You are on page 1of 8

ARABIAN GULF OIL COMPANY DAILY WORKOVER & COMPLETION REPORT

‫شركة الخليج العربى للنفط‬ REPORT NO. 2 DATE: 17/1/2021


WELL NO. : G 235 FIELD NAFOORA RIG NO ADWCO RIG 22
PROD.CSG SIZE, 7" 26 LB/FT CSG SHOE DEPTH 10642 C.R @
LINER SIZE,WT LINER SHOE DEPTH T.O.L @
3 1/2", 9.3
TBG SIZE,WT #/ft. PKR SIZE ,WT 7'' PKR DEPTH 9915

AT 06:00 AM SITP : 0 PSI SICP : 0 PSI IFL: FLOW RATE: CHOKE

TIME DETAILS PERFORATION


OPERATION DESCRIPTION
FROM TO 10288-10334
06:00 10350-10376
CONT MOVE TO G 235 & SPOT OUT SIDE LOCATION 100%
10440-10450

BLEED OFF GAS LINE PRESSURE (1200 PSI) ,DISCONNECTED PRO & GAS LINE

LAY OUT & CONNECT SWAB TANK LINE


TUBING RECORD, JT.
IN HOLE (JTS)
LEVEL LOCATION 100 % ,SOPT IN SIDE LOCATION 50 % & R/UP 30 %
18:00 AT DRK
ON RACKS
TOTAL (JTS)
FLUID DATA
FLUID WT
FLUID LOST
FLUID REC.
LIFT TO REC
TIME DISTRIBUTION
OPERATION 0
R/M,R/U,R/D 12
1 0

*Standby
2 0

Due to
3 0
4 0
5 0
REPAIR 0
FORCE Maj. 0
SHUT DOWN 0
TOTAL 12
RENTAL SERVICE COST
RIG COST 11739
LOG/PERFO
CMT
FORK LIFT 490
KENWORTH
H2O TRUCK 700
F.B.MILL
DIESEL 105
SWAB CUP
OIL SAVER
SALT
PIPE DOPE
SUPER KW
TRANSPORT.
TUBING+CSG
DETAILS BITS
PUMPED RECOVERED TOTAL PUMPED TOTAL RECOVERED 7" RBP
KILL FLUID VOL.(BBL)
0 0 0 0 TOTAL 13,034
DIESEL DATE REC BALANCE 22,158 USED 700

EQUIP. FAILURE REPAIR TIME ( f.r) 0 HRS-MONTH COST FWD. 6,019

REMARKS : TOOLPUSHER: DRILLER: DAILY COST 13,034

NEXT OPERATION CONT SPOT IN LOCATION & R/UP CUM COST 19,053
COST CODE 735-710-XXX-351 AGOCO REPRESENTATIVE AHMEDA

*Standby due to: 1. Weather /Day light 2. Waiting on w.o equip. or serv.from AGOCO 3. Waiting on w.o equip. or serv.from3rd party
4. Due to well 5. 3rd party services
ARABIAN GULF OIL COMPANY DAILY WORKOVER & COMPLETION REPORT

‫شركة الخليج العربى للنفط‬ REPORT NO. DATE:


WELL NO. : FIELD SARIR RIG NO
PROD.CSG SIZE, 7" 26 LB/FT CSG SHOE DEPTH MD
LINER SIZE,WT LINER SHOE DEPTH T.O.L
TBG SIZE,WT 3 1/2", 9.3 #/ft. PKR SIZE ,WT PKR DEPTH
AT 06:00 AM SITP : 0 PSI SICP : 0 PSI IFL: FLOW RATE: FIXED CHOKE
TIME DETAILS PRFS.,TD.,PBTD,CR,
OPERATION DESCRIPTION
FROM TO DBP,FILL.KB
06:00 HORIZONTAL (OH) MD

KOP TVD
TD MD

TUBING RECORD, JT.


IN HOLE (JTS)
AT DRK
ON RACKS
TOTAL (JTS)
FLUID DATA
FLUID WT
FLUID LOST
FLUID REC.
SECURE WELL LIFT TO REC
SHUTDOWN FOR NIGHT TIME DISTRIBUTION
OPERATION 0
R/M,R/U,R/D 0
1 0

