You are on page 1of 1

4/2/2012

CONSULTANT NAME
CLIENT-UNIT-PROJECT NAME

Engineering Estimate

Project # Prepared by: NAME


Revision X - DATE
Discipline Proj Mgr Proc Eng Mech Eng Elec Eng Struct Eng I&C Eng - Sr Technician Drafting Survey Crew Clerical Expenses
Hourly Rate $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Task ( 2 man crew)
Process Design
PFD's/PIDs
Site Information
Reviews/Reports/Misc

Major Equipment - Mechanical


Design/Specifications
Layout/General Arrangement
Vendor Document Review/Coordination
FAT/Shop Inspections
Site Checks/Commissioning/Startup

Civil/Foundation Design
Site Survey
Site Prep/Grading
Major Equipment Foundations
Buildings Foundations
Pipe/Cable Tray Support Foundations
Slabs/Grading Plans
Misc. Foundations

Mechanical/Structural Design
Major Equipment Mechanical/Structural
Building Mechanical/Structural
Access/Platforms
Pipe Racks/Pipe Supports
Cable Tray/Conduit Supports
Misc. Mechanical/Structural

Piping Design
Line List
Tie-In List
PVF Standards/Specs
3-D Model
Piping Plans
Piping Isometrics
BOM/Matl Takeoff
Supports/Hangers

Instrumentation and Controls


Instrument Index
Instrument Specifications
Location Plans and details
Junction Boxes
Cable Trays
Loop Drawings
Documentation and Data Books

Electrical
One Line
Materials Specifications
Location Plans and details
MCC Drawings
Grounding/Lighting Plans
Documentation and Data Books

Project Management
Project Scope of Work Maintenance
Project Schedule Maintenance
Project Engineering Estimate Maintenance
Internal Review Meetings
Client Review Meetings
Regular Engineering & Design Status Report

Field/Construction Support
Construction and Startup assistance

Total Hours 0 0 0 0 0 0 0 0 0 0
Costs $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ -

Man-hours -
Sub Total Costs $0

Misc. expenses travel, food & lodging $ -

Subtotal $0

Contingency 15% $0

Total $0