WAKTU PELAKSANAAN
B1 B2 B3
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10
NO % KET.
ITEM PEKERJAAN VOLUME BOBOT DURASI BOBOT/
10-Nov-17
11-Nov-17
12-Nov-17
13-Nov-17
14-Nov-17
15-Nov-17
16-Nov-17
17-Nov-17
18-Nov-17
10 19-Nov-17
11 20-Nov-17
12 21-Nov-17
13 22-Nov-17
14 23-Nov-17
15 24-Nov-17
16 25-Nov-17
17 26-Nov-17
18 27-Nov-17
19 28-Nov-17
20 29-Nov-17
21 30-Nov-17
10-Dec-17
11-Dec-17
12-Dec-17
13-Dec-17
14-Dec-17
15-Dec-17
16-Dec-17
17-Dec-17
18-Dec-17
19-Dec-17
20-Dec-17
21-Dec-17
22-Dec-17
23-Dec-17
24-Dec-17
25-Dec-17
26-Dec-17
27-Dec-17
28-Dec-17
29-Dec-17
30-Dec-17
31-Dec-17
10-Jan-18
11-Jan-18
12-Jan-18
13-Jan-18
1-Dec-17
2-Dec-17
3-Dec-17
4-Dec-17
5-Dec-17
6-Dec-17
7-Dec-17
8-Dec-17
9-Dec-17
1-Jan-18
2-Jan-18
3-Jan-18
4-Jan-18
5-Jan-18
6-Jan-18
7-Jan-18
8-Jan-18
9-Jan-18
DURASI
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
1
9
A PEKERJAAN PERSIAPAN
Rencana 1 ls 0.42634 3 0.1421 0.14 0.14 0.14 100
1 Pek. Pembersihan lahan
Realisasi 1 ls 0.42634 2 0.2132 0.213 0.213
Rencana 72 m' 2.64295 5 0.5286 0.5 0.5 0.5 0.5 0.5
2 Pek. Pagar keliling site
Realisasi 72 m' 2.64295 3 0.8810 0.9 0.9 0.9
Rencana 20 m2 1.29037 5 0.2581 0.3 0.3 0.3 0.3 0.3
3 Pek. Gudang & bangsal
Realisasi 20 m2 1.29037 2 0.6452 0.645 0.645
Rencana 1 ls 0.06091 3 0.0203 0.0 0.0 0.0
4 Pek. Papan nama proyek
Realisasi 1 ls 0.06091 1 0.0609 0.06
Rencana 1 ls 1.29729 65 0.0200 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
5 Pek. Mobilisasi dan Demobilisasi
Realisasi 1 ls 1.29729 65 0.0200 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
Rencana 70 m' 0.90838 4 0.2271 0.2 0.2 0.2 0.2
6 Pek. Pengukuran dan bowplank
Realisasi 70 m' 0.90838 2 0.4542 0.45 0.45
Rencana 1 ls 0.06091 65 0.0009 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7 Pek. Pengadaan air kerja
Realisasi 1 ls 0.06091 65 0.0009 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Rencana 1 ls 0.36543 65 0.0056 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8 Pek. Listrik kerja
Realisasi 1 ls 0.36543 65 0.0056 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Rencana 1 ls 0.06610 14 0.0047 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9 Pek. SLO Instalasi Listrik
Realisasi 1 ls 0.06610
Rencana 1 ls 0.53475 65 0.0082 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10 Pek. Laporan & dokumentasi
Realisasi 1 ls 0.53475 65 0.0082 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
Rencana 1 ls 0.66996 21 0.0319 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11 Pek. Pengurusan Perizinan
Realisasi 1 ls 0.66996 56 0.0120 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 CC
B PEKERJAAN SELF SUPPORT TOWER
1 Pekerjaan Pondasi Tower
O
a Pek. Galian tanah
Rencana
Realisasi
39.924
39.924
m3
m3
0.33946
0.33946
4
4
0.0849
0.0849
0.08 0.08 0.08 0.08
0.08 0.08 0.08 0.08
PE 90
2 Pek. Beton
Realisasi 1.2795 m3 0.00358 1 0.0036 0.0
PE
a Pek. Sloef 15/20 cm, camp 1:2:3
Rencana 0.44 m3 0.30786 4 0.0770 0.1 0.1 0.1 0.1 RT
Realisasi 0.44 m3 0.30786 2 0.1539 0.2 0.2
i Pek. Exhaust fan type wall mounted fan 30x30 cm + timer + stop kontak Rencana 2 unit 0.37813 7 0.0540 O 0.1 0.1 0.1 0.1 0.1 0.1 0.1
Realisasi 2 unit 0.37813
Rencana 1 ls 0.48724 7 0.0696 0.1 0.1 0.1 0.1 0.1 0.1 0.1 20
h Pek. Gerbang BRC
