You are on page 1of 3

DAFTAR PUSTAKA

Adesola, S dan Baines, T. 2005. Developing and evaluating methodology for


business process improvement. Business Process Management Journal, Vol. 11
No.1, hal. 37-46
Arifianto, Denny. 2005. Usulan Perbaikan Proses Operasional Penerbitan Buku
dengan Menggunakan Pendekatan Business Process Re-engineering. Skripsi.
Teknik Industri: Universitas Indonesia
Arfiyanto, Febi Nur. 2008. Peningkatan Proses Bisnis Pada Unit Hatchery Di Pt.X
Dengan Menggunakan Metode Model-Based And Integrated Process
Improvement. Tesis. Teknik Industri: Universitas Indonesia
Biazzi dan Muscat. 2009. Administrative Process Improvement Methodology in the
Brazilian Public Sector. POMS 20th Annual Conference, Orlando, Florida,USA,
1-4 May 2009
Bryson, J. M. 2004. What to do when Stakeholders Matter: Stakeholder Identification
and Analysis Techniques. Public Management Review, Vol. 6 No. 1, hal 21-53
Davenport, Thomas H. 1993. Process Innovation Reenineering Work Through
Information Technology. Boston: Harvard Business School Press
Hammer, M..J Champy. 1993. Reengineering The Corporation A Manifesto For
Business Revolution. New York: Harper Collins
Harrington, H. J. 1991. Bussiness Process Improvement: The Breakthrough Strategy
for Total Quality, Productivity, and Competitiveness. New York: McGraw-Hill
Heizer, Jay dan Render, B. 2006. Manajemen Operasi, Edisi 7. Jakarta: Salemba
Empat
Hutajulu, Eva K. 2020. Perancangan Proses Bisnis Menggunakan Metode Model
Based And Integrated Process Improvement (MIPI) Pada Ekowisata Barumun
Sumatera Utara. Sistem Informasi Bisnis: Universitas Gunadarma
Ishikawa, Kaoru. 1989. Introduction to Quality Control. Jepang: JUSE Press.ltd
Jeston, J. dan Nelis, J. 2008. Business Process Management Practical Guidelines to
Successful Implementations Second Edition. Oxford: Elsevier.ltd
Keyte, B dan Locher, D. 2004. The Complete Lean Enterprise: Value
StreamMapping for Administrative and Office Processes. USA: CRC Press
Koco, Esti. 2013. Business Process Improvement Pengolahan Bahan Baku Obat
Tradisional Di Klaster Biofarmaka Kabupaten Karanganyar. Skripsi. Teknik
Industri: Universitas Sebelas Maret
Lee K. T. dan Chuah K. B. 2001. A SUPER methodology for business process
improvement. International Journal of Operations & Production Management,
Vol. 21 No. 5/6, hal. 687-706
Mayers, J. 2005. Stakeholder Power Analysis. Tersedia di http://www.policy-
powertools.org/Tools/Understanding/docs/stakeholder_power_tool_english.pdf.
Diakses tanggal 20 Oktober 2018
Padhilah, Rini. 2009. Usulan Perbaikan Bisnis Proses Pada Divisi Production
Engineering Di Industri Otomotif Dengan Menggunakan Pendekatan Business
Process Improvement. Skripsi. Teknik Industri: Universitas Indonesia
Paradise, C. V. dan Lystianingtyas, N. 2012. Analisis Risiko Tools Brainstorming,
Delphi, dan Hazop. Tersedia di http://www.scribd.com/doc/111661472/Tools-
Brainstorming-DelphiHazop-PDF. Diakses tanggal 23 Oktober 2018
Suryadi, Kadarsah, DR. Ir., Ramdhani, M. Ali, Ir. M.T. 2000. Sistem Pendukung
Keputusan, Suatu Wacana Struktural Idealisasi dan Implementasi Konsep
Pengambilan Keputusan. Bandung : Rosdakarya
Tague, N. R. (2005). The Quality Toolbox. Milwaukee: ASQ Quality Press
Tenner, A.R. dam DeToro I. J. 1997. Process Redesign, The Implementation Guide
For Mangers. Reading: MA. Addison-Wesley
V.N., Vaya. 2015. Simulasi Proses Bisnis Pendaftaran Dan Penilaian Peserta
Pendidikan Dan Pelatihan Studi Kasus : Balai Diklat Geospasial, Tugas Akhir.
Sistem Informasi: Universitas Widyatama
Weaver, P. and Bourne, L. (2002). Project Fact or Fiction - Will the Real Project
Please Stand
Up. Maximising Project Value, Melbourne, 21 October, PMI Melbourne Chapter: On
CD-Rom,
p234
Weaver, P. and Bourne, L. (2002). Project Fact or Fiction - Will the Real Project
Please Stand
Up. Maximising Project Value, Melbourne, 21 October, PMI Melbourne Chapter: On
CD-Rom,
p234
Weaver, P. and Bourne, L. (2002). Project Fact or Fiction - Will the Real Project
Please Stand
Up. Maximising Project Value, Melbourne, 21 October, PMI Melbourne Chapter: On
CD-Rom,
p234
Weaver, P. and Bourne, L. (2002). Project Fact or Fiction - Will the Real Project
Please Stand
Up. Maximising Project Value, Melbourne, 21 October, PMI Melbourne Chapter: On
CD-Rom,
p234
Weaver, P. and Bourne, L. (2002). Project Fact or Fiction - Will the Real Project
Please Stand
Up. Maximising Project Value, Melbourne, 21 October, PMI Melbourne Chapter: On
CD-Rom,
p234
Weaver, P. and Bourne, L. 2002. Project Fact or Fiction - Will the Real Project
Please Stand Up. Maximising Project Value. PMI Melbourne hal. 234
Zaheer, A., Rehman, K., dan Khan, M.A. 2010. Development and testing of
abusiness process orientation model to improve employee and organizational
performance. African Journal of Business Management, Vol.4 No.2, hal.149-
161
Zairi, M. 1997. Business process management: a boundaryless approach to modern
competitiveness. Business Process Management Journal, Vol. 3 No. 1, hal. 64-
80

You might also like