TIME SCHEDULE PELAKSANAAN

PEMBANGUNAN TOWER SST 42 METER


UNTUK REPEATER TIMBANUH TERMASUK SHELTER, AKSES JALAN DAN PAGAR KELILING
No: 13.RKS/SCADATEL/2017

WAKTU PELAKSANAAN
B1 B2 B3
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10
NO % KET.
ITEM PEKERJAAN VOLUME BOBOT DURASI BOBOT/

10-Nov-17

11-Nov-17

12-Nov-17

13-Nov-17

14-Nov-17

15-Nov-17

16-Nov-17

17-Nov-17

18-Nov-17

10 19-Nov-17

11 20-Nov-17

12 21-Nov-17

13 22-Nov-17

14 23-Nov-17

15 24-Nov-17

16 25-Nov-17

17 26-Nov-17

18 27-Nov-17

19 28-Nov-17

20 29-Nov-17

21 30-Nov-17

10-Dec-17

11-Dec-17

12-Dec-17

13-Dec-17

14-Dec-17

15-Dec-17

16-Dec-17

17-Dec-17

18-Dec-17

19-Dec-17

20-Dec-17

21-Dec-17

22-Dec-17

23-Dec-17

24-Dec-17

25-Dec-17

26-Dec-17

27-Dec-17

28-Dec-17

29-Dec-17

30-Dec-17

31-Dec-17

10-Jan-18

11-Jan-18

12-Jan-18

13-Jan-18
1-Dec-17

2-Dec-17

3-Dec-17

4-Dec-17

5-Dec-17

6-Dec-17

7-Dec-17

8-Dec-17

9-Dec-17

1-Jan-18

2-Jan-18

3-Jan-18

4-Jan-18

5-Jan-18

6-Jan-18

7-Jan-18

8-Jan-18

9-Jan-18
DURASI

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65
1

9
A PEKERJAAN PERSIAPAN
Rencana 1 ls 0.42634 3 0.1421 0.14 0.14 0.14 100
1 Pek. Pembersihan lahan
Realisasi 1 ls 0.42634 2 0.2132 0.213 0.213
Rencana 72 m' 2.64295 5 0.5286 0.5 0.5 0.5 0.5 0.5
2 Pek. Pagar keliling site
Realisasi 72 m' 2.64295 3 0.8810 0.9 0.9 0.9
Rencana 20 m2 1.29037 5 0.2581 0.3 0.3 0.3 0.3 0.3
3 Pek. Gudang & bangsal
Realisasi 20 m2 1.29037 2 0.6452 0.645 0.645
Rencana 1 ls 0.06091 3 0.0203 0.0 0.0 0.0
4 Pek. Papan nama proyek
Realisasi 1 ls 0.06091 1 0.0609 0.06
Rencana 1 ls 1.29729 65 0.0200 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
5 Pek. Mobilisasi dan Demobilisasi
Realisasi 1 ls 1.29729 65 0.0200 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
Rencana 70 m' 0.90838 4 0.2271 0.2 0.2 0.2 0.2
6 Pek. Pengukuran dan bowplank
Realisasi 70 m' 0.90838 2 0.4542 0.45 0.45
Rencana 1 ls 0.06091 65 0.0009 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7 Pek. Pengadaan air kerja
Realisasi 1 ls 0.06091 65 0.0009 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Rencana 1 ls 0.36543 65 0.0056 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8 Pek. Listrik kerja
Realisasi 1 ls 0.36543 65 0.0056 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Rencana 1 ls 0.06610 14 0.0047 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9 Pek. SLO Instalasi Listrik
Realisasi 1 ls 0.06610
Rencana 1 ls 0.53475 65 0.0082 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10 Pek. Laporan & dokumentasi
Realisasi 1 ls 0.53475 65 0.0082 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
Rencana 1 ls 0.66996 21 0.0319 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11 Pek. Pengurusan Perizinan
Realisasi 1 ls 0.66996 56 0.0120 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 CC
B PEKERJAAN SELF SUPPORT TOWER
1 Pekerjaan Pondasi Tower
O
a Pek. Galian tanah
Rencana
Realisasi
39.924
39.924
m3
m3
0.33946
0.33946
4
4
0.0849
0.0849
0.08 0.08 0.08 0.08
0.08 0.08 0.08 0.08
PE 90

b Pek. Urugan pasir 10 cm


Rencana 3.025 m3 0.05287 3 0.0176 0.0 0.0 0.0 RT
Realisasi 3.025 m3 0.05287 1 0.0529 0.1

c Pek. Lantai kerja


Rencana 1.5125 m3 0.16065 4 0.0402 0.0 0.0 0.0 0.0 A
d Pek. Pondasi Tower
Realisasi 1.5125 m3 0.16065 1 0.1607 0.2
M
d.1 Pek. Beton
Rencana
Realisasi
10.587
10.587
m3
m3
1.38265
1.38265
9
3
0.1536
0.4609
0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
0.5 0.5 0.5
A
Rencana 888.976 kg 2.22478 8 0.2781 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3
d.2 Pek. Pembesian
Realisasi 888.976 kg 2.22478 3 0.7416 0.7 0.7 0.7
Rencana 7.7 m2 0.12093 8 0.0151 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
d.3 Pek. Begisting
Realisasi 7.7 m2 0.12093 6 0.0202 0.0 0.0 0.0 0.0 0.0 0.0
e Pek. Kolom pedestal
Rencana 3.4848 m3 0.45511 9 0.0506 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
e.1 Pek. Beton
Realisasi 3.4848 m3 0.45511 2 0.2276 0.2 0.2
Rencana 440.2618 kg 1.10181 10 0.1102 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
e.2 Pek. Pembesian
Realisasi 440.2618 kg 1.10181 3 0.3673 0.4 0.4 0.4
Rencana 10.56 m2 0.67649 10 0.0676 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
e.3 Pek. Begisting
Realisasi 10.56 m2 0.67649 5 0.1353 0.1 0.1 0.1 0.1 0.1
Rencana 1 ls 0.42634 8 0.0533 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
e.4 Pek. Angkur tower Ø25 mm
Realisasi 1 ls 0.42634 1 0.4263 0.4
Rencana 0.081 m3 0.08295 2 0.0415 0.0 0.0
f Pek. Pondasi tangga tower 45/45/40 cm
Realisasi 0.081 m3 0.08295
Rencana 24.134 m3 0.06752 3 0.0225 0.0 0.0 0.0 80
g Pek. Urugan Kembali galian
Realisasi 24.134 m3 0.06752 1 0.0675 0.1
2 Pekerjaan Tower
Rencana 7088.8 kg 22.45080 37 0.6068 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6
a Pek. Pengadaan tower & accessories
Realisasi 7088.8 kg 22.45080 1 22.4508 22.5
Rencana 7088.8 kg 3.19492 14 0.2282 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
b Pek. Erection
Realisasi 7088.8 kg 3.19492
Rencana 7088.8 kg 2.18500 5 0.4370 0.4 0.4 0.4 0.4 0.4
c Pek. Pengecatan tower
Realisasi 7088.8 kg 2.18500
d Pek. Penangkal petir & grounding system
Pekerjaan penangkal petir (dari ujung atas sampai di ujung tapak tower pakai Rencana 1 set 2.05267 7 0.2932 0.3 0.3 0.3 0.3 0.3 0.3 0.3
d.1
kawat BC 50 mm) Realisasi 1 set 2.05267
Rencana 1 set 1.00772 7 0.1440 0.1 0.1 0.1 0.1 0.1 0.1 0.1
d.2 Pekerjaan pentanahan
Realisasi 1 set 1.00772
Rencana 1 set 0.75167 7 0.1074 0.1 0.1 0.1 0.1 0.1 0.1 0.1
d.3 Pekerjaan lampu tanda (automatic) + instalasi
Realisasi 1 set 0.75167
C PEKERJAAN SHELTER
1 Pekerjaan Tanah & Pondasi
Rencana 4.265 m3 0.03626 2 0.0181 0.0 0.0
a Pek. Galian pondasi
Realisasi 4.265 m3 0.03626 2 0.0181 0.0 0.0
Rencana 0.423 m3 0.00739 1 0.0074 0.0 70
b Pek. Urugan pasir, 5 cm
Realisasi 0.423 m3 0.00739 1 0.0074 0.0
Rencana 0.852 m3 0.04247 5 0.0085 0.0 0.0 0.0 0.0 0.0
c Pek. Pas. Batu kosong
Realisasi 0.852 m3 0.04247 1 0.0425 0.0
Rencana 2.035 m3 0.19063 5 0.0381 0.0 0.0 0.0 0.0 0.0
d Pek. Pondasi batu gunung camp 1:5
Realisasi 2.035 m3 0.19063 2 0.0953 0.1 0.1

e Pek. Pondasi rollag bata


Rencana 0.546 m3 0.04184 4 0.0105 0.0 0.0 0.0 0.0 CC
Realisasi
Rencana
0.546
1.2795
m3
m3
0.04184
0.00358 1 0.0036 0.0
O
f Pek. Urugan kembali galian

2 Pek. Beton
Realisasi 1.2795 m3 0.00358 1 0.0036 0.0
PE
a Pek. Sloef 15/20 cm, camp 1:2:3
Rencana 0.44 m3 0.30786 4 0.0770 0.1 0.1 0.1 0.1 RT
Realisasi 0.44 m3 0.30786 2 0.1539 0.2 0.2

b Pek. Rabat beton teras 5 cm


Rencana 0.879 m3 0.09337 3 0.0311 A
0.0 0.0 0.0
Realisasi 0.879 m3

c Pek. Kolom 15/15 cm, camp 1:2:3


Rencana 0.4725 m3
0.09337
0.48386 4 0.1210 0.1 0.1 0.1 0.1 M
Realisasi
Rencana
0.4725
0.44
m3
m3
0.48386
0.43596
2
3
0.2419
0.1453
0.2 0.2
0.1 0.1 0.1
A
d Pek. Ringbalk 15/20 cm, camp 1:2:3
Realisasi 0.44 m3 0.43596
Rencana 0.44 m3 0.43596 6 0.0727 0.1 0.1 0.1 0.1 0.1 0.1
e Pek. Lisplank beton 10/25 cm, camp 1:2:3
Realisasi 0.44 m3 0.43596
Rencana 1.704 m3 1.81074 6 0.3018 0.3 0.3 0.3 0.3 0.3 0.3
f Pek. Plat dak atap, camp 1:2:3
Realisasi 1.704 m3 1.81074
3 Pek. Dinding & pintu
Rencana 66.36 m2 0.96903 6 0.1615 0.2 0.2 0.2 0.2 0.2 0.2 60
a Pek. Pas. Dinding batu bata, camp 1:5
Realisasi 66.36 m2 0.96903 4 0.2423 0.2 0.2 0.2 0.2
Rencana 132.72 m2 0.74896 3 0.2497 0.2 0.2 0.2
b Pek. Plesteran dinding batu bata, camp 1:5
Realisasi 132.72 m2 0.74896
Rencana 132.72 m2 0.52166 2 0.2608 0.3 0.3
c Pek. Acian dinding
Realisasi 132.72 m2 0.52166
Rencana 1 unit 0.44255 3 0.1475 0.1 0.1 0.1
d Pek. Pintu besi
Realisasi 1 unit 0.44255
Rencana 1 unit 0.02463 3 0.0082 0.0 0.0 0.0
e Pek. Pintu KM, Aluminium
Realisasi 1 unit 0.02463
4 Pek. Lantai
Rencana 2.973 m3 0.05134 5 0.0103 0.0 0.0 0.0 0.0 0.0
a Pek. Urugan tanah bawah lantai
Realisasi 2.973 m3 0.05134 2 0.0257
Rencana 0.6546 m3 0.01144 2 0.0057 0.0 0.0
b Pek. Urugan pasir bawah lantai
Realisasi 0.6546 m3 0.01144 1 0.0114
Rencana 5.42 m2 0.10225 2 0.0511 0.1 0.1
c Pek. Lantai keramik 30x30 cm
Realisasi 5.42 m2 0.10225
Rencana 1.927 m2 0.03635 2 0.0182 0.0 0.0
d Pek. Lantai keramik 30x30 cm KM
Realisasi 1.927 m2 0.03635
5 Pek. Pengecatan
Rencana 148.4 m2 0.64083 8 0.0801 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
a Pek. Pengecatan dinding bata & lisplank
Realisasi 148.4 m2 0.64083
Rencana 35.197 m2 0.26177 8 0.0327 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
b Pek. Waterprofing dak atap & lisplank
Realisasi 35.197 m2 0.26177
6 Pek. Elektrikal
Rencana 2 bh 0.04549 7 0.0065 0.0 0.0 0.0 0.0 0.0 0.0 0.0 50
a Pek. Lampu penerangan TL 2x18 Watt
Realisasi 2 bh 0.04549
Rencana 1 bh 0.01093 7 0.0016 0.0 0.0 0.0 0.0 0.0 0.0 0.0
b Pek. Lampu pijar 5 Watt
Realisasi 1 bh 0.01093
Rencana 1 bh 0.08005 7 0.0114 0.0 0.0 0.0 0.0 0.0 0.0 0.0
c Pek. Lampu kapsul automatic
Realisasi 1 bh 0.08005
Rencana 1 bh 0.00390 7 0.0006 0.0 0.0 0.0 0.0 0.0 0.0 0.0
d Pek. Saklar ganda
Realisasi 1 bh 0.00390
Rencana 1 bh 0.00272 7 0.0004 0.0 0.0 0.0 0.0 0.0 0.0 0.0
e Pek. Saklar tunggal
Realisasi 1 bh 0.00272
Rencana 6 bh 0.02846 7 0.0041 0.0 0.0 0.0 0.0 0.0 0.0 0.0
f Pek. Stop kontak biasa
Realisasi 6 bh 0.02846
Rencana 2 bh 0.04254 3 0.0142 0.0 0.0 0.0
g Pek. Terminal stop kuningan 6 lubang NYY 3x6 mm2
Realisasi 2 bh 0.04254

