Ø100 RWP DN Ø100 RWP DN

TO FREE DISHCHARE TO FREE DISHCHARE General Notes


Ø100 RWP Ø100 RWP
UP Ø100 RWP UP Ø100 RWP 1. All dimensions are in millimetres unless
UP UP otherwise stated
01 01
2. All Water pipes to be CPVC PN 20 Conforming
to the current European Standards for
CPVC installations.

3. CPVCC pipe joints to be by solvent cement


Ladies Gents for CPVC
Ø100 RWP DN
Ø100 RWP DN TO FREE DISHCHARE 4. All valves to be of brass/bronze
TO FREE DISHCHARE Ø100 RWP heavy duty pattern construction
Ø100 RWP Ø100 RWP UP as 'peglar'
UP Ø100 RWP DN
UP TO FREE DISHCHARE
01 01 5. Water Pipes under floor slab, drive
Ø100 RWP
Disabled UP ways, walkways, car parks,to be sleeved
in heavy duty PVC or GMS as instructed

Cashier 6. Exposed hot water pipes to be lagged


Ø100 RWP DN
Ø100 RWP Procedure Consultation Consultation Consultation Consultation with minimum 50mm thick fibre glass
TO FREE DISHCHARE
UP
room room room 7. All drainage pipes above ground to be
room room uPVC 'grey' while those below to be
uPVC golden brown
Ø100 RWP DN
TO FREE DISHCHARE
8. All drainage pipes below floor slab,
02 02 driveways, walkways, car parks to be
Ø100 RWP encased in 150mm concrete sorround
WAITING
UP well cured
Passage
9. All pipework to run in wall chase,

Riser
Security under floor slab,under worktops
03 03 in ceiling etc. Exposed pipes shall
not be acceptable

10. Overflow pipes to discharge at


emergency 150mm beyond the wall
LAB Lab
Specimen shower
Triage (ac) 11. Stack pipes to rise 600mm above
Records Consultation collection
room Store the roof.
Entry porch room
door to be
demolished Reception Lift
Customer
care Ø100 RWP Ø100 RWP Ø100 RWP
UP UP UP
04 04

Ø100 SHALLOW STORM DRAIN SHALLOW STORM DRAIN SHALLOW STORM DRAIN
TO S.E`S DETAILS TO S.E`S DETAILS TO S.E`S DETAILS GRATED GULLEY Cold water servises (cpvc pipe)
stair STAIR
LAB OFFICE
Hot water servises (cpvc pipe)
05 05
Ø150
Hot water return servises (cpvc pipe)
Fire fighting servises (G.I pipe)
GRATED GULLEY
TO C.E`S DETAILS
Ø100 RWP Ø150
one bed UP
06 doctor duty 06
Ø100 RWP
UP
room Ø100 RWP DN
TO FREE DISHCHARE
Female staff

STAFF LOUNGE

private room
Male staff

one bed Ø100 RWP


UP
07 07 1.

No. Revision/Issue Date

SHALLOW STORM DRAIN


TO S.E`S DETAILS
nurse office PROJECT
kitchenette
txt PROPOSED ONCOLOGY EXTENSION AT
Ø100 RWP DN
Ø100 RWP TO FREE DISHCHARE KUTRRH
six bed
six bed Ø100 UP
Ø100 RWP
Nurse 0ffice UP
Doctors room

Ø100 RWP DN

08
TO FREE DISHCHARE
08
TITTLE
therapeuatical
Ø100 RWP GROUND FLOOR

SHALLOW STORM DRAIN


TO S.E`S DETAILS
room UP RAINWATER DRAINAGE LAYOUT
MALE CHANGING ROOM

Doctor's 0ffice

observation
change
ARCHITECTS
room
room ARCH. K . MWANGI
LINEN STORE
Ø100 RWP
UP
MECHANICAL ENGINEERS
six bed Ø100
nurse station six bed Dunstone Consulting Engineers
P.O. Box 23167-00100
TBA Nairobi.
FEMALE CHANGING ROOM Tel. 0203573922,0722724508
email: info@dunstonengineers.com
SHALLOW STORM DRAIN
TO S.E`S DETAILS

