You are on page 1of 20
Dream. Think. Do. @ TRANSPORTATION www.thinktransportation.net WE ARE HERE TO medal ca Piers eMail at OT uy Ti Premera Pree oie cme eal ment and Transportatio Research Institution in ord si deliver efficient, practi nec only today, but also in the future. Our lox Riera as es dy Transportation is one of the basic needs of people to get them where they want to and that requires highways, roadways, bridges, traffic signals, intersections, parking land pedestrian hedges. Think transportation, founded In 2013, is a transportation engineering firm that came into existence to provide practical and effective solutions forall such needs, Page] fibneorenrcrcenear) ‘Our mult-disciplinary and dedicated team works day in and day ‘ut on every undertaken project to deliver solutons that are not only well within budget and schedule but also compliant to engineering principles, quality standards and client specifications, The use of latest software and modern technical methods sets us apart in the industry, ‘Our diverse experience with national and interrational clients enables us to better understand the client needs and present to then build and no-build options, creative ideas and advantage in traffic engineering ard transportation design projects, We have successfully completed 2 number of projects in both urban and rural areas therefore, we are well aware of the challenges where space is premium. Hence, our elucidations are more informed, constuctable, contextual and realistic than standard traffic impact studies and paverrent engineering. We emphasize upon deploying the right people, processes and technologies to achieve project success that is primarily based on our clients preferences. This approach assists us in delivering comprehensive project and program management services that meet and exceed expectations, Think transportation is rapidly expanding its operations inside and outside the country and has earned a good reputation for its professional services in the industry in such a small amount of time. We take pride in owing our success to our people at think transportation who are firm believers of continuous learning and performance improvement. We also thank our clients for their trust, interest and Support Location: Karachi Date: Oct-18 Description This project deols with the traffic impact study of the planned 50 bed welfare cancer hospital named as “Shaukat Khanum Memorial Cancer Hospital Karachi” at Kerachi - Hyderabad Motorway (M9), Kerachi, nearby DHA City. The proposed developmert has a pict size of approximately 22 acres with 18.000 sq. yord hospital building It has ground plus three floors. SKMCH will be equipped with latest cancer care technology, inckiding Radiation Medicine department ot the lower level. The hospital wil have MRI, CT-Scan, Women's Radiology, Outpatient Clinics (Chidren & Adults), Emergency service Department and a Food Court at the ground level. SOMCu emia) Sra Gea eet Reet) Leeaton: Singh Date: Sep-18 Desoretion Tre project aims fo savin @ boveine for conactve measures tequieatorroaaein ne niet Snah ey gathering waite data, paricvary cam ‘ons dertneton ond matlock cours, of aferen enifed road: connectira smo towns. Tis data ‘Nous be Wied for anaiying service fevel of e0ch ‘0 ang int, pinpontng problem area: and the ‘eaurea prevertive actors na mprovemert. The Sign ona sestnation saney hos een formulated {find out the hofic volme generating from a pects tone towaras the tone where fermnares ire tatle voume oosourt for the types and number of vps, ine moverent of passenger: ond Cargo ond types of vehices The mivblock suey haz been aesigned 20 a: 7 determine the sctol frac vole between hve foursin bom directions, ‘ere the watte vcore rent the fot numeer of fies movement cf eassergen/oargo and ‘ype: of Ue a CaM ary TCC eeu tea] Lecetor: Thatta Dore: Mors Description The NS ik the longest ond oldest national hignway in Fokstan. Segment of NS between Karachi ond Thatta seves as an important roadway connecting Karachi and Baluchistan to Southern part of Snchivough Moki. So;awol ‘ana Baan Compronensve traffic study was conducted to Gelemmine trate derard and audit the ccurent io8 collection procedure of National Higrmay 5. Traffic Impact Study of Sawera Grand Location: Karachi Date: Mar-18 Description Traffic impact Study was conducted on propored Residentiol Building. The proposed building would be constructed on plot of size 1,000 Square yard, having Basement, Ground and 20 floors, out of Which 2nd fo Sth Floor is dedicated for Parking comprising total cover area of 33,000 Square feet, De edie