You are on page 1of 33

MULTI LEVEL CAR PARKING

INFOSYS CAMPUS, HYDERABAD

PROJECT:NO.10BLR023

ARCHITECTURAL DRAWINGS (CO-ORDINATION SET)


DATE : 28TH FEB 2011

ENGINEERING (I) PVT LTD

TRC Engineering (I) Pvt Ltd.


No 6/A, Amit Plaza, JP Nagar, 3rd Phase
Bannerghatta Road,Bangalore-560076
Phone : +91-80-26581707/08/09
Fax :+91-80-26582424
WebSite:www.trc.co.in
ISSUE
No. Date Description Revision

DRAWING ABBREVIATIONS LEGEND BUILDING DATA SHEET INDEX


A N
AB ANCHOR BOLT N/A NOT AVAILABLE
AD AREA DRAIN NA NOT APLICABLE MATERIALS DRAWING SYMBOLS PROJECT INFORMATION
ADD'L ADDITIONAL NOM NOMINAL
ADJ ADJACENT NS NEAR SIDE
AFF ABOVE FINISHED NTS NOT TO SCALE STEEL CORNER GUARDS PROJECT NAME: MLCP,HYDERABAD
FLOOR
AGGR AGGREGATE
AL ALUM ALUMINUM CRASH RAIL OWNER- CONTACT PERSON: MS. K.P.NAGARAJ
ALT ALTERNATE SOIL X EXISTING COLUMN
ANOD ANODIZED CENTERLINE
BUMPER RAIL
APPROX APPROXIMATE APPLICABLE CODES
ARCH ARCHITECTURAL
HAND RAIL - BUILDING CODE: NBC, HUDA - LIFE SAFETY CODE: NBC
B CONCRETE/ PRECAST COLUMN
O CONCRETE
X
CENTERLINE
B.M. BENCH MARK OA OVER ALL
BD BOARD OC ON CENTER BUILDING
BETW
BF
BETWEEN
BACKFACE
OD OUTSIDE DIAMETER SAND, EIFS FINISH EXPANSION JOINT PROJECT TEAM
OD OVERFLOW DRAIN COAT, OR CEMENT 1 DEMOLITION
BG BUMPER GUARD OH OPPOSITE HAND PLASTER NUMBERED NOTES
BL BUILDING LINE OPNG OPENING
BUILDING PLANNING OWNER
BLDG BUILDING BRICK
OPP OPPOSITE CMU WALL
BLKG BLOCKING OSF OUTSIDE FACE 01 BUILDING WALL OCCUPANCY: INSTITUTIONAL I-2 MIXED OCCUPANCY? NO REQUIRED FIRE Infosys Technology Ltd.
BM BEAM A0.X SECTION SEPARATION: NO
BOT BOTTOM CMU X
BR BUMPER RAIL ARCHITECT
BRG BEARING 01
BSMT BASEMENT
STONE ELEVATION NEW WALL TRC ENGINEERING (I) PVT LTD
BU ROD BACK-UP ROD A0.XX
BUR BUILT-UP ROOF TYPE OF CONSTRUCTION
EXISTING WALL
BW BEARING WALL
C P FINISH LUMBER A0.XX SECTION DETAIL
C COMPACT PARKING DEMO WALL
P LAM PLASTIC LAMINATE
SPACE PC PRECAST CONCRETE STUCCO AND LATH
01 FIRE WALL
CDR CARD READER PCF POUNDS PER CUBIC FOOT PLAN, BLOW-UP GENERAL BUILDING LIMITATIONS
CEM CEMENT A0.X
PENT PENTHOUSE X DETAIL
CER CERAMIC PL PROPERTY LINE PARTICLE BOARD 2 HOUR SHAFT WALL
CG CORNER GUARD PL PLATE
CIP CAST IN PLACE PLUMB PLUMBING AREA OF PLOT: 29435 Sq Meters
CJ CONTROL JOINT INTERIOR
PLYWD PLYWOOD BATT INSULATION ELEVATION
CJ CONSTRUCTION JOINT PP PUSH PLATE BUILDING SET BACK : See site plan
CL CENTER LINE INDICATOR
POL POLISHED 3
CLG CEILING PORT CEM PORTLAND CEMENT DIRECTION SIGNAGE
RIGID INSULATION REFERENCE HEIGHT OF BUILDING: 19.2 Meters
CLR CLEAR PR PAIR INDICATOR
CMU CONCRETE MASONRY PREFAB PREFABRICATED NUMBER OF STORIES: 6 FLOORS
UNIT PSF POUNDS PER SQUARE ROOM NAME ROOM NAME
COL COLUMN XXXXX ROOM NUMBER
FOOT EDGE OF SLAB ROOF AREA : 6222 Sq meters
COMM COMMUNICATIONS PSI POUNDS PER SQUARE
CONC CONCRETE GYPSUM BOARD
INCH MAXIMUM SINGLE FLOOR PLATE AREA : 11635 sq Meters
CONN CONNECTION PT PAINT D2
CONST CONSTRUCTION DOOR TOTAL AREA OF BUILDING: 63281 Sq Meters
CONT CONTINUOUS PLYWOOD FACE OF BUILDING REFERENCE
COORD COORDINATE - HIGH RISE: YES
COOR CORRIDOR
CR CRASH RAIL +9'-0" CEILING HEIGHT WALL TYPE
CT CERAMIC TILE WT
GLASS - ACCESSIBLE PARKING SPACES PROVIDED: YES
CTD CENTERED
CTR CENTER
CW CURTAIN WALL
D R ASPHALT
PAVING
D DEPTH R RISER
DBA DEFORMED BAR RAD RADIUS
DIMENSION
ANCHOR RCP REFLECTED CEILING PLAN
LUMBER
DET DETAIL RD ROOF DRAIN
BLOCKING
DIA DIAMETER REBAR REINFORCING BAR DIMENSION CEILING SYMBOLS
DIM DIMENSION REF REFER OR REFERENCE LUMBER
DJ DEFLECTION JOINT REINF REINFORCING CONTINUOUS
DL DEAD LOAD REQ'D REQUIRED
DN DOWN RM ROOM
AGGRIGATE BASE
DRG DRAWING RO ROUGH OPENING
COURSE
DS DOWN SPOUT GYP BD CEILING X SMOKE DETECTOR

E S WALL WASHER
SUPPLY AIR
E EACH SBC STANDARD BUILDING CODE
EF EACH FACE SCHED SCHEDULE PENDANT TYPE LIGHT
EIFS EXTERIOR INSULATION
AND FINISH SYSTEM
SDL
LOAD
SUPERIMPOSED DEAD RETURN AIR FIXTURE KEY PLAN
EJ EXPANSION JOINT SECT SECTION ACCESS PANEL WALL MOUNTED
EL ELEVATION SHR SHOWER LIGHT FIXTURE
ELEC ELECTRIC SHW SHOWER FLUORESCENT LIGHT ECC BLOCK
G+14
ELECTRICAL
SUB STATION

ELEV ELEVATOR SHT SHEET DOWNLIGHT SURV EY NO. 51


4ACRES

EOS EDGE OF SLAB SIM SIMILAR WALL MOUNTED FUT URE EXPANSION FUT URE EXPANSION

EQ EQUAL SO STRUCTURAL OPENING FLUORESCENT STRIP LIGHT PHASE-2


SDB5
G+5
SDB4
G+5

EQUIP EQUIPMENT SOG SLAB ON GRADE FIXTURE GA S B A NK


FUT URE EXPANSION
AGRICULTURE LAND
ESC ESCALATOR
FOOD COURT -1

SP STAND PIPE
FOOD COURT -2

PHASE-1 SITE
OF FICE-2

EXIST EXISTING SPA SPACE, SPACING EXIT SIGNS - HATCH SPEAKER P


U
SITE OFF ICE-1

EXP BLT EXPANSION BOLT SPEC SPECIFICATION INDICATES EXIT TEXT SDB3
G+5
SDB2
G+5
UNIT
STORE
CEMENT
GODOW N
M E
T
S
IM S

EXT EXTERIOR AND ARROW


6
5
4
3
2
1
P
U

SQ SQUARE P
U

SS STAINLESS STEEL INDICATES SDB1

F
G+5 STA FF/L AB OU R
CANTEEN

ST STONE DIRECTION REST REST


RO OM -2RO OM -1
TO I E
LT
BLO CK

SECURITY SECURITY

STD STANDARD SUBWAY


RAMP

12
M
ENTRY EXIT

1 2
VIP PA RKI NG
3 4 5
67
PUBLIC A REA

FD FLOOR DRAIN
8 9 CR

STIR STIRRUP
OSSI
10 NG

18.19 ACRES SURV EY NO. 54

SURV EY NO. 49
ED MLC P
DEVELOPER

FDN FOUNDATION STL STEEL


STORE

PROPOS 503 lv l.,

HOL DI NG

FE FIRE EXTINGUISHER STRUC STRUCTURAL


SEC URI TY

14m WIDE ROAD (FUTURE


EXPANSION
SINGAPO RE ENTRANCE
FEC FIRE EXTINGUISHER SYM SYMMETRICAL 26m WIDE ROAD

CABINET SYS SYSTEM


CR OSSI
NG

LAYOUT
FF FLOOR FINISH 14.5m ROAD PRIVA TE

FHC FIRE HOSE CABINET AGRICULTURE LAND


BUS TERMINAL
FHR FIRE HOSE REEL
FIB FIBER GLASS
FIN FINISH
FIN FLR FINISH FLOOR CLIENT:
FLR FLOOR
FT FLOOR TILE
FTG FOOTING
FVC
G
FIRE VALVE CABINET
T M/S INFOSYS TECHNOLOGIES
GA GAUGE T TREAD LTD. HYDERABAD
GALV GALVANIZED T&B TOP AND BOTTOM
GB GRADE BEAM TEL TELEPHONE
GEN GENERAL TEMP TEMPERATURE
GI GALVANIZED IRON THK THICK
GL
GND
GLASS
GROUND
TLT
TO
TOILET
TOP OF GENERAL NOTES VICINITY MAP PROJECT DATA SHEET NAMING CONVENTION PROJECT NUMBER
GR GRADE TOB TOP OF BEAM
GYP BD GYPSUM BOARD TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOP TOP OF PARAPET 10BLR023
TOS TOP OF SLAB NUMBERING SYSTEM:
TOSTL TOP OF STL
TW TOP OF WALL
PROJECT PHASE
1. ALL WORK SHALL CONFIRM TO ALL PERTINENT CODES, REGULATIONS, LAWS & ORDINANCE
TYP TYPICAL AS REQUIRED BY THE CITY.
PROJECT OWNER
H U 2. ALL PLAN DIMENSIONS INDICATED ARE TO COLUMN CENTERLINE, TO FACE OF CONCRETE, MULTI LEVEL CAR PARKING, INFOSYS TECHNOLOGIES LTD. DESIGN DEVELOPEMENT
ELECTRICAL

HDW HARDWARE OR TO FACE OF MASONRY UNLESS NOTED OTHERWISE. ECC BLOCK


G+14
SUB STATION
4ACRES HYDERABAD
HK HOOK SURVEY NO. 51 DISCIPLINE:
U/C UNDER COUNTER
HM HOLLOW METAL
U/G UNDERGROUND
3. ALL FLOOR ELEVATIONS INDICATED ARE TO TOP OF FINISH FLOOR UNLESS FUTURE EXPANSION FUTURE EXPANSION
ARCHITECT AND STRUCTURAL CONSULTANT
HOR HORIZONTAL NOTED OTHERWISE . PHASE-2
SDB5
G+5
SDB4
G+5

HP HIGH POINT
UNO UNLESS NOTED DESIGN -BUILDER ARCHITECTS SERIES NUMBER
OTHERWISE 4. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL DIMENSIONS IN THE FIELD AND, FUTURE EXPANSION
GAS BANK
AGRICULTURE LAND SHEET NUMBER WITHIN
HR HOUR FOOD COURT-2

PHASE-1
FOOD COURT-1

SERIES
HT HEIGHT IN THE EVENT OF DISCREPANCY, REPORTING SUCH DISCREPANCY TO THE ARCHITECT SIT E OFF ICE-1
SIT E
OF F ICE-2

TRC Engineering (I) Pvt. Ltd.


HW HAND WASH BEFORE COMMENCING WORK. DO NOT SCALE DRAWINGS. U
P

SDB3
G+5
SDB2
G+5
UNIT
STORE
CEM ENT
GODOW N
M IS M
E
T S

NUMBER OF PLAN,
6

DETAIL, ETC. ON SHEET


V
4
5
3

5. CONTRACTOR SHALL PROTECT ALL EXCAVATION AND CONSTRUCTION FROM THE PUBLIC.
1
2
U
P

I U
P

SDB1
G+5 STAFF /L ABOU R
CAN TEEN

ID INSIDE DIAMETER VAR VARIES


A2.10/01
REST REST
TO I LET
RO O M- 2 RO O M- 1 BLO CK

INSUL INSULATION VCT VINYL COMPOSITION TILE RAM P


SE C URI T Y SE C URI T Y

INT INTERIOR VERT VERTICAL ENT RY EXI T

SUBWAY V I P PA RKI NG
PUBLIC AREA

ENGINEERING (I) PVT LTD


12M
1 2
3 4
5 6
7 8 CR
9 OSSI
10

SURVEY NO. 54
VEST VESTIBULE STRUCTURAL
NG

18.19 ACRES

J VWC VINYL WALL COVERING ED MLCP


DEVELOPER SURVEY NO. 49

CIVIL
STORE

PRO POS
ENGINEER
503 lvl.,

HOLD ING
SEC URITY

K 14m WIDE ROAD (FUTURE


SINGAPORE ENTRANCE
EXPANSION DISCIPLINE:
W
26m WIDE ROAD
G - GENERAL
CR O
SSI NG
TRC Engineering (I) Pvt. Ltd. H - HAZARDOUS MATERIALS
L
L ANGLE
W/
W/O
W
WITH
WITHOUT
WIDTH
AGRICULTURE LAND
BUS TERMINAL
14.5m ROAD PRIVATE
LAYOUT V - SURVEY /MAPPING
B -GEOTECHNICAL
W - CIVIL WORKS
TRC Engineering (I) Pvt Ltd.
LAV LAVATORY WP WATERPROOF(ING) C - CIVIL
LG LONG WD WOOD L - LANDSCAPE
LKB LOCKABLE WF WIDE FLANGE A - ARCHITECTURE No 6/A, Amit Plaza, JP Nagar, 3rd Phase
LL LIVE LOAD WL WIND LOAD I - INTERIOR
LLH LONG LEG WP WORK POINT DESIGNER
Q - EQUIPMENT Bannerghatta Road,Bangalore-560076
HORIZONTAL F - FIRE PROTECTION
LLV LONG LEG VERTICAL MECHANICAL M - MECHANICAL Phone : +91-80-26581707/08/09
LOC LOCATION ELECTRICAL, E - ELECTRICAL
LP LOW POINT P - PLUMBING Fax :+91-80-26582424 WebSite:www.trc.co.in
LT LIGHT PLUMBING T - TELECOMMUNICATIONS
LWC LIGHTWEIGHT R - RESOURCES
CONCRETE S - STRUCTURAL
M CCCL Z- CONTRACTOR/SHOP
DRAWINGS
MAS MASONRY O - OPERATIONS
MAT'L MATERIAL
MAX
MECH
MAXIMUM
MECHANICAL
FOR CO-ORDINATION
MEP MECHANICAL,
DESIGNED BY:Designer
ELECTRICAL AND
PLUMBING
DRAWN BY:Author
MFG MANUFACTURER
MIN MINIMUM
CHECKED BY:Checker
MISC MISCELLANEOUS
MO MASONRY OPENING
MOD MODIFIED SCALE: 1 : 50
MSL MEAN SEA LEVEL
MTL METAL
DRAWING TITLE

DATA SHEET

SHEET NUMBER

A0-02
DATE:02/28/10 NORTH
ISSUE
No. Date Description Revision

PROJECT TEAM
OWNER
Infosys Technology Ltd.

ARCHITECT
TRC ENGINEERING (I) PVT LTD

ELECTRICAL
ECC BLOCK SUB STATION
G+14
4ACRES
SURVEY NO. 51

FUTURE EXPANSION FUTURE EXPANSION


SDB5 SDB4
PHASE-2 G+5 G+5

GAS BANK
FUTURE EXPANSION
FOOD COURT-2 FOOD COURT-1 AGRICULTURE LAND
PHASE-1 SITE
OFFICE-2
KEY PLAN
ELECTRICAL
SITE OFFICE-1 ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51

FUT URE EXPANSION FUT URE EXPANSION


UP SDB5 SDB4
PHASE-2 G+5 G+5

GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
PHASE-1 SITE
OF FICE-2

SITE OFF ICE-1

P
U

UNIT
SDB3 SDB2 UNIT
STORE

SDB3 SDB2
G+5 G+5
M E
T
S
IM S

CEMENT
GODOW N

6
5
4
3
2
1
P
U

STORE
MS IT EMS

G+5 G+5
P
U

SDB1
G+5 STA FF/L AB OU R
CANTEEN

REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK

SECURITY SECURITY
RAMP

ENTRY EXIT

SUBWAY VIP PA RKI NG


12
M
1 2
3 PUBLIC A REA
CEMENT
4 5
67
8 9 CR
OSSI
10 NG

18.19 ACRES SURV EY NO. 54


GODOWN
SURV EY NO. 49
ED MLC P
DEVELOPER
STORE

PROPOS 503 lv l.,

HOL DI NG
6 SEC URI TY
5
4
3
2
1 14m WIDE ROAD (FUTURE
UP
EXPANSION
SINGAPO RE ENTRANCE
26m WIDE ROAD

CR OSSI
NG

LAYOUT
14.5m ROAD PRIVA TE

AGRICULTURE LAND
BUS TERMINAL

UP

CLIENT:
SDB1
G+5 STAFF/LABOUR M/S INFOSYS TECHNOLOGIES
CANTEEN

LTD. HYDERABAD
REST REST TOILET
ROOM- 2 ROOM- 1 BLOCK

PROJECT NUMBER

SECURITY SECURITY
10BLR023
RAMP

ENTRY EXIT PROJECT PHASE


SUBWAY VIP PARKING
PUBLIC AREA
12M

1 2
3 4
5 6
DESIGN DEVELOPEMENT
7 8 CRO
9 10 S SIN
G

18.19 ACRES SURVEY NO. 54 ARCHITECT AND STRUCTURAL CONSULTANT

SURVEY NO. 49
D MLCP
DEVELOPER
STORE

OPO SE
PR 503 lvl.,

ENGINEERING (I) PVT LTD


HOLDING
SECURITY

14m WIDE ROAD (FU


TU RE EXPANSION TRC Engineering (I) Pvt Ltd.
SINGAPORE ENTRAN
CE No 6/A, Amit Plaza, JP Nagar, 3rd Phase
26m WIDE ROAD Bannerghatta Road,Bangalore-560076
Phone : +91-80-26581707/08/09
Fax :+91-80-26582424 WebSite:www.trc.co.in
CROS
SI NG

FOR CO-ORDINATION
LAYOUT
14.5m RO
AD PRIVATE DESIGNED BY:Designer

DRAWN BY:Author

CHECKED BY:Checker

SCALE: 1 : 1

AGRICULTURE LAND DRAWING TITLE

BUS TERMINAL MASTER PLAN

SHEET NUMBER

A0-03
DATE:02/28/11 NORTH
ISSUE
No. Date Description Revision

PROJECT TEAM
OWNER
Infosys Technology Ltd.

ARCHITECT
TRC ENGINEERING (I) PVT LTD
RAMP

505.50 SUBWAY 505.70

30500
505.30

1487
15.5 M WIDE ROAD Y
TWO
WHEELER
TR

7 M WIDE ROAD
ENTRY
EN
1
2
0
.M

15565
505.10
505.25

8874

13197
LINE
RAMP

8425
12025
Four Two ENTRY
LVL :
G LI NE
lers lers BUILDIN
Whee Whee 132075 506.00

11956
EX IT ROOM

EXIT
PLANT

2 M PATHWAY
BELOW

G LINE
6500X1
0950
50
R62
TER
FIRE WA OR
BUILDIN TER
RAIN WA ING
RESERVI LOW
BE
SU MP 10950
HARV ESTLOW 12750X STIC
BE
SU MP 0950X3000 DOME
7650X1 WATER

505.00
TANK

18000
160709
BELOW

TURNSTILE

SURFACE TW PARKING

SURFACE TW PARKING
27401 RAMP
LINE

32750

5467 10000
44873

OSED MLCP KEY PLAN


PRO P R
63
05 PA
TH
WA
Y
ECC BLOCK
G+14

SURV EY NO. 51
ELECTRICAL
SUB STATION
4ACRES

2M
56275

FUT URE EXPANSION FUT URE EXPANSION

KING
SDB5 SDB4
PHASE-2 G+5 G+5

CE TW PAR
SURFA
GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
PHASE-1 SITE
OF FICE-2

SITE OFF ICE-1

P
U

SDB3 SDB2 UNIT


G+5 G+5 STORE M E
T
S
IM S

CEMENT
GODOW N

90525
6
5
4
3
2 M PATHWAY

2
1
P
U

Y P
U

WA
SDB1
G+5

41638
TH
STA FF/L AB OU R
CANTEEN

NG PA
PARKI
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK

CE TW 2M SECURITY SECURITY

SURFA
RAMP

ENTRY EXIT

SUBWAY VIP PA RKI NG


12
M
1 2
3 4 5
67
8 9 CR
OSSI
PUBLIC A REA
10 NG

18.19 ACRES SURV EY NO. 54

AD
SURV EY NO. 49
ED MLC P
DEVELOPER
STORE

PROPOS

RO
503 lv l.,

HOL DI NG
SEC URI TY

DE
14m WIDE ROAD (FUTURE
EXPANSION
SINGAPO RE ENTRANCE

G LI NE I 26m WIDE ROAD

BUILDIN MW
CR OSSI
NG

LINE
RAMP 7 20 PRIVA TE
LAYOUT

919
14.5m ROAD

AGRICULTURE LAND

03 BUS TERMINAL

350 746
CLIENT:

3385 TH
WA
Y

2M
PA
Y LINE
M/S INFOSYS TECHNOLOGIES
10600

Y
OUNDAR
2M

WA
SITE B
7M

PA
TH
LTD. HYDERABAD
PAT

2M
64

HWA
WID

20621
1225

537
13514
E RO

PROJECT NUMBER

70
10650

00
2M
P

AD
ATH

14
10BLR023
13000
WAY

47
8
8815 PROJECT PHASE
8
32100 73
64 DESIGN DEVELOPEMENT

ARCHITECT AND STRUCTURAL CONSULTANT


Y
31438

WA
31871

ATH
MP
33235

2
31100

7 M WIDE ROAD ENGINEERING (I) PVT LTD


9

WAY
70

2 M PATH
18

TRC Engineering (I) Pvt Ltd.


78724
Y LINE No 6/A, Amit Plaza, JP Nagar, 3rd Phase
OUNDAR
SITE B
79440 Bannerghatta Road,Bangalore-560076
Phone : +91-80-26581707/08/09
Fax :+91-80-26582424 WebSite:www.trc.co.in

FOR CO-ORDINATION
DESIGNED BY:Designer

DRAWN BY:Author
SITE PLAN
1 1 : 350
CHECKED BY:Checker

SCALE:1 : 350

DRAWING TITLE

SITE PLAN

SHEET NUMBER

A0-04
DATE:02/28/11 NORTH
ISSUE
No. Date Description Revision

2
A4-01
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
178225

100225 850 77150

12175 12450 10800 10800 10800 10800 10800 10800 10800 850 10800 10800 10800 10800 10800 10800 12350
PROJECT TEAM
RAIN WATER FIRE WATER SPANDREL ALONG THE RAMP OWNER
HARVESTING RESERVIOR (SEE DETAIL) 17.a
SUMP BELOW SUMP BELOW Infosys Technology Ltd.
BUILDING LINE 7650X10950X3000 12750X10950 STRL. COLUMN COLUMN CAPITAL BRICK PILLAR
@ FIRST FLOOR 800X800 (SEE DETAIL) (SEE DETAIL) 800X800 (SEE DETAIL) 6225 6125
ARCHITECT
A TRC ENGINEERING (I) PVT LTD

2500

TYP.
40 TWO WHEELERS PLANT ROOM
EXIT BELOW
1200 6500X10950 CONCRETE SPANDREL OF
BRICK COLUMN
2200 2400 HEIGHT 1050MM FROM FFL (TYP)
450X450X1250 4
PAINTED WITH APPROVED
TYP. COLOUR AND SHADE A4-02
12275

UP COLUMN TO

8025
RAMP UP TO FIRST FLOOR
8.0 M DRIVE WAY DOMESTIC
2
SUPPORT STAIR
WATER STAIR LINE ABOVE 700 MM DIA
3
TANK A7-01
2 OF 5 (TYP) BELOW ENTRY LVL: 506.00 A7-01

FHR-2 FHR -3

2000
DN FHR -4 200 THK WALL
FHR -5
18 TWO WHEELERS 18 TWO WHEELERS FOR DB MOUNTNG
B

1600
ENTRY LOBBY-2
12 TWO WHEELERS 3

600 6250
18 TWO WHEELERS 19 TWO WHEELERS 4225X6000

6150
LIFTS 3

3 TWO WHEELERS
7 OF 5 (TYP) 2300X2750 A4-01
3.0 M DRIVE WAY 2 OF 5 (TYP) 2 OF 5 (TYP) 4
3.0 M DRIVE WAY

2050
DB & CS B1
3 OF 5 (TYP)
20 TWO WHEELERS 21 TWO WHEELERS 24 PARKING 8 TWO WHEELERS
16750

FOR PHYSICALLY DRV IN/OUT


7.0 M DRIVE WAY
CHALLENGED

425
20 TWO WHEELERS 21 TWO WHEELERS 19 TWO WHEELERS
ENTRY/EXIT TO

6000
GRND FLOOR
3.0 M DRIVE WAY 3.0 M DRIVE WAY 3.0 M DRIVE WAY (TWO WHLR)
1500 1500

450
18 TWO WHEELERS 19 TWO WHEELERS BRICK COLUMN
23 TWO WHEELERS
450X450X1250

3.0 M DRIVE WAY


C
23 TWO WHEELERS
18 TWO WHEELERS 19 TWO WHEELERS
32 TWO WHEELERS

4.45 M DRIVE WAY 6


3.0 M DRIVE WAY 3.0 M DRIVE WAY 4.45 M DRIVE WAY 3.0 M DRIVE WAY A7-01

12 TWO WHEELERS
3
ELECTRICAL
CHARGING

3.0 M DRIVE WAY


A4-02 20 TWO WHEELERS 21 TWO WHEELERS 14 TWO WHEELERS 18 TWO WHEELERS 15 TWO WHEELERS 20 TWO WHEELERS
6.0 M DRIVE WAY

POINTS FOR 16

3.0 M DRIVE WAY


16000

TWO WHEELERS

14 TWO WHEELERS 18 TWO WHEELERS 15 TWO WHEELERS 20 TWO WHEELERS STEEL


20 TWO WHEELERS 21 TWO WHEELERS
89950

STAIRCASE
REFER DETAIL KEY PLAN
2 OF 5 (TYP) 3.0 M DRIVE WAY 3.0 M DRIVE WAY
5 3.0 M DRIVE WAY 3.0 M DRIVE WAY 2 OF 5 (TYP) 3.0 M DRIVE WAY 3.0 M DRIVE WAY FHR-9 2 OF 5 (TYP)
A7-01 FHR-6 17.b ELECTRICAL
SUB STATION
16 TWO WHEELERS
ECC BLOCK
G+14