Ø100 RWP DN
TO FREE DISHCHARE
09 09 CLIENT
Ø100 RWP
UP KENYATTA UNIVERSITY REFERRAL
GRATED GULLEY HOSPITAL
Ø150

SHALLOW STORM DRAIN TO C.E`S DETAILS


TO S.E`S DETAILS
Drg. No.DCEL/21/05/RWD-501
store
Designed:W.N.F
Date: MARCH 2021
electricity Checked: GKR
Scale: 1:100 (A1 ONLY) Approved: GKR
well
STAIR six bed
six bed
General Notes
A B C E F G H I J
1. All dimensions are in millimetres unless
otherwise stated

2. All Water pipes to be CPVC PN 20 Conforming


to the current European Standards for
CPVC installations.

3. CPVCC pipe joints to be by solvent cement


for CPVC

4. All valves to be of brass/bronze


heavy duty pattern construction
Ø100 RWP Ø100 RWP
UP UP
as 'peglar'

01 01 5. Water Pipes under floor slab, drive


ways, walkways, car parks,to be sleeved
in heavy duty PVC or GMS as instructed
airlock
6. Exposed hot water pipes to be lagged
CLEAN with minimum 50mm thick fibre glass
CHANGING 7. All drainage pipes above ground to be
uPVC 'grey' while those below to be
Ø100 RWP uPVC golden brown
Ø100 RWP Ø100 RWP
CHEMO UP UP UP
8. All drainage pipes below floor slab,
01 MIXING 01 driveways, walkways, car parks to be
encased in 150mm concrete sorround
well cured
inpatient
Oncology 9. All pipework to run in wall chase,
NON CHEMO Cold ROOM Store under floor slab,under worktops
Ø100 RWP Pharmacy in ceiling etc. Exposed pipes shall
UP MIXING not be acceptable
PASS BOX 10. Overflow pipes to discharge at
150mm beyond the wall

PASS BOX Ø100 RWP 11. Stack pipes to rise 600mm above
02 UP 02 the roof.

CHEMO
MIXING Security
03 03

PASS BOX Cold water servises (cpvc pipe)


office
Hot water servises (cpvc pipe)
Consultation
linen store conference MTM Consultation Hot water return servises (cpvc pipe)
Fire fighting servises (G.I pipe)
Consultation Lift
Dirty bin

04 04
Ø100 RWP Ø100 RWP Ø100 RWP
UP UP UP
stair STAIR

05 FAMILY 05

doctor duty
CONFERENCE
one bed room
06 Ø100 RWP Ø100 RWP 06
UP UP

1.
Female staff
No. Revision/Issue Date
STAFF LOUNGE
private
room PROJECT
Male staff
PROPOSED ONCOLOGY EXTENSION AT
one bed KUTRRH

Ø100 RWP
07 UP 07

triage TITTLE
Doctor's 0ffice kitchenette
FIRST FLOOR
RAINWATER DRAINAGE LAYOUT

six bed Ø100 RWP Ø100 RWP


six bed UP Nurse 0ffice UP

TBA
ARCHITECTS
PHARMACY Ø100 RWP ARCH. K . MWANGI
08 08
UP

MALE CHANGING ROOM MECHANICAL ENGINEERS


MDT room Dunstone Consulting Engineers
P.O. Box 23167-00100
Nairobi.
NURSE NURSE Tel. 0203573922,0722724508
OFFICE OFFICE email: info@dunstonengineers.com

CLIENT
Ø100 RWP
UP
KENYATTA UNIVERSITY REFERRAL
HOSPITAL
six bed
nurse station six bed

Drg. No.DCEL/21/05/RWD-502
FEMALE CHANGING ROOM
Designed:W.N.F
Date: MARCH 2021
Checked: GKR
Ø100 RWP
09 UP 09 Scale: 1:100 (A1 ONLY) Approved: GKR

store
General Notes
A B C E F G H I J
1. All dimensions are in millimetres unless
otherwise stated

2. All Water pipes to be CPVC PN 20 Conforming


to the current European Standards for
CPVC installations.