*Standby Due to
2 0
3 0
4 0
5 0
REPAIR 0
FORCE Maj. 0
SHUT DOWN 0
TOTAL 0
RENTAL SERVICE COST
RIG COST
LOG/PERFO
CMT
FORK LIFT
KENWORTH
H2O TRUCK
F.B.MILL
DIESEL
SWAB CUP
OIL SAVER
SALT
PIPE DOPE
SUPER KW
TRANSPORT.
TUBING+CSG
DETAILS BITS
PUMPED RECOVERED TOTAL PUMPED TOTAL RECOVERED 7" RBP
KILL FLUID VOL.(BBL)
0 0 0 0 TOTAL
DIESEL DATE REC BALANCE 0 USED 0 COST DATA ( L.D )
EQUIP. FAILURE REPAIR TIME ( f.r) 0 HRS-MONTH COST FWD.
REMARKS : TOOLPUSHER: DRILLER: DAILY COST
NEXT OPERATION CUM COST
COST CODE 324 - 735 - XXX - 365 - 0000 AGOCO REPRESANTATIVE
*Standby due to: 1. Weather /Day light 2. Waiting on w.o equip. or serv.from AGOCO 3. Waiting on w.o equip. or serv.from3rd party
4. Due to well 5. 3rd party services
ARABIAN GULF OIL COMPANY DAILY WORKOVER & COMPLETION REPORT

‫شركة الخليج العربى للنفط‬ REPORT NO. 3 DATE: 18/1/2021


WELL NO. : G 235 FIELD NAFOORA RIG NO ADWCO RIG 22
PROD.CSG SIZE, 7" 26 LB/FT CSG SHOE DEPTH 10642 C.R @
LINER SIZE,WT LINER SHOE DEPTH T.O.L @
3 1/2", 9.3
TBG SIZE,WT #/ft. PKR SIZE ,WT 7'' PKR DEPTH 9915

AT 06:00 AM SITP : 0 PSI SICP : 0 PSI IFL: FLOW RATE: CHOKE

TIME DETAILS PERFORATION


OPERATION DESCRIPTION
FROM TO 10288-10334
06:00 10350-10376
16:00 CONT SPOT IN LOCATION 100 % , R/UP RIG & RIG EQUIP 100 %. 10440-10450
16:00
18:00 BUILD WATER VOLUME (TWO LOAD HAD BEEN RECEIVED).

TUBING RECORD, JT.


IN HOLE (JTS)
AT DRK
ON RACKS
TOTAL (JTS)
FLUID DATA
FLUID WT
FLUID LOST
FLUID REC.
LIFT TO REC
TIME DISTRIBUTION
OPERATION 0
R/M,R/U,R/D 10
NOTE 1 0
WATER TRUCK OF THE RIG TAKE 100 LTR OF FUEL

*Standby
2 2

Due to
3 0
4 0
5 0
REPAIR 0
FORCE Maj. 0
SHUT DOWN 0
TOTAL 12
RENTAL SERVICE COST
RIG COST 11739
LOG/PERFO
CMT
FORK LIFT 490
KENWORTH
H2O TRUCK 700
F.B.MILL
DIESEL 270
SWAB CUP
OIL SAVER
SALT
PIPE DOPE
SUPER KW
TRANSPORT.
TUBING+CSG
DETAILS BITS
PUMPED RECOVERED TOTAL PUMPED TOTAL RECOVERED 7" RBP
KILL FLUID VOL.(BBL)
0 0 0 0 TOTAL 13,199
DIESEL DATE REC BALANCE 19,058 USED 1800

EQUIP. FAILURE REPAIR TIME ( f.r) 0 HRS-MONTH COST FWD. 19,053

REMARKS : TOOLPUSHER: DRILLER: DAILY COST 13,199

NEXT OPERATION CONT TAKE ON WATER CUM COST 32,252


COST CODE 735-710-XXX-351 AGOCO REPRESENTATIVE AHMEDA

*Standby due to: 1. Weather /Day light 2. Waiting on w.o equip. or serv.from AGOCO 3. Waiting on w.o equip. or serv.from3rd party
4. Due to well 5. 3rd party services
ARABIAN GULF OIL COMPANY DAILY WORKOVER & COMPLETION REPORT

‫شركة الخليج العربى للنفط‬ REPORT NO. 4 DATE: 19/1/2021


WELL NO. : G 235 FIELD NAFOORA RIG NO ADWCO RIG 22
PROD.CSG SIZE, 7" 26 LB/FT CSG SHOE DEPTH 10642 C.R @
LINER SIZE,WT LINER SHOE DEPTH T.O.L @
3 1/2", 9.3
TBG SIZE,WT #/ft. PKR SIZE ,WT 7'' PKR DEPTH 9915

SITP : 1300
AT 16:30 AM SICP : 800 PSI IFL: FLOW RATE: CHOKE
PSI
TIME DETAILS PERFORATION
OPERATION DESCRIPTION
FROM TO 10288-10334
06:00 10350-10376
16:30 CONT BUILD WATER VOLUME (SIX LOAD HAD BEEN RECEIVED). 10440-10450
16:30
CHECK PRESSURE, FOUND 1300 PSI IN THE TBG & BLEED OFF TO SWAB TANK

PRESSURE DROP TO 100 PSI .


