04

03
02
01

REVISED:
10.10.2018
1ST DATE OF SUBMISSION:

SHEET NO:

A-06
TYPICAL FOOTING PLAN
DRAWING TITLE:
G.B
E.G.L

(As per Soil Condition)


MINIMUM 5'-0''

Engr. Md. Anarul Islam


ENGINEER:
(FIEB-12360)
3''
D

Re- bar S-dir

S
D
3'' 3''

3''
A A

2''3''
CC
3'' B.F.S
Re- bar L-dir

CONSULTANT:
1' Sand
Re-bar in S-dir.
Re-bar in L-dir.

2'
Base of Improved Subsoil

3'' 3''

SECTION: A-A

CHOYGHARIA JAME MOSJID,


Base of Improved Subsoil Zone
Ensure 92% Dry Density by Modified Proctor Energy

Chapai-Nababgoanj
Benodpur, Shibganj,
Fill Layer by Layer with 6" Lift

CLIENT:
Provide Compaction Preferrably using Plate Compactor

Typical Footing Plan

PROPOSED 3 - STORIED
CHOYGHORIA JAME
MOSQUE BUILDING
PROJECT: