Professional Documents
Culture Documents
CONTRACT NO: 1
DOCUMENT TITLE:
Contents confidential. All rights reserved. Contains confidential information proprietary to ENKA UK Construction Ltd. –
GE Power. Not to be used, reproduced, or disclosed outside ENKA UK Construction Ltd. – GE Power without prior
written permission.
Project
Rev. Department Quality
Rev. Date Revision Description Prepared by Deputy
No Manager Manager
Manager
DHI QAR TRAINING P&ID INDEX GT11/12/13/14
# MLI Description P&ID No
PIPING LINE SYMBOLS VALVE SYMBOLS VALVE ASSMBLIES CONNECTIONS & IN-LINE ITEMS CONNECTIONS & IN-LINE ITEMS GENERAL NOTES :
H
WAFER CHECK VALVE
DIAPHRAGM ACTUATED CONTROL VALVE
MAIN PROCESS LINE DOWNWARD SLOPE DRAIN (HARD-PIPED)
F BASKET STRAINER
VALVE SYMBOLS DOUBLE BLOCK AND BLEED VALVE SOLENOID VALVE ASSEMBLIES
SOCKET WELDED
OPEN CLOSED DOUBLE BASKET STRAINER
SOLENOID WELDED
GATE VALVE ACTUATOR TYPES & ACCESSORIES CONE TYPE STRAINER (STARTUP)
INJECTION QUILL
NY AA AA H.S. A3
Nominated Sub Contractor Document Title Document Status Scale :
A
ISSUED FOR USE -
Identification Number
DOUBLE BODY INSTRUMENT VALVE PIPING & INSTRUMENT DIAGRAM
MANUAL DRAIN
SYMBOLS & LEGENDS IQ360-000-M6J-YA-00001
Rev. Date Lang. Sheet
00 07.09.2017 EN 1/1
12 11 10 9 8 7 6 5 4 3 2 1
PUMPS SYMBOLS FIRE & SAFETY SYMBOLS HVAC SYMBOLS HVAC SYMBOLS HEATERS AND EXCHANGER SYMBOLS GENERAL NOTES :
H
HORIZONTAL CENTRIFUGAL PUMP DELUGE VALVE CENTRIFUGAL BLOWER HIGH-EFFICIENCY PRE-FILTER ELECTRICAL TANK HEATER
PREACTION VALVE
ELECTRICAL START-UP GAS HEATER
VERTICAL WET PIT PUMP POST INDICATOR VALVE ELECTROSTATIC PRECIPITATOR TEMA SHELL TYPE F
HOSE VALVE
VANE AXIAL FAN
SUBMERSIBLE VERTICAL PUMP SIAMESE CONNECTION LOW-EFFICIENCY FILTER (START-UP) TEMA SHELL TYPE G
REFERENCES :
FIRE HYDRANT
AXIAL FAN
F
BIRD SCREEN FOR VACUUM
AIR DIAPHRAGM PUMP FIRE HYDRANT WITH MONITOR TEMA SHELL TYPE H
RELIEF DAMPER
UNIT HEATER Rev. Revision Date BY CHK EGS PEM Brief Description
SCREW PUMP HW - HOT WATER
OPPOSED BLADE DAMPER Description Current Version
S - STEAM
E - ELECTRIC
PROJECT
C TEMA FRONT END TYPE L
PARALLEL BLADE DAMPER DHI QAR COMBINED CYCLE
COMPRESSOR SYMBOLS
VANE PUMP
POWER PLANT PROJECT
BACKDRAFT OR GRAVITY RELIEF DAMPER
HEATERS AND EXCHANGER SYMBOLS
TEMA FRONT END TYPE M NASIRIYAH, IRAQ
OWNER
SINGLE BLADE OR BUTTERFLY DAMPER
CENTRIFUGAL COMPRESSOR
DOUBLE PIPE / MULTI PIPE
HEAT EXCHANGER
RECIPROCATING PUMP TEMA FRONT END TYPE N M
MANUAL BALANCE DAMPER E
PROPORTIONING
B METERING PUMP FIXED LOUVER
00 07.09.2017 EN 1/1
12 11 10 9 8 7 6 5 4 3 2 1
CONE ROOF EXTERNAL FLOATING ROOF FULL CONTACT INTERNAL FLOATING ROOF DOME / UMBRELLA ROOF CLARIFIER
REFERENCES :
STACKS
Revision History
M
E
FILTER
MOE Contract Number :
WEIR HORIZONTAL DEAERATOR AND STORAGE TANK VERTICAL DEAERATOR AND STORAGE TANK NY AA AA H.S. A3
VERTICAL Nominated Sub Contractor Document Title Document Status Scale :
A
ISSUED FOR USE -
HORIZONTAL
Identification Number
PIPING & INSTRUMENT DIAGRAM
SYMBOLS & LEGENDS IQ360-000-M6J-YA-00003
TOWER Rev. Date Lang. Sheet
VORTEX BREAKER
00 07.09.2017 EN 1/1
12 11 10 9 8 7 6 5 4 3 2 1
INTERNAL COIL
BAYONET
ELECTRIC JACKET
G ELECTRIC BAYONET
BOILER ELECTRIC BOILER FORCED DRAFT AIR COOLER STRAIGHT TUBE HEAT EXCHANGER
REBOILER
JACKET
REFERENCES :
FULL COIL
E
HALF COIL
NATURAL DRAFT SAMPLE COOLER GENERIC INDUCED DRAFT AIR COOLER AFTERCOOLER
MECHANICAL DRAFT COOLING TOWER
Revision History
M
E
ELECTRIC MOTOR
ELECTRIC GENERATOR
FUEL (SEPARATE FROM DRIVER UNIT) MOE Contract Number :
CONTRACT NO: 1
Cross Checked
Department Name Date Signature
AIR MOTOR
DIESEL ENGINE
Replaces Responsible Dept. Document Type Project Document Code
(SEPARATE FROM DRIVER UNIT)
- PROCESS P&ID DQR/00/K/003b----000/FD/004
Format
NY AA AA H.S. A3
Nominated Sub Contractor Document Title Document Status Scale :
A
VARIABLE FREQUENCY DRIVE ISSUED FOR USE -
Identification Number
PIPING & INSTRUMENT DIAGRAM
SYMBOLS & LEGENDS IQ360-000-M6J-YA-00004
SINGLE FLOW STEAM TURBINE DOUBLE FLOW STEAM TURBINE GAS TURBINE Rev. Date Lang. Sheet
00 07.09.2017 EN 1/1
12 11 10 9 8 7 6 5 4 3 2 1
HS HS [instrument hydraulic power supply] may be replaced by F() SELF-ACTUATED DEVICES - TEMP
ES [instrument electric power supply].
POSITIVE DISPLACEMENT
AA
SS STEAM SUPPLY
CL ELECTROMAGNETIC, SONIC
D PV
CONNECTION TO PROCESS OR RADIATION (NOT GUIDED) AA
L() PRESSURE REDUCING
OR INSTRUMENT AIR SUPPLY
TCV DESUPERHEATER VALVE
PNEUMATIC SIGNAL CF TEMPERATURE REGULATOR,
VARIABLE AREA FILLED - SYSTEM TYPE
Electronic or electrical continuously variable or binary signal. FCV
CL
CF AA
CAPILLARY TUBING (FILLED SYSTEM)
L() ELECTROMAGNETIC, SONIC Revision History
F() OR RADIATION (GUIDED) TCV AA
HYDRAULIC SIGNAL GWR
ANGLE TEMPERATURE REGULATOR
VORTEX PV
ELECTROMAGNETIC OR SONIC SIGNAL (CAPILLARY ACTUATED)
PRESSURE REDUCING 00 07.09.2017 NY OS AA HS ISSUED FOR USE
(GUIDED) NOTE 11 DESUPERHEATER STATION B 01.06.2017 NY AA AA HS ISSUED FOR REVIEW
CF AA (SHOWN IN CLOSED POSITION)
ELECTROMAGNETIC OR SONIC SIGNAL CL Rev. Revision Date BY CHK EGS PEM Brief Description
AA603 AA604
GENERAL NOTES :
H
REFERENCES :
NOTES:
1. THE INSTRUMENT SYMBOLS AND LEGENDS ARE BASED ON ANSI / ISA-5. 1-2009 STANDART. FOR FURTHER DETAILS AND CLARIFICATION, REFER TO ISA STANDART.
2. THE USER'S CHOICE LETTERS "B", "C", "G", "D", "M", "N" AND "O" ARE FOR UNLISTED MEANINGS THAT WILL BE USED REPETITIVELY. THE MEANING WILL BE DEFINED ONLY ONCE AND HAVE ONE AND ONLY ONE MEANING AS A FIRST
LETTER AND ANOTHER SINGLE MEANING AS A SUCCEEDING LETTER.
3. THE UNCLASSIFIED LETTER "X" IS FOR UNLISTED MEANING THAT MAY BE USED ONLY ONCE OR TO A LIMITED EXTENT. IT MAY HAVE ANY NUMBER OF MEANINGS AS A FIRST LETTER AND ANY NUMBER OF MEANINGS AS A SUCCEEDING
D LETTER EXCEPT FOR ITS USE WITH DISTINCTIVE SYMBOLS. THE MEANINGS WILL BE DEFINED OUTSIDE THE INSTRUMENT BUBBLE.
4. THE LETTER "A" IS USED FOR ALL ANALYSIS VARIABLE, THE FOLLOWING TERMS MAY BE PLACED OUTSIDE THE INSTRUMENT BUBBLE TO DENOTE THE SPECIFIC VARIABLES:
CL2 - CHLORINE H2 - GASEOUS HYDROGEN NOX - NITROGEN OXIDES RAD - RADIATION VISC - VISCOSITY
CO - CARBON MONOXIDE HCL - HYDROGEN CHLORIDE O - DISSOLVED OXYGEN S - SULFUR
CO2 - CARBON DIOXIDE MOIST - MOISTURE OIW - OIL IN WATER SIO2 - SILICA
COMB - COMBUSTIBLE N2 - NITROGEN O2 - GASEOUS OXYGEN SMOKE - SMOKE DENSITY
Revision History
COND - CONDUCTIVITY N2H4 - HYDRAZINE OP - OPACITY SOx - SULPHUR OXIDES
DEN - DENSITY NA - SODIUM ORP - OXIDATION REDUCTION POTENTIAL SO2 - SULPHUR DIOXIDE
H - DISSOLVED HYDROGEN NH3 - AMMONIA pH - HYDROGENION CONCENTRATION TURB - TURBIDITY
00 07.09.2017 NY OS AA HS ISSUED FOR USE
5. THE DESCRIPTION DENOTING THE FUNCTION OF AUXILIARY DEVICES SUCH AS RELAY, CONVERTER OR COMPUTER, "Y" MAY BE SHOWN OUTSIDE THE INSTRUMENT BUBBLE WHEN FURTHER DEFINITIONS IS CONSIDERED NECESSARY. B 01.06.2017 NY AA AA HS ISSUED FOR REVIEW
6. FOR CERTAIN INSTRUMENTS, USE NOTATION AS LISTED BELOW. Rev. Revision Date BY CHK EGS PEM Brief Description
12. INCLUSION OF SAFETY DESIGNATOR IN TAG NUMBER REPLACES THE REQUIREMENT OF INCLUDING "Z" AS A VARIABLE MODIFIER FOR SAFETY INSTRUMENTED SYSTEM.
13. FOR THE DETAILS OF KKS CODE SEE VGB POWERTECH KKS APPLICATION EXPLANATIONS VGB-B 106 B3 E EDITION 2004. Replaces Responsible Dept. Document Type Project Document Code
14. FOR TEST THERMOWELL ADD "QT" WITH LOOP NUMBER INSIDE THE BUBBLE. - PROCESS P&ID DQR/00/K/003b----000/FD/006
Format
NY AA AA H.S. A3
Nominated Sub Contractor Document Title Document Status Scale :
A
ISSUED FOR USE -
Identification Number
PIPING & INSTRUMENT DIAGRAM
SYMBOLS & LEGENDS IQ360-000-M6J-YA-00006
Rev. Date Lang. Sheet
00 07.09.2017 EN 1/1
12 11 10 9 8 7 6 5 4 3 2 1
GENERAL NOTES :
SYSTEM CODES CONTROL SYSTEM EQUIPMENT CODES INSTRUMENT SEQUENCE NUMBER
H
KKS CODE 001 - 099 REMOTE ANALOG 1 LINE COMMODITY CODE IS REPRESENTED BY "BR"
SYSTEM TITLE KKS CODE DESCIPRIPTION
(F1, F2, F3) 100 - 199 LOCAL CONTROL
EG SUPPLY OF LIQUID FUELS (LIGHT DISTILLATE OIL) CD DENSITY
200 - 299 NOT USED
EN SUPPLY OF LIQUID FUELS (CO & HFO) CE ELECTRICAL VARIABLES (e.g. CURREN, VOLTAGE, POWER, ELECTRICAL FREQUENCY)
2 FOR PIPING CLASS DESIGNATIONS, SEE IQ360-000-3PS-PC00-00001,
300 - 399 REMOTE BINARY ( OR LOCAL WITH )
PIPING MATERIAL SPECIFICATION
EV LUBRICANT SUPPLY SYSTEM CF FLOW, RATE
400 - 499 NOT USED
EK SUPPLY OF GASEOUS FUELS CG DISTANCE, LENGHT, POSITION, DIRECTION OF ROTATION
500 - 599 LOCAL INDICATOR / GAUGE
GA RAW WATER SUPPLY CH MANUAL INPUT AS MANUALLY OPERATD SENSOR (e.g. FIRE DETECTOR)
600 - 699 NOT USED
GC TREATMENT SYSTEM (DEMINERALIZATION) CK TIME
700 - 799 NOT USED
GD TREATMENT SYSTEM (OTHERS, E.G. DESALINATION) CL LEVEL
800 - 899 TEST TAPPING POINT
G GH DISTRIBUTION SYSTEMS (NOT DRINKING WATER) CM MOISTURE, HUMIDITY
COMBINED DATA - CALCULATED MEASUREMENT,
900 - 999
GK DRINKING WATER SUPPLY CP PRESSURE AFTER CALCULATION OR CORRECTION
GM PROCESS DRAINAGE SYSTEM CQ QUALITY VARIABLES (ANALYSIS, MATERIAL PROPERTIES, OTHER THAT "CD", "CM", & "CV")
GQ DOMESTIC WASTE WATER COLLECTION AND DRAINAGE SYSTEMS CR RADIATION VARIABLES SYSTEM KKS PLANT / UNIT DESIGNATOR
GR DOMESTIC WASTE WATER TREATMENT SYSTEMS CS VELOCITY, SPEED, FREQUENCY (MECHANICAL), ACCELERATION
UNITS UNIT 1 UNIT 2 UNIT 3 UNIT 4
HA PRESSURE SYSTEM, FEEDWATER AND STEAM SECTIONS CT TEMPERATURE
GAS TURBINE
HJ IGNITION FIRING EQUIPMENT (IF SEPARATE), SUPPLEMENTARY FIRING AS WELL (E.G. FOR HRSG) CU COMBINED AND OTHER VARIABLES HRSG 13
11 12 14
LA FEEDWATER SYSTEM CV VISCOSITY REFERENCES :
CW WEIGHT, MASS STG 10MA
LB STEAM SYSTEM
ACC 10LC
LC CONDENSATE SYSTEM CX NEUTRON FLUX
F
MA STEAM TURBINE PLANT CY VIBRATION, EXPANSION
PLANT COMMON
MB GAS TURBINE PLANT CENTRAL CONTROL COMMON 00UC
DEMINERALIZED WATER 00GC
PA CIRCULATING (MAIN COOLING) WATER SYSTEM
INSTRUMENT & SERVICE AIR
PB CIRCULATING (MAIN COOLING) WATER TREATMENT SYSTEM
AB ISOLATING ELEMENT, AIR LOCKS SEQUENCE NUMBER PIPING MATERIAL CLASS IF INSULATING FLANGE
AE TURNING, DRIVING, LIFTING AND SLEWING GEAR (CRANES & HOISTS) NOMINAL PIPE DIAMETER MIN. MINIMUM
AH HEATING, COOLING AND AIR CONDITIONING UNITS 2 PIPING CLASS DESIGNATORS INSTRUMENT TAGING UG UNDERGROUND
AS ADJUSTING AND TENSIONING EQUIPMENT FOR NON-ELECTRICAL VARIABLES Rev. Revision Date BY CHK EGS PEM Brief Description
CONTRACT NO: 1
UNIT DESIGNATOR LARGE BORE and SMALL BORE MANUAL VALVES.............. 001 - 499
Cross Checked
AA601 AA602 MOTOR OPERATED................................................................. 500 - 549 Department Name Date Signature
SYSTEM CODE
(KKS) AIR OPERATED VALVES and REGULATORS......................... 550 - 599 Replaces Responsible Dept. Document Type Project Document Code
CP - PROCESS P&ID DQR/00/K/003b----000/FD/007
001 SUB SYSTEM CODE INSTRUMENTS ROOT VALVES............................................... 600 - 699 Format
00 07.09.2017 EN 1/1
DIRECTORATE GENERAL FOR GAS POWER
PLANT PROJECTS
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
al
SE
12/03/2012
12/03/2012 13/03/2012
13/03/2012 13/03/2012
13/03/2012
ci
CLERGET
AFR IB MARC BERNIER
BERNIERJOEL
JOEL DURAND
DURANDFREDERIC
FREDERIC
R
CLERGET
AFR IB MARC BERNIER
BERNIERJOEL
JOEL DURAND
DURANDFREDERIC
FREDERIC
ffi
FO
A0
VALIDE
O
GAS TURBINE WITH ASSOCIATES ITEMS-EQUIPMENT
9E GAS TURBINEDRAWING
ARRANGEMENT MODEL LIST ITEMS
E
0406, EQUIP ARR, GT GENERAL ARRANGEMENT
VALIDE
9E GAS TURBINE MODEL LIST ITEMS - -
G
FUCHS ANNE
D
D
ENOVIA
8 7 6 5 4 3 A1
SIZE DWG.NO.
227D1035 1/
SH. REV.
A 1
3
REVISIONS
AFR - ML
1 - VOIR MLI 0414, NOMENCLATURE DES APPAREILS POUR LE REGLAGE DES APPAREILS.
1 - SEE MLI 0414, DEVICE SUMMARY FOR DEVICE SETTING.
D 2 - LA LOCALISATION DES APPAREILS REPRESENTES SUR LE SCHEMA MLI 0415 EST DONNEE A TITRE INDICATIF. D
2 - DEVICE LOCATIONS DEPICTED ON THE SCHEMATIC MLI 0415 ARE FOR REFERENCE ONLY.
4 - DANS LE CAS D'UNE CLASSIFICATION DE ZONE 95SG-13 ET 95SG-14 DEVRONT ETRE INSTALLES EN DEHORS DE LA ZONE CLASSEE.
4 - FOR HAZARDOUS AREAS, 95SG-13 AND 95SG-14 SHALL BE INSTALLED OUTSIDE OF THE CLASSIFIED AREA.
