COST OF HAULING SUB BASE AND BASE MATERIALS FROM MICHEWENI BORROW PIT TO ROAD NO.

A Cost of hiring vehicles


Cost per m3 (in Tshs.) Volume required (m3)
1 Haulage of materials 3,500.00 40,000.00

B Cost of provision of fuel


Cost per m3 (in Tshs.) Volume required (m3)
1 Haulage of materials for a 2,880.00 40,000.00
distance of 40 Km (at a rate of
1.8 litres per m3)

C Cost of facilitation by MoIC officials


NI BORROW PIT TO ROAD NO. 5
Total amount (Tshs.)

140,000,000.00

115,200,000.00

255,200,000.00