You are on page 1of 15

Kennel Runs

Installation Manual
Table of Contents
Pre-Installation......................................................... 2
Hardware Identification....................................... 2-3
Troubleshooting...................................................... 3
General Installation ........................................... 4-10
Free Standing including Raised Floors & Drain Systems

Installation Amendment “A”......................................... 11


Side (Isolation) Panel to Existing Wall
Installation Amendment “B”................................... 12-13
Existing Wall Mount
Care & Cleaning.................................................... 14
Product Warranty................................................... 15
Pre-Installation Check
• Open all packaging carefully and • Verify that the runs will fit the
inspect for damage. Identify and installation area by double checking
report shipping damage as soon as the area’s dimensions. The outside
possible.To protect against scratches depth can be 58" or 72" long.The height
and damage during assembly, is 72" without the floor frame and 81"
DO NOT REMOVE protective with the floor frame. Available run width
film until assembly is finished. openings are:
A. 35" outside-to-outside on frame.
• Confirm quantity and type of side
panels, gate assemblies, and back B. 47 3/8" outside-to-outside on frame
panels required for your specific with standard door and front panel.
installation.

Tools/Parts Required
• #3 Phillips drive head screwdriver (for 1/4-20 screws)
• 7/16" open end wrench, nut driver or drive socket (for 1/4-20 nuts)
• 5/16" socket (self drill/tap screws)
• Electric drill/screw driver
• Square (to square run after assembly before final tightening)
• Level (to confirm slope of run assembly before final tightening)
• Silicone anti-fungus sealant (to seal the side panels and/or front-back panels to the floor)
Several silicone brands are available at your local hardware supplier.

Hardware
Hardware is based on your specific installation and could include the following:
See figure 1A for picture identification.
• Bracket “A” • 1/4-20 Acorn Nut
• Bracket “B” • 1/4-20 x 1 1/2" Screw
• Bracket “C” • 1/4-20 x 1 3/4" Screw
• Bracket “D” (only used in middle of front panel) • #10 Self Drilling & Tapping Screws
• Bracket “E” (for raised floors and drain systems) • 1/4 Split Lock Washer
• Bracket “F” (for raised floors and drain systems) • Floor Frame Leveling Mounts
• Bracket “G” (only used on front panel) • LDPE Spacer
• 1/4-20 Locking Nut • 3/8" Diameter Plug
Depending on your specific installation, the quantity of these parts may vary.
Due to local building codes or local construction practices, anchoring hardware used to
secure kennels to existing walls shall be supplied by the customer. VSSI recommends
anchoring hardware be stainless steel.
2
Hardware continued

BRACKET A BRACKET B BRACKET C BRACKET D


PN 610-0441-04 PN 610-0441-02 PN 610-0441-07 PN 610-0441-12

1/4-20 LOCKING NUT 1/4" ACORN NUT


BRACKET E BRACKET F BRACKET G PN 818-2500-01 PN 818-2500-02
PN 610-0441-00 1310-0441-04 PN 610-0441-08

1/4" SPLIT LOCK WASHER


#10 SELF DRILL/TAP SCREW
1/4-20 X 1 1/2" SCREW 1/4-20 X 1 3/4" SCREW PN 819-2500-04
PN 814-1005-10
PN 816-2515-04 PN 816-2517-02

FLOOR FRAME LEVELING MOUNTS LDPE SPACER 3/8" DIAMETER PLUG


PN 816-3110-03 PN 811-3910-00 PN 813-0375-00

FIGURE 1

Troubleshooting
In the event that a problem occurs, a VSSI factory technician is ready to assist you. Please
call VSSI for assistance before attempting any repairs.
VSSI Technical Support: 1-800-299-9525

3
General Installation Information
The assembly procedure is similar for all Begin kennel assembly by installing the
run styles. long leg of three Bracket “C” to the back
For safe installation and to prevent damage end of left or right end side panel using
to kennel run panels, work area should be the brackets slots closest to the bracket
clean and free of debris. corner and the pre-drilled panel holes,
attach with 1/4-20 x 1 1/2" screws and
DO NOT remove plastic protective coating 1/4-20 locking nuts. On the gate end of left
from wall surfaces until installation is or right side panel install two Bracket “C”,
complete. one bracket at the top and one bracket at
the bottom using the brackets slots closest
1. Side End Panel. to the bracket corner and the pre-drilled
(single & side-by-side)
panel holes attach with 1/4-20 screws
For ease of installation, mount Brackets “C” and 1/4-20 locking nuts.
and “D” to side panels only with 1/4-20 x
1 1/2" screws and 1/4-20 locking nuts, one Install the long leg of Bracket “D” to the
kennel run at a time is recommended.This middle pre-drilled panel hole on the gate
will assist in determining left end, right end, end of side panel and attach with 1/4-20
and middle panel assemblies. Hardware x 1 3/4" screws and 1/4-20 locking nuts.
should only be snugged at this time and DO NOT FULLY TIGHTEN ATTACHING
tightened when installation is complete. SCREWS AND NUTS UNTIL KENNEL IS
For side panel assemblies for single and FULLY ASSEMBLED, SQUARED, AND
side-by-side kennels, see Figures 2 thru 4. CHECKED FOR LEVEL.

