You are on page 1of 4

EHAB ELSAYED

Mobile 00966543191795
Ehabyn@yahoo.com

Civil Engineer with a diversified background over the past 20 years, Additional experience includes technical,

Reporting and production management. Familiar with site supervision, able to coordinate multiple projects

and TeamsSimultaneously and consistent record of completing projects On time and within budget.

Recognized for expert Analytical and qualitative abilities.

Production Manager where i can combine my extensive technical, organization and communications skills in

The PM. Can add and contribute values as part of a team effort.

Planning and Schedules Programs:Primavera P3,P5,Ms Projects,Pertmaster and Navis


work 4D Reporting Programs: Ms Excel ,Ms word , Ms Front page andSmartDraw

Technical Programs:Auto CAD ,Revit and Sketch up 3D

Manage the production within the contract condition and limited to approved budget and planned schedule
Supervise the production and evaluate the result of each phase.
Monitor and control the materials & adequate resources available for the work in accordance to planned schedule
Adhere with the production management techniques, methodology and tools.

Control and manage the whole production process by dividing the main deliverables to smaller

manageable process by using Work Breakdown Structure "WBS"

Execute and track the production process with maintain the performance to suit costumer satisfaction

"One of the ways is Critical Path Method CPM"

Communicate with the crew vertically and horizontally to ease the work.
Coordinate with upper management and liner management to obtain approval to accomplish.
Prepare the required sketches to shown the vision of the production by using sketch up 3D

Manage the production status shown the schedule, budget index factor and analyses to rectify the

problems in ahead by using "Risk Management"

Follow the company's procedure or create one for organize the production"Organization Skills"
Create technical specification and method statement for all the stuff apply on the production
Familiar with the following materials (ARG fiber (Roving, chopped), E glass fiber, Polymer (SBR , PVA),Concrete

additives (Type A,B,C,D,E,F),Gel Coat, Resin, Peroxide, Cobalt, Silica sand, Pigment, Silicone rubber, Crystal

gypsum, negative and positive mold, dry cast, Acid wash, Poly stone

Project Management Professional "PMP"(studies)

Bs.c in Civil Engineering from Alexandria University, Egypt (1991-1996)

Division Manager ALROSTAMANI PEGEL L.L.C Dubai,2008-Present

Al Rostamani pegel L.L.C one of construction Filed Company, Part of AlRostamani group

Monitor and control the precast works to compelet the project within time and budget

Assist the P.M to make a decision in time through evaluation of the precast work (Time, Cost and Resource)

Some of Potential Projects:


EHAB ELSAYED
Mobile 00966543191795
Ehabyn@yahoo.com

Project Manager GIBCA GROUP-Arbian Profile Sharjah,2005-2008

Arabian Profile Ltd.,One of Construction Field Company,its core business is the manufacture of aluminum,steel
and panel cladding (GRC,GRP) for roofs and facades. GRC Division part of theGibca Group is simply a
manufacture of cladding for the construction Industry also provides total design solution and is often sought out by
contractor facing unexpected architectural designs.

Supervise preparing and coordination of shop drawings and details. Assist with 3d sketches for undercut
andfixing detailes

Assist and participate in production and through technical advise (Mold types and qty, design mix, skilled labor
evaluation, ….etc)

Preparing master plan for the production related to available time, cost and resource -items wise and based on
estimation sheet

Proactively managed projects by preparing and presenting, witting statement of works and building client
relationships

Reviewed project reports and schedule status at the completion of each phase, proficient in handling
simultaneous projects and meeting deadlines effectively. Analyzed problems and anticipated project needs
Estimate projects (production by kg with direct and indirect cost, installation,) all based on historic data

Accelerate the progress based on production experience and related to cost controlled

Maintain proper cash flow scheme in parallel to the progress payments


Some of Potential Projects:
EHAB ELSAYED

GRC Division Manager SEIF FOR CONSTRUCTION L.L.C EGYPT,2001-2005

Seif for construction one of construction Filed Company,Part ofSEIF group


Overall division's activity management,Estimation,Control mould design with regard to cost and time
Ensure proper design Mix,Cost control & Develop newproducts (Poly stone,Dry Cast)
Some of Potential Projects:

All the above project sprayed byPS9000 A,POWER SPRAY CO.U.K

Executive Manager of manufacture Process MEAN FOR ENGINEERING EGYPT,1998-2001


Assist the setting up for the factory, Select and evaluate the qualified crow

Monitor and check the requirements for the production (Raw materials, Resource,....)

Develop and produce modifiedGRG

Mean Roman Building-GRC cladding panels 4,500m2 full cladding Sprayed by GGAP, SPRAY TEC CO.USA

Project Engineer French Arabic CO. EGYPT,1996-1998


Coordinate between factory and site to ensure to get materials and panels on time
Record daily activity such as manpower,machinery and tools
Ensure that all previousactivities are approved &signed off by consultant before proceeding further
SHERATON ABU SUMA -HURGADA GRG &GRC

Date of Birth : Aug-1973

Material Status: Married

Nationality: Egyptian

Language: Fluent in spoken and written Arabic and English

Driving licence: U.A.E Valid to 2016

Visa Status: Employment Visa

Others: 3d animation, 4d cinema

You might also like