Professional Documents
Culture Documents
PROJECT:NO.10BLR023
E S WALL WASHER
SUPPLY AIR
E EACH SBC STANDARD BUILDING CODE
EF EACH FACE SCHED SCHEDULE PENDANT TYPE LIGHT
EIFS EXTERIOR INSULATION
AND FINISH SYSTEM
SDL
LOAD
SUPERIMPOSED DEAD RETURN AIR FIXTURE KEY PLAN
EJ EXPANSION JOINT SECT SECTION ACCESS PANEL WALL MOUNTED
EL ELEVATION SHR SHOWER LIGHT FIXTURE
ELEC ELECTRIC SHW SHOWER FLUORESCENT LIGHT ECC BLOCK
G+14
ELECTRICAL
SUB STATION
EOS EDGE OF SLAB SIM SIMILAR WALL MOUNTED FUT URE EXPANSION FUT URE EXPANSION
SP STAND PIPE
FOOD COURT -2
PHASE-1 SITE
OF FICE-2
EXP BLT EXPANSION BOLT SPEC SPECIFICATION INDICATES EXIT TEXT SDB3
G+5
SDB2
G+5
UNIT
STORE
CEMENT
GODOW N
M E
T
S
IM S
SQ SQUARE P
U
F
G+5 STA FF/L AB OU R
CANTEEN
SECURITY SECURITY
12
M
ENTRY EXIT
1 2
VIP PA RKI NG
3 4 5
67
PUBLIC A REA
FD FLOOR DRAIN
8 9 CR
STIR STIRRUP
OSSI
10 NG
SURV EY NO. 49
ED MLC P
DEVELOPER
HOL DI NG
LAYOUT
FF FLOOR FINISH 14.5m ROAD PRIVA TE
HP HIGH POINT
UNO UNLESS NOTED DESIGN -BUILDER ARCHITECTS SERIES NUMBER
OTHERWISE 4. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL DIMENSIONS IN THE FIELD AND, FUTURE EXPANSION
GAS BANK
AGRICULTURE LAND SHEET NUMBER WITHIN
HR HOUR FOOD COURT-2
PHASE-1
FOOD COURT-1
SERIES
HT HEIGHT IN THE EVENT OF DISCREPANCY, REPORTING SUCH DISCREPANCY TO THE ARCHITECT SIT E OFF ICE-1
SIT E
OF F ICE-2
SDB3
G+5
SDB2
G+5
UNIT
STORE
CEM ENT
GODOW N
M IS M
E
T S
NUMBER OF PLAN,
6
5. CONTRACTOR SHALL PROTECT ALL EXCAVATION AND CONSTRUCTION FROM THE PUBLIC.
1
2
U
P
I U
P
SDB1
G+5 STAFF /L ABOU R
CAN TEEN
SUBWAY V I P PA RKI NG
PUBLIC AREA
SURVEY NO. 54
VEST VESTIBULE STRUCTURAL
NG
18.19 ACRES
CIVIL
STORE
PRO POS
ENGINEER
503 lvl.,
HOLD ING
SEC URITY
DATA SHEET
SHEET NUMBER
A0-02
DATE:02/28/10 NORTH
ISSUE
No. Date Description Revision
PROJECT TEAM
OWNER
Infosys Technology Ltd.
ARCHITECT
TRC ENGINEERING (I) PVT LTD
ELECTRICAL
ECC BLOCK SUB STATION
G+14
4ACRES
SURVEY NO. 51
GAS BANK
FUTURE EXPANSION
FOOD COURT-2 FOOD COURT-1 AGRICULTURE LAND
PHASE-1 SITE
OFFICE-2
KEY PLAN
ELECTRICAL
SITE OFFICE-1 ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51
GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
PHASE-1 SITE
OF FICE-2
P
U
UNIT
SDB3 SDB2 UNIT
STORE
SDB3 SDB2
G+5 G+5
M E
T
S
IM S
CEMENT
GODOW N
6
5
4
3
2
1
P
U
STORE
MS IT EMS
G+5 G+5
P
U
SDB1
G+5 STA FF/L AB OU R
CANTEEN
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK
SECURITY SECURITY
RAMP
ENTRY EXIT
HOL DI NG
6 SEC URI TY
5
4
3
2
1 14m WIDE ROAD (FUTURE
UP
EXPANSION
SINGAPO RE ENTRANCE
26m WIDE ROAD
CR OSSI
NG
LAYOUT
14.5m ROAD PRIVA TE
AGRICULTURE LAND
BUS TERMINAL
UP
CLIENT:
SDB1
G+5 STAFF/LABOUR M/S INFOSYS TECHNOLOGIES
CANTEEN
LTD. HYDERABAD
REST REST TOILET
ROOM- 2 ROOM- 1 BLOCK
PROJECT NUMBER
SECURITY SECURITY
10BLR023
RAMP
1 2
3 4
5 6
DESIGN DEVELOPEMENT
7 8 CRO
9 10 S SIN
G
SURVEY NO. 49
D MLCP
DEVELOPER
STORE
OPO SE
PR 503 lvl.,
FOR CO-ORDINATION
LAYOUT
14.5m RO
AD PRIVATE DESIGNED BY:Designer
DRAWN BY:Author
CHECKED BY:Checker
SCALE: 1 : 1
SHEET NUMBER
A0-03
DATE:02/28/11 NORTH
ISSUE
No. Date Description Revision
PROJECT TEAM
OWNER
Infosys Technology Ltd.
ARCHITECT
TRC ENGINEERING (I) PVT LTD
RAMP
30500
505.30
1487
15.5 M WIDE ROAD Y
TWO
WHEELER
TR
7 M WIDE ROAD
ENTRY
EN
1
2
0
.M
15565
505.10
505.25
8874
13197
LINE
RAMP
8425
12025
Four Two ENTRY
LVL :
G LI NE
lers lers BUILDIN
Whee Whee 132075 506.00
11956
EX IT ROOM
EXIT
PLANT
2 M PATHWAY
BELOW
G LINE
6500X1
0950
50
R62
TER
FIRE WA OR
BUILDIN TER
RAIN WA ING
RESERVI LOW
BE
SU MP 10950
HARV ESTLOW 12750X STIC
BE
SU MP 0950X3000 DOME
7650X1 WATER
505.00
TANK
18000
160709
BELOW
TURNSTILE
SURFACE TW PARKING
SURFACE TW PARKING
27401 RAMP
LINE
32750
5467 10000
44873
SURV EY NO. 51
ELECTRICAL
SUB STATION
4ACRES
2M
56275
KING
SDB5 SDB4
PHASE-2 G+5 G+5
CE TW PAR
SURFA
GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
PHASE-1 SITE
OF FICE-2
P
U
CEMENT
GODOW N
90525
6
5
4
3
2 M PATHWAY
2
1
P
U
Y P
U
WA
SDB1
G+5
41638
TH
STA FF/L AB OU R
CANTEEN
NG PA
PARKI
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK
CE TW 2M SECURITY SECURITY
SURFA
RAMP
ENTRY EXIT
AD
SURV EY NO. 49
ED MLC P
DEVELOPER
STORE
PROPOS
RO
503 lv l.,
HOL DI NG
SEC URI TY
DE
14m WIDE ROAD (FUTURE
EXPANSION
SINGAPO RE ENTRANCE
BUILDIN MW
CR OSSI
NG
LINE
RAMP 7 20 PRIVA TE
LAYOUT
919
14.5m ROAD
AGRICULTURE LAND
03 BUS TERMINAL
350 746
CLIENT:
3385 TH
WA
Y
2M
PA
Y LINE
M/S INFOSYS TECHNOLOGIES
10600
Y
OUNDAR
2M
WA
SITE B
7M
PA
TH
LTD. HYDERABAD
PAT
2M
64
HWA
WID
20621
1225
537
13514
E RO
PROJECT NUMBER
70
10650
00
2M
P
AD
ATH
14
10BLR023
13000
WAY
47
8
8815 PROJECT PHASE
8
32100 73
64 DESIGN DEVELOPEMENT
WA
31871
ATH
MP
33235
2
31100
WAY
70
2 M PATH
18
FOR CO-ORDINATION
DESIGNED BY:Designer
DRAWN BY:Author
SITE PLAN
1 1 : 350
CHECKED BY:Checker
SCALE:1 : 350
DRAWING TITLE
SITE PLAN
SHEET NUMBER
A0-04
DATE:02/28/11 NORTH
ISSUE
No. Date Description Revision
2
A4-01
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
178225
12175 12450 10800 10800 10800 10800 10800 10800 10800 850 10800 10800 10800 10800 10800 10800 12350
PROJECT TEAM
RAIN WATER FIRE WATER SPANDREL ALONG THE RAMP OWNER
HARVESTING RESERVIOR (SEE DETAIL) 17.a
SUMP BELOW SUMP BELOW Infosys Technology Ltd.
BUILDING LINE 7650X10950X3000 12750X10950 STRL. COLUMN COLUMN CAPITAL BRICK PILLAR
@ FIRST FLOOR 800X800 (SEE DETAIL) (SEE DETAIL) 800X800 (SEE DETAIL) 6225 6125
ARCHITECT
A TRC ENGINEERING (I) PVT LTD
2500
TYP.
40 TWO WHEELERS PLANT ROOM
EXIT BELOW
1200 6500X10950 CONCRETE SPANDREL OF
BRICK COLUMN
2200 2400 HEIGHT 1050MM FROM FFL (TYP)
450X450X1250 4
PAINTED WITH APPROVED
TYP. COLOUR AND SHADE A4-02
12275
UP COLUMN TO
8025
RAMP UP TO FIRST FLOOR
8.0 M DRIVE WAY DOMESTIC
2
SUPPORT STAIR
WATER STAIR LINE ABOVE 700 MM DIA
3
TANK A7-01
2 OF 5 (TYP) BELOW ENTRY LVL: 506.00 A7-01
FHR-2 FHR -3
2000
DN FHR -4 200 THK WALL
FHR -5
18 TWO WHEELERS 18 TWO WHEELERS FOR DB MOUNTNG
B
1600
ENTRY LOBBY-2
12 TWO WHEELERS 3
600 6250
18 TWO WHEELERS 19 TWO WHEELERS 4225X6000
6150
LIFTS 3
3 TWO WHEELERS
7 OF 5 (TYP) 2300X2750 A4-01
3.0 M DRIVE WAY 2 OF 5 (TYP) 2 OF 5 (TYP) 4
3.0 M DRIVE WAY
2050
DB & CS B1
3 OF 5 (TYP)
20 TWO WHEELERS 21 TWO WHEELERS 24 PARKING 8 TWO WHEELERS
16750
425
20 TWO WHEELERS 21 TWO WHEELERS 19 TWO WHEELERS
ENTRY/EXIT TO
6000
GRND FLOOR
3.0 M DRIVE WAY 3.0 M DRIVE WAY 3.0 M DRIVE WAY (TWO WHLR)
1500 1500
450
18 TWO WHEELERS 19 TWO WHEELERS BRICK COLUMN
23 TWO WHEELERS
450X450X1250
12 TWO WHEELERS
3
ELECTRICAL
CHARGING
POINTS FOR 16
TWO WHEELERS
STAIRCASE
REFER DETAIL KEY PLAN
2 OF 5 (TYP) 3.0 M DRIVE WAY 3.0 M DRIVE WAY
5 3.0 M DRIVE WAY 3.0 M DRIVE WAY 2 OF 5 (TYP) 3.0 M DRIVE WAY 3.0 M DRIVE WAY FHR-9 2 OF 5 (TYP)
A7-01 FHR-6 17.b ELECTRICAL
SUB STATION
16 TWO WHEELERS
ECC BLOCK
G+14
17 TWO WHEELERS 18 TWO WHEELERS 13 TWO WHEELERS 17 TWO WHEELERS SURV EY NO. 51
4ACRES
FHR-8
FUT URE EXPANSION FUT URE EXPANSION
D
SDB5 SDB4
PHASE-2
4 TWO WHEELERS
G+5 G+5
PHASE-1
FOOD COURT -1
16 TWO WHEELERS
1140
SITE
OF FICE-2
2 OF 5 (TYP)
4 M DRIVE WAY
CEMENT
GODOW N
0
6
5
4
3
2
1
P
U
3.0 M DRIVE WAY 3.0 M DRIVE WAY 3.0 M DRIVE WAY 3.0 M DRIVE WAY
CANTEEN
J.1 RAMP
SECURITY SECURITY
REST REST
RO OM -2RO OM -1
TO I E
LT
BLO CK
18 TWO WHEELERS
ENTRY EXIT
20 TWO WHEELERS 21 TWO WHEELERS 14 TWO-WHEELERS 15 TWO WHEELERS SUBWAY VIP PA RKI NG
12
M
1 2
PUBLIC A REA
TE )
3 4 5
67
8 9 CR
OSSI
10 NG
CRE
C ON MN (TYP
SURV EY NO. 49
ED MLC P
DEVELOPER
62
STORE
50
COL
6000
HOL DI NG
SEC URI TY
EXIT
14 TWO-WHEELERS
14m WIDE ROAD (FUTURE
1
EXPANSION
3700
SINGAPO RE ENTRANCE
A8-01
NG
LAYOUT
14.5m ROAD PRIVA TE
D.1 STAIR-1 3.0 M DRIVE WAY 3.0 M DRIVE WAY 3.0 M DRIVE WAY 3.0 M DRIVE WAY
AGRICULTURE LAND
BUS TERMINAL
RAMP LINE ABOVE 6300X3250 17 TWO WHEELERS
4600
DRIV LE RS 17.1
EXIT PROJECT NUMBER
7 TWO-WHEELERS
HEE
20 TWO WHEELERS 21 TWO WHEELERS 14 TWO-WHEELERS
24 T
W O-W
K WAY 1118
0
WAL
INTS 16.1
G PO 0 10BLR023
GIN S
4.3 M DRIVE WAY HAR 1118
4600
DS-1
UP RAMP UP TO FIRST FLOOR
UP
2 4
FHR-11
A7-01
A8-06
ENGINEERING (I) PVT LTD
H
3
A6-04 2115 6400
325
8750 1725 10800 1725 9075 8515
TRC Engineering (I) Pvt Ltd.
