APPENDIX F – COST ESTIMATE FOR CONTEXT I (STRUCTURAL ENGINEERING)

CANTILEVER WALL
MATERIAL COST

FIGURE F-1 MATERIAL COST FOR CANTILEVER WALL


LABOR AND EQUIPMENT RATES

FIGURE F-2 LABOR AND EQUIPMENT RATES FOR CANTILEVER WALL

MANPOWER COST
FIGURE F-3 MANPOWER COST FOR CANTILEVER WALL

EQUIPMENT COST
FIG F-4 TOTAL LABOR COST PER 40 m span
BUTTRESS WALL
MATERIAL COST
FIG F- 5 MATERIAL COST FOR BUTTRESS WALL

FIG F-6 MANPOWER AND LABOR RATE


MANPOWER COST
FIG F- 7MANPOWER COST FOR BUTTRESS
EQUIPMENT COST

FIG F- 8TOTAL LABOR COST OF BUTTRESS WALL


GRAVITY WALL

FIGURE F- 9MANPOWER AND EQUIPMENT RATE


MANPOWER COST

FIG F-10 MANPOWER COST FOR GRAVITY WALL


EQUIPMENT COST
FIG F- 11TOTAL LABOR COST FOR GRAVITY WALL