Realisasi 1 ls 0.48724
2 Pek. Site
Rencana 100.9792 m3 1.74380 25 0.0698 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
a Pek. Urugan tanah site
Realisasi 100.9792 m3 1.74380 15 0.1163 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
Rencana 14.3 m3 0.24993 7 0.0357 0.0 0.0 0.0 0.0 0.0 0.0 0.0
b Pek. Urugan pasir site 5 cm
Realisasi 14.3 m3 0.24993 3 0.0833
Rencana 14.03 m3 0.60390 7 0.0863 0.1 0.1 0.1 0.1 0.1 0.1 0.1
c Pek. Urugan gravel 5 cm
Realisasi 14.03 m3 0.60390 2 0.3020
Rencana 1 bh 0.33173 3 0.1106 0.1 0.1 0.1
d Pek. Lampu site LED, 50 watt, with photocell
Realisasi 1 bh 0.33173
Rencana 1 titik 0.04210 3 0.0140 0.0 0.0 0.0
e Pek. Instalasi titik lampu site
Realisasi 1 titik 0.04210
f Pek. CCTV
Rencana 1 set 2.33118 18 0.1295 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
f.1 Pek. Peralatan utama, DVR 4Ch w/HDD 2TB, network switch & rak metal
Realisasi 1 set 2.33118
Pek. Fixed Color camera dome type, 1/3” CMOS, Rencana 1 unit 0.62792 18 0.0349 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
f.2
1080p Realisasi 1 unit 0.62792
f.3
Pek. Fixed Color camera bullet type, 1/3” CMOS, Rencana 2 unit 1.23024 18 0.0683 CC 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
1080p
Pek. Instalasi CCTV menggunakan Coaxial cable RG5 in PVC HI conduit
Realisasi
Rencana
2
3
unit
titik
1.23024
0.12465 18 0.0069
O 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
f.4
dia.20mm & NYY 2 x 2.5 mm untuk kabel daya ke tiap camera Realisasi 3 titik 0.12465 PE
g Rumah genset
KUMULATIVE RENCANA 0.21 1.22 2.24 3.34 4.42 5.50 6.49 7.55 8.8 10.3 11.7 13.1 14.5 16.2 18.2 20.1 21.9 23.8 25.4 26.9 28.4 30.2 31.9 33.7 35.4 37.2 39.6 41.9 44.1 46.2 48.6 50.9 52.6 54.2 55.7 57.2 59.1 61.0 62.9 64.8 66.8 68.7 70.9 72.3 73.7 75.2 77.0 79.0 80.7 82.4 84.0 85.6 87.3 88.4 89.3 90.3 91.2 92.2 93.6 94.9 96.2 97.4 98.3 99.1 100
PROGRESS REALISASI 100.0 0.035 0.035 0.035 0.035 0.035 0.977 0.916 0.916 0.260 0.260 0.692 0.692 0.047 0.501 0.624 0.315 1.922 1.827 2.111 23.206 1.585 1.388 1.392 0.719 0.801 0.647 0.405 2.110 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
KUMULATIVE REALISASI 0.035 0.069 0.104 0.139 0.174 1.150 2.066 2.982 3.242 3.502 4.193 4.885 4.932 5.433 6.057 6.371 8.294 10.121 12.232 35.438 37.023 38.412 39.804 40.522 41.323 41.970 42.376 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.486 44.49
DEVIASI (0.17) -1.155 -2.13598 -3.20194 -4.2476 -4.35138 -4.42575 -4.56876 -5.56364 -6.79491 -7.49657 -8.25152 -9.61149 -10.723 -12.1854 -13.7331 -13.6475 -13.6421 -13.1777 8.55341 8.62708 8.25346 7.88342 6.84 5.91727 4.74693 2.72918 2.57814 0.38313 -1.69102 -4.09074 -6.44596 -8.11542 -9.70873 -11.2606 -12.713 -14.6211 -16.5292 -18.4264 -20.3236 -22.264 -24.2044 -26.3925 -27.8171 -29.2417 -30.6866 -32.5277 -34.5636 -36.2264 -37.8892 -39.552 -41.1596 -42.7672 -43.9129 -44.8386 -45.8272 -46.7273 -47.7401 -49.0645 -50.3888 -51.7132 -52.9014 -53.7722 -54.6431 -55.5139
KUMMULATIVE s.d MINGGU LALU TERCAPAI MINGGU INI KUMMULATIVE s.d MINGGU SAAT INI MINGGU 4
VOLUME
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
NO. ITEM PEKERJAAN SPESIFIKASI BOBOT PERSENTASE
REAL RENCANA REAL RENCANA REAL RENCANA REAL RENCANA REAL RENCANA REAL KUMMULATIVE