17 TWO WHEELERS 18 TWO WHEELERS 13 TWO WHEELERS 17 TWO WHEELERS SURV EY NO. 51
4ACRES

FHR-8
FUT URE EXPANSION FUT URE EXPANSION

D
SDB5 SDB4
PHASE-2

4 TWO WHEELERS
G+5 G+5

FHR-7 13 TWO WHEELERS 19 TWO WHEELERS FUT URE EXPANSION


GA S B A NK
AGRICULTURE LAND
18 TWO WHEELERS 19 TWO WHEELERS FOOD COURT -2

PHASE-1
FOOD COURT -1

16 TWO WHEELERS

1140
SITE
OF FICE-2

SITE OFF ICE-1


3.0 M DRIVE WAY

3.0 M DRIVE WAY


P
U

SDB3 SDB2 UNIT


G+5 G+5 STORE M E
T
S
IM S

2 OF 5 (TYP)

4 M DRIVE WAY
CEMENT
GODOW N

0
6
5
4
3
2
1
P
U

3.0 M DRIVE WAY 3.0 M DRIVE WAY 3.0 M DRIVE WAY 3.0 M DRIVE WAY

3.0 M DRIVE WAY


P
U

3.0 M DRIVE WAY SDB1


G+5 STA FF/L AB OU R
11400

CANTEEN

J.1 RAMP
SECURITY SECURITY
REST REST
RO OM -2RO OM -1
TO I E
LT
BLO CK

18 TWO WHEELERS
ENTRY EXIT

20 TWO WHEELERS 21 TWO WHEELERS 14 TWO-WHEELERS 15 TWO WHEELERS SUBWAY VIP PA RKI NG
12
M
1 2
PUBLIC A REA

TE )
3 4 5
67
8 9 CR
OSSI
10 NG

18.19 ACRES SURV EY NO. 54

CRE
C ON MN (TYP
SURV EY NO. 49
ED MLC P
DEVELOPER

62
STORE

U J PROPOS 503 lv l.,

50
COL

6000
HOL DI NG
SEC URI TY
EXIT

14 TWO-WHEELERS
14m WIDE ROAD (FUTURE

1
EXPANSION
3700

SINGAPO RE ENTRANCE

20 TWO WHEELERS 21 TWO WHEELERS 15 TWO WHEELERS 26m WIDE ROAD

16 TWO WHEELERS 12 TWO WHEELERS CR OSSI

A8-01
NG

LAYOUT
14.5m ROAD PRIVA TE

D.1 STAIR-1 3.0 M DRIVE WAY 3.0 M DRIVE WAY 3.0 M DRIVE WAY 3.0 M DRIVE WAY
AGRICULTURE LAND
BUS TERMINAL
RAMP LINE ABOVE 6300X3250 17 TWO WHEELERS
4600

DB &CS 13 TWO WHEELERS


UP 17 TWO-WHEELERS 19 TWO WHEELERS 14 TWO-WHEELERS CLIENT:
E FD1
4750
1 LOBBY-1 N
17 TWO-WHEELERS 19 TWO WHEELERS LUM
4000X7400 13 TWO WHEELERS
14 TWO-WHEELERS
K CO
BRIC 450X125
0 X
0
L OF P) D SH
ADE M/S INFOSYS TECHNOLOGIES
LIFTS 45 DRE FFL (TY OUR AN
1
A4-01
2 2300X2750
7 OF 5( TYP)
3.0 M DRIVE WAY 3.0 M DRIVE WAY 3.0 M DRIVE WAY
C R E
PAN
TE S M FROM VED CO
M
CON HT 1050 H APPRO
L
7400 LTD. HYDERABAD
FHR-1 HEIG TED WIT
3550 20 TWO WHEELERS 21 TWO WHEELERS 14 TWO-WHEELERS PAIN 1180
1
17.2
AY
EW
15750

DRIV LE RS 17.1
EXIT PROJECT NUMBER
7 TWO-WHEELERS

HEE
20 TWO WHEELERS 21 TWO WHEELERS 14 TWO-WHEELERS
24 T
W O-W
K WAY 1118
0
WAL
INTS 16.1
G PO 0 10BLR023
GIN S
4.3 M DRIVE WAY HAR 1118
4600

CCTV CONTROL AND 200 MM C.C.BLOCK MASONRY R


1
4.3 M DRIVE WAY AL C EELE
MONITORING ROOM TRIC WO WH
A7-01 4 OF 5 (TYP) EC
EL 24 T 15.1 PROJECT PHASE
FOR 0
1118
F D1

14.1 DESIGN DEVELOPEMENT


LOBBY-3 50 MM EXPANSION 0
1118
DB & CS D1 CHANGE ROOM
CONCRETE COLUMN(TYP) CONCRETE SPANDREL OF FHR-10 5700X1455 5 JOINT
6950

PAINTED WITH APPROVED


COLOUR AND SHADE
HEIGHT 1050MM FROM FFL (TYP)
PAINTED WITH APPROVED 13.1 ARCHITECT AND STRUCTURAL CONSULTANT
ELECTRICAL AND
COLOUR AND SHADE UPS ROOM LIFTS
D1 2300X2750 6
G 12.1
STAIR-3 1
2 ES-1 6300x3300
A6-04 FD1 7 A8-03
6225

DS-1
UP RAMP UP TO FIRST FLOOR
UP
2 4
FHR-11
A7-01
A8-06
ENGINEERING (I) PVT LTD
H
3
A6-04 2115 6400
325
8750 1725 10800 1725 9075 8515
TRC Engineering (I) Pvt Ltd.
No 6/A, Amit Plaza, JP Nagar, 3rd Phase
GROUND FLOOR 6.1 6.2 8.1 9.1 9.2
1 1 : 200
Bannerghatta Road,Bangalore-560076
Phone : +91-80-26581707/08/09
Fax :+91-80-26582424 WebSite:www.trc.co.in

SCHEDULE: AREA STATEMENT

TYPE
DOOR SCHEDULE_GROUND FLOOR SL. FLOOR AREA IN SQ MTS AREA IN SQ FT FRONT RAMP FRONT RAMP FOR CO-ORDINATION
NO. NAME AREA IN SQ MTS AREA IN SQ FT
MARK LEVEL WIDTH HEIGHT COUNT DESCRIPTION
SHAFT SCHEDULE: LEGEND: GENERAL NOTES: DESIGNED BY:Designer
D1 GROUND FLOOR 900 2100 3 FLUSH DOOR
DRAWN BY:Author
FD1 GROUND FLOOR 1000 2100 2 FIRE DOOR 1. GROUND FLOOR 11635 119607
SL. NAME DESCRIPTION SIZE REMARKS CHECKED BY:Checker
1. NON CAR PARKING BAY.
NO. (mm)
2. FIRST FLOOR 11116 114272 1) ALL DIMENSIONS ARE IN MILLIMETRE UNLESS OTHERWISE MENTIONED. SCALE: 1 : 200

PARKING SCHEDULE_GROUND FLOOR 2. SMALL CAR(2.5MX5M)


1. FHR (1-11) FIRE HOSE REEL 1200X1000 PARKING BAY.
2) NO DIMENSIONS TO BE SCALED FROM DRAWING. DRAWING TITLE
TYPE MARK COUNT SECOND FLOOR 11812 ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
3. 121427
TWO WHEELER 1291
Grand total 1291 2. ES -1 ELECTRICAL 1200X400
BIG CAR (3MX6.0M) 3) IN CASE OF DISCREPANCIES LARGER SCALE DETAILED DRAWINGS SHALL
3. PARKING BAY.
4. THIRD FLOOR 10736 110366 SHAFT SUPERCEDE THE SMALLER SCALE DRAWINGS. GROUND FLOOR PLAN
3. DS -1 LV SHAFT FOR 900X400 4. LOBBY AREA. 4) DISCREPANCIES IN THE DRAWINGS ARE TO BE BROUGHT TO THE NOTICE
5. FOURTH FLOOR 7797 80153 2835.63 29143 CCTV AND DATA OF THE ARCHITECT PRIOR TO COMMENCEMENT OF THE WORK.
4. DB&CS DB AND CONTROL 5. STEEL PIPE BOLLARDS
6. FIFTH FLOOR 7797 80153 1575.80 SWITCH LOCATION
16191 @1500 C/C
SHEET NUMBER
6. 2 WHEELER PARKING
7. TERRACE FLOOR 6222 63962 1575.80 16191
BAY (1.2X2.5)
A1-01
DATE:02/28/2011 NORTH
ISSUE
No. Date Description Revision

4 2
A8-05 A4-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
178225

100225 850 77150

12175 12450 10800 10800 10800 10800 10800 10800 10800 850 10800 10800 10800 10800 10800 10800 12350

STRL. COLUMN CONCRETE SPANDREL OF STRL. COLUMN CONCRETE SPANDREL OF SPEED RAMP
17.a PROJECT TEAM
800X800 (SEE DETAIL) HEIGHT 1050MM FROM FFL 800X800 (SEE DETAIL) HEIGHT 1050MM FROM FFL (REFER DETAIL)
COLUMN CAPITAL
PAINTED WITH APPROVED PAINTED WITH APPROVED
(SEE DETAIL) 6225 6125 OWNER
1025

COLOUR AND SHADE COLOUR AND SHADE


Infosys Technology Ltd.
A
ARCHITECT

5000
TYP
6600 18 SMALL CARS
1 TRC ENGINEERING (I) PVT LTD
A8-05
12275

2500 RAMP UP TO SECOND FLOOR @ 10% SLOPE. UP DN RAMP DN TO GROUND FLOOR @ 10% SLOPE. 2 1
6.6M DRIVE WAY

TYP A7-01 200 THK WALL A8-02


LVL. 3000 FOR DB MOUNTNG
3
6.3M DRIVE WAY 4
FHR-4 4 CONCRETE 1 1 A7-01 COLUMN TO
A4-02
FHR -3 SS RAILING ON RAMP A6-04 CONCRETE COLUMN (TYP) SPANDREL PAINTED WITH FHR -5 A6-04 A6-02 SUPPORT STAIR
FHR-2 6250
APPROVED COLOUR AND SHADE 700 MM DIA

ENTRY
B
EXIT 3000
LOBBY-2

6000
3

TYP
TYP TYP TYP 4225X6000

6250
SMALL

6150
BIG SMALL 00 3
CAR CAR CAR 2 BIG CARS
LIFTS 60
7 BIG CARS 3300 BAY 3 BIG CARS 9 BIG CARS 1 SM CAR BAY BAY 2 BIG CARS 2300X2750
4 1 BIG CAR R= A4-01

3000
TYP LEVEL ABOVE FINISHED 2 OF 5 (TYP) 3 OF 5 (TYP)
2 OF 4 (TYP) 2 OF 5 (TYP) GROUND 509.0M ELECTRICAL CHARGING POINTS B1
16750

CONCRETE SPANDREL OF DB & CS


FOR 17 CARS 3 OF 5 (TYP)
HEIGHT 1050MM FROM FFL 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY

4 SMALL CARS
(TYP)PAINTED WITH
APPROVED COLOUR AND SHADE
6M DRIVE WAY 6M DRIVE WAY
22 SMALL CARS

57 SMALL CARS
ELECTRICAL CHARGING STEEL STAIR
POINTS FOR 22 CARS

7.2M DRIVE WAY


C UP
ENTRY TO
LVL. 3000
STAIR
5000
TYP

57 SMALL CARS
6
A7-01
BRICK COLUMN
3 2500
2500 450X450X1250
A4-02 TYP

5 SMALL CARS
16000

ELECTRICAL
6M DRIVE WAY DN
6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY CHARGING
POINTS FOR
2 OF 5 (TYP) 2 OF 5 ( TYP) 1550 2 OF 5( TYP) 11 CARS
89950

2500
5
TYP
54 SMALL CARS 17.b KEY PLAN

5000
A7-01 SMALL
6.6M DRIVE WAY

CAR
FHR-8 BAY

D ELECTRICAL

2 SMALL CARS
ECC BLOCK SUB STATION
FHR-6 FHR-7 FHR-9
G+14

SURV EY NO. 51
4ACRES

52 SMALL CARS

1140
FUT URE EXPANSION FUT URE EXPANSION
SDB5 SDB4
PHASE-2 G+5 G+5

0
GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
PHASE-1 SITE
OF FICE-2
11400

SITE OFF ICE-1

J.1
P
U

SDB3 SDB2 UNIT


G+5 G+5 STORE M E
T
S
IM S

2 OF 5 ( TYP)
CEMENT
GODOW N

WAY
6
5

R
4
3
2
1
P
U

=
RIVE
P
U

60 SDB1
G+5

6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 6M D


STA FF/L AB OU R

J
CANTEEN

00 REST REST
RO OM -2RO OM -1
TO I E
LT
BLO CK

SECURITY SECURITY

200 THK
RAMP

ENTRY EXIT

SUBWAY VIP PA RKI NG


12
M
1 2
3 4 5
67
8 9 CR
OSSI
PUBLIC A REA
10 NG

18.19 ACRES SURV EY NO. 54


MASONRY WALL SURV EY NO. 49
STAIR-1 PROPOS
ED MLC P
DEVELOPER
STORE

503 lv l.,

6300X3250 HOL DI NG
SEC URI TY

D.1 14m WIDE ROAD (FUTURE


SINGAPO RE ENTRANCE
26m WIDE ROAD
EXPANSION

CR OSSI
NG

DN
4600

LAYOUT
14.5m ROAD PRIVA TE

OPENING 34 SMALL CARS


UP
DB &CS AGRICULTURE LAND
BUS TERMINAL

E RS
R.C.C. COLUMN 1 LOBBY-1 L CA
MAL Y P) CLIENT:
(SEE STRL. DRG.) 26 S MN (T
COL U
WAY
4000X7400
5000

E
CRET
RIVE CON
1
2
LIFTS
2300X2750 2500 6M D ITH 7400
ED W
A4-01
FHR-1
D R
AINT
EL P SHADE
M/S INFOSYS TECHNOLOGIES
7 OF 5( TYP) PAN AN D 0 17.2
1 CRE
TE S OLOUR
CON ROVED
C 1118 LTD. HYDERABAD
15750

T S
A6-01 6M DRIVE WAY 6M DRIVE WAY POIN APP 17.1
GING
HAR 0
6 OF 5 (TYP) AL C 1118
TRIC
3 SMALL CARS

ELEC 26 CARS
3 OF 5 (TYP) FOR 16.1 PROJECT NUMBER
0
1
12 SMALL CARS 1118
8 SMALL CARS
4650
A7-01 EXIT 15.1 10BLR023
0
ENTRY 1118
F PROJECT PHASE
FHR-10
14.1
0
LVL. 1500 5 50MM THK 1118
CONCRETE COLUMN(Typ) CONCRETE SPANDREL OF
6950

EXPANSION JOINT
PAINTED WITH APPROVED HEIGHT 1050MM FROM FFL (TYP) DN RAMP DN TO GROUND FLOOR
LOBBY-3
13.1 DESIGN DEVELOPEMENT
COLOUR AND SHADE PAINTED WITH APPROVED 5700X1455
COLOUR AND SHADE
LVL. 3000 6 LIFTS
2300X2750 ARCHITECT AND STRUCTURAL CONSULTANT
G 12.1
EMERGENCY EXIT RAMP ES-1 7
(REFER DETAIL) FD1 1
6225

UP RAMP UP TO SECOND FLOOR


DS-1 UP
A6-03
2 4

A8-06 A7-01 FHR-11


DN
OPENING
H
200 THK STAIR-3
MASONRY WALL 6300x3300 ENGINEERING (I) PVT LTD
2115 6400
325 8750 1725 10800 1725 9075 8515

6.1 6.2 8.1 9.2


TRC Engineering (I) Pvt Ltd.
No 6/A, Amit Plaza, JP Nagar, 3rd Phase
Bannerghatta Road,Bangalore-560076
FIRST FLOOR Phone : +91-80-26581707/08/09
Fax :+91-80-26582424 WebSite:www.trc.co.in
1 1 : 200

SCHEDULE AREA STATEMENT SHAFT SCHEDULE: LEGEND: GENERAL NOTES:


FOR CO-ORDINATION
DOOR SCHEDULE_FIRST FLOOR SL. FLOOR AREA IN SQ MTS AREA IN SQ FT FRONT RAMP FRONT RAMP SL. NAME DESCRIPTION SIZE REMARKS
1. NON CAR PARKING BAY. 1) ALL DIMENSIONS ARE IN MILLIMETRE UNLESS OTHERWISE MENTIONED. DESIGNED BY:Designer
TYPE MARK LEVEL WIDTH HEIGHT COUNT DESCRIPTION NO. NAME AREA IN SQ MTS AREA IN SQ FT NO. (mm)
DRAWN BY:Author
FD1 FIRST FLOOR 1000 2100 2 FIRE DOOR 2) NO DIMENSIONS TO BE SCALED FROM DRAWING.
SMALL CAR(2.5MX5M)
1. GROUND 11635 119607 1. FHR (1-11) FIRE HOSE REEL 1200X1000
2. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. CHECKED BY:Checker

FLOOR
PARKING BAY.
SCALE: 1 : 200
PARKING SCHEDULE_FIRST FLOOR 3) IN CASE OF DISCREPANCIES LARGER SCALE DETAILED DRAWINGS SHALL
2. FIRST 11116 114272 2. ES -1 ELECTRICAL 1200X400
BIG CAR (3MX6.0M) SUPERCEDE THE SMALLER SCALE DRAWINGS.
TYPE MARK COUNT DRAWING TITLE
FLOOR SHAFT 3. PARKING BAY.
BIG CARS 36
4) DISCREPANCIES IN THE DRAWINGS ARE TO BE BROUGHT TO THE NOTICE
SMALL CARS 382
3. SECOND FLOOR 11812 121427 3. DS -1 LV SHAFT FOR 900X400 OF THE ARCHITECT PRIOR TO COMMENCEMENT OF THE WORK.
Grand total 418 CCTV AND DATA 4. LOBBY AREA.
FIRST FLOOR PLAN
4. THIRD FLOOR 10736 110366 4. DB&CS DB AND CONTROL
SWITCH LOCATION 5. STEEL PIPE BOLLARDS
@1500 C/C
5. FOURTH FLOOR 7797 80153 2835.63 29143

6. FIFTH FLOOR 7797 80153 1575.80 SHEET NUMBER


16191

7. TERRACE FLOOR 6222 63962 1575.80 16191 A1-02


DATE:02/28/2011 NORTH
ISSUE
No. Date Description Revision

2
A4-01
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
178225

100225 850 77150

12175 12450 10800 10800 10800 10800 10800 10800 10800 850 10800 10800 10800 10800 10800 10800 12350

CONCRETE SPANDREL OF STRUC. COLUMN CONCRETE SPANDREL OF COLUMN CAPITAL


17.a PROJECT TEAM
HEIGHT 1050MM FROM FFL (TYP) (SEE DETAIL) HEIGHT 1050MM FROM FFL (SEE DETAIL) SPEED RAMP
PAINTED WITH APPROVED (REFER DETAIL)
COLOUR AND SHADE
6225 6125 OWNER
A Infosys Technology Ltd.

RAMP LINE BELOW


7 SMALL CARS ARCHITECT
TRC ENGINEERING (I) PVT LTD
LVL : 6000
12275

RAMP UP TO THIRD FLOOR WITH 1:10 SLOPE. DN RAMP DN TO FIRST FLOOR WITH 1:10 SLOPE 2 3 4
A7-01 A7-01 1
A4-02
A8-02

6625
CONCRETE CONCRETE SPANDREL OF
COLUMN (TYP) HEIGHT 1050MM FROM FFL 1 1
6590 FHR -3 FHR-4 PAINTED WITH APPROVED FHR -5 STAIR-2
FHR-2 A6-04 A6-02
COLOUR AND SHADE UP
UP

ENTRY
B EXIT LIFTS
TYP TYP
2300X2750 3 TYP
9 SMALL CARS

TYP BIG
6000
TYP

TYP SMALL SMALL

00
9 BIG CARS SMALL 3 BIG CARS LOBBY-2 CAR 3
2 BIG CARS

60
7 BIG CARS SMALL 2 BIG CARS CAR CAR CAR
4225X6000 BAY

R=
CAR BAY A4-01
6.6 M DRIVE WAY

3000 BAY BAY 4


BAY
TYP
6 OF 5 (TYP) DB CS B1
2 OF 5 (TYP) 2 OF 5 (TYP) 1 OF 5 (TYP) 200 THK WALL
16750

FOR DB MOUNTNG ENTRY TO STAIR


6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY DN
BRICKCOLUMN
450X450X1250

3 BIG CARS
1

7.4 M DRIVE WAY


14 SMALL CARS 40 SMALL CARS STEEL STAIR
A6-06
(REFER DETAIL)

C
200 MASONRY WALL
2500
14 SMALL CARS 40 SMALL CARS

7.2 M DRIVE WAY


DRIVER'S LOUNGE 6
CONCRETE SPANDREL
21400X11800 A7-01 OF HEIGHT 1050MM
FROM FFL PAINTED
3 W

6 SMALL CARS
WITH APPROVED
A4-02 COLOUR AND SHADE
16000

W
STRUC. COLUMN 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY
W (SEE DETAIL)
2 OF 5 (TYP)
89950

2 OF 5 (TYP) 2 OF 5 (TYP)

5
FHR-6 17.b
A7-01 13 SMALL CARS
2500
38 SMALL CARS
FHR-8 KEY PLAN
1600

TYP.
D

2 SMALL CARS
ELECTRICAL
FHR-7

2000
SUB STATION
FHR-9
ECC BLOCK
G+14

14 SMALL CARS 35 SMALL CARS 4ACRES

1140
SURV EY NO. 51
5000
TYP.

200 THK MASONRY WALL


W PHASE-2
FUT URE EXPANSION
SDB5
G+5
FUT URE EXPANSION
SDB4
G+5

0
W A6-05
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1
GA S B A NK
AGRICULTURE LAND
11400

PHASE-1
J.1
SITE
OF FICE-2

SITE OFF ICE-1

WAY
P
U

TOILET D1 SDB3 SDB2 UNIT


STORE

RIVE
G+5 G+5
M E
T
S
IM S

R CEMENT
GODOW N

4650X5975 600 WIDE = 6


5
4
3

6M D
2
1
P
U

R=
2 OF 5 (TYP) 60
6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY J
P
U

PLATFORM 00 SDB1

60
G+5 STA FF/L AB OU R
CANTEEN

D1

00
D2 D2 REST REST
RO OM -2RO OM -1
TO I E
LT
BLO CK

PANTRY
SECURITY SECURITY
RAMP

ENTRY EXIT

SUBWAY VIP PA RKI NG


12
M
1 2
3 4 5
67
8 9 CR
PUBLIC A REA

STAIR-1
OSSI
10 NG

18.19 ACRES SURV EY NO. 54

WC WC V1 ED MLC P
DEVELOPER
STORE
SURV EY NO. 49

6300X3300 PROPOS
D.1
503 lv l.,

HOL DI NG
SEC URI TY

14m WIDE ROAD (FUTURE


EXPANSION

WAY
SINGAPO RE ENTRANCE

V1 V1 V1 V1 V1 V1 26m WIDE ROAD

RIVE
DN
4600

34 SMALL CARS
CR OSSI
NG

6M D
LAYOUT

(REFER DB &CS 14.5m ROAD PRIVA TE

UP
AGRICULTURE LAND
TOILET DETAIL) BUS TERMINAL

E FD1
RS
OPENING 1 LOBBY-1 MAL
L CA
4000X7400 28 SMALL CARS
26 S CONCRETE COLUMN (TYP) CLIENT:
AY
1 LIFTS EW 7400
A4-01
2 2300X2750
6M DRIV
FHR-1 0 17.2
M/S INFOSYS TECHNOLOGIES
1 1118
5 OF 4( TYP)
OM F
FL
LTD. HYDERABAD
15750

M FR E
A6-01
6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY
6 OF 5 (TYP)
IG
050M
HT 1 AND SH
AD 17.1
3 SMALL CARS

H E 0
1118
L OF R
LOU
DRE VED CO
PAN
TE S A PPRO
3 OF 5 (TYP) CRE
CON TED WIT
H 16.1
8 SMALL CARS PAIN 180 PROJECT NUMBER
1 11
A7-01 2450 15.1
EXIT 0 10BLR023
1118
1700

1700
F ENTRY
14.1 PROJECT PHASE
FHR-10 LOBBY-3 50MM THK 0
LVL : 7500
1455X5700 5 EXPANSION JOINT 1118
6950

CONCRETE COLUMN(TYP)
PAINTED WITH APPROVED
CONCRETE SPANDREL OF
HEIGHT 1050MM FROM FFL (TYP) LVL : 6000
DN RAMP DN TO FIRST FLOOR 13.1 DESIGN DEVELOPEMENT
LIFTS
COLOUR AND SHADE PAINTED WITH APPROVED
COLOUR AND SHADE
2300X2750 6

13464
G 12.1 ARCHITECT AND STRUCTURAL CONSULTANT
EMERGENCY EXIT RAMP ES-1 7
(REFER DETAIL) FD1
6225

UP RAMP UP TO THIRD FLOOR DS-1


4 UP
2
A7-01 FHR-11 OPENING
A8-06
DN

H
STAIR-3
200 THK 6300X3300
MASONRY WALL
2115 6400
1 ENGINEERING (I) PVT LTD
A6-03
325 8750 1725 10800 1725 9075 8515

6.1 6.2 8.1 9.1 9.2 TRC Engineering (I) Pvt Ltd.
SECOND FLOOR No 6/A, Amit Plaza, JP Nagar, 3rd Phase
1 1 : 200 Bannerghatta Road,Bangalore-560076
Phone : +91-80-26581707/08/09
Fax :+91-80-26582424 WebSite:www.trc.co.in

SCHEDULE: AREA STATEMENT SHAFT SCHEDULE: LEGEND: GENERAL NOTES:


FOR CO-ORDINATION
DOOR SCHEDULE_SECOND FLOOR DESIGNED BY:Designer
SL. FLOOR AREA IN SQ MTS AREA IN SQ FT FRONT RAMP FRONT RAMP SL. NAME DESCRIPTION SIZE REMARKS 1) ALL DIMENSIONS ARE IN MILLIMETRE UNLESS OTHERWISE MENTIONED.
TYPE MARK LEVEL WIDTH HEIGHT COUNT DESCRIPTION 1. NON CAR PARKING BAY.
NO. NAME AREA IN SQ MTS AREA IN SQ FT NO. (mm) DRAWN BY:Author
D1 SECOND 900 2100 2 FLUSH DOOR 2) NO DIMENSIONS TO BE SCALED FROM DRAWING.
FLOOR CHECKED BY:Checker
2. SMALL CAR(2.5MX5M) ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
D2 SECOND 750 2100 2 FLUSH DOOR 1. GROUND 11635 119607 1. FHR (1-11) FIRE HOSE REEL PARKING BAY.
FLOOR 1200X1000 SCALE: 1 : 200
FLOOR 3) IN CASE OF DISCREPANCIES LARGER SCALE DETAILED DRAWINGS SHALL
FD1 SECOND 1000 2100 2 FIRE DOOR BIG CAR (3MX6.0M) SUPERCEDE THE SMALLER SCALE DRAWINGS. DRAWING TITLE
FLOOR 2. FIRST 11116 114272 2. ES -1 ELECTRICAL 1200X400 3. PARKING BAY.
FLOOR SHAFT
Grand total: 6 4) DISCREPANCIES IN THE DRAWINGS ARE TO BE BROUGHT TO THE NOTICE
SECOND FLOOR 11812
OF THE ARCHITECT PRIOR TO COMMENCEMENT OF THE WORK.
3. 121427
WINDOW SCHEDULE_ SECOND FLOOR
3. DS -1 LV SHAFT FOR
CCTV AND DATA
900X400 4. LOBBY AREA. SECOND FLOOR PLAN
TYPE MARK WIDTH HEIGHT COUNT DESCRIPTION 4. THIRD FLOOR 10736 110366 4. DB&CS DB AND CONTROL 5. STEEL PIPE BOLLARDS
V1 600 600 7 VENTILATOR SWITCH LOCATION
W 900 900 5 SLIDING WINDOW
@1500 C/C
Grand total: 12 5. FOURTH FLOOR 7797 80153 2835.63 29143

PARKING SCHEDULE_SECOND FLOOR SHEET NUMBER


6. FIFTH FLOOR 7797 80153 1575.80
TYPE MARK COUNT 16191
BIG CARS 38
7. TERRACE FLOOR 6222 1575.80
A1-03
SMALL CARS 348 63962 16191
Grand total: 386
DATE:02/28/2011 NORTH
ISSUE
No. Date Description Revision

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PROJECT TEAM
178225
OWNER
100225 850 77150 Infosys Technology Ltd.

