You are on page 1of 72

Alcatel BSS

Alcatel 9100 BTS Outdoor


Installation Manual

BTS Document
Installation & Dismantling Manual

3BK 17073 0001 RJZZA Ed.08


BLANK PAGE BREAK

Status RELEASED

Short title INS


All rights reserved. Passing on and copying of this document, use
and communication of its contents not permitted without written
authorization from Alcatel/Evolium.

2 / 72 3BK 17073 0001 RJZZA Ed.08


Contents

Contents
Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1 General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
1.1 Hardware Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
1.1.1 Racks Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
1.1.2 Weight and Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1.2 Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1.3 Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1.4 Initial State . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
1.5 Final State . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
1.6 Operating Principle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
1.7 Time Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
1.8 Information Required . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
2 Preliminary Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
2.1 Before Leaving for the Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
2.2 Before Starting (On Arrival at the Site) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
3 Installation on Final Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
3.1 Racks Unpacking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
3.2 Racks Dismantling (If Necessary on Site) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
3.2.1 Cables Disconnecting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
3.2.2 Mechanical Dismantling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
3.3 Racks Transportation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
3.3.1 Rack Transportation by Crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
3.3.2 Rack Transportation by Pallet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
3.3.3 Manual Transportation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
3.4 Racks Positioning and Fixing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
3.4.1 Case of Steel Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
3.4.2 Case of Concrete Foundation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
3.4.3 Connect the Protective Earth Cable at BTS Side . . . . . . . . . . . . . . . . . . . . . . . . . . 30
3.4.4 Connect the Inter-Rack Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
3.5 Install the Batteries (If Needed) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
4 Power Cables Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
4.1 Run the Power Cables at BTS Side . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
4.2 Connect the Power Cables at BTS Side . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
5 PCM Cables Connecting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
5.1 Run the PCM Cables at BTS Side . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
5.2 Connect the PCM Cables at BTS Side . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
5.2.1 Connect the PCM Cables to the Connection Area . . . . . . . . . . . . . . . . . . . . . . . . . 41
5.2.2 Case of L907/ 4 - 120 Ohm Alcatel Cable (1AC 01328 0004) . . . . . . . . . . . . . . . 42
5.2.3 Case of FLEX3/ 4 - 75 Ohm Alcatel Cable (1AC 00110 0011) . . . . . . . . . . . . . . . 43
6 Antenna Cables Connecting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45
6.1 Jumper Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
6.2 Connect the Jumper to the Antenna Coaxial . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48
6.3 Connect and Label the Antenna Jumpers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48
7 Installing Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
7.1 Connect the External Alarm Cables (Option) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54
7.1.1 Install the Alarm Cables at BTS Side . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54
7.1.2 Connect the Alarm Cables to the Connection Area (COAR) . . . . . . . . . . . . . . . . 55
7.1.3 Example of Alcatel Alarm Cable Preparing (L907/ 8 ref: 1AC 01328 0001) . . . 58
7.2 Installing Synchronization Cables (Option) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
7.2.1 A9100 / G2-BTS Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
7.2.2 A9100 / A9100 Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60

3BK 17073 0001 RJZZA Ed.08 3 / 72


Contents

7.2.3 Procedure to Fit the Synchronization Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60


8 Finish the Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
Appendix A : Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
Appendix B : List of Kits and Consumable Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
Appendix C : List of Documents and Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69
Appendix D : CAD Terminal Block Fitting (120 Ohm Cable) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71

4 / 72 3BK 17073 0001 RJZZA Ed.08


Preface

Preface
Purpose This document describes how to install a A9100 outdoor BTS of the
Alcatel BSS subsystem
The document applies to Alcatel qualified installers.

What’s New In Edition 08


Update for document type, category and mnemonic.

In Edition 07
DDF label referece change

In Edition 06
Update for naming rules

In Edition 05
Update for generic CCL.

In Edition 04
ITL 260 and ITL 265 applied.

In Edition 03
New installation kits.
Modification of alarm cabling.
Modification of PCM cabling.
Modification of synchronization cabling.
Supressing TMA section.

In Edition 02
Suppressing microwave chapter

In Edition 01

3BK 17073 0001 RJZZA Ed.08 5 / 72


Preface

Creation

Audience This document is intended for:

Installers

Site administrators
Supervisors

Project managers

Field service technicians

Occasional users.

Assumed Knowledge You must have a basic understanding of the following:

Basic knowledge of Alcatel BSS equipments

Experience of electrical mounting cabling.

6 / 72 3BK 17073 0001 RJZZA Ed.08


1 General Information

1 General Information

This chapter provides general information about the principle of the operation
and requirements for the procedure:

Hardware description
Restrictions

Prerequisite

Initial state

Final state

Operating principle
Time schedule

Information required.