RENCANA KERJA
Sat. Vol. LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN
A PEKERJAAN PERSIAPAN
1 Pek. Pembersihan lahan ls 1.00 0.426 1.000 ls 1.00 ls 0.43 0.426 ls ls 1.000 ls 1.000 ls 0.43 0.43 100.00%
2 Pek. Pagar keliling site Seng bjls, 2 m m' 72.00 2.643 72.000 m' 72.00 m' 2.64 2.643 m' m' 72.000 m' 72.000 m' 2.64 2.64 100.00%
3 Pek. Gudang & bangsal m2 20.00 1.290 20.000 m2 20.00 m2 1.29 1.290 m2 m2 20.000 m2 20.000 m2 1.29 1.29 100.00%
4 Pek. Papan nama proyek ls 1.00 0.061 1.000 ls 1.00 ls 0.06 0.061 ls ls 1.000 ls 1.000 ls 0.06 0.06 100.00%
5 Pek. Mobilisasi dan Demobilisasi ls 1.00 1.297 0.355 ls 0.32 ls 0.42 0.419 0.108 ls 0.108 ls 0.140 0.140 0.463 ls 0.431 ls 0.56 0.56 43.08%
6 Pek. Pengukuran dan bowplank m' 70.00 0.908 70.000 m' 70.00 m' 0.91 0.908 m' m' 70.000 m' 70.000 m' 0.91 0.91 100.00%
7 Pek. Pengadaan air kerja ls 1.00 0.061 0.121 ls 0.22 ls 0.02 0.020 0.108 ls 0.108 ls 0.007 0.007 0.229 ls 0.330 ls 0.03 0.03 32.96%
8 Pek. Listrik kerja ls 1.00 0.365 0.186 ls 0.25 ls 0.12 0.118 0.108 ls 0.108 ls 0.039 0.039 0.294 ls 0.362 ls 0.16 0.16 36.24%
9 Pek. SLO Instalasi Listrik 4400 Va ls 1.00 0.066 0.533 ls 0.00 ls 0.07 0.000 ls ls 0.533 ls 0.000 ls 0.07 0.00 0.00%
10 Pek. Laporan & dokumentasi ls 1.00 0.535 0.223 ls 0.27 ls 0.17 0.173 0.108 ls 0.108 ls 0.058 0.058 0.331 ls 0.381 ls 0.23 0.23 38.07%
11 Pek. Pengurusan Perizinan ls 1.00 0.670 0.890 ls 0.23 ls 0.67 0.156 ls 0.125 ls 0.084 0.890 ls 0.357 ls 0.67 0.24 35.71%
C PEKERJAAN SHELTER
1 Pekerjaan Tanah & Pondasi
a Pek. Galian pondasi m3 4.27 0.036 4.265 m3 4.27 m3 0.04 0.036 m3 m3 4.265 m3 4.265 m3 0.04 0.04 100.00%
b Pek. Urugan pasir, 5 cm m3 0.42 0.007 0.423 m3 0.42 m3 0.01 0.007 m3 m3 0.423 m3 0.423 m3 0.01 0.01 100.00%
c Pek. Pas. Batu kosong m3 0.85 0.042 0.852 m3 0.85 m3 0.04 0.042 m3 m3 0.852 m3 0.852 m3 0.04 0.04 100.00%
d Pek. Pondasi batu gunung camp 1:5 m3 2.04 0.191 2.035 m3 2.04 m3 0.19 0.191 m3 m3 0.0000 2.035 m3 2.035 m3 0.19 0.19 100.00%
e Pek. Pondasi rollag bata m3 0.55 0.042 0.137 m3 0.00 m3 0.01 0.000 0.410 m3 m3 0.031 0.546 m3 0.000 m3 0.04 0.00 0.00%
f Pek. Urugan kembali galian m3 1.28 0.004 0.000 m3 0.00 m3 0.00 0.000 1.280 m3 1.280 m3 0.004 0.004 1.280 m3 1.280 m3 0.00 0.00 100.00%
2 Pek. Beton
a Pek. Sloef 15/20 cm, camp 1:2:3 m3 0.44 0.308 0.110 m3 0.00 m3 0.08 0.000 0.330 m3 0.44 m3 0.231 0.308 0.440 m3 0.440 m3 0.31 0.31 100.00%
b Pek. Rabat beton teras 5 cm m3 0.88 0.093 0.000 m3 0.00 m3 0.00 0.000 m3 m3 0.000 m3 0.000 m3 0.00 0.00 0.00%
c Pek. Kolom 15/15 cm, camp 1:2:3 m3 0.47 0.484 0.000 m3 0.00 m3 0.00 0.000 0.473 m3 0.4725 m3 0.484 0.484 0.473 m3 0.473 m3 0.48 0.48 100.00%
d Pek. Ringbalk 15/20 cm, camp 1:2:3 m3 0.44 0.436 0.000 m3 0.00 m3 0.00 0.000 0.293 m3 m3 0.291 0.293 m3 0.000 m3 0.29 0.00 0.00%
e Pek. Lisplank beton 10/25 cm, camp 1:2:3 m3 0.44 0.436 0.000 m3 0.00 m3 0.00 0.000 0.147 m3 m3 0.145 0.147 m3 0.000 m3 0.15 0.00 0.00%
f Pek. Plat dak atap, camp 1:2:3 m3 1.70 1.811 0.000 m3 0.00 m3 0.00 0.000 0.568 m3 m3 0.604 0.568 m3 0.000 m3 0.60 0.00 0.00%
3 Pek. Dinding & pintu
a Pek. Pas. Dinding batu bata, camp 1:5 m2 66.36 0.969 0.000 m2 0.00 m2 0.00 0.000 66.360 m2 66.36 m2 0.969 0.969 66.360 m2 66.360 m2 0.97 0.97 100.00%