On back end of left or


BACK END OF SIDE PANEL
right side panel, attach
BRACKET “C”
the long leg of 3 Bracket
1" BACK PANEL ALLOWANCE
“C” using the slot closest
to the bracket’s corner
RIGHT END SIDE PANEL

and the pre-drilled panel


LEFT END SIDE PANEL

1/4-20 X 1 1/2" SCREW


1/4-20 LONG LEG OF holes.
LOCKING BRACKET “C”
NUT
On gate end of left or
right side panel, attach
the short leg of 2 bracket
“C” to the pre-drilled
1" GATE ALLOWANCE holes on the top and
GATE END OF SIDE PANEL bottom of the side panel.
Attach 1 Bracket “D” to
SIDE PANEL ASM FOR LEFT OR RIGHT END SIDE OF KENNEL – (top view) the middle pre-drilled
(Single and side-by-side kennel runs)
hole of the side panels.
See Figure #4.
For assembly ease, attach Bracket “C” to side panel as shown prior to attaching back & gate
panels. DO NOT TORQUE SCREW & NUT DOWN until kennel is fully assembled and squared.
FIGURE 2
4
General Installation continued
BACK END OF SIDE PANEL On back middle side panel, attach the
BRACKET “C”
long leg of 6 Bracket “C” using the slot
1" BACK PANEL ALLOWANCE closet to the bracket’s corner and the
pre-drilled panel holes.
On gate end of middle side panel,

MIDDLE SIDE PANEL


1/4-20 X 1 3/4" SCREW
1/4-20 attach the short leg of 4 bracket “C”
LOCKING
LONG LEG OF BRACKET “C”
NUT to the pre-drilled holes on the top
and bottom of the side panel. Attach 2
Bracket “D” to the middle pre-drilled
hole of the side panels. See Figure #4.

1" GATE ALLOWANCE


For assembly ease, attach Bracket “C”
to side panel as shown prior to at-
taching back & gate panels. DO NOT
GATE END OF SIDE PANEL
TORQUE SCREW & NUT DOWN until
SIDE PANEL ASM FOR MIDDLE SIDE PANELS OF KENNEL (top view) kennel is fully assembled and squared.
FIGURE 3
MIDDLE SIDE PANEL

1/4-20 X 1 3/4" SCREW

1/4-20 LOCKING NUT

DO NOT TORQUE SCREW & NUT


1" GATE ALLOWANCE DOWN until kennel is fully assem-
bled & squared.
BRACKETS “D” BRACKET “D”
SHORT LEG TOWARD GATE

GATE PANEL SIDE OF MIDDLE SIDE PANEL

MIDDLE GATE PANEL (top view)

FIGURE 4

2. Back Panel Installation


Attach back end of end side panel to back On other side of back panel, attach either
panel 1/4-20 x 1 1/2" screws and 1/4-20 a middle side panel or side end panel with
locking nuts. Adjust bracket to allow both the 1/4-20 x 1 1/2" screws and 1/4-20
panels to be flush and square with each locking nuts. Adjust brackets to allow all
other. See figure 5. panels to be flush and square with each
other. See figures 5 and 6.