No 6/A, Amit Plaza, JP Nagar, 3rd Phase
GROUND FLOOR 6.1 6.2 8.1 9.1 9.2
1 1 : 200
Bannerghatta Road,Bangalore-560076
Phone : +91-80-26581707/08/09
Fax :+91-80-26582424 WebSite:www.trc.co.in
TYPE
DOOR SCHEDULE_GROUND FLOOR SL. FLOOR AREA IN SQ MTS AREA IN SQ FT FRONT RAMP FRONT RAMP FOR CO-ORDINATION
NO. NAME AREA IN SQ MTS AREA IN SQ FT
MARK LEVEL WIDTH HEIGHT COUNT DESCRIPTION
SHAFT SCHEDULE: LEGEND: GENERAL NOTES: DESIGNED BY:Designer
D1 GROUND FLOOR 900 2100 3 FLUSH DOOR
DRAWN BY:Author
FD1 GROUND FLOOR 1000 2100 2 FIRE DOOR 1. GROUND FLOOR 11635 119607
SL. NAME DESCRIPTION SIZE REMARKS CHECKED BY:Checker
1. NON CAR PARKING BAY.
NO. (mm)
2. FIRST FLOOR 11116 114272 1) ALL DIMENSIONS ARE IN MILLIMETRE UNLESS OTHERWISE MENTIONED. SCALE: 1 : 200
4 2
A8-05 A4-01
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
178225
12175 12450 10800 10800 10800 10800 10800 10800 10800 850 10800 10800 10800 10800 10800 10800 12350
STRL. COLUMN CONCRETE SPANDREL OF STRL. COLUMN CONCRETE SPANDREL OF SPEED RAMP
17.a PROJECT TEAM
800X800 (SEE DETAIL) HEIGHT 1050MM FROM FFL 800X800 (SEE DETAIL) HEIGHT 1050MM FROM FFL (REFER DETAIL)
COLUMN CAPITAL
PAINTED WITH APPROVED PAINTED WITH APPROVED
(SEE DETAIL) 6225 6125 OWNER
1025
5000
TYP
6600 18 SMALL CARS
1 TRC ENGINEERING (I) PVT LTD
A8-05
12275
2500 RAMP UP TO SECOND FLOOR @ 10% SLOPE. UP DN RAMP DN TO GROUND FLOOR @ 10% SLOPE. 2 1
6.6M DRIVE WAY
ENTRY
B
EXIT 3000
LOBBY-2
6000
3
TYP
TYP TYP TYP 4225X6000
6250
SMALL
6150
BIG SMALL 00 3
CAR CAR CAR 2 BIG CARS
LIFTS 60
7 BIG CARS 3300 BAY 3 BIG CARS 9 BIG CARS 1 SM CAR BAY BAY 2 BIG CARS 2300X2750
4 1 BIG CAR R= A4-01
3000
TYP LEVEL ABOVE FINISHED 2 OF 5 (TYP) 3 OF 5 (TYP)
2 OF 4 (TYP) 2 OF 5 (TYP) GROUND 509.0M ELECTRICAL CHARGING POINTS B1
16750
4 SMALL CARS
(TYP)PAINTED WITH
APPROVED COLOUR AND SHADE
6M DRIVE WAY 6M DRIVE WAY
22 SMALL CARS
57 SMALL CARS
ELECTRICAL CHARGING STEEL STAIR
POINTS FOR 22 CARS
57 SMALL CARS
6
A7-01
BRICK COLUMN
3 2500
2500 450X450X1250
A4-02 TYP
5 SMALL CARS
16000
ELECTRICAL
6M DRIVE WAY DN
6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY CHARGING
POINTS FOR
2 OF 5 (TYP) 2 OF 5 ( TYP) 1550 2 OF 5( TYP) 11 CARS
89950
2500
5
TYP
54 SMALL CARS 17.b KEY PLAN
5000
A7-01 SMALL
6.6M DRIVE WAY
CAR
FHR-8 BAY
D ELECTRICAL
2 SMALL CARS
ECC BLOCK SUB STATION
FHR-6 FHR-7 FHR-9
G+14
SURV EY NO. 51
4ACRES
52 SMALL CARS
1140
FUT URE EXPANSION FUT URE EXPANSION
SDB5 SDB4
PHASE-2 G+5 G+5
0
GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
PHASE-1 SITE
OF FICE-2
11400
J.1
P
U
2 OF 5 ( TYP)
CEMENT
GODOW N
WAY
6
5
R
4
3
2
1
P
U
=
RIVE
P
U
60 SDB1
G+5
J
CANTEEN
00 REST REST
RO OM -2RO OM -1
TO I E
LT
BLO CK
SECURITY SECURITY
200 THK
RAMP
ENTRY EXIT
503 lv l.,
6300X3250 HOL DI NG
SEC URI TY
CR OSSI
NG
DN
4600
LAYOUT
14.5m ROAD PRIVA TE
E RS
R.C.C. COLUMN 1 LOBBY-1 L CA
MAL Y P) CLIENT:
(SEE STRL. DRG.) 26 S MN (T
COL U
WAY
4000X7400
5000
E
CRET
RIVE CON
1
2
LIFTS
2300X2750 2500 6M D ITH 7400
ED W
A4-01
FHR-1
D R
AINT
EL P SHADE
M/S INFOSYS TECHNOLOGIES
7 OF 5( TYP) PAN AN D 0 17.2
1 CRE
TE S OLOUR
CON ROVED
C 1118 LTD. HYDERABAD
15750
T S
A6-01 6M DRIVE WAY 6M DRIVE WAY POIN APP 17.1
GING
HAR 0
6 OF 5 (TYP) AL C 1118
TRIC
3 SMALL CARS
ELEC 26 CARS
3 OF 5 (TYP) FOR 16.1 PROJECT NUMBER
0
1
12 SMALL CARS 1118
8 SMALL CARS
4650
A7-01 EXIT 15.1 10BLR023
0
ENTRY 1118
F PROJECT PHASE
FHR-10
14.1
0
LVL. 1500 5 50MM THK 1118
CONCRETE COLUMN(Typ) CONCRETE SPANDREL OF
6950
EXPANSION JOINT
PAINTED WITH APPROVED HEIGHT 1050MM FROM FFL (TYP) DN RAMP DN TO GROUND FLOOR
LOBBY-3
13.1 DESIGN DEVELOPEMENT
COLOUR AND SHADE PAINTED WITH APPROVED 5700X1455
COLOUR AND SHADE
LVL. 3000 6 LIFTS
2300X2750 ARCHITECT AND STRUCTURAL CONSULTANT
G 12.1
EMERGENCY EXIT RAMP ES-1 7
(REFER DETAIL) FD1 1
6225
FLOOR
PARKING BAY.
SCALE: 1 : 200
PARKING SCHEDULE_FIRST FLOOR 3) IN CASE OF DISCREPANCIES LARGER SCALE DETAILED DRAWINGS SHALL
2. FIRST 11116 114272 2. ES -1 ELECTRICAL 1200X400
BIG CAR (3MX6.0M) SUPERCEDE THE SMALLER SCALE DRAWINGS.
TYPE MARK COUNT DRAWING TITLE
FLOOR SHAFT 3. PARKING BAY.
BIG CARS 36
4) DISCREPANCIES IN THE DRAWINGS ARE TO BE BROUGHT TO THE NOTICE
SMALL CARS 382
3. SECOND FLOOR 11812 121427 3. DS -1 LV SHAFT FOR 900X400 OF THE ARCHITECT PRIOR TO COMMENCEMENT OF THE WORK.
Grand total 418 CCTV AND DATA 4. LOBBY AREA.
FIRST FLOOR PLAN
4. THIRD FLOOR 10736 110366 4. DB&CS DB AND CONTROL
SWITCH LOCATION 5. STEEL PIPE BOLLARDS
@1500 C/C
5. FOURTH FLOOR 7797 80153 2835.63 29143
2
A4-01
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
178225
12175 12450 10800 10800 10800 10800 10800 10800 10800 850 10800 10800 10800 10800 10800 10800 12350
RAMP UP TO THIRD FLOOR WITH 1:10 SLOPE. DN RAMP DN TO FIRST FLOOR WITH 1:10 SLOPE 2 3 4
A7-01 A7-01 1
A4-02
A8-02
6625
CONCRETE CONCRETE SPANDREL OF
COLUMN (TYP) HEIGHT 1050MM FROM FFL 1 1
6590 FHR -3 FHR-4 PAINTED WITH APPROVED FHR -5 STAIR-2
FHR-2 A6-04 A6-02
COLOUR AND SHADE UP
UP
ENTRY
B EXIT LIFTS
TYP TYP
2300X2750 3 TYP
9 SMALL CARS
TYP BIG
6000
TYP
00
9 BIG CARS SMALL 3 BIG CARS LOBBY-2 CAR 3
2 BIG CARS
60
7 BIG CARS SMALL 2 BIG CARS CAR CAR CAR
4225X6000 BAY
R=
CAR BAY A4-01
6.6 M DRIVE WAY
3 BIG CARS
1
C
200 MASONRY WALL
2500
14 SMALL CARS 40 SMALL CARS
6 SMALL CARS
WITH APPROVED
A4-02 COLOUR AND SHADE
16000
W
STRUC. COLUMN 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY
W (SEE DETAIL)
2 OF 5 (TYP)
89950
2 OF 5 (TYP) 2 OF 5 (TYP)
5
FHR-6 17.b
A7-01 13 SMALL CARS
2500
38 SMALL CARS
FHR-8 KEY PLAN
1600
TYP.
D
2 SMALL CARS
ELECTRICAL
FHR-7
2000
SUB STATION
FHR-9
ECC BLOCK
G+14
1140
SURV EY NO. 51
5000
TYP.
0
W A6-05
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1
GA S B A NK
AGRICULTURE LAND
11400
PHASE-1
J.1
SITE
OF FICE-2
WAY
P
U
RIVE
G+5 G+5
M E
T
S
IM S
R CEMENT
GODOW N
6M D
2
1
P
U
R=
2 OF 5 (TYP) 60
6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY J
P
U
PLATFORM 00 SDB1
60
G+5 STA FF/L AB OU R
CANTEEN
D1
00
D2 D2 REST REST
RO OM -2RO OM -1
TO I E
LT
BLO CK
PANTRY
SECURITY SECURITY
RAMP
ENTRY EXIT
STAIR-1
OSSI
10 NG
WC WC V1 ED MLC P
DEVELOPER
STORE
SURV EY NO. 49
6300X3300 PROPOS
D.1
503 lv l.,
HOL DI NG
SEC URI TY
WAY
SINGAPO RE ENTRANCE
RIVE
DN
4600
34 SMALL CARS
CR OSSI
NG
6M D
LAYOUT
UP
AGRICULTURE LAND
TOILET DETAIL) BUS TERMINAL
E FD1
RS
OPENING 1 LOBBY-1 MAL
L CA
4000X7400 28 SMALL CARS
26 S CONCRETE COLUMN (TYP) CLIENT:
AY
1 LIFTS EW 7400
A4-01
2 2300X2750
6M DRIV
FHR-1 0 17.2
M/S INFOSYS TECHNOLOGIES
1 1118
5 OF 4( TYP)
OM F
FL
LTD. HYDERABAD
15750
M FR E
A6-01
6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY
6 OF 5 (TYP)
IG
050M
HT 1 AND SH
AD 17.1
3 SMALL CARS
H E 0
1118
L OF R
LOU
DRE VED CO
PAN
TE S A PPRO
3 OF 5 (TYP) CRE
CON TED WIT
H 16.1
8 SMALL CARS PAIN 180 PROJECT NUMBER
1 11
A7-01 2450 15.1
EXIT 0 10BLR023
1118
1700
1700
F ENTRY
14.1 PROJECT PHASE
FHR-10 LOBBY-3 50MM THK 0
LVL : 7500
1455X5700 5 EXPANSION JOINT 1118
6950
CONCRETE COLUMN(TYP)
PAINTED WITH APPROVED
CONCRETE SPANDREL OF
HEIGHT 1050MM FROM FFL (TYP) LVL : 6000
DN RAMP DN TO FIRST FLOOR 13.1 DESIGN DEVELOPEMENT
LIFTS
COLOUR AND SHADE PAINTED WITH APPROVED
COLOUR AND SHADE
2300X2750 6
13464
G 12.1 ARCHITECT AND STRUCTURAL CONSULTANT
EMERGENCY EXIT RAMP ES-1 7
(REFER DETAIL) FD1
6225
H
STAIR-3
200 THK 6300X3300
MASONRY WALL
2115 6400
1 ENGINEERING (I) PVT LTD
A6-03
325 8750 1725 10800 1725 9075 8515
6.1 6.2 8.1 9.1 9.2 TRC Engineering (I) Pvt Ltd.
SECOND FLOOR No 6/A, Amit Plaza, JP Nagar, 3rd Phase
1 1 : 200 Bannerghatta Road,Bangalore-560076
Phone : +91-80-26581707/08/09
Fax :+91-80-26582424 WebSite:www.trc.co.in
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PROJECT TEAM
178225
OWNER
100225 850 77150 Infosys Technology Ltd.
12175 12450 10800 10800 10800 10800 10800 10800 10800 850 10800 10800 10800 10800 10800 10800 12350 ARCHITECT
TRC ENGINEERING (I) PVT LTD
2
SPEED RAMP CONCRETE SPANDREL OF 6
17.a
A8-05 (REFER DETAIL) HEIGHT 1050MM FROM FFL A8-05
RAMP LINE BELOW
6225 6125
A
CONCRETE SPANDREL OF
HEIGHT 1050MM FROM FFL (TYP) STEEL STAIR
PAINTED WITH APPROVED (REFER DETAIL)
1 COLOUR AND SHADE
A8-05 3 4
12275
A7-01 A4-02
LVL: 9000
DN RAMP DN TO SECOND FLOOR 2
A7-01
BRICK COLUMN 1
RAMP LINE BELOW
450X450X1250 A6-02
FHR -3 CONCRETE SPANDREL OF
HEIGHT 1050MM FROM FFL
2500
FHR-2 DN
STAIR-2
ENTRY
B EXIT
TYP
3
TYP ENTRY TO STAIR TYP
6000
TYP TYP TYP TYP
TYP.
5 BIG CARS 9 BIG CARS 3 BIG CARS 3 BIG CARS SMALL
4BIG CARS
SMALL SMALL SMALL SMALL SMALL
5 BIG CARS BIG 00 3
CAR CAR LOBBY-2 CAR 60
CAR
BAY
CAR CAR CAR BAY 4225X6000 4 BAY R= A4-01
BAY BAY BAY BAY
3000 B1
2 OF 5 (TYP) 2 OF 5 (TYP) TYP. 3 OF 5 (TYP) LIFTS
16750
2300X2750
6M DRIVE WAY BUILDING LINE 6M DRIVE WAY 6M DRIVE WAY
6M DRIVE WAY @ FOURTH FLOOR
1550 BUILDING LINE STAIR FROM FOURTH FLOOR
RAMP UP TO FOURTH FLOOR
2500
@ FOURTH FLOOR
TYP.
A8-04
800
800
800
1600
400
C
800
1
A8-04
12 SMALL CARS
6
CONCRETE SPANDREL
A7-01 OF HEIGHT 1050MM
FROM FFL PAINTED
G+14
4ACRES
STRL. COLUMN 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY SURV EY NO. 51
BUILDING LINE
89950
2 OF 5 (TYP) 2 OF 5 (TYP) GA S B A NK
AGRICULTURE LAND
@ FOURTH FLOOR
FUT URE EXPANSION
FOOD COURT -1
FOOD COURT -2
PHASE-1 SITE
OF FICE-2
P
U
5 CEMENT
GODOW N
FHR-6 17.b
6
5
4
3
2
1
P
U
A7-01 FHR-8
P
U
FHR-9
SDB1
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK
SECURITY SECURITY
RAMP
ENTRY EXIT
D
4 5
67
8 9 CR
OSSI
10 NG
SURV EY NO. 49
FHR-7 PROPOS
ED MLC P
DEVELOPER
STORE
2500
503 lv l.,
HOL DI NG
1140
EXPANSION
17 SMALL
17 SMALL
CARSCARS
5000
SINGAPO RE ENTRANCE
26m WIDE ROAD
W CR OSSI
NG
0
LAYOUT
PRIVA TE
AGRICULTURE LAND
MASONRY WALL TYP
11400
BUS TERMINAL
WAY J.1
RIVE
6M D
STORE R
2 OF 5 (TYP) =
W 60
11200X12000
6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 00 J CLIENT:
W
D1 1550
STAIR-1
D.1
6300X3300 M/S INFOSYS TECHNOLOGIES
7.5 M DRIVE WAY
BUILDING LINE
V1 V1 DN
12 SMALL CARS
@ FOURTH FLOOR LTD. HYDERABAD
4600
OPENING DB &CS
UP
E WAY
FD1
RIVE CAR
S
1 6M D 26 S
MAL
L
PROJECT NUMBER
LOBBY-1 12 SMALL CARS CONCRETE COLUMN (TYP)
LIFTS
2300X2750 4000X7400
7400
1
2
10BLR023
5000
A4-01
7 OF 5 (TYP)
1
FHR-1
1118
0 17.2
PROJECT PHASE
15750
A6-01
1118
ENTRY
F EXIT
14.1
50MM THK 0
CONCRETE COLUMN(TYP) FHR 10 LVL: 10500 LOBBY-3 5 EXPANSION JOINT 1118
6950
THIRD FLOOR
1 1 : 200
6.1 6.2 8.1 9.2
FOR CO-ORDINATION
SCHEDULE AREA STATEMENT SHAFT SCHEDULE: LEGEND: GENERAL NOTES: DESIGNED BY:Designer
DRAWN BY:Author
SL. FLOOR AREA IN SQ MTS AREA IN SQ FT FRONT RAMP FRONT RAMP SL. NAME DESCRIPTION SIZE REMARKS
DOOR SCHEDULE_THIRD FLOOR NON CAR PARKING BAY.
NO. NAME AREA IN SQ MTS AREA IN SQ FT NO. (mm) 1. 1) ALL DIMENSIONS ARE IN MILLIMETRE UNLESS OTHERWISE MENTIONED. CHECKED BY:Checker
TYPE MARK LEVEL WIDTH HEIGHT COUNT DESCRIPTION
D1 THIRD FLOOR 900 2100 1 FLUSH DOOR 2) NO DIMENSIONS TO BE SCALED FROM DRAWING. SCALE: 1 : 200
1. GROUND 11635 119607 1. FHR (1-11) FIRE HOSE REEL 2. SMALL CAR(2.5MX5M)
FD1 THIRD FLOOR 1000 2100 2 FIRE DOOR 1200X1000 ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
FLOOR PARKING BAY. DRAWING TITLE
2. FIRST 11116 114272 3) IN CASE OF DISCREPANCIES LARGER SCALE DETAILED DRAWINGS SHALL
WINDOW SCHEDULE_ THIRD FLOOR
FLOOR
2. ES -1 ELECTRICAL 1200X400 BIG CAR (3MX6.0M) SUPERCEDE THE SMALLER SCALE DRAWINGS.
TYPE SHAFT 3. PARKING BAY.
V1
MARK WIDTH
600
HEIGHT
600 2
COUNT DESCRIPTION
VENTILATOR
3. SECOND FLOOR 11812 121427 3. DS -1 LV SHAFT FOR 900X400
4) DISCREPANCIES IN THE DRAWINGS ARE TO BE BROUGHT TO THE NOTICE THIRD FLOOR PLAN
CCTV AND DATA 4. LOBBY AREA. OF THE ARCHITECT PRIOR TO COMMENCEMENT OF THE WORK.
W 900 900 4 SLIDING WINDOW
Grand total: 6 4. THIRD FLOOR 10736 110366 DB&CS DB AND CONTROL
4.