b Pek. Plesteran dinding batu bata, camp 1:5 m2 132.72 0.749 0.000 m2 0.00 m2 0.00 0.000 88.480 m2 m2 0.499 88.480 m2 0.000 m2 0.50 0.00 0.00%
c Pek. Acian dinding m2 132.72 0.522 0.000 m2 0.00 m2 0.00 0.000 m2 m2 m2 m2 0.00%
d Pek. Pintu besi + gembok unit 1.00 0.443 0.000 unit 0.00 unit 0.00 0.000 1.000 unit unit 0.443 1.000 unit 0.000 unit 0.44 0.00 0.00%
e Pek. Pintu KM, Aluminium unit 1.00 0.025 0.000 unit 0.00 unit 0.00 0.000 1.000 unit unit 0.025 1.000 unit 0.000 unit 0.02 0.00 0.00%
4 Pek. Lantai
a Pek. Urugan tanah bawah lantai m3 2.97 0.051 0.000 m3 0.00 m3 0.00 0.000 1.784 m3 m3 0.031 1.784 m3 0.000 m3 0.03 0.00 0.00%
b Pek. Urugan pasir bawah lantai m3 0.65 0.011 0.000 m3 0.00 m3 0.00 0.000 m3 m3 m3 m3
c Pek. Lantai keramik 30x30 cm unpolish m2 5.42 0.102 0.000 m2 0.00 m2 0.00 0.000 m2 m2 m2 m2
d Pek. Lantai keramik 30x30 cm KM unpolish m2 1.93 0.036 0.000 m2 0.00 m2 0.00 0.000 m2 m2 m2 m2
5 Pek. Pengecatan
a Pek. Pengecatan dinding bata & lisplank vinitex/setara m2 148.40 0.641 0.000 m2 0.00 m2 0.00 0.000 m2 m2 m2 m2
b Pek. Waterprofing dak atap & lisplank No Drop/Aquaproff/setara m2 35.20 0.262 0.000 m2 0.00 m2 0.00 0.000 m2 m2 m2 m2
6 Pek. Elektrikal
a Pek. Lampu penerangan TL 2x18 Watt Philips/setara bh 2.00 0.045 0.000 bh 0.00 bh 0.00 0.000 bh bh bh bh
b Pek. Lampu pijar 5 Watt Philips/setara bh 1.00 0.011 0.000 bh 0.00 bh 0.00 0.000 bh bh bh bh
c Pek. Lampu kapsul automatic 18 Watt Philips/setara bh 1.00 0.080 0.000 bh 0.00 bh 0.00 0.000 bh bh bh bh
d Pek. Saklar ganda Panasonic/setara bh 1.00 0.004 0.000 bh 0.00 bh 0.00 0.000 bh bh bh bh
e Pek. Saklar tunggal Panasonic/setara bh 1.00 0.003 0.000 bh 0.00 bh 0.00 0.000 bh bh bh bh
f Pek. Stop kontak biasa Panasonic/setara bh 6.00 0.028 0.000 bh 0.00 bh 0.00 0.000 bh bh bh bh
g Pek. Terminal stop kuningan 6 lubang NYY 3x6 mm2 bh 2.00 0.043 0.000 bh 0.00 bh 0.00 0.000 bh bh bh bh
h Pek. AC Split wall 1/2 PK 220 VAC + timer + stop kontak Panasonic/setara unit 2.00 1.360 0.000 unit 0.00 unit 0.000 unit unit unit unit
0.00
Pek. Exhaust fan type wall mounted fan 30x30 cm + timer
i National, KDK, Setara unit 2.00 0.378 0.000 unit 0.00 unit unit unit unit unit
+ stop kontak 0.00 0.000
j Pek. Instalasi titik lampu NYY 3 x 4 mm2 titik 4.00 0.168 0.000 titik 0.00 titik 0.00 0.000 titik titik titik titik
k Pek. Instalasi stop kontak NYY 3 x 6 mm2 in conduit titik 6.00 0.257 0.000 titik 0.00 titik 0.00 0.000 titik titik titik titik
l Pek. Tray indoor 0.00 0.000
l.1 Pek. Kabel tray 300x50 mm Ex. Lokal m' 7.00 0.112 0.000 m' 0.00 m' 0.00 0.000 m' m' m' m'
l.2 Pek. Cross tray 300x50 mm Ex. Lokal bh 3.00 0.014 0.000 bh 0.00 bh 0.00 0.000 bh bh bh bh
l.3 Pek. Tray ladder 300x50 mm Ex. Lokal m' 2.40 0.168 0.000 m' 0.00 m' 0.00 0.000 m' m' m' m'
m Pek. Tray outdoor 0.00 0.000
m.1 Pek. Kabel tray outdoor 300x50 mm Ex. Lokal m' 5.50 0.088 0.000 m' 0.00 m' 0.00 0.000 m' m' m' m'
m.2 Pek. Tiang penopang tray, pipa galvanis 3" Ex. Lokal ls 1.00 0.061 0.000 ls 0.00 ls 0.00 0.000 ls ls ls ls
n Pek. Panel listrik Schnider/setara set 1.00 1.601 0.167 set 0.00 set 0.27 0.000 0.389 set set 0.623 0.556 set 0.000 set 0.89 0.00 0.00%
o Pek. Rak panel indoor, custom set 1.00 0.709 0.000 set 0.00 set 0.00 0.000 set set set set