5
General Installation continued

MIDDLE SIDE
1/4-20

PANEL ASM
LOCKING 1/4-20
NUT LOCKING
NUT
LEFT OR RIGHT END

BACK PANEL
SIDE PANEL ASM

BACK PANEL BACK PANEL

1/4-20 X 1 1/2" SCREW


1/4-20 X 1 1/2" SCREW

LEFT OR RIGHT END SIDE PANEL & BACK PANEL (top view) MIDDLE SIDE PANEL & BACK PANEL (top view)

FIGURE 5 FIGURE 6
DO NOT TORQUE SCREW & NUT DOWN until kennel is leveled, squared, & fully assembled

3. Attaching Gate Panel


Gate in gate panel must open out from Figure 7. Install door handle and latch
the kennel but may be installed to allow after fully assembling kennel panels, see
swinging to the right or to the left, see Door Handle and Latch Assembly Section.
continued

3' GATE ASM, 3' GATE ASM, 3' GATE ASM, 3' GATE ASM,
LEFT HANDLE, RIGHT SWING RIGHT HANDLE, LEFT SWING LEFT HANDLE, RIGHT SWING RIGHT HANDLE, LEFT SWING

4' GATE ASM, LEFT PANEL, 4' GATE ASM, RIGHT PANEL, 4' GATE ASM, LEFT PANEL, 4' GATE ASM, RIGHT PANEL,
RIGHT HANDLE, LEFT SWING RIGHT HANDLE, LEFT SWING RIGHT HANDLE. LEFT SWING RIGHT HANDLE, LEFT SWING
ALTERNATE: LEFT PANEL, ALTERNATE: RIGHT PANEL, ALTERNATE: LEFT PANEL, ALTERNATE: RIGHT PANEL,
LEFT HANDLE, RIGHT SWING LEFT HANDLE, RIGHT SWING LEFT HANDLE, RIGHT SWING LEFT HANDLE, RIGHT SWING

GATE SWING OPTIONS

FIGURE 7
6
General Installation continued
LEFT END SIDE PANEL

MIDDLE SIDE PANEL


RIGHT SIDE PANEL

END SIDE PANEL


1/4-20 X 1 1/2" SCREW 1/4-20 X 1 1/2" SCREW
BRACKET “C”

BRACKET “C” (Attached to Side Panels)

(Attached to Side Panels)

GATE PANEL GATE PANEL GATE PANEL

1/4-20 LOCKING NUT 1/4-20 LOCKING NUT

GATE PANEL & LEFT & RIGHT PANELS (top view) GATE PANEL & END & MIDDLE PANELS (top view)

FIGURE 8 FIGURE 9
DO NOT TORQUE SCREW & NUT DOWN until kennel is leveled, squared, & fully assembled.

If gate panel is three foot wide, determine Four foot gate assemblies not assembled
gate’s swing and install gate panel to at factory may be assemble as noted above
mating side panels. Lock in place with or assembled with Bracket “G”. Determine
1/4-20 x 1 1/2" screw and 1/4-20 locking gate’s swing and which side front panel
nuts. See figure 8 & 9. will be installed. Install front panel to
gate panel with the two Bracket “G” and
Four foot gate assemblies are usually
1/4-20 x 1 1/2" screws and 1/4-20 locking
assembled at factory. In the event that the
nuts on top and bottom of both panels.
front panel or gate needs to be changed,
See Figure 11.
determine gate’s swing and which side
front panel will be installed. Remove and Install four foot wide gate/front panel
retain the three factory installed bolts and assembly to mating side panel as noted
nuts that join the gate’s outer frame and in Figures 8 and 9.
front panel, and re-install keeping the bolt
head between the inner and outer gate
frame with the nut on the panel side.
See Figure 10.

FACTORY FACTORY 1/4-20


INSTALLED BOLT INSTALLED NUT LOCKING
NUT BRACKET “G”
INNER GATE FRAME

OUTER GATE FRAME

FRONT PANEL GATE PANEL


FRONT PANEL

1/4-20 X 1 1/2"
VSSI RECOMMENDED 4' FRONT PANEL & GATE ASM SCREW
PANEL ASM – FACTORY ALTERNATE 4' FRONT PANEL & GATE ASM
THREE SCREWS AND NUTS ATTACH GATE FRAME TO FRONT PANEL PANEL ASM (top view)
FIGURE 10 FIGURE 11

7
General Installation continued
4. Door Latch and
Latch Assembly
Locking plate
Once the run assembly has been
on latch may
completed, fasten the latch assembly
require removal
to the front of the gate frame with four
and re-install to
1/4-20 x 1 1/2" screws , split lock washers
match swing
and 1/4" acorn nuts. See figure 13A.
of gate.
Unless ordered otherwise, latch assembly Locking plate
is assembled for left swing. For right swing, must move freely
latch assembly must be taken apart, locking and catch on handle
plate flipped 180°, and re-assembled prior when released.
to installing on outer frame of kennel gate.
See figure 12.
FIGURE 12
Install the handle assembly to each door
using four 1/4-20 x 1 1/2" screws, split 1/4" SPLIT LOCK WASHER
lock washers and 1/4" acorn nuts. Adjust 1/4-20 LOCKING NUT
1/4-20
the handle assembly to properly mate into ACORN
the latching assembly. Alignment of the NUT