SWITCH LOCATION 5. STEEL PIPE BOLLARDS
PARKING SCHEDULE_THIRD FLOOR 5. FOURTH FLOOR 7797 2835.63 @1500 C/C
80153 29143
TYPE MARK COUNT SHEET NUMBER
BIG CARS 39 FIFTH FLOOR 7797 1575.80
6. 80153
SMALL CARS
Grand total
336
375
16191
A1-04
7. TERRACE FLOOR 6222 63962 1575.80 16191
DATE:02/28/2011 NORTH
ISSUE
No. Date Description Revision
4
A8-05
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
178225
PROJECT TEAM
100225 850 77150
OWNER
12175 12450 10800 10800 10800 10800 10800 10800 10800 850 10800 10800 10800 10800 10800 10800 12350
Infosys Technology Ltd.
3 ARCHITECT
A8-05 SPEED RAMP
17.a
(REFER DETAIL) TRC ENGINEERING (I) PVT LTD
RAMP LINE BELOW 6225 6125
STRUC. COLUMN
1 (SEE DETAIL)
A8-05 CONCRETE SPANDREL OF HEIGHT 1050MM
FROM FFL PAINTED WITH APPROVED
12275
ENTRY
B EXIT
RAMP UP TO FIFTH FLOOR
TYP
6000
TYP.
TYP SMALL
SMALL CAR
3 BIG CARS CAR 5 BIG CARS BAY 3 BIG CARS 3 BIG CARS
BAY
3000
TYP.
B1
2 OF 5 (TYP) 2 OF 5 (TYP) TERRACE BELOW
16750
2500
UP
UP DN
DN
C
ENTRY
16 SMALL CARS TO
SS RAILING STAIR
RAMP DN TO THIRD FLOOR
2500
3
A4-02 CONCRETE TERRACE BELOW KEY PLAN
16000
SPANDREL
6250
6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY
2 OF 5 (TYP) 2 OF 5 (TYP) ELECTRICAL
ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51
89950
4OF 5 (TYP)
FUT URE EXPANSION FUT URE EXPANSION
5 PHASE-2
SDB5
G+5
SDB4
G+5
A7-01 FHR-6
16 SMALL CARS
FHR-7
27 SMALL CARS FHR-9 17.b FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1
GA S B A NK
AGRICULTURE LAND
PHASE-1 SITE
OF FICE-2
FHR-8 SDB3
P
U
SDB2 UNIT
G+5 G+5 STORE M E
T
S
IM S
D
CEMENT
GODOW N
6
5
4
3
2
1
P
U
DN P
U
SDB1
33 SMALL CARS
G+5 STA FF/L AB OU R
CANTEEN
1140
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK
SECURITY SECURITY
50
RAMP
ENTRY EXIT
00
8 9 CR
OSSI
10 NG
6M DRIVE WAY
0
SURV EY NO. 49
ED MLC P
DEVELOPER
STORE
PROPOS
4OF 5 (TYP) 503 lv l.,
ENTRY
HOL DI NG
SEC URI TY
11400
J.1
EXPANSION
SINGAPO RE ENTRANCE
LVL: 12000 26m WIDE ROAD
WAY
CR OSSI
NG
RIVE
LAYOUT
14.5m ROAD PRIVA TE
L OF
DRE FFL
STAIR-1 PAN
2500 C ARS TE S M FROM
6300X3300 ALL CRE M
TYP. 6 SM CON HT 1050 CLIENT:
D.1 HEIG
DN 25 SMALL CARS
5000
TYP.
4600
4 SMALL CARS
UP
DB &CS
COLUMN (TYP)
M/S INFOSYS TECHNOLOGIES
E
1
FD1 LTD. HYDERABAD
LOBBY-1
4000X7400 25 SMALL CARS
LIFTS TERRACE BELOW
2300X2750
7400
1
2
A4-01 7 OF 5 (TYP) PROJECT NUMBER
FHR-1
1118
0 17.2
W
BELO
15750
A6-01 5 OF 5 (TYP) 0
3 OF 5 (TYP) BUIL 1118
PROJECT PHASE
16.1
0
4695 1 1118
A7-01
12 SMALL CARS 8 SMALL CARS DESIGN DEVELOPEMENT
EXIT
15.1
0
700
H
200 THK OPENING
MASONRY WALL
1
2115 6400
A6-03 No 6/A, Amit Plaza, JP Nagar, 3rd Phase
325 8750 1725 10800 1725 9075 8515
Bannerghatta Road,Bangalore-560076
Phone : +91-80-26581707/08/09
6.1 6.2 8.1 9.2 Fax :+91-80-26582424 WebSite:www.trc.co.in
FOURTH FLOOR
1 1 : 200
SCHEDULE: AREA STATEMENT SHAFT SCHEDULE: LEGEND: GENERAL NOTES: FOR CO-ORDINATION
DESIGNED BY:Designer
DOOR SCHEDULE_FOURTH FLOOR SL. FLOOR AREA IN SQ MTS AREA IN SQ FT FRONT RAMP FRONT RAMP SL. NAME DESCRIPTION SIZE REMARKS 1. NON CAR PARKING BAY. 1) ALL DIMENSIONS ARE IN MILLIMETRE UNLESS OTHERWISE MENTIONED. DRAWN BY:Author
NO. NAME AREA IN SQ MTS AREA IN SQ FT NO. (mm)
TYPE MARK LEVEL WIDTH HEIGHT COUNT DESCRIPTION
2) NO DIMENSIONS TO BE SCALED FROM DRAWING. CHECKED BY:Checker
FD1 FOURTH FLOOR 1000 2100 2 FIRE DOOR 2. SMALL CAR(2.5MX5M) ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
1. GROUND 11635 119607 1. FHR (1-11) FIRE HOSE REEL 1200X1000 PARKING BAY. SCALE: 1 : 200
FLOOR
3) IN CASE OF DISCREPANCIES LARGER SCALE DETAILED DRAWINGS SHALL
BIG CAR (3MX6.0M) SUPERCEDE THE SMALLER SCALE DRAWINGS.
DRAWING TITLE
PARKING SCHEDULE_FOURTH 2. FIRST 11116 114272 2. ES -1 ELECTRICAL 1200X400 3.
FLOOR FLOOR SHAFT PARKING BAY.
TYPE MARK COUNT 4) DISCREPANCIES IN THE DRAWINGS ARE TO BE BROUGHT TO THE NOTICE
OF THE ARCHITECT PRIOR TO COMMENCEMENT OF THE WORK.
BIG CARS
SMALL CARS
23
218
3. SECOND FLOOR 11812 121427 3. DS -1 LV SHAFT FOR
CCTV AND DATA
900X400 4. LOBBY AREA. FOURTH FLOOR PLAN
Grand total 241 THIRD FLOOR 10736 DB&CS DB AND CONTROL
4. 110366 4. 5.
SWITCH LOCATION STEEL PIPE BOLLARDS
@1500 C/C
5 FOURTH FLOOR 7797 80153 2835.63 29143
SHEET NUMBER
6. FIFTH FLOOR 7797 80153 1575.80
16191
A1-05
7. TERRACE FLOOR 6222 63962 1575.80 16191
DATE:02/28/2011 NORTH
ISSUE
No. Date Description Revision
2
1 2 3 4 5 6 7 A4-01
8 9 10 11 12 13 14 15 16 17 18
178225
12175 12450 10800 10800 10800 10800 10800 10800 10800 850 10800 10800 10800 10800 10800 10800 12350
PROJECT TEAM
17.a
COLUMN CAPITAL SPEED RAMP OWNER
(SEE DETAIL) (REFER DETAIL)
RAMP LINE 6225 6125 Infosys Technology Ltd.
BELOW
A ARCHITECT
TRC ENGINEERING (I) PVT LTD
1
A8-05 CONCRETE SPANDREL OF HEIGHT 1050MM
12275
RAMP LINE
BELOW
BUIDING LINE BELOW LIFT SHAFT
FHR-2 FHR -3 BELOW
UP
ENTRY
B EXIT
TYP TYP
6000
6000
TYP.
TYP.
SMALL SMALL
3 BIG CARS 6 BIG CARS 3 BIG CARS 3 BIG CARS
CAR CAR
RAMP UP TO TERRACE
BAY BAY
3000
TYP.
3000
B1
2 OF 5 (TYP) TYP. TERRACE BELOW @ 3RD FLOOR LEVEL
16750
20 SMALL CARS 3
DN
A8-04
C
RAMP DN TO FOURTH FLOOR
5000
TYP.
ENTRY TO STAIR
7.2M DRIVE WAY
11 BIG CARS
10 SMALL CARS
37 SMALL CARS
2500
3
TYP.
A4-02
16000
5
CONCRETE
SPANDREL
KEY PLAN
A7-01
FHR-6 16 SMALL CARS
FHR-7
27 SMALL CARS 17.b
ELECTRICAL
ECC BLOCK
G+14
SUB STATION
D SURV EY NO. 51
4ACRES
1140
50
00 FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1
GA S B A NK
AGRICULTURE LAND
PHASE-1
0
SITE
OF FICE-2
P
U
J.1
6
5
4
3
WAY
2
1
P
U
P
U
RIVE
SDB1
G+5 STA FF/L AB OU R
CANTEEN
6M D
LVL: 15000 REST REST
RO OM -2RO OM -1
TO I E
LT
BLO CK
SECURITY SECURITY
ENTRY EXIT
OF
RE L
SURV EY NO. 49
ED MLC P
DEVELOPER
STORE
AND OM FFL
PROPOS 503 lv l.,
2500 E SP
HOL DI NG
SEC URI TY
STAIR-1 2500
C ARS CRET 0MM FR 14m WIDE ROAD (FUTURE
EXPANSION
PRIVA TE
LAYOUT
DN
25 SMALL CARS
5000
TYP.
AGRICULTURE LAND
4600
BUS TERMINAL
4 SMALL CARS
DB &CS
UP
E FD1 CLIENT:
1
LIFTS 25 SMALL CARS
2300X2750 LOBBY-1
TERRACE BELOW @ 3RD FLOOR LEVEL
1
A4-01
2
4000X7400
7400 M/S INFOSYS TECHNOLOGIES
0 17.2 LTD. HYDERABAD
FHR-1 5 OF 5 (TYP)
7 1118
LOW
15750
5 OF 5 (TYP) 0
A6-01
BUIL 1118
PROJECT NUMBER
3 OF 5 (TYP) 16.1
0
4745 1
12 SMALL CARS 8 SMALL CARS 1118
A7-01 10BLR023
15.1
EXIT 0
1118 PROJECT PHASE
F ENTRY
14.1
FHR-10 0
CONCRETE COLUMN(TYP) LVL: 15000 LOBBY-3 5 50MM THK 1118 DESIGN DEVELOPEMENT
6950
4 UP 6300X3300
RAMP UP TOTERRACE DS-1
UP
2 A7-01 OPENING
A8-06 FHR-11 DN
H
200 THK
ENGINEERING (I) PVT LTD
MASONRY WALL 1
2115 6400 A6-03
A1-06
DATE:02/28/2011 NORTH
ISSUE
No. Date Description Revision
2
A4-01
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
178225
PROJECT TEAM
850 OWNER
100225 77150
Infosys Technology Ltd.
12175 12450 10800 10800 10800 10800 10800 10800 10800 850 10800 10800 10800 10800 10800 10800 12350
ARCHITECT
TRC ENGINEERING (I) PVT LTD
17.a
RAMP LINE
BELOW
A
RAMP LINE BELOW
1
A8-05
12275
CONCRETE SPANDREL OF
HEIGHT 1050MM FROM FFL
PAINTED WITH APPROVED COLOUR AND SHADE
BUILDING LINE @ 3RD FLOOR
B
TYP TYP TYP
6000
TYP.
SMALL SMALL SMALL
5 BIG CARS CAR 6 BIG CARS CAR 3 BIG CARS CAR
BAY BAY BAY TERRACE BELOW
@ 9000 LVL
3000
TYP.
B1
16750
6M DRIVE WAY
2500
TYP.
RAMP DN TO FIFTH FLOOR
5000
TYP.
BUILDING LINE BELOW
20 SMALL CARS
C
10 SMALL CARS
2500 PHASE-2
SDB5
G+5
SDB4
G+5
17.b
P
U
P
U
SDB1
G+5 STA FF/L AB OU R
CANTEEN
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK
D SUBWAY
RAMP
12
M
SECURITY
ENTRY EXIT
SECURITY
1 2
VIP PA RKI NG
3 4 5
67
PUBLIC A REA
DN
8 9 CR
OSSI
10 NG
SURV EY NO. 49
28 SMALL CARS ED MLC P
DEVELOPER
STORE
HOL DI NG
SEC URI TY
LAYOUT
ENTRY
PRIVA TE
11400
14.5m ROAD
SIZE=3.45MX2.1MX2.0M CLIENT:
CONCRETE SPANDREL OF
HEIGHT 1050MM FROM FFL
D.1
DN
STAIR-1
6300X3300
M/S INFOSYS TECHNOLOGIES
4600
25 SMALL CARS
FIRE WATER RESERVE OHT
OVER STAIRCASE HEAD ROOM DB &CS BUILDING LINE BELOW LTD. HYDERABAD
SIZE=3.7MX3.45MX2.0M
E FD1
LIFTS
1 LOBBY-1 25 SMALL CARS
2300X2750 4000X7400 PROJECT NUMBER
1
2
A4-01
7400
8 OF 5 (TYP)
10BLR023
BUILDING LINE 17.2
15750
5 OF 5 (TYP)
0
1118 16.1 DESIGN DEVELOPEMENT
1
12 SMALL CARS 8 SMALL CARS 1118
0 ARCHITECT AND STRUCTURAL CONSULTANT
A7-01 15.1
EXIT
F ENTRY 1118
0
14.1
LOBBY-3 50MM THK
CONCRETE COLUMN(TYP) LVL. 16500 5
6950
AREA STATEMENT
FOR CO-ORDINATION
DESIGNED BY:Designer
DOOR SCHEDULE_TERRACE FLOOR SL. NAME DESCRIPTION SIZE REMARKS 1. NON CAR PARKING BAY. 1) ALL DIMENSIONS ARE IN MILLIMETRE UNLESS OTHERWISE MENTIONED. SCALE: 1 : 200
TYPE MARK LEVEL WIDTH HEIGHT COUNT DESCRIPTION 1. GROUND 11635 119607 NO. (mm)
FD1 TERRACE 1000 2100 2 FIRE DOOR FLOOR
SMALL CAR(2.5MX5M) 2) NO DIMENSIONS TO BE SCALED FROM DRAWING. DRAWING TITLE
2. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
2. FIRST 11116 114272 1. FHR (1-11) FIRE HOSE REEL 1200X1000 PARKING BAY.
FLOOR
PARKING SCHEDULE_TERRACE FLOOR 3) IN CASE OF DISCREPANCIES LARGER SCALE DETAILED DRAWINGS SHALL
BIG CAR (3MX6.0M)
TYPE MARK COUNT 3. SECOND FLOOR 11812 121427
2. ES -1 ELECTRICAL 1200X400 3. PARKING BAY.
SUPERCEDE THE SMALLER SCALE DRAWINGS. TERRACE FLOOR PLAN
SHAFT
BIG CARS 17
4) DISCREPANCIES IN THE DRAWINGS ARE TO BE BROUGHT TO THE NOTICE
SMALL CARS 190 OF THE ARCHITECT PRIOR TO COMMENCEMENT OF THE WORK.
THIRD FLOOR 10736 3. DS -1 LV SHAFT FOR 900X400 4. LOBBY AREA.
Grand total 207 4. 110366 CCTV AND DATA
1500
15000
PT-2 SPANDREL ON RAMP
FOURTH FLOOR
PROJECT TEAM
PT-2 6" PROJECTION 12000
WALL SWEEP PT-1
GLAZED WINDOW OF
APPROVED GLASS GLAZED THIRD FLOOR OWNER
PT-2 WINDOW
CONCRETE SPANDREL PT-2 9000 Infosys Technology Ltd.