12175 12450 10800 10800 10800 10800 10800 10800 10800 850 10800 10800 10800 10800 10800 10800 12350 ARCHITECT
TRC ENGINEERING (I) PVT LTD

2
SPEED RAMP CONCRETE SPANDREL OF 6
17.a
A8-05 (REFER DETAIL) HEIGHT 1050MM FROM FFL A8-05
RAMP LINE BELOW
6225 6125

A
CONCRETE SPANDREL OF
HEIGHT 1050MM FROM FFL (TYP) STEEL STAIR
PAINTED WITH APPROVED (REFER DETAIL)
1 COLOUR AND SHADE
A8-05 3 4
12275

A7-01 A4-02
LVL: 9000
DN RAMP DN TO SECOND FLOOR 2
A7-01
BRICK COLUMN 1
RAMP LINE BELOW
450X450X1250 A6-02
FHR -3 CONCRETE SPANDREL OF
HEIGHT 1050MM FROM FFL

2500
FHR-2 DN
STAIR-2
ENTRY
B EXIT
TYP
3
TYP ENTRY TO STAIR TYP

6000
TYP TYP TYP TYP

TYP.
5 BIG CARS 9 BIG CARS 3 BIG CARS 3 BIG CARS SMALL
4BIG CARS
SMALL SMALL SMALL SMALL SMALL
5 BIG CARS BIG 00 3
CAR CAR LOBBY-2 CAR 60
CAR
BAY
CAR CAR CAR BAY 4225X6000 4 BAY R= A4-01
BAY BAY BAY BAY

3000 B1
2 OF 5 (TYP) 2 OF 5 (TYP) TYP. 3 OF 5 (TYP) LIFTS
16750

2300X2750
6M DRIVE WAY BUILDING LINE 6M DRIVE WAY 6M DRIVE WAY
6M DRIVE WAY @ FOURTH FLOOR
1550 BUILDING LINE STAIR FROM FOURTH FLOOR
RAMP UP TO FOURTH FLOOR

2500
@ FOURTH FLOOR
TYP.

17 SMALL CARS 29 SMALL CARS 6 SMALL CARS

7.5 M DRIVE WAY


5000
TYP.
3
UP

A8-04
800

800

800
1600
400

C
800

1
A8-04

17 SMALL CARS 37 SMALL CARS


KEY PLAN

12 SMALL CARS
6
CONCRETE SPANDREL
A7-01 OF HEIGHT 1050MM
FROM FFL PAINTED

7.2M DRIVE WAY


3 WITH APPROVED
ELECTRICAL
A4-02 COLOUR AND SHADE ECC BLOCK SUB STATION
16000

G+14
4ACRES

STRL. COLUMN 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY SURV EY NO. 51

800X800 (SEE DETAIL) PHASE-2


FUT URE EXPANSION
SDB5
G+5
FUT URE EXPANSION
SDB4
G+5

BUILDING LINE
89950

2 OF 5 (TYP) 2 OF 5 (TYP) GA S B A NK
AGRICULTURE LAND
@ FOURTH FLOOR
FUT URE EXPANSION
FOOD COURT -1
FOOD COURT -2

PHASE-1 SITE
OF FICE-2

SITE OFF ICE-1

P
U

SDB3 SDB2 UNIT


G+5 G+5 STORE M E
T
S
IM S

5 CEMENT
GODOW N

FHR-6 17.b
6
5
4
3
2
1
P
U

A7-01 FHR-8
P
U

FHR-9
SDB1

17 SMALL CARS 37 SMALL CARS


G+5 STA FF/L AB OU R
CANTEEN

REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK

SECURITY SECURITY
RAMP

ENTRY EXIT

SUBWAY VIP PA RKI NG


12
M
1 2
3 PUBLIC A REA

D
4 5
67
8 9 CR
OSSI
10 NG

18.19 ACRES SURV EY NO. 54

SURV EY NO. 49
FHR-7 PROPOS
ED MLC P
DEVELOPER
STORE

2500
503 lv l.,

HOL DI NG

20 SMALL CARS 12 SMALL CARS


SEC URI TY

14m WIDE ROAD (FUTURE

1140
EXPANSION

17 SMALL
17 SMALL
CARSCARS

5000
SINGAPO RE ENTRANCE
26m WIDE ROAD

W CR OSSI
NG

0
LAYOUT
PRIVA TE

W 200 THK 5000 14.5m ROAD

AGRICULTURE LAND
MASONRY WALL TYP
11400

BUS TERMINAL
WAY J.1
RIVE
6M D
STORE R
2 OF 5 (TYP) =
W 60
11200X12000
6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 00 J CLIENT:
W
D1 1550
STAIR-1

D.1
6300X3300 M/S INFOSYS TECHNOLOGIES
7.5 M DRIVE WAY

BUILDING LINE
V1 V1 DN
12 SMALL CARS
@ FOURTH FLOOR LTD. HYDERABAD
4600

OPENING DB &CS
UP

E WAY
FD1
RIVE CAR
S
1 6M D 26 S
MAL
L
PROJECT NUMBER
LOBBY-1 12 SMALL CARS CONCRETE COLUMN (TYP)
LIFTS
2300X2750 4000X7400
7400
1
2
10BLR023

5000
A4-01
7 OF 5 (TYP)
1
FHR-1
1118
0 17.2
PROJECT PHASE
15750

A6-01

6M DRIVE WAY 17.1


3 SMALL CARS

6M DRIVE WAY 5 OF 5 (TYP) 0


EL O
F
1118 DESIGN DEVELOPEMENT
NDR M FFL
S PA
3 OF 5 (TYP) C R ETE MM FRO 16.1
CON HT 1050
HEIG 1118
0 ARCHITECT AND STRUCTURAL CONSULTANT
4645 1 12 SMALL CARS 8 SMALL CARS
A7-01 15.1
0
700

1118
ENTRY
F EXIT
14.1
50MM THK 0
CONCRETE COLUMN(TYP) FHR 10 LVL: 10500 LOBBY-3 5 EXPANSION JOINT 1118
6950

PAINTED WITH APPROVED 1455X5700


COLOUR AND SHADE CONCRETE SPANDREL OF DN RAMP DN TO SECOND FLOOR 13.1
HEIGHT 1050MM FROM FFL (TYP) LIFTS
PAINTED WITH APPROVED LVL: 9000 2300X2750 6 ENGINEERING (I) PVT LTD
G
COLOUR AND SHADE
12.1
7
ES-1
EMERGENCY EXIT RAMP FD1
TRC Engineering (I) Pvt Ltd.
6225

(REFER DETAIL) UP RAMP UP TO FOURTH FLOOR


DS-1 UP
2
FHR-11
A8-06 DN
OPENING
H No 6/A, Amit Plaza, JP Nagar, 3rd Phase
200 THK STAIR-3
MASONRY WALL 6300X3300
1
Bannerghatta Road,Bangalore-560076
1 2115 6400
A6-03 Phone : +91-80-26581707/08/09
A8-06 325 8750 1725 10800 1725 9075 8515 Fax :+91-80-26582424 WebSite:www.trc.co.in

THIRD FLOOR
1 1 : 200
6.1 6.2 8.1 9.2

FOR CO-ORDINATION
SCHEDULE AREA STATEMENT SHAFT SCHEDULE: LEGEND: GENERAL NOTES: DESIGNED BY:Designer

DRAWN BY:Author
SL. FLOOR AREA IN SQ MTS AREA IN SQ FT FRONT RAMP FRONT RAMP SL. NAME DESCRIPTION SIZE REMARKS
DOOR SCHEDULE_THIRD FLOOR NON CAR PARKING BAY.
NO. NAME AREA IN SQ MTS AREA IN SQ FT NO. (mm) 1. 1) ALL DIMENSIONS ARE IN MILLIMETRE UNLESS OTHERWISE MENTIONED. CHECKED BY:Checker
TYPE MARK LEVEL WIDTH HEIGHT COUNT DESCRIPTION
D1 THIRD FLOOR 900 2100 1 FLUSH DOOR 2) NO DIMENSIONS TO BE SCALED FROM DRAWING. SCALE: 1 : 200
1. GROUND 11635 119607 1. FHR (1-11) FIRE HOSE REEL 2. SMALL CAR(2.5MX5M)
FD1 THIRD FLOOR 1000 2100 2 FIRE DOOR 1200X1000 ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
FLOOR PARKING BAY. DRAWING TITLE
2. FIRST 11116 114272 3) IN CASE OF DISCREPANCIES LARGER SCALE DETAILED DRAWINGS SHALL
WINDOW SCHEDULE_ THIRD FLOOR
FLOOR
2. ES -1 ELECTRICAL 1200X400 BIG CAR (3MX6.0M) SUPERCEDE THE SMALLER SCALE DRAWINGS.
TYPE SHAFT 3. PARKING BAY.
V1
MARK WIDTH
600
HEIGHT
600 2
COUNT DESCRIPTION
VENTILATOR
3. SECOND FLOOR 11812 121427 3. DS -1 LV SHAFT FOR 900X400
4) DISCREPANCIES IN THE DRAWINGS ARE TO BE BROUGHT TO THE NOTICE THIRD FLOOR PLAN
CCTV AND DATA 4. LOBBY AREA. OF THE ARCHITECT PRIOR TO COMMENCEMENT OF THE WORK.
W 900 900 4 SLIDING WINDOW
Grand total: 6 4. THIRD FLOOR 10736 110366 DB&CS DB AND CONTROL
4.
SWITCH LOCATION 5. STEEL PIPE BOLLARDS
PARKING SCHEDULE_THIRD FLOOR 5. FOURTH FLOOR 7797 2835.63 @1500 C/C
80153 29143
TYPE MARK COUNT SHEET NUMBER
BIG CARS 39 FIFTH FLOOR 7797 1575.80
6. 80153
SMALL CARS
Grand total
336
375
16191
A1-04
7. TERRACE FLOOR 6222 63962 1575.80 16191
DATE:02/28/2011 NORTH
ISSUE
No. Date Description Revision

4
A8-05

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

178225
PROJECT TEAM
100225 850 77150
OWNER
12175 12450 10800 10800 10800 10800 10800 10800 10800 850 10800 10800 10800 10800 10800 10800 12350
Infosys Technology Ltd.

3 ARCHITECT
A8-05 SPEED RAMP
17.a
(REFER DETAIL) TRC ENGINEERING (I) PVT LTD
RAMP LINE BELOW 6225 6125

STRUC. COLUMN
1 (SEE DETAIL)
A8-05 CONCRETE SPANDREL OF HEIGHT 1050MM
FROM FFL PAINTED WITH APPROVED
12275

LVL: 12000 COLOUR AND SHADE

RAMP LINE BELOW

CONCRETE SPANDREL OF FHR -3 BUIDING LINE BELOW


FHR-2 HEIGHT 1050MM FROM FFL

ENTRY
B EXIT
RAMP UP TO FIFTH FLOOR

TYP

6000
TYP.
TYP SMALL
SMALL CAR
3 BIG CARS CAR 5 BIG CARS BAY 3 BIG CARS 3 BIG CARS
BAY
3000
TYP.
B1
2 OF 5 (TYP) 2 OF 5 (TYP) TERRACE BELOW
16750

6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 2


A8-04
BUIDING LINE
21800
BELOW
CONCRETE SPANDREL OF STEEL STAIR
16 SMALL CARS HEIGHT 1050MM FROM FFL

2500
UP
UP DN
DN

C
ENTRY
16 SMALL CARS TO
SS RAILING STAIR
RAMP DN TO THIRD FLOOR

21 SMALL CARS 6 SMALL CARS


ON RAMP
7.2M DRIVE WAY
9 SMALL CARS

2500
3
A4-02 CONCRETE TERRACE BELOW KEY PLAN
16000

SPANDREL

6250
6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY
2 OF 5 (TYP) 2 OF 5 (TYP) ELECTRICAL
ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51
89950

4OF 5 (TYP)
FUT URE EXPANSION FUT URE EXPANSION

5 PHASE-2
SDB5
G+5
SDB4
G+5

A7-01 FHR-6
16 SMALL CARS
FHR-7
27 SMALL CARS FHR-9 17.b FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1
GA S B A NK
AGRICULTURE LAND
PHASE-1 SITE
OF FICE-2

SITE OFF ICE-1

FHR-8 SDB3
P
U

SDB2 UNIT
G+5 G+5 STORE M E
T
S
IM S

D
CEMENT
GODOW N

6
5
4
3
2
1
P
U

DN P
U

SDB1

33 SMALL CARS
G+5 STA FF/L AB OU R
CANTEEN

1140
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK

SECURITY SECURITY

50
RAMP

ENTRY EXIT

SUBWAY VIP PA RKI NG


12
M
1 2
3 4 5
67
PUBLIC A REA

00
8 9 CR
OSSI
10 NG

18.19 ACRES SURV EY NO. 54

6M DRIVE WAY

0
SURV EY NO. 49
ED MLC P
DEVELOPER
STORE

PROPOS
4OF 5 (TYP) 503 lv l.,
ENTRY

HOL DI NG
SEC URI TY
11400

14m WIDE ROAD (FUTURE

J.1
EXPANSION
SINGAPO RE ENTRANCE
LVL: 12000 26m WIDE ROAD

WAY
CR OSSI
NG

RIVE
LAYOUT
14.5m ROAD PRIVA TE

6M DRIVE WAY 6M DRIVE WAY 6M DRIVE WAY 6M D J AGRICULTURE LAND


BUS TERMINAL
EXIT

L OF
DRE FFL
STAIR-1 PAN
2500 C ARS TE S M FROM
6300X3300 ALL CRE M
TYP. 6 SM CON HT 1050 CLIENT:
D.1 HEIG
DN 25 SMALL CARS
5000
TYP.
4600

4 SMALL CARS
UP
DB &CS
COLUMN (TYP)
M/S INFOSYS TECHNOLOGIES
E
1
FD1 LTD. HYDERABAD
LOBBY-1
4000X7400 25 SMALL CARS
LIFTS TERRACE BELOW
2300X2750
7400
1
2
A4-01 7 OF 5 (TYP) PROJECT NUMBER
FHR-1
1118
0 17.2
W
BELO
15750

6M DRIVE WAY 6M DRIVE WAY CONCRETE


1 6M DRIVE WAY LINE 17.1 10BLR023
DING
SPANDREL
3 SMALL CARS

A6-01 5 OF 5 (TYP) 0
3 OF 5 (TYP) BUIL 1118
PROJECT PHASE
16.1
0
4695 1 1118
A7-01
12 SMALL CARS 8 SMALL CARS DESIGN DEVELOPEMENT
EXIT
15.1
0
700

ENTRY 1118 ARCHITECT AND STRUCTURAL CONSULTANT


F
FHR 10 14.1
0
CONCRETE COLUMN(TYP) CONCRETE SPANDREL OF LVL: 13500 LOBBY-3 5 50MM THK 1118
PAINTED WITH APPROVED HEIGHT 1050MM FROM FFL (TYP)
6950

1455X5700 EXPANSION JOINT


COLOUR AND SHADE PAINTED WITH APPROVED
COLOUR AND SHADE
DN
RAMP DN TO THIRD FLOOR
13.1
LVL: 12000 LIFTS
2300X2750 6
G 12.1
EMERGENCY EXIT RAMP FD1
7 STAIR-3 ENGINEERING (I) PVT LTD
ES-1
6225

(REFER DETAIL) 4 6300X3300


UP RAMP UP TO FIFTH FLOOR
A7-01
DS-1 UP
2
A8-06 FHR-11

TRC Engineering (I) Pvt Ltd.


DN

H
200 THK OPENING
MASONRY WALL
1
2115 6400
A6-03 No 6/A, Amit Plaza, JP Nagar, 3rd Phase
325 8750 1725 10800 1725 9075 8515
Bannerghatta Road,Bangalore-560076
Phone : +91-80-26581707/08/09
6.1 6.2 8.1 9.2 Fax :+91-80-26582424 WebSite:www.trc.co.in
FOURTH FLOOR
1 1 : 200

SCHEDULE: AREA STATEMENT SHAFT SCHEDULE: LEGEND: GENERAL NOTES: FOR CO-ORDINATION
DESIGNED BY:Designer

DOOR SCHEDULE_FOURTH FLOOR SL. FLOOR AREA IN SQ MTS AREA IN SQ FT FRONT RAMP FRONT RAMP SL. NAME DESCRIPTION SIZE REMARKS 1. NON CAR PARKING BAY. 1) ALL DIMENSIONS ARE IN MILLIMETRE UNLESS OTHERWISE MENTIONED. DRAWN BY:Author
NO. NAME AREA IN SQ MTS AREA IN SQ FT NO. (mm)
TYPE MARK LEVEL WIDTH HEIGHT COUNT DESCRIPTION
2) NO DIMENSIONS TO BE SCALED FROM DRAWING. CHECKED BY:Checker
FD1 FOURTH FLOOR 1000 2100 2 FIRE DOOR 2. SMALL CAR(2.5MX5M) ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
1. GROUND 11635 119607 1. FHR (1-11) FIRE HOSE REEL 1200X1000 PARKING BAY. SCALE: 1 : 200
FLOOR
3) IN CASE OF DISCREPANCIES LARGER SCALE DETAILED DRAWINGS SHALL
BIG CAR (3MX6.0M) SUPERCEDE THE SMALLER SCALE DRAWINGS.
DRAWING TITLE
PARKING SCHEDULE_FOURTH 2. FIRST 11116 114272 2. ES -1 ELECTRICAL 1200X400 3.
FLOOR FLOOR SHAFT PARKING BAY.
TYPE MARK COUNT 4) DISCREPANCIES IN THE DRAWINGS ARE TO BE BROUGHT TO THE NOTICE
OF THE ARCHITECT PRIOR TO COMMENCEMENT OF THE WORK.
BIG CARS
SMALL CARS
23
218
3. SECOND FLOOR 11812 121427 3. DS -1 LV SHAFT FOR
CCTV AND DATA
900X400 4. LOBBY AREA. FOURTH FLOOR PLAN
Grand total 241 THIRD FLOOR 10736 DB&CS DB AND CONTROL
4. 110366 4. 5.
SWITCH LOCATION STEEL PIPE BOLLARDS
@1500 C/C
5 FOURTH FLOOR 7797 80153 2835.63 29143
SHEET NUMBER
6. FIFTH FLOOR 7797 80153 1575.80
16191
A1-05
7. TERRACE FLOOR 6222 63962 1575.80 16191
DATE:02/28/2011 NORTH
ISSUE
No. Date Description Revision

2
1 2 3 4 5 6 7 A4-01
8 9 10 11 12 13 14 15 16 17 18
178225

100225 850 77150

12175 12450 10800 10800 10800 10800 10800 10800 10800 850 10800 10800 10800 10800 10800 10800 12350

PROJECT TEAM
17.a
COLUMN CAPITAL SPEED RAMP OWNER
(SEE DETAIL) (REFER DETAIL)
RAMP LINE 6225 6125 Infosys Technology Ltd.
BELOW
A ARCHITECT
TRC ENGINEERING (I) PVT LTD
1
A8-05 CONCRETE SPANDREL OF HEIGHT 1050MM
12275

FROM FFL PAINTED WITH APPROVED


LVL: 15000 COLOUR AND SHADE

RAMP LINE
BELOW
BUIDING LINE BELOW LIFT SHAFT
FHR-2 FHR -3 BELOW
UP
ENTRY
B EXIT
TYP TYP

6000

6000
TYP.

TYP.
SMALL SMALL
3 BIG CARS 6 BIG CARS 3 BIG CARS 3 BIG CARS
CAR CAR
RAMP UP TO TERRACE

BAY BAY

3000
TYP.
3000
B1
2 OF 5 (TYP) TYP. TERRACE BELOW @ 3RD FLOOR LEVEL
16750

6M DRIVE WAY 6M DRIVE WAY 1 OF 5 (TYP)

CONCRETE SPANDREL OF HEIGHT 1050MM FROM FFL 4


PAINTED WITH APPROVED COLOUR AND SHADE A8-04

20 SMALL CARS 3
DN

A8-04

C
RAMP DN TO FOURTH FLOOR

5000
TYP.
ENTRY TO STAIR
7.2M DRIVE WAY
11 BIG CARS

10 SMALL CARS
37 SMALL CARS

2500
3
TYP.
A4-02
16000

6M DRIVE WAY 6M DRIVE WAY TERRACE BELOW @ 3RD FLOOR LEVEL


6M DRIVE WAY
89950

5
CONCRETE
SPANDREL
KEY PLAN
A7-01
FHR-6 16 SMALL CARS
FHR-7
27 SMALL CARS 17.b
ELECTRICAL
ECC BLOCK
G+14
SUB STATION

D SURV EY NO. 51
4ACRES

33 SMALL CARS R= PHASE-2


FUT URE EXPANSION
SDB5
G+5
FUT URE EXPANSION
SDB4
G+5

1140
50
00 FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1
GA S B A NK
AGRICULTURE LAND
PHASE-1

0
SITE
OF FICE-2

SITE OFF ICE-1

P
U

STRL. COLUMN SDB3 SDB2 UNIT


ENTRY

G+5 G+5 STORE M E


T
S
IM S
11400

800X800 (SEE DETAIL)


CEMENT
GODOW N

J.1
6
5
4
3

WAY
2
1
P
U

P
U

RIVE
SDB1
G+5 STA FF/L AB OU R
CANTEEN

6M D
LVL: 15000 REST REST
RO OM -2RO OM -1
TO I E
LT
BLO CK

SECURITY SECURITY

6M DRIVE WAY 6M DRIVE WAY J


RAMP

ENTRY EXIT

SUBWAY VIP PA RKI NG


12
M
1 2
3 4 5
67
8 9 CR
OSSI
PUBLIC A REA
10 NG

18.19 ACRES SURV EY NO. 54


EXIT

OF
RE L
SURV EY NO. 49
ED MLC P
DEVELOPER
STORE

AND OM FFL
PROPOS 503 lv l.,

2500 E SP
HOL DI NG
SEC URI TY

STAIR-1 2500
C ARS CRET 0MM FR 14m WIDE ROAD (FUTURE
EXPANSION

TYP. ALL N SINGAPO RE ENTRANCE

CO HT 10 5 26m WIDE ROAD


6300X3300 TYP. 6 SM
D.1 HEIG
14.5m ROAD
CR OSSI
NG

PRIVA TE
LAYOUT

DN
25 SMALL CARS
5000
TYP.

AGRICULTURE LAND
4600

BUS TERMINAL
4 SMALL CARS
DB &CS
UP

E FD1 CLIENT:
1
LIFTS 25 SMALL CARS
2300X2750 LOBBY-1
TERRACE BELOW @ 3RD FLOOR LEVEL
1
A4-01
2
4000X7400
7400 M/S INFOSYS TECHNOLOGIES
0 17.2 LTD. HYDERABAD
FHR-1 5 OF 5 (TYP)
7 1118
LOW
15750

1 6M DRIVE WAY 6M DRIVE WAY CONCRETE E BE 17.1


SPANDREL
DIN G LIN
3 SMALL CARS

5 OF 5 (TYP) 0
A6-01
BUIL 1118
PROJECT NUMBER
3 OF 5 (TYP) 16.1
0
4745 1
12 SMALL CARS 8 SMALL CARS 1118
A7-01 10BLR023
15.1
EXIT 0
1118 PROJECT PHASE
F ENTRY
14.1
FHR-10 0
CONCRETE COLUMN(TYP) LVL: 15000 LOBBY-3 5 50MM THK 1118 DESIGN DEVELOPEMENT
6950

PAINTED WITH APPROVED 16500 EXPANSION JOINT


1455X5700
COLOUR AND SHADE
CONCRETE SPANDREL OF
HEIGHT 1050MM FROM FFL
DN RAMP DN TO FOUTH FLOOR 13.1
PAINTED WITH APPROVED
6
ARCHITECT AND STRUCTURAL CONSULTANT
COLOUR AND SHADE LIFTS
G 2300X2750 12.1
EMERGENCY EXIT RAMP ES-1
(REFER DETAIL) 7 STAIR-3
FD1
6225

4 UP 6300X3300
RAMP UP TOTERRACE DS-1
UP
2 A7-01 OPENING
A8-06 FHR-11 DN

H
200 THK
ENGINEERING (I) PVT LTD
MASONRY WALL 1
2115 6400 A6-03

325 8750 1725 10800 1725 9075 8515


TRC Engineering (I) Pvt Ltd.
FIFTH FLOOR 6.1 6.2 8.1 9.2
1 1 : 200
No 6/A, Amit Plaza, JP Nagar, 3rd Phase
Bannerghatta Road,Bangalore-560076
Phone : +91-80-26581707/08/09
Fax :+91-80-26582424 WebSite:www.trc.co.in

SCHEDULE: AREA STATEMENT SHAFT SCHEDULE: LEGEND: GENERAL NOTES:

DOOR SCHEDULE_FIFTH FLOOR SL.