AE AU ea re cert Location: Karachi Date: Mar-18 Description The purpose of this study is to conducted ‘ond quontifes the traffic and travel pattern in different section of University Road along the aignment of Red Line Bus Ropid Transit which will ossst in the geometric layout, dimensioning of the junctions and the traffic engineering design. Tratfic surveys ond travel data collection play c key role in understanding the travel pattems and volumes. Surveys indeed provide the core data on which the subsequent analyses. and recommendations of the study are based. This study presents o review of trafic survey ‘and tratfic counts which will be carried out at the proposed BRT Red Line condor. Dolio la tela BC) eM celecoumUtelLy BUT Leeaton: Singh Date: Sep-18 Desorption eatin: Karachi Date: Fab18 Desoeetion “Tis priest deal withthe totic imeact study of the Under corsiucton commercial Guiding named os Faison Mat” ot snateahe Focal Kerach, nearby Pat Recnitment Certer he propored ulling has 9 plot cas of 17.240 savore yard. t har ground plus three commercial ‘er food cour, a nema wih an capachy of S00 seo! ana on mncze paving fac The buiang Elonaies oiarg he prNSpO orerol ot the cty: Le. shahwahesorat locaton of th commercial ulding pay: an viol role (sobishing the fact te corauct @ hallo impact ‘Busy wn not oniy evahatea Ine eftacts of such [using but oso proporeaiascluton eo optinize the trafic sate fer both foci ond roaaiway users es akc ee Location: Karachi Bote: Jon-18 Desoretion ‘Tas prject deat with the tafic impact sty of the proposed condiuotion ofa ressentel buicing ot ine. osoress of let Ne. D7 Both Wand Quarter, Metropolitan Corporation Cran The propored eulaing woud be corshucted on let F Hise 2000 Sovare yard, having Basement Grouna ana Is floss, et of when osemert, Ground, Frit, Second end Trd foor ke ony Sesicoted ‘or posing conering total cover oes F286 Square fee! Traffic Study of Landhi Industrial Area Road, Karachi Location: Kerochi Dote: Jon-18 Descrption This project invoves__Imerovement/ Rehabiltation of three main roads inclusing constuction of drain channel. in Landhi Ineustiol Ateo, Lona Town. Karachi Think Transportation war engaged fo conduct ratfc Study of stated work Bicol om SIU ha lM lutea Leo (ol Lolo Xela lo) Location: Karachi Date: Nov-17 Description Traffic Study wos conducted for Road Improvement of Malir Saudabad Road. Project involves Level of Service Analysis for Vehicles ond Padestrai Dicel omit NA MOL CMI T« ce Intersection Road, Korangi, Karachi Location: Karachi Date: Nov-17 Description Traffic Study wos conducted for Road Improvement of Coast Guord Road. Project involves Level of Service Analysis for Vehicles ond Padestrains. Peshawar Expressway Location: Peshawar. Kohet, Nwsnera, Bote: Aon? Descicton A Bypats road ic being proposed which “ail connect NSS to Cramsan and Fohat. Tre Eypous reas wn azo have a Ira torn the Peshawar Png tead comectng Ine ttc. coming tom ‘Afgransion ora Hoyatazaa ‘2 NSS Higrway. Tre ‘bypass road wil snore a mayor parton a ne marta Bice AMC m tole lo] Lolo Molo lo] Location: Karachi eae Description ey Traffic Study was conducted for Road Sate Nani? S Improvement of Malir Saudabad Road. Project involves Level of Service Analysis for Vehicles and Pedestrains. Desctcton A sevencoy haffc survey waz Conducted on tha 0 Kerochi Hyderabad Neterway along wih OD suvey The suvey feveoed the octal tool hate yng. on the ‘rofernay ona ot the some te ato denied the Gtimate destination tena. The rats mode Le. tre ‘Notte type! ccknuSon wesc oleoty recorded. DiColomSIU- ba) ROTC MET < ice] Intersection Road, Korangi, Karachi De Ee ee Cory Location: Karachi Tee ee ace terete corp Date: Nov-17 Location: Balochistan Description ate Traffic Study was conducted for Road ‘Description This study focuses on the corgo / Improvement of Coast Guard Road. Project involves Level of Service Analysis for Vehicles and Pedestrains. ‘Batienger trafic that hos been * Esimated in Cwoder master plan and wal lkaly to use road oF rel network for onward ‘rorépor to their destinations to ond ftom the port and * Existing traffic that wil possbiy shit fo the rail Feasibiliy of New Freight Train From line such a links proviced fei em oe Mo edatel ilar dolce) eA eeu eee) Location: Karachi Date: Ape7 Description: The propotal_ centers around developing a Shuttle Train System to transfer KPT generated cargo including Containers to Pip Marthaiing Yard, located east of KPT is bout 45 kms by ral, for further processing of cargo related handing procedures. The Pipi Marshalling yard is spread over around 2000 Acres (610 