gate and gate hinge may be required to


properly fit latch assembly. See figure 13B.
LATCH ASM GATE OUTER FRAME

5. Raised Floor Assembly Latch


If your installation does not include a plate
raised floor, skip to step number 6 or 7. must fall
freely on
Screw leveling floor mounts into the
its own
threaded inserts in all floor frame legs.
weight
Place floor frame assembly with the GATE LATCH ASM (side view)

leveling mounts on the floor and with FIGURE 13A


level, adjust all leveling mounts until floor
1/4" SPLIT LOCK WASHER
frame is level. If your specific installation
1/4-20 LOCKING NUT
includes more than one floor frame, level
1/4-20
each individual frame as noted prior to ACORN
NUT
further assembly.
Lay drain system pan on level frame.
Position the drain opening to match HANDLE ASM
GATE FRAME
to existing plumbing access. AVOID
STEPPING ON FLOOR PAN AFTER Adjust as
INSTALLING INTO FLOOR FRAME. required
See Figure 15. using the
Install drain basket into drain spud and fin- mounting
ish plumbing. Position kennel run on floor slots
GATE HANDLE ASM (side view)
frame and anchor as noted in Figure 16.
FIGURE 13B
8
General Installation continued

DRAIN SYSTEM PAN

DRAIN SPUD
MAY BE INSTALLED
FRONT OR BACK

TYP FRAME LEGS


FLOOR FRAME LEG FLOOR
FRAME

FLOOR FRAME FOOT

Install floor frame feet into frame legs


FIGURE 14 FIGURE 15

END PANEL SITS SHARED PANELS


1/2 OFF FRAMES GATE BACK
PANEL BACK PANEL SITS PANEL SITS 1/2 ON
END TWO FRAMES SHARED
SIDE 1/2 OFF FRAME SIDE
SIDE (MIDDLE)
1/2" PANEL PANEL
OVERHANG GATE
ON SIDES PANEL
& BACK FLUSH
1/2" 1/2"
FLAT FLOOR SHARED W/ FRONT OF STEP FLOOR
OVERHANG OVERHANG
MOUNTING PLATE & (MIDDLE) FLOOR FRAME MOUNTING PLATE &
ON SIDES
#10 SELF DRILL PANELS #10 SELF DRILL
SIDE END PANEL & BACK
& TAP SCREWS SITS 1/2 & TAP SCREWS
(Do Not Install On ON TWO VIEW OF KENNEL BANK
Slider Gate Panels) FRAMES

GATE PANEL VIEW OF KENNEL BANK BACK PANEL VIEW OF KENNEL BANK

FIGURE 16

6. Sloping Floor Final


Installation and Assembly
If your installation is installed using the attached to the bottom (floor end) of side
existing floors, assemble mating kennel panel. Channel will assist leveling side
panels per your application as noted. panels on floors with up to 1/4" per
Completed panel assemblies will then 1' slope.To install “U”, channel, if not
need to be anchored level and square installed at factory, remove all screws from
before completely torquing down the bottom of both sides of the side panel.
hardware. Slip “U” channel on bottom of panel, level,
To level side panels on sloping floors, and re-install #10 self drill/tap screws to
a floor “U” channel may be required to be both sides of panel. See figure 17.
9 continued
General Installation continued
Installation of Back Panel Floor Cover
To fill gap between back panel and floor
on sloped floors, install Back Panel Floor BOTTOM EDGE OF SIDE PANEL

Cover to the back panel by removing the


bottom screws on the back panels only.
Apply 1/4" minimum bead of an anti-
fungus silicone sealant to floor edge of
back panel floor cover. Place the floor
cover on the floor so that the edge is
under the panel. Attach to bottom of back FLOOR "U" CHANNEL
panel with self drill/tap screws.
#10 SELF DRILL/TAP SCREWS
See Figure 18.
FIGURE 17

KENNEL RUN
SIDE PANEL W/
SLOPING FLOOR
CHANNEL

KENNEL RUN
BACK PANEL
SELF DRILL/TAP
SCREWS
Apply silicone
to seal kennel
to floor
BACK PANEL
FLOOR COVER FLOOR EDGE POSITIONED
UNDER BACK PANEL