h Pek. AC Split wall 1/2 PK 220 VAC + timer + stop kontak


Rencana
Realisasi
2
2
unit
unit
1.36048
1.36048
7 0.1944
CC 0.2 0.2 0.2 0.2 0.2 0.2 0.2

i Pek. Exhaust fan type wall mounted fan 30x30 cm + timer + stop kontak Rencana 2 unit 0.37813 7 0.0540 O 0.1 0.1 0.1 0.1 0.1 0.1 0.1
Realisasi 2 unit 0.37813

j Pek. Instalasi titik lampu


Rencana 4 titik 0.16839 7 0.0241 0.0 PE
0.0 0.0 0.0 0.0 0.0 0.0
Realisasi
Rencana
4
6
titik
titik
0.16839
0.25661 7 0.0367 0.0
RT
0.0 0.0 0.0 0.0 0.0 0.0
k Pek. Instalasi titik stop kontak

l Pek. Tray indoor


Realisasi 6 titik 0.25661 A
l.1 Pek. Kabel tray 300x50 mm
Rencana 7 m' 0.11187 5 0.0224 M 0.0 0.0 0.0 0.0 0.0
Realisasi 7 m' 0.11187

l.2 Pek. Cross tray 300x50 mm


Rencana 3 bh 0.01446 5 0.0029 A 0.0 0.0 0.0 0.0 0.0 40
Realisasi 3 bh 0.01446
Rencana 2.4 m' 0.16805 5 0.0336 0.0 0.0 0.0 0.0 0.0
l.3 Pek. Tray ladder 300x50 mm
Realisasi 2.4 m' 0.16805
m Pek. Tray outdoor
Rencana 5.5 m' 0.08790 5 0.0176 0.0 0.0 0.0 0.0 0.0
m.1 Pek. Kabel tray outdoor 300x50 mm
Realisasi 5.5 m' 0.08790
Rencana 1 ls 0.06091 5 0.0122 0.0 0.0 0.0 0.0 0.0
m.2 Pek. Tiang penopang tray, pipa galvanis 3"
Realisasi 1 ls 0.06091
Rencana 1 set 1.60102 18 0.0889 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
n Pek. Panel listrik
Realisasi 1 set 1.60102
Rencana 1 set 0.70894 8 0.0886 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
o Pek. Rak panel indoor, custom
Realisasi 1 set 0.70894
Rencana 1 unit 0.05436 5 0.0109 0.0 0.0 0.0 0.0 0.0
p Pek. Bak kontrol
Realisasi 1 unit 0.05436
7 Pek. Mekanikal Plumbing
Rencana 1 ls 0.18272 4 0.0457 0.0 0.0 0.0 0.0
a Pek. Penyambungan air bersih ke jaringan desa
Realisasi 1 ls 0.18272
Rencana 4.5 m' 0.01189 6 0.0020 0.0 0.0 0.0 0.0 0.0 0.0
b Pek. Pipa PVC AW 3/4", air bersih
Realisasi 4.5 m' 0.01189
Rencana 6.3 m' 0.07750 6 0.0129 0.0 0.0 0.0 0.0 0.0 0.0
c Pek. Pipa PVC AW 3", air bekas & air kotor
c Pek. Pipa PVC AW 3", air bekas & air kotor
Realisasi 6.3 m' 0.07750
Rencana 1 bh 0.08016 6 0.0134 0.0 0.0 0.0 0.0 0.0 0.0
d Pek. Closed Jongkok
Realisasi 1 bh 0.08016
Rencana 1 bh 0.00433 6 0.0007 0.0 0.0 0.0 0.0 0.0 0.0
e Pek. Floor drain
Realisasi 1 bh 0.00433
Rencana 1 bh 0.00450 6 0.0007 0.0 0.0 0.0 0.0 0.0 0.0 30
f Pek. Kran air 3/4"
Realisasi 1 bh 0.00450
Rencana 1 bh 0.02954 2 0.0148 0.0 0.0
g Pek. Pegadaan bak air & gayung
Realisasi 1 bh 0.02954
Rencana 1 unit 0.60905 7 0.0870 0.1 0.1 0.1 0.1 0.1 0.1 0.1
h Pek. Septictank gorong-gorong Ø100 cm
Realisasi 1 unit 0.60905 1 0.6091 0.6
D PEKERJAAN PAGAR & SITE
1 Pekerjaan pagar keliling (BRC) tinggi 2 meter
Rencana 11.58967 m3 0.09854 4 0.0246 0.0 0.0 0.0 0.0
a Pek. Galian pondasi
Realisasi
Rencana
11.58967
2.317934
m3
m3
0.09854
0.04051
5
2
0.0197
0.0203
0.0 0.0 0.0 0.0 0.0 Kurva Rencana 0.0 0.0
b Pek. Urugan pasir bawah pondasi, 5 cm
Realisasi 2.317934 m3 0.04051 3 0.0135 0.0 0.0 0.0
Rencana 4.635869 m3 0.23108 7 0.0330 0.0 0.0 0.0 0.0 0.0 0.0 0.0
c Pek. Pas. Batu kosong
Realisasi 4.635869 m3 0.23108 4 0.0578 0.1 0.1 0.1 0.1
Rencana 36.45576 m3 3.41493 7 0.4878 0.5 0.5 0.5 0.5 0.5 0.5 0.5
d Pek. Pondasi batu gunung, camp 1:5
Realisasi 36.45576 m3 3.41493 9 0.3794 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4
Rencana 2.2176 m3 0.00620 4 0.0016 0.0 0.0 0.0 0.0
e Pek. Urugan kembali galian
Realisasi 2.2176 m3 0.00620 3 0.0021 0.0 0.0 0.0
Rencana 0.336 m3 0.03569 7 0.0051 0.0 0.0 0.0 0.0 0.0 0.0 0.0
f Pek. Beton kaki BRC, 20/20/30 cm
Realisasi 0.336 m3 0.03569
g Pek. Pagar BRC, t = 190 cm
Rencana
Realisasi
127.3
127.3
m2
m2
4.95529
4.95529
20
5
0.2478
0.9911 Kurva Realisasi 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2

Rencana 1 ls 0.48724 7 0.0696 0.1 0.1 0.1 0.1 0.1 0.1 0.1 20
h Pek. Gerbang BRC
Realisasi 1 ls 0.48724
2 Pek. Site
Rencana 100.9792 m3 1.74380 25 0.0698 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
a Pek. Urugan tanah site
Realisasi 100.9792 m3 1.74380 15 0.1163 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
Rencana 14.3 m3 0.24993 7 0.0357 0.0 0.0 0.0 0.0 0.0 0.0 0.0
b Pek. Urugan pasir site 5 cm
Realisasi 14.3 m3 0.24993 3 0.0833
Rencana 14.03 m3 0.60390 7 0.0863 0.1 0.1 0.1 0.1 0.1 0.1 0.1
c Pek. Urugan gravel 5 cm
Realisasi 14.03 m3 0.60390 2 0.3020
Rencana 1 bh 0.33173 3 0.1106 0.1 0.1 0.1
d Pek. Lampu site LED, 50 watt, with photocell
Realisasi 1 bh 0.33173
Rencana 1 titik 0.04210 3 0.0140 0.0 0.0 0.0
e Pek. Instalasi titik lampu site
Realisasi 1 titik 0.04210
f Pek. CCTV
Rencana 1 set 2.33118 18 0.1295 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
f.1 Pek. Peralatan utama, DVR 4Ch w/HDD 2TB, network switch & rak metal
Realisasi 1 set 2.33118
Pek. Fixed Color camera dome type, 1/3” CMOS, Rencana 1 unit 0.62792 18 0.0349 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
f.2
1080p Realisasi 1 unit 0.62792

f.3
Pek. Fixed Color camera bullet type, 1/3” CMOS, Rencana 2 unit 1.23024 18 0.0683 CC 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
1080p
Pek. Instalasi CCTV menggunakan Coaxial cable RG5 in PVC HI conduit
Realisasi
Rencana
2
3
unit
titik
1.23024
0.12465 18 0.0069
O 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
f.4
dia.20mm & NYY 2 x 2.5 mm untuk kabel daya ke tiap camera Realisasi 3 titik 0.12465 PE
g Rumah genset

g.1 Pek. Rabat beton 10 cm


Rencana 0.6 m3 0.06373 7 0.0091 RT 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10
Realisasi
Rencana
0.6
1
m3
set
0.06373
0.79177 7 0.1131
A 0.1 0.1 0.1 0.1 0.1 0.1 0.1
g.2 Pek. Rumah genset, atap + gembok, Fin. Cat
Realisasi
Rencana
1
1
set
ls
0.79177
0.09745 7 0.0139
M 0.0 0.0 0.0 0.0 0.0 0.0 0.0
g.3 Pek. Mobilisasi genset & instalasi
Realisasi 1 ls 0.09745 A
Rencana 0.3 m3 0.31879 12 0.0266 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
h Ramp jalan masuk, 10 cm
Realisasi 0.3 m3 0.31879 4 0.0797
Rencana 1 set 0.60905 14 0.0435 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
i Pek. Papan identitas tower, Fin. Cat & Letter huruf
Realisasi 1 set 0.60905
E PEKERJAAN JALAN AKSES LOKASI
Rencana 1 ls 0.36543 13 0.0281 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1 Pek. Persiapan tanah jalan
Realisasi 1 ls 0.36543 4 0.0914 0.1
Rencana 12.83 m3 0.10909 13 0.0084 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2 Pek. Galian pondasi batu kali
Realisasi 12.83 m3 0.10909 4 0.0273 0.0
Rencana 4.115 m3 0.07192 13 0.0055 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3 Pek. Urugan pasir, 5 cm
Realisasi 4.115 m3 0.07192
Rencana 8.692 m3 0.43326 13 0.0333 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4 Pek. Pas. batu kosong
Realisasi 8.692 m3 0.43326 4 0.1083 0.1
Rencana 18.03 m3 1.68893 13 0.1299 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
5 Pek. Pondasi batu gunung, camp 1:5
Realisasi 18.03 m3 1.68893 4 0.4222 0.4
Rencana 34.9344 m3 3.71067 37 0.1003 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
6 Pek. Lantai kerja 5 cm
Realisasi 34.9344 m3 3.71067 2 1.8553
Rencana 582.24 m2 14.24164 40 0.3560 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0
7 Pek. Paving block 8 cm
Realisasi 582.24 m2 14.24164
PROGRESS RENCANA 100.00 0.209 1.016 1.016 1.101 1.080 1.080 0.990 1.059 1.255 1.491 1.394 1.447 1.407 1.612 2.086 1.862 1.837 1.822 1.647 1.475 1.511 1.762 1.762 1.762 1.724 1.817 2.423 2.261 2.195 2.074 2.400 2.355 1.669 1.593 1.552 1.452 1.908 1.908 1.897 1.897 1.940 1.940 2.188 1.425 1.425 1.445 1.841 2.036 1.663 1.663 1.663 1.608 1.608 1.146 0.926 0.989 0.900 1.013 1.324 1.324 1.324 1.188 0.871 0.871 0.871

KUMULATIVE RENCANA 0.21 1.22 2.24 3.34 4.42 5.50 6.49 7.55 8.8 10.3 11.7 13.1 14.5 16.2 18.2 20.1 21.9 23.8 25.4 26.9 28.4 30.2 31.9 33.7 35.4 37.2 39.6 41.9 44.1 46.2 48.6 50.9 52.6 54.2 55.7 57.2 59.1 61.0 62.9 64.8 66.8 68.7 70.9 72.3 73.7 75.2 77.0 79.0 80.7 82.4 84.0 85.6 87.3 88.4 89.3 90.3 91.2 92.2 93.6 94.9 96.2 97.4 98.3 99.1 100
PROGRESS REALISASI 100.0 0.035 0.035 0.035 0.035 0.035 0.977 0.916 0.916 0.260 0.260 0.692 0.692 0.047 0.501 0.624 0.315 1.922 1.827 2.111 23.206 1.585 1.388 1.392 0.719 0.801 0.647 0.405 2.110 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
KUMULATIVE REALISASI 0.035 0.069 0.104 0.139 0.174 1.150 2.066 2.982 3.242 3.502 4.193 4.885 4.932 5.433 6.057 6.371 8.294 10.121 12.232 35.438 37.023 38.412 39.804 40.522 41.323 41.970 42.376 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.49
DEVIASI (0.17) -1.155 -2.13598 -3.20194 -4.2476 -4.35138 -4.42575 -4.56876 -5.56364 -6.79491 -7.49657 -8.25152 -9.61149 -10.723 -12.1854 -13.7331 -13.6475 -13.6421 -13.1777 8.55341 8.62708 8.25346 7.88342 6.84 5.91727 4.74693 2.72918 2.57814 0.38313 -1.69102 -4.09074 -6.44596 -8.11542 -9.70873 -11.2606 -12.713 -14.6211 -16.5292 -18.4264 -20.3236 -22.264 -24.2044 -26.3925 -27.8171 -29.2417 -30.6866 -32.5277 -34.5636 -36.2264 -37.8892 -39.552 -41.1596 -42.7672 -43.9129 -44.8386 -45.8272 -46.7273 -47.7401 -49.0645 -50.3888 -51.7132 -52.9014 -53.7722 -54.6431 -55.5139

