You are on page 1of 1

A B C D E F F E D C B" B' B A

5.5800 4.3500 0.8513 4.0022 2.0825


2.5500
2.5500 7.4300 4.3500 5.5800 2.5500
LONG SPAN COLOR ROOFING 2.5500 LONG SPAN COLOR ROOFING
CONCRETE BEAM
ROOF APEX ROOF APEX
2.5583 2.5583
TOP OF RC. COLUMN TOP OF RC. COLUMN
0.4000
BOT. OF CONCRETE BEAM 0.4000
BOT. OF CONCRETE BEAM
50mm x 100mm TUBULAR BAR 50mm x 100mm TUBULAR BAR 6" THK. CHB ON FIREWALL
6.6314 FOR SUN RAY BREAKER 6.6314 FOR SUN RAY BREAKER
4.9000
CAVITE - BATANGAS IRRIGATION
MANAGEMENT OFFICE
FIN. FLOOR LINE FIN. FLOOR LINE
FIN. GROUND LINE
0.20 0.20
STAINLESS LOGO AND SIGNAGE
FRONT ELEVATION SCALE
1:100 M
05
A 4 REAR ELEVATION SCALE
1:100 M
06
A 4
1 1' 2 3 4 5 6 6 5 4
5.4200 5.4200 5.4200 5.4200
2.8700
END ROOF CAPPING CONCRETE BEAM CONCRETE BEAM END ROOF CAPPING
2.8700 ROOF APEX ROOF APEX
2.5583 2.5583
125 MM thk. CHB WALL CEMENT
TOP OF RC. COLUMN TOP OF RC. COLUMN
1.0023 PLASTER W/ PAINTED FINISH
BOT. OF BEAM 0.4000 0.4000 BOT. OF BEAM
1.0037
1.0452
1.3977
6" THK. CHB ON FIREWALL 50mm x 100mm TUBULAR BAR 50mm x 100mm TUBULAR BAR
FOR SUN RAY BREAKER 6.6314 6.6314 FOR SUN RAY BREAKER
4.9000
FIN. FLOOR LINE FIN. FLOOR LINE
FIN. GROUND LINE FIN. GROUND LINE
0.20 0.20
LEFT - SIDE ELEVATION SCALE
1:100 M
07
A 4 RIGHT - SIDE ELEVATION SCALE
1:100 M
08
A 4
PROJECT TITLE : ARCHITECT : DRAWN BY : SUBMITTED : RECOMMENDED BY : APPROVED BY : SHEET CONTENT : SHEET NO :
P R O P O SE D ERWIN M. LUCELA ROMEO M. LOPEZ
REPUBLIC OF THE PHILIPPINES NICASIO C. PAGDANGANAN
MULTIPURPOSED COVERED
DESIGNED BY :
DIVISION MANAGER A , CBIMO MANAGER , ENGINEERING & OPERATION DIVISION Date REGIONAL MANAGER , RO IV-A Date A-4
NATIONAL IRRIGATION ADMINISTRATION COURT CUM WAREHOUSE
REGION IV-A , CAVITE-BATANGAS IMO PRC REG. NO : TIN :
RGLANDICHO
REVIEWED BY : AS SHOWN
LOCATION : IAPOA NO : DATE ISS :
NAIC , CAVITE PROVINCE
NIA- CAVITE FLIS / PROVINCIAL IRRIGATION MANAGEMENT OFFICE
IBAYO SILANGAN, NAIC , CAVITE PROVINCE
PTR NO : DATE ISS :
CADD BY : ROMULO M. ANGELES
CHIEF , ENGINEERING SECTION
4
ISSUED AT :

You might also like