3BK 17073 0001 RJZZA Ed.08 7 / 72


1 General Information

1.1 Hardware Description


1.1.1 Racks Configuration

Side compartment BTS 1 BTS 2

AIR
Subrack 2/ 3

T T T T
R R R R
E E E E

OPTIONS
FANU FANU FANU
DCDP Subrack 2/ 2
ACRI
S
BACO ACIN U A A A A A A
M N N N N N N
P y x y x y x
P P P P P
2 M
0
M
0
M
0
M
0
M
0
8 8 8 8 8 AIR AIR
FANU FANU FANU

BCU 1 T T T T
Subrack 2/ 1
T T T T
R R R R R R R R
E E E E E E E E

SBS 40
FANU FANU FANU FANU FANU FANU
AIR AIR

1 : Plinth cover
2 : Connection area (COAR) between the racks
3 : Electricity meter location
4 : AC switch board
Figure 1: A9100 Medi Layout (Example : 3x4 Configuration)

8 / 72 3BK 17073 0001 RJZZA Ed.08


1 General Information

1.1.2 Weight and Dimensions

Average weight equipment Equipped without battery = 295 kg


Equipped with 1 battery BU41 = 345 kg
Equipped with 2 battery BU41 = 395 kg

Dimensions Height = 1500 mm


Width = 1200 mm
Depth = 700 mm

Table 1: Mini Characteristics

Average weight equipment Equipped without battery = 495 kg


Equipped with 1 battery BU41 = 545 kg
Equipped with 2 battery BU41 = 595 kg

Dimensions Height = 1500 mm


Width = 1800 mm
Depth = 700 mm

Table 2: Medi Characteristics

Weight 50 kg

Dimensions H 235 mm, W 250 mm, L 400 mm

Table 3: Battery BU41

Weight 160 kg

Dimension Height = 1.50 m


Width = 0.60 m
Depth = 0.70 m

Table 4: BTS Compartment Alone (With TRX)

3BK 17073 0001 RJZZA Ed.08 9 / 72


1 General Information

Weight 100 Kg

Dimension Height = 1.50 m


Width = 0.60 m
Depth = 0.70 m

Table 5: Empty Side Compartment

1.2 Prerequisites
The site is ready to receive the racks, according to the SPP-33 : Particular
specification GSM and DCS for EVOLIUM Alcatel base station for mini/medi
outdoor BTS site preparation Reference : 8BL 00704 0034 DRBRA
The following equipment are necessary installed before installation:

Cable tray

Antenna feeders
AC power cable (∅ maximum 25 mm)

Earth cable and ground plate

Differencial AC circuit breakers

2Mbits cables or Microwave feeders

DDF for 2Mbits cables


Steel construction or councrete foundation

The Alarm cables are not necessary installed (option).


In case one or more of this equipment are not installed before the installation,
contact the ALCATEL person responsible of the installation and tick it in the
CCL document.

1.3 Restrictions
None.

10 / 72 3BK 17073 0001 RJZZA Ed.08


1 General Information

1.4 Initial State


The AC 220V cable is fitted but the tension is not present.

Figure 2: Case of Steel Construction

Figure 3: Case of Concrete Foundation

3BK 17073 0001 RJZZA Ed.08 11 / 72


1 General Information

1.5 Final State


The racks are ready for commissioning
The racks are not powered up.

Figure 4: Case of Buiding Installation

Figure 5: Case of Field Installation

12 / 72 3BK 17073 0001 RJZZA Ed.08


1 General Information

1.6 Operating Principle


Preparation before leaving for the site

Preparation before starting

Installation on final location

Power cables installation

PCM cables installation

Antenna cables installation

Options installation

Finish installation

3BK 17073 0001 RJZZA Ed.08 13 / 72


1 General Information

1.7 Time Schedule

Task Time (mn)

Prerequisite task to starting work on site 60

Delivery 60 (*1)

Installation : 30
- With rack disassembling 15
- Without rack disassembling

Connect AC power supply 25

PCM to A9100 BTS connecting 25

Connect the antenna cables 50

Connect external alarm cables (option) 15

Installing synchronization cables (option) 15

Finishing installation 15

(*1) : This time is an average value. The real time depend of the site configuration

If A9100 BTS is disassembled, manual transportation must be done by


4 people.
Note: in this schedule, the times to install cables in the cable way and the
connection to the site equipment (DDF, power cabinet) are not included.

14 / 72 3BK 17073 0001 RJZZA Ed.08


1 General Information

1.8 Information Required


Site

Address and access to the site (key holder)

Grounding plate location (GND)

Customer power supply cabinet location


Fuse breakers location in customer power supply cabinet

Antenna feeders connection and information (AZIMUTH, Sectors,...)

Rack precise location

Number of alarms to be connected (if the case)

Alarm terminal block location (if the case)

Rack

Type of BTS rack to be installed


Type of batteries (BU41, BU100)

Rack fixing (steel construction, concrete foundation)

Kits

PCM connection type

PCM cables impedance (120 ohm, 75 ohm)

Synchronization configuration (if the case)

3BK 17073 0001 RJZZA Ed.08 15 / 72


1 General Information

16 / 72 3BK 17073 0001 RJZZA Ed.08


2 Preliminary Checks

2 Preliminary Checks

This chapter describes the preparation of the operation in two steps :

At base

Before starting (On Arrival at the Site).

3BK 17073 0001 RJZZA Ed.08 17 / 72


2 Preliminary Checks

2.1 Before Leaving for the Site

Check prerequisites fulfillment See Prerequisites (Section 1.2).

Check availability of information See Information Required (Section 1.8) .


required

Check availability of documentation See List of Documents Required (in section C).

Check availability of tools See List of Necessary Kits (in section B), refer to the ” Tools
catalogue ” for content checking.

Check availability of supplies See List of Necessary Kits (in section B).