Timbanuh, 7 Desember 2017

DISETUJUI OLEH, DIPERIKSA OLEH,


PLN APDP MATARAM PT. TEKNIK EKSAKTA

ANUNG HERMAWAN MUSHLIHUDDIN


Direksi Pekerjaan Konsultan Perencana
LAPORAN PROGRES MINGGUAN
PEMBANGUNAN TOWER SST 42 METER UNTUK REPEATER TIMBANUH TERMASUK SHELTER, AKSES JALAN DAN
PAGAR KELILING

SPK Nomor : 080.SPK/INF/DAN.02.03/APDP.MTR/2017


Tanggal Kontrak : 10 November 2017
Nilai Kontrak : Rp 882.310.000,-
Nilai Kontrak Addendum : Rp 903.102.200,-
Sumber Dana : APLN. TA. 2017
Kontraktor : CV. REZKY SAHABAT
Konsultan : PT. TEKNIK EKSAKTA

Periode : 01 Desember 2017 s/d 07 Desember 2017

KUMMULATIVE s.d MINGGU LALU TERCAPAI MINGGU INI KUMMULATIVE s.d MINGGU SAAT INI MINGGU 4
VOLUME
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
NO. ITEM PEKERJAAN SPESIFIKASI BOBOT PERSENTASE
REAL RENCANA REAL RENCANA REAL RENCANA REAL RENCANA REAL RENCANA REAL KUMMULATIVE
RENCANA KERJA
Sat. Vol. LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN
A PEKERJAAN PERSIAPAN
1 Pek. Pembersihan lahan ls 1.00 0.426 1.000 ls 1.00 ls 0.43 0.426 ls ls 1.000 ls 1.000 ls 0.43 0.43 100.00%
2 Pek. Pagar keliling site Seng bjls, 2 m m' 72.00 2.643 72.000 m' 72.00 m' 2.64 2.643 m' m' 72.000 m' 72.000 m' 2.64 2.64 100.00%
3 Pek. Gudang & bangsal m2 20.00 1.290 20.000 m2 20.00 m2 1.29 1.290 m2 m2 20.000 m2 20.000 m2 1.29 1.29 100.00%
4 Pek. Papan nama proyek ls 1.00 0.061 1.000 ls 1.00 ls 0.06 0.061 ls ls 1.000 ls 1.000 ls 0.06 0.06 100.00%
5 Pek. Mobilisasi dan Demobilisasi ls 1.00 1.297 0.355 ls 0.32 ls 0.42 0.419 0.108 ls 0.108 ls 0.140 0.140 0.463 ls 0.431 ls 0.56 0.56 43.08%
6 Pek. Pengukuran dan bowplank m' 70.00 0.908 70.000 m' 70.00 m' 0.91 0.908 m' m' 70.000 m' 70.000 m' 0.91 0.91 100.00%
7 Pek. Pengadaan air kerja ls 1.00 0.061 0.121 ls 0.22 ls 0.02 0.020 0.108 ls 0.108 ls 0.007 0.007 0.229 ls 0.330 ls 0.03 0.03 32.96%
8 Pek. Listrik kerja ls 1.00 0.365 0.186 ls 0.25 ls 0.12 0.118 0.108 ls 0.108 ls 0.039 0.039 0.294 ls 0.362 ls 0.16 0.16 36.24%
9 Pek. SLO Instalasi Listrik 4400 Va ls 1.00 0.066 0.533 ls 0.00 ls 0.07 0.000 ls ls 0.533 ls 0.000 ls 0.07 0.00 0.00%
10 Pek. Laporan & dokumentasi ls 1.00 0.535 0.223 ls 0.27 ls 0.17 0.173 0.108 ls 0.108 ls 0.058 0.058 0.331 ls 0.381 ls 0.23 0.23 38.07%
11 Pek. Pengurusan Perizinan ls 1.00 0.670 0.890 ls 0.23 ls 0.67 0.156 ls 0.125 ls 0.084 0.890 ls 0.357 ls 0.67 0.24 35.71%

B PEKERJAAN SELF SUPPORT TOWER


1 Pekerjaan Pondasi Tower
a Pek. Galian tanah m3 39.92 0.339 39.924 m3 39.92 m3 0.34 0.339 m3 m3 39.924 m3 39.924 m3 0.34 0.34 100.00%
b Pek. Urugan pasir 10 cm m3 3.03 0.053 3.025 m3 3.03 m3 0.05 0.053 m3 m3 3.025 m3 3.025 m3 0.05 0.05 100.00%
c Pek. Lantai kerja m3 1.51 0.161 1.513 m3 1.51 m3 0.16 0.161 m3 m3 1.513 m3 1.513 m3 0.16 0.16 100.00%
d Pek. Pondasi Tower
d.1 Pek. Beton K-225 m3 10.59 1.383 10.587 m3 3.53 m3 1.38 0.461 m3 7.058 m3 0.922 10.587 m3 10.587 m3 1.38 1.38 100.00%
d.2 Pek. Pembesian kg 888.98 2.225 888.976 kg 888.98 kg 2.22 2.225 kg kg 888.976 kg 888.976 kg 2.22 2.22 100.00%
d.3 Pek. Begisting m2 7.70 0.121 7.700 m2 3.85 m2 0.12 0.060 m2 3.850 m2 0.060 7.700 m2 7.700 m2 0.12 0.12 100.00%
e Pek. Kolom pedestal
e.1 Pek. Beton K-225 m3 3.48 0.455 3.485 m3 3.48 m3 0.46 0.000 m3 m3 0.455 3.485 m3 3.485 m3 0.46 0.46 100.00%
e.2 Pek. Pembesian kg 440.26 1.102 440.262 kg 440.26 kg 1.10 1.102 kg kg 440.262 kg 440.262 kg 1.10 1.10 100.00%
e.3 Pek. Begisting m2 10.56 0.676 10.560 m2 6.34 m2 0.68 0.406 m2 4.224 m2 0.271 10.560 m2 10.560 m2 0.68 0.68 100.00%
e.4 Pek. Angkur tower Ø25 mm ASTM A32/JIS 1180 ls 1.00 0.426 1.000 ls 1.00 ls 0.43 0.426 ls ls 0.000 1.000 ls 1.000 ls 0.43 0.43 100.00%
f Pek. Pondasi tangga tower 45/45/40 cm m3 0.08 0.083 0.000 m3 0.00 m3 0.00 0.000 m3 m3 0.000 m3 0.000 m3 0.00 0.00 0.00%
g Pek. Urugan Kembali galian m3 24.13 0.068 0.000 m3 0.00 m3 0.00 0.000 24.134 m3 24.134 m3 0.068 0.068 24.134 m3 24.134 m3 0.07 0.07 100.00%
2 Pekerjaan Tower
a Pek. Pengadaan tower & accessories ASTM A36/ JIS G3101/ST37 kg 7,088.80 22.451 2873.838 kg 7088.80 kg 9.10 22.451 1,341.124 kg kg 4.247 4214.962 kg 7088.8 kg 13.35 22.45 100.00%
b Pek. Erection kg 7,088.80 3.195 0.000 kg 0.00 kg 0.00 0.000 kg kg kg kg
c Pek. Pengecatan tower Fin. Warna merah & putih kg 7,088.80 2.185 0.000 kg 0.00 kg 0.00 0.000 kg kg kg kg
d Pek. Penangkal petir & grounding system
Pekerjaan penangkal petir (dari ujung atas sampai di
d.1 set 1.00 2.053 0.000 set 0.00 set set set set set
ujung tapak tower pakai kawat BC 50 mm) 0.00 0.000
d.2 Pekerjaan pentanahan set 1.00 1.008 0.000 set 0.00 set 0.00 0.000 set set set set
d.3 Pekerjaan lampu tanda (automatic) + instalasi set 1.00 0.752 0.000 set 0.00 set 0.00 0.000 set set set set

C PEKERJAAN SHELTER
1 Pekerjaan Tanah & Pondasi
a Pek. Galian pondasi m3 4.27 0.036 4.265 m3 4.27 m3 0.04 0.036 m3 m3 4.265 m3 4.265 m3 0.04 0.04 100.00%
b Pek. Urugan pasir, 5 cm m3 0.42 0.007 0.423 m3 0.42 m3 0.01 0.007 m3 m3 0.423 m3 0.423 m3 0.01 0.01 100.00%
c Pek. Pas. Batu kosong m3 0.85 0.042 0.852 m3 0.85 m3 0.04 0.042 m3 m3 0.852 m3 0.852 m3 0.04 0.04 100.00%
d Pek. Pondasi batu gunung camp 1:5 m3 2.04 0.191 2.035 m3 2.04 m3 0.19 0.191 m3 m3 0.0000 2.035 m3 2.035 m3 0.19 0.19 100.00%
e Pek. Pondasi rollag bata m3 0.55 0.042 0.137 m3 0.00 m3 0.01 0.000 0.410 m3 m3 0.031 0.546 m3 0.000 m3 0.04 0.00 0.00%
f Pek. Urugan kembali galian m3 1.28 0.004 0.000 m3 0.00 m3 0.00 0.000 1.280 m3 1.280 m3 0.004 0.004 1.280 m3 1.280 m3 0.00 0.00 100.00%
2 Pek. Beton
a Pek. Sloef 15/20 cm, camp 1:2:3 m3 0.44 0.308 0.110 m3 0.00 m3 0.08 0.000 0.330 m3 0.44 m3 0.231 0.308 0.440 m3 0.440 m3 0.31 0.31 100.00%
b Pek. Rabat beton teras 5 cm m3 0.88 0.093 0.000 m3 0.00 m3 0.00 0.000 m3 m3 0.000 m3 0.000 m3 0.00 0.00 0.00%
c Pek. Kolom 15/15 cm, camp 1:2:3 m3 0.47 0.484 0.000 m3 0.00 m3 0.00 0.000 0.473 m3 0.4725 m3 0.484 0.484 0.473 m3 0.473 m3 0.48 0.48 100.00%
d Pek. Ringbalk 15/20 cm, camp 1:2:3 m3 0.44 0.436 0.000 m3 0.00 m3 0.00 0.000 0.293 m3 m3 0.291 0.293 m3 0.000 m3 0.29 0.00 0.00%
e Pek. Lisplank beton 10/25 cm, camp 1:2:3 m3 0.44 0.436 0.000 m3 0.00 m3 0.00 0.000 0.147 m3 m3 0.145 0.147 m3 0.000 m3 0.15 0.00 0.00%
f Pek. Plat dak atap, camp 1:2:3 m3 1.70 1.811 0.000 m3 0.00 m3 0.00 0.000 0.568 m3 m3 0.604 0.568 m3 0.000 m3 0.60 0.00 0.00%
3 Pek. Dinding & pintu
a Pek. Pas. Dinding batu bata, camp 1:5 m2 66.36 0.969 0.000 m2 0.00 m2 0.00 0.000 66.360 m2 66.36 m2 0.969 0.969 66.360 m2 66.360 m2 0.97 0.97 100.00%
b Pek. Plesteran dinding batu bata, camp 1:5 m2 132.72 0.749 0.000 m2 0.00 m2 0.00 0.000 88.480 m2 m2 0.499 88.480 m2 0.000 m2 0.50 0.00 0.00%
c Pek. Acian dinding m2 132.72 0.522 0.000 m2 0.00 m2 0.00 0.000 m2 m2 m2 m2 0.00%
d Pek. Pintu besi + gembok unit 1.00 0.443 0.000 unit 0.00 unit 0.00 0.000 1.000 unit unit 0.443 1.000 unit 0.000 unit 0.44 0.00 0.00%
e Pek. Pintu KM, Aluminium unit 1.00 0.025 0.000 unit 0.00 unit 0.00 0.000 1.000 unit unit 0.025 1.000 unit 0.000 unit 0.02 0.00 0.00%
4 Pek. Lantai
a Pek. Urugan tanah bawah lantai m3 2.97 0.051 0.000 m3 0.00 m3 0.00 0.000 1.784 m3 m3 0.031 1.784 m3 0.000 m3 0.03 0.00 0.00%
b Pek. Urugan pasir bawah lantai m3 0.65 0.011 0.000 m3 0.00 m3 0.00 0.000 m3 m3 m3 m3
c Pek. Lantai keramik 30x30 cm unpolish m2 5.42 0.102 0.000 m2 0.00 m2 0.00 0.000 m2 m2 m2 m2
d Pek. Lantai keramik 30x30 cm KM unpolish m2 1.93 0.036 0.000 m2 0.00 m2 0.00 0.000 m2 m2 m2 m2
5 Pek. Pengecatan
a Pek. Pengecatan dinding bata & lisplank vinitex/setara m2 148.40 0.641 0.000 m2 0.00 m2 0.00 0.000 m2 m2 m2 m2
b Pek. Waterprofing dak atap & lisplank No Drop/Aquaproff/setara m2 35.20 0.262 0.000 m2 0.00 m2 0.00 0.000 m2 m2 m2 m2
6 Pek. Elektrikal
a Pek. Lampu penerangan TL 2x18 Watt Philips/setara bh 2.00 0.045 0.000 bh 0.00 bh 0.00 0.000 bh bh bh bh
b Pek. Lampu pijar 5 Watt Philips/setara bh 1.00 0.011 0.000 bh 0.00 bh 0.00 0.000 bh bh bh bh
c Pek. Lampu kapsul automatic 18 Watt Philips/setara bh 1.00 0.080 0.000 bh 0.00 bh 0.00 0.000 bh bh bh bh
d Pek. Saklar ganda Panasonic/setara bh 1.00 0.004 0.000 bh 0.00 bh 0.00 0.000 bh bh bh bh
e Pek. Saklar tunggal Panasonic/setara bh 1.00 0.003 0.000 bh 0.00 bh 0.00 0.000 bh bh bh bh
f Pek. Stop kontak biasa Panasonic/setara bh 6.00 0.028 0.000 bh 0.00 bh 0.00 0.000 bh bh bh bh
g Pek. Terminal stop kuningan 6 lubang NYY 3x6 mm2 bh 2.00 0.043 0.000 bh 0.00 bh 0.00 0.000 bh bh bh bh

