You are on page 1of 4

Bill of Quantity

CNG Sorong 2 MMCFD or ~ 70000 m3

Description Qty.

Mother Station

1 Piping System (from piping gas to compressors), min flow 3000 nm3/h 1 lot
2 Metering System (follow standard Migas) 2 (1+1) unit
3 Scrubber 2 (1+1) unit
4 Dryer 2 (1+1) unit
5 Compressors Capacity min. 1250 nm3/h 4 (2+2) unit
6 Compressors Driven (electrical motor) 2 (2+2) unit
Civil Work, included office and control room,
7 compressor foundation, shelter, fences, 1 lot
walk away and operator mess
8 Plant Air & Instrument Air System 1 lot
9 Fire Fighting System 1 lot
10 Electrical System 1 lot
11 SKPP & SKPI 1 lot
12 Custome clearance 1 lot
13 Mob demob 1 lot

Daughter Station Sorong

1 PRU Capacity 1000 nm3/h (double train) include electric hot water system 1 unit
2 Metering System 1 lot
3 Piping System 1 lot
4 Filters 2 unit
5 GTM 40FT Cap 7200 7 unit
6 Head Truck (Rental - Opex) 6 unit
7 Chasis (Rental - Opex) 6 unit
8 Parking & Unloading Area (by customer) 1 lot
9 Canopy to protect PRU System (by customer) 1 lot
10 Mob demob 1 lot

Mother Station - Jetty

1 Head Truck (Rental - Opex) 6 unit


2 Chasis (Rental - Opex) 5 unit
3 GTM 40FT Cap 7200 7 unit
4 Parking & Loading Area (at Jetty) 0 lot

Operation cost (USD)


Chasisrental/m 25 mIDR/m
Headtruck rental/m 66 mIDR/m
LCT rental/m 500 mIDR/m
Bill of Quantity
NG Sorong 2 MMCFD or ~ 70000 m3

Unit Price Total Price Remark

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
Sub Total 0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total 0.00

0.00
0.00
0.00
0.00
Sub Total 0.00

0.00
0.00
0.00
0.00

You might also like