NO.
FLOOR
NAME
AREA IN SQ MTS AREA IN SQ FT FRONT RAMP FRONT RAMP
AREA IN SQ MTS AREA IN SQ FT
SL.
NO.
NAME DESCRIPTION SIZE
(mm)
REMARKS
1. NON CAR PARKING BAY. 1) ALL DIMENSIONS ARE IN MILLIMETRE UNLESS OTHERWISE MENTIONED. FOR CO-ORDINATION
TYPE MARK LEVEL WIDTH HEIGHT COUNT DESCRIPTION
DESIGNED BY:Designer
FD1 FIFTH FLOOR 1000 2100 2 FIRE DOOR 2) NO DIMENSIONS TO BE SCALED FROM DRAWING.
2. SMALL CAR(2.5MX5M)
1. GROUND 11635 119607 1. FHR (1-11) FIRE HOSE REEL 1200X1000 ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. DRAWN BY:Author
FLOOR
PARKING BAY.
CHECKED BY:Checker
3) IN CASE OF DISCREPANCIES LARGER SCALE DETAILED DRAWINGS SHALL
PARKING SCHEDULE_FIFTH FLOOR 2. FIRST 11116 114272 2. ES -1 ELECTRICAL 1200X400
BIG CAR (3MX6.0M) SUPERCEDE THE SMALLER SCALE DRAWINGS.
3. SCALE: 1 : 200
TYPE MARK COUNT FLOOR SHAFT PARKING BAY.
BIG CARS 14 4) DISCREPANCIES IN THE DRAWINGS ARE TO BE BROUGHT TO THE NOTICE DRAWING TITLE
SMALL CARS 240 3. SECOND FLOOR 11812 121427 3. DS -1 LV SHAFT FOR 900X400 OF THE ARCHITECT PRIOR TO COMMENCEMENT OF THE WORK.
4. LOBBY AREA.
CCTV AND DATA
Grand total 254
4. THIRD FLOOR 10736 4. DB&CS DB AND CONTROL
110366
SWITCH LOCATION 5. STEEL PIPE BOLLARDS FIFTH FLOOR PLAN
@1500 C/C
5. FOURTH FLOOR 7797 80153 2835.63 29143

6. FIFTH FLOOR 7797 80153 1575.80


16191
SHEET NUMBER
7. TERRACE FLOOR 6222 63962 1575.80 16191

A1-06
DATE:02/28/2011 NORTH
ISSUE
No. Date Description Revision

2
A4-01
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
178225
PROJECT TEAM

850 OWNER
100225 77150
Infosys Technology Ltd.
12175 12450 10800 10800 10800 10800 10800 10800 10800 850 10800 10800 10800 10800 10800 10800 12350
ARCHITECT
TRC ENGINEERING (I) PVT LTD
17.a

RAMP LINE
BELOW
A
RAMP LINE BELOW

1
A8-05
12275

RAMP UP FROM GROUND FLOOR

CONCRETE SPANDREL OF
HEIGHT 1050MM FROM FFL
PAINTED WITH APPROVED COLOUR AND SHADE
BUILDING LINE @ 3RD FLOOR

B
TYP TYP TYP

6000
TYP.
SMALL SMALL SMALL
5 BIG CARS CAR 6 BIG CARS CAR 3 BIG CARS CAR
BAY BAY BAY TERRACE BELOW
@ 9000 LVL
3000
TYP.
B1
16750

6M DRIVE WAY

2500
TYP.
RAMP DN TO FIFTH FLOOR

5000
TYP.
BUILDING LINE BELOW
20 SMALL CARS

C
10 SMALL CARS

28 SMALL CARS BUILDING LINE BELOW


KEY PLAN
3
A4-02
TERRACE BELOW @
16000

6M DRIVE WAY 15000 LVL


ECC BLOCK
G+14
ELECTRICAL
SUB STATION
4ACRES
SURV EY NO. 51
89950

FUT URE EXPANSION FUT URE EXPANSION

2500 PHASE-2
SDB5
G+5
SDB4
G+5

TYP. FUT URE EXPANSION


FOOD COURT -2
FOOD COURT -1
GA S B A NK
AGRICULTURE LAND
PHASE-1 SITE
OF FICE-2

5 SITE OFF ICE-1

17.b
P
U

SDB3 SDB2 UNIT


G+5 G+5 STORE M E
T
S
IM S

A7-01 28 SMALL CARS 6


5
4
3
2
1
P
U
CEMENT
GODOW N

P
U

SDB1
G+5 STA FF/L AB OU R
CANTEEN

REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK

D SUBWAY
RAMP

12
M
SECURITY

ENTRY EXIT
SECURITY

1 2
VIP PA RKI NG
3 4 5
67
PUBLIC A REA

DN
8 9 CR
OSSI
10 NG

18.19 ACRES SURV EY NO. 54

SURV EY NO. 49
28 SMALL CARS ED MLC P
DEVELOPER
STORE

PROPOS 503 lv l.,

HOL DI NG
SEC URI TY

14m WIDE ROAD (FUTURE


EXPANSION
SINGAPO RE ENTRANCE
26m WIDE ROAD

LVL. 18000 CR OSSI


NG

LAYOUT
ENTRY

PRIVA TE
11400

14.5m ROAD

J.1 AGRICULTURE LAND


BUS TERMINAL

DOMESTIC OHT OVER


STAIRCASE HEAD ROOM 6M DRIVE WAY J
EXIT

SIZE=3.45MX2.1MX2.0M CLIENT:
CONCRETE SPANDREL OF
HEIGHT 1050MM FROM FFL
D.1
DN
STAIR-1
6300X3300
M/S INFOSYS TECHNOLOGIES
4600

25 SMALL CARS
FIRE WATER RESERVE OHT
OVER STAIRCASE HEAD ROOM DB &CS BUILDING LINE BELOW LTD. HYDERABAD
SIZE=3.7MX3.45MX2.0M
E FD1

LIFTS
1 LOBBY-1 25 SMALL CARS
2300X2750 4000X7400 PROJECT NUMBER
1
2
A4-01
7400
8 OF 5 (TYP)
10BLR023
BUILDING LINE 17.2
15750

6M DRIVE WAY @ 3RD FLOOR 1118


0
PROJECT PHASE
17.1
3 SMALL CARS

5 OF 5 (TYP)

0
1118 16.1 DESIGN DEVELOPEMENT

1
12 SMALL CARS 8 SMALL CARS 1118
0 ARCHITECT AND STRUCTURAL CONSULTANT
A7-01 15.1
EXIT
F ENTRY 1118
0
14.1
LOBBY-3 50MM THK
CONCRETE COLUMN(TYP) LVL. 16500 5
6950

LVL: 18000 EXPANSION JOINT 0


1118
PAINTED WITH APPROVED CONCRETE SPANDREL OF HEIGHT 1050MM FROM FFL 1455X5700
COLOUR AND SHADE PAINTED WITH APPROVED COLOUR AN SHADE
DN RAMP DN TO FIFTH FLOOR 13.1
LIFTS
2300X2750 6
12.1 ENGINEERING (I) PVT LTD
G
ES-1 7
FD1
6225

CUT OUT DS-1 OPENING


2
A8-06
4
A7-01 FHR-11
DN
TRC Engineering (I) Pvt Ltd.
H
200 THK STAIR-3 No 6/A, Amit Plaza, JP Nagar, 3rd Phase
MASONRY WALL 6300X3300
Bannerghatta Road,Bangalore-560076
8750 1725 10800 1725 9075 2115 6400
Phone : +91-80-26581707/08/09
40590 Fax :+91-80-26582424 WebSite:www.trc.co.in

TERRACE FLOOR 6.1 6.2 8.1 9.1 9.2


1 1 : 200

AREA STATEMENT
FOR CO-ORDINATION
DESIGNED BY:Designer

SCHEDULE SHAFT SCHEDULE: DRAWN BY:Author


SL. FLOOR AREA IN SQ MTS AREA IN SQ FT FRONT RAMP FRONT RAMP LEGEND: GENERAL NOTES:
NO. NAME AREA IN SQ MTS AREA IN SQ FT CHECKED BY:Checker

DOOR SCHEDULE_TERRACE FLOOR SL. NAME DESCRIPTION SIZE REMARKS 1. NON CAR PARKING BAY. 1) ALL DIMENSIONS ARE IN MILLIMETRE UNLESS OTHERWISE MENTIONED. SCALE: 1 : 200
TYPE MARK LEVEL WIDTH HEIGHT COUNT DESCRIPTION 1. GROUND 11635 119607 NO. (mm)
FD1 TERRACE 1000 2100 2 FIRE DOOR FLOOR
SMALL CAR(2.5MX5M) 2) NO DIMENSIONS TO BE SCALED FROM DRAWING. DRAWING TITLE
2. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
2. FIRST 11116 114272 1. FHR (1-11) FIRE HOSE REEL 1200X1000 PARKING BAY.
FLOOR
PARKING SCHEDULE_TERRACE FLOOR 3) IN CASE OF DISCREPANCIES LARGER SCALE DETAILED DRAWINGS SHALL
BIG CAR (3MX6.0M)
TYPE MARK COUNT 3. SECOND FLOOR 11812 121427
2. ES -1 ELECTRICAL 1200X400 3. PARKING BAY.
SUPERCEDE THE SMALLER SCALE DRAWINGS. TERRACE FLOOR PLAN
SHAFT
BIG CARS 17
4) DISCREPANCIES IN THE DRAWINGS ARE TO BE BROUGHT TO THE NOTICE
SMALL CARS 190 OF THE ARCHITECT PRIOR TO COMMENCEMENT OF THE WORK.
THIRD FLOOR 10736 3. DS -1 LV SHAFT FOR 900X400 4. LOBBY AREA.
Grand total 207 4. 110366 CCTV AND DATA

FOURTH FLOOR 7797 2835.63 4. DB&CS DB AND CONTROL 5.


5. 80153 29143 SWITCH LOCATION STEEL PIPE BOLLARDS SHEET NUMBER
@1500 C/C
6. FIFTH FLOOR 7797 1575.80
80153
16191 A1-07
TERRACE FLOOR 6222 1575.80
7. 63962 16191
DATE:02/28/2011 NORTH
ISSUE
LEGEND OF COLOURS No. Date Description Revision
A B C D D.1 E F G H
PT-1- PAINT (WHITE )OF APPROVED BRAND AND SHADE
WATER TANK
PAINTED WITH APROVED
PT-2 -PAINT (DARK PEACH) OF APPROVED BRAND AND SHADE
COLOUR AND SHADE PT-3 - PAINT (BROWN WITH TEXTURE)OF APPROVED BRAND AND SHADE
PT-4 - PAINT (PEACH) OF APPROVED BRAND AND SHADE
PT-5 - PAINT (CEMENT) OF APPROVED BRAND AND SHADE
50 MM PROJECTION CONCRETE
COLUMN CAPITAL IN PLASTER PAINTED WITH SPANDREL (TYP)
PT-2 SEE DETAIL
SEE DETAIL APPROVED COLOUR AND
PT-3 SHADE 2000
PT-1
PT-3 TERRACE
CONCRETE COLUMN(TYP) 18000
1" REVEAL
FIFTH FLOOR

1500
15000
PT-2 SPANDREL ON RAMP
FOURTH FLOOR
PROJECT TEAM
PT-2 6" PROJECTION 12000
WALL SWEEP PT-1
GLAZED WINDOW OF
APPROVED GLASS GLAZED THIRD FLOOR OWNER
PT-2 WINDOW
CONCRETE SPANDREL PT-2 9000 Infosys Technology Ltd.
PT-2 PT-1
OF APPROVED
COLOUR AND SHADE SECOND FLOOR
PT-3 ARCHITECT
WALL SWEEP OF APPROVED WALL OPENINGS 6000
PT-1 PT-3
BRAND AND SHADE TRC ENGINEERING (I) PVT LTD
PT-2 FIRST FLOOR
PT-2 PT-2
3000

FGL: 506.00 GROUND FLOOR


1" REVEAL DOOR 0
CONCRETE COLUMN PAINTED WITH (SEE DETAIL)
APPROVED COLOUR AND SHADE

WEST SIDE ELEVATION


4 1 : 200

H G F E J.1 D C B1 B A

STAIRCASE
HEAD ROOM
PAINTED WITH CONCRETE SPANDREL
APPROVED SHADE WITH DIFFERENT
AND COLOUR PAINT AND TEXTURE

PLAIN CONCRETE SPANDREL


2400

PT-2 COLUMN CAPITAL


PT-3 SEE DEATIL PAINTED WITH APPROVED
PT-2 COLOUR AND SHADE
PT-3 TERRACE
WALL OPENINGS STAIR CASE HEAD ROOM 18000
900 HIGH SS RAILING PAINTED WITH APPROVED
PT-2 PT-2 PT-4 STEEL STAIR COLOUR AND SHADE FIFTH FLOOR
15000
900 HIGH
SS RAILING
FOURTH FLOOR
21450

PT-2 12000
STEEL STAIR
19200

(SEE STRL. DRG.)


PT-2 PT-2 THIRD FLOOR

100 MM
CONCRETE 9000
PT-2 PT-1 PT-3 COLUMNS
WALL SWEEP SEE DETAIL SECOND FLOOR
PT-3
6000
BRICK COLUMN RAMP WITH

PT-2 PT-2
APPROVED PAINT
FIRST FLOOR KEY PLAN
3000

3000
TWO WHEELER
ENTRY PT-5 ELECTRICAL

FGL:506.00 GROUND FLOOR ECC BLOCK


G+14
SUB STATION
4ACRES
SURV EY NO. 51

0
BRICK COLUMN
FUT URE EXPANSION FUT URE EXPANSION

BRICK COLUMN PAINTED CIRCULAR


PHASE-2
SDB5
G+5
SDB4
G+5

WITH APPROVED COLOUR AND SHADE COLUMN GA S B A NK


FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
PHASE-1 SITE
OF FICE-2

SITE OFF ICE-1

P
U

SDB3 SDB2 UNIT


G+5 G+5 STORE M E
T
S
IM S

CEMENT
GODOW N

6
5
4
3
2
1
P
U

P
U

SDB1
G+5 STA FF/L AB OU R
CANTEEN

EAST SIDE ELEVATION


REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK

SECURITY SECURITY
RAMP

ENTRY EXIT

3
SUBWAY VIP PA RKI NG
12
M
1 2
3 4 5
67
8 9 CR
OSSI
PUBLIC A REA
10 NG

18.19 ACRES SURV EY NO. 54

SURV EY NO. 49

1 : 200 ED MLC P
DEVELOPER
STORE

PROPOS 503 lv l.,

HOL DI NG
SEC URI TY

14m WIDE ROAD (FUTURE


EXPANSION
SINGAPO RE ENTRANCE
26m WIDE ROAD

CR OSSI
NG

LAYOUT
14.5m ROAD PRIVA TE

AGRICULTURE LAND
BUS TERMINAL

1 2 3 4 5 6 6.1 6.2 7 8 8.1 9 9.1 9.2 10 11 12 13 14 15 16 17 18


STAIRCASE HEAD ROOM CLIENT:
PAINTED WITH APPROVED
COLOUR AND SHAE
100 THK PARAPET WALL
WATER TANK
PAINTED WITH APPROVED
450 HIGH PAINTED WITH
APPROVED COLOUR AND 1" THK REVEAL
M/S INFOSYS TECHNOLOGIES
COLOUR AND SHADE SHADE
MASONRY WALL
OF APPROVED
LTD. HYDERABAD
CONCRETE COLOUR AND SHADE
PT-2 CONCRETE SPANDREL SPANDREL
ON RAMP PAINTED

2400
WITH DIFFERENT PAINT 50MM THK EXPANSION JOINT
PT-3 AND TEXTURE COLUMN CAPITAL CONCRETE COLUMN WITH APPROVED
COLOUR AND SHADE PLAIN CONCRETE SPANDREL COLUMN CAPITAL PROJECT NUMBER
OF HEIGHT 1050 MM PAINTED WITH WITH APPROVED TERRACE
APPROVED COLOUR AND SHADE SHADE AND
STAIR COLOUR 50 MM PROJECTION 18000
PT-2 CASE 10BLR023
GLAZED WINDOW PT-2 PT-2 PT-3 PT-4 FIFTH FLOOR
PT-4
OF APPROVED GLASS
RAMP DOOR PT-3 CONCRETE COLUMN
15000 PROJECT PHASE
REFER DETAIL PT-2 FOURTH FLOOR
PT-3 PT-2 PT-3 PT-3 CONCRETE SPANDREL
VENTILATOR WITH DIFFERENT PAINT
PT-1
PT-3 12000 DESIGN DEVELOPEMENT
OF APPROVED AND TEXTURE
PT-2
GLASS
PT-2
THIRD FLOOR
PT-2 PT-2 PT-3
9000
ARCHITECT AND STRUCTURAL CONSULTANT
PT-2 PT-3 PT-1 PT-1 PT-1 PT-3 PT-1
PT-2 SECOND FLOOR
PT-3 PT-5 PT-3
STEEL 6000
DOOR STAIR
PT-2 PT-2 FIRST FLOOR
PT-2 PT-2
3000
CONCRETE SPANDREL FGL : 506.00
OF 1050 HT. PT-2 GROUND FLOOR
PT-3
0 ENGINEERING (I) PVT LTD
BRICK COLUMN

2
SOUTH (REAR) SIDE ELEVATION TRC Engineering (I) Pvt Ltd.
1 : 200
No 6/A, Amit Plaza, JP Nagar, 3rd Phase
18 17.a 17 16 15 14 13 12 11 10 9.2 9.1 9 8.1 8 7 6.2 6.1 6 5 PLAIN CONCRETE 4 3 2 1 Bannerghatta Road,Bangalore-560076
SPANDREL WATER TANK PAINTED WITH
OF HEIGHT 1050 MM APPROVED COLOUR AND SHADE STAIR CASE BEYOND
Phone : +91-80-26581707/08/09
STAIRCASE FROM FFL PAINTED WITH APPROVED Fax :+91-80-26582424 WebSite:www.trc.co.in
HEAD ROOM PAINTED WITH COLOUR AND SHADE
200 THK CONCRETE SPANDREL APPROVED COLOUR
PARAPET WALL WITH DIFFERENT PAINT AND SHADE
CONCRETE COLUMN PLAIN CONCRETE COLUMN CAPITAL DOOR AND TEXTURE OF CONCRETE SPANDREL
STEEL STAIR PT-2 COLUMN CAPITAL
SPANDRELS SEE DETAIL APPROVED COLOUR PAINTED TO MATCH THE CONCRETE COLUMN
LIFT HEAD PLAIN SPANDREL PAINTED AS PER SPEC. PT-3 PAINTED AS PER SPEC.
COLUMN CAPITAL 900 HIGH AND SHADE
ROOM CONCRETE SPANDRELS PT-2

STEEL STAIR
REFER DETAIL WITH DIFFERENT PAINT
AND TEXURE
ALUMINIUM
RAILING
FHR DOOR
PER MANUFACTURER TERRACE FOR CO-ORDINATION
WITH 900 HIGH FHR DOOR 18000
ALUMINIUM PT-5 DESIGNED BY:Designer
PER MANUFACTURER WALL SWEEP
RAILING PAINTED AS PER SPEC
PT-4 PT-4 PT-4 PT-2 FIFTH FLOOR DRAWN BY:Author
FHR DOOR
CONCRETE BRICK COLUMN 15000 CHECKED BY:Checker
SPANDREL PT-1 PT-5
PAINTED TO MATCH
OF 1050 HT. THE COLUMNS FOURTH FLOOR
900 HIGH PT-2 PT-3 PT-3 SCALE: 1 : 200
RAILING 12000
MASONRY WALL PT-5

19050
PT-2 CONCRETE SPANDREL THIRD FLOOR DRAWING TITLE
PT-2
ON RAMP
9000
PT-2 PT-3
PT-2 SECOND FLOOR
PT-3
PT-3
6000 ELEVATIONS
9000

PT-1
PT-2 FIRST FLOOR
6000

PT-2 PT-2 DOOR


3000
PT-1 PT-1 100 MM WALL SWEEP
FGL:506.00 PT-2 FGL: 506.00 GROUND FLOOR
0
CIRCULAR COLUMN BRICK COLUMN BRICK COLUMN SHEET NUMBER
SUPPORTING STEEL STAIR

NORTH (FRONT) SIDE ELEVATION A3-01


1 1 : 200
DATE:02/28/2011 NORTH
ISSUE
LEGEND OF COLOURS
No. Date Description Revision
4 PT-1- PAINT (WHITE )OF APPROVED BRAND AND SHADE
50 MM PROJECTION PAINTED PT-2 -PAINT (DARK PEACH) OF APPROVED BRAND AND SHADE
5 6 6.1 PT-3 - PAINT (BROWN WITH TEXTURE)OF APPROVED BRAND AND SHADE
WITH APPROVED COLOUR PT-4 - PAINT (PEACH) OF APPROVED BRAND AND SHADE
PT-3 AND SHADE PT-5 - PAINT (CEMENT) OF APPROVED BRAND AND SHADE
PT-2
COLUMN CAPITAL
PT-3 SEE DETAIL
CONCRETE SPANDRELS
WITH DIFFERENT PAINT AND TEXURE
CONCRETE COLUMN
MASONRY WALL
OF APPROVED PT-2 950
PAINT

1800
PROJECT TEAM
PT-2 PT-3 TERRACE
18000
OWNER
PT-2
PT-1 WALL SWEEP Infosys Technology Ltd.
100 MM SWEEP PAINTED WITH APPROVED

1200
PLAIN CONCRETE SPANDRELS ARCHITECT
50 MM GROOVE COLOUR AND SHADE TRC ENGINEERING (I) PVT LTD

450 100

100
PT-1 800 PT-1

1800
PT-2 FIFTH FLOOR
15000
PT-2

450
450 50 450 450 50 450 50
MASONRY WALL

1200
PT-2

50

50

1800

1800
PT-3 FOURTH FLOOR

450 PT-1 12000


PT-3 PT-3
600

600

1200

1200
SECOND FLOOR
6000
PT-3
50

50

1050
PT-2

1800
THIRD FLOOR
9000
PT-2

750
450
450

450
PT-3 PT-2

1200
PT-1
100

100
KEY PLAN

1800
PT-3 SECOND FLOOR
ELECTRICAL
6000 ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51

FUT URE EXPANSION FUT URE EXPANSION


SDB5 SDB4
PHASE-2 G+5 G+5

GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND

1200
PHASE-1 SITE
OF FICE-2

SITE OFF ICE-1

P
U

SDB3 SDB2 UNIT


G+5 G+5 STORE M E
T
S
IM S

DETAIL OF SPANDREL
CEMENT
GODOW N

6
5
4
3
2
1
P
U

2
P
U

SDB1
G+5 STA FF/L AB OU R
CANTEEN

1 : 10
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK

SECURITY SECURITY
RAMP

ENTRY EXIT

SUBWAY VIP PA RKI NG


12
M
1 2
3 4 5
67
8 9 CR
OSSI
PUBLIC A REA
10 NG

18.19 ACRES SURV EY NO. 54

SURV EY NO. 49
ED MLC P
100 MM WALL SWEEP

1800
DEVELOPER
STORE

PROPOS 503 lv l.,

HOL DI NG

FIRST FLOOR
SEC URI TY

14m WIDE ROAD (FUTURE


EXPANSION
SINGAPO RE ENTRANCE
26m WIDE ROAD

3000 CR OSSI
NG

LAYOUT
14.5m ROAD PRIVA TE

AGRICULTURE LAND
BUS TERMINAL

1200
CLIENT:

M/S INFOSYS TECHNOLOGIES

950
PT-2
4 GROUND FLOOR LTD. HYDERABAD
0

CONCRETE COLUMN PROJECT NUMBER


PAINTED WITH APPROVED ENLARGED ELEVATION - TYPICAL BAY B1
SHADE AND COLOUR 3 1 : 50 10BLR023

PROJECT PHASE

DESIGN DEVELOPEMENT
CONCRETE SPANDREL
PT-3 ARCHITECT AND STRUCTURAL CONSULTANT
PT-3

75

75
100 MM WALL SWEEP BRICK COLUMN
450 1000 HIGH SS RAILING
150

PT-2 PT-1 450


PT-1 2100
150

100 PT-3 ENGINEERING (I) PVT LTD


PT-1
75
PT-1 PT-2
TRC Engineering (I) Pvt Ltd.

1250
No 6/A, Amit Plaza, JP Nagar, 3rd Phase
Bannerghatta Road,Bangalore-560076
Phone : +91-80-26581707/08/09
PT-2 PT-2 PT-3 Fax :+91-80-26582424 WebSite:www.trc.co.in
50 500 50
1050

PT-1 SECOND FLOOR FOR CO-ORDINATION


6000
DESIGNED BY:Designer

PT-3 PT-3 DRAWN BY:Author

CHECKED BY:Checker

TERRACE SCALE:As indicated

18000
DRAWING TITLE
PT-3
PT-2
50 MM PROJECTION ENLARGED ELEVATIONS
IN PLASTER PAINTED
WITH APPROVED
COLOUR AND SHADE
STAIR LANDING
SHEET NUMBER
DETAIL OF COLUMN CAPITAL ENLARGED ELEVATION @ ENTRY TO STAIR
1 1 : 10 4 A3-02
1 : 10
DATE:02/28/2011 NORTH
ISSUE
No. Date Description Revision

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 17.a 18

850
12175 12450 10800 10800 10800 10800 10800 10800 10800 10800 10800 10800 10800 10800 10800 6225 6125

CONCRETE COLUMN BEAM PER SPANDREL


SPANDREL CAPITAL STRUCTURAL DRG
3000 1550

PARKING DECK TERRACE

SLAB PER
18000
FHR
FHR CONCRETE
COLUMN
STRUCTURAL PROJECT TEAM
RAMP PARKING DECK DRG FIFTH FLOOR
15000 OWNER
3000

2 1 BRICK
RAMP EXPANSION JOINT A4-02 A3-02 COLUMN FOURTH FLOOR
PARKING DECK Infosys Technology Ltd.

500
CONCRETE 12000
3000

225 THK SLAB SPANDREL


ARCHITECT

1800
RAMP PARKING DECK PARKING ON TERRACE THIRD FLOOR
9000
TRC ENGINEERING (I) PVT LTD
3000

BRICK FHR LIFT RAILING


FHR
SHAFT

1800
1200
PARKING DECK PARKING DECK COLUMN RAMP DOOR DOOR SECOND FLOOR
PARKING DECK
6000
3000

BRICK

1200
2250 1800
PARKING DECK PARKING DECK COLUMN PARKING DECK FIRST FLOOR
3000
3000

TWO WHEELER
PARKING TWO WHEELER PARKING GROUND FLOOR

2000
0

3000
PLINTH BEAM
REFER STRUC UNDER GROUND WATER TANKS LIFT PIT
DRAWING FOR DETAIL. REFER STRUCTURAL PLINTH BEAM
REFER STRUCTURE AND SERVICES DRG DRAWING FOR DETAIL. REFER STRUCTURAL
DRAWING FOR DETAIL.
CIRCULAR COLUMN
REFER STRUCTURE DRG

LONGITUDINAL SECTION-3
3 1 : 200

A B C D E F G H
12275 16750 16000 16000 15750 6950 6225

1550
CONCRETE
CONCRETE
SPANDREL
1050 HIGH
PARAPET
COLUMN CAPITAL CONCRETE
SPANDREL
KEY PLAN
1800

COLUMN PARKING DECK TERRACE


RAMP 18000

3000
ELECTRICAL
750 DEEP

2250
750
ECC BLOCK
G+14
SUB STATION
4ACRES
CONCRETE BEAM RAMP SURV EY NO. 51
1800

FIFTH FLOOR
1200

PARKING DECK FUT URE EXPANSION FUT URE EXPANSION


SDB5 SDB4
PHASE-2 G+5 G+5

750 MM DEEP RAMP 15000

3000
CONCRETE

2250

750
225 THK CONCRETE BEAM RAMP
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1
GA S B A NK
AGRICULTURE LAND
SPANDREL FLOOR SLAB
PHASE-1
1800

FOURTH FLOOR
1200

SITE
OF FICE-2

PARKING DECK P
U
SITE OFF ICE-1

SDB3 SDB2 UNIT

RAMP
G+5 G+5 STORE M E
T
S
IM S

12000
CEMENT
GODOW N

3000
6
5
4
3
2
1
P
U

750
2250
P
U

RAMP SDB1
G+5
1800

STA FF/L AB OU R

THIRD FLOOR
CANTEEN

CONCRETE PARKING DECK


1200

REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK

SPANDREL RAMP RAMP


SECURITY SECURITY

9000
ENTRY EXIT

VIP PA RKI NG

3000
SUBWAY 12
M
1 2
3 4 5
67
PUBLIC A REA

750 MM DEEP
8 9 CR
OSSI
10
SURV EY NO. 54

2250
NG

750
18.19 ACRES
COLUMN CAPITAL SURV EY NO. 49

CONCRETE BEAM RAMP PROPOS


ED MLC P
DEVELOPER
STORE
1050 1800 1800

SECOND FLOOR
503 lv l.,

CONCRETE CURB PARKING DECK HOL DI NG


SEC URI TY
1200 1200

14m WIDE ROAD (FUTURE


EXPANSION
SINGAPO RE ENTRANCE
RAMP 6000
26m WIDE ROAD

3000
RAMP

2250

750
CR OSSI
NG

900 HIGH RAILING RAMP LAYOUT


PRIVA TE
ON RAMP FIRST FLOOR
14.5m ROAD

PARKING DECK AGRICULTURE LAND


BUS TERMINAL
PLINTH BEAM RAMP 3000

3000
750
2250
REFER STRUCTURAL RAMP
DRAWING FOR DETAIL. PARKING DECK GROUND FLOOR
CLIENT:
1200

PLINTH BEAM
REFER STRUCTURAL
FFL = 506.0 M
M/S INFOSYS TECHNOLOGIES
DRAWING FOR DETAIL.
LTD. HYDERABAD

TRANSVERSE SECTION-2 PROJECT NUMBER


2 1 : 200
10BLR023

PROJECT PHASE

DESIGN DEVELOPEMENT

ARCHITECT AND STRUCTURAL CONSULTANT

ENGINEERING (I) PVT LTD


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

12175 12450

FLOOR SLAB
10800 10800 10800 10800 10800 10800 10800 850 10800 10800 10800 10800 10800 10800 12350
TRC Engineering (I) Pvt Ltd.
WATER TANK

STAIR HEAD
No 6/A, Amit Plaza, JP Nagar, 3rd Phase
COLUMN
COLUMN CAPITAL ROOM 1
CAPITAL
A4-02
Bannerghatta Road,Bangalore-560076
25 THK
225 MM THICK
2"X1" REVEAL FLOOR SLAB CONCRETE 1050 HIGH
SLAB 50 MM EXPANSION Phone : +91-80-26581707/08/09
COLUMN SPANDREL 1
JOINT COLUMN CAPITAL Fax :+91-80-26582424 WebSite:www.trc.co.in
SEE DEATIL A3-02 TERRACE
TERRACE
225 MM 1050 HIGH 18000

3000
STAIRCASE THICK SLAB SPANDREL
DOOR PARKING DECK TERRACE FIFTH FLOOR
CONCRETE SPANDREL
15000

3000
GLAZED PARKING DECK PARKING DECK
CONCRETE
SPANDREL
FOURTH FLOOR
FOR CO-ORDINATION
WINDOW COLUMN
1050 HIGH CAPITAL 12000 DESIGNED BY:Designer

3000
LIFT SPANDREL 750 DEEP PARAPET
SHAFT BEYOND CONCRETE BEAM PARKING DECK PARKING DECK THIRD FLOOR DRAWN BY:Author

9000 CHECKED BY:Checker

3000
225 MM THICK
SLAB
GLAZED PARKING DECK PARKING DECK SECOND FLOOR SCALE: 1 : 200
VENTILATOR
6000

3000
CONCRETE CONCRETE CONCRETE OPEN
COLUMN COLUMN SPANDREL STAIRS
DRAWING TITLE
PARKING DECK PARKING DECK FIRST FLOOR
3000

3000
PLINTH BEAM
FGL = 506.0 M REFER STRUCTURAL
PARKING DECK GROUND FLOOR
DRAWING FOR DETAIL. PARKING DECK
0
BUIDING SECTIONS
LIFT PIT
REFER STRUCTURAL CONCRETE
COLUMN 100 MM THK CONCRETE SLAB PLINTH BEAM
DRAWING FOR DETAIL. PER STRUCTURAL DRG REFER STRUCTURAL
DRAWING FOR DETAIL.