Hectores) is grossly underuilized with a complex of Roll lines, hump ond switching facilfies to alow formation of trains for dispatch onwards to up Coury. Ce RR id Location: Faivalabad, Chino! Sargodna Date: Apr-17 Deteription: This study checks the viobitty of [project on BOT bass. & seties of surveys and studies were conied ou! to acqure vital Information and comeuter based model is developed otter validation ot traffic ‘parameters along witn crign destination suey Fetus to determine travel ime, detance and cost saved by vehicles trough Using imeroved focity, Location: Balochistan Date: Dec-16 Description Travel demand model was developed for the proposed railway ines using all the collectad data ‘and information. This model was developed in following stages: # Development of Existing Situation Model (with no significant demand of Gwador Port) ~ Stage 1 Development of Travel Time ond Travel Cost Model for Existing Situation Model - Stage 2 © Development of Railway Link in the existing situation with no significant fratfic from Swador = stage 3 © Development of Model with incksion of demand forecast of Gwadar Port - Stage 4 © Development of combined Traffic Model (Stage 142+3+4) - Stage 5 Location: Karachi Date: Nov-16 Desctiption: This report determines the adequacy of the existing or planned transportation improvements ‘and ako guides development authorties for optimal solution for right-of-way, street improvernents, traffic signals, transit sheiters, sidewalks connections or transportation demand management programs that are necessary to mitigate transportation deficiencies. ee esas Location: Korachi Date: Oct-16 Description: LL. Chundrigar Road Road was the financial and. ‘commercial center of the city. Think Transportation Conducted this study 10 estimate travel demand of ew zhuttle service and propozed potential zhuttic, routes to major trip ofiginating zones from LI. (Chundtigar Road, Location: Korachi Date: Oct-16 Description: Traffic Impact Studies includes: ‘© Forecast additional trafic associated with proposed development © Assess the impacts of a proposed development ‘© Determine necessary improvements to ‘accommodate the new development and minimize impacts 10 the transportation system, ‘¢ Assist in land use decision making ecu mesure Pores nke ed Location: Karachi Date: Sep-16 Description: ‘Think Transportation ossigbed the task to suggest fraffic flow improvement plan on the project. Think transportation team conducted topographic survey of the crea. Identified the problems in current design and Proposed geometric desian improvements plan and traffic diversion plan for better tratfic flow. Avenue x Within Catan kent) Road Location: Faisolabad, Chiniot, Sorgodha Date: Asg-16 Description: The study validates traffic parameter cbtained from previous study and reports findirgs ond ‘analysis of the data conceming traffic volumes ‘and its composition on Faisalabad = Chinist Rood Pree Conk oi kena al Location: Korangi. Karachi Date: Jon-16 Description The Getz ASTOLA Pharma Plant build on 1.5 milion sq. ftis going fo be the largest Pharma Plant in Pakistan. Think Transportation has been awarded. the design of access road to the project and fnatfic crculation plan of intemal roads of Project. inthe ferm of a computer based model Cte Ri Location: Peshawar CMe me ML ull lc) Gujranwala Road Date: Jon-16 Location: Sheikhupura, Gujranwala Date: Jub16 Description: a“ Think Transportation conducted cemplete traffic Description: study for Peshawar BRT os National Consultant and. Various traffic studies ore conducted for obtaining perform following activities: key inputs for the geomettic and pavemert design. ‘© Capture the existing condition, and to perform traffic forecasts pertaining ‘© Study of quality of the existing Non-Motorized ‘volumes its composition, capacity, level of service © Transport ‘and lane enhancement requirements for the next © Analysis of physical infrastructure for the 25 year: thereby developing ai financial model to near ineTODicres Analysis of parking pattems and ractices, ‘examine the feasibility of project for BOT bass. Topogaphic Studies. eeu ede mucus Seo ae HiERenee Pee Location: Karachi © Traffic impact analysis of intersections and Date: May-16 turning points. ‘* Recommended the conceptual physical perenne frectments of the key intersections and roadway segments. © Cost analysis. Traffic Impact Study of under construction building at Allahwali Chowrangi Location: Korachi Traffic Studies are performed to identify the congesion spots, their causes and soluticn along major corridors of Karachi including: M.A Jinnah