Professional Documents
Culture Documents
W.O Daily Rep Form
W.O Daily Rep Form
BLEED OFF GAS LINE PRESSURE (1200 PSI) ,DISCONNECTED PRO & GAS LINE
*Standby
2 0
Due to
3 0
4 0
5 0
REPAIR 0
FORCE Maj. 0
SHUT DOWN 0
TOTAL 12
RENTAL SERVICE COST
RIG COST 11739
LOG/PERFO
CMT
FORK LIFT 490
KENWORTH
H2O TRUCK 700
F.B.MILL
DIESEL 105
SWAB CUP
OIL SAVER
SALT
PIPE DOPE
SUPER KW
TRANSPORT.
TUBING+CSG
DETAILS BITS
PUMPED RECOVERED TOTAL PUMPED TOTAL RECOVERED 7" RBP
KILL FLUID VOL.(BBL)
0 0 0 0 TOTAL 13,034
DIESEL DATE REC BALANCE 22,158 USED 700
NEXT OPERATION CONT SPOT IN LOCATION & R/UP CUM COST 19,053
COST CODE 735-710-XXX-351 AGOCO REPRESENTATIVE AHMEDA
*Standby due to: 1. Weather /Day light 2. Waiting on w.o equip. or serv.from AGOCO 3. Waiting on w.o equip. or serv.from3rd party
4. Due to well 5. 3rd party services
ARABIAN GULF OIL COMPANY DAILY WORKOVER & COMPLETION REPORT
KOP TVD
TD MD
*Standby Due to
2 0
3 0
4 0
5 0
REPAIR 0
FORCE Maj. 0
SHUT DOWN 0
TOTAL 0
RENTAL SERVICE COST
RIG COST
LOG/PERFO
CMT
FORK LIFT
KENWORTH
H2O TRUCK
F.B.MILL
DIESEL
SWAB CUP
OIL SAVER
SALT
PIPE DOPE
SUPER KW
TRANSPORT.
TUBING+CSG
DETAILS BITS
PUMPED RECOVERED TOTAL PUMPED TOTAL RECOVERED 7" RBP
KILL FLUID VOL.(BBL)
0 0 0 0 TOTAL
DIESEL DATE REC BALANCE 0 USED 0 COST DATA ( L.D )
EQUIP. FAILURE REPAIR TIME ( f.r) 0 HRS-MONTH COST FWD.
REMARKS : TOOLPUSHER: DRILLER: DAILY COST
NEXT OPERATION CUM COST
COST CODE 324 - 735 - XXX - 365 - 0000 AGOCO REPRESANTATIVE
*Standby due to: 1. Weather /Day light 2. Waiting on w.o equip. or serv.from AGOCO 3. Waiting on w.o equip. or serv.from3rd party
4. Due to well 5. 3rd party services
ARABIAN GULF OIL COMPANY DAILY WORKOVER & COMPLETION REPORT
*Standby
2 2
Due to
3 0
4 0
5 0
REPAIR 0
FORCE Maj. 0
SHUT DOWN 0
TOTAL 12
RENTAL SERVICE COST
RIG COST 11739
LOG/PERFO
CMT
FORK LIFT 490
KENWORTH
H2O TRUCK 700
F.B.MILL
DIESEL 270
SWAB CUP
OIL SAVER
SALT
PIPE DOPE
SUPER KW
TRANSPORT.
TUBING+CSG
DETAILS BITS
PUMPED RECOVERED TOTAL PUMPED TOTAL RECOVERED 7" RBP
KILL FLUID VOL.(BBL)
0 0 0 0 TOTAL 13,199
DIESEL DATE REC BALANCE 19,058 USED 1800
*Standby due to: 1. Weather /Day light 2. Waiting on w.o equip. or serv.from AGOCO 3. Waiting on w.o equip. or serv.from3rd party
4. Due to well 5. 3rd party services
ARABIAN GULF OIL COMPANY DAILY WORKOVER & COMPLETION REPORT
SITP : 1300
AT 16:30 AM SICP : 800 PSI IFL: FLOW RATE: CHOKE
PSI
TIME DETAILS PERFORATION
OPERATION DESCRIPTION
FROM TO 10288-10334
06:00 10350-10376
16:30 CONT BUILD WATER VOLUME (SIX LOAD HAD BEEN RECEIVED). 10440-10450
16:30
CHECK PRESSURE, FOUND 1300 PSI IN THE TBG & BLEED OFF TO SWAB TANK
*Standby
12 2
Due to
0 3
0 4
0 5
REPAIR 0
FORCE Maj. 0
SHUT DOWN 0
TOTAL 12
RENTAL SERVICE COST
RIG COST 11739
LOG/PERFO
CMT
FORK LIFT 490
KENWORTH
H2O TRUCK 700
F.B.MILL
DIESEL 210
SWAB CUP
OIL SAVER
SALT
PIPE DOPE
SUPER KW
TRANSPORT.
TUBING+CSG
DETAILS BITS
PUMPED RECOVERED TOTAL PUMPED TOTAL RECOVERED 7" RBP
KILL FLUID VOL.(BBL)
0 0 0 0 TOTAL 13,139
DIESEL DATE REC BALANCE 17,658 USED 1400
*Standby due to: 1. Weather /Day light 2. Waiting on w.o equip. or serv.from AGOCO 3. Waiting on w.o equip. or serv.from3rd party
4. Due to well 5. 3rd party services
ARABIAN GULF OIL COMPANY DAILY WORKOVER & COMPLETION REPORT
AT 6:30 AM SITP : 500 PSI SICP : 80 PSI IFL: FLOW RATE: CHOKE
R/UP MANSOORI WIRE LINE EQUIPMENT RIH W/ F.B.2 VALVE ,SET @ F.N POH
TUBING RECORD, JT.
IN HOLE (JTS)
RIH W/ POLLING TOOL ,CATCH GAS VALVE NUMBER 6,P0H
AT DRK
ON RACKS
AT SURFACE FOUND POLLING TOOL MISSING IN HOLE
18:00 TOTAL (JTS)
NOTE 1 FLUID DATA
WHILE CHANGE GAS LEFT VALVE MIX BRINE 350 BBLS 9 PPG
FLUID WT
FLUID LOST
FLUID REC.
LIFT TO REC
TIME DISTRIBUTION
OPERATION 0
R/M,R/U,R/D
NOTE 2 0 1
WATER TRUCK OF THE RIG TAKE 100 LTR OF FUEL
*Standby
0 2
Due to
0 3
0 4
12 5
REPAIR 0
FORCE Maj. 0
SHUT DOWN 0
TOTAL 12
RENTAL SERVICE COST
RIG COST 11739
LOG/PERFO
CMT
FORK LIFT 490
KENWORTH
H2O TRUCK 700
F.B.MILL
DIESEL 225
SWAB CUP
OIL SAVER
SALT
PIPE DOPE
SUPER KW
TRANSPORT.
TUBING+CSG
DETAILS BITS
PUMPED RECOVERED TOTAL PUMPED TOTAL RECOVERED 7" RBP
KILL FLUID VOL.(BBL)
0 0 0 0 TOTAL 13,154
DIESEL DATE REC BALANCE 16,158 USED 1500
NEXT OPERATION RIH W/OVER SHOT TO GET BACK PULLING TOOL CUM COST 77,643
COST CODE 735-710-XXX-351 AGOCO REPRESENTATIVE AHMEDA
*Standby due to: 1. Weather /Day light 2. Waiting on w.o equip. or serv.from AGOCO 3. Waiting on w.o equip. or serv.from3rd party
4. Due to well 5. 3rd party services