2.2 Before Starting (On Arrival at the Site)

Check applicable notification list and Refer to ITL “Applicable notifications list” for checking if
Operation Instructions notifications have to applied during the operation.
Refer to IO “Applicable operation instructions list” for checking
if operation instructions have to applied.

Check that safety instructions are Refer to “ General Wiring Handbook “ for checking that safety
applied precautions have been taken into accordance with safety
instructions.

Read instructions to be applied in case Refer to “ General Wiring Handbook “ for instructions.
of anomaly

Fulfill premises inspection form and Refer to CEL “ Premises inspection form “.
completion check list

Fulfill completion check list Complete header field of the CCL


The CCL is completed as each installation instruction is
carried out.

Check availability of Alcatel kits See List of Necessary Kits (in section B).

18 / 72 3BK 17073 0001 RJZZA Ed.08


3 Installation on Final Location

3 Installation on Final Location

This chapter describes the following tasks :

Racks unpacking

Racks dismantling and assembling (if it’s necessary on site)

Racks transportation

Racks positioning.

3BK 17073 0001 RJZZA Ed.08 19 / 72


3 Installation on Final Location

3.1 Racks Unpacking

1. Complete the premise inspection form (CEL)


2. Unpack the equipment
3. Check the packages
4. Locate the site final location.

20 / 72 3BK 17073 0001 RJZZA Ed.08


3 Installation on Final Location

3.2 Racks Dismantling (If Necessary on Site)


3.2.1 Cables Disconnecting
Disconnect Cables From Before disconnecting all interconnecting cables, put temporate marks (or
SIDE COMPARTMENT labels).
to BTS1

3
11
4

5
10
6
9
7
8

Figure 6: Side Compartment (Internal Lateral View)

X1

X6

Figure 7: BTS1 (Front View)

3BK 17073 0001 RJZZA Ed.08 21 / 72


3 Installation on Final Location

Side compartment connection Cable reference BTS1 connection

Figure 6/ 1 3-pin connector - - Light

Figure 6/ 2 Alarm BTS1 (male) 3BK 08090 AAAA - Alarm

Figure 6/ 4 HEX POWER (female) 3BK 08092 AAAA DCDP/X6

Figure 6/ 5 Stud with screw - - GND (y/ g)

Figure 6/ 6 Filter (red) - - 0 Volt

Figure 6/ 7 Filter (blue) - - -48 Volts

Figure 6/ 8 3-pin connector - - Fan

Figure 6/ 9 2-pin connector 3BK 08087 AAAA DCDP/X1 -

Figure 6/ 10 Abis1/ 2 (male) 3BK 07922 ABAA Figure 7/ A Abis 1/ 2

Figure 6/ 11 Sum 37-pin connect - Figure 7/ B -

Table 6: Interconnecting Between SIDE COMPARTMENT and BTS1

Disconnect Cables From The following tables gives the position and reference of the cables to be
BTS2 to BTS1 and BTS2 removed.
to SIDE COMPARTMENT

BTS1 Cable reference BTS2 connection

DCDP/X8 3BK 08077 ABAA Door

DCDP/X12 3BK 08079 ABAA Sub rack 2/1

DCDP/X13 3BK 08079 ABAA Sub rack 2/2

DCDP/X14 3BK 08079 ABAA Sub rack 2/3

22 / 72 3BK 17073 0001 RJZZA Ed.08


3 Installation on Final Location

BTS1 Cable reference BTS2 connection

Figure 8/ C - Heater

Figure 8/ D - Logic flat loom

Table 7: Cabling From BTS2 to BTS1

X12 X13 X14

X8

D
Figure 8: BTS1 Front View

3BK 17073 0001 RJZZA Ed.08 23 / 72


3 Installation on Final Location

Side compartment connection Cable reference BTS2 connection

Figure 6/ 3 (male connector) 3BK 08091 AAAA Alarm

Table 8: Cabling From BTS2 to SIDE COMPARTMENT

3.2.2 Mechanical Dismantling

24 / 72 3BK 17073 0001 RJZZA Ed.08


3 Installation on Final Location

1. Open wide the door


2. Unscrew the BTS roofs (M5 Hexagon screwdriver)
3. Remove the BTS roofs respecting the order indicated in figure
4. Mounting tool key 3BK 08144 AA used to screw the cabinet together
5. Inter-cabinet fixing location
6. Principle of cabinet mechanical assembling
7. Approach the cabinet
8. Insert the screw
9. Tight the screw.

When dismounting, do not remove completely the screws because you can
lose the nut inside the profile.