PT-2 PT-1
OF APPROVED
COLOUR AND SHADE SECOND FLOOR
PT-3 ARCHITECT
WALL SWEEP OF APPROVED WALL OPENINGS 6000
PT-1 PT-3
BRAND AND SHADE TRC ENGINEERING (I) PVT LTD
PT-2 FIRST FLOOR
PT-2 PT-2
3000
H G F E J.1 D C B1 B A
STAIRCASE
HEAD ROOM
PAINTED WITH CONCRETE SPANDREL
APPROVED SHADE WITH DIFFERENT
AND COLOUR PAINT AND TEXTURE
PT-2 12000
STEEL STAIR
19200
100 MM
CONCRETE 9000
PT-2 PT-1 PT-3 COLUMNS
WALL SWEEP SEE DETAIL SECOND FLOOR
PT-3
6000
BRICK COLUMN RAMP WITH
PT-2 PT-2
APPROVED PAINT
FIRST FLOOR KEY PLAN
3000
3000
TWO WHEELER
ENTRY PT-5 ELECTRICAL
0
BRICK COLUMN
FUT URE EXPANSION FUT URE EXPANSION
P
U
CEMENT
GODOW N
6
5
4
3
2
1
P
U
P
U
SDB1
G+5 STA FF/L AB OU R
CANTEEN
SECURITY SECURITY
RAMP
ENTRY EXIT
3
SUBWAY VIP PA RKI NG
12
M
1 2
3 4 5
67
8 9 CR
OSSI
PUBLIC A REA
10 NG
SURV EY NO. 49
1 : 200 ED MLC P
DEVELOPER
STORE
HOL DI NG
SEC URI TY
CR OSSI
NG
LAYOUT
14.5m ROAD PRIVA TE
AGRICULTURE LAND
BUS TERMINAL
2400
WITH DIFFERENT PAINT 50MM THK EXPANSION JOINT
PT-3 AND TEXTURE COLUMN CAPITAL CONCRETE COLUMN WITH APPROVED
COLOUR AND SHADE PLAIN CONCRETE SPANDREL COLUMN CAPITAL PROJECT NUMBER
OF HEIGHT 1050 MM PAINTED WITH WITH APPROVED TERRACE
APPROVED COLOUR AND SHADE SHADE AND
STAIR COLOUR 50 MM PROJECTION 18000
PT-2 CASE 10BLR023
GLAZED WINDOW PT-2 PT-2 PT-3 PT-4 FIFTH FLOOR
PT-4
OF APPROVED GLASS
RAMP DOOR PT-3 CONCRETE COLUMN
15000 PROJECT PHASE
REFER DETAIL PT-2 FOURTH FLOOR
PT-3 PT-2 PT-3 PT-3 CONCRETE SPANDREL
VENTILATOR WITH DIFFERENT PAINT
PT-1
PT-3 12000 DESIGN DEVELOPEMENT
OF APPROVED AND TEXTURE
PT-2
GLASS
PT-2
THIRD FLOOR
PT-2 PT-2 PT-3
9000
ARCHITECT AND STRUCTURAL CONSULTANT
PT-2 PT-3 PT-1 PT-1 PT-1 PT-3 PT-1
PT-2 SECOND FLOOR
PT-3 PT-5 PT-3
STEEL 6000
DOOR STAIR
PT-2 PT-2 FIRST FLOOR
PT-2 PT-2
3000
CONCRETE SPANDREL FGL : 506.00
OF 1050 HT. PT-2 GROUND FLOOR
PT-3
0 ENGINEERING (I) PVT LTD
BRICK COLUMN
2
SOUTH (REAR) SIDE ELEVATION TRC Engineering (I) Pvt Ltd.
1 : 200
No 6/A, Amit Plaza, JP Nagar, 3rd Phase
18 17.a 17 16 15 14 13 12 11 10 9.2 9.1 9 8.1 8 7 6.2 6.1 6 5 PLAIN CONCRETE 4 3 2 1 Bannerghatta Road,Bangalore-560076
SPANDREL WATER TANK PAINTED WITH
OF HEIGHT 1050 MM APPROVED COLOUR AND SHADE STAIR CASE BEYOND
Phone : +91-80-26581707/08/09
STAIRCASE FROM FFL PAINTED WITH APPROVED Fax :+91-80-26582424 WebSite:www.trc.co.in
HEAD ROOM PAINTED WITH COLOUR AND SHADE
200 THK CONCRETE SPANDREL APPROVED COLOUR
PARAPET WALL WITH DIFFERENT PAINT AND SHADE
CONCRETE COLUMN PLAIN CONCRETE COLUMN CAPITAL DOOR AND TEXTURE OF CONCRETE SPANDREL
STEEL STAIR PT-2 COLUMN CAPITAL
SPANDRELS SEE DETAIL APPROVED COLOUR PAINTED TO MATCH THE CONCRETE COLUMN
LIFT HEAD PLAIN SPANDREL PAINTED AS PER SPEC. PT-3 PAINTED AS PER SPEC.
COLUMN CAPITAL 900 HIGH AND SHADE
ROOM CONCRETE SPANDRELS PT-2
STEEL STAIR
REFER DETAIL WITH DIFFERENT PAINT
AND TEXURE
ALUMINIUM
RAILING
FHR DOOR
PER MANUFACTURER TERRACE FOR CO-ORDINATION
WITH 900 HIGH FHR DOOR 18000
ALUMINIUM PT-5 DESIGNED BY:Designer
PER MANUFACTURER WALL SWEEP
RAILING PAINTED AS PER SPEC
PT-4 PT-4 PT-4 PT-2 FIFTH FLOOR DRAWN BY:Author
FHR DOOR
CONCRETE BRICK COLUMN 15000 CHECKED BY:Checker
SPANDREL PT-1 PT-5
PAINTED TO MATCH
OF 1050 HT. THE COLUMNS FOURTH FLOOR
900 HIGH PT-2 PT-3 PT-3 SCALE: 1 : 200
RAILING 12000
MASONRY WALL PT-5
19050
PT-2 CONCRETE SPANDREL THIRD FLOOR DRAWING TITLE
PT-2
ON RAMP
9000
PT-2 PT-3
PT-2 SECOND FLOOR
PT-3
PT-3
6000 ELEVATIONS
9000
PT-1
PT-2 FIRST FLOOR
6000
1800
PROJECT TEAM
PT-2 PT-3 TERRACE
18000
OWNER
PT-2
PT-1 WALL SWEEP Infosys Technology Ltd.
100 MM SWEEP PAINTED WITH APPROVED
1200
PLAIN CONCRETE SPANDRELS ARCHITECT
50 MM GROOVE COLOUR AND SHADE TRC ENGINEERING (I) PVT LTD
450 100
100
PT-1 800 PT-1
1800
PT-2 FIFTH FLOOR
15000
PT-2
450
450 50 450 450 50 450 50
MASONRY WALL
1200
PT-2
50
50
1800
1800
PT-3 FOURTH FLOOR
600
1200
1200
SECOND FLOOR
6000
PT-3
50
50
1050
PT-2
1800
THIRD FLOOR
9000
PT-2
750
450
450
450
PT-3 PT-2
1200
PT-1
100
100
KEY PLAN
1800
PT-3 SECOND FLOOR
ELECTRICAL
6000 ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51
GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
1200
PHASE-1 SITE
OF FICE-2
P
U
DETAIL OF SPANDREL
CEMENT
GODOW N
6
5
4
3
2
1
P
U
2
P
U
SDB1
G+5 STA FF/L AB OU R
CANTEEN
1 : 10
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK
SECURITY SECURITY
RAMP
ENTRY EXIT
SURV EY NO. 49
ED MLC P
100 MM WALL SWEEP
1800
DEVELOPER
STORE
HOL DI NG
FIRST FLOOR
SEC URI TY
3000 CR OSSI
NG
LAYOUT
14.5m ROAD PRIVA TE
AGRICULTURE LAND
BUS TERMINAL
1200
CLIENT:
950
PT-2
4 GROUND FLOOR LTD. HYDERABAD
0
PROJECT PHASE
DESIGN DEVELOPEMENT
CONCRETE SPANDREL
PT-3 ARCHITECT AND STRUCTURAL CONSULTANT
PT-3
75
75
100 MM WALL SWEEP BRICK COLUMN
450 1000 HIGH SS RAILING
150
1250
No 6/A, Amit Plaza, JP Nagar, 3rd Phase
Bannerghatta Road,Bangalore-560076
Phone : +91-80-26581707/08/09
PT-2 PT-2 PT-3 Fax :+91-80-26582424 WebSite:www.trc.co.in
50 500 50
1050
CHECKED BY:Checker
18000
DRAWING TITLE
PT-3
PT-2
50 MM PROJECTION ENLARGED ELEVATIONS
IN PLASTER PAINTED
WITH APPROVED
COLOUR AND SHADE
STAIR LANDING
SHEET NUMBER
DETAIL OF COLUMN CAPITAL ENLARGED ELEVATION @ ENTRY TO STAIR
1 1 : 10 4 A3-02
1 : 10
DATE:02/28/2011 NORTH
ISSUE
No. Date Description Revision
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 17.a 18
850
12175 12450 10800 10800 10800 10800 10800 10800 10800 10800 10800 10800 10800 10800 10800 6225 6125
SLAB PER
18000
FHR
FHR CONCRETE
COLUMN
STRUCTURAL PROJECT TEAM
RAMP PARKING DECK DRG FIFTH FLOOR
15000 OWNER
3000
2 1 BRICK
RAMP EXPANSION JOINT A4-02 A3-02 COLUMN FOURTH FLOOR
PARKING DECK Infosys Technology Ltd.
500
CONCRETE 12000
3000
1800
RAMP PARKING DECK PARKING ON TERRACE THIRD FLOOR
9000
TRC ENGINEERING (I) PVT LTD
3000
1800
1200
PARKING DECK PARKING DECK COLUMN RAMP DOOR DOOR SECOND FLOOR
PARKING DECK
6000
3000
BRICK
1200
2250 1800
PARKING DECK PARKING DECK COLUMN PARKING DECK FIRST FLOOR
3000
3000
TWO WHEELER
PARKING TWO WHEELER PARKING GROUND FLOOR
2000
0
3000
PLINTH BEAM
REFER STRUC UNDER GROUND WATER TANKS LIFT PIT
DRAWING FOR DETAIL. REFER STRUCTURAL PLINTH BEAM
REFER STRUCTURE AND SERVICES DRG DRAWING FOR DETAIL. REFER STRUCTURAL
DRAWING FOR DETAIL.
CIRCULAR COLUMN
REFER STRUCTURE DRG
LONGITUDINAL SECTION-3
3 1 : 200
A B C D E F G H
12275 16750 16000 16000 15750 6950 6225
1550
CONCRETE
CONCRETE
SPANDREL
1050 HIGH
PARAPET
COLUMN CAPITAL CONCRETE
SPANDREL
KEY PLAN
1800
3000
ELECTRICAL
750 DEEP
2250
750
ECC BLOCK
G+14
SUB STATION
4ACRES
CONCRETE BEAM RAMP SURV EY NO. 51
1800
FIFTH FLOOR
1200
3000
CONCRETE
2250
750
225 THK CONCRETE BEAM RAMP
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1
GA S B A NK
AGRICULTURE LAND
SPANDREL FLOOR SLAB
PHASE-1
1800
FOURTH FLOOR
1200
SITE
OF FICE-2
PARKING DECK P
U
SITE OFF ICE-1
RAMP
G+5 G+5 STORE M E
T
S
IM S
12000
CEMENT
GODOW N
3000
6
5
4
3
2
1
P
U
750
2250
P
U
RAMP SDB1
G+5
1800
STA FF/L AB OU R
THIRD FLOOR
CANTEEN
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK
9000
ENTRY EXIT
VIP PA RKI NG
3000
SUBWAY 12
M
1 2
3 4 5
67
PUBLIC A REA
750 MM DEEP
8 9 CR
OSSI
10
SURV EY NO. 54
2250
NG
750
18.19 ACRES
COLUMN CAPITAL SURV EY NO. 49
SECOND FLOOR
503 lv l.,
3000
RAMP
2250
750
CR OSSI
NG
3000
750
2250
REFER STRUCTURAL RAMP
DRAWING FOR DETAIL. PARKING DECK GROUND FLOOR
CLIENT:
1200
PLINTH BEAM
REFER STRUCTURAL
FFL = 506.0 M
M/S INFOSYS TECHNOLOGIES
DRAWING FOR DETAIL.
LTD. HYDERABAD
PROJECT PHASE
DESIGN DEVELOPEMENT
12175 12450
FLOOR SLAB
10800 10800 10800 10800 10800 10800 10800 850 10800 10800 10800 10800 10800 10800 12350
TRC Engineering (I) Pvt Ltd.
WATER TANK
STAIR HEAD
No 6/A, Amit Plaza, JP Nagar, 3rd Phase
COLUMN
COLUMN CAPITAL ROOM 1
CAPITAL
A4-02
Bannerghatta Road,Bangalore-560076
25 THK
225 MM THICK
2"X1" REVEAL FLOOR SLAB CONCRETE 1050 HIGH
SLAB 50 MM EXPANSION Phone : +91-80-26581707/08/09
COLUMN SPANDREL 1
JOINT COLUMN CAPITAL Fax :+91-80-26582424 WebSite:www.trc.co.in
SEE DEATIL A3-02 TERRACE
TERRACE
225 MM 1050 HIGH 18000
3000
STAIRCASE THICK SLAB SPANDREL
DOOR PARKING DECK TERRACE FIFTH FLOOR
CONCRETE SPANDREL
15000
3000
GLAZED PARKING DECK PARKING DECK
CONCRETE
SPANDREL
FOURTH FLOOR
FOR CO-ORDINATION
WINDOW COLUMN
1050 HIGH CAPITAL 12000 DESIGNED BY:Designer
3000
LIFT SPANDREL 750 DEEP PARAPET
SHAFT BEYOND CONCRETE BEAM PARKING DECK PARKING DECK THIRD FLOOR DRAWN BY:Author
3000
225 MM THICK
SLAB
GLAZED PARKING DECK PARKING DECK SECOND FLOOR SCALE: 1 : 200
VENTILATOR
6000
3000
CONCRETE CONCRETE CONCRETE OPEN
COLUMN COLUMN SPANDREL STAIRS
DRAWING TITLE
PARKING DECK PARKING DECK FIRST FLOOR
3000
3000
PLINTH BEAM
FGL = 506.0 M REFER STRUCTURAL
PARKING DECK GROUND FLOOR
DRAWING FOR DETAIL. PARKING DECK
0
BUIDING SECTIONS
LIFT PIT
REFER STRUCTURAL CONCRETE
COLUMN 100 MM THK CONCRETE SLAB PLINTH BEAM
DRAWING FOR DETAIL. PER STRUCTURAL DRG REFER STRUCTURAL
DRAWING FOR DETAIL.
SHEET NUMBER
LONGITUDINAL SECTION-1
1 1 : 200 A4-01
DATE:02/28/11 NORTH
ISSUE
9 10 11 12 1 2
12175 No. Date Description Revision
10800 850 10800
COLUMN CAPITAL COLUMN CAPITAL COLUMN CAPITAL
1550
PER DETAIL PER DETAIL PER DETAIL COLUMN CAPITAL 750 MM BEAM
1050 500
PER DETAIL PER STRUC DRG
1800
TERRACE
1200
3000
COLUMN COLUMN COLUMN
3000
PER STRUCTURAL DRG PER STRUCTURAL DRG PER STRUCTURAL DRG
SPANDREL R.C.C. BEAM ALONG RAMP RAMP RAILING
1800
SEE DETAIL (SEE STRUC. DRG.) SEE DETAIL PROJECT TEAM
FIFTH FLOOR
15000
250 THK SLAB OWNER
SECOND FLOOR RAMP (SEE STRUC. DRG.)
Infosys Technology Ltd.
6000
1200
750
ARCHITECT
3000
TRC ENGINEERING (I) PVT LTD
RAMP RAILING
SEE DETAIL EXPANSION 300 300
3000
JOINT 3725 3725 3725
SPANDREL
1800
SEE DETAIL FOURTH FLOOR
RAMP RAILING 12000
SEE DETAIL
FIRST FLOOR RAMP (SEE STRUC. DRG.)
3000
3000
2250
WALL SWEEP
3000
SEE DETAIL MASONRY WALL
SPANDREL R.C.C. BEAM ALONG RAMP 750 MM BEAM
(SEE STRUC. DRG.) PER STRUC DRG
THIRD FLOOR
100 THK 9000
750
SLAB PER STRUC.
GROUND FLOOR
0
MASONRY WALL
3000
2250
SPANDREL
SEE DETAIL
3000
750 MM BEAM
WATER TANK WATER TANK 250 THK SLAB PER STRUC DRG
DRIVER'S LOUNGE SECOND FLOOR
6000
750
3000
2250
SECTION THRU - UNDER GROUND WATER TANK SPANDREL KEY PLAN
2 1 : 50 SEE DETAIL PARKING DECK FIRST FLOOR
ELECTRICAL
3000 ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51
1950
PHASE-2 G+5 G+5
GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
COLUMN CAPITAL SPANDREL
PHASE-1 SITE
OF FICE-2
3000
SITE OFF ICE-1
P
U
6
5
4
3
2
1
P
U
SDB2
G+5
UNIT
STORE
CEMENT
GODOW N
M E
T
S
IM S
P
U
SPANDREL SDB1
G+5 STA FF/L AB OU R
CANTEEN
SEE DETAIL
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK
1050
SECURITY SECURITY
10800 850
RAMP
1550
ENTRY EXIT
SURV EY NO. 49
ED MLC P
DEVELOPER
STORE
GROUND FLOOR
HOL DI NG
SEC URI TY
PARKING AREA
SINGAPO RE ENTRANCE
26m WIDE ROAD
TERRACE 0 CR OSSI
NG
LAYOUT
14.5m ROAD PRIVA TE
EXPANSION
3000
JOINT 10BLR023
2000
LIFT MACHINE
ROOM PROJECT PHASE
FOURTH FLOOR
DESIGN DEVELOPEMENT
PARKING AREA FOURTH FLOOR 12000
12000 ARCHITECT AND STRUCTURAL CONSULTANT
3000
750 MM BEAM SPANDREL
3000
250 THK
1800
SLAB THIRD FLOOR ENGINEERING (I) PVT LTD
225 THK SLAB
PARKING AREA THIRD FLOOR 9000
STAIR RAILING
9000 SEE DETIAL
STAIR TRC Engineering (I) Pvt Ltd.