SHEET NUMBER
LONGITUDINAL SECTION-1
1 1 : 200 A4-01
DATE:02/28/11 NORTH
ISSUE
9 10 11 12 1 2
12175 No. Date Description Revision
10800 850 10800
COLUMN CAPITAL COLUMN CAPITAL COLUMN CAPITAL

1550
PER DETAIL PER DETAIL PER DETAIL COLUMN CAPITAL 750 MM BEAM

1050 500
PER DETAIL PER STRUC DRG

1800
TERRACE

750 MM BEAM 18000


PER STRUCTURAL DRG THIRD FLOOR RAMP (SEE STRUC. DRG.)
9000

1200

3000
COLUMN COLUMN COLUMN

3000
PER STRUCTURAL DRG PER STRUCTURAL DRG PER STRUCTURAL DRG
SPANDREL R.C.C. BEAM ALONG RAMP RAMP RAILING

1800
SEE DETAIL (SEE STRUC. DRG.) SEE DETAIL PROJECT TEAM
FIFTH FLOOR
15000
250 THK SLAB OWNER
SECOND FLOOR RAMP (SEE STRUC. DRG.)
Infosys Technology Ltd.
6000

1200
750
ARCHITECT

3000
TRC ENGINEERING (I) PVT LTD
RAMP RAILING
SEE DETAIL EXPANSION 300 300

3000
JOINT 3725 3725 3725
SPANDREL

1800
SEE DETAIL FOURTH FLOOR
RAMP RAILING 12000
SEE DETAIL
FIRST FLOOR RAMP (SEE STRUC. DRG.)
3000

3000
2250
WALL SWEEP

3000
SEE DETAIL MASONRY WALL
SPANDREL R.C.C. BEAM ALONG RAMP 750 MM BEAM
(SEE STRUC. DRG.) PER STRUC DRG
THIRD FLOOR
100 THK 9000

750
SLAB PER STRUC.
GROUND FLOOR
0
MASONRY WALL

3000
2250
SPANDREL
SEE DETAIL
3000

750 MM BEAM
WATER TANK WATER TANK 250 THK SLAB PER STRUC DRG
DRIVER'S LOUNGE SECOND FLOOR
6000

750

3000
2250
SECTION THRU - UNDER GROUND WATER TANK SPANDREL KEY PLAN
2 1 : 50 SEE DETAIL PARKING DECK FIRST FLOOR
ELECTRICAL
3000 ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51

9 10 11 FUT URE EXPANSION


SDB5
FUT URE EXPANSION
SDB4

1950
PHASE-2 G+5 G+5

GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
COLUMN CAPITAL SPANDREL
PHASE-1 SITE
OF FICE-2

3000
SITE OFF ICE-1

P
U

PER DETAIL SDB3


G+5

6
5
4
3
2
1
P
U
SDB2
G+5
UNIT
STORE
CEMENT
GODOW N
M E
T
S
IM S

P
U

SPANDREL SDB1
G+5 STA FF/L AB OU R
CANTEEN

SEE DETAIL
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK

1050
SECURITY SECURITY

10800 850
RAMP
1550

ENTRY EXIT

SUBWAY VIP PA RKI NG

TWO WHEELER PUBLIC A REA


12
M
1 2
3 4 5
67
8 9 CR
OSSI
10 NG

18.19 ACRES SURV EY NO. 54

SURV EY NO. 49
ED MLC P
DEVELOPER
STORE

EXIT PROPOS 503 lv l.,

GROUND FLOOR
HOL DI NG
SEC URI TY

14m WIDE ROAD (FUTURE


EXPANSION

PARKING AREA
SINGAPO RE ENTRANCE
26m WIDE ROAD

TERRACE 0 CR OSSI
NG

LAYOUT
14.5m ROAD PRIVA TE

18000 AGRICULTURE LAND


BUS TERMINAL

COLUMN COLUMN SECTION THRU DRIVER'S LOUNGE AND RAMP CLIENT:


3
3000

PER STRUCTURAL DRG PER STRUCTURAL DRG 1 : 50


M/S INFOSYS TECHNOLOGIES
B1 B LTD. HYDERABAD
PARKING AREA FIFTH FLOOR
6150
15000
PROJECT NUMBER

EXPANSION
3000

JOINT 10BLR023

2000
LIFT MACHINE
ROOM PROJECT PHASE

FOURTH FLOOR
DESIGN DEVELOPEMENT
PARKING AREA FOURTH FLOOR 12000
12000 ARCHITECT AND STRUCTURAL CONSULTANT

3000
750 MM BEAM SPANDREL
3000

PER STRUCTURAL DRG SEE DETAIL

250 THK

1800
SLAB THIRD FLOOR ENGINEERING (I) PVT LTD
225 THK SLAB
PARKING AREA THIRD FLOOR 9000
STAIR RAILING
9000 SEE DETIAL
STAIR TRC Engineering (I) Pvt Ltd.

1200
200 THK WALL

3000
SPANDREL SEE DETAIL
FOR DB MOUNTNG
3000

& SEE DETAIL


No 6/A, Amit Plaza, JP Nagar, 3rd Phase
CONTROL
SWITCH Bannerghatta Road,Bangalore-560076

1800
750 MM BEAM Phone : +91-80-26581707/08/09
SECOND FLOOR
PER STRUCTURAL DRG Fax :+91-80-26582424 WebSite:www.trc.co.in
PARKING AREA SECOND FLOOR 6000
6000

1200

3000
200 THK WALL SPANDREL FOR CO-ORDINATION
3000

FOR DB MOUNTNG SEE DETAIL


DESIGNED BY:Designer
&
CONTROL DRAWN BY:Author
225 THK
SWITCH

1800
SLAB FIRST FLOOR CHECKED BY:Checker
250 THK SLAB
PARKING AREA FIRST FLOOR 3000 SCALE: 1 : 50

3000
DRAWING TITLE
200 THK WALL

1200
FOR DB MOUNTNG

3000
&
3000

CONTROL
SWITCH
ENLARGED SECTIONS

1050
100 THK SLAB
GROUND FLOOR
100 THK SLAB
GROUND FLOOR 0
0 SHEET NUMBER

ENLARGED SECTION -1 SECTION TO SHOW DISTRIBUTION BOARD & CONTROL SWITCH A4-02
1 1 : 50
4 1 : 50
DATE:02/28/11 NORTH
ISSUE
E No. Date Description Revision
5
A6-01
BOTTOM OF FLOOR SLAB. WALL PAINTED WITH
PAINT OF APPROVED SHADE AND APPROVED COLOUR AND SHADE
COLOUR AS PER SPEC (PT-08) (PT-06)

CORNICE AS PER SPEC

3000
SIGNAL RED
0520

EQ 450 EQ

250
TERRACE TERRACE
18000 18000
450 PT-07 250
PLASTIC EMULSION PAINT OF PROJECT TEAM
APPROVED COLOUR AND SHADE OWNER
(PT-07)

3000
Infosys Technology Ltd.
565
2775

REGAL JEWEL VIOLET


PT-06 7150
STAIR DOOR ARCHITECT
(SEE DETAILS) TRC ENGINEERING (I) PVT LTD
450

FIFTH FLOOR FIFTH FLOOR


PT-07
15000 15000
FLOOR TILE AS
150 MM PER SPEC. (SEE DETAIL
SKIRTING NO.6/A6-01)

3000
(PT-07) SILVER BLUSH
M502
FIRST FLOOR
3000

FOURTH FLOOR FOURTH FLOOR


12000 12000

ELEVATION 3 (TYP FOR ALL FLOORS) 225 THK


3

3000
1 : 20 OLD BRICK BROWN
8613
SLAB

WALL PAINTED WITH


THIRD FLOOR THIRD FLOOR
APPROVED COLOUR AND SHADE
9000 9000
(PT-06)
BOTTOM OF FLOOR SLAB.
PLASTIC EMULSION PAINT OF PAINT OF APPROVED SHADE
APPROVED COLOUR AND SHADE AND COLOUR AS PER SPEC

3000
(PT-07) (PT-08) PEACOCK BLUE
E 0161
FLOOR NUMBER 225 THK
LIFT CALL POINT SLAB
SECOND FLOOR SECOND FLOOR
6000 6000 KEY PLAN
ELECTRICAL
ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51

3000
CORNICE AS LILY GOLD YELLOW
LIFT DOOR PHASE-2
FUT URE EXPANSION
SDB5
G+5
FUT URE EXPANSION
SDB4
G+5
250

250

1 1 PER SPEC 7942 AS PER FUT URE EXPANSION


FOOD COURT -2

PHASE-1
FOOD COURT -1
GA S B A NK
AGRICULTURE LAND

STANDARDS
SITE
OF FICE-2

SITE OFF ICE-1

P
U

SDB3 SDB2 UNIT


G+5 G+5 STORE M E
T
S
IM S

CEMENT
GODOW N

6
5
4
3
2
1
P
U
450

250
P
U

PT-07
SDB1
G+5 STA FF/L AB OU R
CANTEEN

FIRST FLOOR FIRST FLOOR REST REST


RO OM -2RO OM -1
TO I E
LT
BLO CK

250 250
LIFT:ELENESSA(P21) RAMP
SECURITY

ENTRY EXIT
SECURITY

3000 3000
SUBWAY VIP PA RKI NG
12
M
1 2
3 4 5
67
8 9 CR
OSSI
PUBLIC A REA
10 NG
SURV EY NO. 54

AS PER SPEC
18.19 ACRES
SURV EY NO. 49
ED MLC P
DEVELOPER
STORE

PROPOS 503 lv l.,

HOL DI NG
SEC URI TY

14m WIDE ROAD (FUTURE


EXPANSION
565

SINGAPO RE ENTRANCE
2775

26m WIDE ROAD

PT-06 PT-06 14.5m ROAD


CR OSSI
NG

PRIVA TE
LAYOUT

3000
150 MM ITALIAN OLIVE GREEN
AGRICULTURE LAND
BUS TERMINAL

SKIRTING 7823
PT-06 LIFT
450

PT-07 (PT-07) CLIENT:


LOBBY
1200

FLOOR TILE AS GROUND FLOOR GROUND FLOOR


EQ 450 EQ PER SPEC. (SEE DETAIL 0 0 M/S INFOSYS TECHNOLOGIES
NO.6/A6-01) LTD. HYDERABAD
NOTES : COLOUR SHADES AND
NUMBERS ARE AS PER ASIAN PAINTS.
FIRST FLOOR
3000 PROJECT NUMBER

COLOR DETAIL SECTION OF LOBBY-1 10BLR023


5 1 : 50
4 1 : 50 PROJECT PHASE

ELEVATION 2 (TYPICAL FOR ALL FLOORS) DESIGN DEVELOPEMENT


2 1 : 20 FILLER @ JOINTS ARCHITECT AND STRUCTURAL CONSULTANT

12 THK FLOOR
4
TILE PER SPEC LOBBY 3 PARKING
A6-01
2 DECK
12 THK CEMENT
250 500 1800 250 MORTAR
2300 250 THK ENGINEERING (I) PVT LTD
SHEAR WALL RCC SLAB AS PER
STRUCTURAL DRG

TRC Engineering (I) Pvt Ltd.


650

1025

E 250 THK LIFT


LIFT SHEAR WALL
PARKING TILE FLOORING OF No 6/A, Amit Plaza, JP Nagar, 3rd Phase
APPROVED COLOUR AND
1200

1 SHADE (FT-01)
Bannerghatta Road,Bangalore-560076
Phone : +91-80-26581707/08/09
Fax :+91-80-26582424 WebSite:www.trc.co.in
LOBBY-1
4010X7400
1800

FLOORING DETAIL
6
5975

1:1
3 FOR CO-ORDINATION
LIFT (TYP) DESIGNED BY:Designer
1200

2
LEGEND:
A6-01
2 DRAWN BY:Author
FHR CHECKED BY:Checker

200 THK
1025

SCALE:As indicated
FT1
1: PT-06 - WALL PAINT OF APPROVED SHADE AND COLOUR AS
MASONRY
WALL
PER SPEC DRAWING TITLE

600 800
450

2: PT-07 - WALL PAINT OF APPROVED SHADE AND COLOUR AS


1025

PER SPEC LOBBY - 1 DETAILS (TYP) FOR


ALL FLOORS
3: PT-08 - PAINT OF APPROVED SHADE AND COLOUR AS
450 PER SPEC

PLAN OF LOBBY-1 (TYP ON ALL FLOORS) SHEET NUMBER


4: FT1 - (600X600X12) FLOOR TILE OF APPROVED COLOUR
1 1 : 50 AND SHADE AS PER SPEC
A6-01
DATE:02/28/11 NORTH
ISSUE
1050 HIGH SPANDREL PLASTIC EMULSION PAINT OF
100 MM WALL SWEEP 225 THK SLAB No. Date Description Revision
PAINTED AS PER SPEC. APPROVED COLOUR AND
PAINTED PER SPEC PT-08
BOTTOM OF FLOOR SLAB. SHADE (PT-07)
PAINT OF APPROVED SHADE AND
B COLOUR AS PER SPEC(PT-08) CORNICE AS PER SPEC
PT-06

100
WALL PAINTED WITH
APPROVED COLOUR AND SHADE (PT- FLOOR NUMBER
06)

1200
OPENING EQ 450 EQ

2775

250

250
1 1
250 PROJECT TEAM

100

450
CALL POINT PT-07 OWNER
Infosys Technology Ltd.

LIFT:ELENESSA(P21) ARCHITECT

565

2775
PT-06 AS PER SPEC

950
TRC ENGINEERING (I) PVT LTD
PT-06 FLOOR TILE AS
PER SPEC. (SEE DETAIL
FLOOR TILE AS
NO.6/A6-01)
PER SPEC. (SEE DETAIL

450
FIRST FLOOR PT-07 NO.6/A6-01)
3000

150 MM 150 MM SKIRTING


ELEVATION-3 (TYP FOR ALL FLOORS) SKIRTING PT-07
3 1 : 20
PT-07
FIRST FLOOR
3000

B 7
A6-02
FOURTH FLOOR FOURTH FLOOR ELEVATION (TYP FOR ALL FLOORS)
12000 12000 4 1 : 20

3000
OLD BRICK BROWN 17
8613
2300
1800
THIRD FLOOR THIRD FLOOR
9000 9000

SHEAR WALL
3000

CONCRETE SPANDREL PEACOCK BLUE


REFER DETAIL 0161 KEY PLAN
ELECTRICAL
3

OVERHEAD HEIGHT
ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51

SECOND FLOOR SECOND FLOOR A4-01


FUT URE EXPANSION FUT URE EXPANSION
SDB5 SDB4
PHASE-2 G+5 G+5

6000 6000
GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
PHASE-1

2750
2400
1200
SITE
OF FICE-2

LIFT DOOR AS
SITE OFF ICE-1

P
U

SDB3 SDB2 UNIT


G+5 G+5 STORE M E
T
S
IM S

CEMENT
GODOW N

PER STANDARDS
6
5
4
3
2
1
P
U

P
U

SDB1
3000

G+5 STA FF/L AB OU R


CANTEEN

REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK

LILY GOLD YELLOW RAMP


SECURITY

ENTRY EXIT
SECURITY

7942
SUBWAY VIP PA RKI NG
12
M
1 2
3 4 5
67
8 9 CR
OSSI
PUBLIC A REA
10 NG

18.19 ACRES SURV EY NO. 54

SURV EY NO. 49
ED MLC P
DEVELOPER
STORE

225 THK PROPOS


HOL DI NG
503 lv l.,

SEC URI TY

14m WIDE ROAD (FUTURE


EXPANSION
SINGAPO RE ENTRANCE

SLAB CR OSSI
NG
26m WIDE ROAD

LAYOUT
PRIVA TE

FIRST FLOOR FIRST FLOOR


14.5m ROAD

AGRICULTURE LAND
BUS TERMINAL
3000 3000

LIFT CLIENT:
LOBBY
3000

ITALIAN OLIVE GREEN


7823
M/S INFOSYS TECHNOLOGIES
150 MM
SKIRTING LTD. HYDERABAD
LIFT PLAN
PT-07 5
GROUND FLOOR GROUND FLOOR 1 : 25
0 0 PROJECT NUMBER
NOTES : COLOUR SHADES AND
10BLR023
SECTION OF LOBBY -2 NUMBERS ARE AS PER ASIAN PAINTS.
2 1 : 50 MODEL :MITSUBISHI, ELENESSA P-21 PROJECT PHASE
COLOUR DETAIL
7 1 : 50 DESIGN DEVELOPEMENT
CAPACITY 1275 KG-1600 KG
NUMBER OF PERSONS : 21
MINIMUM FLOOR HEIGHT

ARCHITECT AND STRUCTURAL CONSULTANT

FINISHES
WALL : PAINTED STEEL SHEET PER LIFT STANDARD AND APPROVED
PATTERN
17 DOORS : PAINTED STEEL SHEET WITH GLASS WINDOWS PER LIFT
STANDARD AND APPROVED PATTERN ENGINEERING (I) PVT LTD
TRANSFORM PANEL : PAINTED STEEL SHEET PER LIFT STANDARD AND APPROVED
125 125 2300 250 PATTERN
2
FRONT RETURN PANEL : STAINLESS STEEL MIRROR
1050 HIGH FLOOR TILE OF APPROVED
SPANDREL
A6-02
2300
COLOUR AND SHADE (FT-01) FLOOR : VINYL TILES
TRC Engineering (I) Pvt Ltd.
250

CEILING : METALLIC SURFACE OF APPROVED TEXTURES AND DESIGN No 6/A, Amit Plaza, JP Nagar, 3rd Phase
Bannerghatta Road,Bangalore-560076
B
775

Phone : +91-80-26581707/08/09
Fax :+91-80-26582424 WebSite:www.trc.co.in
1200

2750

3
250 THK SHEAR WALL
3
STEEL PIPE BOLLARDS FOR CO-ORDINATION
775

A6-02 4 @ 1500C/C
LEGEND: DESIGNED BY:Designer
250

DB AND CONTROL DRAWN BY:Author


775

SWITCH LOCATION CHECKED BY:Checker


LOBBY-2 (REFER ELECTRICAL DRG)
4225X6000 1: PT-06 - WALL PAINT OF APPROVED SHADE AND COLOUR AS SCALE:As indicated
1200

4 PER SPEC
PIT DEPTH

DRAWING TITLE
775

200 THK BRICK WALL


2: PT-07 - WALL PAINT OF APPROVED SHADE AND COLOUR AS
PER SPEC LOBBY - 2 DETAILS (TYP)
FOR ALL FLOORS
3: PT-08 - PAINT OF APPROVED SHADE AND COLOUR AS
PER SPEC
SHEET NUMBER
4: FT1 - (600X600X12) FLOOR TILE OF APPROVED COLOUR
PLAN OF LOBBY-2 (TYP ON ALL FLOORS) LIFT SECTION AND SHADE AS PER SPEC
1 6 A6-02
1 : 50 1 : 50
DATE:02/28/11 NORTH
ISSUE
PLASTIC EMULSION PAINT OF PAINT OF APPROVED No. Date Description Revision
APPROVED COLOUR AND COLOUR AND SHADE
BOTTOM OF FLOOR SLAB. LIFT:ELENESSA(P21) SHADE (PT-07) (PT-06) G WALL PAINTED WITH APPROVED BOTTOM OF FLOOR SLAB.
PAINT OF APPROVED SHADE AND AS PER SPEC COLOUR AND SHADE PAINT OF APPROVED SHADE AND
FLOOR NUMBER LIFT CALL POINT
COLOUR AS PER SPEC G 225 THK SLAB (PT-06) COLOUR AS PER SPEC
(PT-08) CORNICE AS PER (PT-08)
SPEC PT-07

37
EQ 450 EQ

250
1 1 1
PT-06

450
PT-07 PT-07 PROJECT TEAM
250 OWNER
Infosys Technology Ltd.

565
2775

PT-06 PT-06 ARCHITECT


PT-06 PT-06 TRC ENGINEERING (I) PVT LTD

450
PT-07 PT-07
1200

150 MM 150 MM 150 MM FLOOR TILE


SKIRTING SKIRTING SKIRTING AS PER SPEC. (SEE
PT-07 PT-07 PT-07 DETAIL NO.6/A6-01)
FIRST FLOOR FIRST FLOOR
3000 3000

FLOOR TILE
AS PER SPEC. (SEE DETAIL NO.6/A6-01)
ELEVATION 3 (TYP FOR ALL FLOORS) ELEVATION 4 (TYP FOR ALL FLOORS)
3 1 : 20
4 1 : 20

BOTTOM OF FLOOR SLAB. PAINT OF


APPROVED SHADE AND COLOUR AS
PER SPEC(PT-08)
9.1
WALL PAINTED WITH STAIR DOOR
APPROVED COLOUR AND SHADE (SEE DETAILS) G
(PT-06)
6
A6-03

KEY PLAN
ELECTRICAL
ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51

2850
FUT URE EXPANSION FUT URE EXPANSION
SDB5 SDB4
PHASE-2 G+5 G+5

PT-06 PT-06
450

SIGNAL RED
PT-07 0520
FUT URE EXPANSION
FOOD COURT -2

PHASE-1
FOOD COURT -1
GA S B A NK

SITE
OF FICE-2
AGRICULTURE LAND
SITE OFF ICE-1

P
U

SDB3 SDB2 UNIT


G+5 G+5 STORE M E
T
S
IM S

CEMENT
GODOW N

6
5
4
3
2
1
P
U

P
U
2775

SDB1
G+5 STA FF/L AB OU R
CANTEEN
565

TERRACE TERRACE
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK

SECURITY SECURITY
RAMP

ENTRY EXIT

EQ 450 EQ 18000 18000


SUBWAY 12
M
1 2
VIP PA RKI NG
3 4 5
67
8 9
10
CR
OSSI
NG
PUBLIC A REA
18.19 ACRES
SURV EY NO. 49
SURV EY NO. 54

FD1 PROPOS
ED MLC P
DEVELOPER
STORE

503 lv l.,

HOL DI NG
SEC URI TY

14m WIDE ROAD (FUTURE


EXPANSION
SINGAPO RE ENTRANCE
26m WIDE ROAD

CR OSSI
NG
450

LAYOUT

PT-07 14.5m ROAD PRIVA TE

3000
AGRICULTURE LAND
BUS TERMINAL
REGAL JEWEL VIOLET
150 MM 150 MM 7150
CLIENT:
SKIRTING SKIRTING
PT-07 PT-07
FIRST FLOOR
FIFTH FLOOR
15000
FIFTH FLOOR
15000
M/S INFOSYS TECHNOLOGIES
3000 LTD. HYDERABAD

3000
SILVER BLUSH PROJECT NUMBER
M502
ELEVATION 2 (TYP FOR ALL FLOORS)
2 1 : 20 10BLR023

FOURTH FLOOR FOURTH FLOOR PROJECT PHASE


12000 12000
9 DESIGN DEVELOPEMENT
9.2
5 ARCHITECT AND STRUCTURAL CONSULTANT
3000

A6-03
PARKING TILE FLOORING OF
APPROVED COLOUR AND SHADE OLD BRICK BROWN
8613
214

(FT-01) J
225 THK
SLAB
F
THIRD FLOOR THIRD FLOOR
2800
9000 9000
ENGINEERING (I) PVT LTD
250 THK
1025

2550
SHEAR WALL
3000

PEACOCK BLUE
TRC Engineering (I) Pvt Ltd.
1200

0161
5
No 6/A, Amit Plaza, JP Nagar, 3rd Phase
6950

SECOND FLOOR SECOND FLOOR


Bannerghatta Road,Bangalore-560076
6000 6000
Phone : +91-80-26581707/08/09
Fax :+91-80-26582424 WebSite:www.trc.co.in
4 A6-03 3
3000

2
LILY GOLD YELLOW LIFT DOOR AS
1200

7942 PER STANDARDS


LOBBY-3 6 FOR CO-ORDINATION
5715X10064
DESIGNED BY:Designer
FIRST FLOOR FIRST FLOOR
3000 3000 LEGEND: DRAWN BY:Author

CHECKED BY:Checker
G
1: PT-06 - WALL PAINT OF APPROVED SHADE AND COLOUR AS SCALE:As indicated

PER SPEC DRAWING TITLE


3000

ITALIAN OLIVE GREEN


2900

1200

7823
7 2: PT-07 - WALL PAINT OF APPROVED SHADE AND COLOUR AS
LIFT LOBBY
PER SPEC LOBBY -3 DETAILS (TYP) FOR
ALL FLOORS
775

GROUND FLOOR GROUND FLOOR


0 0 3: PT-08 - PAINT OF APPROVED SHADE AND COLOUR AS
NOTES : COLOUR SHADES AND PER SPEC
NUMBERS ARE AS PER ASIAN PAINTS.
4: FT1 - (600X600X12) FLOOR TILE OF APPROVED COLOUR SHEET NUMBER
PLAN OF LOBBY-3 (TYP ON ALL FLOORS) COLOUR DETAIL 1 SECTION OF LOBBY-3 AND SHADE AS PER SPEC
1 6 5 A6-03
1 : 50 1 : 50 1 : 50
DATE:02/28/11 NORTH
ISSUE
No. Date Description Revision
6 6.1 6.2 7

CONCRETE COLUMN
PER DETAIL

DISTRIBUTION BOARD 200 THK


AND SWITCH LOCATION MASONRY WALL
100 900 2250
F

200
PROJECT TEAM
9 9.1 OWNER
D1 Infosys Technology Ltd.

ARCHITECT
100 MM THK MASONRY WALL
400 TRC ENGINEERING (I) PVT LTD

1250

100
200 200
4700 3250 200

CHANGE ROOM
CCTV CONTROL ELECTRICAL SHAFT

2250

1300
MONITORING ROOM

900
D1
DATA SHAFT
4370

100
200

900
200 MM THK MASONRY WALL

200
200 THK

200
ELECTRICAL AND UPS ROOM 200 THK MASONRY WALL

6200
FHR-11
200 THK MASONRY WALL
MASONRY WALL
COLUMN
PER STRUC DRG
10350

3750
RAMP LINE ABOVE KEY PLAN
ELECTRICAL
ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51
900

D1
FUT URE EXPANSION FUT URE EXPANSION
SDB5 SDB4
PHASE-2 G+5 G+5

GA S B A NK

ENLARGED PLAN-LOBBY 3 SHAFTS


FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
PHASE-1 SITE
OF FICE-2

SITE OFF ICE-1

3
P
U

SDB3 SDB2 UNIT


G+5 G+5 STORE M E
T
S
IM S

1 : 20
CEMENT
GODOW N

6
5
4
3
2
1
P
U

P
U

SDB1
G+5 STA FF/L AB OU R
CANTEEN

REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK

SECURITY SECURITY
RAMP

ENTRY EXIT

SUBWAY VIP PA RKI NG


12
M
1 2
3 4 5
67
8 9 CR
OSSI
PUBLIC A REA
10 NG

18.19 ACRES SURV EY NO. 54

SURV EY NO. 49
ED MLC P
DEVELOPER
STORE

PROPOS
930

503 lv l.,

HOL DI NG
SEC URI TY

14m WIDE ROAD (FUTURE


EXPANSION
SINGAPO RE ENTRANCE
26m WIDE ROAD

CR OSSI
NG

LAYOUT
14.5m ROAD PRIVA TE

AGRICULTURE LAND
BUS TERMINAL

CLIENT:
G
M/S INFOSYS TECHNOLOGIES
200 THK
LTD. HYDERABAD
MASONRY WALL
PROJECT NUMBER

10BLR023
ELECTRICAL ROOM DETAIL @ GROUND FLOOR
2 1 : 20
PROJECT PHASE

DESIGN DEVELOPEMENT

ARCHITECT AND STRUCTURAL CONSULTANT

16

CONCRETE COLUMN PROJECTION 12 CONCRETE COLUMN ENGINEERING (I) PVT LTD


PER STRUC. DRG
PER STRUC DRG IN PLASTER

TRC Engineering (I) Pvt Ltd.