h Pek. AC Split wall 1/2 PK 220 VAC + timer + stop kontak Panasonic/setara unit 2.00 1.360 0.000 unit 0.00 unit 0.000 unit unit unit unit
0.00
Pek. Exhaust fan type wall mounted fan 30x30 cm + timer
i National, KDK, Setara unit 2.00 0.378 0.000 unit 0.00 unit unit unit unit unit
+ stop kontak 0.00 0.000
j Pek. Instalasi titik lampu NYY 3 x 4 mm2 titik 4.00 0.168 0.000 titik 0.00 titik 0.00 0.000 titik titik titik titik
k Pek. Instalasi stop kontak NYY 3 x 6 mm2 in conduit titik 6.00 0.257 0.000 titik 0.00 titik 0.00 0.000 titik titik titik titik
l Pek. Tray indoor 0.00 0.000
l.1 Pek. Kabel tray 300x50 mm Ex. Lokal m' 7.00 0.112 0.000 m' 0.00 m' 0.00 0.000 m' m' m' m'
l.2 Pek. Cross tray 300x50 mm Ex. Lokal bh 3.00 0.014 0.000 bh 0.00 bh 0.00 0.000 bh bh bh bh
l.3 Pek. Tray ladder 300x50 mm Ex. Lokal m' 2.40 0.168 0.000 m' 0.00 m' 0.00 0.000 m' m' m' m'
m Pek. Tray outdoor 0.00 0.000
m.1 Pek. Kabel tray outdoor 300x50 mm Ex. Lokal m' 5.50 0.088 0.000 m' 0.00 m' 0.00 0.000 m' m' m' m'
m.2 Pek. Tiang penopang tray, pipa galvanis 3" Ex. Lokal ls 1.00 0.061 0.000 ls 0.00 ls 0.00 0.000 ls ls ls ls
n Pek. Panel listrik Schnider/setara set 1.00 1.601 0.167 set 0.00 set 0.27 0.000 0.389 set set 0.623 0.556 set 0.000 set 0.89 0.00 0.00%
o Pek. Rak panel indoor, custom set 1.00 0.709 0.000 set 0.00 set 0.00 0.000 set set set set
p Pek. Bak kontrol unit 1.00 0.054 0.000 unit 0.00 unit 0.00 0.000 unit unit unit unit
7 Pek. Mekanikal Plumbing
a Pek. Penyambungan air bersih ke jaringan desa Wavin/setara ls 1.00 0.183 0.500 ls 0.00 ls 0.09 0.000 0.500 ls ls 0.091 1.000 ls 0.000 ls 0.18 0.00 0.00%
b Pek. Pipa PVC AW 3/4", air bersih Wavin/setara m' 4.50 0.012 0.000 m' 0.00 m' 0.00 0.000 2.250 m' m' 0.006 2.250 m' 0.000 m' 0.01 0.00 0.00%
c Pek. Pipa PVC AW 3", air bekas & air kotor Wavin/setara m' 6.30 0.077 0.000 m' 0.00 m' 0.00 0.000 3.150 m' m' 0.039 3.150 m' 0.000 m' 0.04 0.00 0.00%
d Pek. Closed Jongkok Toto/setara bh 1.00 0.080 0.000 bh 0.00 bh 0.00 0.000 0.500 bh bh 0.040 0.500 bh 0.000 bh 0.04 0.00 0.00%
e Pek. Floor drain Stainlessteel bh 1.00 0.004 0.000 bh 0.00 bh 0.00 0.000 0.500 bh bh 0.002 0.500 bh 0.000 bh 0.00 0.00 0.00%
f Pek. Kran air 3/4" Ex. Lokal bh 1.00 0.004 0.000 bh 0.00 bh 0.00 0.000 0.500 bh bh 0.002 0.500 bh 0.000 bh 0.00 0.00 0.00%
g Pek. Pegadaan bak air & gayung Ex. Lokal bh 1.00 0.030 0.000 bh 0.00 bh 0.00 0.000 bh bh bh bh
h Pek. Septictank gorong-gorong Ø100 cm Ex. Lokal unit 1.00 0.609 0.000 unit 0.00 unit 0.00 0.000 0.286 unit 1 unit 0.174 0.609 0.286 unit 1.000 unit 0.17 0.61 100.00%

D PEKERJAAN PAGAR & SITE


1 Pekerjaan pagar keliling (BRC) tinggi 2 meter
a Pek. Galian pondasi m3 11.59 0.099 0.000 m3 11.59 m3 0.00 0.099 m3 m3 0.000 m3 11.590 m3 0.00 0.10 100.00%
b Pek. Urugan pasir bawah pondasi, 5 cm m3 2.32 0.041 0.000 m3 2.32 m3 0.00 0.041 m3 m3 0.000 m3 2.318 m3 0.00 0.04 100.00%
c Pek. Pas. Batu kosong m3 4.64 0.231 0.000 m3 4.64 m3 0.00 0.231 m3 m3 0.000 m3 4.636 m3 0.00 0.23 100.00%
d Pek. Pondasi batu gunung, camp 1:5 m3 36.46 3.415 0.000 m3 20.25 m3 0.00 1.897 m3 16.2025583 m3 1.518 0.000 m3 36.456 m3 0.00 3.41 100.00%
e Pek. Urugan kembali galian m3 2.22 0.006 0.000 m3 0.00 m3 0.00 0.000 m3 2.2176 m3 0.006 0.000 m3 2.218 m3 0.00 0.01 100.00%
f Pek. Beton kaki BRC, 20/20/30 cm m3 0.34 0.036 0.000 m3 0.00 m3 0.00 0.000 m3 m3 0.000 m3 0.000 m3 0.00 0.00 0.00%
g Pek. Pagar BRC, t = 190 cm m2 127.30 4.955 0.000 m2 0.00 m2 0.00 0.000 m2 m2 0.000 m2 0.000 m2 0.00 0.00 0.00%
h Pek. Gerbang BRC + gembok m2 1.00 0.487 0.000 m2 0.00 m2 0.00 0.000 m2 m2 0.000 m2 0.000 m2 0.00 0.00 0.00%
2 Pek. Site
a Pek. Urugan tanah site m3 100.98 1.744 0.000 m3 33.66 m3 0.00 0.581 m3 47.1236225 m3 0.814 0.000 m3 80.783 m3 0.00 1.40 80.00%
b Pek. Urugan pasir site 5 cm m3 14.30 0.250 0.000 m3 0.00 m3 0.00 0.000 m3 m3 m3 m3 0.00%
c Pek. Urugan gravel 5 cm m3 14.03 0.604 0.000 m3 0.00 m3 0.00 0.000 m3 m3 m3 m3 0.00%
d Pek. Lampu site LED, 50 watt, with photocell bh 1.00 0.332 0.000 bh 0.00 bh 0.00 0.000 bh bh bh bh 0.00%
e Pek. Instalasi titik lampu site titik 1.00 0.042 0.000 titik 0.00 titik 0.00 0.000 titik titik titik titik 0.00%
f Pek. CCTV 0.00
Pek. Peralatan utama, DVR 4Ch w/HDD 2TB, network
f.1 Avtech/setara set 1.00 2.331 0.000 set 0.00 set 0.000 set set set set 0.00%
switch & rak metal 0.00
Pek. Fixed Color camera dome type, 1/3” CMOS,
f.2 Avtech/setara unit 1.00 0.628 0.000 unit 0.00 unit 0.000 unit unit unit unit 0.00%
1080p 0.00
Pek. Fixed Color camera bullet type, 1/3” CMOS,
f.3 Avtech/setara unit 2.00 1.230 0.000 unit 0.00 unit 0.000 unit unit unit unit 0.00%
1080p 0.00
Pek. Instalasi CCTV menggunakan Coaxial cable RG5 in
f.4 PVC HI conduit dia.20mm & NYMHY 2 x 1,5 mm2 untuk titik 3.00 0.125 0.000 titik 0.00 titik 0.000 titik titik titik titik 0.00%
kabel daya ke tiap camera 0.00
g Rumah genset 0.000 0.00
g.1 Pek. Rabat beton 10 cm m3 0.60 0.064 0.000 m3 0.00 m3 0.00 0.000 m3 m3 m3 m3 0.00%
g.2 Pek. Rumah genset, atap + gembok, Fin. Cat set 1.00 0.792 0.000 set 0.00 set 0.00 0.000 set set set set 0.00%
g.3 Pek. Mobilisasi genset & instalasi ls 1.00 0.097 0.000 ls 0.00 ls 0.00 0.000 ls ls ls ls 0.00%
h Ramp jalan masuk, 10 cm m3 0.30 0.319 0.000 m3 0.00 m3 0.00 0.000 m3 m3 m3 m3 0.00%
i Pek. Papan identitas tower, Fin. Cat & Letter huruf Besi pelat 1 mm & pipa besi 2" set 1.00 0.609 0.000 set 0.00 set 0.00 0.000 set set set set 0.00%

E PEKERJAAN JALAN AKSES LOKASI


1 Pek. Persiapan tanah jalan ls 1.00 0.365 0.615 ls 0.00 ls 0.22 0.000 0.385 ls 0.25 ls 0.141 0.091 1.000 ls 0.250 ls 0.37 0.09 25.00%
2 Pek. Galian pondasi batu kali m3 12.83 0.109 7.895 m3 0.00 m3 0.07 0.000 4.935 m3 3.2075 m3 0.042 0.027 12.830 m3 3.208 m3 0.11 0.03 25.00%
3 Pek. Urugan pasir, 5 cm m3 4.12 0.072 2.532 m3 0.00 m3 0.04 0.000 1.583 m3 m3 0.028 4.115 m3 0.000 m3 0.07 0.00 0.00%
4 Pek. Pas. batu kosong m3 8.69 0.433 5.349 m3 0.00 m3 0.27 0.000 3.343 m3 2.173 m3 0.167 0.108 8.692 m3 2.173 m3 0.43 0.11 25.00%
5 Pek. Pondasi batu gunung, camp 1:5 m3 18.03 1.689 11.095 m3 0.00 m3 1.04 0.000 6.935 m3 4.5075 m3 0.650 0.422 18.030 m3 4.508 m3 1.69 0.42 25.00%
6 Pek. Lantai kerja 5 cm m3 34.93 3.711 6.609 m3 0.00 m3 0.70 0.000 6.609 m3 m3 0.702 13.218 m3 0.000 m3 1.40 0.00 0.00%
7 Pek. Paving block 8 cm Herringbone 90° m2 582.24 14.242 101.892 m2 0.00 m2 2.49 0.000 101.892 m2 m2 2.492 203.784 m2 0.000 m2 4.98 0.00 0.00%
F TOTAL 100.0 28.40 37.023 13.512 7.463 41.9 44.486 32.09
G Deviasi = (∑Bobot Realisasi) - (∑Bobot Rencana) 8.62707752003221 (6.05) 2.58 (67.9068)

DISETUJUI OLEH, DIPERIKSA OLEH,


PLN APDP MATARAM PT. TEKNIK EKSAKTA

ANUNG HERMAWAN MUSHLIHUDDIN


Direksi Pekerjaan Konsultan Pengawas
LAPORAN PROGRES MINGGUAN
PEMBANGUNAN TOWER SST 42 METER UNTUK REPEATER TIMBANUH TERMASUK SHELTER, AKSES JALAN DAN
PAGAR KELILING

SPK Nomor : 080.SPK/INF/DAN.02.03/APDP.MTR/2017


Tanggal Kontrak : 10 November 2017
Nilai Kontrak : Rp 882.310.000,-
Nilai Kontrak Addendum : Rp 903.102.200,-
Sumber Dana : APLN. TA. 2017
Kontraktor : CV. REZKY SAHABAT
Konsultan : PT. TEKNIK EKSAKTA