A A A REV
REV STATUS
OF SHEETS
3 2 1 SH
3
SYSTEM AND COMPONENT CLEANLINESS
REQUIREMENTS GE-362A2412
C
C
IT. NOMENCLATURE IDENT
DIRECTORATE GENERAL FOR GAS POWER B
PLANT PROJECTS
B
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
al
SE
11/02/2009
11/02/2009 13/02/2009
13/02/2009 13/02/2009
13/02/2009
ci
None AFR MLML GAUFROID
AFR GAUFROIDFLORIAN
FLORIAN JANIN PASCAL
JANIN PASCAL
R
AFR MLML
AFR GAUFROID
GAUFROIDFLORIAN
FLORIAN JANIN PASCAL
JANIN PASCAL
ffi
FO
A1
VALIDE
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCHEMA
AND INSTRUMENTATION
INSTRUMENT CONTROLE
DIAGRAM (P&I D) TURB
E
0415, PID, DEVICES-TURBINE
NOMS / NAMES
VALIDE
DIAG. SCH. CONTROL
DRAWN AFR - ML DEVICE TURBINE
G
CHECKED GAUFROID F.
APPROVED
A
JANIN P.
SCH. INSTRUMENTATION CONTROLE TURBINE
ANNE
AA
DIAG. SCH. CONTROL DEVICE TURBINE
FUCHS
0415
gazton0
227D1035
This document, exclusive property of
A1
DISTR
Ce document, propriete exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. IL ne peut etre communique, is strictly confidential. It must not be communicated
01 F X
copie ou reproduit sans son autorisation ecrite prealable. copied or reproduced without our previous written consent. SIM
TO: 206D7191
1/1
1/3(1)
SCALE REV. : A SHEET : 1/3
DT-1C
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 A1
SIZE DWG.NO.
227D1035 2/
SH. REV.
A 1
3
ASPIRATION ECHAPPEMENT
INLET EXHAUST
TE (TT-IB-2)
(95SP-14)
JX
TE (TT-IB-1) (TT-IB-3)
TE
TE (TT-WS3AO-2)
TE (TT-WS3AO-1)
TE (TT-XD-18) TE (TT-XD-7)
TE (TT-XD-17) TE (TT-XD-8)
VOIR NOTE 4
TE (TT-XD-16) TE (TT-XD-9)
SEE NOTE 4
JXY (95SG-13) TE (TT-XD-15) TE (TT-XD-10) C
C TE (TT-XD-14) TE (TT-XD-11)
JXY (95SG-14)
TE (TT-XD-13) TE (TT-XD-12)
SOCLE (30SG-1) VUE B / VIEW B
(CT-DA-2) (TT-WS1FI-2) (TT-WS1AO-2) (TT-WS2AO-2) JXA
BASE TE TE TE TE PAROI ARRIERE, CAISSON ECHAPP.
SENS DU FLUX VUE DE DROITE AFT. WALL, EXHAUST PLENUM
DOWNSTREAM RIGHT SIDE VIEW
ECHAPPEMENT ASPIRATION
EXHAUST INLET
(TT-WS3FO-1)
TE (77NH-3) LEAVE THIS SPACE BLANK
(TT-WS2AO-1) SE
TE
(TT-WS2FO-1)
TE (77NH-2)
(TT-WS1AO-1) SE
TE
(77NH-1)
SE
(28FD-4)
TEF
DIRECTORATE GENERAL FOR GAS POWER B
TEF
(28FD-5)
PLANT PROJECTS
B
(CT-IF-1) (CT-IF-2)
MEGA DEAL PROJECTS
NASIRIYAH POWER PLANT
TE TE
CONTRACT N° 28
A [4 x 125 MW]
al
SE
11/02/2009
11/02/2009 13/02/2009
13/02/2009 13/02/2009
13/02/2009
ci
None AFR MLML GAUFROID
AFR GAUFROIDFLORIAN
FLORIAN JANIN PASCAL
JANIN PASCAL
R
AFR MLML
AFR GAUFROID
GAUFROIDFLORIAN
FLORIAN JANIN PASCAL
JANIN PASCAL
ffi
FO
A1
VALIDE
O
(CT-DA-1)
TE SOCLE VUE A / VIEW A GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
PAROI AVANT,CAISSON ASPIRATION SCHEMA
AND INSTRUMENTATION
INSTRUMENT CONTROLE
DIAGRAM (P&I D) TURB
BASE
FORWARD WALL,INLET PLENUM
E
SENS DU FLUX VUE DE GAUCHE (39V-2A) 0415, PID, DEVICES-TURBINE
NOMS / NAMES
VALIDE
DOWNSTREAM LEFT SIDE VIEW VE
DIAG. SCH. CONTROL
DRAWN AFR - ML. DEVICE TURBINE
G
CHECKED GAUFROID F.
(TT-WS1FI-1) APPROVED
A
JANIN P.
SCH. INSTRUMENTATION CONTROLE TURBINE
ANNE
TE
AA
DIAG. SCH. CONTROL DEVICE TURBINE
FUCHS
0415
gazton0
227D1035
This document, exclusive property of
A1
DISTR
Ce document, propriete exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. IL ne peut etre communique, is strictly confidential. It must not be communicated
01 F X
copie ou reproduit sans son autorisation ecrite prealable. copied or reproduced without our previous written consent. SIM
TO: 206D7191
1/1
2/3(2)
SCALE REV. : A SHEET : 2/3
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 A1
SIZE DWG.NO.
227D1035
SH.
3/3
REV.
A 1
VOIR/SEE NOTE 3
(77RP-11) (96VC-11)
SE ZE
(39VS-22) (39VS-24) (39VS-31)
D ZT VEY VEY VEX D
(39VS-12) (39VS-32)
VEY VTY VTY VTX VEY
VTY VTY
(39VS-21) (39VS-23)
VEX VEX
VTX ZT
C
C
PALIER 1 PALIER 2 PALIER 3
DIRECTORATE GENERAL FOR GAS POWER B
(BT-TI1-2A, 2B) (BT-J1-2A, 2B)
PLANT PROJECTS
TE TE
B
(BT-TI1-5A, 5B) (BT-J1-1A, 1B) (BT-J2-1A, 1B) (BT-J3-1A, 1B)
MEGA DEAL PROJECTS
NASIRIYAH POWER PLANT
TE TE TE TE
CONTRACT N° 28
al
SE
(BT-TA1-2A, 2B) (BT-TA1-5A, 5B)
TE TE
11/02/2009
11/02/2009 13/02/2009
13/02/2009 13/02/2009
13/02/2009
ci
None AFR MLML GAUFROID
AFR GAUFROIDFLORIAN
FLORIAN JANIN PASCAL
JANIN PASCAL
R
AFR MLML
AFR GAUFROID
GAUFROIDFLORIAN
FLORIAN JANIN PASCAL
JANIN PASCAL
ffi
FO
A1
VALIDE
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCHEMA
AND INSTRUMENTATION
INSTRUMENT CONTROLE
DIAGRAM (P&I D) TURB
E
0415, PID, DEVICES-TURBINE
NOMS / NAMES
VALIDE
DIAG. SCH. CONTROL
DRAWN AFR - ML. DEVICE TURBINE
G
CHECKED GAUFROID F.
APPROVED
A
JANIN P.
SCH. INSTRUMENTATION CONTROLE TURBINE
ANNE
AA
DIAG. SCH. CONTROL DEVICE TURBINE
FUCHS
0415
gazton0
227D1035
This document, exclusive property of
A1
DISTR
Ce document, propriete exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. IL ne peut etre communique, is strictly confidential. It must not be communicated
01 F X
copie ou reproduit sans son autorisation ecrite prealable. copied or reproduced without our previous written consent. SIM
TO: 206D7191
1/1
3/3(3)
SCALE REV. : A SHEET : 3/3
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 SIZE
A1
DWG.NO.
227D1331
SH.
1 G
REV.
1
REVISIONS
JENNEVIN R.
A FIRST ISSUE
NOTES: 24/11/2008 BELPERRON S.
DELIMOGES S.
1 - VOIR MLI 0414, NOMENCLATURE DES APPAREILS POUR LE REGLAGE DES APPAREILS. RENIER L.
B IM-2008011746 25/11/2008 BELPERRON S.
1- SEE MLI 0414, DEVICE SUMMARY FOR DEVICE SETTING. DELIMOGES S.
RENIER L.
2 - VOIR MLI 0313 ET 0314 POUR LES CARACTERISTIQUES DES CONNEXIONS. C IM-2009000362 14/01/2009 BELPERRON S.
DELIMOGES S.
2 - SEE MLI 0313 AND 0314 FOR CONNECTIONS CHARACTERISTICS. IM-2009007898
D D - page 2 zone D-7 remplacement HV150 & 151 par des connexions rapides 05/09/2009
AFR - CP
JENNEVIN R.
D
- sheet 2 area D-7 replace valves HV150 ans HV151 by quicks connectors DELIMOGES S.
3 - VOIR LIGNE 4 DU TABLEAU "LIST OF COMPLEMENTARY DOCUMENTS" POUR LES CARACTERISTIQUES DU FLUIDE. IM-2010001635 JENNEVIN R.
3 - SEE ITEM 4 OF THE "LIST OF COMPLEMENTARY DOCUMENTS" FOR FLUID CHARACTERISTICS. - Suppression brides bypass VPR2 page 2 zone D7 & ajout piquage bouchonné 16/03/2010 BELPERRON S.
E entre bride à orifice et VPR2, page 2 zone D7, par requete US DELIMOGES S.
- Sheet 2 area D7 remove bypass flange VPR2 and add plug between blank
flange end VPR2 query by US
4 - LA CONNEXION LO1 PERMET LE REMPLISSAGE DE LA CUVE A HUILE.
IM-2010001868 AFR - CP
4 - THE LO1 CONNECTION IS DESIGNED FOR THE OIL TANK FILLING. F - Mise à jour afin de respecter la spécification 172A6828 19/03/2010 JENNEVIN R.
(ajout de la description en anglais) DELIMOGES S.
- Changement du diamètre du diaphragme DI130 en 25,4 mm - 1" page 2 zone D7
- Update to be compliant with document’s specification 172A6828
(add english description)
- Change diameter of DI130 25.4mm - 1" sheet 2 area D7
IM-2011005882 BELPERRON S.
G - Changement de nom du diaphragme LOF1-1 de DI120 à DI110, ajout du nom DI115 31/08/2011
GADRET K.
pour le diaphragme de LOF1-2
- Change orifice name of LOF1-1 from DI120 to DI110 and add of orifice name DELOGE D.
DI115 for LOF1-2
- Renommer la vanne HV101 en zone B-6 en HV106
- Change name of HV101 (zone B-6) to HV106
G G G REV
REV STATUS
OF SHEETS
3 2 1 SH
DIRECTORATE GENERAL FOR GAS POWER B
PLANT PROJECTS
B
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
SE
E0872 100 I70 FD 001 B
al
U
31/08/2011
31/08/2011 05/09/2011
05/09/2011 06/09/2011
06/09/2011
ci
None BELPERRON SANDRINE BELPERRON
BELPERRON SANDRINE BELPERRONSANDRINE
SANDRINE DELOGE
DELOGEDANIEL
DANIEL
R
BELPERRON SANDRINE
BELPERRON SANDRINE BELPERRON
BELPERRONSANDRINE
SANDRINE DELOGE
DELOGEDANIEL
DANIEL
ffi
FO
A1
VALIDE
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCHEMA HUILE DE DIAGRAM
AND INSTRUMENT GRAISSAGE
(P&I D)
E
0416, PID, LUBE OIL
NOMS / NAMES
VALIDE
DIAG. SCH. PP-LUBE
DRAWN
JENNEVIN OIL
R.
G
CHECKED BELPERRON S.
FUCHSBRIGITTE
APPROVED DELIMOGES S.
A SCHEMA HUILE DE GRAISSAGE
ANNE
G
DIAG. SCH. PP LUBE OIL G
0416
CHENUT
227D1331
This document, exclusive property of
A1
DISTR
Ce document, propriété exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. Il ne peut être communiqué, is strictly confidential. It must not be communicated
- F X
copié ou reproduit sans son autorisation écrite préalable. copied or reproduced without our previous written consent. SIM
TO:
1/3
1/3
SCALE REV. : G SHEET : 1
DT-1C
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 A1
SIZE DWG.NO.
227D1331
SH.
2 G
REV.
1
(96QA-2) (63QA-2)
TW
VERS / TO MLI.0421
VERS / TO MLI.0434
38 L/mn 10 GPM
TE
(LT-TH-2) VOIR PAGE 3
TE PC LO19A
SEE SHEET 3
OR-2
OR-3
NC (LT-TH-3)
NO NO HV301 A B C
TE
HV302 HV300
D OD D
OR-3
OR-2
W D
NC 31,75mm - 1.25"
HV303 (DANS CORPS
IN BODY) MIST OIL ELIMINATOR (MLI A098)
VPR2-1
W D
OD
OL-2
DI 130 (88QV-1A)
25,4 mm - 1"
M (23QV-1A)
2%
TE
PEN E
W D
P
SLO
EJECTEUR AIR:
ECHANTILLON HUILE FILTREE VOIR AIR ATOM.
DI 120 AIR EJECTOR :
128 mm--2.50"
64 mm 5.00" FILTERED OIL SAMPLE
76mm - 3.00" (FOR TEST ONLY) NC
SEE ATOM. AIR
VCK20-13
VERS / TO MLI.0434
(MLI ITEM 0425)
W D
HV101
OR-1
NC
HV212 HV222 W D
LOF1-1 LOF1-2 W D
DI 110 DI 115
OD OD
(63QQ-21) 2,6 mm - 2,6 mm - (63QQ-22)
0.105" 0.105" REDUCTEUR DES
PDS PDS AUXILIAIRES
SG
115 L/mn
COMP. AIR ATOM. C
SG HV141 HV142 57 L/MIN LO18
C NC NC PC
ACCESSORY GEAR ATOM. AIR COMP
OD 30 GPM 2%
OD OD 15 GPM
OD TE
PEN E 2%
PQ1-1 P TE 2%
SLO PEN E TE
NO NO P PEN E
POMPE PRINCIPALE ATTELEE 3000 L/MN 6.89 BAR SLO P
HV210 HV220 SLO
SHAFT DRIVEN GEAR PUMP 792 GPM 100PSIG
CONN. PURGE LESSIVAGE EN USINE
D W
D
SEE CLG WATER (ML IT. 0420) SEE CLG WATER (ML IT. 0420) VERS / TO MLI. 0421 0-1514 L/MN
VOIR EAU DE REFROID. VOIR EAU DE REFROID. OL-6 0-400 GPM
PEN E
OL-6
TW
P LEAVE THIS SPACE BLANK
NC SLO
NC
NC HV130 NC HV104
HV110 HV120 OD
ACF-1
NO
HV103
ECHANTILLON HUILE (63QQ-8)
NON FILTREE (96QE-2)
PT PDS
UNFILTERED OIL
DIRECTORATE GENERAL FOR GAS POWER B
SAMPLE
NC
HV010
NC
PLANT PROJECTS
D W
HV106 2%
B HV100 NC PEN
T
LI HV105 SLO E
W D
OL-1 NC
NO (96QV-1) PE
HV020
OD
LO25 LO22 MEGA DEAL PROJECTS
LSH (71QH-1) NO BCF-1
NASIRIYAH POWER PLANT
NO PT PC PC
HV102
OD-1
DESSUS DU FER I BOX WITH VISUAL
(88QA-1) CONTRACT N° 28
OD-2
(71QL-1) TOP OF BASE BEAM (88QE-1) LEVEL GAUGE
LSL M (23QA-1)
M [4 x 125 MW]
W D
200 mm
OL-4
OL-5
OL-3
Maxi
254
305
406
432
SE
E0872 100 I70 FD 001 B
al
659
U
31/08/2011
31/08/2011 05/09/2011
05/09/2011 06/09/2011
06/09/2011
ci
None BELPERRON SANDRINE BELPERRON
BELPERRON SANDRINE BELPERRONSANDRINE
SANDRINE DELOGE
DELOGEDANIEL
DANIEL
R
(LT-OT-1) DI 100 BELPERRON SANDRINE
BELPERRON SANDRINE BELPERRON
BELPERRONSANDRINE
SANDRINE DELOGE
DELOGEDANIEL
DANIEL
ffi
FO
TE
32.8
6.35mm - 0.25" A1
PQ2-1
VALIDE
(LT-OT-2)
O
TE PLEIN/FULL 100 PSIG. 6.89 BAR (23QT-1)
VIDE/EMPTY 793 GPM. 3002 L/mn (23QT-2) GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
ALARME BASSE 20 PSIG. 1.37 BAR SCHEMA HUILE DE DIAGRAM
GRAISSAGE
420 GPM. 1596 L/mn AND INSTRUMENT (P&I D)
LOW ALARM FACE ASPIRATION AUXILIAIRE
E
SUCTION FACE AUXILIARY HV401 0416, PID, LUBE OIL
NOMS / NAMES
VALIDE
NC NC DIAG. SCH. PP-LUBE
DRAWN JENNEVIN OIL
R.
G
HV400 CHECKED BELPERRON S.
LO2A LO2B
FUCHSBRIGITTE
APPROVED DELIMOGES S.
A PC PC SCHEMA HUILE DE GRAISSAGE
ANNE
CAPACITE APPROX. CUVE PLEINE 12491 L. G
CAISSON D'HUILE DANS LE SOCLE
LUBE OIL TANK IN BASE FULL TANK CAPACITY APPROX. 3300 GAL.
DIAG. SCH. PP LUBE OIL G
0416
CHENUT
227D1331
This document, exclusive property of
A1
DISTR
Ce document, propriété exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. Il ne peut être communiqué, is strictly confidential. It must not be communicated
- F X
copié ou reproduit sans son autorisation écrite préalable. copied or reproduced without our previous written consent. SIM
TO:
2/3
2/3
SCALE REV. : G SHEET : 2
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 SIZE
A1
DWG.NO.
227D1331
SH.
3 G
REV.
1
D D
VOIR PAGE 2
SEE SHEET 2
DI 140
33mm - 1.3" FUITE CONTINUE DI 150 DI 160
TELL TALE DRAIN 34.3mm - 1.35" 33mm - 1.3"
(96QT-2B)
BUTEE CONTRE BUTEE COUSSINET COUSSINET COUSSINET PT
PALIER N0 1 PALIER N0 1 PALIER N0 1 PALIER N0 2 PALIER N0 3
264 L/mn 26 L/mn 262 L/mn 492 L/mn 303 L/mn
(63QT-2A)
PS
NO. 1 LOADED NO. 1 UNLOADED NO. 1 JOURNAL LO17 NO. 2 JOURNAL
THRUST BEARING THRUST BEARING BEARING PC BEARING NO. 3 JOURNAL
69.7 GPM 6.8 GPM 69 GPM 130 GPM BEARING 80 GPM (LT-G1D-1)
HV500 TE
NO
W D
(LT-B1D-1) (LT-G2D-1)
TE
TE D W
OLV-2 SG
EVENT BOUCHE SITUE SUR
VOIR PAGE 2 TOURILLON DE LEVAGE
SEE SHEET 2 VENT CAPPED AT TURBINE
BASE LIFTING TRUNNION
BOITE D'ECOULEMENT
SOCLE TURBINE
TURBINE BASE SURGE TANK
W D W D W D W D
LO23
[4 x 125 MW]
BOITE D' BOITE D' BOITE D' BOITE D'
ECOULEMENT ECOULEMENT ECOULEMENT ECOULEMENT PC
D'HUILE 1 D'HUILE 2 D'HUILE 3 D'HUILE 4
SURGE TANK SURGE TANK SURGE TANK SURGE TANK PC
SE
E0872 100 I70 FD 001 B
al
LO24
U
31/08/2011
31/08/2011 05/09/2011
05/09/2011 06/09/2011
06/09/2011
ci
None BELPERRON SANDRINE BELPERRON
BELPERRON SANDRINE BELPERRONSANDRINE
SANDRINE DELOGE
DELOGEDANIEL
DANIEL
R
BELPERRON SANDRINE
BELPERRON SANDRINE BELPERRON
BELPERRONSANDRINE
SANDRINE DELOGE
DELOGEDANIEL
DANIEL
ffi
FO
A1
OD-2
VALIDE
DE / FROM MLI. 0422
OD
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCHEMA HUILE DE DIAGRAM
AND INSTRUMENT GRAISSAGE
(P&I D)
E
D 0416, PID, LUBE OIL
NOMS / NAMES
VALIDE
VOIR PAGE 2 DIAG. SCH. PP-LUBE
DRAWN
JENNEVIN OIL
R.