No 6/A, Amit Plaza, JP Nagar, 3rd Phase
200

1000
Bannerghatta Road,Bangalore-560076
200

Phone : +91-80-26581707/08/09
Fax :+91-80-26582424 WebSite:www.trc.co.in
B B
1200

1200

FOR CO-ORDINATION
DESIGNED BY:Designer
OPENING IN SLAB
450X450 DRAWN BY:Author

BEAM CHECKED BY:Checker

BEAM PER STRUC FINISHING SCHEDULE FOR ELECTRICAL SCALE: 1 : 20

PER STRUC.
1000 ROOM DRAWING TITLE
FHR SHAFT WALL CEILING FLOORING
OPENING IN SLAB ENLARGED PLANS
FHR SHAFT
450X450

OPENING
PER MANUFACTURER CEMENT CEMENT ANTI SKID FLOOR TILES
PLAN OF FHR-5 (TYP) PLAN OF FHR-3,4 (TYP) PAINT PAINT 600X600 PER SPEC. SHEET NUMBER
1 1 : 20
4 1 : 20
A6-04
DATE:02/28/11 NORTH
ISSUE
D.1 No. Date Description Revision

100 THK
URINAL STALLS 200X300 TILES EQ 1900 EQ 200X300 TILES MASONRY WALL
PER SPEC PER SPEC PER DETAIL 600x600
VENTILATORS
MIRROR
PER SPEC
1125

PROJECT TEAM

1350
750

1125
OWNER
URINAL
50 MM GRANITE SLAB PARTITION Infosys Technology Ltd.
2100

75

OF APPROVED COLOR

2100
ARCHITECT

300
TRC ENGINEERING (I) PVT LTD

75
900

750
600

900
410
SECOND FLOOR
495 625 625 625 400
COUNTER TOP WOODEN CABINET 6000
WASH BASIN DOOR WALL HUNG 750 750
PER SPEC WC PER SPEC

SECTIONAL ELEVATION 1 SECTIONAL ELEVATION 2


1 1 : 20
2 1 : 20

D.1

1
4
A6-05

4675 200
200X300 TILES

200
D2
PER SPEC.

100
KEY PLAN
EQ

1125
900
DOOR PER D1
DETAIL

2100
75
D1
P
U

M E
T
S
IM S

TOILET
1200

6
5
4
3
2
1
P
U

4650X5975

900
COUNTER TOP

750
WASH BASIN
PER SPEC.
SECOND FLOOR PRIVA TE
LAYOUT

FT-2 6000
2625

WASH BASIN WALL MOUNTED


EQ

CLIENT:
4 URINAL STALLS PER SPEC WC PER SPEC
PER SPEC
M/S INFOSYS TECHNOLOGIES
SECTIONAL ELEVATION 4
4 LTD. HYDERABAD
5996

DOOR PER
400

1 : 20
100

DETAIL
750 650 750 650 PROJECT NUMBER
100
625

100 100 100 100 200X300 TILES 10BLR023


PER DETAIL
PROJECT PHASE

D2 D2
625

DESIGN DEVELOPEMENT
300 300
5
3170

A6-05
ARCHITECT AND STRUCTURAL CONSULTANT
2
A6-05 WASH BASIN
625

WASH BASIN
2271

PER SPEC
PER SPEC.
WALL MOUNTED
75

D2 D2
WC PER SPEC.
495

900

750
TRC Engineering (I) Pvt Ltd.
D.1 SECOND FLOOR
No 6/A, Amit Plaza, JP Nagar, 3rd Phase
6000
300 300 Bannerghatta Road,Bangalore-560076
Phone : +91-80-26581707/08/09
1 750 750 Fax :+91-80-26582424 WebSite:www.trc.co.in
A6-05

1475 1500 1500


100 100 200
FOR CO-ORDINATION
DESIGNED BY:Designer

DRAWN BY:Author

ENLARGED PLAN SECTIONAL ELEVATION 5 CHECKED BY:Checker

3 1 : 20
5 1 : 20 SCALE: 1 : 20

FINISHING SCHEDULE DRAWING TITLE

WALL CEILING FLOORING


TOILET DETAILS

CEMENT CEMENT ANTI SKID FLOOR TILES


SHEET NUMBER
PAINT PAINT 300X300 PER SPEC.
A6-05
DATE:02/28/11 NORTH
ISSUE
No. Date Description Revision

1 2

D D.1
11400
STRL. COLUMN 200 MASONRY WALL BOTTOM OF FLOOR SLAB.
750 MM BEAM PAINT OF APPROVED SHADE AND
(SEE DETAIL) PER STRUC DRG COLOUR AS PER SPEC(PT-08) THIRD FLOOR
9000
C
DOOR KITCHEN SINK RCC COLUMN
COLUMN COLUMN IN ELEVATION SEE DETAIL PER SPEC
PROJECT TEAM

3000
PER STRUC DRG PER STRUC DRG
PT-06 PT-06
DRIVER'S LOUNGE OWNER
21400X11800 Infosys Technology Ltd.
MASONRY WALL 150 THK SKIRTING PT-07 MASONRY WALL
SECOND FLOOR ARCHITECT
6000 TRC ENGINEERING (I) PVT LTD
FLOOR TILE AS
PER SPEC

ELEVATION 2
2 1 : 50

200 MASONRY WALL

5
GLAZED WALL SWEEP
WINDOW SEE DETAIL THIRD FLOOR
9000
4 A6-07 2 200X300 WALL TILES
ASPER SPEC
FLOORING TILE OF
APPROVED COLOUR

3000
AND SHADE (FT-02) 3 20MM THK GRANITE
COUNTER TOP PT-06

150 MM SKIRTING PT-07


SECOND FLOOR KEY PLAN
6000
FLOOR TILE AS SPANDREL ELECTRICAL
SUB STATION
PER SPEC
ECC BLOCK

SEE DETAIL
G+14
4ACRES
SURV EY NO. 51

ELEVATION 3
FUT URE EXPANSION FUT URE EXPANSION
SDB5 SDB4
PHASE-2 G+5 G+5

STRL. COLUMN
800X800 (SEE DETAIL) 3 1 : 50
FUT URE EXPANSION
FOOD COURT -2

P
U
PHASE-1
FOOD COURT -1
GA S B A NK

SITE OFF ICE-1


SITE
OF FICE-2
AGRICULTURE LAND

SDB3 SDB2 UNIT


G+5 G+5 STORE M E
T
S
IM S

CEMENT
GODOW N

6
5
4
3
2
1
P
U

P
U

SDB1
G+5 STA FF/L AB OU R
CANTEEN

REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK

SECURITY SECURITY
RAMP

ENTRY EXIT

SUBWAY VIP PA RKI NG


12
M
1 2
3 4 5
67
8 9 CR
OSSI
PUBLIC A REA
10 NG

18.19 ACRES SURV EY NO. 54

SURV EY NO. 49

D ED MLC P
DEVELOPER
STORE

PROPOS 503 lv l.,

HOL DI NG
SEC URI TY

14m WIDE ROAD (FUTURE


EXPANSION
SINGAPO RE ENTRANCE
26m WIDE ROAD

CR OSSI
NG

LAYOUT
14.5m ROAD PRIVA TE

AGRICULTURE LAND
BUS TERMINAL

CLIENT:

D.1 D M/S INFOSYS TECHNOLOGIES


11400 16000 LTD. HYDERABAD
C
BOTTOM OF FLOOR SLAB.
PAINT OF APPROVED SHADE AND PROJECT NUMBER
200 THK COLOUR AS PER SPEC(PT-08) 750 MM BEAM WALL PAINTED WITH
MASONRY WALL
300

4875 6900 PER STRUC DRG APPROVED COLOUR AND SHADE (PT-06) THIRD FLOOR
9000
10BLR023

200x300 TILES PROJECT PHASE


PER SPEC
900

D1
DOOR (D1) COLUMN PT-06 DESIGN DEVELOPEMENT
20MM THK GRANITE PT-06 SEE DETAIL PT-06
COUNTER TOP PER STRUC DRG
TOILET ARCHITECT AND STRUCTURAL CONSULTANT
4650X5975 PANTRY WINDOW (W) WINDOW (W)
150 THK SKIRTING (PT-07) SEE DETAIL SEE DETAIL
SECOND FLOOR
6000
6196

900

D1 FLOOR TILE AS
4996

PER SPEC
ENGINEERING (I) PVT LTD
D2 D2
600 WIDE
PLATFORM ELEVATION 4
2500

WC WC 4 1 : 50
TRC Engineering (I) Pvt Ltd.
FINISHING SCHEDULE No 6/A, Amit Plaza, JP Nagar, 3rd Phase
D.1
WALL CEILING FLOORING Bannerghatta Road,Bangalore-560076
Phone : +91-80-26581707/08/09
Fax :+91-80-26582424 WebSite:www.trc.co.in
REFER TOILET DETAIL 200 THK
MASONRY WALL CEMENT CEMENT
PAINT PAINT ANTI SKID FLOOR TILES
1 2 600X600 PER SPEC.
WALL PAINTED WITH
FOR CO-ORDINATION
PLAN 12175
APPROVED COLOUR AND SHADE (PT-06)
1 1 : 50
DESIGNED BY:Designer

THIRD FLOOR DRAWN BY:Author


9000 CHECKED BY:Checker

4600 LEGEND: SCALE: 1 : 50

DRAWING TITLE
TV PT-06
MASONRY WALL 1: PT-06 - WALL PAINT OF APPROVED SHADE AND COLOUR
1200

AS PER SPEC DRIVERS LOUNGE DETAIL


150 THK SKIRTING (PT-07)
SECOND FLOOR
6000 2: PT-08 - PAINT OF APPROVED SHADE AND COLOUR AS PER
FLOOR TILE AS SPEC
PER SPEC 3: PT-07 - PAINT OF APPROVED SHADE AND COLOUR AS PER
SHEET NUMBER
ELEVATION 5 SPEC
5 1 : 50
4: FT2 - FLOOR TILE OF APPROVED COLOUR AND SHADE AS A6-06
PER SPEC
DATE:02/28/11 NORTH
ISSUE
No. Date Description Revision

FLUSH DOOR FLUSH DOOR MS FIRE DOOR DOOR SCHEDULE:


SHUTTERS SHUTTERS FRAME 125 X 100
900 1150
1050 ENAMEL ENAMEL − 2 HR RATED SL.
PAINTED ON PAINTED ON WITH − ENAMEL TYPE MARK WIDTH HEIGHT COUNT DESCRIPTION
750 NO.
900 SURFACE WITH SURFACE WITH 1000 PAINTED ON
APPROVED APPROVED SURFACE WITH FLUSH DOOR
COLOR COLOR APPROVED 1. D1 900 2100 6
SHUTTERS
COLOR
FLUSH DOOR PROJECT TEAM
2. D2 750 2100 2
SHUTTERS
OWNER
SAL SAL VISION PANEL − MS FIRE DOOR Infosys Technology Ltd.
3. FD1 1000 2100 14
WOOD WOOD 4MM GLASS WITH VISION PANEL
FRAME FRAME ARCHITECT
100 X 75 100 X 75 TRC ENGINEERING (I) PVT LTD

WINDOW SCHEDULE:
SL.
TYPE MARK WIDTH HEIGHT COUNT DESCRIPTION
NO.

ALUMINUM FRAME

2175

2175

2175
1. W 900 900 9
2100

2100

2100
WITH GLASS

2. V1 600 600 9 ALUMINUM


MS SHUTTER

1500
50MM THK −
ENAMEL
PAINTED − 2 HR
1100

1100

1100
FIRE RATED
75 75 75 75

FLUSH DOOR
SHUTTERS
ENAMEL PAINTED
ON SURFACE
WITH APPROVED
35 COLOR

SAL WOOD
900 750 1000

200
FRAME 100X75

100
KEY PLAN
D1 D2 FD1 ELECTRICAL
SUB STATION

75
ECC BLOCK
G+14
4ACRES
SURV EY NO. 51

FUT URE EXPANSION FUT URE EXPANSION


SDB5 SDB4
PHASE-2 G+5 G+5

DOOR DETAIL
GA S B A NK
FUT URE EXPANSION
AGRICULTURE LAND

TYPICAL WOODEN DOOR FRAME DETAIL


FOOD COURT -1
FOOD COURT -2

PHASE-1

1
SITE
OF FICE-2

SITE OFF ICE-1

P
U

A
SDB3 SDB2 UNIT
G+5 G+5 STORE M E
T
S
IM S

CEMENT
GODOW N

6
5
4
3
2
1
P
U

SCALE: 1:10 SCALE: N.T.S.


P
U

SDB1
G+5 STA FF/L AB OU R
CANTEEN

ALUMINUM −
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK

SECURITY SECURITY
RAMP

ENTRY EXIT

SUBWAY VIP PA RKI NG


12
M

PUBLIC A REA

SECTION AS
1 2
3 4 5
67
8 9 CR
OSSI
10 NG

18.19 ACRES SURV EY NO. 54

SURV EY NO. 49
ED MLC P
DEVELOPER
STORE

PROPOS
APPROVED −
503 lv l.,

HOL DI NG
SEC URI TY

14m WIDE ROAD (FUTURE


EXPANSION
SINGAPO RE ENTRANCE

POWDER COATED 4MM GLASS CR OSSI


NG
26m WIDE ROAD

/ANODIZED 14.5m ROAD PRIVA TE


LAYOUT

ALUMINUM FINISH AGRICULTURE LAND


BUS TERMINAL

AS APPROVED 50
CLIENT:

35
M/S INFOSYS TECHNOLOGIES

150

80
LTD. HYDERABAD

35
900

50 25 PROJECT NUMBER

10BLR023

PROJECT PHASE
TYPICAL MS DOOR FRAME PROFILE
B SCALE: N.T.S.
DESIGN DEVELOPEMENT

ARCHITECT AND STRUCTURAL CONSULTANT


900 450 900 450 900

W
ENGINEERING (I) PVT LTD
WINDOW DETAIL
2 SCALE: 1:10
ALUMINUM − TRC Engineering (I) Pvt Ltd.
SECTION AS
ALUMINUM MASONRY WALL
APPROVED −
LOUVERS No 6/A, Amit Plaza, JP Nagar, 3rd Phase
POWDER COATED
/ANODIZED MASONRY WALL Bannerghatta Road,Bangalore-560076
ALUMINUM FINISH Phone : +91-80-26581707/08/09
AS APPROVED Fax :+91-80-26582424 WebSite:www.trc.co.in
HOLLOW METAL
DOOR FRAME
HOLLOW METAL T ANCHORS AT EACH
DOOR FRAME JAMBOOR FRAME
FOR CO-ORDINATION
100
600

HOLLOW METAL DOOR


DESIGNED BY:Designer

GROUT FRAME DRAWN BY:Author

SOLID CHECKED BY:Checker

25 SCALE: 1 : 10
TO FIN. FLR.

600 450 600 450 600


DRAWING TITLE
1200

V1 DOOR AND WINDOW DETAIL

VENTILATOR DETAIL DOOR HEAD DETAIL DOOR JAMB DETAIL


3 SCALE: 1:10 C SCALE: 1:10 D SCALE: 1:10
SHEET NUMBER

A6-07
DATE:02/28/11 NORTH
ISSUE
1 No. Date Description Revision
H

COLUMN CAPITAL B
SEED DETAIL B 375
A
A A7-01
B 300
A7-01
COLUMN PER A7-01
STRUC DRG
250 MM THK 250 MM THK

1050
SPANDREL SPANDREL
225 THK SLABS
TERRACE TERRACE
PER STRUC DRG
THIRD FLOOR THIRD FLOOR 18000 18000

750
9000 9000

750
STAIRCASE
B PROJECT TEAM

1200
100 MM WALL B

3000

3000
A7-01

1200
750 MM A SWEEP A7-01

3000

3000
BEAM PER STRUC A7-01
OWNER
DRG. 750 MM BEAM Infosys Technology Ltd.

1050
PER STRUC 100 MM WALL

1050
DRG. SWEEP ARCHITECT
225 THK SLAB FIFTH FLOOR FIFTH FLOOR
SECOND FLOOR
PER STRUC DRG. SECOND FLOOR TRC ENGINEERING (I) PVT LTD
15000 15000

750
6000 6000

750

1200

3000

3000
750 MM BEAM

1200
3000

3000
PER STRUC DRG.
RAMP PER

1050
250 MM THK
250 MM THK SPANDREL STRUC DRG

1050
SPANDREL FOURTH FLOOR FOURTH FLOOR
FIRST FLOOR FIRST FLOOR 12000 12000

3000
750
3000 3000

750

1200

3000

3000
100MM THK

1200
3000

3000
WALL SWEEP 250 MM THK
WALL
225 THK SLAB PER

1050

1050
PLINTH BEAM
STRUC DRG.

1050
PER STRUC DRG
THIRD FLOOR THIRD FLOOR
GROUND FLOOR GROUND FLOOR 9000 9000

750

750
750 MM BEAM PER
0 0
STRUC DRG.

1200

1200
100 MM WALL

3000

3000
SWEEP
225 THK SLAB PER
STRUC DRG.

1050

1050
250 MM THK
WALL SECTION-2 WALL SECTION-3 SPANDREL
2 1 : 50
3 1 : 50
SECOND FLOOR SECOND FLOOR
6000 6000

750

750
KEY PLAN
F 250 MM THK 250 MM THK

1200

1200
3000

3000
SPANDREL SPANDREL ELECTRICAL
ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51

550 750 MM BEAM PER PHASE-2


FUT URE EXPANSION
SDB5
G+5
FUT URE EXPANSION
SDB4
G+5

750 MM BEAM PER

1050

1050
300 A STRUC DRG. FUT URE EXPANSION
GA S B A NK
AGRICULTURE LAND
STRUC DRG.
FOOD COURT -1
FOOD COURT -2

PHASE-1 SITE
OF FICE-2

SITE OFF ICE-1

A7-01
FIRST FLOOR FIRST FLOOR
P
U

SDB3 SDB2 UNIT


G+5 G+5 STORE M E
T
S
IM S

CEMENT
GODOW N

6
5
4
3
2
1
P
U

3000 3000

750

750
P
U

SDB1
G+5 STA FF/L AB OU R
CANTEEN

750 MM BEAM
1050

REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK

SECURITY SECURITY

PER STRUC DRG


RAMP

ENTRY EXIT

SUBWAY VIP PA RKI NG


12
M
1 2
3 4 5
67
8 9 CR
OSSI
PUBLIC A REA
10 NG

18.19 ACRES SURV EY NO. 54

SURV EY NO. 49
TERRACE PROPOS
ED MLC P
DEVELOPER
STORE

1200
503 lv l.,

HOL DI NG

3000
SEC URI TY

3000
14m WIDE ROAD (FUTURE

18000 SINGAPO RE ENTRANCE


EXPANSION
750

26m WIDE ROAD

CR OSSI
NG

2250
PLINTH BEAM PER 14.5m ROAD PRIVA TE
LAYOUT

100MM THK STRUC DRG PLINTH BEAM PER AGRICULTURE LAND


BUS TERMINAL

0 1050
WALL SWEEP STRUC DRG
1200

B
3000

A7-01
GROUND FLOOR GROUND FLOOR CLIENT:
225 THK SLAB PER 0 0
STRUC DRG
1050

M/S INFOSYS TECHNOLOGIES


FIFTH FLOOR
LTD. HYDERABAD
15000
750

WALL SECTION-5
WALL SECTION-4 5 1 : 50
4 PROJECT NUMBER
1200

1 : 50
3000

250MM THK 10BLR023


SPANDREL 18
1050

PROJECT PHASE
FOURTH FLOOR
COLUMN CAPITAL
PER DETAIL DESIGN DEVELOPEMENT
12000
750

100 MM WALL SWEEP


ARCHITECT AND STRUCTURAL CONSULTANT
250 MM THK
1200

F
3000

SPANDREL
225 THK SLAB PER
STRUC DRG F
225 THK SLAB PER
1550

STRUC DRG.
550 550
1050

750 MM BEAM PER


STRUC DRG 100 MM THK
THIRD FLOOR THIRD FLOOR WALL SWEEP
250 250 50 ENGINEERING (I) PVT LTD

100
9000 CONCRETE COLUMN 9000 100 MM THK
750

PER STRUC DRG

100
WALL SWEEP

PROJECTION
TRC Engineering (I) Pvt Ltd.
1200

250 MM THK 250 MM THK

450
3000
3000

250MM THK SPANDREL SPANDREL


SPANDREL

50
No 6/A, Amit Plaza, JP Nagar, 3rd Phase
225 THK SLAB

950
225 THK SLAB PER
1050

100MM WALL SWEEP 750 MM BEAM PER Bannerghatta Road,Bangalore-560076

450
PER STRUC DRG STRUC DRG

1800
STRUC DRG.

150
SECOND FLOOR SECOND FLOOR Phone : +91-80-26581707/08/09

1800
6000 6000
TERRACE Fax :+91-80-26582424 WebSite:www.trc.co.in
750

18000 FIFTH FLOOR


750 MM BEAM
250 MM THK PER STRUC DRG 15000
100MM WALL SWEEP 750 MM BEAM PER

50
450
SPANDREL STRUC DRG
1200

650
3000
3000

100 MM THK
225 THK SLAB PER WALL SWEEP
100 MM THK
FOR CO-ORDINATION
STRUC DRG. WALL SWEEP DESIGNED BY:Designer
1050

750 MM BEAM 100 DRAWN BY:Author

100
FIRST FLOOR PER STRUC DRG. FIRST FLOOR 25 25 CHECKED BY:Checker
3000 3000
750

SCALE:As indicated

DRAWING TITLE
1200

100 MM WALL
3000

3000

SWEEP TYPICAL DETAIL OF SPANDREL WITH TEXTURE TYPICAL DETAIL OF PLAIN SPANDREL
A 1 : 20
B 1 : 20 WALL SECTIONS
PLINTH BEAM
1050

PER STRUC DRG


GROUND FLOOR GROUND FLOOR
0 0

SHEET NUMBER

WALL SECTION-6 A7-01


WALL SECTION-1 6
1 1 : 50
1 : 50
DATE:02/2811 NORTH
ISSUE
2 No. Date Description Revision

2
FD1 PT-05

TERRACE

10 R @ 150MM 10R @ 150MM 10 R @ 150MM 10 @ 150MM 10 R @ 150MM 10 @ 150MM 10 R @ 150MM 10 @ 150MM 10 R @ 150MM 10 @ 150MM 10 R @150 MM 10R @ 150mm
18000

=1500mm
PROJECT TEAM
SECOND FLOOR
6000
OWNER

3000
Infosys Technology Ltd.

= 1500 MM
FD1 ARCHITECT
25 MM DIA MS BALUSTERS

275

RAILING TOP =1000


@ 1000MM C/C PER SPEC TRC ENGINEERING (I) PVT LTD
FIFTH FLOOR

250 250
15000
25 MM DIA MS

=1500 MM
RAILING PER
SPEC
PT-05

3000

325
50 MM DIA
MS HANDRAIL RAIL

=1500 MM
FD1
AS PER SPEC

FOURTH FLOOR
12000 FD1

=1500 MM
4
A8-01

ST-1

3000
REFER

=1500 MM
FD1 STRUCTURAL DRG.
FIRST FLOOR
SS RAILING
3000
THIRD FLOOR
9000
PT-05

=1500 MM
FIRE DOOR
PER DETAIL

3000

=1500 MM
FD1 3
225 THK A8-01
FLOOR SLAB
SECOND FLOOR RAILING DETAIL
6000 3 1 : 20 KEY PLAN
=1500 MM

ELECTRICAL
ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51
3000

FUT URE EXPANSION FUT URE EXPANSION


SDB5 SDB4
PHASE-2 G+5 G+5
=1500 MM

GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
PHASE-1
FD1 SITE OFF ICE-1
SITE
OF FICE-2

P
U

SDB3 SDB2 UNIT


G+5 G+5 STORE M E
T
S
IM S

CEMENT
GODOW N

6
5
4
3
2
1
P
U

P
U

SDB1
G+5 STA FF/L AB OU R
CANTEEN

FIRST FLOOR REST REST


RO OM -2RO OM -1
TO I E
LT
BLO CK

SECURITY SECURITY
RAMP

ENTRY EXIT

3000 SUBWAY 12
M
1 2
VIP PA RKI NG
3 4 5
67
8 9
10
CR
OSSI
NG
PUBLIC A REA
18.19 ACRES SURV EY NO. 54
=1500MM

SURV EY NO. 49

15MM BULLNOSED ED MLC P


DEVELOPER
STORE

PROPOS 503 lv l.,

HOL DI NG
SEC URI TY

14m WIDE ROAD (FUTURE


EXPANSION

TREAD
SINGAPO RE ENTRANCE
26m WIDE ROAD

PT-05
CR OSSI
NG

LAYOUT
PRIVA TE
3000

14.5m ROAD

AGRICULTURE LAND
BUS TERMINAL
12 MM GROOVE
=1500 MM

FD1
100 THK CLIENT:
LANDING SLAB 12 MM THK KOTA STONE
GROUND FLOOR ON TREAD
0 M/S INFOSYS TECHNOLOGIES
LTD. HYDERABAD
SECTION - STAIR NO-1 12 THK CEMENT 15
MORTAR

RISER = 150 MM
2 1 : 50 PROJECT NUMBER

2 RCC RISER
6300 10BLR023

PROJECT PHASE
RCC COLUMN
1800 9T @ 300MM =2700MM 1800 DESIGN DEVELOPEMENT
10R @ 150MM =1500MM
ARCHITECT AND STRUCTURAL CONSULTANT
D.1

NOSING DETAIL
4 1:1
RCC COLUMN
ENGINEERING (I) PVT LTD
11 12 13 14 15 16 17 18 19 20
625

ST1 ST1
TRC Engineering (I) Pvt Ltd.
100

1500

No 6/A, Amit Plaza, JP Nagar, 3rd Phase


150 150
Bannerghatta Road,Bangalore-560076
2
A8-01 Phone : +91-80-26581707/08/09
Fax :+91-80-26582424 WebSite:www.trc.co.in
3250

1800

250

200 THK
MASONRY
RAILING (SEE WALL FOR CO-ORDINATION
DETAIL NO.3/A8-02) DESIGNED BY:Designer

150 DRAWN BY:Author


1500

DOOR (SEE DOOR DETAILS)


100

CHECKED BY:Checker
UP
SCALE:As indicated

FINISHING SCHEDULE LEGEND:


625

RCC COLUMN DRAWING TITLE


10 9 8 7 6 5 4 3 2 1 FD1
WALL CEILING FLOORING 1: PT-05 - WALL PAINT OF APPROVED SHADE AND COLOUR AS
PER SPEC STAIR NO.1 DETAIL
200 THK LANDING TREAD RISER
2550 1000 150 2: ST-1 - 12MM THK KOTA STONE AS PER SPEC
MASONRY
WALL
CEMENT CEMENT KOTA KOTA NA SHEET NUMBER
PAINT PAINT STONE STONE
PLAN OF STAIR NO-1 (TYPICAL ON ALL FLOORS) A8-01
1 1 : 20
DATE:02/28/11 NORTH
ISSUE
18
No. Date Description Revision
500 2500 C B1 B
WIDTH
2
7400 8200 10600 6150 3000
A8-02

CIRCULAR COLUMN 9T @ 300MM 2000 9T @ 300MM 8100 9T @ 300MM 2000 9T @ 300MM 600 2100 150
PER STRUC.
=2700MM LANDING =2700MM =2700MM =2700MM

2600
450

3100

10R @ 150MM
=1500MM
M.S.HANDRAIL PROJECT TEAM
(REFER DETAIL
B NO.3/ A8-01) SECOND FLOOR SECOND FLOOR OWNER
6000 Infosys Technology Ltd.
BRICK COLUMN
ARCHITECT

2050
R.C.C. SLAB

10R @ 150MM
CIRCULAR COLUMN TRC ENGINEERING (I) PVT LTD

3000
=1500MM
SEE STRUC. DRG. REFER STRUC DRG

950
STEEL STAIR. A8-02
CONCRETE SPANDREL

6150
FIRST FLOOR REF. STRUC. DRG. (REFER DETAIL) FIRST FLOOR
3000
R.C.C. COLUMN

10R @ 150MM
=1500MM
9950 BRICK COLUMN

3000
STEEL STAIR.
REF. STRUC. DRG. GROUND FLOOR
B1 10R @ 150MM
0
= 1500MM
M.S.HANDRAIL
6000 (REFER DETAIL
NO.3/ A8-01)
SECTION -STAIR NO.2
2 1 : 50
10R @ 150MM =1500
9T @ 300MM =2700

KEY PLAN
10600

CONCRETE SPANDREL
(REFER DETAIL) ELECTRICAL

EQ
ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51

FUT URE EXPANSION FUT URE EXPANSION


SDB5 SDB4
PHASE-2 G+5 G+5

RAILING TOP = 1000MM


LANDING

GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
PHASE-1
2000

SITE
OF FICE-2

SITE OFF ICE-1

EQ
P
U

SDB3 SDB2 UNIT


G+5 G+5 STORE M E
T
S
IM S

CEMENT
GODOW N

6
5
4
3
2
1
P
U

P
U

SDB1
G+5 STA FF/L AB OU R
CANTEEN

REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK

SECURITY SECURITY
RAMP

ENTRY EXIT

SUBWAY VIP PA RKI NG


12
M
1 2
3 4 5
67
8 9 CR
OSSI
PUBLIC A REA
10 NG

18.19 ACRES SURV EY NO. 54

SURV EY NO. 49
ED MLC P
DEVELOPER
STORE

EQ
PROPOS 503 lv l.,

HOL DI NG
SEC URI TY

14m WIDE ROAD (FUTURE


EXPANSION
SINGAPO RE ENTRANCE
26m WIDE ROAD

CR OSSI
NG

LAYOUT
14.5m ROAD PRIVA TE

AGRICULTURE LAND
RCC COLUMN
3000

BUS TERMINAL

EQ
50 MM DIA MS HANDRAIL STEEL STAIR. CLIENT:
RAIL AS PER SPEC REF. STRL. DRG. SECOND FLOOR
C 25 MM DIA MS BALUSTERS @ 6000
UP 1000MM C/C PER SPEC
M/S INFOSYS TECHNOLOGIES
LTD. HYDERABAD
RAILING AS 25 MM DIA MS RAILING
2500

PER DETAIL PER SPEC


PROJECT NUMBER
10 RISERS @ 150MM

BRICK 10BLR023

COLUMN PROJECT PHASE


1500

DESIGN DEVELOPEMENT

300 ARCHITECT AND STRUCTURAL CONSULTANT


CONCRETE SPANDREL 3000
(REFER DETAIL)
5300

150
150
ENGINEERING (I) PVT LTD
150
16000

DN TRC Engineering (I) Pvt Ltd.