3. CPVCC pipe joints to be by solvent cement


for CPVC

4. All valves to be of brass/bronze


Ø100 RWP Ø100 RWP heavy duty pattern construction
UP UP as 'peglar'

01 01 5. Water Pipes under floor slab, drive


ways, walkways, car parks,to be sleeved
in heavy duty PVC or GMS as instructed

6. Exposed hot water pipes to be lagged


with minimum 50mm thick fibre glass

7. All drainage pipes above ground to be


uPVC 'grey' while those below to be
Ø100 RWP uPVC golden brown
Nine bed Ø100 RWP Ø100 RWP
UP
UP UP
8. All drainage pipes below floor slab,
01 01 driveways, walkways, car parks to be
encased in 150mm concrete sorround
well cured

Waiting
9. All pipework to run in wall chase,
Five bed under floor slab,under worktops
Ø100 RWP in ceiling etc. Exposed pipes shall
UP not be acceptable

10. Overflow pipes to discharge at


150mm beyond the wall
Linen
Ø100 RWP
UP
11. Stack pipes to rise 600mm above
02 02
Nurse station the roof.

Security
03 03
Nine bed
Cold water servises (cpvc pipe)
Hot water servises (cpvc pipe)
Hot water return servises (cpvc pipe)
Six bed Fire fighting servises (G.I pipe)
Five bed Lift

04 04
Ø100 RWP Ø100 RWP Ø100 RWP
UP UP UP

05 05

06 Ø100 RWP Ø100 RWP 06


UP UP

1.
Female staff
No. Revision/Issue Date
Sluice FAMILY CONFERENCE

PROJECT
Male staff
PROPOSED ONCOLOGY EXTENSION AT
KUTRRH

Ø100 RWP
07 UP Staff lounge 07
Doctor's 0ffice

TITTLE
SECOND FLOOR
RAINWATER DRAINAGE LAYOUT
txt kitchenette
Ø100 RWP Ø100 RWP
UP Nurse 0ffice UP

TBA
ARCHITECTS
Ø100 RWP ARCH. K . MWANGI
08 08
UP

MALE CHANGING ROOM MECHANICAL ENGINEERS


Dunstone Consulting Engineers
P.O. Box 23167-00100
LINEN STORE Nairobi.
Tel. 0203573922,0722724508
email: info@dunstonengineers.com

CLIENT
Ø100 RWP
ROOF BELOW UP KENYATTA UNIVERSITY REFERRAL
HOSPITAL
ON CALL

ROOF BELOW Drg. No.DCEL/21/05/RWD-503


FEMALE CHANGING ROOM
Designed:W.N.F
Date: MARCH 2021
Checked: GKR
Ø100 RWP
09 UP 09 Scale: 1:100 (A1 ONLY) Approved: GKR
General Notes
A B C E F G H I J
1. All dimensions are in millimetres unless
otherwise stated

2. All Water pipes to be CPVC PN 20 Conforming


to the current European Standards for
CPVC installations.

