WIR Site Staff Comments

Page 1
WIR SUBJECT: WATER SUPPLY SYSTEM INSTALLATION INSPECTION
DATE: 24 Jun 2021
CONTRACTOR: MODERN BUILDING LEADERS CO. LTD.
PROJECT TITLE: AL HASSAN 2020 - UMLUJ
PROJECT NUMBER: UMS-2112
ATTACHMENTS: IFC DRAWING
WIR NUMBER: MBL-P046-IR-ME-0304

DESIGN DRAWINGS, SPECIFICATION & SITE REQUIREMENTS HAVE BEEN USED FOR WIR REVIEW.
FOLLOWING ARE OCNSULTANT COMMENTS RELATED TO ATTACHED WIR:
ACTION
ITEM CONSULTANT COMMENTS
CODE

1 Hot water pipes & fittings need to be insulated properly.


There is one kitchen sink at pantry is not shown on attached drawings, Updated As-Built
2
layout is required.
3 Hydro Leak Test is required to be conducted for water supply system.
Water pressure should not increase the maximum levels at sanitary fixture & devices. Install
4
PRV where required.
Cold water supply & hot water supply need to be flushed and washed properly before
5
operation.
6 Water supply piping & valves need to be labelled & tagged.
Properly sized access doors are required for all valves & electric water heater for operation
7
& maintenance purposes.
Since several construction phases have been earlier executed on project site without

FOR INFORMATION
supervision from DIYAR consultant side. Therfore the contractor is solely responsible for all
hidden works which are inaccessible and invisible to be inspectedby Diyar engineers
8 including but not limited to materials, method statments, third party tests, verification
process of structural & MEP works, or any other documents which is not previousely
reviewed and approved by Diyar in accordance to project specifications and design
drawings.

NAME: WALEED ABDELMONEAM NAME: MOHAMMED SOBHI DATE: 24/6/2021