You are on page 1of 1

SAP rough cut capacity planning t-codes (Transaction Codes)

CM01 - Cap. planning, work center load PP - Capacity Evaluations


MD04 - Display Stock/Requirements Situation PP - Master Data
MD61 - Create Planned Indep. Requirements PP - Demand Management
MD02 - MRP - Single-item, Multi-level - PP - Master Data
CM21 - capacity leveling SFC planning table PP - Capacity Leveling
CM25 - capacity leveling: Variable PP - Capacity Leveling
BPS0 - Business planning BW - Business Planning and Simulation
FERT - Flow of cost trace FI - Financial Accounting
KP06 - Change CElem/Activity Input planning CO - Cost Center Accounting
MD01 - MRP Run PP - Master Data
KP26 - Change Plan Data for Activity Types CO - Cost Center Accounting
OPU5 - Parameter long term planning PlndOrd PP - Scheduling
OPJK - Maintain Control PP - Order Planning
OPU3 - Production order control parameters PP - Scheduling
MC87 - Sales and Operations planning PP - Sales Plan
MF50 - planning Table - Change PP - Repetitive Manufacturing
MD03 - MRP-Individual planning-Single Level PP - Master Data
RSPLAN - Modeling BI Integrated planning BW - Planning
CIF - APO Core Interface Supply Chain Mgmt - SCM Basis
MC35 - Create rough-cut planning Profile PP - Sales Plan
MC93 - Create Flexible LIS planning PP - Sales Plan
OPPQ - C M MRP Plant Parameters for MRP PP - Master Data
CM50 - capacity level.: SFC work cntr list PP - Capacity Leveling
KEPM - CO-PA planning CO - Profitability Analysis
MD62 - Change Planned Indep. Requirements PP - Demand Management

You might also like