G
SEE SHEET 2 CHECKED BELPERRON S.
FUCHSBRIGITTE
APPROVED DELIMOGES S.
A SCHEMA HUILE DE GRAISSAGE
ANNE
G
DIAG. SCH. PP LUBE OIL G
0416
CHENUT
227D1331
This document, exclusive property of
A1
DISTR
Ce document, propriété exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. Il ne peut être communiqué, is strictly confidential. It must not be communicated
- F X
copié ou reproduit sans son autorisation écrite préalable. copied or reproduced without our previous written consent. SIM
TO:
3/3
3/3
SCALE REV. : G SHEET : 3
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 SIZE
A1
DWG.NO.
219D2331
SH.
1/2 C
REV.
1
REVISIONS
3 - VOIR ITEMS 3 ET 4 DU TABLEAU DE " LIST OF REFERENCE DOCUMENTS " POUR LES CARACTERISTIQUES DES FLUIDES.
3 - SEE ITEMS 3 & 4 OF THE " LIST OF REFERENCE DOCUMENTS " FOR FLUID CHARACTERISTICS.
4 - REFROIDISSEMENT CAPTEURS DE VIBRATION, DEBIT AU TRAVERS DE DEUX TROUS (DIAM 2,5mm) DANS CHAQUE COUVERCLE.
4 - VIBRATION SENSORS COOLING SYSTEM, FLOW THROUGH TWO BLEEDING HOLES (DIAM 0.0984") IN EACH COVER.
5 - LA VANNE "FUITE CONTINUE" D'AIR ETANCHEITE DU SEPARATEUR DOIT ETRE OUVERTE DURANT TOUTE LA SEQUENCE DE LAVAGE ET NETTOYAGE DE LA TG ET DOIT ETRE FERMEE LE RESTE DU TEMPS.
5 - BEARING SEALING AIR DIRT SEPARATOR BLOW-DOWN VALVE IS TO BE OPEN DURING ALL ABRASIVE AND WATER WASH AND IS TO BE CLOSED AT ALL OTHER TIMES.
C C REV
REV STATUS
OF SHEETS
2 1 SH
DIRECTORATE GENERAL FOR GAS POWER B
PLANT PROJECTS
B
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
SE
E0872 100 I60 FD 002 B
al
U
10/02/2010
10/02/2010 12/02/2010
12/02/2010 17/03/2010
17/03/2010
ci
None AFR FB FB NGUYEN
AFR NGUYENAILAN
AILAN DELIMOGES
DELIMOGESSYLVAIN
SYLVAIN
R
AFR FB FB
AFR NGUYEN
NGUYENAILAN
AILAN DELIMOGES
DELIMOGESSYLVAIN
SYLVAIN
ffi
FO
A1
VALIDE
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCHEMA
AND TUY. AIR REFROID.
INSTRUMENT DIAGRAM & ETANCHEITE
(P&I D)
E
0417, PID, COOLING & SEALING AIR
NOMS / NAMES
VALIDE
DIAG. SCH. PP-CLG
DRAWN
AFR - ML.& SLG AIR
G
CHECKED NGUYEN A.
APPROVED DELIMOGES S. SCHEMA TUY. AIR REFROIDT. &
A
ANNE
ETANCHEITE
C
DIAG. SCH. PP-CLG & SLG AIR C
FUCHS
0417
gazton0
219D2331
This document, exclusive property of
A1
DISTR
Ce document, propriété exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. Il ne peut être communiqué, is strictly confidential. It must not be communicated
01 F X
copié ou reproduit sans son autorisation écrite préalable. copied or reproduced without our previous written consent. SIM
TO:
219D1919 1/2
1/2
SCALE REV. : C SHEET : 1/2
DT-1C
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 SIZE
A1
DWG.NO.
219D2331
SH.
2/2 C
REV.
1
CSA001
PS
(63TK-1) PS (63TK-2)
ENTREE
PENTE PENTE
2% MINI.
D'AIR
2% MINI.
DI 800 SLOPE SLOPE DI 801 AIR INLET
2% MINI. 2% MINI.
D CA13A CA13B D
D
W
CW CCW PACKAGE ACOUSTIQUE
PC PC ACOUSTICAL PACKAGE
D
W
(VCK7-1) (VCK7-2)
D
W
CSA1
PC CA13C
(88TK-1) (88TK-2)
M (23TK-1) M (23TK-2) PC
HV401
(96CD-1A) W D
W D
W D
DI 401 W D W D
W D
W D
A L'ATMOSPHERE
TO ATMOSPHERE
0,79 mm FO (VA2-3) C
4"x3"
W D
HV422
AE-5 DI 402 1/2"
HV406 AD-4B
0,79 mm
W D
( 0.031" ) NO 8"x6"
MLI 0557 VOIR NOTE 4
AE-11 HV423 SEE NOTE 4
1"
AD-4C
NO 1/2"x1"
D
W
D
W
D
W
HV301
1/2"
W
W
D
AD-5A
D
D
W
D
W
NC
AE-5
W
3"x2"
D
PLANT PROJECTS
D
AD-5C
D
W
NC
B
W
4"x3"
D
ZSH
146,46 mm
( 5.766" )
MEGA DEAL PROJECTS
NASIRIYAH POWER PLANT
3"x2" (VA2-2) A L'ATMOSPHERE
W D
W D
W D
W D
W D W D
(VA2-4)
W D
A L'ATMOSPHERE
TO ATMOSPHERE
PENTE NO FO
D
W
DI 101 DI 111
D
W
2% MINI.
22 mm
SE
SLOPE PENTE 146,46 mm
E0872 100 I60 FD 002 B
al
PENTE ( 0.866" )
2% MINI. 2% MINI. ( 5.766" )
2% MINI. SLOPE
U
HV500 DI 120 HV102 SLOPE VTA 10/02/2010
10/02/2010 12/02/2010
12/02/2010 17/03/2010
17/03/2010
D
2% MINI.
W
ci
2,5 mm 2% MINI. FA6 FO None
NC NC C AFR FB FB
AFR NGUYEN
NGUYENAILAN
AILAN DELIMOGES
DELIMOGESSYLVAIN
SYLVAIN
D
R
W
( 0.1" )
A B AFR FB FB
AFR NGUYEN
NGUYENAILAN
AILAN DELIMOGES
DELIMOGESSYLVAIN
SYLVAIN
ffi
FO
A1
VOIR NOTE 5 (20CB-1)
VALIDE
SEE NOTE 5 S
O
W D
DI 121
0,79 mm
W D
E
0417, PID, COOLING & SEALING AIR
NOMS / NAMES
VALIDE
WW7 DIAG. SCH. PP-CLG
DRAWN AFR - ML.& SLG AIR
CA1
G
CHECKED NGUYEN A.
PC PC SCHEMA TUY. AIR REFROIDT. &
APPROVED DELIMOGES S.
A
ANNE
ETANCHEITE
C
DIAG. SCH. PP-CLG & SLG AIR C
FUCHS
0417
gazton0
219D2331
This document, exclusive property of
A1
DISTR
Ce document, propriété exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. Il ne peut être communiqué, is strictly confidential. It must not be communicated
01 F X
copié ou reproduit sans son autorisation écrite préalable. copied or reproduced without our previous written consent. SIM
TO:
219D1919 2/2
2/2
SCALE REV. : C SHEET : 2/2
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 SIZE DWG.NO.
227D1412
SH.
1/2
REV.
A 1
A1
REVISIONS
AFR - IN.
A FIRST ISSUE 22/01/2009 THEVENIN JP.
NOTES: ANCEL T.
1 - VOIR MLI 0414, NOMENCLATURE DES APPAREILS POUR LE REGLAGE DES APPAREILS.
1 - SEE MLI 0414, DEVICE SUMMARY FOR DEVICE SETTING.
3 - VOIR ITEMS 3 ET 4 DU TABLEAU DE " LIST OF COMPLEMENTARY DOCUMENTS " POUR LES CARACTERISTIQUES DES FLUIDES.
3 - SEE ITEMS 3 AND 4 OF THE " LIST OF COMPLEMENTARY DOCUMENTS " FOR FLUID CHARACTERISTICS.
4 - VOIR SCHEMA TUYAUTERIE LAVAGE TURBINE & COMPRESSEUR (MLI 0442) POUR LA LOCALISATION DES DRAINS.
4 - SEE PIPING - TURB & CPRSR WSHG (MLI 0442) FOR DRAIN LOCATION.
A A REV
REV STATUS
OF SHEETS
2 1 SH
DIRECTORATE GENERAL FOR GAS POWER B
PLANT PROJECTS
B
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
al
SE
22/01/2009
22/01/2009 26/01/2009
26/01/2009 12/02/2009
12/02/2009
ci
None AFR IN IN THEVENIN
AFR THEVENINJEAN-PAUL
JEAN-PAUL MALIVERNAY
MALIVERNAYMARC
MARC
R
AFR IN IN
AFR THEVENIN
THEVENINJEAN-PAUL
JEAN-PAUL MALIVERNAY
MALIVERNAYMARC
MARC
ffi
FO
A1
VALIDE
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCH.DEBIT
AND ASPIRATION
INSTRUMENT & ECHAPT
DIAGRAM (P&I D)
E
0471, PID, AIR FILTER
NOMS / NAMES
VALIDE
DIA.DRAWN
FLOW INLET & EXHAUST
AFR - IN.
G
CHECKED THEVENIN JP.
APPROVED ANCEL T.
A SCHEMA DEBIT ASPIRATION & ECHAPPEMENT
ANNE
AA
DIAGRAM, FLOW INLET & EXHAUST
FUCHS
0471
gazton0
227D1412
A1
DISTR
Ce document, propriete exclusive de This document, exclusive property of
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. IL ne peut etre communique, is strictly confidential. It must not be communicated
01 F X
copie ou reproduit sans son autorisation ecrite prealable. copied or reproduced without our previous written consent. SIM TO: 219D2887
1/2
1/2
SCALE REV. : A SHEET : 1/2
DT-1C
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 A1
SIZE DWG.NO.
227D1412
SH.
2/2
REV.
A 1
D D
LEGENDE / LEGEND
VTA VTA VTA
ELEMENT FILTRANT
ARMOIR ELECTRIQUE FILTRE A AIR (MLI A040) JB78 FILTER ELEMENT
AIR FILTER ELECTRICAL CONTROL BOX (MLI A040)
HS
100
TIMER
(63TF-10A) (63TF-2A)
PDDH PDDH
(63TF-10B) (63TF-2B)
PDDH PDDH
(96TF-10) (96TF-1)
PDT PDT
PDS
100
PI
100 (27TF-1)
C
C
VTA
ENTREE
D'AIR
AIR INLET
V
WD
WD
SYSTEME
D'ECHAPPEMENT DIRECTORATE GENERAL FOR GAS POWER B
PSV100 EXHAUST
PLANT PROJECTS
3 PLACES 2 PLACES SYSTEM
B 3 PLACES 2 PLACES
MEGA DEAL PROJECTS
IE2
HV100 (63CA-1) NASIRIYAH POWER
PLANT
PC
PSL CONTRACT N° 28
PLENUM
NO PCV100
ENTREE PLENUM TURBINE GAZ ECHAPPEMENT [4 x 125 MW]
VOIR NOTE 5
PI
INLET PLENUM
(MLI 1612)
GAS TURBINE EXHAUST PLENUM
SEE NOTE 5 101 (MLI 1625)
al
SE
DRAIN / DRAIN DRAIN / DRAIN
22/01/2009
22/01/2009 26/01/2009
26/01/2009 12/02/2009
12/02/2009
U
VOIR NOTE 4 VOIR NOTE 4
ci
None AFR IN IN THEVENIN
SEE NOTE 4 SEE NOTE 4 AFR THEVENINJEAN-PAUL
JEAN-PAUL MALIVERNAY
MALIVERNAYMARC
MARC
R
AFR IN IN
AFR THEVENIN
THEVENINJEAN-PAUL
JEAN-PAUL MALIVERNAY
MALIVERNAYMARC
MARC
VOIR / SEE GENERAL ARRANGEMENT DRAWING ITEM A040 FOR CONNECTION POINTS CHARACTERISTICS
ffi
FO
A1
VALIDE
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCH.DEBIT
AND ASPIRATION
INSTRUMENT & ECHAPT
DIAGRAM (P&I D)
E
0471, PID, AIR FILTER
NOMS / NAMES
VALIDE
DIA.DRAWN
FLOW INLET
AFR -&IN.EXHAUST
G
CHECKED THEVENIN JP.
APPROVED ANCEL T.
A SCHEMA DEBIT ASPIRATION & ECHAPPEMENT
ANNE
DIAGRAM, FLOW INLET & EXHAUSTAA
FUCHS
0471
gazton0
227D1412
This document, exclusive property of
A1
DISTR
Ce document, propriété exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. Il ne peut être communiqué, is strictly confidential. It must not be communicated
01 F X
copié ou reproduit sans son autorisation écrite préalable. copied or reproduced without our previous written consent. SIM TO: 206D7724
2/2
2/2
SCALE REV. : A SHEET : 2/2
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
$*+, - ./012 3 4516
0 : 9 4 1 8 >
2
7?"& *&
;257;005 2@;
& +
7
&
2
+ *
+ 7 + * 7 , @ *,
+*> ,&
$+ - =8@=0@;==: + &
7 ,*" &
$+ < A &
, < ;==5==2;0; =5@=;@;==5 +*> ,&
7 ,*" &
2< *+, =121 *, -+ 7 + *-+ + " " 7 + & $+ < $ &
, < ;=2===21:5 =;@=8@;=2= +*> ,&
, IJ # % ! 7 ,*"
)*+,- )./0-1 +2* 3+43-1 564
7 ;< *+, =828 =821 *-+ + + D- 7 * 3* &
$+ K ""& 7
7 , < ;=2===9=59 =:@2=@;=2= +*> ,&
%J ) %# / ' # 6 % # 7 ,*"
% 22= 22; %L%
/' % M 6 % &
8< *+ " 1 7- -7 H *$ + $ + 7* -, H *-+ + + D- 7- $ - 7 &
** + )/678620 %9+.7-, 59 )./0-& 52 ,:- 462- 75""52
' ' ,5 ,:- +2* +2* ,:- ;< /-)4+7620 ,:-
)/6786201 % 1=.+/- 75/81& < 0/6)1 59 )/-11./-
1& * -, +*3 , $ 7- C , 7E - 7 + $+* 7 , + * 3* ?2; ?28 7 = 0 8 F< 2=G /;22 F< 2=G " * 6&
!" # $% # $ &
& *, -+ 7
*$ + $ + 7* -,
DIRECTORATE GENERAL FOR GAS POWER
PLANT PROJECTS
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
SE
E0872 100 I60 FD 001 C
al
U
07/10/2010
07/10/2010 14/10/2010
14/10/2010 14/10/2010
14/10/2010
ci
None AFR GGGG ROZE
AFR ROZEMAGALI
MAGALI DELIMOGES
DELIMOGESSYLVAIN
SYLVAIN
R
AFR GGGG
AFR ROZE
ROZEMAGALI
MAGALI DELIMOGES
DELIMOGESSYLVAIN
SYLVAIN
ffi
FO
A1
VALIDE
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCH.INSTRUMENT
AND TUY. EAU DE DIAGRAM
REFROIDISSEMENT
(P&I D)
E
0420, PID, COOLING
*, @ WATER
,
VALIDE
DIA.SCH.PP
7+ ? COOLING
+*> ,& WATER
G
7 + &
+* 7 7 ,*" &
FUCHS ANNE
D
D
gazton0
+
*
" # $% " # $%
! & ) ! %& ' %
7
01 F X
% % % % %' & ( ( & , *. *
1/2
1/2 + &. 7 . 2@;
DT-1C
0 : 9 4 1 8 ; 2
$*+, 2.012 3 451 / * 414:<250=6
$*+, - ./012 3 4516
0 : 9 4 1 8 >
2
7?"& *&
;257;005 ;@;
& +
7
&
2
282
/? < <26
"
" -
7 7
- *+ "
?7
7 2=2 7 2=; ?7
21 59 88 ;
?8: / =&405H 6 / 2&8=:H 6 ?80
2<2 2<21
*
7 2=0
7 + ", ?2=0
7 241
*+ * 9
( *
+ $+ " + * 7 7 -+ ?2=0
7 $ ,, 1 /, =1246 2;2
?;
> % &
22; 228 *
*
+ $+ " + - 7 "+ " ;0$7<22 ;0$7<2= ;0$7<1 ;0$7<4
/ * + , =1296 ?2
% (& 2;=
?;
*+ * 9
*
(
22= 222
[4 x 125 MW]
+ ?8
?7 ?7
2=2 ?28
?7
SE
+ E0872 100 I60 FD 001 C
al
2=4 *
$*
U
/, 2=846 07/10/2010
07/10/2010 14/10/2010
14/10/2010 14/10/2010
14/10/2010
ci
2=; 2=8 None AFR GGGG
AFR ROZE
ROZEMAGALI
MAGALI DELIMOGES
DELIMOGESSYLVAIN
SYLVAIN
R
?2=: 7 2=:
?2; AFR GGGG
AFR ROZE
ROZEMAGALI
MAGALI DELIMOGES
DELIMOGESSYLVAIN
SYLVAIN
ffi
FO
$* 9 84 A1
/ =&;4H 6
VALIDE
* 2=1
O
7 2== /, 2=;:6
?7 ?7
E
?4 24= 242 0420, PID, COOLING
*, @ WATER
,
VALIDE
* DIA.SCH.PP
7+ ? COOLING
+*> ,& WATER
G
7 + &
+* 7 7 ,*" &
7 2=1
FUCHS ANNE
4= D
/2&590H6
D
gazton0
+
*
" # $% " # $%
! & ) ! %& ' %
7
01 F X
% % % % %' & ( ( & , *. *
2/2
2/2 + &. 7 . ;@;
0 : 9 4 1 8 ; 2
$*+, 2.012 3 451 / * 414:<250=6
@ # #
% # >
$" #
$#!"$!$""
?
$!
$ !
$$!
" "
$!
$
$ $ $
$
$"
DIRECTORATE GENERAL FOR GAS POWER
PLANT PROJECTS
MEGA DEAL"# PROJECTS
$ % "
[4 x 125 MW]?
@ "" @ "#$
al
SE
01/04/2011
01/04/2011 05/04/2011
05/04/2011 06/04/2011
06/04/2011
ci
None VAUDOIS OLIVIER MERCEY
VAUDOIS OLIVIER MERCEYCHRISTOPHE
CHRISTOPHE CLOET
CLOETLAURENT
LAURENT
R
VAUDOIS OLIVIER
VAUDOIS OLIVIER MERCEY
MERCEYCHRISTOPHE
CHRISTOPHE CLOET
CLOETLAURENT
LAURENT
ffi
FO
A1
VALIDE
O
! "#
E
!