Periode : 17 November 2017 s/d 23 November 2017

KUMMULATIVE s.d MINGGU LALU TERCAPAI MINGGU INI KUMMULATIVE s.d MINGGU SAAT INI MINGGU 3
VOLUME
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
NO. ITEM PEKERJAAN SPESIFIKASI BOBOT PERSENTASE
REAL RENCANA REAL RENCANA REAL RENCANA REAL RENCANA REAL RENCANA REAL KUMMULATIVE
RENCANA KERJA
Sat. Vol. LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN
A PEKERJAAN PERSIAPAN
1 Pek. Pembersihan lahan ls 1.00 0.426 1.000 ls 1.000 ls 0.43 0.426 ls ls 1.000 ls 1.000 ls 0.43 0.43 100.00%
2 Pek. Pagar keliling site Seng bjls, 2 m m' 72.00 2.643 72.000 m' 72.000 m' 2.64 2.643 m' m' 72.000 m' 72.000 m' 2.64 2.64 100.00%
3 Pek. Gudang & bangsal m2 20.00 1.290 20.000 m2 20.000 m2 1.29 1.290 m2 m2 20.000 m2 20.000 m2 1.29 1.29 100.00%
4 Pek. Papan nama proyek ls 1.00 0.061 1.000 ls 1.000 ls 0.06 0.061 ls ls 1.000 ls 1.000 ls 0.06 0.06 100.00%
5 Pek. Mobilisasi dan Demobilisasi ls 1.00 1.297 0.247 ls 0.215 ls 0.28 0.279 0.108 ls 0.108 ls 0.140 0.140 0.355 ls 0.323 ls 0.42 0.42 32.31%
6 Pek. Pengukuran dan bowplank m' 70.00 0.908 70.000 m' 35.000 m' 0.91 0.454 m' 35.00 m' 0.454 70.000 m' 70.000 m' 0.91 0.91 100.00%
7 Pek. Pengadaan air kerja ls 1.00 0.061 0.013 ls 0.114 ls 0.01 0.013 0.108 ls 0.108 ls 0.007 0.007 0.121 ls 0.222 ls 0.02 0.02 22.19%
8 Pek. Listrik kerja ls 1.00 0.365 0.079 ls 0.147 ls 0.08 0.079 0.108 ls 0.108 ls 0.039 0.039 0.186 ls 0.255 ls 0.12 0.12 25.47%
9 Pek. SLO Instalasi Listrik 4400 Va ls 1.00 0.066 0.104 ls 0.000 ls 0.04 0.000 0.429 ls ls 0.028 0.533 ls 0.000 ls 0.07 0.00 0.00%
10 Pek. Laporan & dokumentasi ls 1.00 0.535 0.115 ls 0.165 ls 0.12 0.115 0.108 ls 0.108 ls 0.058 0.058 0.223 ls 0.273 ls 0.17 0.17 27.30%
11 Pek. Pengurusan Perizinan ls 1.00 0.670 0.557 ls 0.107 ls 0.45 0.072 0.333 ls 0.125 ls 0.223 0.084 0.890 ls 0.232 ls 0.67 0.16 23.21%

B PEKERJAAN SELF SUPPORT TOWER


1 Pekerjaan Pondasi Tower
a Pek. Galian tanah m3 39.92 0.339 39.924 m3 0.000 m3 0.339 0.000 m3 39.924 m3 0.339 39.924 m3 39.924 m3 0.34 0.34 100.00%
b Pek. Urugan pasir 10 cm m3 3.03 0.053 3.025 m3 0.000 m3 0.053 0.000 m3 3.025 m3 0.053 3.025 m3 3.025 m3 0.05 0.05 100.00%
c Pek. Lantai kerja m3 1.51 0.161 1.513 m3 0.000 m3 0.161 0.000 m3 1.5125 m3 0.161 1.513 m3 1.513 m3 0.16 0.16 100.00%
d Pek. Pondasi Tower
d.1 Pek. Beton K-225 m3 10.59 1.383 5.882 m3 0.000 m3 0.768 0.000 4.705 m3 3.529 m3 0.615 0.461 10.587 m3 3.529 m3 1.38 0.46 33.33%
d.2 Pek. Pembesian kg 888.98 2.225 777.854 kg 0.000 kg 1.947 0.000 111.122 kg 888.976 kg 0.278 2.225 888.976 kg 888.976 kg 2.22 2.22 100.00%
d.3 Pek. Begisting m2 7.70 0.121 4.813 m2 0.000 m2 0.076 0.000 2.888 m2 3.85 m2 0.045 0.060 7.700 m2 3.850 m2 0.12 0.06 50.00%
e Pek. Kolom pedestal
e.1 Pek. Beton K-225 m3 3.48 0.455 1.549 m3 0.000 m3 0.202 0.000 1.936 m3 3.48 m3 0.253 - 3.485 m3 3.485 m3 0.46 0.00 100.00%
e.2 Pek. Pembesian kg 440.26 1.102 264.157 kg 0.000 kg 0.661 0.000 176.105 kg 440.2618 kg 0.441 1.102 440.262 kg 440.262 kg 1.10 1.10 100.00%
e.3 Pek. Begisting m2 10.56 0.676 5.280 m2 0.000 m2 0.338 0.000 5.280 m2 6.336 m2 0.338 0.406 10.560 m2 6.336 m2 0.68 0.41 60.00%
e.4 Pek. Angkur tower Ø25 mm ASTM A32/JIS 1180 ls 1.00 0.426 0.375 ls 0.000 ls 0.160 0.000 0.625 ls 1 ls 0.266 0.426 1.000 ls 1.000 ls 0.43 0.43 100.00%
f Pek. Pondasi tangga tower 45/45/40 cm m3 0.08 0.083 0.000 m3 0.000 m3 0.000 0.000 m3 m3 0.000 m3 0.000 m3 0.00 0.00 0.00%
g Pek. Urugan Kembali galian m3 24.13 0.068 0.000 m3 0.000 m3 0.000 0.000 m3 m3 0.000 m3 0.000 m3 0.00 0.00 0.00%
2 Pekerjaan Tower
a Pek. Pengadaan tower & accessories ASTM A36/ JIS G3101/ST37 kg 7,088.80 22.451 1532.71 kg 0.000 kg 4.854 0.000 1,341.124 kg 7088.80 kg 4.247 22.451 2873.838 kg 7088.8 kg 9.10 22.45 100.00%
b Pek. Erection kg 7,088.80 3.195 kg kg kg kg kg kg
c Pek. Pengecatan tower Fin. Warna merah & putih kg 7,088.80 2.185 kg kg kg kg kg kg
d Pek. Penangkal petir & grounding system
Pekerjaan penangkal petir (dari ujung atas sampai di
d.1 set 1.00 2.053 set set set set
ujung tapak tower pakai kawat BC 50 mm) set set
d.2 Pekerjaan pentanahan set 1.00 1.008 set set set set set set
d.3 Pekerjaan lampu tanda (automatic) + instalasi set 1.00 0.752 set set set set set set

C PEKERJAAN SHELTER
1 Pekerjaan Tanah & Pondasi
a Pek. Galian pondasi m3 4.27 0.036 0.000 m3 0 m3 0.00 0.00 4.265 m3 4.265 m3 0.036 0.03626 4.265 m3 4.265 m3 0.04 0.04 100.00%
b Pek. Urugan pasir, 5 cm m3 0.42 0.007 m3 m3 0.423 m3 0.423 m3 0.007 0.0074 0.423 m3 0.423 m3 0.01 0.01 100.00%
c Pek. Pas. Batu kosong m3 0.85 0.042 m3 m3 0.852 m3 0.852 m3 0.042 0.852 m3
### 0.852 m3 0.04 0.04 100.00%
d Pek. Pondasi batu gunung camp 1:5 m3 2.04 0.191 m3 m3 2.035 m3 2.035 m3 0.191 0.1906 2.035 m3 2.035 m3 0.19 0.19 100.00%
e Pek. Pondasi rollag bata m3 0.55 0.042 m3 m3 0.137 m3 m3 0.010 0.137 m3 0.000 m3 0.01 0.00 0.00%
f Pek. Urugan kembali galian m3 1.28 0.004 m3 m3 m3 m3 m3 m3
2 Pek. Beton
a Pek. Sloef 15/20 cm, camp 1:2:3 m3 0.44 0.308 m3 m3 0.110 m3 m3 0.077 0.110 m3 0.000 m3 0.08 0.00 0.00%
b Pek. Rabat beton teras 5 cm m3 0.88 0.093 m3 m3 m3 m3 m3 m3
c Pek. Kolom 15/15 cm, camp 1:2:3 m3 0.47 0.484 m3 m3 m3 m3 m3 m3
d Pek. Ringbalk 15/20 cm, camp 1:2:3 m3 0.44 0.436 m3 m3 m3 m3 m3 m3
e Pek. Lisplank beton 10/25 cm, camp 1:2:3 m3 0.44 0.436 m3 m3 m3 m3 m3 m3
f Pek. Plat dak atap, camp 1:2:3 m3 1.70 1.811 m3 m3 m3 m3 m3 m3
3 Pek. Dinding & pintu
a Pek. Pas. Dinding batu bata, camp 1:5 m2 66.36 0.969 m2 m2 m2 m2 m2 m2
b Pek. Plesteran dinding batu bata, camp 1:5 m2 132.72 0.749 m2 m2 m2 m2 m2 m2
c Pek. Acian dinding m2 132.72 0.522 m2 m2 m2 m2 m2 m2
d Pek. Pintu besi + gembok unit 1.00 0.443 unit unit unit unit unit unit
e Pek. Pintu KM, Aluminium unit 1.00 0.025 unit unit unit unit unit unit
4 Pek. Lantai
a Pek. Urugan tanah bawah lantai m3 2.97 0.051 m3 m3 m3 m3 m3 m3
b Pek. Urugan pasir bawah lantai m3 0.65 0.011 m3 m3 m3 m3 m3 m3
c Pek. Lantai keramik 30x30 cm unpolish m2 5.42 0.102 m2 m2 m2 m2 m2 m2
d Pek. Lantai keramik 30x30 cm KM unpolish m2 1.93 0.036 m2 m2 m2 m2 m2 m2
5 Pek. Pengecatan
a Pek. Pengecatan dinding bata & lisplank vinitex/setara m2 148.40 0.641 m2 m2 m2 m2 m2 m2
b Pek. Waterprofing dak atap & lisplank No Drop/Aquaproff/setara m2 35.20 0.262 m2 m2 m2 m2 m2 m2
6 Pek. Elektrikal
a Pek. Lampu penerangan TL 2x18 Watt Philips/setara bh 2.00 0.045 bh bh bh bh bh bh
b Pek. Lampu pijar 5 Watt Philips/setara bh 1.00 0.011 bh bh bh bh bh bh
c Pek. Lampu kapsul automatic 18 Watt Philips/setara bh 1.00 0.080 bh bh bh bh bh bh
d Pek. Saklar ganda Panasonic/setara bh 1.00 0.004 bh bh bh bh bh bh
e Pek. Saklar tunggal Panasonic/setara bh 1.00 0.003 bh bh bh bh bh bh
f Pek. Stop kontak biasa Panasonic/setara bh 6.00 0.028 bh bh bh bh bh bh
g Pek. Terminal stop kuningan 6 lubang NYY 3x6 mm2 bh 2.00 0.043 bh bh bh bh bh bh

h Pek. AC Split wall 1/2 PK 220 VAC + timer + stop kontak Panasonic/setara unit 2.00 1.360 unit unit unit unit
unit unit
Pek. Exhaust fan type wall mounted fan 30x30 cm + timer
i National, KDK, Setara unit 2.00 0.378 unit unit unit unit
+ stop kontak unit unit
j Pek. Instalasi titik lampu NYY 3 x 4 mm2 titik 4.00 0.168 titik titik titik titik titik titik
k Pek. Instalasi stop kontak NYY 3 x 6 mm2 in conduit titik 6.00 0.257 titik titik titik titik titik titik
l Pek. Tray indoor
l.1 Pek. Kabel tray 300x50 mm Ex. Lokal m' 7.00 0.112 m' m' m' m' m' m'
l.2 Pek. Cross tray 300x50 mm Ex. Lokal bh 3.00 0.014 bh bh bh bh bh bh
l.3 Pek. Tray ladder 300x50 mm Ex. Lokal m' 2.40 0.168 m' m' m' m' m' m'
m Pek. Tray outdoor
m.1 Pek. Kabel tray outdoor 300x50 mm Ex. Lokal m' 5.50 0.088 m' m' m' m' m' m'
m.2 Pek. Tiang penopang tray, pipa galvanis 3" Ex. Lokal ls 1.00 0.061 ls ls ls ls ls ls
n Pek. Panel listrik Schnider/setara set 1.00 1.601 set set 0.167 set set 0.267 0.167 set 0.000 set 0.27 0.00 0.00%
o Pek. Rak panel indoor, custom set 1.00 0.709 set set set set set set
p Pek. Bak kontrol unit 1.00 0.054 unit unit unit unit unit unit
7 Pek. Mekanikal Plumbing
a Pek. Penyambungan air bersih ke jaringan desa Wavin/setara ls 1.00 0.183 0.500 ls 0.000 ls 0.091 0.000 ls ls 0.500 ls 0.000 ls 0.09 0.00 0.00%
b Pek. Pipa PVC AW 3/4", air bersih Wavin/setara m' 4.50 0.012 m' m' m' m' m' m'
c Pek. Pipa PVC AW 3", air bekas & air kotor Wavin/setara m' 6.30 0.077 m' m' m' m' m' m'
d Pek. Closed Jongkok Toto/setara bh 1.00 0.080 bh bh bh bh bh bh
e Pek. Floor drain Stainlessteel bh 1.00 0.004 bh bh bh bh bh bh
f Pek. Kran air 3/4" Ex. Lokal bh 1.00 0.004 bh bh bh bh bh bh
g Pek. Pegadaan bak air & gayung Ex. Lokal bh 1.00 0.030 bh bh bh bh bh bh
h Pek. Septictank gorong-gorong Ø100 cm Ex. Lokal unit 1.00 0.609 unit unit unit unit unit unit

