Rainwater Drainage
Rainwater Drainage
Riser
Security under floor slab,under worktops
03 03 in ceiling etc. Exposed pipes shall
not be acceptable
Ø100 SHALLOW STORM DRAIN SHALLOW STORM DRAIN SHALLOW STORM DRAIN
TO S.E`S DETAILS TO S.E`S DETAILS TO S.E`S DETAILS GRATED GULLEY Cold water servises (cpvc pipe)
stair STAIR
LAB OFFICE
Hot water servises (cpvc pipe)
05 05
Ø150
Hot water return servises (cpvc pipe)
Fire fighting servises (G.I pipe)
GRATED GULLEY
TO C.E`S DETAILS
Ø100 RWP Ø150
one bed UP
06 doctor duty 06
Ø100 RWP
UP
room Ø100 RWP DN
TO FREE DISHCHARE
Female staff
STAFF LOUNGE
private room
Male staff
Ø100 RWP DN
08
TO FREE DISHCHARE
08
TITTLE
therapeuatical
Ø100 RWP GROUND FLOOR
Doctor's 0ffice
observation
change
ARCHITECTS
room
room ARCH. K . MWANGI
LINEN STORE
Ø100 RWP
UP
MECHANICAL ENGINEERS
six bed Ø100
nurse station six bed Dunstone Consulting Engineers
P.O. Box 23167-00100
TBA Nairobi.
FEMALE CHANGING ROOM Tel. 0203573922,0722724508
email: info@dunstonengineers.com
SHALLOW STORM DRAIN
TO S.E`S DETAILS
Ø100 RWP DN
TO FREE DISHCHARE
09 09 CLIENT
Ø100 RWP
UP KENYATTA UNIVERSITY REFERRAL
GRATED GULLEY HOSPITAL
Ø150
PASS BOX Ø100 RWP 11. Stack pipes to rise 600mm above
02 UP 02 the roof.
CHEMO
MIXING Security
03 03
04 04
Ø100 RWP Ø100 RWP Ø100 RWP
UP UP UP
stair STAIR
05 FAMILY 05
doctor duty
CONFERENCE
one bed room
06 Ø100 RWP Ø100 RWP 06
UP UP
1.
Female staff
No. Revision/Issue Date
STAFF LOUNGE
private
room PROJECT
Male staff
PROPOSED ONCOLOGY EXTENSION AT
one bed KUTRRH
Ø100 RWP
07 UP 07
triage TITTLE
Doctor's 0ffice kitchenette
FIRST FLOOR
RAINWATER DRAINAGE LAYOUT
TBA
ARCHITECTS
PHARMACY Ø100 RWP ARCH. K . MWANGI
08 08
UP
CLIENT
Ø100 RWP
UP
KENYATTA UNIVERSITY REFERRAL
HOSPITAL
six bed
nurse station six bed
Drg. No.DCEL/21/05/RWD-502
FEMALE CHANGING ROOM
Designed:W.N.F
Date: MARCH 2021
Checked: GKR
Ø100 RWP
09 UP 09 Scale: 1:100 (A1 ONLY) Approved: GKR
store
General Notes
A B C E F G H I J
1. All dimensions are in millimetres unless
otherwise stated
Waiting
9. All pipework to run in wall chase,
Five bed under floor slab,under worktops
Ø100 RWP in ceiling etc. Exposed pipes shall
UP not be acceptable
Security
03 03
Nine bed
Cold water servises (cpvc pipe)
Hot water servises (cpvc pipe)
Hot water return servises (cpvc pipe)
Six bed Fire fighting servises (G.I pipe)
Five bed Lift
04 04
Ø100 RWP Ø100 RWP Ø100 RWP
UP UP UP
05 05
1.
