STAGE 1
STAGE 3
A
DIG HOLE TO 500MM DEEP MIN A
DIG DRAINAGE (IF APPLICABLE) AND DUCT TO CABINET BACK FILL WITH C35 CONCRETE
DUCT TO BE APPROX 70mm WITH MIN 200mm RADIUS ON BENDS UP TO DESIRED LEVEL
CAREFULLY POSITION PIT LINER USING MEASURMENTS (THIS CAN BE TO FINISHED FLOOR LEVEL
ENSURE IT IS LEVEL IN ALL DIRECTIONS OR BELOW TO ALLOW FOR PAVING, TARMAC ETC)
FINISHED PIT MUST BE 100MM MINIUM AWAY FROM NB - TAKE CARE NOT TO LET THE CONCRETE TO
ADJACENT WALLS OR HANDRAILS TO AVOID ENTRAPMENT BEND IN THE SIDE WALLS OF THE PIT LINER
IT IS RECOMMENDED TO BRACE THE INSIDE
CONNECT UP DRAINAGE WALLS BEFORE POURING
CONNECT UP DUCT
POSITION 6MM RE-BAR 2 EITHER SIDE
B
AND 2 AT REAR CROSSING OVER
75MM UP FROM BASE
B
POSITION SEVERAL VERTICAL RE-BAR TO
TIE IN BACK FILL
C C
STAGE 4
FINISH FLOOR SURFACE UP TO STAINLESS FRAME
STAGE 2
D D
A A
B B
C C
D D
A A
90 35
130
C
(Dimensions not back box to the control C
64
METAL DOUBLE GANG
BACK BOX
DO NOT SCALE DRAWING REVISION
PRESSURE
GAUGE
B B
726 **800
C C
D D
AVAILABLE WITH KEY SWITCH AUTHORISATION NAME SIGNATURE DATE TREATMENT: DRAWING NOTES :
DRAWN DEBUR AND BREAK SHARP EDGES
CHK'D
A A
126
B B
C C
LIFT SUPPORTED
IN DOWN POSITION
D D
DETAIL A
SCALE 1 : 5
622
A A
B B
C C
B
D D
PR9-4-1000 LOADINGS
1 2 3 4 SHEET 2 OF 2