1200
200 THK WALL
3000
SPANDREL SEE DETAIL
FOR DB MOUNTNG
3000
1800
750 MM BEAM Phone : +91-80-26581707/08/09
SECOND FLOOR
PER STRUCTURAL DRG Fax :+91-80-26582424 WebSite:www.trc.co.in
PARKING AREA SECOND FLOOR 6000
6000
1200
3000
200 THK WALL SPANDREL FOR CO-ORDINATION
3000
1800
SLAB FIRST FLOOR CHECKED BY:Checker
250 THK SLAB
PARKING AREA FIRST FLOOR 3000 SCALE: 1 : 50
3000
DRAWING TITLE
200 THK WALL
1200
FOR DB MOUNTNG
3000
&
3000
CONTROL
SWITCH
ENLARGED SECTIONS
1050
100 THK SLAB
GROUND FLOOR
100 THK SLAB
GROUND FLOOR 0
0 SHEET NUMBER
ENLARGED SECTION -1 SECTION TO SHOW DISTRIBUTION BOARD & CONTROL SWITCH A4-02
1 1 : 50
4 1 : 50
DATE:02/28/11 NORTH
ISSUE
E No. Date Description Revision
5
A6-01
BOTTOM OF FLOOR SLAB. WALL PAINTED WITH
PAINT OF APPROVED SHADE AND APPROVED COLOUR AND SHADE
COLOUR AS PER SPEC (PT-08) (PT-06)
3000
SIGNAL RED
0520
EQ 450 EQ
250
TERRACE TERRACE
18000 18000
450 PT-07 250
PLASTIC EMULSION PAINT OF PROJECT TEAM
APPROVED COLOUR AND SHADE OWNER
(PT-07)
3000
Infosys Technology Ltd.
565
2775
3000
(PT-07) SILVER BLUSH
M502
FIRST FLOOR
3000
3000
1 : 20 OLD BRICK BROWN
8613
SLAB
3000
(PT-07) (PT-08) PEACOCK BLUE
E 0161
FLOOR NUMBER 225 THK
LIFT CALL POINT SLAB
SECOND FLOOR SECOND FLOOR
6000 6000 KEY PLAN
ELECTRICAL
ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51
3000
CORNICE AS LILY GOLD YELLOW
LIFT DOOR PHASE-2
FUT URE EXPANSION
SDB5
G+5
FUT URE EXPANSION
SDB4
G+5
250
250
PHASE-1
FOOD COURT -1
GA S B A NK
AGRICULTURE LAND
STANDARDS
SITE
OF FICE-2
P
U
CEMENT
GODOW N
6
5
4
3
2
1
P
U
450
250
P
U
PT-07
SDB1
G+5 STA FF/L AB OU R
CANTEEN
250 250
LIFT:ELENESSA(P21) RAMP
SECURITY
ENTRY EXIT
SECURITY
3000 3000
SUBWAY VIP PA RKI NG
12
M
1 2
3 4 5
67
8 9 CR
OSSI
PUBLIC A REA
10 NG
SURV EY NO. 54
AS PER SPEC
18.19 ACRES
SURV EY NO. 49
ED MLC P
DEVELOPER
STORE
HOL DI NG
SEC URI TY
SINGAPO RE ENTRANCE
2775
PRIVA TE
LAYOUT
3000
150 MM ITALIAN OLIVE GREEN
AGRICULTURE LAND
BUS TERMINAL
SKIRTING 7823
PT-06 LIFT
450
12 THK FLOOR
4
TILE PER SPEC LOBBY 3 PARKING
A6-01
2 DECK
12 THK CEMENT
250 500 1800 250 MORTAR
2300 250 THK ENGINEERING (I) PVT LTD
SHEAR WALL RCC SLAB AS PER
STRUCTURAL DRG
1025
1 SHADE (FT-01)
Bannerghatta Road,Bangalore-560076
Phone : +91-80-26581707/08/09
Fax :+91-80-26582424 WebSite:www.trc.co.in
LOBBY-1
4010X7400
1800
FLOORING DETAIL
6
5975
1:1
3 FOR CO-ORDINATION
LIFT (TYP) DESIGNED BY:Designer
1200
2
LEGEND:
A6-01
2 DRAWN BY:Author
FHR CHECKED BY:Checker
200 THK
1025
SCALE:As indicated
FT1
1: PT-06 - WALL PAINT OF APPROVED SHADE AND COLOUR AS
MASONRY
WALL
PER SPEC DRAWING TITLE
600 800
450
100
WALL PAINTED WITH
APPROVED COLOUR AND SHADE (PT- FLOOR NUMBER
06)
1200
OPENING EQ 450 EQ
2775
250
250
1 1
250 PROJECT TEAM
100
450
CALL POINT PT-07 OWNER
Infosys Technology Ltd.
LIFT:ELENESSA(P21) ARCHITECT
565
2775
PT-06 AS PER SPEC
950
TRC ENGINEERING (I) PVT LTD
PT-06 FLOOR TILE AS
PER SPEC. (SEE DETAIL
FLOOR TILE AS
NO.6/A6-01)
PER SPEC. (SEE DETAIL
450
FIRST FLOOR PT-07 NO.6/A6-01)
3000
B 7
A6-02
FOURTH FLOOR FOURTH FLOOR ELEVATION (TYP FOR ALL FLOORS)
12000 12000 4 1 : 20
3000
OLD BRICK BROWN 17
8613
2300
1800
THIRD FLOOR THIRD FLOOR
9000 9000
SHEAR WALL
3000
OVERHEAD HEIGHT
ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51
6000 6000
GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
PHASE-1
2750
2400
1200
SITE
OF FICE-2
LIFT DOOR AS
SITE OFF ICE-1
P
U
CEMENT
GODOW N
PER STANDARDS
6
5
4
3
2
1
P
U
P
U
SDB1
3000
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK
ENTRY EXIT
SECURITY
7942
SUBWAY VIP PA RKI NG
12
M
1 2
3 4 5
67
8 9 CR
OSSI
PUBLIC A REA
10 NG
SURV EY NO. 49
ED MLC P
DEVELOPER
STORE
SEC URI TY
SLAB CR OSSI
NG
26m WIDE ROAD
LAYOUT
PRIVA TE
AGRICULTURE LAND
BUS TERMINAL
3000 3000
LIFT CLIENT:
LOBBY
3000
FINISHES
WALL : PAINTED STEEL SHEET PER LIFT STANDARD AND APPROVED
PATTERN
17 DOORS : PAINTED STEEL SHEET WITH GLASS WINDOWS PER LIFT
STANDARD AND APPROVED PATTERN ENGINEERING (I) PVT LTD
TRANSFORM PANEL : PAINTED STEEL SHEET PER LIFT STANDARD AND APPROVED
125 125 2300 250 PATTERN
2
FRONT RETURN PANEL : STAINLESS STEEL MIRROR
1050 HIGH FLOOR TILE OF APPROVED
SPANDREL
A6-02
2300
COLOUR AND SHADE (FT-01) FLOOR : VINYL TILES
TRC Engineering (I) Pvt Ltd.
250
CEILING : METALLIC SURFACE OF APPROVED TEXTURES AND DESIGN No 6/A, Amit Plaza, JP Nagar, 3rd Phase
Bannerghatta Road,Bangalore-560076
B
775
Phone : +91-80-26581707/08/09
Fax :+91-80-26582424 WebSite:www.trc.co.in
1200
2750
3
250 THK SHEAR WALL
3
STEEL PIPE BOLLARDS FOR CO-ORDINATION
775
A6-02 4 @ 1500C/C
LEGEND: DESIGNED BY:Designer
250
4 PER SPEC
PIT DEPTH
DRAWING TITLE
775
37
EQ 450 EQ
250
1 1 1
PT-06
450
PT-07 PT-07 PROJECT TEAM
250 OWNER
Infosys Technology Ltd.
565
2775
450
PT-07 PT-07
1200
FLOOR TILE
AS PER SPEC. (SEE DETAIL NO.6/A6-01)
ELEVATION 3 (TYP FOR ALL FLOORS) ELEVATION 4 (TYP FOR ALL FLOORS)
3 1 : 20
4 1 : 20
KEY PLAN
ELECTRICAL
ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51
2850
FUT URE EXPANSION FUT URE EXPANSION
SDB5 SDB4
PHASE-2 G+5 G+5
PT-06 PT-06
450
SIGNAL RED
PT-07 0520
FUT URE EXPANSION
FOOD COURT -2
PHASE-1
FOOD COURT -1
GA S B A NK
SITE
OF FICE-2
AGRICULTURE LAND
SITE OFF ICE-1
P
U
CEMENT
GODOW N
6
5
4
3
2
1
P
U
P
U
2775
SDB1
G+5 STA FF/L AB OU R
CANTEEN
565
TERRACE TERRACE
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK
SECURITY SECURITY
RAMP
ENTRY EXIT
FD1 PROPOS
ED MLC P
DEVELOPER
STORE
503 lv l.,
HOL DI NG
SEC URI TY
CR OSSI
NG
450
LAYOUT
3000
AGRICULTURE LAND
BUS TERMINAL
REGAL JEWEL VIOLET
150 MM 150 MM 7150
CLIENT:
SKIRTING SKIRTING
PT-07 PT-07
FIRST FLOOR
FIFTH FLOOR
15000
FIFTH FLOOR
15000
M/S INFOSYS TECHNOLOGIES
3000 LTD. HYDERABAD
3000
SILVER BLUSH PROJECT NUMBER
M502
ELEVATION 2 (TYP FOR ALL FLOORS)
2 1 : 20 10BLR023
A6-03
PARKING TILE FLOORING OF
APPROVED COLOUR AND SHADE OLD BRICK BROWN
8613
214
(FT-01) J
225 THK
SLAB
F
THIRD FLOOR THIRD FLOOR
2800
9000 9000
ENGINEERING (I) PVT LTD
250 THK
1025
2550
SHEAR WALL
3000
PEACOCK BLUE
TRC Engineering (I) Pvt Ltd.
1200
0161
5
No 6/A, Amit Plaza, JP Nagar, 3rd Phase
6950
2
LILY GOLD YELLOW LIFT DOOR AS
1200
CHECKED BY:Checker
G
1: PT-06 - WALL PAINT OF APPROVED SHADE AND COLOUR AS SCALE:As indicated
1200
7823
7 2: PT-07 - WALL PAINT OF APPROVED SHADE AND COLOUR AS
LIFT LOBBY
PER SPEC LOBBY -3 DETAILS (TYP) FOR
ALL FLOORS
775
CONCRETE COLUMN
PER DETAIL
200
PROJECT TEAM
9 9.1 OWNER
D1 Infosys Technology Ltd.
ARCHITECT
100 MM THK MASONRY WALL
400 TRC ENGINEERING (I) PVT LTD
1250
100
200 200
4700 3250 200
CHANGE ROOM
CCTV CONTROL ELECTRICAL SHAFT
2250
1300
MONITORING ROOM
900
D1
DATA SHAFT
4370
100
200
900
200 MM THK MASONRY WALL
200
200 THK
200
ELECTRICAL AND UPS ROOM 200 THK MASONRY WALL
6200
FHR-11
200 THK MASONRY WALL
MASONRY WALL
COLUMN
PER STRUC DRG
10350
3750
RAMP LINE ABOVE KEY PLAN
ELECTRICAL
ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51
900
D1
FUT URE EXPANSION FUT URE EXPANSION
SDB5 SDB4
PHASE-2 G+5 G+5
GA S B A NK
3
P
U
1 : 20
CEMENT
GODOW N
6
5
4
3
2
1
P
U
P
U
SDB1
G+5 STA FF/L AB OU R
CANTEEN
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK
SECURITY SECURITY
RAMP
ENTRY EXIT
SURV EY NO. 49
ED MLC P
DEVELOPER
STORE
PROPOS
930
503 lv l.,
HOL DI NG
SEC URI TY
CR OSSI
NG
LAYOUT
14.5m ROAD PRIVA TE
AGRICULTURE LAND
BUS TERMINAL
CLIENT:
G
M/S INFOSYS TECHNOLOGIES
200 THK
LTD. HYDERABAD
MASONRY WALL
PROJECT NUMBER
10BLR023
ELECTRICAL ROOM DETAIL @ GROUND FLOOR
2 1 : 20
PROJECT PHASE
DESIGN DEVELOPEMENT
16
1000
Bannerghatta Road,Bangalore-560076
200
Phone : +91-80-26581707/08/09
Fax :+91-80-26582424 WebSite:www.trc.co.in
B B
1200
1200
FOR CO-ORDINATION
DESIGNED BY:Designer
OPENING IN SLAB
450X450 DRAWN BY:Author
PER STRUC.
1000 ROOM DRAWING TITLE
FHR SHAFT WALL CEILING FLOORING
OPENING IN SLAB ENLARGED PLANS
FHR SHAFT
450X450
OPENING
PER MANUFACTURER CEMENT CEMENT ANTI SKID FLOOR TILES
PLAN OF FHR-5 (TYP) PLAN OF FHR-3,4 (TYP) PAINT PAINT 600X600 PER SPEC. SHEET NUMBER
1 1 : 20
4 1 : 20
A6-04
DATE:02/28/11 NORTH
ISSUE
D.1 No. Date Description Revision
100 THK
URINAL STALLS 200X300 TILES EQ 1900 EQ 200X300 TILES MASONRY WALL
PER SPEC PER SPEC PER DETAIL 600x600
VENTILATORS
MIRROR
PER SPEC
1125
PROJECT TEAM
1350
750
1125
OWNER
URINAL
50 MM GRANITE SLAB PARTITION Infosys Technology Ltd.
2100
75
OF APPROVED COLOR
2100
ARCHITECT
300
TRC ENGINEERING (I) PVT LTD
75
900
750
600
900
410
SECOND FLOOR
495 625 625 625 400
COUNTER TOP WOODEN CABINET 6000
WASH BASIN DOOR WALL HUNG 750 750
PER SPEC WC PER SPEC
D.1
1
4
A6-05
4675 200
200X300 TILES
200
D2
PER SPEC.
100
KEY PLAN
EQ
1125
900
DOOR PER D1
DETAIL
2100
75
D1
P
U
M E
T
S
IM S
TOILET
1200
6
5
4
3
2
1
P
U
4650X5975
900
COUNTER TOP
750
WASH BASIN
PER SPEC.
SECOND FLOOR PRIVA TE
LAYOUT
FT-2 6000
2625
CLIENT:
4 URINAL STALLS PER SPEC WC PER SPEC
PER SPEC
M/S INFOSYS TECHNOLOGIES
SECTIONAL ELEVATION 4
4 LTD. HYDERABAD
5996
DOOR PER
400
1 : 20
100
DETAIL
750 650 750 650 PROJECT NUMBER
100
625
D2 D2
625
DESIGN DEVELOPEMENT
300 300
5
3170
A6-05
ARCHITECT AND STRUCTURAL CONSULTANT
2
A6-05 WASH BASIN
625
WASH BASIN
2271
PER SPEC
PER SPEC.
WALL MOUNTED
75
D2 D2
WC PER SPEC.
495
900
750
TRC Engineering (I) Pvt Ltd.
D.1 SECOND FLOOR
No 6/A, Amit Plaza, JP Nagar, 3rd Phase
6000
300 300 Bannerghatta Road,Bangalore-560076
Phone : +91-80-26581707/08/09
1 750 750 Fax :+91-80-26582424 WebSite:www.trc.co.in
A6-05
DRAWN BY:Author
3 1 : 20
5 1 : 20 SCALE: 1 : 20
1 2
D D.1
11400
STRL. COLUMN 200 MASONRY WALL BOTTOM OF FLOOR SLAB.
750 MM BEAM PAINT OF APPROVED SHADE AND
(SEE DETAIL) PER STRUC DRG COLOUR AS PER SPEC(PT-08) THIRD FLOOR
9000
C
DOOR KITCHEN SINK RCC COLUMN
COLUMN COLUMN IN ELEVATION SEE DETAIL PER SPEC
PROJECT TEAM
3000
PER STRUC DRG PER STRUC DRG
PT-06 PT-06
DRIVER'S LOUNGE OWNER
21400X11800 Infosys Technology Ltd.