3. CPVCC pipe joints to be by solvent cement


for CPVC

4. All valves to be of brass/bronze


heavy duty pattern construction
Ø100 RWP Ø100 RWP as 'peglar'
UP UP
5. Water Pipes under floor slab, drive
01 01
ways, walkways, car parks,to be sleeved
in heavy duty PVC or GMS as instructed

6. Exposed hot water pipes to be lagged


with minimum 50mm thick fibre glass

7. All drainage pipes above ground to be


uPVC 'grey' while those below to be
uPVC golden brown
Ø100 RWP
Nine bed Ø100 RWP Ø100 RWP
UP
UP UP 8. All drainage pipes below floor slab,
01 01
driveways, walkways, car parks to be
encased in 150mm concrete sorround
well cured

Waiting
9. All pipework to run in wall chase,
Five bed under floor slab,under worktops
Ø100 RWP in ceiling etc. Exposed pipes shall
UP not be acceptable

10. Overflow pipes to discharge at


150mm beyond the wall
Linen
Ø100 RWP 11. Stack pipes to rise 600mm above
02 UP 02 the roof.
Nurse station

Security
03 03
Nine bed
Cold water servises (cpvc pipe)
Hot water servises (cpvc pipe)
Hot water return servises (cpvc pipe)
Six bed Fire fighting servises (G.I pipe)
Five bed Lift

04 04
Ø100 RWP Ø100 RWP Ø100 RWP
UP UP UP

05 05

06 Ø100 RWP Ø100 RWP 06


UP UP

1.
Female staff
No. Revision/Issue Date
FAMILY CONFERENCE

PROJECT
Male staff
PROPOSED ONCOLOGY EXTENSION AT
KUTRRH

Ø100 RWP
07 UP 07

Staff lounge
TITTLE
Doctor's 0ffice THIRD FLOOR
RAINWATER DRAINAGE LAYOUT

Ø100 RWP Ø100 RWP


UP UP

Nurse 0ffice
kitchenette
ARCHITECTS
Ø100 RWP ARCH. K . MWANGI
08 08
UP

MALE CHANGING ROOM MECHANICAL ENGINEERS


Dunstone Consulting Engineers
P.O. Box 23167-00100
TBA Nairobi.
Tel. 0203573922,0722724508
email: info@dunstonengineers.com

CLIENT
Ø100 RWP
UP KENYATTA UNIVERSITY REFERRAL
HOSPITAL

TBA Drg. No.DCEL/21/05/RWD-504


FEMALE CHANGING ROOM
Designed:W.N.F
Date: MARCH 2021
Checked: GKR
Ø100 RWP
09 UP 09 Scale: 1:100 (A1 ONLY) Approved: GKR
General Notes
A B C E F G H I J
1. All dimensions are in millimetres unless
otherwise stated

2. All Water pipes to be CPVC PN 20 Conforming


to the current European Standards for
CPVC installations.

3. CPVCC pipe joints to be by solvent cement


for CPVC

4. All valves to be of brass/bronze


heavy duty pattern construction
Ø100 RWP Ø100 RWP as 'peglar'
UP UP
5. Water Pipes under floor slab, drive
01 01
ways, walkways, car parks,to be sleeved
in heavy duty PVC or GMS as instructed
Disinfection
6. Exposed hot water pipes to be lagged
with minimum 50mm thick fibre glass

7. All drainage pipes above ground to be


uPVC 'grey' while those below to be
uPVC golden brown
Ø100 RWP Ø100 RWP Ø100 RWP
Apparatus and Dressing UP UP UP
8. All drainage pipes below floor slab,
Preparation driveways, walkways, car parks to be
01 01
encased in 150mm concrete sorround
Kitch well cured
enette
9. All pipework to run in wall chase,

txt
under floor slab,under worktops
Ø100 RWP Sluice in ceiling etc. Exposed pipes shall
OPERATING ROOM not be acceptable
UP
Disposal Room 01 Room 02 Room 03 Room 04
10. Overflow pipes to discharge at
150mm beyond the wall
Ø100 RWP 11. Stack pipes to rise 600mm above
nurse station UP
02 02 the roof.
Setup
Bed Clean corridor
change Patients entry
Security
03
ANAESTHETIC 03
AREA Passage
Cold water servises (cpvc pipe)
Room 06 Room 05 Hot water servises (cpvc pipe)
Scrup up Conference Hot water return servises (cpvc pipe)
Call
Drug store Incharge Fire fighting servises (G.I pipe)