TUBING RECORD, JT.
IN HOLE (JTS)
FOUND 800 PSI IN CSG & BLEED OFF TO SWAB TONK
18:00 AT DRK
ON RACKS
TOTAL (JTS)
FLUID DATA
FLUID WT
FLUID LOST
FLUID REC.
LIFT TO REC
TIME DISTRIBUTION
OPERATION 0
R/M,R/U,R/D
NOTE 0 1
WATER TRUCK 5/10/8443 TAKE 50 LTR OF FUEL

*Standby
12 2

Due to
0 3
0 4
0 5
REPAIR 0
FORCE Maj. 0
SHUT DOWN 0
TOTAL 12
RENTAL SERVICE COST
RIG COST 11739
LOG/PERFO
CMT
FORK LIFT 490
KENWORTH
H2O TRUCK 700
F.B.MILL
DIESEL 210
SWAB CUP
OIL SAVER
SALT
PIPE DOPE
SUPER KW
TRANSPORT.
TUBING+CSG
DETAILS BITS
PUMPED RECOVERED TOTAL PUMPED TOTAL RECOVERED 7" RBP
KILL FLUID VOL.(BBL)
0 0 0 0 TOTAL 13,139
DIESEL DATE REC BALANCE 17,658 USED 1400

EQUIP. FAILURE REPAIR TIME ( f.r) 0 HRS-MONTH COST FWD. 32,252

REMARKS : TOOLPUSHER: DRILLER: DAILY COST 13,139

NEXT OPERATION MIX SALT CUM COST 45,391


COST CODE 735-710-XXX-351 AGOCO REPRESENTATIVE AHMEDA

*Standby due to: 1. Weather /Day light 2. Waiting on w.o equip. or serv.from AGOCO 3. Waiting on w.o equip. or serv.from3rd party
4. Due to well 5. 3rd party services
ARABIAN GULF OIL COMPANY DAILY WORKOVER & COMPLETION REPORT

‫شركة الخليج العربى للنفط‬ REPORT NO. 5 DATE: 20/1/2021


WELL NO. : G 235 FIELD NAFOORA RIG NO ADWCO RIG 22
PROD.CSG SIZE, 7" 26 LB/FT CSG SHOE DEPTH 10642 C.R @
LINER SIZE,WT LINER SHOE DEPTH T.O.L @
3 1/2", 9.3
TBG SIZE,WT #/ft. PKR SIZE ,WT 7'' PKR DEPTH 9915

AT 6:30 AM SITP : 500 PSI SICP : 80 PSI IFL: FLOW RATE: CHOKE

TIME DETAILS PERFORATION


OPERATION DESCRIPTION
FROM TO 10288-10334
06:00 10350-10376
08:30 BLEED OFF PRESSURE TO SWAB TANK 10440-10450
08:30
R/UP VEE DOORS& CAT WALK

R/UP MANSOORI WIRE LINE EQUIPMENT RIH W/ F.B.2 VALVE ,SET @ F.N POH
TUBING RECORD, JT.
IN HOLE (JTS)
RIH W/ POLLING TOOL ,CATCH GAS VALVE NUMBER 6,P0H
AT DRK
ON RACKS
AT SURFACE FOUND POLLING TOOL MISSING IN HOLE
18:00 TOTAL (JTS)
NOTE 1 FLUID DATA
WHILE CHANGE GAS LEFT VALVE MIX BRINE 350 BBLS 9 PPG
FLUID WT
FLUID LOST
FLUID REC.
LIFT TO REC
TIME DISTRIBUTION
OPERATION 0
R/M,R/U,R/D
NOTE 2 0 1
WATER TRUCK OF THE RIG TAKE 100 LTR OF FUEL

*Standby
0 2

Due to
0 3
0 4
12 5
REPAIR 0
FORCE Maj. 0
SHUT DOWN 0
TOTAL 12
RENTAL SERVICE COST
RIG COST 11739
LOG/PERFO
CMT
FORK LIFT 490
KENWORTH
H2O TRUCK 700
F.B.MILL
DIESEL 225
SWAB CUP
OIL SAVER
SALT
PIPE DOPE
SUPER KW
TRANSPORT.
TUBING+CSG
DETAILS BITS
PUMPED RECOVERED TOTAL PUMPED TOTAL RECOVERED 7" RBP
KILL FLUID VOL.(BBL)
0 0 0 0 TOTAL 13,154
DIESEL DATE REC BALANCE 16,158 USED 1500

EQUIP. FAILURE REPAIR TIME ( f.r) 0 HRS-MONTH COST FWD. 32,252

REMARKS : TOOLPUSHER: DRILLER: DAILY COST 45,391

NEXT OPERATION RIH W/OVER SHOT TO GET BACK PULLING TOOL CUM COST 77,643
COST CODE 735-710-XXX-351 AGOCO REPRESENTATIVE AHMEDA

*Standby due to: 1. Weather /Day light 2. Waiting on w.o equip. or serv.from AGOCO 3. Waiting on w.o equip. or serv.from3rd party
4. Due to well 5. 3rd party services

You might also like