MASONRY WALL 150 THK SKIRTING PT-07 MASONRY WALL
SECOND FLOOR ARCHITECT
6000 TRC ENGINEERING (I) PVT LTD
FLOOR TILE AS
PER SPEC
ELEVATION 2
2 1 : 50
5
GLAZED WALL SWEEP
WINDOW SEE DETAIL THIRD FLOOR
9000
4 A6-07 2 200X300 WALL TILES
ASPER SPEC
FLOORING TILE OF
APPROVED COLOUR
3000
AND SHADE (FT-02) 3 20MM THK GRANITE
COUNTER TOP PT-06
SEE DETAIL
G+14
4ACRES
SURV EY NO. 51
ELEVATION 3
FUT URE EXPANSION FUT URE EXPANSION
SDB5 SDB4
PHASE-2 G+5 G+5
STRL. COLUMN
800X800 (SEE DETAIL) 3 1 : 50
FUT URE EXPANSION
FOOD COURT -2
P
U
PHASE-1
FOOD COURT -1
GA S B A NK
CEMENT
GODOW N
6
5
4
3
2
1
P
U
P
U
SDB1
G+5 STA FF/L AB OU R
CANTEEN
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK
SECURITY SECURITY
RAMP
ENTRY EXIT
SURV EY NO. 49
D ED MLC P
DEVELOPER
STORE
HOL DI NG
SEC URI TY
CR OSSI
NG
LAYOUT
14.5m ROAD PRIVA TE
AGRICULTURE LAND
BUS TERMINAL
CLIENT:
4875 6900 PER STRUC DRG APPROVED COLOUR AND SHADE (PT-06) THIRD FLOOR
9000
10BLR023
D1
DOOR (D1) COLUMN PT-06 DESIGN DEVELOPEMENT
20MM THK GRANITE PT-06 SEE DETAIL PT-06
COUNTER TOP PER STRUC DRG
TOILET ARCHITECT AND STRUCTURAL CONSULTANT
4650X5975 PANTRY WINDOW (W) WINDOW (W)
150 THK SKIRTING (PT-07) SEE DETAIL SEE DETAIL
SECOND FLOOR
6000
6196
900
D1 FLOOR TILE AS
4996
PER SPEC
ENGINEERING (I) PVT LTD
D2 D2
600 WIDE
PLATFORM ELEVATION 4
2500
WC WC 4 1 : 50
TRC Engineering (I) Pvt Ltd.
FINISHING SCHEDULE No 6/A, Amit Plaza, JP Nagar, 3rd Phase
D.1
WALL CEILING FLOORING Bannerghatta Road,Bangalore-560076
Phone : +91-80-26581707/08/09
Fax :+91-80-26582424 WebSite:www.trc.co.in
REFER TOILET DETAIL 200 THK
MASONRY WALL CEMENT CEMENT
PAINT PAINT ANTI SKID FLOOR TILES
1 2 600X600 PER SPEC.
WALL PAINTED WITH
FOR CO-ORDINATION
PLAN 12175
APPROVED COLOUR AND SHADE (PT-06)
1 1 : 50
DESIGNED BY:Designer
DRAWING TITLE
TV PT-06
MASONRY WALL 1: PT-06 - WALL PAINT OF APPROVED SHADE AND COLOUR
1200
WINDOW SCHEDULE:
SL.
TYPE MARK WIDTH HEIGHT COUNT DESCRIPTION
NO.
ALUMINUM FRAME
2175
2175
2175
1. W 900 900 9
2100
2100
2100
WITH GLASS
1500
50MM THK −
ENAMEL
PAINTED − 2 HR
1100
1100
1100
FIRE RATED
75 75 75 75
FLUSH DOOR
SHUTTERS
ENAMEL PAINTED
ON SURFACE
WITH APPROVED
35 COLOR
SAL WOOD
900 750 1000
200
FRAME 100X75
100
KEY PLAN
D1 D2 FD1 ELECTRICAL
SUB STATION
75
ECC BLOCK
G+14
4ACRES
SURV EY NO. 51
DOOR DETAIL
GA S B A NK
FUT URE EXPANSION
AGRICULTURE LAND
PHASE-1
1
SITE
OF FICE-2
P
U
A
SDB3 SDB2 UNIT
G+5 G+5 STORE M E
T
S
IM S
CEMENT
GODOW N
6
5
4
3
2
1
P
U
SDB1
G+5 STA FF/L AB OU R
CANTEEN
ALUMINUM −
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK
SECURITY SECURITY
RAMP
ENTRY EXIT
PUBLIC A REA
SECTION AS
1 2
3 4 5
67
8 9 CR
OSSI
10 NG
SURV EY NO. 49
ED MLC P
DEVELOPER
STORE
PROPOS
APPROVED −
503 lv l.,
HOL DI NG
SEC URI TY
AS APPROVED 50
CLIENT:
35
M/S INFOSYS TECHNOLOGIES
150
80
LTD. HYDERABAD
35
900
50 25 PROJECT NUMBER
10BLR023
PROJECT PHASE
TYPICAL MS DOOR FRAME PROFILE
B SCALE: N.T.S.
DESIGN DEVELOPEMENT
W
ENGINEERING (I) PVT LTD
WINDOW DETAIL
2 SCALE: 1:10
ALUMINUM − TRC Engineering (I) Pvt Ltd.
SECTION AS
ALUMINUM MASONRY WALL
APPROVED −
LOUVERS No 6/A, Amit Plaza, JP Nagar, 3rd Phase
POWDER COATED
/ANODIZED MASONRY WALL Bannerghatta Road,Bangalore-560076
ALUMINUM FINISH Phone : +91-80-26581707/08/09
AS APPROVED Fax :+91-80-26582424 WebSite:www.trc.co.in
HOLLOW METAL
DOOR FRAME
HOLLOW METAL T ANCHORS AT EACH
DOOR FRAME JAMBOOR FRAME
FOR CO-ORDINATION
100
600
25 SCALE: 1 : 10
TO FIN. FLR.
A6-07
DATE:02/28/11 NORTH
ISSUE
1 No. Date Description Revision
H
COLUMN CAPITAL B
SEED DETAIL B 375
A
A A7-01
B 300
A7-01
COLUMN PER A7-01
STRUC DRG
250 MM THK 250 MM THK
1050
SPANDREL SPANDREL
225 THK SLABS
TERRACE TERRACE
PER STRUC DRG
THIRD FLOOR THIRD FLOOR 18000 18000
750
9000 9000
750
STAIRCASE
B PROJECT TEAM
1200
100 MM WALL B
3000
3000
A7-01
1200
750 MM A SWEEP A7-01
3000
3000
BEAM PER STRUC A7-01
OWNER
DRG. 750 MM BEAM Infosys Technology Ltd.
1050
PER STRUC 100 MM WALL
1050
DRG. SWEEP ARCHITECT
225 THK SLAB FIFTH FLOOR FIFTH FLOOR
SECOND FLOOR
PER STRUC DRG. SECOND FLOOR TRC ENGINEERING (I) PVT LTD
15000 15000
750
6000 6000
750
1200
3000
3000
750 MM BEAM
1200
3000
3000
PER STRUC DRG.
RAMP PER
1050
250 MM THK
250 MM THK SPANDREL STRUC DRG
1050
SPANDREL FOURTH FLOOR FOURTH FLOOR
FIRST FLOOR FIRST FLOOR 12000 12000
3000
750
3000 3000
750
1200
3000
3000
100MM THK
1200
3000
3000
WALL SWEEP 250 MM THK
WALL
225 THK SLAB PER
1050
1050
PLINTH BEAM
STRUC DRG.
1050
PER STRUC DRG
THIRD FLOOR THIRD FLOOR
GROUND FLOOR GROUND FLOOR 9000 9000
750
750
750 MM BEAM PER
0 0
STRUC DRG.
1200
1200
100 MM WALL
3000
3000
SWEEP
225 THK SLAB PER
STRUC DRG.
1050
1050
250 MM THK
WALL SECTION-2 WALL SECTION-3 SPANDREL
2 1 : 50
3 1 : 50
SECOND FLOOR SECOND FLOOR
6000 6000
750
750
KEY PLAN
F 250 MM THK 250 MM THK
1200
1200
3000
3000
SPANDREL SPANDREL ELECTRICAL
ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51
1050
1050
300 A STRUC DRG. FUT URE EXPANSION
GA S B A NK
AGRICULTURE LAND
STRUC DRG.
FOOD COURT -1
FOOD COURT -2
PHASE-1 SITE
OF FICE-2
A7-01
FIRST FLOOR FIRST FLOOR
P
U
CEMENT
GODOW N
6
5
4
3
2
1
P
U
3000 3000
750
750
P
U
SDB1
G+5 STA FF/L AB OU R
CANTEEN
750 MM BEAM
1050
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK
SECURITY SECURITY
ENTRY EXIT
SURV EY NO. 49
TERRACE PROPOS
ED MLC P
DEVELOPER
STORE
1200
503 lv l.,
HOL DI NG
3000
SEC URI TY
3000
14m WIDE ROAD (FUTURE
CR OSSI
NG
2250
PLINTH BEAM PER 14.5m ROAD PRIVA TE
LAYOUT
0 1050
WALL SWEEP STRUC DRG
1200
B
3000
A7-01
GROUND FLOOR GROUND FLOOR CLIENT:
225 THK SLAB PER 0 0
STRUC DRG
1050
WALL SECTION-5
WALL SECTION-4 5 1 : 50
4 PROJECT NUMBER
1200
1 : 50
3000
PROJECT PHASE
FOURTH FLOOR
COLUMN CAPITAL
PER DETAIL DESIGN DEVELOPEMENT
12000
750
F
3000
SPANDREL
225 THK SLAB PER
STRUC DRG F
225 THK SLAB PER
1550
STRUC DRG.
550 550
1050
100
9000 CONCRETE COLUMN 9000 100 MM THK
750
100
WALL SWEEP
PROJECTION
TRC Engineering (I) Pvt Ltd.
1200
450
3000
3000
50
No 6/A, Amit Plaza, JP Nagar, 3rd Phase
225 THK SLAB
950
225 THK SLAB PER
1050
450
PER STRUC DRG STRUC DRG
1800
STRUC DRG.
150
SECOND FLOOR SECOND FLOOR Phone : +91-80-26581707/08/09
1800
6000 6000
TERRACE Fax :+91-80-26582424 WebSite:www.trc.co.in
750
50
450
SPANDREL STRUC DRG
1200
650
3000
3000
100 MM THK
225 THK SLAB PER WALL SWEEP
100 MM THK
FOR CO-ORDINATION
STRUC DRG. WALL SWEEP DESIGNED BY:Designer
1050
100
FIRST FLOOR PER STRUC DRG. FIRST FLOOR 25 25 CHECKED BY:Checker
3000 3000
750
SCALE:As indicated
DRAWING TITLE
1200
100 MM WALL
3000
3000
SWEEP TYPICAL DETAIL OF SPANDREL WITH TEXTURE TYPICAL DETAIL OF PLAIN SPANDREL
A 1 : 20
B 1 : 20 WALL SECTIONS
PLINTH BEAM
1050
SHEET NUMBER
2
FD1 PT-05
TERRACE
10 R @ 150MM 10R @ 150MM 10 R @ 150MM 10 @ 150MM 10 R @ 150MM 10 @ 150MM 10 R @ 150MM 10 @ 150MM 10 R @ 150MM 10 @ 150MM 10 R @150 MM 10R @ 150mm
18000
=1500mm
PROJECT TEAM
SECOND FLOOR
6000
OWNER
3000
Infosys Technology Ltd.
= 1500 MM
FD1 ARCHITECT
25 MM DIA MS BALUSTERS
275
250 250
15000
25 MM DIA MS
=1500 MM
RAILING PER
SPEC
PT-05
3000
325
50 MM DIA
MS HANDRAIL RAIL
=1500 MM
FD1
AS PER SPEC
FOURTH FLOOR
12000 FD1
=1500 MM
4
A8-01
ST-1
3000
REFER
=1500 MM
FD1 STRUCTURAL DRG.
FIRST FLOOR
SS RAILING
3000
THIRD FLOOR
9000
PT-05
=1500 MM
FIRE DOOR
PER DETAIL
3000
=1500 MM
FD1 3
225 THK A8-01
FLOOR SLAB
SECOND FLOOR RAILING DETAIL
6000 3 1 : 20 KEY PLAN
=1500 MM
ELECTRICAL
ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51
3000
GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
PHASE-1
FD1 SITE OFF ICE-1
SITE
OF FICE-2
P
U
CEMENT
GODOW N
6
5
4
3
2
1
P
U
P
U
SDB1
G+5 STA FF/L AB OU R
CANTEEN
SECURITY SECURITY
RAMP
ENTRY EXIT
3000 SUBWAY 12
M
1 2
VIP PA RKI NG
3 4 5
67
8 9
10
CR
OSSI
NG
PUBLIC A REA
18.19 ACRES SURV EY NO. 54
=1500MM
SURV EY NO. 49
HOL DI NG
SEC URI TY
TREAD
SINGAPO RE ENTRANCE
26m WIDE ROAD
PT-05
CR OSSI
NG
LAYOUT
PRIVA TE
3000
14.5m ROAD
AGRICULTURE LAND
BUS TERMINAL
12 MM GROOVE
=1500 MM
FD1
100 THK CLIENT:
LANDING SLAB 12 MM THK KOTA STONE
GROUND FLOOR ON TREAD
0 M/S INFOSYS TECHNOLOGIES
LTD. HYDERABAD
SECTION - STAIR NO-1 12 THK CEMENT 15
MORTAR
RISER = 150 MM
2 1 : 50 PROJECT NUMBER
2 RCC RISER
6300 10BLR023
PROJECT PHASE
RCC COLUMN
1800 9T @ 300MM =2700MM 1800 DESIGN DEVELOPEMENT
10R @ 150MM =1500MM
ARCHITECT AND STRUCTURAL CONSULTANT
D.1
NOSING DETAIL
4 1:1
RCC COLUMN
ENGINEERING (I) PVT LTD
11 12 13 14 15 16 17 18 19 20
625
ST1 ST1
TRC Engineering (I) Pvt Ltd.
100
1500
1800
250
200 THK
MASONRY
RAILING (SEE WALL FOR CO-ORDINATION
DETAIL NO.3/A8-02) DESIGNED BY:Designer
CHECKED BY:Checker
UP
SCALE:As indicated
CIRCULAR COLUMN 9T @ 300MM 2000 9T @ 300MM 8100 9T @ 300MM 2000 9T @ 300MM 600 2100 150
PER STRUC.
=2700MM LANDING =2700MM =2700MM =2700MM
2600
450
3100
10R @ 150MM
=1500MM
M.S.HANDRAIL PROJECT TEAM
(REFER DETAIL
B NO.3/ A8-01) SECOND FLOOR SECOND FLOOR OWNER
6000 Infosys Technology Ltd.
BRICK COLUMN
ARCHITECT
2050
R.C.C. SLAB
10R @ 150MM
CIRCULAR COLUMN TRC ENGINEERING (I) PVT LTD
3000
=1500MM
SEE STRUC. DRG. REFER STRUC DRG
950
STEEL STAIR. A8-02
CONCRETE SPANDREL
6150
FIRST FLOOR REF. STRUC. DRG. (REFER DETAIL) FIRST FLOOR
3000
R.C.C. COLUMN
10R @ 150MM
=1500MM
9950 BRICK COLUMN
3000
STEEL STAIR.
REF. STRUC. DRG. GROUND FLOOR
B1 10R @ 150MM
0
= 1500MM
M.S.HANDRAIL
6000 (REFER DETAIL
NO.3/ A8-01)
SECTION -STAIR NO.2
2 1 : 50
10R @ 150MM =1500
9T @ 300MM =2700
KEY PLAN
10600
CONCRETE SPANDREL
(REFER DETAIL) ELECTRICAL
EQ
ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51
GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
PHASE-1
2000
SITE
OF FICE-2
EQ
P
U
CEMENT
GODOW N
6
5
4
3
2
1
P
U
P
U
SDB1
G+5 STA FF/L AB OU R
CANTEEN
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK
SECURITY SECURITY
RAMP
ENTRY EXIT
SURV EY NO. 49
ED MLC P
DEVELOPER
STORE
EQ
PROPOS 503 lv l.,
HOL DI NG
SEC URI TY
CR OSSI
NG
LAYOUT
14.5m ROAD PRIVA TE
AGRICULTURE LAND
RCC COLUMN
3000
BUS TERMINAL
EQ
50 MM DIA MS HANDRAIL STEEL STAIR. CLIENT:
RAIL AS PER SPEC REF. STRL. DRG. SECOND FLOOR
C 25 MM DIA MS BALUSTERS @ 6000
UP 1000MM C/C PER SPEC
M/S INFOSYS TECHNOLOGIES
LTD. HYDERABAD
RAILING AS 25 MM DIA MS RAILING
2500
BRICK 10BLR023
DESIGN DEVELOPEMENT
150
150
ENGINEERING (I) PVT LTD
150
16000
1500
2000
DESIGNED BY:Designer
DRAWN BY:Author
DN CHECKED BY:Checker
10R @ 150MM =1500
9T @ 300MM =2700
SCALE:As indicated
DRAWING TITLE
3000
TERRACE
10R @ 150MM 10R @ 150MM 10R @ 150MM 10R @ 150MM 10R @ 150MM 10R @ 150MM 10R @ 150MM 10R @ 150MM
18000
= 1500MM
PROJECT TEAM
OWNER
9.2 9.1
3000
Infosys Technology Ltd.