0421, PID, STARTING MEANS
VALIDE
>
DIAG. SCH. PP - STARTING MEANS
A
G
?
FUCHS ANNE
C
C
"#$
gazton0
>
IM-2011002151
1 ,-./01234 8(-8(*131 15.6/+*71 ,1
21(;9 (-,/.3+ ('2.1 1+3
)*+ ,-./01234 15.6/+*71 8(-81(39 -:
21(;9 (-,/.3+ ('2.1
205D4866
205D4866 $" # IM-2011002151
+3(*.310123 .-2:*,123*16 21 81/3 13(1 .-00/2*=/14 *+ +3(*.369 .-2:*,123*'6 3 0/+3 2-3 &1 .-00/2*.'31,
.-8*1 -/ (18(-,/*3 +'2+ +-2 '/3-(*+'3*-2 1.(*31 8(1'6'&61 .-8*1, -( (18(-,/.1, <*3)-/3 -/( 8(17*-/+ <(*3312 .-2+123 @ $"$ @ @ !
- F X
1/1
1/1 DT-1C
% # $
@ # # # % "
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 SIZE
A1
DWG.NO.
227D1390
SH.
1/3 C
REV.
1
REVISIONS
AFR - ML.
A FIRST ISSUE 20/02/2009 GUILLIN C.
NOTES : POURRON N.
AFR - FB.
B IM - 2009004782 19/05/2009 GUILLIN C.
1 - VOIR MLI 0414, NOMENCLATURE DES APPAREILS, POUR REGLAGE DES APPAREILS. SARREY P-H.
1 - SEE MLI 0414, DEVICE SUMMARY, FOR CONTROL DEVICE SETTINGS. AFR - JLC.
C IM - 2009009201 22/10/2009 GUILLIN C.
SARREY P-H.
2 - VOIR MLI 0313 ET 0314 POUR LES CARACTERISTIQUES DES CONNEXIONS. D
D 2 - SEE MLI 0313 AND 0314 FOR CONNECTIONS CHARACTERISTICS.
3 - VOIR ITEMS 3 ET 4 DU TABLEAU DE "LIST OF REFERENCE DOCUMENTS" POUR LES CARACTERISTIQUES DU FLUIDE.
3 - SEE ITEMS 3 & 4 OF THE "LIST OF REFERENCE DOCUMENTS" FOR FLUID CHARACTERISTICS
4 - LES FILTRES DE DERNIERE CHANCE INSTALLES A LA MISE EN SERVICE ET APRES TOUTES INTERVENTIONS MAJEURES SUR LA LIGNE GAZ DEVRONT
ETRE IMPERATIVEMENT RETIRES APRES 10 HEURES D'UTILISATION.
4 - FILTER INSTALLED ON STARTING OFF ENGING AND AFTER ALL GREATER INTERVENTIONS ON GAS FUEL LINE WILL BE IMPERATIVELY TAKEN OUT
AFTER 10 HOURS OFF USE.
C C C REV
REV STATUS
OF SHEETS
3 2 1 SH
DIRECTORATE GENERAL FOR GAS POWER B
PLANT PROJECTS
B
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
al
SE
22/10/2009
22/10/2009 22/10/2009
22/10/2009 26/10/2009
26/10/2009
ci
AFR JLCJLC
AFR GUILLIN
GUILLINCAROLE
CAROLE SARREY
SARREYPIERRE-HUBERT
PIERRE-HUBERT
R
AFR JLCJLC
AFR GUILLIN
GUILLINCAROLE
CAROLE SARREY
SARREYPIERRE-HUBERT
PIERRE-HUBERT
ffi
FO
A1
VALIDE
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCHEMA
AND TUY. COMBUSTIBLE
INSTRUMENT GAZD)
DIAGRAM (P&I
E
0422, PID, FUEL NOMS
GAS/ NAMES
VALIDE
DIAGRAM
DRAWN SCHEMA
AFR - ML.PP-FUEL GAS
G
CHECKED GUILLIN C.
APPROVED POURRON N.
A SCHEMA TUY. COMBUSTIBLE GAZ
ANNE
C
DIAG. SCH. PP. FUEL GAS C
FUCHS
0422
gazton0
227D1390
This document, exclusive property of
A1
DISTR
Ce document, propriété exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. Il ne peut être communiqué, is strictly confidential. It must not be communicated
01 F X
copié ou reproduit sans son autorisation écrite préalable. copied or reproduced without our previous written consent. SIM
TO:
219D1050 1/3
1/3
SCALE REV. : C SHEET : 1/3
DT-1C
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 SIZE
A1
DWG.NO.
227D1390
SH.
2/3 C
REV.
1
FG3
PC
D D
SOCLE T. G.
(96FG-2C) DE /FROMMLI.0477 PA4 GAS TURBINE BASE
PT PA4
4"
4" x 5"
(96FG-2B)
PT EVENT
VENT
(MG1)
(96FG-2A)
PT
FG133 W D
FG104
GF
PC PC
5"
6" x 5" W D
HV111
NC POUR 14 INJECTEURS
VOIR NOTE 5 DE LA CHAMBRE DE COMBUSTION
SEE NOTE 5 FOR 14 COMBUSTION
(63FG-2) (63FG-1) (96FG-1) PURGE CHAMBER NOZZLES
PS HV306 PS HV304 PT HV302 DRAIN
(20VG-1) (33VG-11) FC
NC NC NC
S ZSL GPL-2
HV305 HV303 HV301 GFV-1 C
C NO NO NO NO B1 H D
DI 500
PLEIN DEBIT (VGC-1)
(96VM-1) FULL FLOW
PDT
VOIR NOTE 5
VOIR NOTE 5 SEE NOTE 5
VENT SEE NOTE 5
VALVE
FG20 FG21 FG1 5" x 6" FC W D
8" 6"
PC PC PC
GPL-1
8" x 5"
CORIOLIS HV103 HV410
NC NC LEAVE THIS SPACE BLANK
(VM-1)
B1 D
W D
H W D
(VSR-1)
ENSEMBLE ACCUMULATEUR
DIRECTORATE GENERAL FOR GAS POWER B
ACCUMULATOR MANIFOLD ASSY.
PLANT PROJECTS
CONNECTION POUR GONFLAGE
B PRE-CHARGE CONNEXION
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
(AH1-3) CONTRACT N° 28
[4 x 125 MW]
PSV 800
al
SE
22/10/2009
22/10/2009 22/10/2009
22/10/2009 26/10/2009
26/10/2009
ci
HV802 AFR JLCJLC
AFR GUILLIN
GUILLINCAROLE
CAROLE SARREY
SARREYPIERRE-HUBERT
PIERRE-HUBERT
R
AFR JLCJLC
AFR GUILLIN
GUILLINCAROLE
CAROLE SARREY
SARREYPIERRE-HUBERT
PIERRE-HUBERT
HV801
ffi
NC
FO
A1
VALIDE
O
H011 GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
DE /FROMMLI.0434 SCHEMA
AND TUY. COMBUSTIBLE
INSTRUMENT GAZD)
DIAGRAM (P&I
OH-2
PC
E
0422, PID, FUEL NOMS
GAS / NAMES
VALIDE
H010
VERS / TO MLI 0416 DIAGRAM
DRAWN SCHEMA
AFR - ML.PP-FUEL GAS
PC
G
OD CHECKED GUILLIN C.
MODULE COMBUSTIBLE GAZ APPROVED POURRON N.
A SCHEMA TUY. COMBUSTIBLE GAZ
ANNE
GAS FUEL MODULE
C
DIAG. SCH. PP. FUEL GAS C
FUCHS
0422
gazton0
227D1390
This document, exclusive property of
A1
DISTR
Ce document, propriété exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. Il ne peut être communiqué, is strictly confidential. It must not be communicated
01 F X
copié ou reproduit sans son autorisation écrite préalable. copied or reproduced without our previous written consent. SIM
TO:
219D1050 2/3
2/3
SCALE REV. : C SHEET : 2/3
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 SIZE
A1
DWG.NO.
227D1390
SH.
3/3 C
REV.
1
D D
DELTA P INDICATEUR
DELTA P INDICATEUR
INDICATOR
INDICATOR
PDI
PDI
B1 B1
(FH8-1)
(FH7-1)
D D
(90SR-1) (65GC-1)
(20FGS-1)
(20FGC-1)
(VH5-2)
C
C
(VH5-1)
(96GC-1) (96GC-2)
(96SR-1) (96SR-2) ZE ZE
ZE ZE
FUEL DRAIN FUEL DRAIN
DRAIN FUEL DRAIN FUEL
FC
FC
(VSR-1) (VGC-1)
DIRECTORATE GENERAL FOR GAS POWER B
PLANT PROJECTS
B
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
al
SE
22/10/2009
22/10/2009 22/10/2009
22/10/2009 26/10/2009
26/10/2009
ci
AFR JLCJLC
AFR GUILLIN
GUILLINCAROLE
CAROLE SARREY
SARREYPIERRE-HUBERT
PIERRE-HUBERT
R
AFR JLCJLC
AFR GUILLIN
GUILLINCAROLE
CAROLE SARREY
SARREYPIERRE-HUBERT
PIERRE-HUBERT
ffi
FO
A1
VALIDE
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCHEMA
AND TUY. COMBUSTIBLE
INSTRUMENT GAZD)
DIAGRAM (P&I
E
0422, PID, FUEL NOMS
GAS / NAMES
VALIDE
DIAGRAM
DRAWN SCHEMA
AFR - ML.PP-FUEL GAS
G
CHECKED GUILLIN C.
APPROVED POURRON N.
A SCHEMA TUY. COMBUSTIBLE GAZ
ANNE
C
DIAG. SCH. PP. FUEL GAS C
FUCHS
0422
gazton0
227D1390
This document, exclusive property of
A1
DISTR
Ce document, propriété exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. Il ne peut être communiqué, is strictly confidential. It must not be communicated
01 F X
copié ou reproduit sans son autorisation écrite préalable. copied or reproduced without our previous written consent. SIM
TO:
219D1050 3/3
3/3
SCALE REV. : C SHEET : 3/3
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 SIZE
A1
DWG.NO.
227D1347
SH.
1/2
REV.
E 1
REVISIONS
Y. GEROME
A FIRST ISSUE 09/12/2008 Y. GEROME
D. DELOGE
Zone B-4 : 20PF-100 representation modification AFR - ML.
B Zone C-7 : Piping OIL suppression
26/02/2009 Y. GEROME
D. DELOGE
NOTES: AFR - CP.
C Zones B-6 + C-6 : 2 pluggeg tapping added
07/07/2009 Y. GEROME
Zone C-6 : HV110 to vent D. DELOGE
D 1 - VOIR MLI 0414, NOMENCLATURE DES APPAREILS POUR LE REGLAGE DES APPAREILS.
D
Zone C-6 : Add removable insulation thermal blanket
14/12/2009
Y. GEROME
Y. GEROME
D
1 - SEE MLI 0414, DEVICE SUMMARY FOR DEVICE SETTING. around pump PF-1 D. DELOGE
Y. GEROME
Zone C-5 : Change tube run from HV204 to PC LF6
2 - VOIR MLI 0313 ET 0314 POUR LES CARACTERISTIQUES DES CONNEXIONS. E 20/04/2010 Y. GEROME
instead of LF5 D. DELOGE
2 - SEE MLI 0313 AND 0314 FOR CONNECTIONS CHARACTERISTICS.
3 - VOIR ITEM 4 DU TABLEAU DE " LIST OF REFERNCE DOCUMENTS " POUR LES CARACTERISTIQUES DES FLUIDES.
3 - SEE ITEM 4 OF THE " LIST OF REFERNCE DOCUMENTS " FOR FLUID CHARACTERISTICS.
4 - RETIRER ET SUPPRIMER LE TAMIS DU FILTRE APRES LES PREMIERES 600 HEURES DE MARCHE.
NETTOYER ET RINCER LE LOGEMENT DU FILTRE AVANT LA REMISE EN SERVICE DE LA TURBINE A GAZ.
4 - REMOVE AND CANCEL STRAINER SCREEN AFTER THE INITIAL 600 HOURS OF OPERATION.
STRAINER HOUSING IS TO BE CLEANED AND FLUSHED PRIOR TO RESTART THE GAS TURBINE.
1 SPECIFICATION P&ID 123E4888
(XXX-X)
5 - SIGNIFIE QUE CET EQUIPEMENT FAIT PARTIE D'UNE BOUCLE DE SECURITE.
5 - MEANS THIS EQUIPMENT BELONGS TO A SAFETY LOOP. 2 EXTRA RULES FOR 04XX SCHEMATICS CREATION 379A9908
C
C
E E REV
REV STATUS
OF SHEETS
2 1 SH
DIRECTORATE GENERAL FOR GAS POWER B
PLANT PROJECTS
B
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
al
SE
20/04/2010
20/04/2010 20/04/2010
20/04/2010 20/04/2010
20/04/2010
ci
None GEROME YVES GEROME
GEROME YVES GEROMEYVES
YVES DELOGE
DELOGEDANIEL
DANIEL
R
GEROME YVES
GEROME YVES GEROME
GEROMEYVES
YVES DELOGE
DELOGEDANIEL
DANIEL
ffi
FO
A1
VALIDE
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCHEMA TUY.COMBUSTIBLE
AND INSTRUMENT LIQUIDE
DIAGRAM (P&I D)
E
0424, PID, LIQUID FUEL
NOMS / NAMES
VALIDE
AFR LIQUID
DIAGR. SCH. PP.
DRAWN
- ML FUEL
G
CHECKED Y. GEROME
APPROVED D. DELOGE
A
SCHEMA TUY. COMBUSTIBLE LIQUIDE
ANNE
DIAG. SCH. PP - LIQUID FUEL EE
0424
FUCHS
gazton0
DISTR
Ce document, propriete exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. IL ne peut etre communique, is strictly confidential. It must not be communicated
copie ou reproduit sans son autorisation ecrite prealable. copied or reproduced without our previous written consent. SIM TO: None SCALE REV. : E SHEET : 1/2 - F X
1/2
1/2 DT-1C
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 SIZE
A1
DWG.NO.
227D1347
SH.
2/2
REV.
E 1
PURGE DU CARTER DE
CHAMBRE DE COMBUSTION
HV400 (POUR UNE SEULE CHAMBRE)
OF-5 NO (VCK1-1 TO 14)
COMBUSTION CHAMBER
OD (VC3) WRAPPER DRAIN
(ONLY FOR ONE CHAMBER)
FO
(88FM)
DE / FROM MLI.0420
(VR4)
HV203 M SEE GT & CPRSR WASHING
VERS / TO MLI.0420
HV201 DRAIN
NC (63LF-7) NC
VERS / TO MLI.0442
PDS
WD
HV200 HV202
HV302
WD
NO NO
71 FF-4
LSH 71 FF-5
HV300 NC
VOIR NOTE 4 (FF2-1) HV204 71 FF-6
SEE NOTE 4 HV301 NC
RECUPERATION DE FUITES
WD
NC HV320 COMPART
OF-1 HV312
PC NC HV600
LF41
LF1 FC
WD
(VR27) NC PC
NC 1.00-T
OFD-3 HV310 DRAIN
MATELAS ISOLANT HV311
HV101 OFD-2 DEMONTABLE
NO REMOVABLE
WD
HV102 (20CF-1) NO NC
HV100 INSULATION BLANKET
(FF2-2)
NC
NC HV313
NC
HV103
(77FD-1) LEAVE THIS SPACE BLANK
OFD-10 REDUCT. DES AUX. SE
ACCESSO. GEAR BOX PURGE EVENT
NC DRAIN VENT (77FD-2)
(63FL-2) SG SG SG SE
PS VH17-1
(77FD-3) VANNE DE
SE SELECTION
SELECTOR
VALVE
FD1-1 DIRECTORATE GENERAL FOR GAS POWER B
FLOW-DIVIDER
ASSEMBLY PLANT PROJECTS
B
PC LF6 PC LF5 MEGA DEAL PROJECTS
(20FL-1)
DPI
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
VOIR ALIM. HYDRAUL. ( 20PF-100 ) (33PF-1)
SEE HYDR. SUPPLY ZS
TYP.14 PLACES
DE / FROM MLI.0434
OH6
P A ( VP-1) E0872 100 I20 FD 001 C
al
SE
T B
20/04/2010
20/04/2010 20/04/2010
20/04/2010 20/04/2010
20/04/2010
ci
WD
R
DE / FROM MLI.0434
ffi
FO
A1
VALIDE
4 2
O
1 2 1
OH-3
E
0424, PID, LIQUID FUEL
NOMS / NAMES
VALIDE
AFRLIQUID
- ML FUEL
WD
G
PORT A PORT B CHECKED Y. GEROME
A LF17 PC
APPROVED
D. DELOGE SCHEMA TUY. COMBUSTIBLE LIQUIDE
ANNE
SOCLE AUX. SOCLE TURB. DIAG. SCH. PP - LIQUID FUEL EE
0424
FUCHS
AUX BASE TURBINE BASE
gazton0
DISTR
Ce document, propriete exclusive de This document, exclusive property of
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. IL ne peut etre communique, is strictly confidential. It must not be communicated
copie ou reproduit sans son autorisation ecrite prealable. copied or reproduced without our previous written consent. SIM TO: None SCALE REV. : E SHEET : 2/2 - F X
2/2
2/2
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 A1
SIZE DWG.NO.
227D1078
SH.
1/2
REV.
D 1
REVISIONS
AFR - ML.
A FIRST ISSUE 04/03/2009 LEBRUMENT M.
MONTAGNE P.
1 - VOIR MLI 0414, NOMENCLATURE DES APPAREILS POUR LE REGLAGE DES APPAREILS. AFR - ML.
1 - SEE MLI 0414, DEVICE SUMMARY FOR DEVICE SETTING. B IM - 2009003375 01/04/2009 LEBRUMENT M.
MONTAGNE P.
AFR - CP
2 - VOIR MLI 0313 ET 0314 POUR LES CARACTERISTIQUES DES CONNEXIONS. IM – 2009006211
C 03/07/2009 MENI S.
2 - SEE MLI 0313 AND 0314 FOR CONNECTIONS CHARACTERISTICS. -Ajout d’un piquage en zone A-5
MONTAGNE P.
D AFR - FB D
3 - VOIR ITEMS 3 ET 4 DU TABLEAU DE " LIST OF REFERENCE DOCUMENTS " POUR LES CARACTERISTIQUES DES FLUIDES. D IM - 2009008086 14/09/2009 MONTAGNE P.
DELOGE D.
3 - SEE ITEMS 3 & 4 OF THE " LIST OF REFERENCE DOCUMENTS " FOR FLUID CHARACTERISTICS.
D D REV
REV STATUS
OF SHEETS
2 1 SH
DIRECTORATE GENERAL FOR GAS POWER B
PLANT PROJECTS
B
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
al
SE
14/09/2009
14/09/2009 15/09/2009
15/09/2009 24/09/2009
24/09/2009
ci
None AFR FB FB MONTAGNE
AFR MONTAGNEPIERRE
PIERRE DELOGE
DELOGEDANIEL
DANIEL
R
AFR FB FB
AFR MONTAGNE
MONTAGNEPIERRE
PIERRE DELOGE
DELOGEDANIEL
DANIEL
ffi
FO
A1
VALIDE
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCHEMA
AND TUY. AIR ATOMISATION
INSTRUMENT DIAGRAM (P&I D)
E
0425, PID, ATOMIZING AIR
NOMS / NAMES
VALIDE
DIAG. SCH. PP-ATOMIZING
DRAWN AFR - ML. AIR
G
CHECKED LEBRUMENT M.
