Professional Documents
Culture Documents
0.5𝑘 𝑘 𝑓 𝑑
𝐿 . = ≥ 0.058𝑓 𝑘 𝑑
𝑘 𝑓
204
= 68𝑚𝑚
3
30 + 12 = 42𝑚𝑚
68
𝑐 = min 2 = 34𝑚𝑚 = 34𝑚𝑚
42𝑚𝑚
𝑘 = 1.0 Since there is less than 300mm of concrete below the bar.
132 − 28
𝑘 = = 1.04
100
0.15 × (34 − 28)
𝑘 = 1.0 − = 0.97
28
0.5 × 1.0 × 0.97 × 500 × 28
𝐿 . = = 1154𝑚𝑚
1.04√32
1(b)
𝑐 = 25 + 10 = 35𝑚𝑚
𝑘 = 1.0
132 − 24
𝑘 = = 1.08
100
0.15 × (35 − 24)
𝑘 = 1.0 − = 0.93
24
0.5 × 1.0 × 0.93 × 500 × 24
𝐿 . = = 1033𝑚𝑚
1.08√25
𝑇𝑜 𝑒𝑑𝑔𝑒 = 40 + 12 = 52𝑚𝑚
75
𝑐 = = 37.5𝑚𝑚
2
132 − 32
𝑘 = = 1.0
100
0.15 × (37.5 − 32)
𝑘 = 1.0 − = 0.97
32
0.5 × 1.3 × 0.97 × 500 × 32
𝐿 . = = 1595𝑚𝑚
1.0√40
1(d)
𝑇𝑜 𝑒𝑑𝑔𝑒 = 25𝑚𝑚
𝑐 = 25𝑚𝑚
𝑘 = 1.0
132 − 12
𝑘 = = 1.2
100
0.15 × (25 − 12)
𝑘 = 1.0 − = 0.84
12
0.5 × 1.0 × 0.84 × 500 × 12
𝐿 . = = 371𝑚𝑚
1.2√32
Self weight:
1.6
𝑀∗ = 180 × 1.4 + 4.7 × = 252 + 6 = 258𝑘𝑁𝑚
2
32
𝑑 = 400 − 35 − 10 − = 339𝑚𝑚
2
Assume the value in the brackets for the beam formula is approximately 0.9.
𝑀 ∗ ≤ 𝜙𝑀 = 𝜙𝐴 𝑓 𝑑 × (≈ 0.9)
258 × 10
𝐴 ≥ = 1989𝑚𝑚
0.85 × 500 × 339 × 0.9
32
𝐴 =𝜋× = 804𝑚
4
1989
→ 3 × 𝑁32 𝐵𝑎𝑟𝑠
804
2(b)
𝑇𝑜 𝑒𝑑𝑔𝑒 = 35 + 10 = 45𝑚𝑚
𝑐 = 45𝑚𝑚
132 − 32
𝑘 = = 1.0
100
0.15 × (45 − 32)
𝑘 = 1.0 − = 0.94
32
0.5 × 1.3 × 0.94 × 500 × 32
𝐿 . = = 1728𝑚𝑚
1.0√32
(c)
The effective development length then becomes 1565 + 864 = 2429 > 1728 ∴ 𝑂𝐾.