p Pek. Bak kontrol unit 1.00 0.054 0.000 unit 0.00 unit 0.00 0.000 unit unit unit unit
7 Pek. Mekanikal Plumbing
a Pek. Penyambungan air bersih ke jaringan desa Wavin/setara ls 1.00 0.183 0.500 ls 0.00 ls 0.09 0.000 0.500 ls ls 0.091 1.000 ls 0.000 ls 0.18 0.00 0.00%
b Pek. Pipa PVC AW 3/4", air bersih Wavin/setara m' 4.50 0.012 0.000 m' 0.00 m' 0.00 0.000 2.250 m' m' 0.006 2.250 m' 0.000 m' 0.01 0.00 0.00%
c Pek. Pipa PVC AW 3", air bekas & air kotor Wavin/setara m' 6.30 0.077 0.000 m' 0.00 m' 0.00 0.000 3.150 m' m' 0.039 3.150 m' 0.000 m' 0.04 0.00 0.00%
d Pek. Closed Jongkok Toto/setara bh 1.00 0.080 0.000 bh 0.00 bh 0.00 0.000 0.500 bh bh 0.040 0.500 bh 0.000 bh 0.04 0.00 0.00%
e Pek. Floor drain Stainlessteel bh 1.00 0.004 0.000 bh 0.00 bh 0.00 0.000 0.500 bh bh 0.002 0.500 bh 0.000 bh 0.00 0.00 0.00%
f Pek. Kran air 3/4" Ex. Lokal bh 1.00 0.004 0.000 bh 0.00 bh 0.00 0.000 0.500 bh bh 0.002 0.500 bh 0.000 bh 0.00 0.00 0.00%
g Pek. Pegadaan bak air & gayung Ex. Lokal bh 1.00 0.030 0.000 bh 0.00 bh 0.00 0.000 bh bh bh bh
h Pek. Septictank gorong-gorong Ø100 cm Ex. Lokal unit 1.00 0.609 0.000 unit 0.00 unit 0.00 0.000 0.286 unit 1 unit 0.174 0.609 0.286 unit 1.000 unit 0.17 0.61 100.00%
KUMMULATIVE s.d MINGGU LALU TERCAPAI MINGGU INI KUMMULATIVE s.d MINGGU SAAT INI MINGGU 3
VOLUME
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
NO. ITEM PEKERJAAN SPESIFIKASI BOBOT PERSENTASE
REAL RENCANA REAL RENCANA REAL RENCANA REAL RENCANA REAL RENCANA REAL KUMMULATIVE
RENCANA KERJA
Sat. Vol. LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN
A PEKERJAAN PERSIAPAN
1 Pek. Pembersihan lahan ls 1.00 0.426 1.000 ls 1.000 ls 0.43 0.426 ls ls 1.000 ls 1.000 ls 0.43 0.43 100.00%
2 Pek. Pagar keliling site Seng bjls, 2 m m' 72.00 2.643 72.000 m' 72.000 m' 2.64 2.643 m' m' 72.000 m' 72.000 m' 2.64 2.64 100.00%
3 Pek. Gudang & bangsal m2 20.00 1.290 20.000 m2 20.000 m2 1.29 1.290 m2 m2 20.000 m2 20.000 m2 1.29 1.29 100.00%
4 Pek. Papan nama proyek ls 1.00 0.061 1.000 ls 1.000 ls 0.06 0.061 ls ls 1.000 ls 1.000 ls 0.06 0.06 100.00%
5 Pek. Mobilisasi dan Demobilisasi ls 1.00 1.297 0.247 ls 0.215 ls 0.28 0.279 0.108 ls 0.108 ls 0.140 0.140 0.355 ls 0.323 ls 0.42 0.42 32.31%
6 Pek. Pengukuran dan bowplank m' 70.00 0.908 70.000 m' 35.000 m' 0.91 0.454 m' 35.00 m' 0.454 70.000 m' 70.000 m' 0.91 0.91 100.00%
7 Pek. Pengadaan air kerja ls 1.00 0.061 0.013 ls 0.114 ls 0.01 0.013 0.108 ls 0.108 ls 0.007 0.007 0.121 ls 0.222 ls 0.02 0.02 22.19%
8 Pek. Listrik kerja ls 1.00 0.365 0.079 ls 0.147 ls 0.08 0.079 0.108 ls 0.108 ls 0.039 0.039 0.186 ls 0.255 ls 0.12 0.12 25.47%
9 Pek. SLO Instalasi Listrik 4400 Va ls 1.00 0.066 0.104 ls 0.000 ls 0.04 0.000 0.429 ls ls 0.028 0.533 ls 0.000 ls 0.07 0.00 0.00%
10 Pek. Laporan & dokumentasi ls 1.00 0.535 0.115 ls 0.165 ls 0.12 0.115 0.108 ls 0.108 ls 0.058 0.058 0.223 ls 0.273 ls 0.17 0.17 27.30%
11 Pek. Pengurusan Perizinan ls 1.00 0.670 0.557 ls 0.107 ls 0.45 0.072 0.333 ls 0.125 ls 0.223 0.084 0.890 ls 0.232 ls 0.67 0.16 23.21%
C PEKERJAAN SHELTER
1 Pekerjaan Tanah & Pondasi
a Pek. Galian pondasi m3 4.27 0.036 0.000 m3 0 m3 0.00 0.00 4.265 m3 4.265 m3 0.036 0.03626 4.265 m3 4.265 m3 0.04 0.04 100.00%
b Pek. Urugan pasir, 5 cm m3 0.42 0.007 m3 m3 0.423 m3 0.423 m3 0.007 0.0074 0.423 m3 0.423 m3 0.01 0.01 100.00%