=1500MM
ARCHITECT
PT-05
TRC ENGINEERING (I) PVT LTD
FIFTH FLOOR
=1500MM 15000 SECOND FLOOR
6000
3000
=1500MM
RCC COLUMN
RAILING (SEE BEYOND
ST-1 FOURTH FLOOR
12000
DETAIL NO.3/A8-02)
=1500MM
3000
100 THK
THIRD FLOOR WINDOW RCC SLAB
9000 REFER WINDOW SCHEDULE 225 THK FLOOR
=1500MM
4
A8-01 SLAB
3000
FIRST FLOOR
=1500MM
SECOND FLOOR
6000 KEY PLAN
10 R @150mm
ELECTRICAL
ECC BLOCK SUB STATION
1500 MM
G+14
4ACRES
3000
SURV EY NO. 51
GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
PHASE-1 SITE
OF FICE-2
P
U
PT-05
SDB3 SDB2 UNIT
G+5 G+5 STORE M E
T
S
IM S
CEMENT
GODOW N
P
U
SDB1
FIRST FLOOR
G+5
3
STA FF/L AB OU R
CANTEEN
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK
1 : 20
SECURITY SECURITY
10R @ 150MM 10R @ 150MM
3000
RAMP
ENTRY EXIT
SURV EY NO. 49
3 ED MLC P
DEVELOPER
STORE
HOL DI NG
SEC URI TY
LAYOUT
3000
AGRICULTURE LAND
BUS TERMINAL
=1500MM
CLIENT:
GROUND FLOOR
0 M/S INFOSYS TECHNOLOGIES
LTD. HYDERABAD
SECTION-STAIR NO.3
2 1 : 50
PROJECT NUMBER
10BLR023
9.1 9.2 PROJECT PHASE
DOOR (SEE DOOR DETAILS)
DESIGN DEVELOPEMENT
200 THK
MASONRYWALL
FD1
1 2 3 4 5 6 7 8 9 10
750
ST1
ENGINEERING (I) PVT LTD
1500
UP
100
2
A8-03
TRC Engineering (I) Pvt Ltd.
150
150 No 6/A, Amit Plaza, JP Nagar, 3rd Phase
OPENING
RAILING (SEE Bannerghatta Road,Bangalore-560076
DETAIL NO.3/A8-02)
300
Phone : +91-80-26581707/08/09
1800
DESIGNED BY:Designer
100
DRAWN BY:Author
CHECKED BY:Checker
ST1
FINISHING SCHEDULE LEGEND:
750
SCALE:As indicated
H 13 12 11
DRAWING TITLE
WALL CEILING FLOORING 1: PT-05 - WALL PAINT OF APPROVED SHADE AND COLOUR AS
PER SPEC
LANDING TREAD RISER STAIR NO.3 DETAILS
100 1700 9T @ 300MM = 2700MM 1700 100
2: ST-1 -12MM THK KOTA STONE AS PER SPEC
10R @ 150MM = 1500MM
200 THK
CEMENT CEMENT KOTA KOTA NA
MASONRY WALL
PAINT PAINT STONE STONE
SHEET NUMBER
PLAN -STAIR NO.3 (TYPICAL FOR ALL FLOORS)
1 1 : 20
A8-03
DATE:02/03/11 NORTH
ISSUE
No. Date Description Revision
3350 9T @ 300MM 2000 9T @ 300MM 3550 9T @ 300MM 2000 9T @ 300MM
=2700MM =2700MM =2700MM =2700MM
14 15
1000
M.S.HANDRAIL
(REFER DETAIL
FIFTH FLOOR NO.3 A8-01) FIFTH FLOOR
15000
10R @ 150MM
RCC SLAB
=1500MM
REF. STRL. DRG.
PROJECT TEAM
M.S.HANDRAIL
(REFER DETAIL OWNER
3000
NO.3 A8-01) Infosys Technology Ltd.
ARCHITECT
STEEL STAIR.
10R @ 150MM
REF. STRL. DRG. TRC ENGINEERING (I) PVT LTD
=1500MM
FOURTH FLOOR FOURTH FLOOR
12000
M.S.HANDRAIL
10R @ 150MM
RCC SLAB (REFER DETAIL
=1500MM
REF. STRL. DRG. NO.3 A8-01)
3000
CONCRETE SPANDREL BEYOND STEEL STAIR.
CONCRETE SPANDREL BEYOND REF. STRL. DRG.
10R @ 150MM
=1500MM
THIRD FLOOR
9000
SURV EY NO. 51
ELECTRICAL
SUB STATION
4ACRES
GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
PHASE-1
P
U
CEMENT
GODOW N
P
U
SDB1
G+5 STA FF/L AB OU R
CANTEEN
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK
SECURITY SECURITY
RAMP
ENTRY EXIT
ST1 ST1
OSSI
10 NG
SURV EY NO. 49
ED MLC P
DEVELOPER
STORE
HOL DI NG
SEC URI TY
CR OSSI
NG
LAYOUT
14.5m ROAD PRIVA TE
2500
AGRICULTURE LAND
BUS TERMINAL
C PROJECT PHASE
RAILING (SEE
DESIGN DEVELOPEMENT
DETAIL NO.3/A8-01)
CONCRETE SPANDREL
(SEE DETAIL) ARCHITECT AND STRUCTURAL CONSULTANT
RCC COLUMN
14
FOURTH FLOOR STEEL STAIRS PLAN
2 1 : 25
15
ENGINEERING (I) PVT LTD
3100
7400
3350 9T @ 300MM =2700MM 2000 9T @ 300M M=3000MM TRC Engineering (I) Pvt Ltd.
9T @ 300MM =2700MM 2000 9T @ 300MM =2700MM 10R @ 150MM =1500MM 10R @ 150MM =1500MM
10R @ 150MM =1500MM 10R @ 150M =1500MM No 6/A, Amit Plaza, JP Nagar, 3rd Phase
Bannerghatta Road,Bangalore-560076
ST1 ST1 ST1 Phone : +91-80-26581707/08/09
Fax :+91-80-26582424 WebSite:www.trc.co.in
2500
MID LANDING
LANDING-FIFTH FLOOR MID LANDING
2500
3 UP 3 UP FOR CO-ORDINATION
A8-04 A8-04 DESIGNED BY:Designer
DRAWN BY:Author
CHECKED BY:Checker
SCALE:1 : 25
20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 8 3 2 1 21 20 19 18 17 16 15 14 13 12 11 10 09 08 07 06 05 04 03 02 01 DRAWING TITLE
RCC COLUMN
650
ENTRY TO STAIR
TERRACE STEEL STAIRS
C C DETAILS
SHEET NUMBER
CONCRETE SPANDREL RCC COLUMN RAILING (SEE
THIRD FLOOR STEEL STAIRS PLAN FIFTH FLOOR STEEL STAIRS PLAN (SEE DETAIL) DETAIL NO.3/A8-01) A8-04
1 1 : 25
4 1 : 25
DATE:02/28/11 NORTH
ISSUE
14 13 12 11 10 9 8 7 6 5 4 3 2 1
No. Date Description Revision
10800 10800 10800 10800 10800 10800 10800 10800 10800 10800 12450 12175
850 3 1 COLUMN CAPITAL
1550
CONCRETE A3-02 CONCRETE A3-02 SEE DETAIL
COLUMN SPANDREL
TERRACE
1550
18000
3000
RAILING
CONCRETE FIFTH FLOOR
SPANDREL
15000
3000
1 225 MM THK
1550 A3-02 SLAB FOURTH FLOOR
CONCRETE 12000
3000
SPANDREL THIRD FLOOR
100 MM WALL ENTRY LVL THIRD FLOOR
SWEEP
3000 3000 3000 3000
9000
3000
SECOND FLOOR
PROJECT TEAM
900 MM HIGH
ENTRY LVL RAILING SECOND FLOOR
6000 OWNER
3000
FIRST FLOOR 225 THK R.C.C. BEAM ALONG RAMP
SLAB (SEE STRUC. DRG.) FIRST FLOOR Infosys Technology Ltd.
ENTRY LVL
3000
3000
R.C.C. GRADE BEAM. 750 MM DEEP ARCHITECT
(SEE STRUC. DRG.) CONCRETE BEAM FGL: 506.00 GROUND FLOOR
TRC ENGINEERING (I) PVT LTD
RAIN WATER 0
PLANT ROOM FIRE WATERTANK HARVESTING
WATER SUMP
SECTION - 1
1 1 : 200
1 2 A B C D D.1 E
1 2
12175 12275 16750 16000 11400 4600
12175
11775 400
4
1550
1800 HIGH CONCRETE COLUMN RAMP
WIDTH A8-05
SPANDREL CAPITAL
250
TERRACE
4 ENTRY TERRACE
A
1550
A8-05
CONCRETE SPANDREL OF
18000
3000
HEIGHT 1050MM FROM FFL
FIFTH FLOOR GLAZED FIXED
FIFTH FLOOR
250
3000
3000
9000 A8-05 25 MM
FOURTH FLOOR FOURTH FLOOR FOURTH FLOOR
LVL GROOVE
12275
12275
3000
3000
A8-05
12000 THIRD FLOOR FLUSH
D1
12275
12275
3000
3000
225 THK 750 MM FLUSH D1
200
1950 3000
3000
CABLE RAILING FIRST FLOOR
EQ LANDING FIRST FLOOR
200
B
KEY PLAN
RAMP UP TO FIFTH FLOOR
3000
3000
EQ
EQ
1050
0 ECC BLOCK
G+14
ELECTRICAL
SUB STATION
4ACRES
EQ
16750
SURV EY NO. 51
CONCRETE SPANDREL OF
TYP.
EQ
GA S B A NK
AGRICULTURE LAND
TYP.
16750
PHASE-1 SITE
OF FICE-2
EQ
P
U
CONCRETE SPANDREL OF
SECTION - 4
P
U
SDB1
G+5
EQ
STA FF/L AB OU R
CANTEEN
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK
SECURITY SECURITY
RAMP
ENTRY EXIT
1 : 200
VIP PA RKI NG
32250
SUBWAY 12
M
PUBLIC A REA
R.C.C. COLUMN
1 2
3 4 5
67
8 9 CR
OSSI
10 NG
C
STORE
503 lv l.,
HOL DI NG
SEC URI TY
CABLE RAILING
CR OSSI
NG
C CONCRETE CURB
100 MM DIA. PIPE 14.5m ROAD PRIVA TE
LAYOUT
AGRICULTURE LAND
BUS TERMINAL
A B
250 525
10.75 % SLOPE
650
COLUMN CAPITAL ENGINEER
LTD. HYDERABAD
1800
CONCRETE
800X800 COLUMN SPANDREL
900
RCC BEAM BELOW
PER STRUC. DRG.
300
150
RAMP LATERAL BEAMS PROJECT NUMBER
300
3500
1200
12000
D LVL 15
0 10BLR023
500
250
150
ENTRY
11400
11400
LANDING
STORE
7800
11200X12000 200 THK 3725 300 3725 300 3725 150 150
1800
11400
11400
MASONRY WALL
DESIGN DEVELOPEMENT
EXIT
900
D.1
Cable Rail Details
972
250
SPEED RAMP THIRD FLOOR LEVEL SPEED RAMP FOURTH FLOOR LEVEL RAMP DETAIL - 5
2 3 5
1 : 200 1 : 200 1 : 50 TRC Engineering (I) Pvt Ltd.
No 6/A, Amit Plaza, JP Nagar, 3rd Phase
Bannerghatta Road,Bangalore-560076
1 2 3 4 5 6 7 8 9 10 11 12 13 14 Phone : +91-80-26581707/08/09
Fax :+91-80-26582424 WebSite:www.trc.co.in
12175 12450 10800 10800 10800 10800 10800 10800 10800 10800 10800 10800
A DRAWN BY:Author
525
150
RAMP DN TO SECOND FLOOR RAMP DN TO FIRST FLOOR RAMP DN TO GROUND FLOOR CHECKED BY:Checker
CONCRETE CURB
9.98 % SLOPE 11.89 % SLOPE 10.66 % SLOPE
1 SCALE:As indicated
A8-05
10800
9000 3000 0
LVL LVL LVL LVL
THIRD FLOOR
LANDING EQ EQ EQ EQ EQ 2800 CONCRETE CURB EQ EQ EQ EQ EQ EQ
25 CABLE RAILING
TYP.
2500
RCC RETAINING
WALL SPEED RAMP DETAILS
TYP. TYP.
B
SHEET NUMBER
SPEED RAMP FROM GROUND TO THIRD FLOOR
6 1 : 200 A8-05
DATE:02/28/11 NORTH
ISSUE
No. Date Description Revision
1050
STAIR CASE
OWNER
1050
TERRACE Infosys Technology Ltd.
18000
LANDING
ARCHITECT
3000
225 THK SLAB
TRC ENGINEERING (I) PVT LTD
FIFTH FLOOR
3000
15000
LANDING
3000
FHR
LANDING
FOURTH FLOOR
3000
12000
LANDING
21450
18000
3000
3000
LANDING
THIRD FLOOR
3000
9000
LANDING
3000
LANDING
SECOND FLOOR
3000
6000
LANDING
3000
LANDING
FIRST FLOOR
3000
3000
LANDING
3000
1803
FGL:506.00
GROUND FLOOR
0
KEY PLAN
ELECTRICAL
ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51
GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
PHASE-1
SECTION-2
SITE
OF FICE-2
P
U
UNIT
2
SDB3 SDB2
G+5 G+5 STORE M E
T
S
IM S
CEMENT
GODOW N
6
5
4
3
2
1
P
U
1 : 100 P
U
SDB1
G+5 STA FF/L AB OU R
CANTEEN
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK
SECURITY SECURITY
RAMP
ENTRY EXIT
SURV EY NO. 49
ED MLC P
DEVELOPER
STORE
HOL DI NG
SEC URI TY
CR OSSI
NG
LAYOUT
14.5m ROAD PRIVA TE
AGRICULTURE LAND
BUS TERMINAL
CLIENT:
PROJECT NUMBER
10BLR023
6 6.1 6.2 7 8 8.1 9
PROJECT PHASE
F
ENTRY
EXIT ENGINEERING (I) PVT LTD
CONCRETE SPANDREL OF
WIDTH
6950
6450
6300
2
FOR CO-ORDINATION
A8-06
DESIGNED BY:Designer
DRAWN BY:Author
H
CHECKED BY:Checker
SCALE: 1 : 100
CONCRETE SPANDREL OF CONCRETE SPANDREL OF
HEIGHT 1050MM FROM FFL (TYP) HEIGHT 1050MM FROM FFL DRAWING TITLE
PAINTED WITH APPROVED
COLOUR AND SHADE
SHEET NUMBER
A8-06
DATE:02/03/11 NORTH
ISSUE
No. Date Description Revision
"L"
4"*** 200 50** WORD WORD 50** 175 2"** WORD WORD 100***100*** WORD
EQ 12.5
WORD 100***
EQ 12.5
EQ 12.5
EQ 12.5
45°
EQ 12.5
75 50 75
"H"
"D"
"H"
"H"
"D"
"H"
"H"
12.5 EQ
12.5 EQ
12.5 EQ
12.5 EQ
12.5 EQ
NOTE: FOR NOTE: FOR
12.5 WHITE BACKGROUND
ARROW ARROW
NON−REFLECTIVE PROJECT TEAM
DIRECTION REFER TO SCHEDULE DIRECTION REFER TO SCHEDULE RED REFLECTIVE
OWNER
SIGN COMPONENT SIGN COMPONENT SIGN COMPONENT SIGN COMPONENT SIGN COMPONENT SIGN COMPONENT Infosys Technology Ltd.
1 SCALE: N.T.S
2 SCALE: N.T.S
3 SCALE: N.T.S
4 SCALE: N.T.S
5 SCALE: N.T.S
6 SCALE: N.T.S
ARCHITECT
TRC ENGINEERING (I) PVT LTD
"H"
"D"
"H"
"D"
"H"
"D"
SIGN DETAIL V1, V10 SIGN DETAIL V2 SIGN DETAIL V3,V7
7 SCALE: N.T.S
8 SCALE: N.T.S
9 SCALE: N.T.S
"H"
"D"
"H"
"D"
"H"
"D"
EMERGENCY EXIT
SIGN DETAIL V4 SIGN DETAIL V5, V9 SIGN DETAIL V6, V8 SIGN DETAIL V1, V10
10 SCALE: N.T.S
11 SCALE: N.T.S
12 SCALE: N.T.S
13 SCALE: N.T.S KEY PLAN
ELECTRICAL
ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51
"L"
FOOD COURT -2
PHASE-1 SITE
OF FICE-2
P
U
CEMENT
GODOW N
6
5
4
3
2
1
P
U
P
U
SDB1
G+5 STA FF/L AB OU R
CANTEEN
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK
SECURITY SECURITY
RAMP
ENTRY EXIT
SURV EY NO. 49
"H"
"D"
"H"
"D"
STORE
EMERGENCY EXIT
PROPOS 503 lv l.,
HOL DI NG
SEC URI TY
CR OSSI
NG
LAYOUT
14.5m ROAD PRIVA TE
AGRICULTURE LAND
BUS TERMINAL
SIGN DETAIL V13 SIGN DETAIL V14 SIGN DETAIL V15 CLIENT:
14 SCALE: N.T.S
15 SCALE: N.T.S
16 SCALE: N.T.S
10BLR023
"H" "H"
"H" "H"
EMERGENCY PARK ! ! PROJECT PHASE
"D"
"D"
"H"
"D"
RAMP ENTRANCE UPPER LEVELS Caution 2−way Traffic
DESIGN DEVELOPEMENT
"H" "H"
! ! ! SPECIAL ! TRC Engineering (I) Pvt Ltd.