3BK 17073 0001 RJZZA Ed.08 25 / 72


3 Installation on Final Location

3.3 Racks Transportation


3.3.1 Rack Transportation by Crane

Figure 9: Handle by Crane

Figure 10: Mini and Medi - Insert Rods Through Eyebolts

26 / 72 3BK 17073 0001 RJZZA Ed.08


3 Installation on Final Location

3.3.2 Rack Transportation by Pallet

Figure 11: Pallet Transportation

3.3.3 Manual Transportation

Figure 12: Manual Transportation (For Very Short Distance)

3BK 17073 0001 RJZZA Ed.08 27 / 72


3 Installation on Final Location

3.4 Racks Positioning and Fixing


3.4.1 Case of Steel Construction

Figure 13: Steel Construction Installation

2
1

1. Position the racks


2. Level the racks.

28 / 72 3BK 17073 0001 RJZZA Ed.08


3 Installation on Final Location

3.4.2 Case of Concrete Foundation

Figure 14: Concrete Construction Installation

18 mm
500 mm

1150 mm

500 mm
95 mm
1 2
1748 mm

1. Mark the position of fixing points


2. Drill holes (using depthstop).

3BK 17073 0001 RJZZA Ed.08 29 / 72


3 Installation on Final Location

3.4.3 Connect the Protective Earth Cable at BTS Side

1. Socle cover with cable entry holes


2. Reduction adapter cable bushes and sleeve
3. Run earth cable on side compartment
4. Earth connecting detail:

1 - External ground cable


2 - Stud for Ground.

3.4.4 Connect the Inter-Rack Cables


Connect the following cables:
1. From BTS1 to side compartment : use Table 6
2. From BTS2 to BTS1 : use Table 7
3. From BTS2 to side compartment : use Table 8.

30 / 72 3BK 17073 0001 RJZZA Ed.08


3 Installation on Final Location

3.5 Install the Batteries (If Needed)

2
1

− +
TEMPERATURE
− + Sensor

BACO

1
2

3 4

1. Fit strap up the batteries


2. Install exhausting hoses
3. Connect the inlet/outlet cables
4. Battery connection details
5. Connection of 3BK 08119 AA temperature sensor cable :
Fit heat shrink sleeve over the sensor

Connect the cable to the positive contact of battery 1(See Step 3)

Connect the cable to BACO/X200

3BK 17073 0001 RJZZA Ed.08 31 / 72


3 Installation on Final Location

32 / 72 3BK 17073 0001 RJZZA Ed.08


4 Power Cables Installation

4 Power Cables Installation

This chapter describes the procedure to connect the AC power supply cables
to the side compartment cabinet.
According to the Alcatel SPP-33 document, the power cables and earth cables
are already supplied and installed before A9100 Outdoor installation.

Before making any electrical connections to the BTS, ensure that the safety
instructions are followed.
It is essential that :

The protective earth is connected to the equipment earth terminal

The electrical power supply is disconnected.

3BK 17073 0001 RJZZA Ed.08 33 / 72


4 Power Cables Installation

4.1 Run the Power Cables at BTS Side

34 / 72 3BK 17073 0001 RJZZA Ed.08


4 Power Cables Installation

1. Identify an available hole on the socle cover with cable entry holes
2. Reduction adapter cable bushes and sleeve
3. Auxilliary compartment bottom plate

1 - Entry for cables diameter 16 to 25 mm. Minimum over braiding 13 mm

2 - Entry for cables diameter 8 to 14 mm. Minimum over braiding 5 mm

4. Cable gland detail mounting

Pass shrink sleeve over the cable

Pass adapter over the cable


Strip the cable to the braid

Shrink the sleeve

5. Mounted cable gland


6. Run the cables into the side compartment as described in Figure 15.

Figure 15: Running AC Power Cable at BTS Side

3BK 17073 0001 RJZZA Ed.08 35 / 72


4 Power Cables Installation

4.2 Connect the Power Cables at BTS Side

1 AB 05067 0004

PE N L1 L2 L3

1 2

Figure 16: Power Cable Connection

1. Remove the AC area protection


2. Prepare the head of AC cable

Strip the cable

Cut the cable shielding

Apply 10 cm shrink sleeve (1 Figure 16 Step 2 )


Insert lug pin on end cable (2 Figure 16 Step 2 )

Cut a notch in the upper part of the AC area protection (1 Figure


16 Step 1 )

3. Connect the power supply cable to AC switch board


If needed on site documentation, the equipment can be cabled in 1-phase
system or 3-phase system.For 1 phase system :

The two wires from breakers L2 and L3 are not present (1 & 2 Figure 17
) 2.

The clamp bridge in AC-out is present (3 Figure 17 )

For 3 phase system :

The two wires from breakers L2 and L3 are present (1 & 2 Figure 17 )

The clamp bridge in AC-out is not present (3 Figure 17 )

4. Fit the AC area protection.

36 / 72 3BK 17073 0001 RJZZA Ed.08


4 Power Cables Installation

Figure 17: AC Switch Board

3BK 17073 0001 RJZZA Ed.08 37 / 72


4 Power Cables Installation

38 / 72 3BK 17073 0001 RJZZA Ed.08


5 PCM Cables Connecting

5 PCM Cables Connecting

This chapter describes the procedure to connect the PCM cables to the A9100
Side compartment.
According to the Alcatel SPP-33 document, the PCM cables are already
supplied and installed before A9100 installation.

3BK 17073 0001 RJZZA Ed.08 39 / 72


5 PCM Cables Connecting

5.1 Run the PCM Cables at BTS Side

1. Insulation removing

40 / 72 3BK 17073 0001 RJZZA Ed.08


5 PCM Cables Connecting

2. Reduction adapter and cable bushes


3. Auxilliary compartment bottom plate
1 - Entry for cables diameter 8 to 14 mm (PG16). (Minimum over braiding 5
mm)
4. Cable gland detail mounting

Pass shrink sleeve over the cable

Pass adapter over the cable

Fit the cable through the socle cover


Strip the cable to the braid

Shrink the sleeve

5. Mounted cable gland.

5.2 Connect the PCM Cables at BTS Side


5.2.1 Connect the PCM Cables to the Connection Area
The connection area is located between SIDE COMPARTMENT and BTS
1 COMPARTMENT.
The cables are connected on screw terminal. Shielding braid connected to
GND by means of earthing clamp.

