You are on page 1of 2
AND TRANSPORT Ai ig Lata att eS DEPARTMENT OF MUNICIPALITIES hye saio! gpa Material Approval Form Application No: 202000351331 Version: 2 Date: 2020-07-09 Project Details Epocall cll Kee sill gM CIS y ally gapaall paaill Syed ali yg 25d. Jel Lgl 5S agan. ld gh Project Name A Miscellaneous works for the Development and Rehabilitation Epil al of Landscape Assets and Local Irigation Networks-at Al Shahama Municipality Center Limits Contract No ‘SMC 201 aiall ee Stel 3 clay YL Gal ve Contractor ROYAL GARDENS AGRICULTURAL CONTRACTING L.L.C Osi Sl dit Sip nay oalen PARSONS INTERNATIONAL LIMITED ee geil Rane - cll yall nl 5 is Client Department of Urban Planning and Municipalities - Abu Dhabi LS City Municipality Material Details Bd pals Material Type iss aye alles Spec. Ref. VOLUME 2B, SECTION 02900 Page No.34/42. lial. gan pl Sih 2 PF BOQ Ref S.0.R- 02-07 Page:21/162 Volume 3, SectionH ®t aa 7 i Material Description GRAVEL 0 gg) (One/ make, model _(Size: 20-40MM & 40-80MM) (Color: Grey & Red) aa atc) (Asap « Ge eine Intended Usage DECORATIVE HARD LANDSCAPE pS Oe vial Stas Ai lly s seal) yi . fe eae Seal / ja Manufacturer/ Source ASR MARBLE & STONE TRADING LLC ' AL NASR MARBLE & STONE TRADING LLC . Supplier/Applicator AL NASR MARBLE & STONE TRADING LLC GhMaseh ee ddely 3M bag 48 gaa Sub-Contractor ROYAL GARDENS AGRICULTURAL CONTRACTING. il ai LLC 85826 feet on? ti, 2020-07-14 12:24 202000351331 Conditions. sayy 1) This is only a preliminary material approval for decorative gravel (Size: 20-40MM & 40-80MM for (Grey & Red color) for landscape works, Supplied from AL NASR MARBLE & STONE TRADING LLC , from Muscet, Oman as per required project specifications and contract documents. Furthermore, this approval is Only for the material properties NOT 2) an approval of the architectural/aesthetic aspects such as Colors, size, pattems, finish, etc. which shall be approved by the ADM design section. 3) 4) 5) On delivery and prior to placement, random samples shall be collected for testing of all material parameters at Abu Dhabi QCC Lab/ ‘Approved third party lab, 6) 7) 8) 9) Placement shall be as per approved method statement, project specification. Final Recommendation: Approved ted a Technical Reviewer: delta ob pall 538 sill gal 85826 Bade2 2 ated 3) (2020-07-14 12:24 202000351331

You might also like