c Pek. Pas. Batu kosong m3 0.85 0.042 m3 m3 0.852 m3 0.852 m3 0.042 0.852 m3
### 0.852 m3 0.04 0.04 100.00%
d Pek. Pondasi batu gunung camp 1:5 m3 2.04 0.191 m3 m3 2.035 m3 2.035 m3 0.191 0.1906 2.035 m3 2.035 m3 0.19 0.19 100.00%
e Pek. Pondasi rollag bata m3 0.55 0.042 m3 m3 0.137 m3 m3 0.010 0.137 m3 0.000 m3 0.01 0.00 0.00%
f Pek. Urugan kembali galian m3 1.28 0.004 m3 m3 m3 m3 m3 m3
2 Pek. Beton
a Pek. Sloef 15/20 cm, camp 1:2:3 m3 0.44 0.308 m3 m3 0.110 m3 m3 0.077 0.110 m3 0.000 m3 0.08 0.00 0.00%
b Pek. Rabat beton teras 5 cm m3 0.88 0.093 m3 m3 m3 m3 m3 m3
c Pek. Kolom 15/15 cm, camp 1:2:3 m3 0.47 0.484 m3 m3 m3 m3 m3 m3
d Pek. Ringbalk 15/20 cm, camp 1:2:3 m3 0.44 0.436 m3 m3 m3 m3 m3 m3
e Pek. Lisplank beton 10/25 cm, camp 1:2:3 m3 0.44 0.436 m3 m3 m3 m3 m3 m3
f Pek. Plat dak atap, camp 1:2:3 m3 1.70 1.811 m3 m3 m3 m3 m3 m3
3 Pek. Dinding & pintu
a Pek. Pas. Dinding batu bata, camp 1:5 m2 66.36 0.969 m2 m2 m2 m2 m2 m2
b Pek. Plesteran dinding batu bata, camp 1:5 m2 132.72 0.749 m2 m2 m2 m2 m2 m2
c Pek. Acian dinding m2 132.72 0.522 m2 m2 m2 m2 m2 m2
d Pek. Pintu besi + gembok unit 1.00 0.443 unit unit unit unit unit unit
e Pek. Pintu KM, Aluminium unit 1.00 0.025 unit unit unit unit unit unit
4 Pek. Lantai
a Pek. Urugan tanah bawah lantai m3 2.97 0.051 m3 m3 m3 m3 m3 m3
b Pek. Urugan pasir bawah lantai m3 0.65 0.011 m3 m3 m3 m3 m3 m3
c Pek. Lantai keramik 30x30 cm unpolish m2 5.42 0.102 m2 m2 m2 m2 m2 m2
d Pek. Lantai keramik 30x30 cm KM unpolish m2 1.93 0.036 m2 m2 m2 m2 m2 m2
5 Pek. Pengecatan
a Pek. Pengecatan dinding bata & lisplank vinitex/setara m2 148.40 0.641 m2 m2 m2 m2 m2 m2
b Pek. Waterprofing dak atap & lisplank No Drop/Aquaproff/setara m2 35.20 0.262 m2 m2 m2 m2 m2 m2
6 Pek. Elektrikal
a Pek. Lampu penerangan TL 2x18 Watt Philips/setara bh 2.00 0.045 bh bh bh bh bh bh
b Pek. Lampu pijar 5 Watt Philips/setara bh 1.00 0.011 bh bh bh bh bh bh
c Pek. Lampu kapsul automatic 18 Watt Philips/setara bh 1.00 0.080 bh bh bh bh bh bh
d Pek. Saklar ganda Panasonic/setara bh 1.00 0.004 bh bh bh bh bh bh
e Pek. Saklar tunggal Panasonic/setara bh 1.00 0.003 bh bh bh bh bh bh
f Pek. Stop kontak biasa Panasonic/setara bh 6.00 0.028 bh bh bh bh bh bh
g Pek. Terminal stop kuningan 6 lubang NYY 3x6 mm2 bh 2.00 0.043 bh bh bh bh bh bh
h Pek. AC Split wall 1/2 PK 220 VAC + timer + stop kontak Panasonic/setara unit 2.00 1.360 unit unit unit unit
unit unit
Pek. Exhaust fan type wall mounted fan 30x30 cm + timer
i National, KDK, Setara unit 2.00 0.378 unit unit unit unit
+ stop kontak unit unit
j Pek. Instalasi titik lampu NYY 3 x 4 mm2 titik 4.00 0.168 titik titik titik titik titik titik
k Pek. Instalasi stop kontak NYY 3 x 6 mm2 in conduit titik 6.00 0.257 titik titik titik titik titik titik
l Pek. Tray indoor
l.1 Pek. Kabel tray 300x50 mm Ex. Lokal m' 7.00 0.112 m' m' m' m' m' m'
l.2 Pek. Cross tray 300x50 mm Ex. Lokal bh 3.00 0.014 bh bh bh bh bh bh
l.3 Pek. Tray ladder 300x50 mm Ex. Lokal m' 2.40 0.168 m' m' m' m' m' m'
m Pek. Tray outdoor
m.1 Pek. Kabel tray outdoor 300x50 mm Ex. Lokal m' 5.50 0.088 m' m' m' m' m' m'
m.2 Pek. Tiang penopang tray, pipa galvanis 3" Ex. Lokal ls 1.00 0.061 ls ls ls ls ls ls