8 1 8 1 8 1 8 1

ALAR M
A B IS 4 A B IS 3 A B IS 2 A B IS 1

Figure 18: Connection Area (COAR)

1. Screw terminal Abis in cable connection


2. Screw terminal Abis out cable.

3BK 17073 0001 RJZZA Ed.08 41 / 72


5 PCM Cables Connecting

The Abis cables are labeled during installation.

5.2.2 Case of L907/ 4 - 120 Ohm Alcatel Cable (1AC 01328 0004)
This cable has 2 twisted quads (1 quad = 2 pairs).

B M
L

brown
Pair 2
violet Quad
I
yellow 2
Pair 1
grey
D L9 07
1 AC 0 1 3 2 8 0 004

blue
Pair 2
violet Quad
H
white 1
Pair 1
E grey

G 1AC 01328 0004


Figure 19: L907/ 4 -120 Ohm PCM Cable

Quad 1 Pair COAR Signal Color

1 ABIS 1 TX grey
TX white

2 ABIS 1 RX violet
RX blue

Quad 2 1 ABIS 2 TX grey


TX yellow

2 ABIS 2 RX violet
RX brown

42 / 72 3BK 17073 0001 RJZZA Ed.08


5 PCM Cables Connecting

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8

1 : GND (bread earthing clamp)


2 : TX
3 : TX
4 : GND (gather the 2 drain wires)
5 : RX
6 : RX
7 : R200 (not used)
8 : GND (bread earthing clamp)
Figure 20: L907/ 4 - 120 Ohm PCM Cable Connection

5.2.3 Case of FLEX3/ 4 - 75 Ohm Alcatel Cable (1AC 00110 0011)


This cable has four coaxial cables.

B
G

E
F

J
D
I
H
C
K

Figure 21: FLEX3/ 4 -75 Ohm PCM Cable

3BK 17073 0001 RJZZA Ed.08 43 / 72


5 PCM Cables Connecting

Coaxial COAR Signal

1 ABIS 1 TX

2 ABIS 1 RX

3 ABIS 2 TX

4 ABIS 2 RX

1
2
3
4
5
6
7
8

1 : GND (bread earthing clamp)


2 : TX (wire bridge from pin 1)
3 : TX (inner conductor)
4 : GND
5 : RX (wire bridge from pin 4)
6 : RX (inner conductor and wire bridge to pin 7)
7 : R200
8 : GND (bread earthing clamp)
Figure 22: FLEX3/ 4 - 75 Ohm PCM Cable Connection

44 / 72 3BK 17073 0001 RJZZA Ed.08


6 Antenna Cables Connecting

6 Antenna Cables Connecting

This chapter describes the procedure to connect the antenna feeders cables to
the A9100 BTS compartment cabinet.
According to the Alcatel SPP-33 document, these cables are already supplied
and installed before A9100 installation.

3BK 17073 0001 RJZZA Ed.08 45 / 72


6 Antenna Cables Connecting

6.1 Jumper Installation

1 : Antenna coaxial cable


2 : 7/ 16 antenna connector
3 : 7/ 16 jumper connector
4 : Coaxial jumper
5 : Adapter
6 : Bottom plinth
7 : Radius of bending mini 50 mm
8 : 7/ 16 coaxial socket
9 : 7/ 16 jumper connector
Figure 23: Antenna Jumpers Cables Connection

1. Identify the appropriate cable bushes for passing the cables


2. Cable bushes reduction adapter fitting.

46 / 72 3BK 17073 0001 RJZZA Ed.08


6 Antenna Cables Connecting

Figure 24: BTS Antenna Socket Connectors

To connect 1, 2, 3, 4, 5 & 6 of Figure 24, refer to Part Volume documentation


(T17/V18).

3BK 17073 0001 RJZZA Ed.08 47 / 72


6 Antenna Cables Connecting

6.2 Connect the Jumper to the Antenna Coaxial

1 : Antenna coaxial cable


2 : Shrink sleeve 63/19 mm 1AC 00057 0103
3 : Shrink sleeve 40/13 mm 1AC 00057 0102
4 : Jumper cable
5 : Tape auto-vulcanisant 1AC 01595 0001
Figure 25: Detail Connection Between Coaxial Cables

6.3 Connect and Label the Antenna Jumpers


Starting with the AZIMUT labeled on antenna feeders, using criteria sheet of
site documentation, and using Part Volume (T17/V18), connect and label the
jumpers.
Tighten with specific tightening tool ref. 3BK 25050 AA.