FIGURE 18

7. Final Assembly
Completely install each kennel until panel. Attach the step mounting plate with
kennel bank is complete repeating the four #10 self drilling & tapping screws to
same installation order noted above. the back of floor frame & back panel.
When complete, confirm the square of the
Install the PVC coated floor panels on the
gate and side panels. If necessary, shim for
floor frame. Lay first two floor panels on
uneven floors between the bottom edges
sides of floor frame/drain panel and slide
of the run and the floor.Tighten all 1/4-20
to back of run.To install third floor panel,
screws and locking nuts. Remove plastic
step into run and slide toward the front
protective coating from panels. Seal all
of run.
panels to the floor with 1/4" minimum
bead anti-fungus silicone sealant. Floor panels are not designed to hold a
human over 250 lbs for 3' panels and
Attach flat floor mounting plate with four
200 lbs for 4' panels.
#10 self drilling and tapping screws to
front of floor frame and bottom of front
10
Side (Isolation) Panel to
Amendment “A” - Existing Wall Mounting

The following manual is provided to assist


in the installation of Kennel Side Panels to
an existing wall.
Panel Assembly.
The assembly procedure is similar for all
run styles.
For safe installation and to prevent damage
to kennel run panels, work area should be
clean and free of debris.
DO NOT remove plastic protective coating
from panel surfaces until installation is
complete.

Installation of Side Panel to Wall


For ease of installation, mount two
Brackets “C” to bottom of side panel on
the wall side of panel with 1/4-20 X 1 3/4"
screws and 1/4" locking nuts. Hardware
should only be snugged at this time and
tightened when installation is complete.
See Figure A1. ROOM WALL

Slip 2 Bracket “B” in area between the end


tube and 3/8" diameter rod. Locate one BRACKET “B”
Bracket “B” under top panel tube and one
Bracket “B” on top of isolation area of
panels for proper spacing of brackets.
See Figure A1.
BRACKET “B”
Square and level side panel and anchor
all brackets securely to wall. VSSI
SIDE PANEL’S
recommends using stainless steel
SIDE PANEL ISOLATION AREA
anchoring hardware. Anchoring hardware
will be supplied by customer and is to be
consistent with current building codes for
given wall materials.
BRACKET “C”
(both sides)

1/4-20 X 1 3/4" SCREW


&
1/4-20 LOCKING NUT

FIGURE A1

11
Amendment “B” - Existing Wall Mounting
The following manual is provided to assist
in the installation of VSSI Kennel Run
Gate/Frame Assembly to an existing wall
or wall opening. For safe installation and
to prevent damage to kennel run panels,
work area should be clean and free of
debris.
The assembly procedure is similar for all
run styles.
DO NOT remove plastic protective coating
from panel surfaces until installation is
complete.

a. INSIDE GATE OPENING MOUNT,


NO BRACKETS - See Figure B1
Gate assembly may be mounted inside an
existing wall opening using the 3 pre-drill
Ø 3/8" holes drilled through each side of
the gate’s outer frame. Mounting bolt
heads should be low profile to prevent SS WASHERS OR
ANCHOR
interference with swing of gate. LDPE SPACER
(IF REQ'D) LOW PROFILE HEAD
LAG BOLT
VSSI recommends using stainless steel GATE OUTER FRAME
anchoring hardware to anchor kennel BUILDING
WALL
panels to wall. Anchoring hardware will
be supplied by Customer to be consistent
with current building codes for given wall
materials. VSSI'S PERFERRED MOUNTING METHOD
INSIDE GATE OPENING MOUNT
Shimming between the gate assembly
FIGURE B1
outer frame and existing wall may be
required. Flat 3/8" ID stainless steel ANCHORS LOCK WASHER
BOTH SIDES
washers or 3/8" ID LDPE spacers. LDPE BUILDING
LAG BOLT
WALL
spacers come in 1/2", 3/4" and 1" lengths OUTSIDE
BOTH SIDES

and may be cut to fit application. RUN


GATE OUTER FRAME

b. OUTSIDE GATE OPENING MOUNT


WITH BRACKET “A” - See Figure B2
Gate assembly may be mounted outside BRACKET “A”
existing wall opening VSSI'S PERFERRED MOUNTING OUTSIDE METHOD
Recommend 3 brackets per side. OUTSIDE GATE OPENING MOUNT WITH BRACKET “A”

FIGURE B2
continued

12
Amendment “B” continued
c. OPTIONAL MOUNTING OPTION
BUILDING WALL
Inside gate opening with INSIDE RUN LOCK WASHER BOTH SIDES
Bracket “A”- See Figure B3. LAG BOLT BOTH SIDES
ANCHORS
Gate assembly may be mounted inside
existing wall opening with Bracket “A”
and 2 anchor bolts per bracket. GATE OUTER FRAME
Recommend 3 brackets per side.

d. OPTIONAL MOUNTING OPTION


Inside gate opening with
BRACKET “A”
Bracket “B”-See Figure B4
INSIDE GATE OPENING MOUNT WITH BRACKET “A”
Gate assembly may be mounted inside
existing wall opening with Bracket “B” FIGURE B3

and 2 anchor bolts per bracket.


