Project:
TIRODA THERMAL POWER PROJECT
3300 MW (2x660 MW Phase – I + 1 x 660 MW Phase – II
& 2x660 MW Phase III )
Tiroda, Gondia District, Maharashtra
Owner:
ADANI POWER MAHARASHTRA LIMITED
TIRORA, MAHARASHTRA
CONSULTANT : FICHTNER Consulting Engineers (India) Private Limited
CONTRACTOR: ABB Limited.
APPROVED Comments marked in
CAT-A1 Sheet 35 shall be taken
care in As-built.
B.P. NANDA
Digitally signed by B.P. NANDA
DN: cn=B.P. NANDA, o=APL, ou, email=bp.
nanda@adanipower.com, c=IN
Date: 2010.12.15 13:15:52 +05'30'
APML DOC.NO. : TIR1-SGR-HGR-DE-F-101 Revision: 02
PROJECT DOC. TITLE : SCHEMATIC DRAWING FOR BUS TRANSFER PANELS FOR
10BBA/10BBB/20BBA/20BBB
CONTRACTOR DOC. NO.: YN1M201018-CAA Revision: 02
APPROVAL STATUS : SUBMITTED FOR APPROVAL.
02 06.12.2010 CUP CUP YDB THIRD SUBMISSION
01 24.09.2010 CUP CUP YDB SECOND SUBMISSION
00 21.08.2010 CUP CUP YDB FIRST SUBMISSION
INITIALS SIGN INITIALS SIGN INITIALS SIGN DETAILS OF REVISION
REV DATE
PREPARED CHECKED APPROVED
Please mention which signals
are going to/coming from DCS
or HT Switchgear and which are
all the signals used in BTS
panel itself for better
understanding.