APPROVED MONTAGNE P.
A SCHEMA TUY. AIR ATOMISATION
ANNE
D
DIAG. SCH. PP-ATOMIZING AIR D
FUCHS
0425
gazton0
227D1078
This document, exclusive property of
A1
DISTR
Ce document, propriete exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. IL ne peut etre communique, is strictly confidential. It must not be communicated
01 F X
copie ou reproduit sans son autorisation ecrite prealable. copied or reproduced without our previous written consent. SIM
TO:
219D2389 1/2
1/2
SCALE
REV. : D SHEET : 1/2
DT-1C
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 A1
SIZE DWG.NO.
227D1078
SH.
2/2
REV.
D 1
HV605 (96AA-4A)
PT
NO HV606
COMPRESSEUR
D
W
TURBINE NC
COMPRESSOR (MV964)
D
W
D HV603 (96AA-4B) D
MANIFOLD AIR PT
HV205 ATOMISATION
ATOMIZING AIR NO HV604
CA5
2" MANIFOLD
PC NC
CHAMBRE DE COMBUSTION (MV963)
D
NO
W
HV206 W D
COMBUSTION CHAMBER
NC HV601 (96AA-4C)
1/2"
W D
CA15 PT
PC 6" TYP. POUR 14 INJECTEURS
PURGE MANIFOLD TYP. FOR 14 NOZZLES NO HV602
MANIFOLD DRAIN
VERS/TO ML ITEM 0477 6" NC
PG47 4" (MV962)
D
W
AD
6" MLI 557T
HV201
AA3A 3"
DE/FROM ML ITEM 0442
PC
NC
HV101 HV102
HV202 NO NO HV209
AA3B 4" NC
PC AA3C
NC PC
6"x10"
DI 201
6"x3" 30,4 mm - 1.2 " 2" PA2
(VA18-1) 3"x4" VERS/TO ML ITEM 0477
D
W
3" 3"
HV207
FC C
W
C
D
AA26
PC
NC
AA4
VERS/TO ML ITEM 0441
TC1
PC 4" HV208
AA3D
COMPARTIMENT TURBINE PC
GAS TURBINE COMPARTMENT NC
5"x4"
VTA
HV503
NC LEAVE THIS SPACE BLANK
HV501 HV502
(96AD-1)
PDT D W
NO NO D W
(AAT-1A)
TE
(AAT-2A) HV204 DIRECTORATE GENERAL FOR GAS POWER B
TE
VTA
PLANT PROJECTS
B (HX1-1) (CA1)
10"x6" NRV101 5" NC
6" 6" 6"
WR WF AA10
MEGA DEAL PROJECTS
NASIRIYAH POWER PLANT
PC
3" TW 3"
SG
A ATMOSPHERE CONTRACT N° 28
TO ATMOS.
NRV201
(20AB-1)
PLUGGED [4 x 125 MW]
(VPR68-1)
S VTA
2 1
DE/FROM ML ITEM 0420
VERS/TO ML ITEM 0420
al
DI 301 OD
SE
NC HV203
6,4 mm ARBRE REDUCTEUR
0.25 " NC (CA2) 14/09/2009
14/09/2009 15/09/2009
15/09/2009 24/09/2009
24/09/2009
U
DES AUXILIAIRES
ci
(VA22-1) EJECTEUR D'AIR None
3" AFR FB FB
AFR MONTAGNE
MONTAGNEPIERRE
PIERRE DELOGE
DELOGEDANIEL
DANIEL
AIR EJECTOR ACCESS. GEAR DRIVE
R
AFR FB FB MONTAGNE
MONTAGNEPIERRE DELOGE DANIEL
W
FO
ffi
FO
A1
FUITE CONTINUE
(FA4-1) POINT BAS TROU φ 0,80 mm
VALIDE
AA1 (20AA-18)
(88AB-1) LOW POINT 0.031 inch DIA. HOLE
O
PC M
S (23AB-1) CONTINUOUS BLOWDOWN
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCHEMA
AND TUY. AIR ATOMISATION
INSTRUMENT DIAGRAM (P&I D)
FUITE CONTINUE 2 1
MODULE AUXILIAIRE
TROU φ 0,80 mm
D W
E
0.031 inch DIA. HOLE VTA 3 FO ACCESSORIES MODULE 0425, PID, ATOMIZING AIR
NOMS / NAMES
VALIDE
CONTINUOUS BLOWDOWN DIAG. SCH. PP-ATOMIZING
DRAWN AFR - ML. AIR
G
PA1 CHECKED LEBRUMENT M.
VERS/TO ML ITEM 0477 APPROVED MONTAGNE P.
A SCHEMA TUY. AIR ATOMISATION
ANNE
D
DIAG. SCH. PP-ATOMIZING AIR D
FUCHS
0425
gazton0
227D1078
This document, exclusive property of
A1
DISTR
Ce document, propriete exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. IL ne peut etre communique, is strictly confidential. It must not be communicated
01 F X
copie ou reproduit sans son autorisation ecrite prealable. copied or reproduced without our previous written consent. SIM
TO: 2/2
2/2
SCALE
REV. : D SHEET : 2/2
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 SIZE
A1
DWG.NO.
219D2715
SH.
1/3
REV.
B 1
REVISIONS
AFR - IN.
A FIRST ISSUE 08/07/2008 BOLLE C.
1- VOIR MLI 0414, NOMENCLATURE DES APPAREILS POUR LE REGLAGE DES APPAREILS. GUYENNET D.
AFR - FB.
1- SEE MLI 0414, DEVICE SUMMARY FOR DEVICE SETTINGS. B IM-2008011219 17/11/2008 BOLLE C.
BOUDOT D.
2 - VOIR MLI 0313 ET 0314 POUR LES CARACTERISTIQUES DES CONNEXIONS.
2 - SEE MLI 0313 AND 0314 FOR CHARACTERISTICS CONNECTIONS.
D D
3- LE SYSTEME COMPORTE 3 ZONES :
ZONE 1 : CONSTITUE DES COMPARTIMENTS TURBINES ET AUXILIAIRES
ZONE 2 : CONSTITUE DU COMPARTIMENT PUISSANCE
ZONE 4 : CONSTITUE DU COMPARTIMENT GAZ
FP6-R / FP6-L 1/2" 495 kg 1 60 min 2 EXTRA RULES FOR 04XX SCHEMATICS CREATION 379A9908
C
3 SYSTEM AND COMPONENT CLEANLINESS REQUIREMENTS GE-362A2412
C
FP7-R / FP7-L 1" 90 kg 1 1 min IT. NOMENCLATURE IDENT
DIRECTORATE GENERAL FOR GAS POWER B
PLANT PROJECTS
B
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
SE
E0872 100 I80 FD 002 A
al
U
17/11/2008
17/11/2008 17/11/2008
17/11/2008 17/11/2008
17/11/2008
ci
None AFR IN IN BOLLE
AFR BOLLECHRISTOPHE
CHRISTOPHE BOUDOT
BOUDOTDENIS
DENIS
R
AFR IN IN
AFR BOLLE
BOLLECHRISTOPHE
CHRISTOPHE BOUDOT
BOUDOTDENIS
DENIS
ffi
FO
A1
VALIDE
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCHEMA
AND TUY. PROTECTION
INSTRUMENT DIAGRAM INCENDIE
(P&I D)
E
0426, PID, FIRE PROTECTION
NOMS / NAMES
VALIDE
DIAG. SCH. PP.
DRAWN FIRE
AFR - IN. PROTECTION
G
CHECKED BOLLE C.
APPROVED GUYENNET D.
A SCHEMA TUY. PROTECTION INCENDIE
ANNE
DIAG. SCH. PP. FIRE PROTECTIONBB
FUCHS
0426
gazton0
219D2715
This document, exclusive property of
A1
DISTR
Ce document, propriété exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. Il ne peut être communiqué, is strictly confidential. It must not be communicated
01 F X
copié ou reproduit sans son autorisation écrite préalable. copied or reproduced without our previous written consent. SIM
TO: 206D7910
1/3
1/3
SCALE REV. : B SHEET : 1/3
DT-1C
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 SIZE
A1
DWG.NO.
219D2715
SH.
2/3 B
REV.
1
Emission initiale zone 1 ( coté gauche ) / Initial discharge Zone 1 ( left side )
Emission de maintien zone 1 ( coté gauche ) / Extended discharge Zone 1 ( left side )
Emission initiale zone 2 ( coté gauche ) / Initial discharge Zone 2 ( left side )
Emission de maintien zone 2 ( coté gauche ) / Extended discharge Zone 2 ( left side )
Alimentation sirène pneumatique zone 1 ( coté gauche ) / Pneumatic horn supply Zone 1 ( left side )
D Alimentation sirène pneumatique zone 2 ( coté gauche ) / Pneumatic horn supply Zone 2 ( left side ) D
(43CP-1) (5E-10) (SLI-1C) (SLI-1B) (43CP-2)
FP2-L FP1-L FP7-L FP6-L FP8-L FP9-L
PC PC PC PC PC PC HS HS HS
ENCEINTE ACOUSTIQUE
ACOUSTICAL ENCLOSURE
COMPARTIMENT AUXILIAIRES
AUXILIARIES COMPARTMENT (45FA-10A) (45FA-10B) (45FA-11A) (45FA-11B)
TSH TSH TSH TSH
(SLI-3C)
COMPARTIMENT ECHAPPEMENT
EXHAUST COMPARTMENT
COMPARTIMENT TURBINE (43CP-5)
(SLI-1A) TURBINE COMPARTMENT
HS
(45FT-9A) (45FT-9B) C
C TSH TSH
PC PC PC
D
W
W
DIRECTORATE GENERAL FOR GAS POWER B
W D W D W D
PLANT PROJECTS
B
MEGA DEAL PROJECTS
(45FA-12A) (45FA-12B) (45FA-13A) (45FA-13B) NASIRIYAH POWER
PLANT
TSH TSH TSH TSH
CONTRACT N° 28
[4 x 125 MW]
(43CP-3) (5E-11) (SLI-2C) (SLI-2B) (43CP-4)
FP2-R FP1-R FP7-R FP6-R FP8-R FP9-R
SE
HS HS E0872 100 I80 FD 002 A
al
HS
PC PC PC PC PC PC
U
17/11/2008
17/11/2008 17/11/2008
17/11/2008 17/11/2008
17/11/2008
ci
None AFR IN IN BOLLE
AFR BOLLECHRISTOPHE
CHRISTOPHE BOUDOT
BOUDOTDENIS
DENIS
R
AFR IN IN
AFR BOLLE
BOLLECHRISTOPHE
CHRISTOPHE BOUDOT
BOUDOTDENIS
DENIS
ffi
FO
A1
Alimentation sirène pneumatique zone 2 ( coté droit ) / Pneumatic horn supply Zone 2 ( right side )
VALIDE
Alimentation sirène pneumatique zone 1 ( coté droit ) / Pneumatic horn supply Zone 1 ( right side )
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
Emission de maintien zone 2 ( coté droit ) / Extended discharge Zone 2 ( right side ) SCHEMA
AND TUY. PROTECTION
INSTRUMENT DIAGRAM INCENDIE
(P&I D)
E
Emission initiale zone 2 ( coté droit ) / Initial discharge Zone 2 ( right side ) 0426, PID, FIRE PROTECTION
NOMS / NAMES
VALIDE
DIAG. SCH. PP.
DRAWN AFRFIRE
- IN. PROTECTION
Emission de maintien zone 1 ( coté droit ) / Extended discharge Zone 1 ( right side )
G
CHECKED BOLLE C.
A Emission initiale zone 1 ( coté droit ) / Initial discharge Zone 1 ( right side ) APPROVED
GUYENNET D.
SCHEMA TUY. PROTECTION INCENDIE
ANNE
DIAG. SCH. PP. FIRE PROTECTIONBB
FUCHS
0426
gazton0
219D2715
This document, exclusive property of
A1
DISTR
Ce document, propriété exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. Il ne peut être communiqué, is strictly confidential. It must not be communicated
01 F X
copié ou reproduit sans son autorisation écrite préalable. copied or reproduced without our previous written consent. SIM
TO: 206D7910
2/3
2/3
SCALE REV. : B SHEET : 2/3
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 SIZE
A1
DWG.NO.
219D2715
SH.
3/3 B
REV.
1
D D
(43CP-7)
HS
(45FA-7A) (45FA-7B)
TSH TSH
(SLI-1E)
DIRECTORATE GENERAL FOR GAS POWER B
PLANT PROJECTS
B
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
SE
E0872 100 I80 FD 002 A
al
U
17/11/2008
17/11/2008 17/11/2008
17/11/2008 17/11/2008
17/11/2008
ci
None AFR IN IN BOLLE
AFR BOLLECHRISTOPHE
CHRISTOPHE BOUDOT
BOUDOTDENIS
DENIS
R
AFR IN IN
AFR BOLLE
BOLLECHRISTOPHE
CHRISTOPHE BOUDOT
BOUDOTDENIS
DENIS
ffi
FO
A1
VALIDE
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCHEMA
AND TUY. PROTECTION
INSTRUMENT DIAGRAM INCENDIE
(P&I D)
E
0426, PID, FIRE PROTECTION
NOMS / NAMES
VALIDE
DIAG. SCH. PP.
DRAWN AFRFIRE
- IN. PROTECTION
G
CHECKED BOLLE C.
APPROVED GUYENNET D.
A SCHEMA TUY. PROTECTION INCENDIE
ANNE
DIAG. SCH. PP. FIRE PROTECTIONBB
FUCHS
0426
gazton0
219D2715
This document, exclusive property of
A1
DISTR
Ce document, propriété exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. Il ne peut être communiqué, is strictly confidential. It must not be communicated
01 F X
copié ou reproduit sans son autorisation écrite préalable. copied or reproduced without our previous written consent. SIM
TO: 206D7910
3/3
3/3
SCALE REV. : B SHEET : 3/3
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
l
ia
26/08/2011 26/08/2011 01/09/2011
None
c
ROUSSEL FRANCOIS
ROUSSEL FRANCOIS
ffi
A1
VALIDE
O
PROTECTION INCENDIE TG
E
GT UNIT FIRE FIGHTING PID
PRESCURA SILVIA
C
IM-2011005791
223D6425
- E
1/3
DT-7C
l
ia
26/08/2011 26/08/2011 01/09/2011
None
c
ROUSSEL FRANCOIS
ROUSSEL FRANCOIS
ffi
A1
VALIDE
O
PROTECTION INCENDIE TG
E
GT UNIT FIRE FIGHTING PID
PRESCURA SILVIA
C
IM-2011005791
223D6425
- E
2/3
l
ia
26/08/2011 26/08/2011 01/09/2011
None
c
ROUSSEL FRANCOIS
ROUSSEL FRANCOIS
ffi
A1
VALIDE
O
PROTECTION INCENDIE TG
E
GT UNIT FIRE FIGHTING PID
PRESCURA SILVIA
C
IM-2011005791
223D6425
- E
3/3
$-/6 8 =?;4. @ :24A
; 3 < : 4 5 *
.
+,"& -&
012+3145 .
& / &
.
/ -
/ + / - + -6 7 6
9 6
$/ 8 1271470114 + 6-" &
. 9 - / -6 8/ -8/ - /- / " " + / & &
// $&
69011:11.403 047157011: + 6-" &
&
$/ 9 $ &
6901.111<0.1 .47.1701.1 / / &
C 0 ) %# D ' E +94 +93& + 6-" &
!"#$ % #&'($) "*+" ", -
+ +
6 $- + >+/ 8
?;; B9.A
6 ?05 B9.A - - -8/ "- $ "
-+
-+
/
/ 8
/ +8 8/ + 8@ /
:11
-$
? /00A
.
? /0.A :1.
& -6 8/ +
- 9:
-$ / $ / +- 86
..1
/ 7 - 6 &1400
- 9: $/ 6 + $-/ = 6 211. 6 = 1454
$9.
-
- 90
$ / >+/ 8 B8 - 9< / 7 - 6 &1404
- 9<
? 64A
- 90
- - 95 / 7 - 6 &1404
- 95
193 / +
?$ 09.A ?$ 090A
,+
- 94 / 7 - 6 &14<2
,+
- 94
...
MEGA DEAL PROJECTS
$9.
-
- 9. NASIRIYAH POWER
PLANT
CONTRACT N° 28
?<5 B9.A
SE
E0872 100 I70 FD 002 B
al
U
14/10/2010
14/10/2010 14/10/2010
14/10/2010 14/10/2010
14/10/2010
.0.
ci
AFR FB FB
AFR RENIER
RENIERLUCIE
LUCIE DELIMOGES
DELIMOGESSYLVAIN
SYLVAIN
R
AFR FB FB
AFR RENIER
RENIERLUCIE
LUCIE DELIMOGES
DELIMOGESSYLVAIN
SYLVAIN
ffi
FO
A1
VALIDE
,+
-
O
.01 GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCHEMA
AND ALIM.HUILE
INSTRUMENT HP
DIAGRAM (P&I D)
E
0434, PID, HYDRAULIC
-6 7 6 SUPPLY " / / -6 >
VALIDE
DIAG.SCHEM.PP
+/ , HP9 HYDR.SUPPLY
6
G
+ + 6-" &
/- + &
/ FUCHS ANNE
C
C
gazton0
012+3145
!
.
-
" # $% " # $%
! & ) ! %& ' %
01 F X
+
% % % % %' & ( ( & -= 01:+:;<5
6 1/1
1/1 / &= = .
DT-1C
; 3 < : 4 5 0 .
$-/6 .=;4. @ :24 ? - :4:39.2;1A
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 SIZE
A1
DWG.NO.
219D2734
SH.
1/4 C
REV.
1
REVISIONS
AFR - IN.
A FIRST ISSUE 01/10/2008 TRIANON F.
RISS O.
NOTES : AFR - IN.
B IM - 2008011698 27/11/2008 TRIANON F.
RISS O.
1 - VOIR MLI 0414, NOMENCLATURE DES APPAREILS POUR LE REGLAGE DES APPAREILS. AFR - JLC.
1 - SEE MLI 0414, DEVICE SUMMARY, FOR DEVICE SETTING. C IM - 2009001176 05/02/2009 TRIANON F.
HERRMANN A-C.
C C C C REV
REV STATUS
OF SHEETS
4 3 2 1 SH
DIRECTORATE GENERAL FOR GAS POWER B
PLANT PROJECTS
B
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
al
SE
05/02/2009
05/02/2009 05/02/2009
05/02/2009 05/02/2009
05/02/2009
ci
None AFR JLCJLC TRIANON
AFR TRIANONFLORIAN
FLORIAN HERRMANN
HERRMANNANNE-CLAIRE
ANNE-CLAIRE
R
AFR JLCJLC
AFR TRIANON
TRIANONFLORIAN
FLORIAN HERRMANN
HERRMANNANNE-CLAIRE
ANNE-CLAIRE
ffi
FO
A1
VALIDE
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCHEMA
AND CHAUFFAGE
INSTRUMENT ET VENTILATION
DIAGRAM (P&I D)
E
0436, PID, FLOW-HEATING
NOMS / NAMES & VENTILATION
VALIDE
DIAG DCH HEATING
DRAWN
AFR - IN.& VENTILATION
G
CHECKED
TRIANON F.