10R @ 150MM =1500
9T @ 300MM =2700

No 6/A, Amit Plaza, JP Nagar, 3rd Phase


2000 2700 Bannerghatta Road,Bangalore-560076
LANDING 9 THREADS @ 300MM Phone : +91-80-26581707/08/09
Fax :+91-80-26582424 WebSite:www.trc.co.in

STEEL STAIR RAILING DETAIL


3 1 : 10
FOR CO-ORDINATION
LANDING

1500
2000

DESIGNED BY:Designer

DRAWN BY:Author

DN CHECKED BY:Checker
10R @ 150MM =1500
9T @ 300MM =2700

SCALE:As indicated

DRAWING TITLE

EXTERNAL STAIR NO.2


17.b DETAILS
D
SHEET NUMBER
NOTE: STEEL STAIRCASE AS PER THE FABRICATOR
PLAN - STAIR NO-2 A8-02
1 1 : 50
DATE:02/28/11 NORTH
ISSUE
No. Date Description Revision
9.2 9.1

3000
TERRACE

10R @ 150MM 10R @ 150MM 10R @ 150MM 10R @ 150MM 10R @ 150MM 10R @ 150MM 10R @ 150MM 10R @ 150MM
18000

= 1500MM
PROJECT TEAM
OWNER
9.2 9.1

3000
Infosys Technology Ltd.

=1500MM
ARCHITECT
PT-05
TRC ENGINEERING (I) PVT LTD
FIFTH FLOOR
=1500MM 15000 SECOND FLOOR
6000
3000

=1500MM

RCC COLUMN
RAILING (SEE BEYOND
ST-1 FOURTH FLOOR
12000
DETAIL NO.3/A8-02)
=1500MM
3000

PT-05 225 THK 200 THK


FLOOR SLAB
MASONARY WALL
=1500MM

100 THK
THIRD FLOOR WINDOW RCC SLAB
9000 REFER WINDOW SCHEDULE 225 THK FLOOR
=1500MM

4
A8-01 SLAB
3000

FIRST FLOOR
=1500MM

100 THK 3000


LANDING SLAB

SECOND FLOOR
6000 KEY PLAN
10 R @150mm

ELECTRICAL
ECC BLOCK SUB STATION
1500 MM

G+14
4ACRES
3000

SURV EY NO. 51

FUT URE EXPANSION FUT URE EXPANSION


SDB5 SDB4
PHASE-2 G+5 G+5

GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
PHASE-1 SITE
OF FICE-2

SITE OFF ICE-1

P
U

PT-05
SDB3 SDB2 UNIT
G+5 G+5 STORE M E
T
S
IM S

CEMENT
GODOW N

ENLARGED SECTION (TYPICAL FOR ALL FLOORS)


6
5
4
3
2
1
P
U

P
U

SDB1

FIRST FLOOR
G+5

3
STA FF/L AB OU R
CANTEEN

REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK

1 : 20
SECURITY SECURITY
10R @ 150MM 10R @ 150MM

3000
RAMP

ENTRY EXIT

SUBWAY VIP PA RKI NG


12
M
1 2
3 4 5
67
8 9 CR
OSSI
PUBLIC A REA
10 NG

18.19 ACRES SURV EY NO. 54


=1500MM

SURV EY NO. 49

3 ED MLC P
DEVELOPER
STORE

PROPOS 503 lv l.,

HOL DI NG
SEC URI TY

225 THK A8-03 14m WIDE ROAD (FUTURE


SINGAPO RE ENTRANCE
26m WIDE ROAD
EXPANSION

FLOOR SLAB CR OSSI


NG

LAYOUT
3000

14.5m ROAD PRIVA TE

AGRICULTURE LAND
BUS TERMINAL
=1500MM

CLIENT:
GROUND FLOOR
0 M/S INFOSYS TECHNOLOGIES
LTD. HYDERABAD
SECTION-STAIR NO.3
2 1 : 50
PROJECT NUMBER

10BLR023
9.1 9.2 PROJECT PHASE
DOOR (SEE DOOR DETAILS)
DESIGN DEVELOPEMENT

100 1000 2500 ARCHITECT AND STRUCTURAL CONSULTANT

200 THK
MASONRYWALL
FD1
1 2 3 4 5 6 7 8 9 10
750

ST1
ENGINEERING (I) PVT LTD
1500

UP
100

2
A8-03
TRC Engineering (I) Pvt Ltd.
150
150 No 6/A, Amit Plaza, JP Nagar, 3rd Phase
OPENING
RAILING (SEE Bannerghatta Road,Bangalore-560076
DETAIL NO.3/A8-02)
300

Phone : +91-80-26581707/08/09
1800

Fax :+91-80-26582424 WebSite:www.trc.co.in

150 FOR CO-ORDINATION


1500

DESIGNED BY:Designer
100

DRAWN BY:Author

CHECKED BY:Checker
ST1
FINISHING SCHEDULE LEGEND:
750

SCALE:As indicated
H 13 12 11
DRAWING TITLE
WALL CEILING FLOORING 1: PT-05 - WALL PAINT OF APPROVED SHADE AND COLOUR AS
PER SPEC
LANDING TREAD RISER STAIR NO.3 DETAILS
100 1700 9T @ 300MM = 2700MM 1700 100
2: ST-1 -12MM THK KOTA STONE AS PER SPEC
10R @ 150MM = 1500MM
200 THK
CEMENT CEMENT KOTA KOTA NA
MASONRY WALL
PAINT PAINT STONE STONE
SHEET NUMBER
PLAN -STAIR NO.3 (TYPICAL FOR ALL FLOORS)
1 1 : 20
A8-03
DATE:02/03/11 NORTH
ISSUE
No. Date Description Revision
3350 9T @ 300MM 2000 9T @ 300MM 3550 9T @ 300MM 2000 9T @ 300MM
=2700MM =2700MM =2700MM =2700MM

14 15

1000
M.S.HANDRAIL
(REFER DETAIL
FIFTH FLOOR NO.3 A8-01) FIFTH FLOOR
15000

10R @ 150MM
RCC SLAB

=1500MM
REF. STRL. DRG.

PROJECT TEAM
M.S.HANDRAIL
(REFER DETAIL OWNER

3000
NO.3 A8-01) Infosys Technology Ltd.

ARCHITECT
STEEL STAIR.

10R @ 150MM
REF. STRL. DRG. TRC ENGINEERING (I) PVT LTD

=1500MM
FOURTH FLOOR FOURTH FLOOR
12000

M.S.HANDRAIL

10R @ 150MM
RCC SLAB (REFER DETAIL

=1500MM
REF. STRL. DRG. NO.3 A8-01)

CONCRETE COLUMN BEYOND

3000
CONCRETE SPANDREL BEYOND STEEL STAIR.
CONCRETE SPANDREL BEYOND REF. STRL. DRG.

10R @ 150MM
=1500MM
THIRD FLOOR
9000

STEEL STAIRS SECTION


3 1 : 25
KEY PLAN
14 15
3100 ECC BLOCK
G+14

SURV EY NO. 51
ELECTRICAL
SUB STATION
4ACRES

FUT URE EXPANSION FUT URE EXPANSION


SDB5 SDB4
PHASE-2 G+5 G+5

GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
PHASE-1

3550 9T @ 300MM =2700MM 2000 9T @ 300MM =2700MM


SITE
OF FICE-2

SITE OFF ICE-1

P
U

SDB3 SDB2 UNIT


G+5 G+5 STORE M E
T
S
IM S

CEMENT
GODOW N

10R @ 150MM =1500MM 10R @ 150M =1500MM


6
5
4
3
2
1
P
U

P
U

SDB1
G+5 STA FF/L AB OU R
CANTEEN

REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK

SECURITY SECURITY
RAMP

ENTRY EXIT

SUBWAY VIP PA RKI NG


12
M
1 2
3 4 5
67
8 9 CR
PUBLIC A REA

ST1 ST1
OSSI
10 NG

18.19 ACRES SURV EY NO. 54

SURV EY NO. 49
ED MLC P
DEVELOPER
STORE

PROPOS 503 lv l.,

HOL DI NG
SEC URI TY

14m WIDE ROAD (FUTURE


EXPANSION
SINGAPO RE ENTRANCE
26m WIDE ROAD

CR OSSI
NG

LAYOUT
14.5m ROAD PRIVA TE

2500
AGRICULTURE LAND
BUS TERMINAL

UP LANDING-FOURTH FLOOR DN CLIENT:


3
A8-04

M/S INFOSYS TECHNOLOGIES


LTD. HYDERABAD
04 03 02 01 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21
PROJECT NUMBER

ENTRY TO STAIR 10BLR023

C PROJECT PHASE
RAILING (SEE
DESIGN DEVELOPEMENT
DETAIL NO.3/A8-01)
CONCRETE SPANDREL
(SEE DETAIL) ARCHITECT AND STRUCTURAL CONSULTANT
RCC COLUMN

14
FOURTH FLOOR STEEL STAIRS PLAN
2 1 : 25
15
ENGINEERING (I) PVT LTD
3100
7400
3350 9T @ 300MM =2700MM 2000 9T @ 300M M=3000MM TRC Engineering (I) Pvt Ltd.
9T @ 300MM =2700MM 2000 9T @ 300MM =2700MM 10R @ 150MM =1500MM 10R @ 150MM =1500MM
10R @ 150MM =1500MM 10R @ 150M =1500MM No 6/A, Amit Plaza, JP Nagar, 3rd Phase
Bannerghatta Road,Bangalore-560076
ST1 ST1 ST1 Phone : +91-80-26581707/08/09
Fax :+91-80-26582424 WebSite:www.trc.co.in
2500

MID LANDING
LANDING-FIFTH FLOOR MID LANDING
2500

3 UP 3 UP FOR CO-ORDINATION
A8-04 A8-04 DESIGNED BY:Designer

DRAWN BY:Author

CHECKED BY:Checker

SCALE:1 : 25

20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 8 3 2 1 21 20 19 18 17 16 15 14 13 12 11 10 09 08 07 06 05 04 03 02 01 DRAWING TITLE

RCC COLUMN
650

ENTRY TO STAIR
TERRACE STEEL STAIRS
C C DETAILS

SHEET NUMBER
CONCRETE SPANDREL RCC COLUMN RAILING (SEE
THIRD FLOOR STEEL STAIRS PLAN FIFTH FLOOR STEEL STAIRS PLAN (SEE DETAIL) DETAIL NO.3/A8-01) A8-04
1 1 : 25
4 1 : 25
DATE:02/28/11 NORTH
ISSUE
14 13 12 11 10 9 8 7 6 5 4 3 2 1
No. Date Description Revision

10800 10800 10800 10800 10800 10800 10800 10800 10800 10800 12450 12175
850 3 1 COLUMN CAPITAL

1550
CONCRETE A3-02 CONCRETE A3-02 SEE DETAIL
COLUMN SPANDREL

TERRACE

1550
18000

3000
RAILING
CONCRETE FIFTH FLOOR
SPANDREL
15000

3000
1 225 MM THK
1550 A3-02 SLAB FOURTH FLOOR
CONCRETE 12000

3000
SPANDREL THIRD FLOOR
100 MM WALL ENTRY LVL THIRD FLOOR
SWEEP
3000 3000 3000 3000

9000

3000
SECOND FLOOR
PROJECT TEAM
900 MM HIGH
ENTRY LVL RAILING SECOND FLOOR
6000 OWNER

3000
FIRST FLOOR 225 THK R.C.C. BEAM ALONG RAMP
SLAB (SEE STRUC. DRG.) FIRST FLOOR Infosys Technology Ltd.
ENTRY LVL
3000

3000
R.C.C. GRADE BEAM. 750 MM DEEP ARCHITECT
(SEE STRUC. DRG.) CONCRETE BEAM FGL: 506.00 GROUND FLOOR
TRC ENGINEERING (I) PVT LTD
RAIN WATER 0
PLANT ROOM FIRE WATERTANK HARVESTING
WATER SUMP

GRAVEL FILLING CONCRETE WALL


(SEE STRUC. DRG.)

SECTION - 1
1 1 : 200

1 2 A B C D D.1 E
1 2
12175 12275 16750 16000 11400 4600
12175

11775 400
4

1550
1800 HIGH CONCRETE COLUMN RAMP
WIDTH A8-05
SPANDREL CAPITAL

250
TERRACE
4 ENTRY TERRACE
A

1550
A8-05
CONCRETE SPANDREL OF
18000

3000
HEIGHT 1050MM FROM FFL
FIFTH FLOOR GLAZED FIXED
FIFTH FLOOR
250

LANDING WINDOW FIFTH FLOOR


A ENTRY
1
15000

3000

3000
9000 A8-05 25 MM
FOURTH FLOOR FOURTH FLOOR FOURTH FLOOR
LVL GROOVE
12275

12275

LANDING LANDING ENTRY FOURTH FLOOR


1
12000

3000

3000
A8-05
12000 THIRD FLOOR FLUSH
D1
12275

12275

THIRD FLOOR LANDING DOOR THIRD FLOOR


LANDING LVL
9000

3000

3000
225 THK 750 MM FLUSH D1
200

CABLE RAILING SECOND FLOOR


LANDING SLAB DEEP BEAM DOOR SECOND FLOOR
B 6000

1950 3000

3000
CABLE RAILING FIRST FLOOR
EQ LANDING FIRST FLOOR
200

B
KEY PLAN
RAMP UP TO FIFTH FLOOR

3000

3000
EQ

EQ

FGL: 506.00 GROUND FLOOR


10.75 % SLOPE

1050
0 ECC BLOCK
G+14
ELECTRICAL
SUB STATION
4ACRES
EQ

16750

SURV EY NO. 51
CONCRETE SPANDREL OF
TYP.
EQ

HEIGHT 1050MM FROM FFL FUT URE EXPANSION


SDB5
FUT URE EXPANSION
SDB4
RAMP UP TO FOURTH FLOOR

PHASE-2 G+5 G+5

GA S B A NK
AGRICULTURE LAND
TYP.
16750

FUT URE EXPANSION


FOOD COURT -1
FOOD COURT -2
EQ

PHASE-1 SITE
OF FICE-2
EQ

SITE OFF ICE-1

P
U

CONCRETE SPANDREL OF SDB3


G+5
SDB2
G+5
UNIT
STORE
CEMENT
GODOW N
M E
T
S
IM S

HEIGHT 1050MM FROM FFL 6


5
4
3
2
1
P
U

CONCRETE SPANDREL OF
SECTION - 4
P
U

SDB1
G+5
EQ

STA FF/L AB OU R
CANTEEN

CONCRETE CURB HEIGHT 1050MM FROM FFL


4
EQ

REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK

SECURITY SECURITY
RAMP

ENTRY EXIT

1 : 200
VIP PA RKI NG
32250

SUBWAY 12
M

PUBLIC A REA

R.C.C. COLUMN
1 2
3 4 5
67
8 9 CR
OSSI
10 NG

18.19 ACRES SURV EY NO. 54


CONCRETE SPANDREL OF SURV EY NO. 49
ED MLC P
DEVELOPER

C
STORE

HEIGHT 1050MM FROM FFL PROPOS


SEE STRUC. DRG.
EQ

503 lv l.,

HOL DI NG
SEC URI TY

CONCRETE CURB 14m WIDE ROAD (FUTURE


SINGAPO RE ENTRANCE
EXPANSION
32250

26m WIDE ROAD

CABLE RAILING
CR OSSI
NG

C CONCRETE CURB
100 MM DIA. PIPE 14.5m ROAD PRIVA TE
LAYOUT

AGRICULTURE LAND
BUS TERMINAL
A B
250 525

100 100 100 100 100 150


RAMP DN TO THIRD FLOOR

150 150 10800 12 TO 15 MM DIA. WIRE CLIENT:


16000

10.75 % SLOPE

250 R.C.C. COLUMN STRAND CABLE


150 525 150 10800 SEE STRUC. DRG. (DETAILS & TENSION TO BE
M/S INFOSYS TECHNOLOGIES
16000

150 VERIFIED BY STRUCTURAL

650
COLUMN CAPITAL ENGINEER
LTD. HYDERABAD

1800
CONCRETE
800X800 COLUMN SPANDREL

900
RCC BEAM BELOW
PER STRUC. DRG.
300

CONCRETE SPANDREL OF CONCRETE CURB


RAMP PER STRUC. DRG. CABLE RAILING
HEIGHT 1050MM FROM FFL CONCRETE CURB
D SEE DETAIL

150
RAMP LATERAL BEAMS PROJECT NUMBER
300

3500

200 THK MASONRY WALL PER STRUC. DRG.

1200
12000
D LVL 15
0 10BLR023
500

250
150
ENTRY
11400

11400

FOURTH FLOOR RAMP


PROJECT PHASE
OPENING

LANDING
STORE
7800

11200X12000 200 THK 3725 300 3725 300 3725 150 150

1800
11400

11400

MASONRY WALL
DESIGN DEVELOPEMENT
EXIT
900

200 THK WALL


D1 D.1 ARCHITECT AND STRUCTURAL CONSULTANT
250

D.1
Cable Rail Details
972
250

250 11775 200 7 1 : 10


200

ENGINEERING (I) PVT LTD

SPEED RAMP THIRD FLOOR LEVEL SPEED RAMP FOURTH FLOOR LEVEL RAMP DETAIL - 5
2 3 5
1 : 200 1 : 200 1 : 50 TRC Engineering (I) Pvt Ltd.
No 6/A, Amit Plaza, JP Nagar, 3rd Phase
Bannerghatta Road,Bangalore-560076
1 2 3 4 5 6 7 8 9 10 11 12 13 14 Phone : +91-80-26581707/08/09
Fax :+91-80-26582424 WebSite:www.trc.co.in

12175 12450 10800 10800 10800 10800 10800 10800 10800 10800 10800 10800

6925 29925 7225 35675 7500 850 32000 1650


CONCRETE SPANDREL OF HEIGHT LANDING LANDING
1050MM FROM FFL (TYP) PAINTED
WITH APPROVED
4 FOR CO-ORDINATION
250
150
A8-05
COLOUR AND SHADE COLUMN CAPITAL CONCRETE SPANDREL OF RCC RETAINING WALL CONCRETE SPANDREL OF
HEIGHT 1050MM FROM FFL BELOW RAMP HEIGHT 1050MM FROM FFL DESIGNED BY:Designer

A DRAWN BY:Author
525
150

RAMP DN TO SECOND FLOOR RAMP DN TO FIRST FLOOR RAMP DN TO GROUND FLOOR CHECKED BY:Checker
CONCRETE CURB
9.98 % SLOPE 11.89 % SLOPE 10.66 % SLOPE
1 SCALE:As indicated

A8-05
10800

6000 DRAWING TITLE


12275

9000 3000 0
LVL LVL LVL LVL

THIRD FLOOR
LANDING EQ EQ EQ EQ EQ 2800 CONCRETE CURB EQ EQ EQ EQ EQ EQ
25 CABLE RAILING
TYP.
2500
RCC RETAINING
WALL SPEED RAMP DETAILS
TYP. TYP.
B

SHEET NUMBER
SPEED RAMP FROM GROUND TO THIRD FLOOR
6 1 : 200 A8-05
DATE:02/28/11 NORTH
ISSUE
No. Date Description Revision

6 6.1 6.2 7 8 8.1 9 9.1 9.2 10 11

CONCRETE COLUMN CAPITAL


SPANDRELS
RAMP PROJECT TEAM

1050
STAIR CASE

OWNER

1050
TERRACE Infosys Technology Ltd.
18000
LANDING
ARCHITECT

3000
225 THK SLAB
TRC ENGINEERING (I) PVT LTD

FIFTH FLOOR

3000
15000
LANDING

3000
FHR

LANDING
FOURTH FLOOR

3000
12000
LANDING

21450
18000

3000

3000
LANDING
THIRD FLOOR

3000
9000
LANDING

3000
LANDING
SECOND FLOOR

3000
6000
LANDING

3000
LANDING
FIRST FLOOR

3000
3000
LANDING

3000
1803
FGL:506.00
GROUND FLOOR
0

KEY PLAN
ELECTRICAL
ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51

FUT URE EXPANSION FUT URE EXPANSION


SDB5 SDB4
PHASE-2 G+5 G+5

GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
PHASE-1

SECTION-2
SITE
OF FICE-2

SITE OFF ICE-1

P
U

UNIT

2
SDB3 SDB2
G+5 G+5 STORE M E
T
S
IM S

CEMENT
GODOW N

6
5
4
3
2
1
P
U

1 : 100 P
U

SDB1
G+5 STA FF/L AB OU R
CANTEEN

REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK

SECURITY SECURITY
RAMP

ENTRY EXIT

SUBWAY VIP PA RKI NG


12
M
1 2
3 4 5
67
8 9 CR
OSSI
PUBLIC A REA
10 NG

18.19 ACRES SURV EY NO. 54

SURV EY NO. 49
ED MLC P
DEVELOPER
STORE

PROPOS 503 lv l.,

HOL DI NG
SEC URI TY

14m WIDE ROAD (FUTURE


EXPANSION
SINGAPO RE ENTRANCE
26m WIDE ROAD

CR OSSI
NG

LAYOUT
14.5m ROAD PRIVA TE

AGRICULTURE LAND
BUS TERMINAL

CLIENT:

M/S INFOSYS TECHNOLOGIES


LTD. HYDERABAD

PROJECT NUMBER

10BLR023
6 6.1 6.2 7 8 8.1 9
PROJECT PHASE

325 8750 1725 10800 1725 9075 DESIGN DEVELOPEMENT


CONCRETE SPANDREL OF
HEIGHT 1050MM FROM FFL (TYP) ARCHITECT AND STRUCTURAL CONSULTANT
2
PAINTED WITH APPROVED
A4-01 CONCRETE SPANDREL OF
COLOUR AND SHADE
HEIGHT 1050MM FROM FFL

F
ENTRY
EXIT ENGINEERING (I) PVT LTD
CONCRETE SPANDREL OF
WIDTH
6950

6450

HEIGHT 1050MM FROM FFL


RAMP DN TO SECOND FLOOR TRC Engineering (I) Pvt Ltd.
THIRD FLOOR
LANDING
No 6/A, Amit Plaza, JP Nagar, 3rd Phase
Bannerghatta Road,Bangalore-560076
G
Phone : +91-80-26581707/08/09
9000 10500 Fax :+91-80-26582424 WebSite:www.trc.co.in
LVL LVL
WIDTH
6225

6300

RAMP UP TO FOURTH FLOOR

2
FOR CO-ORDINATION
A8-06
DESIGNED BY:Designer

DRAWN BY:Author
H
CHECKED BY:Checker

SCALE: 1 : 100
CONCRETE SPANDREL OF CONCRETE SPANDREL OF
HEIGHT 1050MM FROM FFL (TYP) HEIGHT 1050MM FROM FFL DRAWING TITLE
PAINTED WITH APPROVED
COLOUR AND SHADE

EMERGENCY EXIT RAMP


EMERGENCY RAMP DETAILS
1 1 : 100

SHEET NUMBER

A8-06
DATE:02/03/11 NORTH
ISSUE
No. Date Description Revision
"L"
4"*** 200 50** WORD WORD 50** 175 2"** WORD WORD 100***100*** WORD

EQ 12.5
WORD 100***

EQ 12.5
EQ 12.5
EQ 12.5
45°

EQ 12.5

12.5 EQ "H" 25 "H" EQ 12.5


50

75 50 75

"H"
"D"

"H"

"H"

"D"

"H"
"H"

12.5 EQ
12.5 EQ

12.5 EQ

12.5 EQ
12.5 EQ
NOTE: FOR NOTE: FOR
12.5 WHITE BACKGROUND
ARROW ARROW
NON−REFLECTIVE PROJECT TEAM
DIRECTION REFER TO SCHEDULE DIRECTION REFER TO SCHEDULE RED REFLECTIVE
OWNER
SIGN COMPONENT SIGN COMPONENT SIGN COMPONENT SIGN COMPONENT SIGN COMPONENT SIGN COMPONENT Infosys Technology Ltd.
1 SCALE: N.T.S
2 SCALE: N.T.S
3 SCALE: N.T.S
4 SCALE: N.T.S
5 SCALE: N.T.S
6 SCALE: N.T.S
ARCHITECT
TRC ENGINEERING (I) PVT LTD

"L" "L" "L"

Do Not Enter Exit Park Exit

"H"
"D"

"H"
"D"

"H"
"D"
SIGN DETAIL V1, V10 SIGN DETAIL V2 SIGN DETAIL V3,V7
7 SCALE: N.T.S
8 SCALE: N.T.S
9 SCALE: N.T.S

"L" "L" "L" "L"

Park Exit Park


"H"
"D"

"H"
"D"

"H"
"D"