n Pek. Panel listrik Schnider/setara set 1.00 1.601 set set 0.167 set set 0.267 0.167 set 0.000 set 0.27 0.00 0.00%
o Pek. Rak panel indoor, custom set 1.00 0.709 set set set set set set
p Pek. Bak kontrol unit 1.00 0.054 unit unit unit unit unit unit
7 Pek. Mekanikal Plumbing
a Pek. Penyambungan air bersih ke jaringan desa Wavin/setara ls 1.00 0.183 0.500 ls 0.000 ls 0.091 0.000 ls ls 0.500 ls 0.000 ls 0.09 0.00 0.00%
b Pek. Pipa PVC AW 3/4", air bersih Wavin/setara m' 4.50 0.012 m' m' m' m' m' m'
c Pek. Pipa PVC AW 3", air bekas & air kotor Wavin/setara m' 6.30 0.077 m' m' m' m' m' m'
d Pek. Closed Jongkok Toto/setara bh 1.00 0.080 bh bh bh bh bh bh
e Pek. Floor drain Stainlessteel bh 1.00 0.004 bh bh bh bh bh bh
f Pek. Kran air 3/4" Ex. Lokal bh 1.00 0.004 bh bh bh bh bh bh
g Pek. Pegadaan bak air & gayung Ex. Lokal bh 1.00 0.030 bh bh bh bh bh bh
h Pek. Septictank gorong-gorong Ø100 cm Ex. Lokal unit 1.00 0.609 unit unit unit unit unit unit
KUMMULATIVE s.d MINGGU LALU TERCAPAI MINGGU INI KUMMULATIVE s.d MINGGU SAAT INI MINGGU 2
VOLUME
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
NO. ITEM PEKERJAAN SPESIFIKASI BOBOT PERSENTASE
REAL RENCANA REAL RENCANA REAL RENCANA REAL RENCANA REAL RENCANA REAL KUMMULATIVE
RENCANA KERJA
Sat. Vol. LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN
A PEKERJAAN PERSIAPAN
1 Pek. Pembersihan lahan ls 1.00 0.426 1.000 ls 0.000 ls 0.43 0.000 ls 1.00 ls 0.426 1.000 ls 1.000 ls 0.43 0.43 100.00%
2 Pek. Pagar keliling site Seng bjls, 2 m m' 72.00 2.643 72.000 m' 48.000 m' 2.64 1.762 m' 24.00 m' 0.881 72.000 m' 72.000 m' 2.64 2.64 100.00%
3 Pek. Gudang & bangsal m2 20.00 1.290 20.000 m2 0.000 m2 1.29 0.000 m2 20.00 m2 1.290 20.000 m2 20.000 m2 1.29 1.29 100.00%
4 Pek. Papan nama proyek ls 1.00 0.061 1.000 ls 1.000 ls 0.06 0.061 ls ls 1.000 ls 1.000 ls 0.06 0.06 100.00%
5 Pek. Mobilisasi dan Demobilisasi ls 1.00 1.297 0.108 ls 0.108 ls 0.14 0.140 0.140 ls 0.108 ls 0.140 0.140 0.247 ls 0.215 ls 0.28 0.28 21.54%
6 Pek. Pengukuran dan bowplank m' 70.00 0.908 70.000 m' 0.000 m' 0.91 0.000 m' 35.00 m' 0.454 70.000 m' 35.000 m' 0.91 0.45 50.00%
7 Pek. Pengadaan air kerja ls 1.00 0.061 0.007 ls 0.007 ls 0.01 0.007 0.007 ls 0.108 ls 0.007 0.007 0.013 ls 0.114 ls 0.01 0.01 11.43%
8 Pek. Listrik kerja ls 1.00 0.365 0.039 ls 0.039 ls 0.04 0.039 0.039 ls 0.108 ls 0.039 0.039 0.079 ls 0.147 ls 0.08 0.08 14.70%
9 Pek. SLO Instalasi Listrik 4400 Va ls 1.00 0.066 0.071 ls 0.000 ls 0.00 0.000 0.033 ls ls 0.033 0.104 ls 0.000 ls 0.04 0.00 0.00%
10 Pek. Laporan & dokumentasi ls 1.00 0.535 0.058 ls 0.058 ls 0.06 0.058 0.058 ls 0.108 ls 0.058 0.058 0.115 ls 0.165 ls 0.12 0.12 16.53%
11 Pek. Pengurusan Perizinan ls 1.00 0.670 0.223 ls 0.000 ls 0.22 0.000 0.333 ls 0.107 ls 0.223 0.072 0.557 ls 0.107 ls 0.45 0.07 10.71%
C PEKERJAAN SHELTER
1 Pekerjaan Tanah & Pondasi
a Pek. Galian pondasi m3 4.27 0.036 m3 m3 m3 m3 0.00000 0.000 m3 0.000 m3 0.00 0.00 0.00%
b Pek. Urugan pasir, 5 cm m3 0.42 0.007 m3 m3 m3 m3 m3 m3
c Pek. Pas. Batu kosong m3 0.85 0.042 m3 m3 m3 m3 m3 m3
d Pek. Pondasi batu gunung camp 1:5 m3 2.04 0.191 m3 m3 m3 m3 m3 m3
e Pek. Pondasi rollag bata m3 0.55 0.042 m3 m3 m3 m3 m3 m3
f Pek. Urugan kembali galian m3 1.28 0.004 m3 m3 m3 m3 m3 m3
2 Pek. Beton
