Causal Analysis Tree Rev. 1
Attachment 5
C03 Natural environment LTA two or more facts were of adequate quality and up-
C01 Defective or failed part C02 Change not implemented in a timely manner understood
C06 Individual underestimated to-date
C02 Defective or failed material the problem by using past C03 Inadequate vendor support of change C06 Suspected problems not
C07 Means not provided for assuring
event as basis communicated to supervision
C03 Defective weld, braze or adequate availability of C04 Risks/consequences associated with change not Level A nodes are underlined.
soldering point B4 WORK PRACTICES LTA appropriate materials / tools adequately reviewed/ assessed C07 No communication method
available Level B nodes are in ALL CAPS.
Page 1
C04 End of life failure C01 Individual’s capability to C08 Means not provided for assuring C05 System interactions not considered
perform work LTA [Examples adequate equipment quality, C06 Personnel/ department interactions not considered Level C nodes are in
C05 Electrical or instrument
noise include: Sensory/perceptual reliability, or operability C07 Effects of change on schedules not adequately addressed “Sentence case.”
capabilities LTA, Motor/ C09 Personnel selections did not
C06 Contamination C08 Change-related training/ retraining not performed or not LTA – Less than adequate
physical capabilities LTA, and assure match of worker adequate
Attitude/ psychological profile motivations / job descriptions
LTA.] C09 Change-related documents not developed or revised
C10 Means / method not provided
C02 Deliberate violation for assuring adequate quality of C10 Change-related equipment not developed or revised
contract services C11 Changes not adequately communicated
C12 Change not identifiable during task
C13 Accuracy/ effectiveness of change not verified or not
validated