Item Description Unit Qty Materials I Mobilization/Demobilization lot 1
II Excavation/Backfilling lot 1
III Pilot Testing
1. Clamp Saddle, 4" x 3/4" (subject for verification) pc 4 1,155.00 2. Corporation Stop, 3/4" pc 4 1,450.00 3. HDPE Pipe, 3/4" m 65 650.00 4. Male Adapter SCA, 1/2" pc 4 550.00 5. Reducer SCA, 3/4" x 1/2" pc 4 550.00 Labor Unit Rate Total 10,000.00 10,000.00