APPROVED RISS O.
A SCHEMA CHAUFFAGE ET VENTILATION
ANNE
C
C
DIAG. SCH. HEATING & VENTILATION
FUCHS
0436
gazton0
219D2734
This document, exclusive property of
A1
DISTR
Ce document, propriete exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. IL ne peut etre communique, is strictly confidential. It must not be communicated
01 F X
copie ou reproduit sans son autorisation ecrite prealable. copied or reproduced without our previous written consent. SIM
TO:
219D2564 1/4
1/4
SCALE REV. : C SHEET : 1/4
DT-1C
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 SIZE
A1
DWG.NO.
219D2734
SH.
2/4 C
REV.
1
SEE NOTE 4
AIR OUTLET VOIR NOTE 4 AIR OUTLET
SORTIE SORTIE
D'AIR D'AIR
D D
(33BT-1) (33BT-2)
ZSL ZSL
M (88BT-1) M (88BT-2)
V (23BT-1) V (23BT-2)
C
C
LOAD
(33VG-2) (88VG-2) AIR INLET
COMPARTMENT M
SEE NOTE 3 COMPARTIMENT
ZSL (23VG-2) ENTREE D'AIR
FS
VOIR NOTE 3 PUISSANCE
(AT-TC-1) DIRECTORATE GENERAL FOR GAS POWER B
(95BT-3)
TE
PLANT PROJECTS
AIR OUTLET
B FS (AT-AC-1)
SORTIE D'AIR
TE
(95BT-2) (AT-TC-3)
FS TE MEGA DEAL PROJECTS
(95BT-1) NASIRIYAH POWER
PLANT
CONTRACT N° 28
(23HT-30) EXHAUST
COMPARTMENT
[4 x 125 MW]
COMPARTIMENT
ECHAPPEMENT
al
SE
05/02/2009
05/02/2009 05/02/2009
05/02/2009 05/02/2009
05/02/2009
ci
None AFR JLCJLC TRIANON
AFR TRIANONFLORIAN
FLORIAN HERRMANN
HERRMANNANNE-CLAIRE
ANNE-CLAIRE
R
AFR JLCJLC
AFR TRIANON
TRIANONFLORIAN
FLORIAN HERRMANN
HERRMANNANNE-CLAIRE
ANNE-CLAIRE
ffi
FO
A1
VALIDE
(33DT-2) (33DT-4)
O
ZSL ZSL
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCHEMA
AND CHAUFFAGE
INSTRUMENT ET VENTILATION
DIAGRAM (P&I D)
E
0436, PID, FLOW-HEATING
NOMS / NAMES & VENTILATION
VALIDE
AIR INLET DIAG DCH HEATING
DRAWN AFR - IN.& VENTILATION
G
ENTREE D'AIR CHECKED TRIANON F.
RISS O. SCHEMA CHAUFFAGE ET VENTILATION
A APPROVED
ANNE
C
C
DIAG. SCH. HEATING & VENTILATION
FUCHS
0436
gazton0
219D2734
This document, exclusive property of
A1
DISTR
Ce document, propriete exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. IL ne peut etre communique, is strictly confidential. It must not be communicated
01 F X
copie ou reproduit sans son autorisation ecrite prealable. copied or reproduced without our previous written consent. SIM
TO:
206D7864 2/4
2/4
SCALE REV. : C SHEET : 2/4
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 SIZE
A1
DWG.NO.
219D2734
SH.
3/4 C
REV.
1
D D
SEE NOTE 4
VOIR NOTE 4
AIR OUTLET
SORTIE D'AIR
C
C (33VL-1) (33VL-2)
ZSL ZSL
(88VL-1) (88VL-2)
V M V M (33DT-11) (33DT-12)
ZSL ZSL
(95VL-1) (49HA-12)
FS TSHH
(95VL-2)
-(23HA-16)
FS
-(23HA-15)
(95VL-3)
-(23HA-14)
FS -(23HA-13)
-(23HA-12)
(23HA-11) (AT-AC-11)
TE
DIRECTORATE GENERAL FOR GAS POWER B
PLANT PROJECTS
B (33DT-13) ZSL ZSL (33DT-14)
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
al
SE
05/02/2009
05/02/2009 05/02/2009
05/02/2009 05/02/2009
05/02/2009
ci
None AFR JLCJLC TRIANON
AFR TRIANONFLORIAN
FLORIAN HERRMANN
HERRMANNANNE-CLAIRE
ANNE-CLAIRE
R
AFR JLCJLC
AFR TRIANON
TRIANONFLORIAN
FLORIAN HERRMANN
HERRMANNANNE-CLAIRE
ANNE-CLAIRE
ffi
FO
A1
VALIDE
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCHEMA
AND CHAUFFAGE
INSTRUMENT ET VENTILATION
DIAGRAM (P&I D)
E
0436, PID, FLOW-HEATING
NOMS / NAMES & VENTILATION
VALIDE
DIAG DCH HEATING
DRAWN AFR - IN.& VENTILATION
G
CHECKED TRIANON F.
APPROVED RISS O. SCHEMA CHAUFFAGE ET VENTILATION
A
ANNE
C
C
DIAG. SCH. HEATING & VENTILATION
FUCHS
0436
gazton0
219D2734
This document, exclusive property of
A1
DISTR
Ce document, propriete exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. IL ne peut etre communique, is strictly confidential. It must not be communicated
01 F X
copie ou reproduit sans son autorisation ecrite prealable. copied or reproduced without our previous written consent. SIM
TO:
206D7050 3/4
3/4
SCALE REV. : C SHEET : 3/4
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 SIZE
A1
DWG.NO.
219D2734
SH.
4/4 C
REV.
1
D D
(33JS-1)
ZSL
(88JS-1)
M (23WR-30)
(33JS-2)
ZSL
DIRECTORATE GENERAL FOR GAS POWER B
PLANT PROJECTS
B
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
al
SE
05/02/2009
05/02/2009 05/02/2009
05/02/2009 05/02/2009
05/02/2009
ci
None AFR JLCJLC TRIANON
AFR TRIANONFLORIAN
FLORIAN HERRMANN
HERRMANNANNE-CLAIRE
ANNE-CLAIRE
R
AFR JLCJLC
AFR TRIANON
TRIANONFLORIAN
FLORIAN HERRMANN
HERRMANNANNE-CLAIRE
ANNE-CLAIRE
ffi
FO
A1
VALIDE
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCHEMA
AND CHAUFFAGE
INSTRUMENT ET VENTILATION
DIAGRAM (P&I D)
E
0436, PID, FLOW-HEATING
NOMS / NAMES & VENTILATION
VALIDE
DIAG DCH HEATING
DRAWN
AFR - IN.& VENTILATION
G
CHECKED TRIANON F.
APPROVED RISS O. SCHEMA CHAUFFAGE ET VENTILATION
A
ANNE
C
C
DIAG. SCH. HEATING & VENTILATION
FUCHS
0436
gazton0
219D2734
This document, exclusive property of
A1
DISTR
Ce document, propriete exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. IL ne peut etre communique, is strictly confidential. It must not be communicated
01 F X
copie ou reproduit sans son autorisation ecrite prealable. copied or reproduced without our previous written consent. SIM
TO:
206D7941 4/4
4/4
SCALE REV. : C SHEET : 4/4
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 SIZE
A1
DWG.NO.
227D1308
SH.
1/2
REV.
A 1
REVISIONS
1 - VOIR MLI 0414, NOMENCLATURE DES APPAREILS, POUR REGLAGE DES APPAREILS.
1 - SEE MLI 0414, DEVICE SUMMARY, FOR CONTROL DEVICE SETTINGS.
2 - VOIR MLI 0313 ET 0314 POUR LES CARACTERISTIQUES DES CONNEXIONS CLIENT. D
D 2 - SEE MLI 0313 AND 0314 FOR CHARACTERISTICS OF THE CUSTOMER CONNECTIONS.
3 - VOIR ITEMS 3 ET 4 DU TABLEAU DE " LIST OF COMPLEMENTARY DOCUMENTS " POUR LES CARACTERISTIQUES DES FLUIDES.
3 - SEE ITEMS 3 & 4 OF THE " LIST OF COMPLEMENTARY DOCUMENTS " FOR FLUID CHARACTERISTICS.
A A REV
REV STATUS
OF SHEETS
2 1 SH
DIRECTORATE GENERAL FOR GAS POWER B
PLANT PROJECTS
B
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
SE
E0872 100 IK0 FD 003 A
al
22/10/2008 05/11/2008 18/11/2008
U
22/10/2008 05/11/2008 18/11/2008
AFR IN GROSLAMBERT STEPHANEDELIMOGES SYLVAIN
ci
AFR IN GROSLAMBERT STEPHANE
DELIMOGES SYLVAIN
R
AFR IN GROSLAMBERT STEPHANEDELIMOGES SYLVAIN
A1 AFR IN GROSLAMBERT STEPHANE
DELIMOGES SYLVAIN
ffi
FO
VALIDE
A1
O
SCH. NETTOYAGE
GAS TURBINE COMP.
WITH ET TG ITEMS-PIPING
ASSOCIATES
AND INSTRUMENT DIAGRAM (P&I D)
E
0441, PID, TURBINE
NOMS / CLEANING
NAMES
VALIDE
DIA. SCH. PP-TURBINE & COMP. CLN
DRAWN
AFR - IN.
G
CHECKED GROSLAMBERT
APPROVED DELIMOGES S.
A SCHEMA NETTOYAGE COMP. ET
TG
ANNE
AA
user
DIAG. SCH. PP-TURBINE & COMP. CLN
FUCHS
0441
super
DISTR
Ce document, propriété exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. Il ne peut être communiqué, is strictly confidential. It must not be communicated 01 FX
copié ou reproduit sans son autorisation écrite préalable. copied or reproduced without our previous written consent. SIM
TO:
219D1369 1/1
1/2(1)
SCALE REV. : A SHEET : 1/2
DT-1C
DT-1C
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 SIZE
A1
DWG.NO.
227D1308
SH.
2/2 A
REV.
1
COMPARTIMENT TURBINE
GAS TURBINE COMPARTMENT
D D
TC1-1 TC1-2 TC1-3 TC1-4 TC1-5 TC1-6 TC1-7 TC1-8 TC1-9 TC1-10 TC1-11 TC1-12 TC1-13 TC1-14
VANNES NETTOYAGE TURBINE
(CHAMBRES A COMBUSTION)
COMBUSTION CHAMBER
CLEANING VALVES
HV001 HV002 HV003 HV004 HV005 HV006 HV007 HV008 HV009 HV010 HV011 HV012 HV013 HV014 C
C
NC NC NC NC NC NC NC NC NC NC NC NC NC NC
HV016
NC VANNE DE PURGE
BLOWDOWN VALVE HV017
NC
3" x 1"
0-10 BARS
145 PSI
LEAVE THIS SPACE BLANK
TREMIE BP (260L)
HV105 LOW
NC PRESSURE
HOPPER VIBREUR
VIBRATOR
20KF 33KF-1
HV109
33KF-2 DIRECTORATE GENERAL FOR GAS POWER B
M PLANT PROJECTS
NC
B
FAKJ-1 NC 20KF/PB
63KJ
MEGA DEAL PROJECTS
NASIRIYAH POWER PLANT
HV108 TREMIE HP
0-40 BARS
580 PSI HIGH PRESSURE HOPPER
CONTRACT N° 28
NC FUITE CONTINUE DI 101 PLEIN PASSAGE [4 x 125 MW]
POINT BAS TROU DIA 0,80MM
LOW POINT 0,031 INCH DIA HOLE FULL PASSAGE
VR. 26 CONTINUOUS BLOWDOWN HV102
NO NC
0-40 BARS
HV104
SE
580 PSI
E0872 100 IK0 FD 003 A
al
NC HV107 HV103 22/10/2008 05/11/2008 18/11/2008
U
NC 22/10/2008 05/11/2008 18/11/2008
HV101 NC AFR IN GROSLAMBERT STEPHANEDELIMOGES SYLVAIN
ci
FAKJ-2
AFR IN GROSLAMBERT STEPHANE
DELIMOGES SYLVAIN
R
TC1 TC2 AFR IN GROSLAMBERT STEPHANEDELIMOGES SYLVAIN
A1 AFR IN GROSLAMBERT STEPHANE
DELIMOGES SYLVAIN
ffi
FO
HV106
VALIDE
A1
NC
SKID DE NETTOYAGE
O
NC E026
TURBINE CLEANING SKID SCH. NETTOYAGE
GAS TURBINE COMP.
WITH ET TG ITEMS-PIPING
ASSOCIATES
AND INSTRUMENT DIAGRAM (P&I D)
E
0441, PID, TURBINE
NOMS / CLEANING
NAMES
VALIDE
DIA. SCH. PP-TURBINE & COMP. CLN
DRAWN AFR - IN.
G
CHECKED GROSLAMBERT
APPROVED DELIMOGES S.
A SCHEMA NETTOYAGE COMP. ET TG
ANNE
AA
user
DIAG. SCH. PP-TURBINE & COMP. CLN
FUCHS
0441
super
DISTR
Ce document, propriété exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. Il ne peut être communiqué, is strictly confidential. It must not be communicated 01 FX
copié ou reproduit sans son autorisation écrite préalable. copied or reproduced without our previous written consent. SIM
TO:
219D1369 1/1
2/2(2)
SCALE REV. : A SHEET : 2/2
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
DIRECTORATE GENERAL FOR GAS POWER
PLANT PROJECTS
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
SE
E0872 100 IK0 FD 001 A
al
U
15/05/2008 15/05/2008 16/05/2008
ci
AFR JLC GROSLAMBERT STEPHANE
SICARD VINCENT
R
AFR JLC GROSLAMBERT STEPHANE
SICARD VINCENT
ffi
FO
A1
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
AND INSTRUMENT DIAGRAM (P&I D)
E
0442, PID, COMPRESSOR WASHING
VALIDE
G
FUCHS ANNE
C
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
SE
E0872 100 IK0 FD 001 A
al
U
15/05/2008 15/05/2008 16/05/2008
ci
AFR JLC GROSLAMBERT STEPHANE
SICARD VINCENT
R
AFR JLC GROSLAMBERT STEPHANE
SICARD VINCENT
ffi
FO
A1
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
AND INSTRUMENT DIAGRAM (P&I D)
E
0442, PID, COMPRESSOR WASHING
VALIDE
G
FUCHS ANNE
C
8 7 6 5 4 3 A1
SIZE DWG.NO.
227D1360
SH.
1
REV.
A 1
REVISIONS
ROZE M.
A FIRST ISSUE 23 DEC 08 BALCER L.
DELIMOGES S.
NOTES:
1. SE REFERER AU "DEVICE SUMMARY" (MLI 0414) POUR LA DESCRIPTION ET LE REGLAGE DES APPAREILS.
1. REFER TO DEVICE SUMMARY (MLI 0414) FOR DEVICE SETTINGS AND DESCRIPTION.
D D
2. SE REFERER AU PLAN D'IMPLANTATION (MLI 0313) ET AUX NOTES (MLI 0314) POUR LA POSITION ET LES CARACTERISTIQUES DES CONNEXIONS PC TURBINE.
2. REFER TO OUTLINE DRAWING (MLI 0313) AND NOTES (MLI 0314) FOR GAS TURBINE PC CONNECTION POSITIONS AND CHARACTERISTICS.
3. SE REFERER AUX DOCUMENTS 3 ET 4 DE LA LISTE DES DOCUMENTS COMPLEMENTAIRES POUR CE QUI CONCERNE LES RECOMMANDATIONS SUR L'EAU D'INJECTION.
3. REFER TO DOCUMENTS 3 AND 4 OF LIST OF COMPLEMENTARY DOCUMENTS FOR WATER INJECTION RECOMMENDATIONS.
4. LE FILTRE CONIQUE EN AMONT DE LA POMPE DOIT ETRE NETTOYE APRES 500 HEURES DE FONCTIONNEMENT DU SKID, ET TOUS LES 3 ANS ENSUITE.
4. THE CONICAL FILTER UPSTREAM OF THE PUMP MUST BE CLEANED AFTER THE INITIAL 500 HOURS OF OPERATION AND EVERY THREE YEARS AFTER.
NOMENCLATURE IDENT
A A REV
REV STATUS
OF SHEETS
2 1 SH
DIRECTORATE GENERAL FOR GAS POWER B
PLANT PROJECTS
B
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
SE
E0872 100 IK0 FD 002 A
al
U
23/12/2008
23/12/2008 23/12/2008
23/12/2008 23/12/2008
23/12/2008
ci
None ROZE MAGALI BALCER
ROZE MAGALI BALCERLAURENT
LAURENT DELIMOGES
DELIMOGESSYLVAIN
SYLVAIN
R
ROZE MAGALI
ROZE MAGALI BALCER
BALCERLAURENT
LAURENT DELIMOGES
DELIMOGESSYLVAIN
SYLVAIN
ffi
FO
A1
VALIDE
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCHEMA
AND TUYAUTERIE
INSTRUMENT INJECTION
DIAGRAM EAU
(P&I D)
E
0462, PID, WATER INJECTION
NOMS / NAMES SYSTEM GENERAL ELECTRIC COMPANY
VALIDE
DIAG SCH PP WATER
DRAWN ROZE M. INJECTION
G
CHECKED BALCER L.
APPROVED DELIMOGES S.
A
SCHEMA TUY.INJECTION EAU
ANNE
A
DIAG. SCH. PP-WATER INJECTIONA
FUCHS
0462
gazton0
227D1360
A1
DISTR
Ce document, propriete exclusive de This document, exclusive property of
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. IL ne peut etre communique, is strictly confidential. It must not be com municated
01 F X
copie ou reproduit sans son autorisation ecrite prealable. copied or reproduced without our previous written consent. SIM
TO:
219D1277 1/2
1/2
SCALE REV. : A SHEET : 1
DT-1C
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 A1
SIZE DWG.NO.
227D1360
SH.
2
REV.