"H"
"D"
EMERGENCY EXIT
SIGN DETAIL V4 SIGN DETAIL V5, V9 SIGN DETAIL V6, V8 SIGN DETAIL V1, V10
10 SCALE: N.T.S
11 SCALE: N.T.S
12 SCALE: N.T.S
13 SCALE: N.T.S KEY PLAN
ELECTRICAL
ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51

FUT URE EXPANSION FUT URE EXPANSION


SDB5 SDB4
PHASE-2 G+5 G+5

"L" "L" FUT URE EXPANSION


FOOD COURT -1
GA S B A NK
AGRICULTURE LAND

"L"
FOOD COURT -2

PHASE-1 SITE
OF FICE-2

SITE OFF ICE-1

P
U

SDB3 SDB2 UNIT


G+5 G+5 STORE M E
T
S
IM S

CEMENT
GODOW N

6
5
4
3
2
1
P
U

P
U

SDB1
G+5 STA FF/L AB OU R
CANTEEN

REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK

SECURITY SECURITY
RAMP

ENTRY EXIT

SUBWAY VIP PA RKI NG


12
M
1 2
3 4 5
67
8 9 CR
OSSI
PUBLIC A REA
10 NG

18.19 ACRES SURV EY NO. 54

SURV EY NO. 49

Emergency Ramp Entrance


ED MLC P

Emergency Ramp Entrance


DEVELOPER
"H"
"D"

"H"
"D"

"H"
"D"
STORE

EMERGENCY EXIT
PROPOS 503 lv l.,

HOL DI NG
SEC URI TY

14m WIDE ROAD (FUTURE


EXPANSION
SINGAPO RE ENTRANCE
26m WIDE ROAD

CR OSSI
NG

LAYOUT
14.5m ROAD PRIVA TE

AGRICULTURE LAND
BUS TERMINAL

SIGN DETAIL V13 SIGN DETAIL V14 SIGN DETAIL V15 CLIENT:
14 SCALE: N.T.S
15 SCALE: N.T.S
16 SCALE: N.T.S

M/S INFOSYS TECHNOLOGIES


LTD. HYDERABAD
"L" "L" "L"
PROJECT NUMBER

10BLR023
"H" "H"

"H" "H"
EMERGENCY PARK ! ! PROJECT PHASE
"D"

"D"

"H"
"D"
RAMP ENTRANCE UPPER LEVELS Caution 2−way Traffic
DESIGN DEVELOPEMENT

ARCHITECT AND STRUCTURAL CONSULTANT


SIGN DETAIL V16 SIGN DETAIL V17 SIGN DETAIL M1
17 SCALE: N.T.S
18 SCALE: N.T.S
19 SCALE: N.T.S

"L" "L" "L"


ENGINEERING (I) PVT LTD

"H" "H"
! ! ! SPECIAL ! TRC Engineering (I) Pvt Ltd.
Caution Traffic Merge STAY IN LANES
"H"
"D"

"D"

"H"
"D"
PERMIT AREA No 6/A, Amit Plaza, JP Nagar, 3rd Phase
Bannerghatta Road,Bangalore-560076
SIGN DETAIL M2 SIGN DETAIL R1 SIGN DETAIL R2 Phone : +91-80-26581707/08/09
20 SCALE: N.T.S
21 SCALE: N.T.S
22 SCALE: N.T.S Fax :+91-80-26582424 WebSite:www.trc.co.in

"L" "L"
FOR CO-ORDINATION
DESIGNED BY:Designer

DRAWN BY:Author

2 WHEELERS ONLY 4 WHEELERS ONLY


"H"
"D"

"H"
"D"
CHECKED BY:Checker

SCALE: 1 : 10

DRAWING TITLE
SIGN DETAIL E4 SIGN DETAIL E5
23 SCALE: N.T.S
24 SCALE: N.T.S
SIGNAGE DETAILS-1

SHEET NUMBER

A9-08
DATE:02/28/11 NORTH
ISSUE
No. Date Description Revision

L"
EQ EQ SIGN SCHEDULE
LEVEL COLOR
"L" MARK
SIZE(MM)
TEXT DETAIL BACKGROUND LETTERS/SYMB.
REMARKS
D L REF. COLOR "H" COLOR
"L" COPY

2" "H" EQ
VEHICULAR SIGNS MM
Level
V1 300 1800 DO NOT ENTER A7.105/9 GREEN 125 WHITE

"D"
Elevator/Stair

"H"
"D"
EXIT
V2 300 1800 Exit A7.105/12 GREEN 150 WHITE

"H"
"H"
"D"
LEVEL COLOR
BACKGROUND V3 300 1800 Park Exit A7.105/17 GREEN 150 WHITE

EQ
WHITE V4 300 1800 Park A7.105/16 GREEN 150 WHITE
BACKGROUND
A7.105/11 150 WHITE
PROJECT TEAM
V5 300 1800 Exit GREEN
SIGN DETAIL P1 SIGN DETAIL P2 SIGN DETAIL P3 Park A7.105/15 150 WHITE
OWNER
V6 300 1800 GREEN
SCALE: NTS SCALE: NTS SCALE: NTS Infosys Technology Ltd.
V7 300 1800 Exit Park A7.105/17 GREEN 150 WHITE
"D" ARCHITECT
V8 300 1800 Park A7.105/15 GREEN 150 WHITE TRC ENGINEERING (I) PVT LTD
"H"
V9 300 1800 Exit A7.105/11 GREEN 150 WHITE
"L" "L"
V10 300 1800 DO NOT ENTER A7.105/9 GREEN 125 WHITE

V11 300 1800 EMERGENCY EXIT A7.105/12 GREEN 100 WHITE

Elevator/Stair STAIR
V12 300 1800 EMERGENCY EXIT A7.105/11 GREEN 100 WHITE

"H"
"D"

"H"
"D"
S V13 300 1800 EMERGENCY EXIT A7.105/11 GREEN 100 WHITE

t
V14 300 1800 A7.105/11 GREEN 100 WHITE

"L"
SIGN DETAIL P4 SIGN DETAIL P8 V15 300 1800 A7.105/15 GREEN 100 WHITE

SCALE: NTS SCALE: NTS


a V16 300 1800 EMERGENCY RAMP A7.105/17 GREEN 100 WHITE

i V17 300 1800 PARK UPPER LEVELS A7.105/16 GREEN 100 WHITE

"L"
r
ENTRANCE SIGNS
"L" E1 200∅ 3000 DO NOT ENTER A7.105/9
SPRAYLAT HIGH
HIDING BLACK
175 WHITE/RED P.V.C. PIPE SIGN (SEE SPEC.)

SPRAYLAT HIGH
E2 200∅ 3000 ?’−?" CLEARANCE A7.105/23 175 WHITE P.V.C. PIPE SIGN (SEE SPEC.)
HIDING BLACK

STAIR
Clearance 0’−0"
E3 300 3000 ENTER A7.105/10 RED WHITE

"H"
"D"
SIGN DETAIL P6 Maximum Vehicle Load 6000 lbs.

TURNSTILE
"H""H"
"D" A7.105/10 175 WHITE/RED
SCALE: NTS E4 300 3000 2 WHEELERS ONLY RED

AREA E5 300 3000 4 WHEELERS ONLY A7.105/10 RED 175 WHITE

PEDESTRIAN SIGNS
SIGN DETAIL P4 SIGN DETAIL P8 P1 * * A7.105/20 * 175 RED
KEY PLAN
EXIT * LED ILLUMINATED SIGN
SCALE: NTS SCALE: NTS
P2 450 450 Level, # A7.105/19 BLUE 212.5 WHITE ** ARCHITECT TO SELECT LEVEL COLORS ECC BLOCK
G+14
ELECTRICAL
SUB STATION
4ACRES
SURV EY NO. 51

P3 300 Elevator/Stair A7.105/13 BLUE 150 WHITE


FUT URE EXPANSION FUT URE EXPANSION

2100 ** ARCHITECT TO SELECT LEVEL COLORS PHASE-2


SDB5
G+5
SDB4
G+5

GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
PHASE-1
150
SITE

Elevator/Stair A7.105/14 WHITE


OF FICE-2

P4 300 2100 BLUE ** ARCHITECT TO SELECT LEVEL COLORS


SITE OFF ICE-1

"L"
P
U

SDB3 SDB2 UNIT

300±
STORE

2400 300±
G+5 G+5
M E
T
S
IM S

CEMENT
GODOW N

6
5
4
3
2
1
P
U

Level, #, Stair A7.105/22 212.5 **


P
U

P5 550 450 ** ** ARCHITECT TO SELECT LEVEL COLORS


SDB1
G+5 STA FF/L AB OU R
CANTEEN

REST REST
RO OM -2RO OM -1
TO I E
LT
BLO CK

SECURITY SECURITY
RAMP

ENTRY EXIT

CHAIN ATTACHED
SUBWAY VIP PA RKI NG

150
PUBLIC A REA

Stair (vertical sign) A7.105/18 WHITE


12
M

P6 300
1 2

BLUE
3

2100
4 5
67
8 9 CR

** ARCHITECT TO SELECT LEVEL COLORS


OSSI
10 NG

18.19 ACRES SURV EY NO. 54

EYE BOLT ATTACHED TO UNDERSIDE ED MLC P


DEVELOPER
STORE
SURV EY NO. 49

PROPOS 503 lv l.,

TO PVC PIPE

SLOW
OF DOUBLE TEES
HOL DI NG
"H""H"

SEC URI TY

14m WIDE ROAD (FUTURE


EXPANSION

P7 300 Stair (vertical sign) A7.105/15 212.5


SINGAPO RE ENTRANCE

2100 BLUE 26m WIDE ROAD


"D"

CR OSSI
NG

PEOPLE PRESENT 0’−0" CLEARANCE


LAYOUT
14.5m ROAD PRIVA TE

P8 300 2100 Stair A7.105/16 BLUE 212.5 WHITE ** ARCHITECT TO SELECT LEVEL COLORS AGRICULTURE LAND
BUS TERMINAL

P9 300 2100 TURNSTYLE A7.105/13 BLUE 100 WHITE ** ARCHITECT TO SELECT LEVEL COLORS
CLIENT:
150MM HIGH TEXT − VINYL DIE CUT 200MM∅ PVC PIPE
SCOTCH LITE LETTERS − PAINTED P10 SLOW PEOPLE PRESENT A7.105/14 BLUE 212.5 WHITE ** ARCHITECT TO SELECT LEVEL COLORS

SIGN DETAIL P10 SIGN DETAIL E3 PVC END CAPS


− PAINTED REGULATORY SIGNS
M/S INFOSYS TECHNOLOGIES
SCALE: NTS SCALE: NTS R1 12" 7’−0" Special Permit Area A7.105/12 VOILET 100 WHITE
LTD. HYDERABAD
1 1

R2 300 7’−0" STAY IN LANE RED 175


PROJECT NUMBER
MISCELLANEOUS SIGNS
M1 300 3000 1 CAUTION 2WAY TRAFFIC 1 A7.105/2 RED 150 10BLR023
"L" "L" PROJECT PHASE
M1 300 3000 1 CAUTION TRAFFIC MERGE 1 A7.105/3 RED 150 WHITE EXAMPLE SIGN ONLY

EXAMPLE
300 1200 Park GREEN 150 WHITE EXAMPLE SIGN ONLY DESIGN DEVELOPEMENT

Clearance 0’−0"
"H""H"
Do Not Enter
ARCHITECT AND STRUCTURAL CONSULTANT

ENTER
"H"
"D"

"D"
"L" (1200) ACTUAL SIGN LENGTH
TOLERANCES
Maximum Vehicle Load 6000 lbs.
DIMENSIONS
75 225 75 75 * 50 200 100 AND TOLERANCES * SPACE BETWEEN LETTERS ARE EQUAL TO
**

EQ TYP
THE VERTICAL STROKE WIDTH OF THE LETTERS.

9
(UNLESS REQUIRED TO MAKE THE SIGN
DIMENSIONS WORK ±25% OF STROKE WIDTH.

Park

18MHL
"H"(150) ** DIMENSION(S) MAY VARY ±1"
TO MAKE SIGN WORK.
SIGN DETAIL E1 SIGN DETAIL E3

EQ
150 EQ. EQ. 150 MOUNTING HOLE
ENGINEERING (I) PVT LTD
SCALE: NTS SCALE: NTS LOCATIONS (MHL) NOTES:
BACKGROUND LOCATION OF PRE-PUNCHED "D"(300) 1. FOR COMPONENT DIMENSIONS, REFER
TO SIGN COMPONENT DETAILS.
COLOR GREEN HOLES IN SIGN FOR
SCOTCHLITE #3290
MOUNTING FASTENERS
INDICATED THUS TYP.
WHITE (REFLECTIVE)
LETTER/SYMBOL COLOR
2. THIS EXAMPLE SIGN IS FOR ILLUSTRATIVE
PURPOSES ONLY, IT IS NOT IN CONTRACT. TRC Engineering (I) Pvt Ltd.
EXAMPLE SIGN ONLY
300 CONC. TOPPING L"
No 6/A, Amit Plaza, JP Nagar, 3rd Phase
Bannerghatta Road,Bangalore-560076
EQ EQ Phone : +91-80-26581707/08/09
LEVEL COLOR Fax :+91-80-26582424 WebSite:www.trc.co.in
2"

COPY
2" "H" EQ

300 150 150 50 MESSAGE 300 MESSAGE


Level
6MM∅ EYE BOLT ATTACHED
SET THREADED EYE INTO

2
TO UNDERSIDE OF TEE
"D"

THREADED EXPANSION
ANCHOR LEVEL COLOR FOR CO-ORDINATION
"H"

CHAIN ATTACHED TO
BACKGROUND
DESIGNED BY:Designer
6MM∅ EYE BOLT (BOTH
EQ

200MM∅ PVC PIPE SIDES)


WHITE COPY DRAWN BY:Author
60° THREADED EYE
Stair CHECKED BY:Checker
7X19Xe" STAINLESS STEEL SCOTCHLITE #3290
BOLT
CABLE WITH BRASS NICRO− WHITE SCOTCHLITE #3290
PRESS COMPRESSION FITTINGS WHITE BACKGROUND P.V/C. PIPE P.V/C. PIPE WHITE SCALE: 1 : 10
6MM∅ EYE BOLT ATTACHED SIGN AT BOTH ENDS SCOTCHLITE #3272
TO PVC PIPE W/ 2"∅ WASHER SUSPENDED RED DRAWING TITLE
(EACH SIDE). FROM
BOTTOM OF
SLAB ONLY
BOTTOM OF
SIZE FLUSH SIGNAGE DETAILS-2
DETAIL WITH
BOTTOM OF
DETAIL SIGN DETAIL P5 SIGN DETAIL E1 SIGN DETAIL E2
SCALE: NTS BEAM SCALE: NTS SCALE: NTS SCALE: NTS SCALE: NTS

SHEET NUMBER

A9-09
DATE:02/28/11 NORTH
ISSUE
No. Date Description Revision
KEYED NOTES: KEYED NOTES: KEYED NOTES: KEYED NOTES:
1. CONC. TOPPING ON 1. 12.5 1. CONCRETE 1. 150MM∅X6.25MM
CONC. DOUBLE TEE TOOLED 3 RETAINING WALL STEEL PIPE BOLLARD−
200
JOINT 2. CONCRETE SLAB FILL W/ CONCRETE
2. EXPANSION JOINT 2. FILLER 1 ON A.B.C. − AND PAINT
3. STEEL SUPPORT PLATE 3. CAULKING 12.5 SEE SOILS 2. EMBED BOLLARD
4. CONC. SLAB ON BASE− REPORT 750MM INTO
SEE SOILS REPORT 3. FOUNDATION 1 CONCRETE FOOTING
(SEE 3. CONCRETE SLAB
5. BASE − SEE SOILS STRUCTURE) OVER A.B.C.
REPORT SEE SOILS REPORT
6. CONC. WALL − SEE 4. S.O.G. OVER BOLLARD

1050
SOILS REPORT FTG. 1 PROJECT TEAM
7. DAMP ROOFING WITH A DETAIL 5. 600MM∅ CONCRETE
2 OWNER
PROTECTION BOARD PIER FOOTONG
2
8. SHIMS @ 1200MM O.C. Infosys Technology Ltd.

VARIES
ARCHITECT
2

1050
A TRC ENGINEERING (I) PVT LTD

12.5
1 4

3 4
625MM
6.25
18.75 MM
2
12.5

VARIES

750
2
8

1200
5

450
5

7 3

PIPE BOLLARD DETAIL @ GRADE


EXPANSION JOINT DETAIL 3
1 RETAINING WALL SECTION SCALE: NTS

SCALE: NTS 2 SCALE: NTS KEY PLAN


ELECTRICAL
ECC BLOCK
G+14
SUB STATION
4ACRES
SURV EY NO. 51

FUT URE EXPANSION FUT URE EXPANSION


SDB5 SDB4
PHASE-2 G+5 G+5

GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND
PHASE-1 SITE
OF FICE-2

SITE OFF ICE-1

P
U

SDB3 SDB2 UNIT


G+5 G+5 STORE M E
T
S
IM S

CEMENT
GODOW N

6
5
4
3
2
1
P
U

P
U

SDB1
G+5 STA FF/L AB OU R
CANTEEN

KEYED NOTES: KEYED NOTES: 1 SUBWAY


RAMP

12
M
SECURITY

ENTRY EXIT
SECURITY

1 2
VIP PA RKI NG
3 4 5 PUBLIC A REA
REST REST
RO OM -2RO OM -1
TO I E
LT
BLO CK

67
8 9 CR
OSSI
10
SURV EY NO. 54

9.375MM STN STL FLATHEAD FASTENER WITH HEAVY−DUTY


NG

18.19 ACRES
SURV EY NO. 49
ED MLC P
DEVELOPER

1. CAST−IN PLACE 1. 60MM


STORE

PROPOS 503 lv l.,

HOL DI NG
SEC URI TY

SEISMIC−CENTERING BAR SPACED AT 45OMM O.C.


14m WIDE ROAD (FUTURE
EXPANSION

CONCRETE TOPPING EXPANSION SINGAPO RE ENTRANCE

2 CR OSSI
NG
26m WIDE ROAD

2. SLOPE TO DRAIN BOLTS IN 9.375MM ALUMINUM COVER PLATE W/BRUSHED FINISH


"B"
LAYOUT
14.5m ROAD PRIVA TE

3. ROOF DRAIN PER EACH LEG AGRICULTURE LAND


BUS TERMINAL

PLUMBING PLANS 2. 4.7MM BENT


STEEL WABOCRETE II ELASTOMERIC CONCRETE INFILL MATERIAL CLIENT:
PLATE, VIBRATION REDUCTION GASKET
PAINTED
1 FINISHED SURFACE
YELLOW M/S INFOSYS TECHNOLOGIES
3. CONC. COLM
4. SEE MECH. & INSTALL USING PRIMA−LUB ADHESIVE
ALUMINUM EXTRUSION LTD. HYDERABAD
5 PLUMB.
A10.01 DRAWINGS
FOR PIPE PROJECT NUMBER
SIZES & 9.375MM X 75MM LG CONCRETE EXPANSION
ANCHOR WITH NUT AND WASHER SPACED @
LOCATIONS 10BLR023
450MM O.C.
"A" PROJECT PHASE
MOISTURE BARRIER (NON−EXTRUDED BARRIER MAY BE UTILIZED FOR WIDE OPENINGS)

DESIGN DEVELOPEMENT

2 3 ROOF
DRAIN ARCHITECT AND STRUCTURAL CONSULTANT
25MM R. 4 3

PLAN DETAIL (DRAIN) RISER PROTECTION DETAIL EXPANSION JOINT


4 SCALE: NTS
6 SCALE: NTS
7 SCALE: NTS
NOTE:
ALL ROOF DRAINS ENGINEERING (I) PVT LTD
SHALL COMPLY W/
IPC SCT. 1106.

TRC Engineering (I) Pvt Ltd.


KEYED NOTES: No 6/A, Amit Plaza, JP Nagar, 3rd Phase

1. CAST−IN PLACE Bannerghatta Road,Bangalore-560076


CONCRETE TOPPING Phone : +91-80-26581707/08/09
2. CONCRETE TEE Fax :+91-80-26582424 WebSite:www.trc.co.in
3. FLOOR DRAIN PER
PLUMBING PLANS 4
SEE −
A10.01
FOR CO-ORDINATION
600
DESIGNED BY:Designer
1 300 300
DRAWN BY:Author
6.25

CHECKED BY:Checker

SCALE: 1 : 2
2
DRAWING TITLE

3 MISCELLANEOUS DETAILS-1

DRAIN LINE

SHEET NUMBER
SECTION DETAIL
5 SCALE: NTS A10-01
DATE:02/28/11 NORTH
ISSUE
No. Date Description Revision

2500

600
(STALL DEPTH)

600
H.C. SIGN 1200 100MM WIDE WHITE
ATTACHED TO 300 PAINTED BORDER
BOLLARD

100MM WIDE
BLUE PAINTED
PAINT STRIPE 100MM WIDE BACKGROUND
(TYPICAL) PAINT STRIPE

STALL DEPTH
(TYPICAL)

STALL DEPTH
6000 WHITE PAINTED

5000
HANDICAPPED

1200
(TYP. WIDTH)
SYMBOL
PROJECT TEAM

1200
OWNER
Infosys Technology Ltd.
300

100MM WIDE ARCHITECT

300
PAINT STRIPE
(TYPICAL) TRC ENGINEERING (I) PVT LTD

2500 2500
3000 SEE PLAN 3000

1 HANDICAP
SCALE: NTS
STALL LAYOUT 2 STANDARD
SCALE: NTS
STALL LAYOUT − 90° 3 MOTORCYCLE
SCALE: NTS
STALL LAYOUT
4 ACCESSIBLE
SCALE: NTS
SYMBOLS

HIGH VISIBILITY BLUE


PAINTED BACKGROUND
HIGH VISIBILITY BLUE SOLID WHITE REFLECTIVE
PAINTED BACKGROUND 3300
PAINT − TYPICAL
15.63 MM 1
SOLID WHITE REFLECTIVE MIN.
2400
PAINT − TYPICAL KEYED NOTES:

30
2
0
60

0
300

300
SEE STRUCT.

450
1. VERTICAL SURFACE 4
FOR ADDITIONAL
0

METAL
60

INFORMATION
GRATE
30° 2. TRAFFIC SEALANT
30° EMBED
300

ANGLE

300

25MM
MIN.
2100

1200
3. NOT USED

1350

2250
1350

2250

30°
4. CONCRETE TOPPING
30° 60°
30°
60

450
0

300

CONCRETE JOINT @ MID- SLAB JOINT @ VERTICAL SURFACE


NOTES:
60

2400 SLAB
SOLID WHITE REFLECTIVE
0

2400
PAINT − TYPICAL
3300 600MM SQ. x
1. DETAIL SHALL OCCURE AT JOINT 2. CONTROL JOINTS ARE TO BE TOOLED WITH KEY PLAN
3300 HIGH VISIBILITY BLUE SEE PLUMBING PLANS WHERE: A) TEE FLANGE ABUTS GOLDBLAT GROOVER #06-314-M7
600MM DEEP ANOTHER TEE FLANGE, B) TEE WHEREVER TWO PRECAST "TEES"
PAINTED BACKGROUND FOR DISCHARGE LOCATION SUMP PIT
ABUTS A CONCRETE BEAM, FORM A JOINT. ECC BLOCK
G+14
ELECTRICAL
SUB STATION
4ACRES
C) TEE ABOUTS A SPANDREL OR SURV EY NO. 51

WALL PANEL. 3. SOFT SAWCUTTING WILL BE ALLOWED PHASE-2


FUT URE EXPANSION
SDB5
G+5
FUT URE EXPANSION
SDB4
G+5

AT ANY TOPPING. GA S B A NK
FUT URE EXPANSION
FOOD COURT -2
FOOD COURT -1 AGRICULTURE LAND

5 PAINTED ARROW DETAILS


PHASE-1

SUMP PIT DETAIL


SITE
OF FICE-2

SITE OFF ICE-1

6
P
U

SDB3 SDB2 UNIT


G+5 G+5 STORE M E
T
S
IM S

SCALE: NTS CEMENT


GODOW N

SCALE: NTS
JOINT DETAIL
6
5
4
3
2
1
P
U

7
P
U

SDB1
G+5 STA FF/L AB OU R
CANTEEN

SCALE: NTS
REST REST TO I E
LT
RO OM -2RO OM -1 BLO CK

SECURITY SECURITY
RAMP

ENTRY EXIT

SUBWAY VIP PA RKI NG


12
M
1 2
3 4 5
67
8 9 CR
OSSI
PUBLIC A REA
10 NG

18.19 ACRES SURV EY NO. 54

SURV EY NO. 49
ED MLC P
DEVELOPER
STORE

PROPOS 503 lv l.,

HOL DI NG
SEC URI TY

14m WIDE ROAD (FUTURE


EXPANSION
SINGAPO RE ENTRANCE
26m WIDE ROAD

CR OSSI
NG

1 14.5m ROAD PRIVA TE


LAYOUT

KEYED NOTES:
25MM

AGRICULTURE LAND

KEYED NOTES: KEYED NOTES: 1


BUS TERMINAL

1. TOOLED JOINT CLIENT:


1. CONCRETE COLUMN 1. 100MM HIGH X 1200MM LONG RUBBER
VARIES

1" 6" 1"


WHEEL STOP
2. TRAFFIC SEALANT TO MATCH 4 2
2. 150MM HIGH CONCRETE
CONCRETE COLOR 2. 3- 50MM∅ PUDDLES OF APPROVED
3. PREFORMED EXPANSION
CURB 1 MASTIC- EQ. SPACED M/S INFOSYS TECHNOLOGIES
3. CONCRETE SLAB ON A.B.C.- 3
JOINT MATERIAL
A. CONTROL JOINT SEE SOILS REPORT 3. CONCRETE SLAB LTD. HYDERABAD

4"
2
4. PLANTER
4. PIN AT AC PAVING
2
5. AC PAVING
NOTE: CONFIRM JOINTING WITH STRUCTURAL 12.5MM 3 PROJECT NUMBER
3
5
10BLR023
VARIES

4 PROJECT PHASE

DESIGN DEVELOPEMENT
SEE SHT A1.100 FOR LOCATION.
B. EXPANSION JOINT
ARCHITECT AND STRUCTURAL CONSULTANT

8 JOINT DETAIL 9 CONCRETE CURB WHEEL STOP DETAIL


SCALE: NTS SCALE: NTS 10 SCALE: NTS

ENGINEERING (I) PVT LTD

250MM 1
EQ. EQ. TRC Engineering (I) Pvt Ltd.
No 6/A, Amit Plaza, JP Nagar, 3rd Phase
EQ.
EQ

2 Bannerghatta Road,Bangalore-560076
.

A Phone : +91-80-26581707/08/09

3 Fax :+91-80-26582424 WebSite:www.trc.co.in
EQ

EQ.

1
.

4
KEYED NOTES: VERIFY BOLT SIZE AND
LAYOUT WITH MFG. 2
PLAN- BOLLARD 1. LIGHT STANDARD
A
2. METAL CAP
3 FOR CO-ORDINATION
DESIGNED BY:Designer
3. BASE PLATE WITH
KEYED NOTES: LEVELING NUTS DRAWN BY:Author

1. 150MM∅X6.25MM STEEL PIPE 5 4. ANCHOR BOLTS 4 CHECKED BY:Checker


CAP

BOLLARD-FILL W/ CONCRETE
1130MM A.F.F.

SCALE: 1 : 2
AND PAINT 2 5. CONCRETE COLUMN
5
2. 250MM SQ.X 12.5MM THICK 6. CONDUIT FOR LIGHT DRAWING TITLE
STEEL PLATE 6
7. CONDUIT FOR C.C.T.V.
3. 18.75MM DRYPACK
4. CONCRETE TOPPING
6 MISCELLANEOUS DETAILS-2
5. 9.375MM∅ THRU BOLTS CAP
1 AT EA. CORNER SEE ELECTRICAL FOR
ADDITIONAL INFORMATION 7
6. PRECAST CONCRETE TEES
PLAN SECTION

SHEET NUMBER

A10-02
11 PIPE BOLLARD DETAIL @ DECK
SCALE: NTS 12 LIGHT
SCALE: NTS
STANDARD DETAIL
DATE:02/28/11 NORTH

You might also like