by: Group 2
Members:
Millano, Lester
Gasing, Rojene
Porlage, Roger
Pornelos, Eladio
Dineros, Lourence
Gasalatan, Aldrech
Ladao, Jimuel
Chapter 1
Introduction
The design is a Dam-Style Water Level Detector with Street Lights and House with
lightings.
Materials used:
Three BC547 NPN Transistors
Four 1k-ohm resistors
Three 330-ohm resistors
Two 9V batteries
Two meter wire
Illustration board
Popsicle Sticks
Green Color Paper
Paints (White and Red)
Seven LEDs
Buzzer
Cement and Sand
Soil
Two Battery Holders
Stick Glues
Wood (served as holder for the circuit)
Plywood
Rods of metals
Chapter 2
Methodology
Started with mixing and pouring the cement and sand to a piece of plywood for
flooring. Some rods of metals are used for the foundation.
The next day as the cement dried, the group started to make the dam walls with pre-
installed connecting wires for future convenience in electric installations.
Planned to connect the wires underground for the street lights and house lights,
the group digged the walls already before the cemented walls dry. The connection
of wires happened afterwards and the wires are buried with cement.
The group also dug up some depth in a wall for the location of the Water Level
Detector. The detector is fixed with a stick glue melted with the glue gun.
The lighting is done with the connection from the bottom of the house up with the
floors. The LEDs are the lighting elements with 1k-ohm resistors connected on
each positive leg of it.
The emitters are connected in the ground, the LEDs and the buzzer are connected in
the collector at the positive terminal of the battery (with 330-ohm resistors
connected in the LEDs) and the bases are the level indicators in the dam. A wire
connected from the positive terminal of the battery is also placed in the bottom
of the dam.
Special Mentions:
This project's idea and theme planning is done with Lester Millano.
In charge of the electrical installations and cement-moldings is for Rojene Gasing.
The works are also done with the assistance of Eladio Pornelos, Aldrech Gasalatan
and Jimuel Ladao.
Chapter 3
Photo Docs
1, 2 planning of the project
3-5 flooring of the dam
8 construction of the walls and pre-installation of the wires
9-12 (pahabol aldrech) Working out the project
13-14 house placing
15 soil putting
17 finishing of the house
19 placing the components in the dam
20 paintings and finishing works