A 1
TYP. POUR 8 BUSES D'INJECTION D'EAU TYP. POUR 4 BUSES D'INJECTION D'EAU
VERS RESERVOIR
(POUR UN INJECTEUR FUEL)
TO WATER TANK
(POUR UN INJECTEUR FUEL)
WJ10 (FOR ONE FUEL NOZZLE)
PC
(FOR ONE FUEL NOZZLE)
PC
WJ3
WD
63WN-1 63WN-2
MANIFOLDS POUR
PI PI PSL 14 INJECTEURS FUEL
PDSL
MANIFOLDS SUPPLY
STOP VALVE FOR 14 FUEL NOZZLES
ASSEMBLY
ALIMENTATION EN EAU
FROM WATER SUPPLY
(VPR62-13)
WD
HV110 (FO-1)
HV121
NC HV111
HV120 NC VTA
NO
WD
ON
(20WN-2)
WD
WI2
PC
WD
PC
PW1-1 C
C WI1
VS2-2 PC SOCLE TURBINE
TURBINE BASE
(33WN-7)
(33WN-8)
ZSH
ZSL TURBINE BASE PIPING MLI 0968
HV130
CONTROL
VALVE
WD
VCK110
WD
WD
ASSEMBLY PC
PDI FC
NO WJ2
( VPR62-1 )
63WN-3
HV127 HV129
NC NC ( VPR62-11)
VTA
HV126 VTA
NC (20WN-1) DIRECTORATE GENERAL FOR GAS POWER B
( 90WN-1 )
PLANT PROJECTS
B NC I
P
( 33WN-1 )
HV123 ( VQE1-1 )
( 33WN-2)
ZSH MEGA DEAL PROJECTS
FW1-1 ( 96WF-1) ( 96WF-2)
HV122 NO NO
HV128 ZSL FT FT NASIRIYAH POWER
PLANT
NO NO CONTRACT N° 28
HV124 HV125 [4 x 125 MW]
FC
FW1-3 VS2-1
( 96WF-3)
FT
(33WN-3)
SE
VC4-1 FM1-1 (33WN-4) ZSH E0872 100 IK0 FD 002 A
al
HV131
ZSL
U
23/12/2008
23/12/2008 23/12/2008
23/12/2008 23/12/2008
23/12/2008
VCK111
ci
None ROZE MAGALI BALCER
ROZE MAGALI BALCERLAURENT
LAURENT DELIMOGES
DELIMOGESSYLVAIN
SYLVAIN
R
PC
ROZE MAGALI
ROZE MAGALI BALCER
BALCERLAURENT
LAURENT DELIMOGES
DELIMOGESSYLVAIN
SYLVAIN
FC NO
ffi
FO
WJ4 A1
DRAIN
VALIDE
MODULE INJECTION D'EAU A035
O
WATER INJECTION MODULE A035 GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
PC SCHEMA
AND TUYAUTERIE
INSTRUMENT INJECTION
DIAGRAM EAU
(P&I D)
WJ5
E
0462, PID, WATER INJECTION
NOMS / NAMES SYSTEM GENERAL ELECTRIC COMPANY
VALIDE
DIAG SCH PP WATER
DRAWN ROZE M. INJECTION
G
CHECKED BALCER L.
APPROVED DELIMOGES S.
A
SCHEMA TUY.INJECTION EAU
ANNE
AA
DIAG. SCH. PP-WATER INJECTION
FUCHS
0462
gazton0
227D1360
This document, exclusive property of
A1
DISTR
Ce document, propriete exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. IL ne peut etre communique, is strictly confidential. It must not be com municated
01 F X
copie ou reproduit sans son autorisation ecrite prealable. copied or reproduced without our previous written consent. SIM 219D1277
TO: 2/2
2/2
SCALE REV. : A SHEET : 2
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
DWG Number 132T9047 Rev - Released 3/4/2019 Page 1 of 2
REVISION HISTORY
THIS DOCUMENT SHALL BE REVISED IN DATE
NOTES: REV DESCRIPTION APPROVED
ITS ENTIRETY. ALL SHEETS OF THIS (YYYY-MM-DD)
1. REFER TO DEVICE SUMMARY (MLI 0414) FOR DEVICE SETTINGS AND DESCRIPTION. DOCUMENT ARE THE SAME REVISION
A LEVEL AS INDICATED. A
2. REFER TO OUTLINE DRAWING (MLI 0313) AND NOTES (MLI 0314) FOR GAS TURBINE PC
CONNECTION POSITIONS AND CHARACTERISTICS.
B 5. EXPOSED WATER PIPING AND COMPONENTS MUST BE INSULATED AND HEAT TRACED TO B
PREVENT WATER FROM FREEZING IF THE SKID IS INSTALLED IN AREA WHERE SURROUNDING
TEMPERATURE COULD FALL BELOW 32°F (0°C).
6. THE RECIRCULATION FLOW SHOULD BE RETURNED TO THE STORAGE TANK AND NOT SHORT-
CIRCUITED TO THE PUMP INLET. IT IS RECOMMENDED THAT NO VALVES BE INSTALLED IN THIS
LINE. YET, IF IT IS REQUIRED TO INSTALL ANY VALVE IN THE LINE, IT MUST BE TAGGED OR
LOCKED OPENED DURING OPERATION TO PREVENT SERIOUS DAMAGE TO THE PUMP.
C 7. THE CONICAL FILTER UPSTREAM OF THE PUMP MUST BE CLEANED AFTER 500 HOURS OF C
RUNNING HOURS AND AFTER THAT EVERY 3 YEARS.
8. IF IT IS NOT WRITTEN (NC) THE DEFAULT POSITION OF ALL THE VALVES IS NORMALLY OPEN
(NO).
E E
F F
G G
H H
J J
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
WJ10
PC
A A
(FA8-2)
HOLE DIA. 0.03 inch 79mm
LOW POINT CONTINUOUS DRAIN
WD
TO VS2-4
SH-2, ZONE H-3
B B
( VPR62-1 ) ( VPR62-11)
(VCK8-1 TO 14)
C C
VTA
C B (20WN-1)
VTA
A
D D C
( VQE1-1 )
( 90WN-1 )
I
P
(33WN-1)
ZSH (96WF-1) (96WF-2)
(33WN-2) (33WN-4)
E ZSL FT FT
(33WN-3)
E
ZSL ZSH HV134
WD WI2
WJ2
PC PC
FC FC NO
(VS2-1)
(VC4-1) (FM1-1)
HV113
PURGE
F (96WN-1) WATER DRAIN F
HV148
FROM WATER SUPPLY
(88WN-1)
(23WN-1)
( 20WN-18 )
(FO-1)
(33WN-11)
J J
ZSH
DRAIN
WATER INJECTION MODULE MLI A035
(VCK100) WD WJ5
PC
PC
WJ3 FO (VS2-4)
CREATED BY APPROVED BY DOCUMENT TYPE REVISION
P.SANTHIYAGU G, RAVIKUMAR SHEMATIC -
K GE CLASS II (IN TERNAL NON-CRITICAL) /NOT EXPORT CONT ROLLED TITLE
K
C 2 01 9 General El ectri c Company (USA)
All rights reserved. The information herein is Proprietary and Technically Exclusive content that is solely owned by General Electric Company WATER INJECTION SYSTEM- MOD
and/or its affiliates. Thus, it is being provided with the explicit expectation of restricted and privileged use. All persons or legal entities
receiving this information shall be deemed by the act of its receipt to have contractually agreed to make no duplications, reproductions of GE POWER
any nature by any means, modifications, disclosures, or use any portion of this material; except as is expressly authorized in writing by CREATION DATE (YYYY-MM-DD) SHEET SIZE DRAWING NO. SHEET
General Electric Company and/or its legitimate affiliates. 2019-02-23 D 132T9047 2 OF 2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
GE Proprietary Information - Class II (Internal) US EAR - NLR
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 SIZE
A1
DWG.NO.
219D1732
SH.
1/2
REV.
A 1
REVISIONS
AFR - JLC.
A FIRST ISSUE 15/09/2008 RENIER L.
BELPERRON S.
NOTES:
1 - VOIR MLI 0414, NOMENCLATURE DES APPAREILS POUR LE REGLAGE DES APPAREILS.
1 - SEE MLI 0414, DEVICE SUMMARY FOR DEVICE SETTING. D
D
2 - VOIR MLI 0313 ET 0314 POUR LES CARACTERISTIQUES DES CONNEXIONS.
2 - SEE MLI 0313 AND 0314 FOR CONNECTIONS CHARACTERISTICS.
3 - ARTICULATION.
3 - SPHERICAL BEARING.
4 - SI LA TEMPERATURE DES TUYAUTERIES DE LIAISON PEUT DESCENDRE EN DESSOUS DE 15°C DU FAIT DE LA TEMPERATURE AMBIANTE,
IL EST OBLIGATOIRE DE LES TRACER ET CALORIFUGER POUR MAINTENIR AU MOINS A 15°C.
4 - IF CONNECTING PIPING TEMPERATURE MAY DECREASE LOWER THAN 15°C (59°F) DUE TO AMBIENT TEMPERATURE,
IT IS MANDATORY THAT HEAT TRACING AND INSULATING BE USED TO MAINTAIN THEM AT LEAST AT 15°C (59°F).
A A REV
REV STATUS
OF SHEETS
2 1 SH
DIRECTORATE GENERAL FOR GAS POWER B
PLANT PROJECTS
B
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
al
SE
15/09/2008
15/09/2008 22/07/2008
22/07/2008 22/07/2008
22/07/2008
ci
None AFR IN IN RENIER
AFR RENIERLUCIE
LUCIE BELPERRON
BELPERRONSANDRINE
SANDRINE
R
AFR IN IN
AFR RENIER
RENIERLUCIE
LUCIE BELPERRON
BELPERRONSANDRINE
SANDRINE
ffi
FO
A1
VALIDE
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCHEMA
AND CDE. AUBES
INSTRUMENT VARIABLES
DIAGRAM (P&I D)
E
0469, PID, IGV NOMS / NAMES
GEORGEVALIDE
DIAG. SCH. PIPING
DRAWN IGV.
AFR - JLC.
G
CHECKED RENIER L.
APPROVED BELPERRON S.
A SCHEMA CDE. AUBES VARIABLES.
FUCHS ANNE
AA
DIAG. SCH. PIPING IGV.
GIRNEATA
DISTR
Ce document, propriété exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. Il ne peut être communiqué, is strictly confidential. It must not be communicated
01 F X
copié ou reproduit sans son autorisation écrite préalable. copied or reproduced without our previous written consent. SIM
TO:
206D6828 1/2
1/2
SCALE REV. : A SHEET : 1/2
DT-1C
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 SIZE
A1
DWG.NO.
219D1732
SH.
2/2 A
REV.
1
D D
VOIR NOTE 4
SEE NOTE 4 ANNEAU DES AUBES ENTREE
PDIH INLET GUIDE VANE RING
100
DI 200
OH-4 0,76 mm - 0.030 "
DE/FROM MLI.0434
OH-4
FI 100
MODULE AUXILIAIRES
20TV-1
ACCY MODULE FH6-1
C
C
FERME (96TV-1)
CLOSE
P R ZE
(96TV-2)
2 ZE
1 90TV-1
OUVERT
OPEN
LEAVE THIS SPACE BLANK
VH3-1A VH3-1B
DIRECTORATE GENERAL FOR GAS POWER B
PLANT PROJECTS
B
DI 100
MEGA DEAL PROJECTS
NASIRIYAH POWER PLANT
1,78 mm - 0.070 "
W D
CONTRACT N° 28
[4 x 125 MW]
DI 101 W D
1,78 mm - 0.070 "
HM3-1
0548
E0872 100 I30 FD 002 A
al
SE
AU DESSUS 15/09/2008
15/09/2008 22/07/2008
22/07/2008 22/07/2008
22/07/2008
ci
DU NIVEAU None AFR IN IN RENIER
AFR RENIERLUCIE
LUCIE BELPERRON
BELPERRONSANDRINE
SANDRINE
OD
R
ABOVE FLUID COMPARTIMENT TURBINE AFR IN IN
AFR RENIER
RENIERLUCIE
LUCIE BELPERRON
BELPERRONSANDRINE
SANDRINE
ffi
LEVEL
FO
GAS TURBINE COMPARTMENT A1
VALIDE
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCHEMA
AND CDE. AUBES
INSTRUMENT VARIABLES
DIAGRAM (P&I D)
E
0469, PID, IGV NOMS / NAMES
GEORGEVALIDE
DIAG. SCH. PIPING
DRAWN IGV.
AFR - JLC.
G
CHECKED RENIER L.
APPROVED BELPERRON S.
A SCHEMA CDE. AUBES VARIABLES
FUCHS ANNE
AA
DIAG. SCH. PIPING IGV.
GIRNEATA
DISTR
Ce document, propriété exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. Il ne peut être communiqué, is strictly confidential. It must not be communicated
01 F X
copié ou reproduit sans son autorisation écrite préalable. copied or reproduced without our previous written consent. SIM
TO:
206D6828 2/2
2/2
SCALE REV. : A SHEET : 2/2
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
DIRECTORATE GENERAL FOR GAS POWER
PLANT PROJECTS
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
SE
E0872 100 I80 FD 001 A
al
U
13/04/2005 26/04/2005 27/04/2005
ci
None TCA-CV DEMACEDO ANTHONY BACH JEAN-SEBASTIEN
R
TCA-CV DEMACEDO ANTHONY BACH JEAN-SEBASTIEN
ffi
FO
A1
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
AND INSTRUMENT DIAGRAM (P&I D)
E
0474, PID, HAZARDOUS GAS DETECTOR
VALIDE
G
FUCHS ANNE
A
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
SE
E0872 100 I80 FD 001 A
al
U
13/04/2005 26/04/2005 27/04/2005
ci
None TCA-CV DEMACEDO ANTHONY BACH JEAN-SEBASTIEN
R
TCA-CV DEMACEDO ANTHONY BACH JEAN-SEBASTIEN
ffi
FO
A1
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
AND INSTRUMENT DIAGRAM (P&I D)
E
0474, PID, HAZARDOUS GAS DETECTOR
VALIDE
G
FUCHS ANNE
A
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
SE
E0872 100 I80 FD 001 A
al
U
13/04/2005 26/04/2005 27/04/2005
ci
None TCA-CV DEMACEDO ANTHONY BACH JEAN-SEBASTIEN
R
TCA-CV DEMACEDO ANTHONY BACH JEAN-SEBASTIEN
ffi
FO
A1
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
AND INSTRUMENT DIAGRAM (P&I D)
E
0474, PID, HAZARDOUS GAS DETECTOR
VALIDE
G
FUCHS ANNE
A
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
al
SE
20/02/2008 20/02/2008 20/02/2008
ci
None AFR JLC TOTH CHARLES IMPELLIZZERI ERIC
R
AFR JLC TOTH CHARLES IMPELLIZZERI ERIC
ffi
FO
A1
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
AND INSTRUMENT DIAGRAM (P&I D)
E
0477, PID, FUEL PURGE
VALIDE
G
FUCHS ANNE
B
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
REVISION HISTORY
NOTES : THIS DOCUMENT SHALL BE REVISED IN REV DESCRIPTION
DATE
APPROVED
ITS ENTIRETY. ALL SHEETS OF THIS (YYYY-MM-DD)
1. SEE MLI 0414, DEVICE SUMMARY FOR DEVICE SETTING. DOCUMENT ARE THE SAME REVISION
A LEVEL AS INDICATED. A
2. SEE MLI 0313 AND 0314 FOR CONNECTIONS CHARACTERISITICS.
3. SEE ITEMS 3, 4 & 5 OF THE " LIST OF COMPLEMENTARY DOCUMENTS " FOR FLUID
CHARACTERISTICS.
4. LINE STYLE SHOWN IN PHANTOM REPRESENTS EXISTING LINE. LINE STYLE SHOWN IN SOLID
REPRESENTS NEW LINE WHICH IS SUPPLIED FOR THIS REQUISITION.
B B
(VPR54-1)
PG68
0.375 T
PC CUSTOMER INSTRUMENT AIR SUPPLY
C 2 1 2 1 C
VTA 3 FO VTA 3 FO
TO MLI 0462
ES)
ES) LAC
P LA C T (14 P
T( 1 4
NC 0. 75
NC
LIQUID FUEL 0. 75 WATER PURGE
WD
NO NO
MANIFOLD
E
HV101
HV101
HV102
E
(VA19-1) SLOPE SLOPE
WD
MINI 2% (VA33-1) WD
MINI 2%
C B WD
C B WD
A FO 2"x1.5" A FO 2"x1.5"
SLOPE MINI 2%
1.5-80-SS
SLOPE MINI 2%
F F
3 mDI 101 3 mDI 105
m- m-
0.12 0.12
" "
AA2 AA20
PC PC
TELLTALE LEAK-OFF
TELLTALE LEAK-OFF
1.5-80-SS
G G
2"x1.5"
(FA3-2)
2"x1.5"
H FROM ATOMIZING AIR SYSTEM 2.00-40-SS H
MLI0425 FROM PA2
WD
GE CLASS II (INTERNAL NON-CRITICAL) /NOT EXPORT CONTROLLED CREATED BY Approved by DRAWING NO.
120T9785
105041064 SEE PLM
K C 2016 General Electric Company(USA) TITLE K
All rights reserved. The information herein is Proprietary and Technically Exclusive content that is solely owned by General Electric Company
THIRD ANGLE PROJECTION DIAG. SCH.-FUEL PURGE AIR-
and/or its affiliates. Thus, it is being provided with the explicit expectation of restricted and privileged use. All persons or legal entities
receiving this information shall be deemed by the act of its receipt to have contractually agreed to make no duplications, reproductions of
POWER MOD
any nature by any means, modifications, disclosures, or use any portion of this material; except as is expressly authorized in writing by CREATION DATE (YYYY-MM-DD) SHEET SIZE SHEET
General Electric Company and/or its legitimate affiliates. 2016-02-25 D 1 OF 2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
GE Proprietary Information - Class II (Internal) US EAR - NLR
DWG Number 120T9785 Rev - Released 2/26/2016 Page 2 of 2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
REVISION HISTORY
DATE
REV DESCRIPTION APPROVED
(YYYY-MM-DD)
A A
B B
C C
FG6
PC
MLI 0991 GAS FUEL MODULE
(20PG-2)
D PG35 PG36
(VPR44-2) S
D
FROM MLI 0425 0.5T 2 1
PC PC
PA1
3 NO
VTA
(VPR44-1) S (20PG-1)
HV301
E 2 1
(96PG-12) E
PT (20VG-2)
3 NO
VTA S
HV516 NO VTA 3 1 (VA36-2)
VTA 3 1 (VA36-1) FO 2
NC
1.50-40-SS
FO 2 WD
G
HV201
NC
G
DI 102
1.6 mm - 0.062 "
CONTINUOUS
BLOWDOWN
H H
J J
8 7 6 5 4 3 SIZE
A1
DWG.NO.
214D1258
SH.
1
REV.
C 1
REVISIONS
TATA BSL
A FIRST ISSUE 24/11/2005 JANIN P.
SICARD V.
AFR - JLC.
NOTES: B IM - 2006003911 30/05/2006 JANIN P.
SICARD V.
TATA AM
C IM - 2006004211 09/06/2006 JANIN P.
1 - VOIR MLI 0414, NOMENCLATURE DES APPAREILS POUR LE REGLAGE DES APPAREILS. SICARD V.
3 - PAR DEFAUT TOUTES LES VANNES SONT NORMALEMENT OUVERTES (NO), SAUF INDICATIONS CONTRAIRES (NC).
3 - UNLESS NORMALLY CLOSED (NC) IS SPECIFIED, ALL VALVE POSITIONS ARE CONSIDERED NORMALLY OPEN (NO).
C C REV
REV STATUS
OF SHEETS
2 1 SH
3
SYSTEM AND COMPONENT CLEANLINESS C
REQUIREMENTS GE-362A2412
C
IT. NOMENCLATURE IDENT
DIRECTORATE GENERAL FOR GAS POWER B
PLANT PROJECTS
B
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
al
SE
12/06/2006
12/06/2006 13/06/2006
13/06/2006 13/06/2006
13/06/2006
ci
None SELVARAJAN BALASUBRAMANIAN
JANIN
SELVARAJAN JANINPASCAL
BALASUBRAMANIAN PASCAL SICARD VINCENT
SICARD VINCENT
R
SELVARAJAN BALASUBRAMANIAN
SELVARAJAN JANIN
JANINPASCAL
BALASUBRAMANIAN PASCAL SICARD VINCENT
SICARD VINCENT
ffi
FO
A1
VALIDE
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCHEMA
AND SURVEILLANCE
INSTRUMENT PERFORMANCES
DIAGRAM (P&I D)
E
0492, PID, MONITORING
NOMS / NAMES
JESSICAVALIDE
DIAG.SCH.PERFORMANCE
DRAWN TATA BSL MONITORING
G
CHECKED JANIN P.
