1, Appointment of New Director General 1
2. Major achievements during tenure of
former DG Ex. Kesbab Kumar Sharma
Progress in Fiscal Year (RY) 2
Progress in current Fiscal Year (EY 207/078)
‘Ongoing National Pride Projects under Dok
Falling Weight Deflectometer WD)
‘Quality Research and Development Centre (QRDC)
1, Appointment of
new — Director
General
Br Axjun Jung Thapa bas
ben appointed as a nes
Director General (DG) of
Dok and welcomed by
Do staffs in DoR meeting
N] tat on 17% February,
fe | 2021. In the meantime,
Tomer DG Et Keshab
Kamar Sharma was bade
farowell who hes been transfered to Ministry of Physical
Infrastructure and Transport (MePI7) in the positon of Joint,
Secretary In the program the new DG has expressed that Dol
will have following priorities in his ene
1. Revival of Bio-engincering by establishing nurseries and
implementing slope stabilization works in every road
under Divisions and Project ices
Planning, designing snd_consructin
buildings in all Federal Monitoring
Divisions Offices
3. Strengthen Laboratory facilites in all Road Divisions and
Projets Offices to enhience quslity of constriction and
‘maintenance works.
4. Revival of DoR Newsletter and publish it bi-annualy
5. Accelerate publication work of diferent. guidelines
‘and manuals that are useful for design, constuction,
‘Supervision and maintenance works
6 Finalize O&M Survey and make necessity plans for
modem office
tees and Road
7. Accelerate the preparation of typical Designs/Drawings.
Fo short an lng span bridges
8. Dudhkoshi Motorable Suspension Bridge 3
9. Web-based Applications in DOR 6
10, Strategic Road Connectivity & Trade Improvement
Project (SRCTIP) ‘
11. Nagdhunga Tunnel Construction Project, 7
12, Recent Road Safety Activities 0
13, List of National Highways 0
1M. Pile integrity Testing 2
15, Photographs of some major worksin reeent years 15
8, Establish DoR's ov state of at tining Center at Gajur
with modern fuiities.
9, Focus on Road Assets Management works of DOR.
1, Development of curriculum for tsining in different areas
2. Majorachievements during tenure (2019/4/01-
2021/02/16) of former DG Er. Keshab Kumar
Sharma.
1. Initiation of teste Connectivity and Trade
Improvement Project (SRCTIP)
2. Commencement of constructions work in Nagdhunga
Tune! Road Project.
Completion of Mugling(deck arch bridge) & Dhobikbola
(Network arch bridge) bridge.
4, Approval of Consulting Norms for Detail Feasibility
Study of Tunnel Works, and approval of Specification and
Norms for Tunnel Construction works in Engineering,
Procurement and Construction (EPC) modality
5. nitition of Kamala-Kanchanpur Road Project.
6. -Slurting of Mugling-Pokhara roud extension project under
ig Pokhara Highway Improvemnet Project,
(SMPHIP-ADB Project No. 52097-002)
7. Mobilization ofthe Consultant for preperation of Detail
Project Report for Pakali Kokarbbita and Pathluiya
Narayanglt Road
8, Improvement of road condition in Kathmandu valley.
9. Initiation of Organization & Management (0 & M) survey
of stats and submited for approval
10, Initiation of detail design of grade separated intersections
alo
Chowk.
Started the prompt uploading ofthe staff raner decision
inweb site
Completion of significant numberof bridge
the ring road, at Gwvarko, Saidobato & Ekantakuna