48 / 72 3BK 17073 0001 RJZZA Ed.08


6 Antenna Cables Connecting

Figure 26: Example of RF coaxial Cables Labeling (Only 4 Sectors)

3BK 17073 0001 RJZZA Ed.08 49 / 72


6 Antenna Cables Connecting

Figure 27: Help to Find Sector Position of Antenna Connectors at Bottom of BTS Compartments

50 / 72 3BK 17073 0001 RJZZA Ed.08


6 Antenna Cables Connecting

Figure 28: Help to Find Sector Position of Antenna Connectors at Bottom of BTS Compartments

3BK 17073 0001 RJZZA Ed.08 51 / 72


6 Antenna Cables Connecting

52 / 72 3BK 17073 0001 RJZZA Ed.08


7 Installing Options

7 Installing Options

This chapter describes the procedure to :

Connect alarm cables to the side compartment

Install synchronization cables.

3BK 17073 0001 RJZZA Ed.08 53 / 72


7 Installing Options

7.1 Connect the External Alarm Cables (Option)


7.1.1 Install the Alarm Cables at BTS Side

1. Identify the appropriate cable bushes for passing the cables


2. Cable bushes reduction adapter fitting:

Pass shrink sleeve over the cable


Pass adapter over the cable

Fit the cable through the socle cover

Strip the cable to the braid

Shrink the sleeve.

3. Fit the cable gland on bottom plate

1 : Alarm cable hole


Figure 29: Side Compartment Bottom Plate

4. Mount the cable gland

54 / 72 3BK 17073 0001 RJZZA Ed.08


7 Installing Options

Figure 30: Cable Gland Mounting

7.1.2 Connect the Alarm Cables to the Connection Area (COAR)


The connection area is located between SIDE COMPARTMENT and BTS
1 COMPARTMENT.
The alarm cables are connected on screw terminal.

8 1 8 1 8 1 8 1
ALARM
ABIS 4 ABIS 3 ABIS 2 ABIS 1

Figure 31: Connection Area (COAR)

3BK 17073 0001 RJZZA Ed.08 55 / 72


7 Installing Options

A
white
Pair 2
B violet Quad
C K 4
green
Pair 1
grey
d1 red
Pair 2
violet Quad
J 3
black
Pair 1
grey
brown
D L 9 07
1 A C 0 1 32 8 0 00 1
Pair 2
violet Quad
I 2
yellow
d2 Pair 1
grey
E blue
Pair 2
violet Quad
F H 1
White
Pair 1
grey
G
Figure 32: Alcatel 8 Pairs Cable L907/ 8

Alarm nr Color COAR pin connector

Quad 1 Alarm 1 grey 2


white 3

Alarm 2 violet 4
blue 5

Quad 2 Alarm 3 grey 6


yellow 7

not used violet not connected


brown

Quad 3 & 4 not used

56 / 72 3BK 17073 0001 RJZZA Ed.08


7 Installing Options

1
2
3
4
5
6
7
8

1 : GND (braid earthing clamp)


2 : ALM1 GND
3 : ALM 1 (external alarm nr 10)
4 : ALM 2 GND
5 : ALM 2 (external alarm nr 13)
6 : ALM 3 GND
7 : ALM 3 (external alarm nr 14)
8 : GND (braid earthing clamp)
Figure 33: Example of Customer Cables : 3 Cables for 3 Alarms

1
2
3
4
5
6
7
8

1 : GND (braid earthing clamp)


2 : ALM1 GND
3 : ALM 1 (external alarm nr 10)
4 : ALM 2 GND
5 : ALM 2 (external alarm nr 13)
6 : ALM 3 GND
7 : ALM 3 (external alarm nr 14)
8 : GND (braid earthing clamp)
Figure 34: Example of Customer Cable : 1 Cable for 3 Alarms

3BK 17073 0001 RJZZA Ed.08 57 / 72


7 Installing Options

7.1.3 Example of Alcatel Alarm Cable Preparing (L907/ 8 ref: 1AC 01328
0001)

1 2

6
5

7 8

1. Remove plastic insulation


2. Get out wire of the braid
3. Cut the braid (be careful , don(t cut the DRAIN wire)
4. Cut the aluminum tape
5. Cut the plastic film
6. Untwist the wires (15 cm)
7. Twist each pair (1 cm)
8. Cut the skin of cable at 3 cm and shift it 1 cm ahead of cable. It’s also
possible to put a rubber sleeve.

58 / 72 3BK 17073 0001 RJZZA Ed.08


7 Installing Options

7.2 Installing Synchronization Cables (Option)


7.2.1 A9100 / G2-BTS Connection

A9100 Master Cable G2 Slave

COAR/XCLK1out OCC23 COB2 (*)


COAR/XCLK2in/out OCC23 COB2 (*)

G2 Master Cable A9100 Slave

COB2 (*) OCC23 COAR/XCL1in


COB2 (*) OCC23 COAR/XCL2in/out

A 91 00 BTS G2−BTS

COAR COB 2
P1

Figure 35: A9100/ G2 BTS Synchronization cable Mounting general View

10 m
COAR COB2
screen
screen
white
5 5
brown
9 9
green
4 4
yellow
8 8
grey
3 3
P1 P2 pink
7 7
blue
2 2
red
6 6
1 2 3 4 5

6 7 8 9 P1 P2
OCC23 3BK 08303 AA

Figure 36: A9100/ G2-BTS Cable (Ref. 3BK 08303 AAAA)