D PEKERJAAN PAGAR & SITE


1 Pekerjaan pagar keliling (BRC) tinggi 2 meter
a Pek. Galian pondasi m3 11.59 0.099 m3 m3 m3 11.5896723 m3 0.0985 0.000 m3 11.590 m3 0.00 0.10 100.00%
b Pek. Urugan pasir bawah pondasi, 5 cm m3 2.32 0.041 m3 m3 m3 2.31793446 m3 0.04051 0.000 m3 2.318 m3 0.00 0.04 100.00%
c Pek. Pas. Batu kosong m3 4.64 0.231 m3 m3 m3 4.63586892 m3 0.2311 0.000 m3 4.636 m3 0.00 0.23 100.00%
d Pek. Pondasi batu gunung, camp 1:5 m3 36.46 3.415 m3 m3 m3 20.2531979 m3 1.8972 0.000 m3 20.253 m3 0.00 1.90 55.56%
e Pek. Urugan kembali galian m3 2.22 0.006 m3 m3 m3 m3 m3 m3
f Pek. Beton kaki BRC, 20/20/30 cm m3 0.34 0.036 m3 m3 m3 m3 m3 m3
g Pek. Pagar BRC, t = 190 cm m2 127.30 4.955 m2 m2 m2 m2 m2 m2
h Pek. Gerbang BRC + gembok m2 1.00 0.487 m2 m2 m2 m2 m2 m2
2 Pek. Site
a Pek. Urugan tanah site m3 100.98 1.744 m3 m3 m3 33.6597303 m3 0.58127 0.000 m3 33.660 m3 0.00 0.58 33.33%
b Pek. Urugan pasir site 5 cm m3 14.30 0.250 m3 m3 m3 m3 m3 m3
c Pek. Urugan gravel 5 cm m3 14.03 0.604 m3 m3 m3 m3 m3 m3
d Pek. Lampu site LED, 50 watt, with photocell bh 1.00 0.332 bh bh bh bh bh bh
e Pek. Instalasi titik lampu site titik 1.00 0.042 titik titik titik titik titik titik
f Pek. CCTV
Pek. Peralatan utama, DVR 4Ch w/HDD 2TB, network
f.1 Avtech/setara set 1.00 2.331 set set set set
switch & rak metal set set
Pek. Fixed Color camera dome type, 1/3” CMOS,
f.2 Avtech/setara unit 1.00 0.628 unit unit unit unit
1080p unit unit
Pek. Fixed Color camera bullet type, 1/3” CMOS,
f.3 Avtech/setara unit 2.00 1.230 unit unit unit unit
1080p unit unit
Pek. Instalasi CCTV menggunakan Coaxial cable RG5 in
f.4 PVC HI conduit dia.20mm & NYMHY 2 x 1,5 mm2 untuk titik 3.00 0.125 titik titik titik titik
kabel daya ke tiap camera titik titik
g Rumah genset
g.1 Pek. Rabat beton 10 cm m3 0.60 0.064 m3 m3 m3 m3 m3 m3
g.2 Pek. Rumah genset, atap + gembok, Fin. Cat set 1.00 0.792 set set set set set set
g.3 Pek. Mobilisasi genset & instalasi ls 1.00 0.097 ls ls ls ls ls ls
h Ramp jalan masuk, 10 cm m3 0.30 0.319 m3 m3 m3 m3 m3 m3
i Pek. Papan identitas tower, Fin. Cat & Letter huruf Besi pelat 1 mm & pipa besi 2" set 1.00 0.609 set set set set set set

E PEKERJAAN JALAN AKSES LOKASI


1 Pek. Persiapan tanah jalan ls 1.00 0.365 0.077 ls 0.00 ls 0.028 0.000 0.538 ls ls 0.197 0.615 ls 0.000 ls 0.22 0.00 0.00%
2 Pek. Galian pondasi batu kali m3 12.83 0.109 0.987 m3 0.00 m3 0.008 0.000 6.908 m3 m3 0.059 7.895 m3 0.000 m3 0.07 0.00 0.00%
3 Pek. Urugan pasir, 5 cm m3 4.12 0.072 0.317 m3 0.00 m3 0.006 0.000 2.216 m3 m3 0.039 2.532 m3 0.000 m3 0.04 0.00 0.00%
4 Pek. Pas. batu kosong m3 8.69 0.433 0.669 m3 0.00 m3 0.033 0.000 4.680 m3 m3 0.233 5.349 m3 0.000 m3 0.27 0.00 0.00%
5 Pek. Pondasi batu gunung, camp 1:5 m3 18.03 1.689 1.387 m3 0.00 m3 0.130 0.000 9.708 m3 m3 0.909 11.095 m3 0.000 m3 1.04 0.00 0.00%
6 Pek. Lantai kerja 5 cm m3 34.93 3.711 m3 m3 6.609 m3 m3 0.702 6.609 m3 0.000 m3 0.70 0.00 0.00%
7 Pek. Paving block 8 cm Herringbone 90° m2 582.24 14.242 m2 m2 101.892 m2 m2 2.492 101.892 m2 0.000 m2 2.49 0.00 0.00%
F TOTAL 100.0 16.156 5.433 12.241 31.590 28.396 37.023 23.627
G Deviasi = (∑Bobot Realisasi) - (∑Bobot Rencana) -10.7225483088099 19.35 8.63 (76.3729)

DISETUJUI OLEH, DIPERIKSA OLEH,


PLN APDP MATARAM PT. TEKNIK EKSAKTA

ANUNG HERMAWAN MUSHLIHUDDIN


Direksi Pekerjaan Konsultan Pengawas
LAPORAN PROGRES MINGGUAN
PEMBANGUNAN TOWER SST 42 METER UNTUK REPEATER TIMBANUH TERMASUK SHELTER, AKSES JALAN DAN
PAGAR KELILING

SPK Nomor : 080.SPK/INF/DAN.02.03/APDP.MTR/2017


Tanggal Kontrak : 10 November 2017
Nilai Kontrak : Rp 882.310.000,-
Nilai Kontrak Addendum : Rp 903.102.200,-
Sumber Dana : APLN. TA. 2017
Kontraktor : CV. REZKY SAHABAT
Konsultan : PT. TEKNIK EKSAKTA

Periode : 17 November 2017 s/d 23 November 2017

KUMMULATIVE s.d MINGGU LALU TERCAPAI MINGGU INI KUMMULATIVE s.d MINGGU SAAT INI MINGGU 2
VOLUME
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
NO. ITEM PEKERJAAN SPESIFIKASI BOBOT PERSENTASE
REAL RENCANA REAL RENCANA REAL RENCANA REAL RENCANA REAL RENCANA REAL KUMMULATIVE
RENCANA KERJA
Sat. Vol. LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN
A PEKERJAAN PERSIAPAN
1 Pek. Pembersihan lahan ls 1.00 0.426 1.000 ls 0.000 ls 0.43 0.000 ls 1.00 ls 0.426 1.000 ls 1.000 ls 0.43 0.43 100.00%
2 Pek. Pagar keliling site Seng bjls, 2 m m' 72.00 2.643 72.000 m' 48.000 m' 2.64 1.762 m' 24.00 m' 0.881 72.000 m' 72.000 m' 2.64 2.64 100.00%
3 Pek. Gudang & bangsal m2 20.00 1.290 20.000 m2 0.000 m2 1.29 0.000 m2 20.00 m2 1.290 20.000 m2 20.000 m2 1.29 1.29 100.00%
4 Pek. Papan nama proyek ls 1.00 0.061 1.000 ls 1.000 ls 0.06 0.061 ls ls 1.000 ls 1.000 ls 0.06 0.06 100.00%
5 Pek. Mobilisasi dan Demobilisasi ls 1.00 1.297 0.108 ls 0.108 ls 0.14 0.140 0.140 ls 0.108 ls 0.140 0.140 0.247 ls 0.215 ls 0.28 0.28 21.54%
6 Pek. Pengukuran dan bowplank m' 70.00 0.908 70.000 m' 0.000 m' 0.91 0.000 m' 35.00 m' 0.454 70.000 m' 35.000 m' 0.91 0.45 50.00%
7 Pek. Pengadaan air kerja ls 1.00 0.061 0.007 ls 0.007 ls 0.01 0.007 0.007 ls 0.108 ls 0.007 0.007 0.013 ls 0.114 ls 0.01 0.01 11.43%
8 Pek. Listrik kerja ls 1.00 0.365 0.039 ls 0.039 ls 0.04 0.039 0.039 ls 0.108 ls 0.039 0.039 0.079 ls 0.147 ls 0.08 0.08 14.70%
9 Pek. SLO Instalasi Listrik 4400 Va ls 1.00 0.066 0.071 ls 0.000 ls 0.00 0.000 0.033 ls ls 0.033 0.104 ls 0.000 ls 0.04 0.00 0.00%
10 Pek. Laporan & dokumentasi ls 1.00 0.535 0.058 ls 0.058 ls 0.06 0.058 0.058 ls 0.108 ls 0.058 0.058 0.115 ls 0.165 ls 0.12 0.12 16.53%
11 Pek. Pengurusan Perizinan ls 1.00 0.670 0.223 ls 0.000 ls 0.22 0.000 0.333 ls 0.107 ls 0.223 0.072 0.557 ls 0.107 ls 0.45 0.07 10.71%

B PEKERJAAN SELF SUPPORT TOWER


1 Pekerjaan Pondasi Tower
a Pek. Galian tanah m3 39.92 0.339 9.98 m3 - m3 0.085 0.000 29.94 m3 m3 0.255 39.924 m3 0.000 m3 0.34 0.00 0.00%
b Pek. Urugan pasir 10 cm m3 3.03 0.053 m3 m3 3.025 m3 m3 0.053 3.025 m3 0.000 m3 0.05 0.00 0.00%
c Pek. Lantai kerja m3 1.51 0.161 m3 m3 1.513 m3 m3 0.161 1.513 m3 0.000 m3 0.16 0.00 0.00%
d Pek. Pondasi Tower
d.1 Pek. Beton K-225 m3 10.59 1.383 m3 m3 5.882 m3 m3 0.768 5.882 m3 0.000 m3 0.77 0.00 0.00%
d.2 Pek. Pembesian kg 888.98 2.225 kg kg 777.854 kg kg 1.947 777.854 kg 0.000 kg 1.95 0.00 0.00%
d.3 Pek. Begisting m2 7.70 0.121 m2 m2 4.813 m2 m2 0.076 4.813 m2 0.000 m2 0.08 0.00 0.00%
e Pek. Kolom pedestal
e.1 Pek. Beton K-225 m3 3.48 0.455 m3 m3 1.549 m3 m3 0.202 1.549 m3 0.000 m3 0.20 0.00 0.00%
e.2 Pek. Pembesian kg 440.26 1.102 kg kg 264.157 kg kg 0.661 264.157 kg 0.000 kg 0.66 0.00 0.00%
e.3 Pek. Begisting m2 10.56 0.676 m2 m2 5.280 m2 m2 0.338 5.280 m2 0.000 m2 0.34 0.00 0.00%
e.4 Pek. Angkur tower Ø25 mm ASTM A32/JIS 1180 ls 1.00 0.426 ls ls 0.375 ls ls 0.160 0.375 ls 0.000 ls 0.16 0.00 0.00%
f Pek. Pondasi tangga tower 45/45/40 cm m3 0.08 0.083 m3 m3 m3 m3 m3 m3
g Pek. Urugan Kembali galian m3 24.13 0.068 m3 m3 m3 m3 m3 m3
2 Pekerjaan Tower
a Pek. Pengadaan tower & accessories ASTM A36/ JIS G3101/ST37 kg 7,088.80 22.451 191.59 kg 0.000 kg 0.607 0.000 1,341.124 kg kg 4.247 1532.714 kg 0.000 kg 4.85 0.00 0.00%
b Pek. Erection kg 7,088.80 3.195 kg kg kg kg kg kg
c Pek. Pengecatan tower Fin. Warna merah & putih kg 7,088.80 2.185 kg kg kg kg kg kg
d Pek. Penangkal petir & grounding system
Pekerjaan penangkal petir (dari ujung atas sampai di
d.1 set 1.00 2.053 set set set set
ujung tapak tower pakai kawat BC 50 mm) set set
d.2 Pekerjaan pentanahan set 1.00 1.008 set set set set set set
d.3 Pekerjaan lampu tanda (automatic) + instalasi set 1.00 0.752 set set set set set set