Caution Traffic Merge STAY IN LANES
"H"
"D"
"D"
"H"
"D"
PERMIT AREA No 6/A, Amit Plaza, JP Nagar, 3rd Phase
Bannerghatta Road,Bangalore-560076
SIGN DETAIL M2 SIGN DETAIL R1 SIGN DETAIL R2 Phone : +91-80-26581707/08/09
20 SCALE: N.T.S
21 SCALE: N.T.S
22 SCALE: N.T.S Fax :+91-80-26582424 WebSite:www.trc.co.in
"L" "L"
FOR CO-ORDINATION
DESIGNED BY:Designer
DRAWN BY:Author
"H"
"D"
CHECKED BY:Checker
SCALE: 1 : 10
DRAWING TITLE
SIGN DETAIL E4 SIGN DETAIL E5
23 SCALE: N.T.S
24 SCALE: N.T.S
SIGNAGE DETAILS-1
SHEET NUMBER
A9-08
DATE:02/28/11 NORTH
ISSUE
No. Date Description Revision
L"
EQ EQ SIGN SCHEDULE
LEVEL COLOR
"L" MARK
SIZE(MM)
TEXT DETAIL BACKGROUND LETTERS/SYMB.
REMARKS
D L REF. COLOR "H" COLOR
"L" COPY
2" "H" EQ
VEHICULAR SIGNS MM
Level
V1 300 1800 DO NOT ENTER A7.105/9 GREEN 125 WHITE
"D"
Elevator/Stair
"H"
"D"
EXIT
V2 300 1800 Exit A7.105/12 GREEN 150 WHITE
"H"
"H"
"D"
LEVEL COLOR
BACKGROUND V3 300 1800 Park Exit A7.105/17 GREEN 150 WHITE
EQ
WHITE V4 300 1800 Park A7.105/16 GREEN 150 WHITE
BACKGROUND
A7.105/11 150 WHITE
PROJECT TEAM
V5 300 1800 Exit GREEN
SIGN DETAIL P1 SIGN DETAIL P2 SIGN DETAIL P3 Park A7.105/15 150 WHITE
OWNER
V6 300 1800 GREEN
SCALE: NTS SCALE: NTS SCALE: NTS Infosys Technology Ltd.
V7 300 1800 Exit Park A7.105/17 GREEN 150 WHITE
"D" ARCHITECT
V8 300 1800 Park A7.105/15 GREEN 150 WHITE TRC ENGINEERING (I) PVT LTD
"H"
V9 300 1800 Exit A7.105/11 GREEN 150 WHITE
"L" "L"
V10 300 1800 DO NOT ENTER A7.105/9 GREEN 125 WHITE
Elevator/Stair STAIR
V12 300 1800 EMERGENCY EXIT A7.105/11 GREEN 100 WHITE
"H"
"D"
"H"
"D"
S V13 300 1800 EMERGENCY EXIT A7.105/11 GREEN 100 WHITE
t
V14 300 1800 A7.105/11 GREEN 100 WHITE
"L"
SIGN DETAIL P4 SIGN DETAIL P8 V15 300 1800 A7.105/15 GREEN 100 WHITE
i V17 300 1800 PARK UPPER LEVELS A7.105/16 GREEN 100 WHITE
"L"
r
ENTRANCE SIGNS
"L" E1 200∅ 3000 DO NOT ENTER A7.105/9
SPRAYLAT HIGH
HIDING BLACK
175 WHITE/RED P.V.C. PIPE SIGN (SEE SPEC.)
SPRAYLAT HIGH
E2 200∅ 3000 ?’−?" CLEARANCE A7.105/23 175 WHITE P.V.C. PIPE SIGN (SEE SPEC.)
HIDING BLACK
STAIR
Clearance 0’−0"
E3 300 3000 ENTER A7.105/10 RED WHITE
"H"
"D"
SIGN DETAIL P6 Maximum Vehicle Load 6000 lbs.
TURNSTILE
"H""H"
"D" A7.105/10 175 WHITE/RED
SCALE: NTS E4 300 3000 2 WHEELERS ONLY RED
PEDESTRIAN SIGNS
SIGN DETAIL P4 SIGN DETAIL P8 P1 * * A7.105/20 * 175 RED
KEY PLAN
EXIT * LED ILLUMINATED SIGN
SCALE: NTS SCALE: NTS
P2 450 450 Level, # A7.105/19 BLUE 212.5 WHITE ** ARCHITECT TO SELECT LEVEL COLORS ECC BLOCK
G+14
ELECTRICAL
SUB STATION
4ACRES
SURV EY NO. 51
GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
PHASE-1
150
SITE
"L"
P
U
300±
STORE
2400 300±
G+5 G+5
M E
T
S
IM S
CEMENT
GODOW N
6
5
4
3
2
1
P
U
REST REST
RO OM -2RO OM -1
TO I E
LT
BLO CK
SECURITY SECURITY
RAMP
ENTRY EXIT
CHAIN ATTACHED
SUBWAY VIP PA RKI NG
150
PUBLIC A REA
P6 300
1 2
BLUE
3
2100
4 5
67
8 9 CR
TO PVC PIPE
SLOW
OF DOUBLE TEES
HOL DI NG
"H""H"
SEC URI TY
CR OSSI
NG
P8 300 2100 Stair A7.105/16 BLUE 212.5 WHITE ** ARCHITECT TO SELECT LEVEL COLORS AGRICULTURE LAND
BUS TERMINAL
P9 300 2100 TURNSTYLE A7.105/13 BLUE 100 WHITE ** ARCHITECT TO SELECT LEVEL COLORS
CLIENT:
150MM HIGH TEXT − VINYL DIE CUT 200MM∅ PVC PIPE
SCOTCH LITE LETTERS − PAINTED P10 SLOW PEOPLE PRESENT A7.105/14 BLUE 212.5 WHITE ** ARCHITECT TO SELECT LEVEL COLORS
EXAMPLE
300 1200 Park GREEN 150 WHITE EXAMPLE SIGN ONLY DESIGN DEVELOPEMENT
Clearance 0’−0"
"H""H"
Do Not Enter
ARCHITECT AND STRUCTURAL CONSULTANT
ENTER
"H"
"D"
"D"
"L" (1200) ACTUAL SIGN LENGTH
TOLERANCES
Maximum Vehicle Load 6000 lbs.
DIMENSIONS
75 225 75 75 * 50 200 100 AND TOLERANCES * SPACE BETWEEN LETTERS ARE EQUAL TO
**
EQ TYP
THE VERTICAL STROKE WIDTH OF THE LETTERS.
9
(UNLESS REQUIRED TO MAKE THE SIGN
DIMENSIONS WORK ±25% OF STROKE WIDTH.
Park
18MHL
"H"(150) ** DIMENSION(S) MAY VARY ±1"
TO MAKE SIGN WORK.
SIGN DETAIL E1 SIGN DETAIL E3
EQ
150 EQ. EQ. 150 MOUNTING HOLE
ENGINEERING (I) PVT LTD
SCALE: NTS SCALE: NTS LOCATIONS (MHL) NOTES:
BACKGROUND LOCATION OF PRE-PUNCHED "D"(300) 1. FOR COMPONENT DIMENSIONS, REFER
TO SIGN COMPONENT DETAILS.
COLOR GREEN HOLES IN SIGN FOR
SCOTCHLITE #3290
MOUNTING FASTENERS
INDICATED THUS TYP.
WHITE (REFLECTIVE)
LETTER/SYMBOL COLOR
2. THIS EXAMPLE SIGN IS FOR ILLUSTRATIVE
PURPOSES ONLY, IT IS NOT IN CONTRACT. TRC Engineering (I) Pvt Ltd.
EXAMPLE SIGN ONLY
300 CONC. TOPPING L"
No 6/A, Amit Plaza, JP Nagar, 3rd Phase
Bannerghatta Road,Bangalore-560076
EQ EQ Phone : +91-80-26581707/08/09
LEVEL COLOR Fax :+91-80-26582424 WebSite:www.trc.co.in
2"
COPY
2" "H" EQ
2
TO UNDERSIDE OF TEE
"D"
THREADED EXPANSION
ANCHOR LEVEL COLOR FOR CO-ORDINATION
"H"
CHAIN ATTACHED TO
BACKGROUND
DESIGNED BY:Designer
6MM∅ EYE BOLT (BOTH
EQ
SHEET NUMBER
A9-09
DATE:02/28/11 NORTH
ISSUE
No. Date Description Revision
KEYED NOTES: KEYED NOTES: KEYED NOTES: KEYED NOTES:
1. CONC. TOPPING ON 1. 12.5 1. CONCRETE 1. 150MM∅X6.25MM
CONC. DOUBLE TEE TOOLED 3 RETAINING WALL STEEL PIPE BOLLARD−
200
JOINT 2. CONCRETE SLAB FILL W/ CONCRETE
2. EXPANSION JOINT 2. FILLER 1 ON A.B.C. − AND PAINT
3. STEEL SUPPORT PLATE 3. CAULKING 12.5 SEE SOILS 2. EMBED BOLLARD
4. CONC. SLAB ON BASE− REPORT 750MM INTO
SEE SOILS REPORT 3. FOUNDATION 1 CONCRETE FOOTING
(SEE 3. CONCRETE SLAB
5. BASE − SEE SOILS STRUCTURE) OVER A.B.C.
REPORT SEE SOILS REPORT
6. CONC. WALL − SEE 4. S.O.G. OVER BOLLARD
1050
SOILS REPORT FTG. 1 PROJECT TEAM
7. DAMP ROOFING WITH A DETAIL 5. 600MM∅ CONCRETE
2 OWNER
PROTECTION BOARD PIER FOOTONG
2
8. SHIMS @ 1200MM O.C. Infosys Technology Ltd.
VARIES
ARCHITECT
2
1050
A TRC ENGINEERING (I) PVT LTD
−
12.5
1 4
3 4
625MM
6.25
18.75 MM
2
12.5
VARIES
750
2
8
1200
5
450
5
7 3
GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
PHASE-1 SITE
OF FICE-2
P
U
CEMENT
GODOW N
6
5
4
3
2
1
P
U
P
U
SDB1
G+5 STA FF/L AB OU R
CANTEEN
12
M
SECURITY
ENTRY EXIT
SECURITY
1 2
VIP PA RKI NG
3 4 5 PUBLIC A REA
REST REST
RO OM -2RO OM -1
TO I E
LT
BLO CK
67
8 9 CR
OSSI
10
SURV EY NO. 54
18.19 ACRES
SURV EY NO. 49
ED MLC P
DEVELOPER
HOL DI NG
SEC URI TY
2 CR OSSI
NG
26m WIDE ROAD
DESIGN DEVELOPEMENT
2 3 ROOF
DRAIN ARCHITECT AND STRUCTURAL CONSULTANT
25MM R. 4 3
CHECKED BY:Checker
SCALE: 1 : 2
2
DRAWING TITLE
3 MISCELLANEOUS DETAILS-1
DRAIN LINE
SHEET NUMBER
SECTION DETAIL
5 SCALE: NTS A10-01
DATE:02/28/11 NORTH
ISSUE
No. Date Description Revision
2500
600
(STALL DEPTH)
600
H.C. SIGN 1200 100MM WIDE WHITE
ATTACHED TO 300 PAINTED BORDER
BOLLARD
100MM WIDE
BLUE PAINTED
PAINT STRIPE 100MM WIDE BACKGROUND
(TYPICAL) PAINT STRIPE
STALL DEPTH
(TYPICAL)
STALL DEPTH
6000 WHITE PAINTED
5000
HANDICAPPED
1200
(TYP. WIDTH)
SYMBOL
PROJECT TEAM
1200
OWNER
Infosys Technology Ltd.
300
300
PAINT STRIPE
(TYPICAL) TRC ENGINEERING (I) PVT LTD
2500 2500
3000 SEE PLAN 3000
1 HANDICAP
SCALE: NTS
STALL LAYOUT 2 STANDARD
SCALE: NTS
STALL LAYOUT − 90° 3 MOTORCYCLE
SCALE: NTS
STALL LAYOUT
4 ACCESSIBLE
SCALE: NTS
SYMBOLS
30
2
0
60
0
300
300
SEE STRUCT.
450
1. VERTICAL SURFACE 4
FOR ADDITIONAL
0
METAL
60
INFORMATION
GRATE
30° 2. TRAFFIC SEALANT
30° EMBED
300
ANGLE
300
25MM
MIN.
2100
1200
3. NOT USED
1350
2250
1350
2250
30°
4. CONCRETE TOPPING
30° 60°
30°
60
450
0
300
2400 SLAB
SOLID WHITE REFLECTIVE
0
2400
PAINT − TYPICAL
3300 600MM SQ. x
1. DETAIL SHALL OCCURE AT JOINT 2. CONTROL JOINTS ARE TO BE TOOLED WITH KEY PLAN
3300 HIGH VISIBILITY BLUE SEE PLUMBING PLANS WHERE: A) TEE FLANGE ABUTS GOLDBLAT GROOVER #06-314-M7
600MM DEEP ANOTHER TEE FLANGE, B) TEE WHEREVER TWO PRECAST "TEES"
PAINTED BACKGROUND FOR DISCHARGE LOCATION SUMP PIT
ABUTS A CONCRETE BEAM, FORM A JOINT. ECC BLOCK
G+14
ELECTRICAL
SUB STATION
4ACRES
C) TEE ABOUTS A SPANDREL OR SURV EY NO. 51
AT ANY TOPPING. GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
6
P
U
SCALE: NTS
JOINT DETAIL
6
5
4
3
2
1
P
U
7
P
U
SDB1
G+5 STA FF/L AB OU R
CANTEEN
SCALE: NTS
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK
SECURITY SECURITY
RAMP
ENTRY EXIT
SURV EY NO. 49
ED MLC P
DEVELOPER
STORE
HOL DI NG
SEC URI TY
CR OSSI
NG
KEYED NOTES:
25MM
AGRICULTURE LAND
4"
2
4. PLANTER
4. PIN AT AC PAVING
2
5. AC PAVING
NOTE: CONFIRM JOINTING WITH STRUCTURAL 12.5MM 3 PROJECT NUMBER
3
5
10BLR023
VARIES
4 PROJECT PHASE
DESIGN DEVELOPEMENT
SEE SHT A1.100 FOR LOCATION.
B. EXPANSION JOINT
ARCHITECT AND STRUCTURAL CONSULTANT
250MM 1
EQ. EQ. TRC Engineering (I) Pvt Ltd.
No 6/A, Amit Plaza, JP Nagar, 3rd Phase
EQ.
EQ
2 Bannerghatta Road,Bangalore-560076
.
A Phone : +91-80-26581707/08/09
−
3 Fax :+91-80-26582424 WebSite:www.trc.co.in
EQ
EQ.
1
.
4
KEYED NOTES: VERIFY BOLT SIZE AND
LAYOUT WITH MFG. 2
PLAN- BOLLARD 1. LIGHT STANDARD
A
2. METAL CAP
3 FOR CO-ORDINATION
DESIGNED BY:Designer
3. BASE PLATE WITH
KEYED NOTES: LEVELING NUTS DRAWN BY:Author
BOLLARD-FILL W/ CONCRETE
1130MM A.F.F.
SCALE: 1 : 2
AND PAINT 2 5. CONCRETE COLUMN
5
2. 250MM SQ.X 12.5MM THICK 6. CONDUIT FOR LIGHT DRAWING TITLE
STEEL PLATE 6
7. CONDUIT FOR C.C.T.V.
3. 18.75MM DRYPACK
4. CONCRETE TOPPING
6 MISCELLANEOUS DETAILS-2
5. 9.375MM∅ THRU BOLTS CAP
1 AT EA. CORNER SEE ELECTRICAL FOR
ADDITIONAL INFORMATION 7
6. PRECAST CONCRETE TEES
PLAN SECTION
SHEET NUMBER
A10-02
11 PIPE BOLLARD DETAIL @ DECK
SCALE: NTS 12 LIGHT
SCALE: NTS
STANDARD DETAIL
DATE:02/28/11 NORTH