3BK 17073 0001 RJZZA Ed.08 59 / 72


7 Installing Options

7.2.2 A9100 / A9100 Connection

A9100 Master Cable A9100 Slave

COAR/XCLK1out OCC33 COAR/XCLK1in

A 91 00 BTS A 91 00 BTS

COAR
COAR
P1 P2

Figure 37: A9100/ A9100 Synchronization Cable Mounting General View

COAR 1 COAR 2
screen
screen
white
5 5
brown
9 9
green
4 4
yellow
8 8
grey
3 3
pink
P1 P2
7 7
blue
2 2
red
6 6
1 2 3 4 5 1 2 3 4 5
P1 P2
6 7 8 9 6 7 8 9 OCC33 3BK 08304 AA

Figure 38: A9100/ A9100 Cable (Ref. 3BK 08304 AAAA)

7.2.3 Procedure to Fit the Synchronization Cables


1. Fit the synchronization cables trough the cable gland
2. Connect the synchronization cables to the first BTS
3. Solder the connector of the second BTS
4. Connect the synchronization cables to the second BTS
5. Label the cables.
(*) For G2-BTS outdoor connection, see T17/V03 document

60 / 72 3BK 17073 0001 RJZZA Ed.08


8 Finish the Installation

8 Finish the Installation

This chapter describes the procedure for :

Labelling the A9100 racks

Completing the mechanical assembly


Tidying up the site

3BK 17073 0001 RJZZA Ed.08 61 / 72


8 Finish the Installation

3BK 05368 AAAA 3BK 05365 AAAA

BTS STATION 4

BTS STATI ON 4

1 2

3 4

1. Fit the caps on socle cover cable bush


2. Label the cabinets
3. Give the key to the site responsibleRemark:

one key marked side allow only to open the side compartment
one other key marked side+BTS allow to open all doors of the A9100

4. Tidy up the site


Clean out the rack

Remove the packaging from the site

Leave the site clean

62 / 72 3BK 17073 0001 RJZZA Ed.08


Appendix A : Abbreviations

Appendix A: Abbreviations
AC Alternating Current

ACSB AC Switch Board

ANx Antenna Network (Duplexor + receiver head)

ANy Combiner wide band + power splitter

BACO Batteries Connection Unit

BSS Base Station Subsystem

BTS Base Transmission Station

BU Battery Unit

COAR Connection area

COB2 Connection Box 2

DC Direct current

DCDP Direct Current Distribution Panel

DCS Digital Cellular system

EMC Electro-Magnetic Compatibility

FANU Fan Unit

GND Ground

GSM Global System of Mobile communication

IDU Indoor Device Unit

L1 AC main sypply phase 1

L2 AC main sypply phase 2

L3 AC main sypply phase 3

LP Lightning Protection

MBit Mega bit

MEDI BTS medium version

MINI BTS mini version

MW Microwave

N AC main supply Neutral

3BK 17073 0001 RJZZA Ed.08 63 / 72


Appendix A : Abbreviations

NTPM Network Terminaison Primary Multiplexer

ODU Outdoor Device Unit

PCM Pulse coded modulation

PDU Power Device Unit

PE Protective Earth

PVC Chlorure de Polivinyle

RF Radio Frequency

RX Reception

SUM (or SUMP) Station Unit Module (logic board)

TMA Tower Mounted Amplifier

TNL Transceiver (TRX + FUMO + FUCO)

TRE Transceiver (TRX + FUMO + FUCO)

TRX Transmission and Reception radio frequency module

64 / 72 3BK 17073 0001 RJZZA Ed.08


Appendix B : List of Kits and Consumable Supplies

Appendix B: List of Kits and Consumable Supplies


List of Necessary Kits
Package Labelling For each site, the delivery is depending on the options required by the customer.
References Each kit is referenced and labelled either on packages or on equipments
Note : a paper part-list is included into each package.
The reference labelled on package may have 3 possibilities

A mnemonic reference Example :BKBO


It’s the Mnemonic reference of the standart installation kit for MINI or
MEDI BTS Outdoor.

An industrial reference
Example : 3BK 05360 DA
It’s the industial reference of the antenna jumper 3m cable.

An Alcatel ordering reference


Example : G3INS**OO801
It’s the service kit. The method to read it is described next page.

Alcatel Ordering Example : reference G3INS**OO803


Reference Reading The meaning of this reference is :
Method (For A9100 BTS
G3 as generation Evolium A9100
Mini Outdoor Only)
INS as installation reference

** digits not used in Evolium A9100 BTS

OO as configuration OO of the BTS


8 as Service kit

03 as edition 3 of the kit

List of Kits The following table is used to check, on site, the mandatory or optional delivery
item kits.
The used symbols are :
• mandatory kit,

∇ technical choice kit,

◊ customer option kit.