APPROVED SICARD V.
A SCHEMA SURVEILLANCE PERFORMANCES
FUCHS ANNE
C
C
DIAG. SCH. PERFORMANCE MONITORING
GERALDES
strictement confidentiel. Il ne peut être communiqué, is strictly confidential. It must not be communicated
01 F X
copié ou reproduit sans son autorisation écrite préalable. copied or reproduced without our previous written consent. SIM
TO:
NONE 1/1
1/2(1)
SCALE REV. : C SHEET : 1
DT-1C
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 SIZE
A1
DWG.NO.
214D1258
SH.
2
REV.
C 1
D D
CAISSON D'ADMISSION
OU
GAINE DE TRANSITION
INLET PLENUM
OR
INLET TRANSITION (96BD-1) (96CS-1) (96AP-1A) (96AP-1B) (96AP-1C)
PDT PDT PT PT PT
LP HP LP HP
PE PE
100A 100B
C
C
BDH / CSL AP
HV100
3% mini 3% mini
(CT-IF-3/R)
TE
AU DRAIN
TO DRAIN
PE PE
101A 101D LEAVE THIS SPACE BLANK
SONDES DE PRESSION
STATIQUE TULIPE SONDES DE PRESSION STATIQUE
STATIC PRESSURE PROBES D'ADMISSION STATIC PRESSURE PROBES PM01
PC
BELL MOUTH
PE PE
101B 101C
DIRECTORATE GENERAL FOR GAS POWER B
PLANT PROJECTS
B
BDL
HV103
3% mini
MEGA DEAL PROJECTS
A L' ATMOSPHERE EXTERIEURE
TO EXTERIOR ATMOSPHERE NASIRIYAH POWER
PLANT
AU DRAIN
CONTRACT N° 28
TO DRAIN [4 x 125 MW]
al
SE
12/06/2006
12/06/2006 13/06/2006
13/06/2006 13/06/2006
13/06/2006
ci
None SELVARAJAN BALASUBRAMANIAN
JANIN
SELVARAJAN JANINPASCAL
BALASUBRAMANIAN PASCAL SICARD VINCENT
SICARD VINCENT
R
SELVARAJAN BALASUBRAMANIAN
SELVARAJAN JANIN
JANINPASCAL
BALASUBRAMANIAN PASCAL SICARD VINCENT
SICARD VINCENT
ffi
FO
A1
VALIDE
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCHEMA
AND SURVEILLANCE
INSTRUMENT PERFORMANCES
DIAGRAM (P&I D)
E
0492, PID, MONITORING
NOMS / NAMES
JESSICAVALIDE
DIAG.SCH.PERFORMANCE
DRAWN TATA BSL MONITORING
G
CHECKED JANIN P.
APPROVED SICARD V.
A SCHEMA SURVEILLANCE PERFORMANCES
FUCHS ANNE
C
C
DIAG. SCH. PERFORMANCE MONITORING
GERALDES
strictement confidentiel. Il ne peut être communiqué, is strictly confidential. It must not be communicated
01 F X
copié ou reproduit sans son autorisation écrite préalable. copied or reproduced without our previous written consent. SIM
TO:
NONE 1/1
2/2(2)
SCALE REV. : C SHEET : 2
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 SIZE
A1
DWG.NO.
219D1937
SH.
1/2
REV.
B 1
REVISIONS
AFR - JLC.
A FIRST ISSUE 16/01/2008 GEROME Y.
1 - VOIR MLI 0414, NOMENCLATURE DES APPAREILS POUR LE REGLAGE DES APPAREILS. DELOGE D.
MOREL JB.
1 - SEE MLI 0414, DEVICE SUMMARY FOR DEVICE SETTINGS. B IM 2008011496 19/11/08 GEROME Y.
ABOUJAIB M.
2 - VOIR MLI 0313 ET 0314 POUR LES CARACTERISTIQUES DES CONNEXIONS.
2 - SEE MLI 0313 AND 0314 FOR CHARACTERISTICS CONNECTIONS.
D D
3 - RESERVOIR DE 1,25 m3 ( 330 US GALLONS ).
3 - 1.25 m3 (330 US GALLONS ).
DIRECTORATE GENERAL FOR GAS POWER B
PLANT PROJECTS
B
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
al
SE
19/11/2008
19/11/2008 28/11/2008
28/11/2008 28/11/2008
28/11/2008
ci
MOREL JEAN-BAPTISTE
MOREL JEAN-BAPTISTE GEROME
GEROMEYVES
YVES ABOUJAIB
ABOUJAIBMAHER
MAHER
R
MOREL JEAN-BAPTISTE
MOREL JEAN-BAPTISTE GEROME
GEROMEYVES
YVES ABOUJAIB
ABOUJAIBMAHER
MAHER
ffi
FO
A1
VALIDE
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCHEMA SKID INJECT.
AND INSTRUMENT INHIBITEUR
DIAGRAM (P&I D)VANADIUM
E
0494, PID, ADDITIVE
NOMS INJECTION
/ NAMES
VALIDE
DIAG.SCH.INHIBITION
DRAWN
AFR - JLC.SKID VANADIUM
G
CHECKED GEROME Y.
APPROVED DELOGE D.
A SCHEMA SKID INJECT. INHIBITEUR VANADIUM
ANNE
BB
DIAG. SCH. INHIBITION SKID VANADIUM
FUCHS
0494
gazton0
219D1937
This document, exclusive property of
A1
DISTR
Ce document, propriété exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. Il ne peut être communiqué, is strictly confidential. It must not be communicated
01 F X
copié ou reproduit sans son autorisation écrite préalable. copied or reproduced without our previous written consent. SIM 205D4553
TO: 1/2
1/2
SCALE REV. : B SHEET : 1/2
DT-1C
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 SIZE
A1
DWG.NO.
219D1937
SH.
2/2 B
REV.
1
(PSV-31)
VACUUM PRESS.
D (88FA-30) (PFA-30) D
M MOBILE NOTE 3 0.50-T
PUMP
VANADIUM
INHIBITOR
STORAGE
PC
LFAD-31
501BA
(71FA-31)
PRODUCT LSL
(71FA-32)
UNLOADING PI LSL
554
HV554
100mm MIN NO
4inch MIN
0.50-T (VR60-31)
(88FA-31)
PI
M 400
HV503
502BA HV505
(PFA-31)
PI
556 HV400
(VA99-31) NO NO C
C FO NO
HV556 LFAD-34
0.50-T
(VR60-32)
NO PC
(88FA-32)
M TO FILTERING
HV502 HV501 (VA99-33) (VA99-32) HV504
HV506 SKID
FO FC 1.00-T (PFA-32)
NC NO NO NO
S FF31-1
FO (63AF-31)
PSH
(20IA-31)
PC
2.00-P-40
MEGA DEAL PROJECTS
DRAIN
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
al
SE
19/11/2008
19/11/2008 28/11/2008
28/11/2008 28/11/2008
28/11/2008
ci
MOREL JEAN-BAPTISTE
MOREL JEAN-BAPTISTE GEROME
GEROMEYVES
YVES ABOUJAIB
ABOUJAIBMAHER
MAHER
R
MOREL JEAN-BAPTISTE
MOREL JEAN-BAPTISTE GEROME
GEROMEYVES
YVES ABOUJAIB
ABOUJAIBMAHER
MAHER
ffi
FO
A1
VALIDE
O
GAS TURBINE WITH ASSOCIATES ITEMS-PIPING
SCHEMA SKID INJECT.
AND INSTRUMENT INHIBITEUR
DIAGRAM (P&I D)VANADIUM
E
0494, PID, ADDITIVE
NOMS INJECTION
/ NAMES
VALIDE
DIAG.SCH.INHIBITION
DRAWN AFR - JLC.SKID VANADIUM
G
CHECKED GEROME Y.
APPROVED DELOGE D.
A SCHEMA SKID INJECT. INHIBITEUR VANADIUM
ANNE
BB
DIAG. SCH. INHIBITION SKID VANADIUM
FUCHS
0494
gazton0
219D1937
This document, exclusive property of
A1
DISTR
Ce document, propriété exclusive de
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. Il ne peut être communiqué, is strictly confidential. It must not be communicated
01 F X
copié ou reproduit sans son autorisation écrite préalable. copied or reproduced without our previous written consent. SIM
TO:
205D4553 2/2
2/2
SCALE REV. : B SHEET : 2/2
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
DIRECTORATE GENERAL FOR GAS POWER
PLANT PROJECTS
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
SE
E0872 2G0 I10 FD 001 C
al
U
13/04/2012
13/04/2012 13/04/2012
13/04/2012 13/04/2012
13/04/2012
ci
None BERTHEL FRANC ROUSSEL
BERTHEL FRANC ROUSSELFRANCOIS
FRANCOIS WERDENBERG
WERDENBERGERIC
ERIC
R
BERTHEL FRANC
BERTHEL FRANC ROUSSEL
ROUSSELFRANCOIS
FRANCOIS WERDENBERG
WERDENBERGERIC
ERIC
ffi
FO
A1
VALIDE
O
GT GAS FUEL SUPPLY-PIPING AND INSTRUMENT DIAGRAM (P&I D)
ALIMENTATION GAZ DE LA TG
E
GAS FUEL SUPPLY
VALIDE
GT GAS FUEL SUPPLY
G
userANNE
G
G
FUCHS
super
IM-2012002467
IM-2012002467
223D6431
223D6431
- EX
1/1
1/1 DT-7C
DIRECTORATE GENERAL FOR GAS POWER
PLANT PROJECTS
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
SE
E0872 2D2 I20 FD 001 B
al
U
14/06/2011
14/06/2011 15/06/2011
15/06/2011 15/06/2011
15/06/2011
ci
None BERTHEL FRANC ROUSSEL
BERTHEL FRANC ROUSSELFRANCOIS
FRANCOIS SORANZO
SORANZODOMINIQUE
DOMINIQUE
R
BERTHEL FRANC
BERTHEL FRANC ROUSSEL
ROUSSELFRANCOIS
FRANCOIS SORANZO
SORANZODOMINIQUE
DOMINIQUE
ffi
FO
A1
VALIDE
O
HEAVY OIL FILTERING SKID-PIPING
SKID INSTRUMENT
AND FILTRATION FUEL LOURD
DIAGRAM (P&I D)
E
HEAVY FUEL OIL - FILTERING SKID
VALIDE
HEAVY FUEL OIL FILTERING SKID
G
ANNE
OANA
D
D
FUCHS
GHIGA
IM-2011004038
IM-2011004038
223D6430
223D6430
- EX
1/1
1/1 DT-7C
DIRECTORATE GENERAL FOR GAS POWER
PLANT PROJECTS
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
SE
E0872 2C2 I20 FD 001 B
al
U
14/06/2011
14/06/2011 15/06/2011
15/06/2011 15/06/2011
15/06/2011
ci
None BERTHEL FRANC ROUSSEL
BERTHEL FRANC ROUSSELFRANCOIS
FRANCOIS SORANZO
SORANZODOMINIQUE
DOMINIQUE
R
BERTHEL FRANC
BERTHEL FRANC ROUSSEL
ROUSSELFRANCOIS
FRANCOIS SORANZO
SORANZODOMINIQUE
DOMINIQUE
ffi
FO
A1
VALIDE
O
HEAVY OIL FORWARDING SKID-PIPING
SKID INSTRUMENT
AND POMPAGE FUEL LOURD(P&I D)
DIAGRAM
E
HEAVY FUEL OIL - FORWARDING SKID
VALIDE
HEAVY FUEL OIL FORWARDING SKID
G
ANNE
OANA
D
D
FUCHS
GHIGA
IM-2011004035
IM-2011004035
223D6428
223D6428
- EX
1/1
1/1 DT-7C
DIRECTORATE GENERAL FOR GAS POWER
PLANT PROJECTS
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
SE
E0872 2D1 I20 FD 001 B
al
U
14/06/2011
14/06/2011 15/06/2011
15/06/2011 15/06/2011
15/06/2011
ci
None BERTHEL FRANC ROUSSEL
BERTHEL FRANC ROUSSELFRANCOIS
FRANCOIS SORANZO
SORANZODOMINIQUE
DOMINIQUE
R
BERTHEL FRANC
BERTHEL FRANC ROUSSEL
ROUSSELFRANCOIS
FRANCOIS SORANZO
SORANZODOMINIQUE
DOMINIQUE
ffi
FO
A1
VALIDE
O
LIGHT DISTILLATE OIL FILTERING SKID-PIPING
SKID INSTRUMENT
AND FILTRATION FUEL LEGER
DIAGRAM (P&I D)
E
LIGHT DISTILLATE OIL - FILTERING SKID
VALIDE
LIGHT DISTILLATE OIL FILTERING SKID
G
ANNE
OANA
C
C
FUCHS
GHIGA
IM-2011004036
IM-2011004036
223D6429
223D6429
- EX
1/1
1/1 DT-7C
DIRECTORATE GENERAL FOR GAS POWER
PLANT PROJECTS
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
al
SE
14/06/2011
14/06/2011 15/06/2011
15/06/2011 15/06/2011
15/06/2011
ci
None BERTHEL FRANC ROUSSEL
BERTHEL FRANC ROUSSELFRANCOIS
FRANCOIS SORANZO
SORANZODOMINIQUE
DOMINIQUE
R
BERTHEL FRANC
BERTHEL FRANC ROUSSEL
ROUSSELFRANCOIS
FRANCOIS SORANZO
SORANZODOMINIQUE
DOMINIQUE
ffi
FO
A1
VALIDE
O
LIGHT DISTILLATE OIL FORWARDING SKID-PIPING
SKID INSTRUMENT
AND POMPAGE FUEL LEGER(P&I D)
DIAGRAM
E
LIGHT DISTILLATE OIL - FORWARDING SKID
VALIDE
LIGHT DISTILLATE OIL FORWARDING SKID
G
ANNE
OANA
C
C
FUCHS
GHIGA
IM-2011004034
IM-2011004034
223D6427
223D6427
- EX
1/1
1/1 DT-7C
DIRECTORATE GENERAL FOR GAS POWER
PLANT PROJECTS
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
SE
E0872 280 IK0 FD 002 B
al
U
26/08/2011
26/08/2011 26/08/2011
26/08/2011 04/10/2011
04/10/2011
ci
None BERTHEL FRANC ROUSSEL
BERTHEL FRANC ROUSSELFRANCOIS
FRANCOIS SORANZO
SORANZODOMINIQUE
DOMINIQUE
R
BERTHEL FRANC
BERTHEL FRANC ROUSSEL
ROUSSELFRANCOIS
FRANCOIS SORANZO
SORANZODOMINIQUE
DOMINIQUE
ffi
FO
A1
VALIDE
O
COMPRESSOR/TURBINE WASHING-PIPING
EAU DE
AND LAVAGE DIAGRAM (P&I D)
INSTRUMENT
E
WASHING SYSTEM
NICOLASVALIDE
WASHING WATER SYSTEM
G
FUCHS ANNE
D
D
PASQUIER
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
SE
E0872 280 IK0 FD 001 B
al
U
14/06/2011
14/06/2011 15/06/2011
15/06/2011 15/06/2011
15/06/2011
ci
None BERTHEL FRANC ROUSSEL
BERTHEL FRANC ROUSSELFRANCOIS
FRANCOIS SORANZO
SORANZODOMINIQUE
DOMINIQUE
R
BERTHEL FRANC
BERTHEL FRANC ROUSSEL
ROUSSELFRANCOIS
FRANCOIS SORANZO
SORANZODOMINIQUE
DOMINIQUE
ffi
FO
A1
VALIDE
O
COMPRESSOR/TURBINE WASHING-PIPING
SKID INSTRUMENT
AND LAVAGE ON &DIAGRAM
OFF LINE(P&I D)
E
WASHING SKID
VALIDE
WASHING SKID ON & OFF LINE
DANIELA
FUCHS ANNE
D
D
MIHAILESCU
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
SE
E0872 2J0 IC0 FD 001 B
al
U
26/08/2011
26/08/2011 26/08/2011
26/08/2011 04/10/2011
04/10/2011
ci
None BERTHEL FRANC ROUSSEL
BERTHEL FRANC ROUSSELFRANCOIS
FRANCOIS SORANZO
SORANZODOMINIQUE
DOMINIQUE
R
BERTHEL FRANC
BERTHEL FRANC ROUSSEL
ROUSSELFRANCOIS
FRANCOIS SORANZO
SORANZODOMINIQUE
DOMINIQUE
ffi
FO
A1
VALIDE
O
GT AIR PROCESSING UNIT-PIPING AND INSTRUMENT DIAGRAM (P&I D)
UNITE TRAITEMENT D_AIR
E
AIR PROCESS UNIT
VALIDE
ANNE FLORENTA
GT AIR PROCESSING UNIT
G
FUCHSMARIA
EE
EREMIA
MEGA DEAL PROJECTS
NASIRIYAH POWER
PLANT
CONTRACT N° 28
[4 x 125 MW]
SE
E0872 811 I60 FD 001 C
al
U
14/06/2011
14/06/2011 15/06/2011
15/06/2011 15/06/2011
15/06/2011
ci
None BERTHEL FRANC ROUSSEL
BERTHEL FRANC ROUSSELFRANCOIS
FRANCOIS SORANZO
SORANZODOMINIQUE
DOMINIQUE
R
BERTHEL FRANC
BERTHEL FRANC ROUSSEL
ROUSSELFRANCOIS
FRANCOIS SORANZO
SORANZODOMINIQUE
DOMINIQUE
ffi
FO
A1
VALIDE
O
SIMPLE CYCLE FIN FAN COOLERS-PIPING
REFROIDISSEMENT
AND PAR AEROREFRIGERANTS
INSTRUMENT DIAGRAM (P&I D)
E
FIN FAN COOLERS
VALIDE
SIMPLE CYCLE FIN FAN COOLERS
G
FUCHS ANNE
D
D
gazton0
N
IO
AT
M
R
FO
REFERENCE NUMBER : E0880 510 I40 FD 001 REVISION : A
al
05/12/2008 30/09/2009 30/09/2009
IN
ECH / SCALE
None DATE 05/12/2008 30/09/2009 30/09/2009
KNOEPFLI CHRISTOPHE ROUSSEL FRANCOIS SORANZO DOMINIQUE
ci
None NOM / NAME KNOEPFLI CHRISTOPHE ROUSSEL FRANCOIS SORANZO DOMINIQUE
KNOEPFLI CHRISTOPHE ROUSSEL FRANCOIS SORANZO DOMINIQUE
R
FORMAT
A1 / SIZE VISA KNOEPFLI CHRISTOPHE ROUSSEL FRANCOIS SORANZO DOMINIQUE
ffi
FO
VALIDE
A1 REDIGE / MADE VERIFIE / CHECKED APPROUVE / APPROVED
TITRE / TITLE
O
GENERATOR-PIPING
HUILE AND INSTRUMENT DIAGRAM (P&I D)
DE SOULEVEMENT
E
GENERATOR - JACKING OIL SYSTEM
VALIDE
JACKING OIL
user JESSICA
Ce document, propriété exclusive de REVISION
GE Energy Products France SNC
GE Energy A
GERALDES
est strictement confidentiel. Il ne peut A
être communiqué, copié ou reproduit
sans son autorisation écrite préalable INSTRUCTION DE
super
MODIFICATION