Note:1.

All Header lines Relieving/Venting to ATM Pressure should be


150 lb. rated, inline with:Approved Inspection Reports and Stress nalysis
reports. 2, On PID -012, lines 4"-CV-20018-B1E, 8'-CV-50606-B1E
SHOULD BE REMOVED 3. ON PID-012, The Tie-in topo to ZZZ-150
SHOULD BE CHANGED!!

Inline with Pro Op


Phil this valve &
others 12" & above
should be GOV!!!!

assign line number!!


Assign Line Number!!
assign Line number!!

Remove!!
MAK-500B is a Vendor Supplied equipment.
Inline with APPROVED PROJECT doc: NGC-SODA-DTA-BRL-PRO-RPT-002,
The design of MAK-500B and hence the P & ID shall be commpleted by the manufacturer/Vendor. Therefore the P & ID should
onlyindicate the plant Piping/Tie Points.
SECTION C
BE CONSTR

Space contrent
section cant be
constructed!!
this pipe segment &
Others venting o
ATM cannot be B1E.
Please refer to
Approved Wall
Thickness
Calcullation Report!!!

There is space
contrents to
accommodate all the
Local instruments in
this section!!!
Check for valves 12" above
represent as GOV, inline with Pro
Op Phil!!
There should be
piping Attached to
this relief.