Rd, Shahrah e Faisal. Korangi Rd. University Rd. Sir ‘Shah Muncmmad Suleman Rd, , Shahrah e Sher Shah Sur, Shahrah e Pakistan, National Highway (N-5}, Snahrah e Quaideen, Shaheed e Milat Rd. Date: Jon-16 Pee enceumk ieee ea unc — on: Karachi Descript | e A ale Impact Study (1S) is « sludy which Dee ‘assesses the effects that a development’ traffic ‘will have on the transportation system and the community. Transportation Impact Studies should, ‘accompany developments which have the potential fo impact the transportation system. This study explains how the existing transportation system can be made more sustainable ond complementary to new transportation developments. Location: Sukkur, Guddu, Kandhtot, Ghotki Date: Dac-15 Description: The objective of this study is to estimate the travel demand of the proposed facily between Ghotki ‘and Kandhkot through collectirg the tratfic data {and recording the travel patterns, Location: Karachi Date: Dec-15 Description: This study Is performed to exarrine the viabilly of extension of Lyari expressway Up to Hawksbay to provide direct access to Mouriur industrial from Motorway M-9. For this purpose, Think Transpotiation performed traffic volume count and ofigin destination surveys on all toll gates of Lycri Expressway and other tratfic attraction roads. Location: Karachi Date: Sep-15 Description: This stucy is performed to examine the feasibility of flyover on DHA Creek Road acces point on Korangi Road. Think Transportation performed Mid- block count survey, Usturr count survey, Intersection count survey and uming movement count survey on relevant locaion and on entry locations of DHA. License plate survey was also performed fo track the travel pettern of vehicles in DHA, Location: Multan Date: Sep-15 Description: Inner Ring Road Multan constitutes almost 20 km foods with many mojor roundabouts and congested creas. A series of flyovers ate. constucted to smooth the traffic. Project ao. included the widening of the roads, construction of services roads. A post construction study was ‘so conducted for travel demanc validation of Inner Ring Road Muitan. Modernization of Gaddani Shipbreaking Yard Location: Gaddani Date: May-15 Description Traffic Count Surveys, Topographic Surveys, Soil Testing surveys were conducted on Shipbreaking yard rood and nearby premises. Information Collected is then used in geometric and pavement design through advanced designing softwares to provide plan to modemized Gaddani ship breaking yard. Location: Faisalabod Date: May-15 Description: This project examines the traffic data from historic cond recent studies for Oualization of Faisolabad Ring Road in February 2015 in order to evaluate: traffic volumes ond vehicle classifications that ‘would utiize the Project Section of the Road. The fundamental aim for carrying out traffic studies was to acquire primary inputs for devising feasibilty, of the Project followed by geometric and avernent design of the road. v Traffic Circulation Plan of Quetta City Major Roads reheat ees Location: Quetta Date: May-15 Description: Think Transportation performed study to prepare traffic circulation plan for mojor road ond congesion intersection of Quetta including: Saryab Road, Sabzai Road, Brewery Road, Siti Road, Zarghoon Road, Satelite Town and Sader Town. For this purpose, Think Transportation perform reconnaissance survey on cl these locations to observe tratfic condition and pattem, Green Line Bus Rapid Transit Location: Karachi Date: Aor 15 Description: Think Transportation as sub consultant of, Engineering Associates performed traffic studies of Green Une BRT. © Dek study on maps satelite imagery validated by Reconnaissance visit ‘© Alinment options and recommended alignment with comparisons ‘© Saialite image of entire condor with recommended option duly marked on it ‘© Presentation of alignment and Crosesection for approval from Project Office ‘* Exact detail for Project at grade, grade separated, intersection. interchanges © Preocration of Reports, related drawings etc. MORO eels ony Road Location: Faisalabad, Chiniot Date: Aor15 Description: Data conceming volumes and composition / Classification of traffic on Foisclabad - Chiniot Road; ablained from historic and fresh traffic. studies was analyzed for the feasibiity study of the project. Pie en ethene eae) el Location: Gaddani Date: Apr-15 Description: Design the road infrastructure of access road of Gaddani Picnic Point and Gaddani ship Breaking Yord starting from N25 highway having length of 8 km. Traffic Count Surveys, Topographic Surveys, Soil Tesiing were performed on ship