3BK 17073 0001 RJZZA Ed.08 65 / 72


Appendix B : List of Kits and Consumable Supplies

Mandatory kits Ordering ref. Mnemo Industrial ref. Qty

• Basic kit for Mini or Medi INS**OOF BKG3O 3BK 08107 AA

• Antenna jumper cables - - - -


INS**OOU BLF1 3BK 05360 BA 2/s
INS**OOJ BLF2 3BK 05360 CA 2/s
INS**OOA BLF3 3BK 05360 DA 2/s
INSTALBOOK BLF5 3BK 05360 EL 2/s

Option kits Ord. ref. Mnemo Industrial ref. Q

◊ Service kit (*1) INS**OO8 - - -


• BTS terminal cable CBTE 3BK 07951 AB 1
• Monitoring trace cable MT2C 3BK 07952 AA 1
• Alarm disable connector ADCO 3BK 07953 AA 1
• Calibration cable CALC 3BK 08066 AB 1
• Special mounting tool key OMTL 3BK 08244 AA 1

◊ 2Mbits cables (roll 100 m or 250 m) - -


∇ 120 Ohm (4 pairs) L907/4 1AC 01328 0004
∇ 75 Ohm (4 coax) FLEX3/4 1AC 00110 0011

◊ Power cables (roll 100 m) - - -


• Y/G ground cable YG50 1AC 00106 0061 1
• Shielded power cable 5 x 6 mm2 BK5x6 1AC 00468 0003 1

◊ Cable for synchronization - - -


∇ A9100/A9100 (10 m) OCC33 3BK 08304 AA 1
∇ A9100/BTS-G2o) (10 m) OCC23 3BK 08303 AA 2

◊ Alarm cable 8 pairs (roll 100 m or L907/8 1AC 01328 0001 1


250 m)

◊ Mechanical part for 24 Terminal block MP24 1AD 02843 0001 1

◊ Label for 24 terminal block LAB 1AD 02853 0001 1

◊ CAD Terminal block 120/75 ohm JS10 1AD 06634 0011 4


(Alcatel)

◊ Fixing kit for wall FKW 1AD 02844 0001 1

◊ Fixing kit for rack FKR 1AD 02845 0001

◊ Load 50 Ohm (*1) CH716 3BK 06827 AA 1/S

66 / 72 3BK 17073 0001 RJZZA Ed.08


Appendix B : List of Kits and Consumable Supplies

(*1) : This kit is delivered with the others equipments, but is used by commissioning teams.

List of Consumable
Supplies

Item Qty

Indelible marker 1

Rubber sleeves for cables 50

Tie wraps 100

Lugs 20

Blank labels for cables 20

Adhesive tape 2

3BK 17073 0001 RJZZA Ed.08 67 / 72


Appendix B : List of Kits and Consumable Supplies

68 / 72 3BK 17073 0001 RJZZA Ed.08


Appendix C : List of Documents and Tools

Appendix C: List of Documents and Tools


List of Documents The following table is used to check, at base, the availability of the necessary
Required documents.

Document Reference

SPP-33 Particular specifcation GSM and DCS for EVOLIUM 8BL 00704 0034 DRBRA
Alcatel 900 base station for MINI/MEDI outdoor BTS site
preparation

Site documentation Depending of site

Part Volume T17/V18 3DF 00424 0022 ADBRQ

Part Volume T17/V03 (G2-BTSO) 3DF 00424 0009 ADBRQ

Applicable notifications list (ITL) 3DF 00462 0004 AAAGA

Applicable operations instruction (IO) 3DF 00300 0004 UAZZA

Site premises inspection form (CEL) 8BL 00704 0015 DRBRA

General wiring book 3BK 17160 0001 RJZZA

Installation manual generic completion check list (CCL) 3BK 17200 0002 QZZZA

List of Tools Required The following table is used to check, at base, the availability of the necessary
tools (See ” Tools catalogue ” for content checking).

Screwdriver ftat head Tightening tool for antenna jumpers


3 - 4 - 5 mm ref. 3BK 25050 AA

Screwdrivers for Torx® heads screwdriver for Pozidriv head

Screwdriver for hexagon socket heads M5 - M6 Hot air blower


with cable buses

Cutting plier Marking pen

Open-end wrenches Electricians knife


8 to 19 and 27

Percussion drilling (with depthstop) Tape labelling machine


for φ18 masonry drill bits Black tape 12 mm

Masonry drill bits for percussion tools Alcatel insertion tool for terminal block
reference :1AD 01604 0001
φ 8 - 12 - 18 mm

Standard drill bits Tape rule (2m)


φ 8 to 16 mm

3BK 17073 0001 RJZZA Ed.08 69 / 72


Appendix C : List of Documents and Tools

Mounting key Level


reference : 3BK 08144 AA

Hacksaw Stepladder

Wire stripers Nibblers

Crimping pliers for lug up to 50 mm2 Sleeving plier

Bar for craning Tent for Evolium BTS outdoor


reference : 3BK 08804 AAAA reference : 3BK 08 470 AAAA

70 / 72 3BK 17073 0001 RJZZA Ed.08


Appendix D : CAD Terminal Block Fitting (120 Ohm Cable)

Appendix D: CAD Terminal Block Fitting (120 Ohm


Cable)

C LI CK
CLI CK

1 2

200 mm

3 4

5 6

3BK 17073 0001 RJZZA Ed.08 71 / 72


Appendix D : CAD Terminal Block Fitting (120 Ohm Cable)

7 8

9
10

1. Insert the jack strip


2. Verify the good positionning
3. Prepare the end of cablewithout strip the wires
4. Pass the pair in lateral hole
5. Insert the first wire
6. Connect the wire with specific tool
7. Connect the second wire
8. Pass the drain wire
9. Drain pass detail
10. Connect the Drain wire with specific tool

72 / 72 3BK 17073 0001 RJZZA Ed.08