LOCK WASHER BOTH SIDES
Recommend 3 brackets per side.
LAG BOLT BOTH SIDES

BRACKET “B”
GATE OUTER FRAME

ANCHORS
BUILDING
WALL

INSIDE GATE OPENING MOUNT WITH BRACKET “B”

FIGURE B4

13
Care and Cleaning
PROPER CARE OF STAINLESS STEEL WILL PREVENT RUSTING
There is an invisible passive film on all Avoid cleaners containing quaternary
stainless steel that acts as a shield against salts. Consult your cleaner supplier
corrosion. As long as this film is properly for these types of products. Use
cared for, the metal is protected from recommended strength for cleaning
corrosion.The following tips will assist 4.) Use soft water – this reduces
you in this cleaning process. deposits. Consult your treatment
1.) Use non-abrasive tools - specialist for the proper filters to
A) Soft cloths eliminate corrosive elements
B) Plastic scouring pads 5.) Clean frequently to avoid build-up of
C) Stainless steel pads (scrubbing hard, stubborn stains
motion must be in the direction 6.) Rinse thoroughly – wipe dry
of the polishing marks) immediately - allow to air dry
D) Do not use - steel pads, wire
brush, or scrapers Do not let water or cleaner set
on stainless steel - wipe off
2.) Clean or scrub in the same direction immediately
of the visible polishing lines
7.) Never use Hydrochloric acid
3.) Use alkaline, alkaline chlorinated, or (muriatic acid) on stainless steel
non-chloride containing cleaners.

RECOMMENDED CLEANERS
JOB CLEANING AGENT COMMENTS
Routine cleaning Soap, Ammonia, Detergent, Use cloth or sponge
Medallion, Foamquat™
Fingerprints, smears Arcal 20, Lac-O-Nu, Ecoshine Provides barrier film
Stubborn stains Cameo,Talc, Zud, First Impression Rub in direction of
or discolorations polish lines
Grease, fatty acids, blood Easy-off, De-grease it, Oven aid
Grease and oil Any good commercial detergent Use cloth or sponge
Restoration/Passivation Bonefir, Super Sheen

CAUTION: DO NOT USE CHLORINE BASED PRODUCTS!


Please call VSSI, Inc. with any questions you may have. 1-800-299-9525

14
Product Warranty
This product is warranted for 1 year from the date of delivery
to the original purchaser only. Warranty is only applicable if
customer complies with all instructions and specifications
furnished by VSSI, Inc. relating to installation, care, and application.
Customer agrees that they will not modify, misapply, or misuse
product in any manner which deviates from the VSSI, Inc.
instructions. Any repairs, alterations, or services provided by
parties other than VSSI, Inc. or its authorized representatives
may void warranty.The buyer is responsible for all
freight charges on returned items.

Product Satisfaction Policy


In the event that the customer is not fully satisfied with the products
purchased, VSSI, Inc. may, at its own discretion, arrange for the customer’s
account to be credited (excluding shipping charges) or replace the product.
The customer must notify VSSI of any claim of nonconformity or defect in
writing within 30 days from the date of receipt.The product must be
returned to VSSI in its original packaging, undamaged and showing no
unusual wear within 20 days of the customer’s written notice.

To return an item, follow these simple instructions:


• Call VSSI, Inc. for complete instructions (800-299-9525)
• A sales representative will give you a Return Authorization Number
• If a Restocking Fee applies, you will be informed at this time
• Label the boxes with this Return Authorization Number
(All items must have a Return Authorization Number)
• Return the items, postage/freight prepaid

If necessary, the VSSI sales representative will assist you with


freight arrangements.

Note: Custom orders and/or custom colors may not be returned.

, INC.

#1 Civil War Road - Area 5 • P.O. Box 431 • Carthage, MO 64836


1-800-299-9525 • fax 417-358-4716
email vssi@vssi.com • www.vssi.com

15