.0 45 82418 68647.5
44 3.5 45 190.5 49.5 37 26 12 45 82418 68647.5

m floor to underside of structural system:


Scenario
Number Short description
R1.1 Concrete
R1.2 Concrete Advanced
R2.1 Steel
R2.2 Steel Advanced
R3.1 Composite
R3.2 Composite Advanced
O1.1 Concrete
O1.2 Concrete Advanced
O2.1 Steel
O2.2 Steel Advanced
O3.1 Composite
O3.2 Composite Advanced
Building Dynam

1st mode (x) 2nd mode (y)


[s] [s]

Conventional beam+ slab, normal f’c, concrete core 6.1 5.3


Post-tensioned flat slab, high strength f’c, concrete core 6 4.9
Rolled beams, columns, braced+ plate core 6.4 5.7
Built up beams, columns, braced+ plate core w/ high-strength steel 6.4 5.7
Rolled beams, columns, concrete core 6.7 5.7
Built up beams, composite columns, concrete shear walls w/ high-strength steel 6.8 5.7
Conventional beam+ slab, normal f’c, core 7 6.5
Post-tensioned wide-shallow, high strength f’c, concrete shear walls 6.6 6.2
Rolled beams, columns, braced+ plate core 6.97 6.75
Built up beams, columns, braced+ place core w/ high-strength steel 6.96 6.74
Rolled beams, columns, concrete core 6.93 4.13
Built up beams, composite columns, concrete shear walls w/ high-strength steel 6.85 4.05
Building Dynamics Building Foundations Reactions
Wind (700yr)

X max Y max Overturning Overturning


3rd mode (RZ) interstory interstory Total Total Live Shear (x) Shear (y)
[s] drift (10ys drift (10ys (ab. Y) (ab. X)
Dead (reduced) [GN] [GN]
wind) wind) [GN-M] [GN-M]

4.4 H/1400 H/960 0.4841 0.0319 0.0076 0.0079 0.683 0.7206


4 H/1750 H/940 0.4724 0.0319 0.0065 0.0067 0.5012 0.5361
5.1 H/750 H/550 0.28 0.28 0.0075 0.0078 0.64 0.62
5.1 H/750 H/550 0.28 0.28 0.0075 0.0078 0.64 0.62
4.4 H/700 H/640 0.362 0.0468 0.00769 0.008 0.697 0.671
4.5 H/1010 H7/660 0.36 0.0468 0.00769 0.008 0.697 0.671
5.3 H/980 H/620 0.801 0.083 0.0159 0.0150 1.234 1.663
5.4 H/870 H/730 0.726 0.083 0.0108 0.0145 1.178 1.546
6.58 H/646 H/624 0.521 0.079 1.22E-03 1.63E-02 1.27 1.7
6.58 H/646 H/624 0.52 0.079 1.22E-03 1.63E-02 1.27 1.7
2.59 H/2174 H/518 0.762 0.039 0.012 0.016 1.267 1.802
2.6 H/2320 H/539 0.754 0.039 0.012 0.016 1.267 1.802
ns Reactions
Notional
Typical floor
(2% dead load)
Overturni Overturni Concrete
Shear (x) Shear (y) ng ng Concrete Rebar Prestressed Steel
Grade
[GN] [GN] (ab. Y) (ab. X) [mc] (tonne) (tonne) (tonne)
(MPa)
[GN-M] [GN-M]
0.0097 0.0097 0.8034 0.8198 236.5 35 34.6
0.0094 0.0094 0.6933 0.7173 252.9 50 14.5 5.7
0.0056 0.0056 0.43 0.43 150 30 2.00 29
0.0056 0.0056 0.43 0.43 150 30 2.00 21
0.00724 0.00724 0.547 0.547 150 30 5 28.25
0.00708 0.00708 0.551 0.551 150 30 5 27
0.0159 0.0159 2.18 2.206 390 35 35.9
0.0145 0.0145 1.95 1.917 350 50 27.8 5.9
1.63E-02 1.10E-02 1.14 1.14 222 30 85.7
1.15E-02 1.15E-02 1.14 1.14 222 30 83.5
0.015 0.015 1.47 1.56 270 30 18 50
0.015 0.015 1.465 1.555 270 30 18 44
COST - SYDNEY COST - BANGKOK COST - SINGAPORE
Steel equipmen labor equipmen labor equipmen labor
material material material
Grade t [man- t [man- t [man-
[USD] [USD] [USD]
(MPa) [USD] hour] [USD] hour] [USD] hour]

350
450
420
420

350
350
350
350
45 x Typical floor
COST - SYDNEY COST - BANGK
Concrete Prestresse Steel equipmen labor
Concrete Rebar Steel material material
Grade d Grade t [man-
[mc] (tonne) (tonne) [USD] [USD]
(MPa) (tonne) (MPa) [USD] hour]

10642.7 35 1558.4
11380.5 50 652.5 256.5
6750 30 90 1305 350
6750 30 90 945 450
6750 30 225 1271.25 420
6750 30 225 1215 420
17400 35 1616
15560 50 1248 266
9990 30 3857 350
9990 30 3116 350
12150 30 810 2250 350
12150 30 810 1980 350
Columns
COST - BANGKOK COST - SINGAPORE
equipmen labor equipmen labor Concrete Prestresse
material Concrete Rebar Steel
t [man- t [man- Grade d
[USD] [mc] (tonne) (tonne)
[USD] hour] [USD] hour] (MPa) (tonne)

1604.8 45 602.1
1041.7 70 281.5
560
450
673.6
360.8 70 535.7
3060 45 464
2060 70 319
4817
4817
1700
1000 70 150 840
COST - SYDNEY COST - BANGKOK COST - SINGAPORE
Steel equipmen labor equipmen labor equipmen labor
material material material
Grade t [man- t [man- t [man-
[USD] [USD] [USD]
(MPa) [USD] hour] [USD] hour] [USD] hour]

350
450
350
350

350
450
350
450
Lateral system
COST - SYDNEY
Concrete Prestresse Steel Steel equipmen
Concrete Rebar Steel Steel material
Grade d Grade Grade t
[mc] (tonne) (tonne) (tonne) [USD]
(MPa) (tonne) (MPa) (MPa) [USD]

2600.8 45 329.2
2028.1 70 272.8
3160 350
1750 350 1100 450
2032 45 190.2
1822 70 122.4
7190 45 713
6550 70 685
1742 350
1742 450
10300 50 1010
9400 70 820
ST - SYDNEY COST - BANGKOK COST - SINGAPORE
labor equipmen labor equipmen labor Estimanted time
material material
[man- t [man- t [man- of construction
[USD] [USD]
hour] [USD] hour] [USD] hour] [months]

You might also like