CASS TOES FOR THE OVERALL SAFETY LIFECYCLE ASSESSMENT (IEC 61508-1: 2010)

For general guidance on using CASS conformity assessment documents, refer to: ‘ Guidance for assessors on using the CASS TOEs’ available from www.61508.org/cass
Standard Version used: IEC 61508-1:2010
In the table below, E/E/PES is used as an abbreviation for Electrical/Electronic/Programmable-Electronic safety-related System
For every TOE, generally the rigour shall increase with increasing SIL

TOE Referring IEC 61508


Target of Evaluation (TOE) Purpose of TOE Comments
Ref. Clauses and Tables
1 Overall Safety Life-cycle To structure the development of the overall 1/7.1
project into defined phases and activities that 1/Figure 2
will allow the functional safety of the overall 1/Table 1
project to be developed, maintained, verified
etc.
2 Concept Documentation To develop a level of understanding of the 1/7.2
Equipment Under Control (EUC) and it’s 1/ Table 1 Phase 1
environment (physical, legislative etc.) to
enable other safety life-cycle activities to be
carried out satisfactorily.
3 Fully Installed E/E/PES To implement all the requirements of the 1/7.13.2.1
Overall Installation Plan 1/Table 1 Phase12
4 Fully Commissioned E/E/PES To implement all the requirements of the 1/7.13.2.3
Overall Commissioning Plan 1/Table 1 Phase12
5 Overall Installation To report the results of the overall installation 1/7.13.2.2
&Commissioning Records & commissioning activities 1/7.13.2.4
1/Table 1 Phase12
6 Overall Scope Definition To determine the boundary of the overall 1/7.3
Documents project and determine the scope of the 1/Table 1 Phase2
hazard & risk analysis. E.g. process,
environmental hazards etc.

7 Overall Safety Plan To outline when, how and by whom specific Management Of Functional
phases within the Overall Safety Life-cycle Safety: 1/6.2.2 to
shall be performed. 1/6.2.18

528291337.doc Page 1 of 3 © The CASS Scheme Limited 2016


CASS TOES FOR THE OVERALL SAFETY LIFECYCLE ASSESSMENT (IEC 61508-1: 2010)

TOE Referring IEC 61508


Target of Evaluation (TOE) Purpose of TOE Comments
Ref. Clauses and Tables
8 Hazard & Risk Analysis Report To report the results of the hazard and risk 1/7.4
analysis throughout the overall life-cycle 1/Table 1 Phase3
9 Overall Safety Requirements To specify the overall safety requirements in 1/7.5
Specification terms of the Safety Functions 1/Table 1 Phase4
Requirements and the Safety Integrity
Requirements for all safety related systems
and other risk reduction facilities in order to
achieve the required functional safety for the
project.
10 Overall Safety Requirements To report on: 1/7.6
Allocation Report a) the allocation of each safety function and 1/Tables 2 & 3
it’s associated safety integrity requirement 1/ Table 1 Phase5
to the designated safety system or other 1/Figure 6
risk reduction facility
b) the allocation of a Safety Integrity
Level (SIL) and target failure measure
to each safety function.
11 Overall Safety Validation Plan To define the steps/procedures for the overall 1/7.8
safety validation of the E/E/PE safety related 1/Table 1 Phase7
systems against the Overall Safety
Requirements Specification.
12 Overall Operation and To define the steps/procedures for operating 1/7.7
Maintenance Plan & maintaining the E/E/PE safety related 1/Figure 8
systems to ensure the required functional 1/Table 1 Phase6
safety of the overall system is maintained 1/Figure 7
during operation, testing & maintenance
13 Overall Installation & To define the steps/procedures for installing & 1/7.9
Commissioning Plan commissioning the E/E/PE safety-related 1/7.9.2.1
system in a controlled manner to ensure the 1/7.9.2.2
required functional safety is achieved 1/Table 1 Phase8

528291337.doc Page 2 of 3 © The CASS Scheme Limited 2016


CASS TOES FOR THE OVERALL SAFETY LIFECYCLE ASSESSMENT (IEC 61508-1: 2010)

TOE Referring IEC 61508


Target of Evaluation (TOE) Purpose of TOE Comments
Ref. Clauses and Tables
14 E/E/PE System Safety To define the E/E/PE System Safety 1/7.10 This shall be issued to the safety system
Requirements Specification Requirements Specification 1/Table 1 Phase9 developer
15 E/E/PE safety-related systems: To create the E/E/PE safety-related systems 1/7.11 System design Requirements Specification
realisation phase deliverables conforming to the E/E/PE System Safety Parts 2 & 3 Software Safety Requirements Specification
Requirements Specification 1/Table 1 Phase10 See E/E/PES & Software TOEs
16 OTHER Risk Reduction measures: To confirm delivery of all other risk reduction 1/7.12 No 61508 requirements.
Specification and realisation facilities which have been specified as part of 1/Table 1 Phase11 Show evidence of delivery against Overall Safety
phase deliverables the overall safety system Requirements Specification
17 Overall Safety Validation Records To report the results of the overall safety 1/7.14 Appropriate levels of rigour for relevant SIL
validation against the Overall Safety 1/Table 1 Phase13
Requirements Specification
18 Overall Operation, Maintenance & To report the results of any operation, 1/7.15 Appropriate levels of rigour for relevant SIL
Repair Records maintenance & repair activities 1/Table 1 Phase14
19 Overall Modification & Retrofit To report the results of any modification & 1/7.16 Appropriate levels of rigour for relevant SIL
Records retrofit activities, indicating any impact on the 1/Table 1 Phase15
level of functional safety of the overall system 1/Figure 9
20 Decommissioning/disposal Plans To report the probable impact and results of 1/7.17
& Records decommissioning and disposal activities. 1/Table 1 Phase16
21 Verification Documentation To demonstrate for each phase of the life- 1/7.18
cycle, by review, analysis or test
documentation, that the outputs for the phase
meet the specified requirements.

528291337.doc Page 3 of 3 © The CASS Scheme Limited 2016