C PEKERJAAN SHELTER
1 Pekerjaan Tanah & Pondasi
a Pek. Galian pondasi m3 4.27 0.036 m3 m3 m3 m3 0.00000 0.000 m3 0.000 m3 0.00 0.00 0.00%
b Pek. Urugan pasir, 5 cm m3 0.42 0.007 m3 m3 m3 m3 m3 m3
c Pek. Pas. Batu kosong m3 0.85 0.042 m3 m3 m3 m3 m3 m3
d Pek. Pondasi batu gunung camp 1:5 m3 2.04 0.191 m3 m3 m3 m3 m3 m3
e Pek. Pondasi rollag bata m3 0.55 0.042 m3 m3 m3 m3 m3 m3
f Pek. Urugan kembali galian m3 1.28 0.004 m3 m3 m3 m3 m3 m3
2 Pek. Beton
a Pek. Sloef 15/20 cm, camp 1:2:3 m3 0.44 0.308 m3 m3 m3 m3 m3 m3
b Pek. Rabat beton teras 5 cm m3 0.88 0.093 m3 m3 m3 m3 m3 m3
c Pek. Kolom 15/15 cm, camp 1:2:3 m3 0.47 0.484 m3 m3 m3 m3 m3 m3
d Pek. Ringbalk 15/20 cm, camp 1:2:3 m3 0.44 0.436 m3 m3 m3 m3 m3 m3
e Pek. Lisplank beton 10/25 cm, camp 1:2:3 m3 0.44 0.436 m3 m3 m3 m3 m3 m3
f Pek. Plat dak atap, camp 1:2:3 m3 1.70 1.811 m3 m3 m3 m3 m3 m3
3 Pek. Dinding & pintu
a Pek. Pas. Dinding batu bata, camp 1:5 m2 66.36 0.969 m2 m2 m2 m2 m2 m2
b Pek. Plesteran dinding batu bata, camp 1:5 m2 132.72 0.749 m2 m2 m2 m2 m2 m2
c Pek. Acian dinding m2 132.72 0.522 m2 m2 m2 m2 m2 m2
d Pek. Pintu besi + gembok unit 1.00 0.443 unit unit unit unit unit unit
e Pek. Pintu KM, Aluminium unit 1.00 0.025 unit unit unit unit unit unit
4 Pek. Lantai
a Pek. Urugan tanah bawah lantai m3 2.97 0.051 m3 m3 m3 m3 m3 m3
b Pek. Urugan pasir bawah lantai m3 0.65 0.011 m3 m3 m3 m3 m3 m3
c Pek. Lantai keramik 30x30 cm unpolish m2 5.42 0.102 m2 m2 m2 m2 m2 m2
d Pek. Lantai keramik 30x30 cm KM unpolish m2 1.93 0.036 m2 m2 m2 m2 m2 m2
5 Pek. Pengecatan
a Pek. Pengecatan dinding bata & lisplank vinitex/setara m2 148.40 0.641 m2 m2 m2 m2 m2 m2
b Pek. Waterprofing dak atap & lisplank No Drop/Aquaproff/setara m2 35.20 0.262 m2 m2 m2 m2 m2 m2
6 Pek. Elektrikal
a Pek. Lampu penerangan TL 2x18 Watt Philips/setara bh 2.00 0.045 bh bh bh bh bh bh
b Pek. Lampu pijar 5 Watt Philips/setara bh 1.00 0.011 bh bh bh bh bh bh
c Pek. Lampu kapsul automatic 18 Watt Philips/setara bh 1.00 0.080 bh bh bh bh bh bh
d Pek. Saklar ganda Panasonic/setara bh 1.00 0.004 bh bh bh bh bh bh
e Pek. Saklar tunggal Panasonic/setara bh 1.00 0.003 bh bh bh bh bh bh
f Pek. Stop kontak biasa Panasonic/setara bh 6.00 0.028 bh bh bh bh bh bh
g Pek. Terminal stop kuningan 6 lubang NYY 3x6 mm2 bh 2.00 0.043 bh bh bh bh bh bh

h Pek. AC Split wall 1/2 PK 220 VAC + timer + stop kontak Panasonic/setara unit 2.00 1.360 unit unit unit unit
unit unit
Pek. Exhaust fan type wall mounted fan 30x30 cm + timer
i National, KDK, Setara unit 2.00 0.378 unit unit unit unit
+ stop kontak unit unit
j Pek. Instalasi titik lampu NYY 3 x 4 mm2 titik 4.00 0.168 titik titik titik titik titik titik
k Pek. Instalasi stop kontak NYY 3 x 6 mm2 in conduit titik 6.00 0.257 titik titik titik titik titik titik
l Pek. Tray indoor
l.1 Pek. Kabel tray 300x50 mm Ex. Lokal m' 7.00 0.112 m' m' m' m' m' m'
l.2 Pek. Cross tray 300x50 mm Ex. Lokal bh 3.00 0.014 bh bh bh bh bh bh
l.3 Pek. Tray ladder 300x50 mm Ex. Lokal m' 2.40 0.168 m' m' m' m' m' m'
m Pek. Tray outdoor
m.1 Pek. Kabel tray outdoor 300x50 mm Ex. Lokal m' 5.50 0.088 m' m' m' m' m' m'
m.2 Pek. Tiang penopang tray, pipa galvanis 3" Ex. Lokal ls 1.00 0.061 ls ls ls ls ls ls
n Pek. Panel listrik Schnider/setara set 1.00 1.601 set set set set set set
o Pek. Rak panel indoor, custom set 1.00 0.709 set set set set set set
p Pek. Bak kontrol unit 1.00 0.054 unit unit unit unit unit unit
7 Pek. Mekanikal Plumbing
a Pek. Penyambungan air bersih ke jaringan desa Wavin/setara ls 1.00 0.183 ls ls 0.500 ls ls 0.091 0.500 ls 0.000 ls 0.09 0.00 0.00%
b Pek. Pipa PVC AW 3/4", air bersih Wavin/setara m' 4.50 0.012 m' m' m' m' m' m'
c Pek. Pipa PVC AW 3", air bekas & air kotor Wavin/setara m' 6.30 0.077 m' m' m' m' m' m'
d Pek. Closed Jongkok Toto/setara bh 1.00 0.080 bh bh bh bh bh bh
e Pek. Floor drain Stainlessteel bh 1.00 0.004 bh bh bh bh bh bh
f Pek. Kran air 3/4" Ex. Lokal bh 1.00 0.004 bh bh bh bh bh bh
g Pek. Pegadaan bak air & gayung Ex. Lokal bh 1.00 0.030 bh bh bh bh bh bh
h Pek. Septictank gorong-gorong Ø100 cm Ex. Lokal unit 1.00 0.609 unit unit unit unit unit unit

D PEKERJAAN PAGAR & SITE


1 Pekerjaan pagar keliling (BRC) tinggi 2 meter
a Pek. Galian pondasi m3 11.59 0.099 m3 m3 m3 m3 m3 m3
b Pek. Urugan pasir bawah pondasi, 5 cm m3 2.32 0.041 m3 m3 m3 m3 m3 m3
c Pek. Pas. Batu kosong m3 4.64 0.231 m3 m3 m3 m3 m3 m3
d Pek. Pondasi batu gunung, camp 1:5 m3 36.46 3.415 m3 m3 m3 m3 m3 m3
e Pek. Urugan kembali galian m3 2.22 0.006 m3 m3 m3 m3 m3 m3
f Pek. Beton kaki BRC, 20/20/30 cm m3 0.34 0.036 m3 m3 m3 m3 m3 m3
g Pek. Pagar BRC, t = 190 cm m2 127.30 4.955 m2 m2 m2 m2 m2 m2
h Pek. Gerbang BRC + gembok m2 1.00 0.487 m2 m2 m2 m2 m2 m2
2 Pek. Site
a Pek. Urugan tanah site m3 100.98 1.744 m3 m3 m3 m3 m3 m3
b Pek. Urugan pasir site 5 cm m3 14.30 0.250 m3 m3 m3 m3 m3 m3
c Pek. Urugan gravel 5 cm m3 14.03 0.604 m3 m3 m3 m3 m3 m3
d Pek. Lampu site LED, 50 watt, with photocell bh 1.00 0.332 bh bh bh bh bh bh
e Pek. Instalasi titik lampu site titik 1.00 0.042 titik titik titik titik titik titik
f Pek. CCTV
Pek. Peralatan utama, DVR 4Ch w/HDD 2TB, network
f.1 Avtech/setara set 1.00 2.331 set set set set
switch & rak metal set set
Pek. Fixed Color camera dome type, 1/3” CMOS,
f.2 Avtech/setara unit 1.00 0.628 unit unit unit unit
1080p unit unit
Pek. Fixed Color camera bullet type, 1/3” CMOS,
f.3 Avtech/setara unit 2.00 1.230 unit unit unit unit
1080p unit unit
Pek. Instalasi CCTV menggunakan Coaxial cable RG5 in
f.4 PVC HI conduit dia.20mm & NYMHY 2 x 1,5 mm2 untuk titik 3.00 0.125 titik titik titik titik
kabel daya ke tiap camera titik titik
g Rumah genset
g.1 Pek. Rabat beton 10 cm m3 0.60 0.064 m3 m3 m3 m3 m3 m3
g.2 Pek. Rumah genset, atap + gembok, Fin. Cat set 1.00 0.792 set set set set set set
g.3 Pek. Mobilisasi genset & instalasi ls 1.00 0.097 ls ls ls ls ls ls
h Ramp jalan masuk, 10 cm m3 0.30 0.319 m3 m3 m3 m3 m3 m3
i Pek. Papan identitas tower, Fin. Cat & Letter huruf Besi pelat 1 mm & pipa besi 2" set 1.00 0.609 set set set set set set

E PEKERJAAN JALAN AKSES LOKASI


1 Pek. Persiapan tanah jalan ls 1.00 0.365 ls ls 0.077 ls ls 0.028 0.077 ls 0.000 ls 0.03 0.00 0.00%
2 Pek. Galian pondasi batu kali m3 12.83 0.109 m3 m3 0.987 m3 m3 0.008 0.987 m3 0.000 m3 0.01 0.00 0.00%
3 Pek. Urugan pasir, 5 cm m3 4.12 0.072 m3 m3 0.317 m3 m3 0.006 0.317 m3 0.000 m3 0.01 0.00 0.00%
4 Pek. Pas. batu kosong m3 8.69 0.433 m3 m3 0.669 m3 m3 0.033 0.669 m3 0.000 m3 0.03 0.00 0.00%
5 Pek. Pondasi batu gunung, camp 1:5 m3 18.03 1.689 m3 m3 1.387 m3 m3 0.130 1.387 m3 0.000 m3 0.13 0.00 0.00%
6 Pek. Lantai kerja 5 cm m3 34.93 3.711 m3 m3 m3 m3 m3 m3
7 Pek. Paving block 8 cm Herringbone 90° m2 582.24 14.242 m2 m2 m2 m2 m2 m2
F TOTAL 100.0 6.492 2.066 9.664 3.367 16.156 5.433 5.249
G Deviasi = (∑Bobot Realisasi) - (∑Bobot Rencana) -4.42575458791903 -6.29679372089089 -10.7225483088099 (94.7509)

DISETUJUI OLEH, DIPERIKSA OLEH,


PLN APDP MATARAM PT. TEKNIK EKSAKTA

ANUNG HERMAWAN MUSHLIHUDDIN


Direksi Pekerjaan Konsultan Pengawas
LAPORAN PROGRES MINGGUAN
PEMBANGUNAN TOWER SST 42 METER UNTUK REPEATER TIMBANUH TERMASUK SHELTER, AKSES
JALAN DAN PAGAR KELILING
SPK Nomor : 080.SPK/INF/DAN.02.03/APDP.MTR/2017
Tanggal Kontrak : 10 November 2017
Nilai Kontrak : Rp 882.310.000,-
Nilai Kontrak Addendum : Rp 903.102.200,-
Sumber Dana : APLN. TA. 2017
Kontraktor : CV. REZKY SAHABAT
Konsultan : PT. TEKNIK EKSAKTA

Periode : 10 November 2017 s/d 16 November 2017

KUMMULATIVE s.d MINGGU LALU TERCAPAI MINGGU INI KUMMULATIVE s.d MINGGU SAAT INI MINGGU 1
VOLUME
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
NO. ITEM PEKERJAAN SPESIFIKASI BOBOT PERSENTASE
REAL RENCANA REAL RENCANA REAL RENCANA REAL RENCANA REAL RENCANA REAL KUMMULATIVE
RENCANA KERJA
Sat. Vol. LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN
A PEKERJAAN PERSIAPAN
1 Pek. Pembersihan lahan ls 1.00 0.426 ls ls 1.000 ls ls 0.426 1.000 ls 0.000 ls 0.426 0.000 0.000%
2 Pek. Pagar keliling site Seng bjls, 2 m m' 72.00 2.643 m' m' 72.000 m' 48 m' 2.643 1.762 72.000 m' 48.000 m' 2.643 1.762 66.667%
3 Pek. Gudang & bangsal m2 20.00 1.290 m2 m2 20.000 m2 m2 1.290 20.000 m2 0.000 m2 1.290 0.000 0.000%
4 Pek. Papan nama proyek ls 1.00 0.061 ls ls 1.000 ls 1.000 ls 0.061 0.061 1.000 ls 1.000 ls 0.061 0.061 100.000%
5 Pek. Mobilisasi dan Demobilisasi ls 1.00 1.297 ls ls 0.108 ls 0.108 ls 0.140 0.140 0.108 ls 0.108 ls 0.140 0.140 10.769%
6 Pek. Pengukuran dan bowplank m' 70.00 0.908 m' m' 70.000 m' m' 0.908 70.000 m' 0.000 m' 0.908 0.000 0.000%
7 Pek. Pengadaan air kerja ls 1.00 0.061 ls ls 0.007 ls 0.007 ls 0.007 0.007 0.007 ls 0.007 ls 0.007 0.007 0.656%
8 Pek. Listrik kerja ls 1.00 0.365 ls ls 0.039 ls 0.039 ls 0.039 0.039 0.039 ls 0.039 ls 0.039 0.039 3.935%
9 Pek. SLO Instalasi Listrik 4400 Va ls 1.00 0.066 ls ls 0.071 ls ls 0.005 0.071 ls 0.000 ls 0.005 0.000 0.000%
10 Pek. Laporan & dokumentasi ls 1.00 0.535 ls ls 0.058 ls 0.058 ls 0.058 0.058 0.058 ls 0.058 ls 0.058 0.058 5.759%
11 Pek. Pengurusan Perizinan ls 1.00 0.670 ls ls 0.223 ls ls 0.223 0.223 ls 0.000 ls 0.223 0.000 0.000%