breaking yard food and nearby premises. All this information is then used in geometric and pavernent design through advanced designing software to provide plan and design of imoroved infrastructure. esd elec eer eer Location: Sheikhupura, Guranwala: Traffic studies were conducted for obtaining key inputs for the geomeiric and pavement design of the Project Road and determination of traffic forecasts pertaining to volumes and compostion for the next 25 years. thereby corying out capacity analysis, calculating yearly level of service and lane enhancement requirements. eens ae) oe Deas eur Location: Hesiipur, Bahawainagar Date: Feb-15 Description The trafic study resulted in the expected traffic volume to use the Project Section of the Road. It provides the traffic input requked for canying out the geometric and pavement design and economic feasibly siudy of the project. Aeris Hosilpur Date: Dec-14 Description: Traffic Count Surveys, Topographic Survays, Soil Testing were performed on Nawab Nahabat Khanji Road and nearby premises. All this information is then used in geometic ond Pavement design an improved infrastructure. Red Line Bus Rapid Transit een MS Scie eI Renee hea eur meal Location: Korachi Date: Sep-15, Description: Large Bus, Mini Bus, Wagons and Gingqi. Extensive bus route alignment and travel time surveys were conducted for all categories of public transport. aia racd Location: DHA, Karachi Date: Aug-14 Description: This project determines the potential impacts on existing tratfic due to multipurpose recreational mall named “The Place” in DHA Phase 8, Karachi The study building wil serve as commercial purpose containing mall, Cineplex Cinema, Food. Lounge and Sports Complex etc. This study concludes whether a development is ‘oppropriate for a particular location and what Improvements to the transportation system cre necessary, Sindh Rural Roads improvement Project Location: Tando Adam, Sanghar. Ghotki Dadu, Lorkane, Jacobabad, shikarpur, Mithi, Matiar, Thul, Mipur, Mirpur, Mathelo, Mathel, Rato Dero Date: Aar-14 Description: Think Transportation conducted extensive traffic ‘count cnd origion destination surveys to estimate. travel demand on Sinch Intercity ond rural highway network. These information is then used in preparing improvement plan and constuction priorities for 26 rural roads of Sindh Province. Location: DHA. Karachi Date: Feb-14 Description: A Traffic Impact Study {Mis} is a study which assesses the effects that a developments traffic. wil have on the transportation system ond the community. Think Transportation conducted TIS cond indentified traffic flow problems ond proposed intersection improvement plan. Geometric Design of Shahkot-Sanghar Bridge Location: Sanghar Date: Jan-14 Description: This study is performed to design @ bridge on Sangha Shahdedpur Road. For this purpose, Think Transpotation performed topographic suvey on study ofea ond used advanced computer, Packages to design road ond infrastructure of proposed bridge. Pr mec cu cocci (M-9) Korachi, Hyderabad. Oct-13 Description: This project examines the traffic data from historic ‘ond recent studies for Feasibility Study of Karachi Hyderabad Motorway (M-9) in October 2013 in order fo evaluate trafic volumes and vehicle Classifications that would utllze the Motorway. The fundamental aim for carying out traffic studies ‘was fo acquire primary inputs for devising feasibity of the Project followed by geometric and Pavement design of the road. Location: BHA, Karachi Date: Aug-13 Description: This project determines the potential impacts on. existing traffic due to construction of Proposed 24 story and 12 blocks building named “The Arkadion Tower" located in OHA Phase 8, Karachi. Proposed building will serve as residential pupose. Study building Is situated near recreational mall “The: Place” and Moin Khan Cricket Acadamy. SOL Me elo RCCL Location: Karachi Description Think Transportation as « sub consultant of National Engineering Services Pakistan perormed traffic surveys including traffic volume count surveys, Travel Speed and Delay Surveys, Road User Interview Surveys, Bus Route Confirmatory Surveys, Boarding ond Aighting Surveys, Occupancy Surveys, fare siructure surveys, Frequency Surveys, Social Surveys, Passenger Transfer Suveys efc..and performed Traffic Simulation on diferent project locations. Plot A-23 Block 10 A, Gulshan-e-Iqbal Unalan Mahallesi, Unalan Cd. No:11, Karachi, Pakistan. FEE 2700 Uskidar istanbul, Turkey Phone : +92-343-2845847, +92-213-4960263 Email: info@thinktransportation.net Web : hiips://thinktransportation.net

You might also like