PROJECT: ALP PARKLINKS NORTH TOWER

SCOPE OF WORK: FIRE PROTECTION WORKS


LOCATION: UGONG NORTE, QUEZON CITY
SUBCONTRACTOR : SF SALAZAR CONSTRUCTION

DESCRIPTION QTY

FIRE PROTECTION WORKS

Fire Protection Pipes & Fittings

Check Valve (Swing Type) - BERMAD


150 mm Ø 3.00
100 mm Ø 9.00

Check Valve (Swing Type) for Pumps - BERMAD


150 mm Ø 3.00

Alarm Check Valve (with complete accesories) - BERMAD


150 mm Ø 1.00

Pressure Relief Valve (PN 25, 365 psi) - BERMAD


150 mm Ø 2.00

Fire Hose Cabinets - 20 LBS


Fire Hose Cabinets (FHC-S) with 20 lbs Fire
19.00
Extinguisher

Prepared By: Checked by:

Jaya Salazar Susan Salazar


Admin General Manager
PREVIOUS REVISED UNIT
PREVIOUS REVISED TOTAL
UNIT UNIT PRICE PRICE
TOTAL AMOUNT AMOUNT
(WEFLO) (BERMAD)

pc 58,535.08 175,605.24 65,170.00 195,510.00


pc 37,128.46 334,156.14 41,400.00 372,600.00

pc 58,535.08 175,605.24 65,170.00 195,510.00

pc 97,725.47 97,725.47 109,000.00 109,000.00

pc 183,035.71 366,071.42 263,000.00 526,000.00

sets 27,232.14 517,410.66 33,365.80 633,950.20

hecked by:

usan Salazar
eneral Manager