Fast Bus Transfer Panel DRG

The Tiroda Thermal Power Project, owned by Adani Power Maharashtra Limited, consists of a total capacity of 3300 MW across three phases. The project involves schematic drawings for bus transfer panels and has undergone multiple submissions for approval. The document includes details on revisions and requests for clarification on signal connections related to the DCS and HT Switchgear.

Uploaded by

Yadav Akhilesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
109 views35 pages

Fast Bus Transfer Panel DRG

The Tiroda Thermal Power Project, owned by Adani Power Maharashtra Limited, consists of a total capacity of 3300 MW across three phases. The project involves schematic drawings for bus transfer panels and has undergone multiple submissions for approval. The document includes details on revisions and requests for clarification on signal connections related to the DCS and HT Switchgear.

Uploaded by

Yadav Akhilesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Project:

TIRODA THERMAL POWER PROJECT


3300 MW (2x660 MW Phase – I + 1 x 660 MW Phase – II
& 2x660 MW Phase III )
Tiroda, Gondia District, Maharashtra
Owner:

ADANI POWER MAHARASHTRA LIMITED


TIRORA, MAHARASHTRA

CONSULTANT : FICHTNER Consulting Engineers (India) Private Limited

CONTRACTOR: ABB Limited.

APPROVED Comments marked in


CAT-A1 Sheet 35 shall be taken
care in As-built.

B.P. NANDA
Digitally signed by B.P. NANDA
DN: cn=B.P. NANDA, o=APL, ou, email=bp.
nanda@adanipower.com, c=IN
Date: 2010.12.15 13:15:52 +05'30'

APML DOC.NO. : TIR1-SGR-HGR-DE-F-101 Revision: 02

PROJECT DOC. TITLE : SCHEMATIC DRAWING FOR BUS TRANSFER PANELS FOR
10BBA/10BBB/20BBA/20BBB

CONTRACTOR DOC. NO.: YN1M201018-CAA Revision: 02

APPROVAL STATUS : SUBMITTED FOR APPROVAL.

02 06.12.2010 CUP CUP YDB THIRD SUBMISSION

01 24.09.2010 CUP CUP YDB SECOND SUBMISSION

00 21.08.2010 CUP CUP YDB FIRST SUBMISSION


INITIALS SIGN INITIALS SIGN INITIALS SIGN DETAILS OF REVISION
REV DATE
PREPARED CHECKED APPROVED
Please mention which signals
are going to/coming from DCS
or HT Switchgear and which are
all the signals used in BTS
panel itself for better
understanding.

You might also like