B PEKERJAAN SELF SUPPORT TOWER


1 Pekerjaan Pondasi Tower
a Pek. Galian tanah m3 39.92 0.339 m3 m3 9.981 m3 m3 0.085 9.981 m3 0.000 m3 0.085 0.000 0.000%
b Pek. Urugan pasir 10 cm m3 3.03 0.053 m3 m3 m3 m3 m3 m3
c Pek. Lantai kerja m3 1.51 0.161 m3 m3 m3 m3 m3 m3
d Pek. Pondasi Tower
d.1 Pek. Beton K-225 m3 10.59 1.383 m3 m3 m3 m3 m3 m3
d.2 Pek. Pembesian kg 888.98 2.225 kg kg kg kg kg kg
d.3 Pek. Begisting m2 7.70 0.121 m2 m2 m2 m2 m2 m2
e Pek. Kolom pedestal
e.1 Pek. Beton K-225 m3 3.48 0.455 m3 m3 m3 m3 m3 m3
e.2 Pek. Pembesian kg 440.26 1.102 kg kg kg kg kg kg
e.3 Pek. Begisting m2 10.56 0.676 m2 m2 m2 m2 m2 m2
e.4 Pek. Angkur tower Ø25 mm ASTM A32/JIS 1180 ls 1.00 0.426 ls ls ls ls ls ls
f Pek. Pondasi tangga tower 45/45/40 cm m3 0.08 0.083 m3 m3 m3 m3 m3 m3
g Pek. Urugan Kembali galian m3 24.13 0.068 m3 m3 m3 m3 m3 m3
2 Pekerjaan Tower
a Pek. Pengadaan tower & accessories ASTM A36/ JIS G3101/ST37 kg 7,088.80 22.451 kg kg 191.589 kg kg 0.607 191.589 kg 0.000 kg 0.607 0.000 0.000%
b Pek. Erection kg 7,088.80 3.195 kg kg kg kg kg kg
c Pek. Pengecatan tower Fin. Warna merah & putih kg 7,088.80 2.185 kg kg kg kg kg kg
d Pek. Penangkal petir & grounding system
Pekerjaan penangkal petir (dari ujung atas sampai di
d.1 set 1.00 2.053 set set set set
ujung tapak tower pakai kawat BC 50 mm) set set
d.2 Pekerjaan pentanahan set 1.00 1.008 set set set set set set
d.3 Pekerjaan lampu tanda (automatic) + instalasi set 1.00 0.752 set set set set set set

C PEKERJAAN SHELTER
1 Pekerjaan Tanah & Pondasi
a Pek. Galian pondasi m3 4.27 0.036 m3 m3 m3 m3 m3 m3
b Pek. Urugan pasir, 5 cm m3 0.42 0.007 m3 m3 m3 m3 m3 m3
c Pek. Pas. Batu kosong m3 0.85 0.042 m3 m3 m3 m3 m3 m3
d Pek. Pondasi batu gunung camp 1:5 m3 2.04 0.191 m3 m3 m3 m3 m3 m3
e Pek. Pondasi rollag bata m3 0.55 0.042 m3 m3 m3 m3 m3 m3
f Pek. Urugan kembali galian m3 1.28 0.004 m3 m3 m3 m3 m3 m3
2 Pek. Beton
a Pek. Sloef 15/20 cm, camp 1:2:3 m3 0.44 0.308 m3 m3 m3 m3 m3 m3
b Pek. Rabat beton teras 5 cm m3 0.88 0.093 m3 m3 m3 m3 m3 m3
c Pek. Kolom 15/15 cm, camp 1:2:3 m3 0.47 0.484 m3 m3 m3 m3 m3 m3
d Pek. Ringbalk 15/20 cm, camp 1:2:3 m3 0.44 0.436 m3 m3 m3 m3 m3 m3
e Pek. Lisplank beton 10/25 cm, camp 1:2:3 m3 0.44 0.436 m3 m3 m3 m3 m3 m3
f Pek. Plat dak atap, camp 1:2:3 m3 1.70 1.811 m3 m3 m3 m3 m3 m3
3 Pek. Dinding & pintu
a Pek. Pas. Dinding batu bata, camp 1:5 m2 66.36 0.969 m2 m2 m2 m2 m2 m2
b Pek. Plesteran dinding batu bata, camp 1:5 m2 132.72 0.749 m2 m2 m2 m2 m2 m2
c Pek. Acian dinding m2 132.72 0.522 m2 m2 m2 m2 m2 m2
d Pek. Pintu besi + gembok unit 1.00 0.443 unit unit unit unit unit unit
e Pek. Pintu KM, Aluminium unit 1.00 0.025 unit unit unit unit unit unit
4 Pek. Lantai
a Pek. Urugan tanah bawah lantai m3 2.97 0.051 m3 m3 m3 m3 m3 m3
b Pek. Urugan pasir bawah lantai m3 0.65 0.011 m3 m3 m3 m3 m3 m3
c Pek. Lantai keramik 30x30 cm unpolish m2 5.42 0.102 m2 m2 m2 m2 m2 m2
d Pek. Lantai keramik 30x30 cm KM unpolish m2 1.93 0.036 m2 m2 m2 m2 m2 m2
5 Pek. Pengecatan
a Pek. Pengecatan dinding bata & lisplank vinitex/setara m2 148.40 0.641 m2 m2 m2 m2 m2 m2
b Pek. Waterprofing dak atap & lisplank No Drop/Aquaproff/setara m2 35.20 0.262 m2 m2 m2 m2 m2 m2
6 Pek. Elektrikal
a Pek. Lampu penerangan TL 2x18 Watt Philips/setara bh 2.00 0.045 bh bh bh bh bh bh
b Pek. Lampu pijar 5 Watt Philips/setara bh 1.00 0.011 bh bh bh bh bh bh
c Pek. Lampu kapsul automatic 18 Watt Philips/setara bh 1.00 0.080 bh bh bh bh bh bh
d Pek. Saklar ganda Panasonic/setara bh 1.00 0.004 bh bh bh bh bh bh
e Pek. Saklar tunggal Panasonic/setara bh 1.00 0.003 bh bh bh bh bh bh
f Pek. Stop kontak biasa Panasonic/setara bh 6.00 0.028 bh bh bh bh bh bh
g Pek. Terminal stop kuningan 6 lubang NYY 3x6 mm2 bh 2.00 0.043 bh bh bh bh bh bh

h Pek. AC Split wall 1/2 PK 220 VAC + timer + stop kontak Panasonic/setara unit 2.00 1.360 unit unit unit unit
unit unit
Pek. Exhaust fan type wall mounted fan 30x30 cm + timer
i National, KDK, Setara unit 2.00 0.378 unit unit unit unit
+ stop kontak unit unit
j Pek. Instalasi titik lampu NYY 3 x 4 mm2 titik 4.00 0.168 titik titik titik titik titik titik
k Pek. Instalasi stop kontak NYY 3 x 6 mm2 in conduit titik 6.00 0.257 titik titik titik titik titik titik
l Pek. Tray indoor
l.1 Pek. Kabel tray 300x50 mm Ex. Lokal m' 7.00 0.112 m' m' m' m' m' m'
l.2 Pek. Cross tray 300x50 mm Ex. Lokal bh 3.00 0.014 bh bh bh bh bh bh
l.3 Pek. Tray ladder 300x50 mm Ex. Lokal m' 2.40 0.168 m' m' m' m' m' m'
m Pek. Tray outdoor
m.1 Pek. Kabel tray outdoor 300x50 mm Ex. Lokal m' 5.50 0.088 m' m' m' m' m' m'
m.2 Pek. Tiang penopang tray, pipa galvanis 3" Ex. Lokal ls 1.00 0.061 ls ls ls ls ls ls
n Pek. Panel listrik Schnider/setara set 1.00 1.601 set set set set set set
o Pek. Rak panel indoor, custom set 1.00 0.709 set set set set set set
p Pek. Bak kontrol unit 1.00 0.054 unit unit unit unit unit unit
7 Pek. Mekanikal Plumbing
a Pek. Penyambungan air bersih ke jaringan desa Wavin/setara ls 1.00 0.183 ls ls ls ls ls ls
b Pek. Pipa PVC AW 3/4", air bersih Wavin/setara m' 4.50 0.012 m' m' m' m' m' m'
c Pek. Pipa PVC AW 3", air bekas & air kotor Wavin/setara m' 6.30 0.077 m' m' m' m' m' m'
d Pek. Closed Jongkok Toto/setara bh 1.00 0.080 bh bh bh bh bh bh
e Pek. Floor drain Stainlessteel bh 1.00 0.004 bh bh bh bh bh bh
f Pek. Kran air 3/4" Ex. Lokal bh 1.00 0.004 bh bh bh bh bh bh
g Pek. Pegadaan bak air & gayung Ex. Lokal bh 1.00 0.030 bh bh bh bh bh bh
h Pek. Septictank gorong-gorong Ø100 cm Ex. Lokal unit 1.00 0.609 unit unit unit unit unit unit

D PEKERJAAN PAGAR & SITE


1 Pekerjaan pagar keliling (BRC) tinggi 2 meter
a Pek. Galian pondasi m3 11.59 0.099 m3 m3 m3 m3 m3 m3
b Pek. Urugan pasir bawah pondasi, 5 cm m3 2.32 0.041 m3 m3 m3 m3 m3 m3
c Pek. Pas. Batu kosong m3 4.64 0.231 m3 m3 m3 m3 m3 m3
d Pek. Pondasi batu gunung, camp 1:5 m3 36.46 3.415 m3 m3 m3 m3 m3 m3
e Pek. Urugan kembali galian m3 2.22 0.006 m3 m3 m3 m3 m3 m3
f Pek. Beton kaki BRC, 20/20/30 cm m3 0.34 0.036 m3 m3 m3 m3 m3 m3
g Pek. Pagar BRC, t = 190 cm m2 127.30 4.955 m2 m2 m2 m2 m2 m2
h Pek. Gerbang BRC + gembok m2 1.00 0.487 m2 m2 m2 m2 m2 m2
2 Pek. Site
a Pek. Urugan tanah site m3 100.98 1.744 m3 m3 m3 m3 m3 m3
b Pek. Urugan pasir site 5 cm m3 14.30 0.250 m3 m3 m3 m3 m3 m3
c Pek. Urugan gravel 5 cm m3 14.03 0.604 m3 m3 m3 m3 m3 m3
d Pek. Lampu site LED, 50 watt, with photocell bh 1.00 0.332 bh bh bh bh bh bh
e Pek. Instalasi titik lampu site titik 1.00 0.042 titik titik titik titik titik titik
f Pek. CCTV
Pek. Peralatan utama, DVR 4Ch w/HDD 2TB, network
f.1 Avtech/setara set 1.00 2.331 set set set set
switch & rak metal set set
Pek. Fixed Color camera dome type, 1/3” CMOS,
f.2 Avtech/setara unit 1.00 0.628 unit unit unit unit
1080p unit unit
Pek. Fixed Color camera bullet type, 1/3” CMOS,
f.3 Avtech/setara unit 2.00 1.230 unit unit unit unit
1080p unit unit
Pek. Instalasi CCTV menggunakan Coaxial cable RG5 in
f.4 PVC HI conduit dia.20mm & NYMHY 2 x 1,5 mm2 untuk titik 3.00 0.125 titik titik titik titik
kabel daya ke tiap camera titik titik
g Rumah genset
g.1 Pek. Rabat beton 10 cm m3 0.60 0.064 m3 m3 m3 m3 m3 m3
g.2 Pek. Rumah genset, atap + gembok, Fin. Cat set 1.00 0.792 set set set set set set
g.3 Pek. Mobilisasi genset & instalasi ls 1.00 0.097 ls ls ls ls ls ls
h Ramp jalan masuk, 10 cm m3 0.30 0.319 m3 m3 m3 m3 m3 m3
i Pek. Papan identitas tower, Fin. Cat & Letter huruf Besi pelat 1 mm & pipa besi 2" set 1.00 0.609 set set set set set set

E PEKERJAAN JALAN AKSES LOKASI


1 Pek. Persiapan tanah jalan ls 1.00 0.365 ls ls ls ls ls ls
2 Pek. Galian pondasi batu kali m3 12.83 0.109 m3 m3 m3 m3 m3 m3
3 Pek. Urugan pasir, 5 cm m3 4.12 0.072 m3 m3 m3 m3 m3 m3
4 Pek. Pas. batu kosong m3 8.69 0.433 m3 m3 m3 m3 m3 m3
5 Pek. Pondasi batu gunung, camp 1:5 m3 18.03 1.689 m3 m3 m3 m3 m3 m3
6 Pek. Lantai kerja 5 cm m3 34.93 3.711 m3 m3 m3 m3 m3 m3
7 Pek. Paving block 8 cm Herringbone 90° m2 582.24 14.242 m2 m2 m2 m2 m2 m2
F TOTAL 100.0 - - 6.492 2.066 6.492 2.066 1.878
G Deviasi = (∑Bobot Realisasi) - (∑Bobot Rencana) 0 -4.42575458791903 -4.42575458791903 (98.1221)

DISETUJUI OLEH, DIPERIKSA OLEH,


PLN APDP MATARAM PT. TEKNIK EKSAKTA

ANUNG HERMAWAN MUSHLIHUDDIN


Direksi Pekerjaan Konsultan Pengawas