Year of Birth : 1973 Civil Engineer with a diversified background over the past 23 years, Additional
Year in Industry : 24 years experience includes technical, Reporting and project management. Familiar with
E-Mail : site supervision, able to coordinate multiple projects and teams simultaneously
Ehabyn@gmail.com and consistent record of completing projects on time and within budget.
Contact : 0019294425586 Recognized for expert Analytical and qualitative abilities.
Education:
BSc in Civil Engineering from Alexandria University, Egypt (1996)
Certified Construction manager (CCM)
OSHA 50 Hours Construction Industry Certified # 376053
ACI Certified- Certification ID # 01401024
Professional Memberships:
Member of Saudi Council of Engineers.
Technical Skills:
Planning and Schedules Programs: Primavera P6,Ms Projects,
Premaster and Navis work 4D Reporting Programs: BIM,Ms Office,
Sketch up8 for 3D,Bluebeam -VBA
Area of Experience:
Manage the project within the contract condition and limited to approved
budget and planned schedule
Manage the project within the contract condition and limited to approved
budget and planned schedule
Supervise site's tasks and evaluate the result of each phase
Monitor and control the materials & adequate resources available for the
work in accordance to planned schedule
Adhere with the project management techniques, methodology and
tools.
Control and manage the whole project by dividing the main deliverables
to smaller manageable activities by using Work Breakdown Structure.
Execute and track the activities with maintain the performance of other
trades to suit customer satisfaction
Communicate with all stakeholders vertically & horizontally to ease the
work.
Coordinate with upper management and liner management to obtain
approval to accomplish.
Prepare the required sketches to shown the vision of the project by
using sketch up 3D and 4D.
Report the project status shown the schedule, budget index factor SPI,
CPI) and analyses to rectify the problems in ahead by using "Risk
Management"
Follow the company's procedure or create one for organize the project
"Organization Skills"
Create technical specification and method statement for all the stuff
apply on the project
Monitoring sub-contractor performance & actual progress against the
project schedules maintaining cost & time control of the projec
Page 1 of 4
Ehab El Sayed,CCM
Manager of Project Management Control Systems & Document Management
Experience:
InfoTran Engineers, P.C. 2020 Present Reviewing schedule updates, record the delay events
with supportive documents, Delay assessment in the
MTA - CCM Services for manner of (Excusable / Inexcusable or compensable /
Replacement of Six Traction non-compensable) , and reviewing monthly Detailed
Elevators at 181st Street and 190th Cost Breakdowns (DCB's) & Contractor Payment
Street Station, NY (Dec 2020 to Requisitions. Reviewing & redlining of shop drawings
Present) & any other submittals for conformance with
Scope: CM services were provided for the specifications and various mechanical codes such as
replacement of six traction elevators in the State building codes, ANSI, AWWA, ASME, AHRI,
A-line, in the Borough of Manhattan. The ASHRAE, etc. Overseeing installation, elevator
scope includes removal of existing elevator commissioning & operation of the above-stated
cabs, and structural repairs in the hoist equipment and systems to ensure it functions
ways, machine room & battery room. The according to the designed specification during normal
project has MEP elements like installation operating conditions. Coordinating with Contractor and
of Instrumentation and Control (I&C) the Designer & Quality Control on RFI’s/Submittals
systems & associated electrical work, and related items. Reviewing Contract Drawings,
CCTV Camera System, Fire Alarm System RFI’s, shop drawings, and specs and determine the
(FAS), Fiber Optic Network equipment, Contractors eligibility to perform the job on the field.
associated mechanical work (air Preparing Scope of Work for AWO’s, keeping track of
conditioners, heaters, hoist way ventilation the schedule, and drafting response letters on RFIs.
system, etc.) and associated plumbing Accommodating any required permits, factory & site
work (sump pumps, lavatories in a tests, commissioning, and user group requests.
machine room. etc.). The environmental
aspects of the work include hazardous
material surveys and ACM abatement
Page 2 of 4
Ehab El Sayed,CCM
Manager of Project Management Control Systems & Document Management
Projacs International, KSA 2015 2019 Manage the program Phases Starting from Pre Design
including Finalizing the budget and defining the
Project Name: Alesayi Hospitality Contract Strategy, Preparing the Design Procedure
Program manual
Location: Jeddah, KSA Claim Avoidance review, Implement cost/scope
Construction Budget: To build and control measures such as Value Engineering,
Operate 10 Hotels with 1.8 Billion SR developing a realistic ,all-inclusive budget that meets
Position: Senior PCS Manager the owner’s goals and constructability review for
design phase and all the related sub design Phase
Concept, Schematic, Design development up to
tender Documents.
Prepare and establish Master schedule for
Procurement and Construction Phase.
Establish the procedures in line with control forms as
required for the construction and post constructions
Phase.
Projacs International, KSA 2009 2015 Directing all process and function in coordination with
construction managers, supervisors, planners and
Project Name: Dar Al Qibla Hotel work flow.
with 5B+G+11 floors over 7000m² Spearheading the process of delays analysis,
Location: Madina, KSA assessing claims ensuring accuracy and consistency
Construction Budget: SR 600M of claims Settlement.
Position: PCS Manager Collecting metric data (such as baseline, actual values
for costs, schedule, work in progress and work
completed)
Project Name : King Abdelaziz
International Airport 2010 And preparing reports to take corrective actions in
case of variance
ALROSTAMANI PEGEL L.L.C, Dubai, 2007 2009 Prepare weekly and monthly project status reports,
UAE Analyzed problems (4d) and anticipated project need.
Provide weekly updates and KPI to management.
Position: Planning Engineer Analyzed Delays and Prepare EOT
Monitor and control the projects to complete within
time and budget.
Assist the P.M to make a decision in time through
evaluation of the project (time, cost and resource).
GIBCA GROUP-Arabian Profile, Sharjah, 2005 2007 Preparing master plan related to available time, cost
UAE and resource.
Proactively managed projects by preparing and
Position: Planning Engineer presenting, witting statement of works and building
client relationships.
Reviewed project reports and schedule status at the
completion of each phase, proficient in handling
simultaneous
projects and meeting deadlines effectively.