WC/SH
room
Passage Lift

04 04
Ø100 RWP Ø100 RWP
UP
Clean corridor Bone marrow UP

Staff Lounge
05
transplant unit 05

kitchenette

06 Ø100 RWP Ø100 RWP 06


UP UP

Passage
1.
Female staff
No. Revision/Issue Date

Nurse station
PROJECT
Male staff
Staff entry PROPOSED ONCOLOGY EXTENSION AT
KUTRRH

Ø100 RWP
07 UP 07

TITTLE
FOURTH FLOOR
RAINWATER DRAINAGE LAYOUT

Ø100 RWP Ø100 RWP


UP UP

ARCHITECTS
Fulbora ARCH. K . MWANGI
08 Outlet 08

MECHANICAL ENGINEERS

Private wards
Dunstone Consulting Engineers
P.O. Box 23167-00100
Nairobi.
Tel. 0203573922,0722724508
email: info@dunstonengineers.com

CLIENT
Ø100 RWP
UP
KENYATTA UNIVERSITY REFERRAL
HOSPITAL

Drg. No.DCEL/21/05/RWD-505

Designed:W.N.F
Date: MARCH 2021
Fulbora
Checked: GKR
09 Outlet 09 Scale: 1:100 (A1 ONLY) Approved: GKR
General Notes
A B C E F G H I J

1. All dimensions are in millimetres unless


otherwise stated

2. All Water pipes to be CPVC PN 20 Conforming


to the current European Standards for
CPVC installations.

3. CPVCC pipe joints to be by solvent cement


for CPVC

4. All valves to be of brass/bronze


heavy duty pattern construction
Fulbora Fulbora as 'peglar'
01 Outlet Outlet 01 5. Water Pipes under floor slab, drive
ways, walkways, car parks,to be sleeved
in heavy duty PVC or GMS as instructed

6. Exposed hot water pipes to be lagged


with minimum 50mm thick fibre glass

7. All drainage pipes above ground to be


uPVC 'grey' while those below to be
uPVC golden brown
Fulbora Fulbora Fulbora
Outlet 8. All drainage pipes below floor slab,
01 Outlet Outlet 01 driveways, walkways, car parks to be
encased in 150mm concrete sorround
well cured

9. All pipework to run in wall chase,


Fulbora under floor slab,under worktops
Outlet in ceiling etc. Exposed pipes shall
not be acceptable

10. Overflow pipes to discharge at


150mm beyond the wall
Fulbora
02 Outlet 02 11. Stack pipes to rise 600mm above
the roof.

03 03

ROOF Cold water servises (cpvc pipe)


Hot water servises (cpvc pipe)
Hot water return servises (cpvc pipe)
Fire fighting servises (G.I pipe)

04 Fulbora Fulbora 04
Outlet Outlet
ROOF
05 05

Fulbora Fulbora
06 06
Outlet Outlet

1.

No. Revision/Issue Date

PROJECT
PROPOSED ONCOLOGY EXTENSION AT
KUTRRH
Fulbora
07 Outlet 07

TITTLE
ROOF PLAN
RAINWATER DRAINAGE LAYOUT

Fulbora Fulbora
Outlet Outlet

ARCHITECTS

08 08 ARCH. K . MWANGI

MECHANICAL ENGINEERS
Dunstone Consulting Engineers
P.O. Box 23167-00100
Nairobi.
Tel. 0203573922,0722724508
email: info@dunstonengineers.com

CLIENT
Fulbora
Outlet KENYATTA UNIVERSITY REFERRAL
HOSPITAL

Drg. No.DCEL/21/05/RWD - 506

Designed:W.N.F
Date: MARCH 2021
Checked: GKR
09 09
Scale: 1:100 (A1 ONLY) Approved: GKR

ROOF PLAN