Female staff
No. Revision/Issue Date
Sluice FAMILY CONFERENCE
PROJECT
Male staff
PROPOSED ONCOLOGY EXTENSION AT
KUTRRH
Ø100 RWP
07 UP Staff lounge 07
Doctor's 0ffice
TITTLE
SECOND FLOOR
RAINWATER DRAINAGE LAYOUT
txt kitchenette
Ø100 RWP Ø100 RWP
UP Nurse 0ffice UP
TBA
ARCHITECTS
Ø100 RWP ARCH. K . MWANGI
08 08
UP
CLIENT
Ø100 RWP
ROOF BELOW UP KENYATTA UNIVERSITY REFERRAL
HOSPITAL
ON CALL
Waiting
9. All pipework to run in wall chase,
Five bed under floor slab,under worktops
Ø100 RWP in ceiling etc. Exposed pipes shall
UP not be acceptable
Security
03 03
Nine bed
Cold water servises (cpvc pipe)
Hot water servises (cpvc pipe)
Hot water return servises (cpvc pipe)
Six bed Fire fighting servises (G.I pipe)
Five bed Lift
04 04
Ø100 RWP Ø100 RWP Ø100 RWP
UP UP UP
05 05
1.
Female staff
No. Revision/Issue Date
FAMILY CONFERENCE
PROJECT
Male staff
PROPOSED ONCOLOGY EXTENSION AT
KUTRRH
Ø100 RWP
07 UP 07
Staff lounge
TITTLE
Doctor's 0ffice THIRD FLOOR
RAINWATER DRAINAGE LAYOUT
Nurse 0ffice
kitchenette
ARCHITECTS
Ø100 RWP ARCH. K . MWANGI
08 08
UP
CLIENT
Ø100 RWP
UP KENYATTA UNIVERSITY REFERRAL
HOSPITAL
txt
under floor slab,under worktops
Ø100 RWP Sluice in ceiling etc. Exposed pipes shall
OPERATING ROOM not be acceptable
UP
Disposal Room 01 Room 02 Room 03 Room 04
10. Overflow pipes to discharge at
150mm beyond the wall
Ø100 RWP 11. Stack pipes to rise 600mm above
nurse station UP
02 02 the roof.
Setup
Bed Clean corridor
change Patients entry
Security
03
ANAESTHETIC 03
AREA Passage
Cold water servises (cpvc pipe)
Room 06 Room 05 Hot water servises (cpvc pipe)
Scrup up Conference Hot water return servises (cpvc pipe)
Call
Drug store Incharge Fire fighting servises (G.I pipe)
WC/SH
room
Passage Lift
04 04
Ø100 RWP Ø100 RWP
UP
Clean corridor Bone marrow UP
Staff Lounge
05
transplant unit 05
kitchenette
Passage
1.
Female staff
No. Revision/Issue Date
Nurse station
PROJECT
Male staff
Staff entry PROPOSED ONCOLOGY EXTENSION AT
KUTRRH
Ø100 RWP
07 UP 07
TITTLE
FOURTH FLOOR
RAINWATER DRAINAGE LAYOUT
ARCHITECTS
Fulbora ARCH. K . MWANGI
08 Outlet 08
MECHANICAL ENGINEERS
Private wards
Dunstone Consulting Engineers
P.O. Box 23167-00100
Nairobi.
Tel. 0203573922,0722724508
email: info@dunstonengineers.com
CLIENT
Ø100 RWP
UP
KENYATTA UNIVERSITY REFERRAL
HOSPITAL
Drg. No.DCEL/21/05/RWD-505
Designed:W.N.F
Date: MARCH 2021
Fulbora
Checked: GKR
09 Outlet 09 Scale: 1:100 (A1 ONLY) Approved: GKR
General Notes
A B C E F G H I J
03 03
04 Fulbora Fulbora 04
Outlet Outlet
ROOF
05 05
Fulbora Fulbora
06 06
Outlet Outlet
1.
PROJECT
PROPOSED ONCOLOGY EXTENSION AT
KUTRRH
Fulbora
07 Outlet 07
TITTLE
ROOF PLAN
RAINWATER DRAINAGE LAYOUT
Fulbora Fulbora
Outlet Outlet
ARCHITECTS
08 08 ARCH. K . MWANGI
MECHANICAL ENGINEERS
Dunstone Consulting Engineers
P.O. Box 23167-00100
Nairobi.
Tel. 0203573922,0722724508
email: info@dunstonengineers.com
CLIENT
Fulbora
Outlet KENYATTA UNIVERSITY REFERRAL
HOSPITAL
Designed:W.N.F
Date: MARCH 2021
Checked: GKR
09 09
Scale: 1:100 (A1 ONLY) Approved: GKR
ROOF PLAN