a Pek. Sloef 15/20 cm, camp 1:2:3 m3 0.44 0.308 m3 m3 m3 m3 m3 m3
b Pek. Rabat beton teras 5 cm m3 0.88 0.093 m3 m3 m3 m3 m3 m3
c Pek. Kolom 15/15 cm, camp 1:2:3 m3 0.47 0.484 m3 m3 m3 m3 m3 m3
d Pek. Ringbalk 15/20 cm, camp 1:2:3 m3 0.44 0.436 m3 m3 m3 m3 m3 m3
e Pek. Lisplank beton 10/25 cm, camp 1:2:3 m3 0.44 0.436 m3 m3 m3 m3 m3 m3
f Pek. Plat dak atap, camp 1:2:3 m3 1.70 1.811 m3 m3 m3 m3 m3 m3
3 Pek. Dinding & pintu
a Pek. Pas. Dinding batu bata, camp 1:5 m2 66.36 0.969 m2 m2 m2 m2 m2 m2
b Pek. Plesteran dinding batu bata, camp 1:5 m2 132.72 0.749 m2 m2 m2 m2 m2 m2
c Pek. Acian dinding m2 132.72 0.522 m2 m2 m2 m2 m2 m2
d Pek. Pintu besi + gembok unit 1.00 0.443 unit unit unit unit unit unit
e Pek. Pintu KM, Aluminium unit 1.00 0.025 unit unit unit unit unit unit
4 Pek. Lantai
a Pek. Urugan tanah bawah lantai m3 2.97 0.051 m3 m3 m3 m3 m3 m3
b Pek. Urugan pasir bawah lantai m3 0.65 0.011 m3 m3 m3 m3 m3 m3
c Pek. Lantai keramik 30x30 cm unpolish m2 5.42 0.102 m2 m2 m2 m2 m2 m2
d Pek. Lantai keramik 30x30 cm KM unpolish m2 1.93 0.036 m2 m2 m2 m2 m2 m2
5 Pek. Pengecatan
a Pek. Pengecatan dinding bata & lisplank vinitex/setara m2 148.40 0.641 m2 m2 m2 m2 m2 m2
b Pek. Waterprofing dak atap & lisplank No Drop/Aquaproff/setara m2 35.20 0.262 m2 m2 m2 m2 m2 m2
6 Pek. Elektrikal
a Pek. Lampu penerangan TL 2x18 Watt Philips/setara bh 2.00 0.045 bh bh bh bh bh bh
b Pek. Lampu pijar 5 Watt Philips/setara bh 1.00 0.011 bh bh bh bh bh bh
c Pek. Lampu kapsul automatic 18 Watt Philips/setara bh 1.00 0.080 bh bh bh bh bh bh
d Pek. Saklar ganda Panasonic/setara bh 1.00 0.004 bh bh bh bh bh bh
e Pek. Saklar tunggal Panasonic/setara bh 1.00 0.003 bh bh bh bh bh bh
f Pek. Stop kontak biasa Panasonic/setara bh 6.00 0.028 bh bh bh bh bh bh
g Pek. Terminal stop kuningan 6 lubang NYY 3x6 mm2 bh 2.00 0.043 bh bh bh bh bh bh
h Pek. AC Split wall 1/2 PK 220 VAC + timer + stop kontak Panasonic/setara unit 2.00 1.360 unit unit unit unit
unit unit
Pek. Exhaust fan type wall mounted fan 30x30 cm + timer
i National, KDK, Setara unit 2.00 0.378 unit unit unit unit
+ stop kontak unit unit
j Pek. Instalasi titik lampu NYY 3 x 4 mm2 titik 4.00 0.168 titik titik titik titik titik titik
k Pek. Instalasi stop kontak NYY 3 x 6 mm2 in conduit titik 6.00 0.257 titik titik titik titik titik titik
l Pek. Tray indoor
l.1 Pek. Kabel tray 300x50 mm Ex. Lokal m' 7.00 0.112 m' m' m' m' m' m'
l.2 Pek. Cross tray 300x50 mm Ex. Lokal bh 3.00 0.014 bh bh bh bh bh bh
l.3 Pek. Tray ladder 300x50 mm Ex. Lokal m' 2.40 0.168 m' m' m' m' m' m'
m Pek. Tray outdoor
m.1 Pek. Kabel tray outdoor 300x50 mm Ex. Lokal m' 5.50 0.088 m' m' m' m' m' m'
m.2 Pek. Tiang penopang tray, pipa galvanis 3" Ex. Lokal ls 1.00 0.061 ls ls ls ls ls ls
n Pek. Panel listrik Schnider/setara set 1.00 1.601 set set set set set set
o Pek. Rak panel indoor, custom set 1.00 0.709 set set set set set set
p Pek. Bak kontrol unit 1.00 0.054 unit unit unit unit unit unit
7 Pek. Mekanikal Plumbing
a Pek. Penyambungan air bersih ke jaringan desa Wavin/setara ls 1.00 0.183 ls ls 0.500 ls ls 0.091 0.500 ls 0.000 ls 0.09 0.00 0.00%
b Pek. Pipa PVC AW 3/4", air bersih Wavin/setara m' 4.50 0.012 m' m' m' m' m' m'
c Pek. Pipa PVC AW 3", air bekas & air kotor Wavin/setara m' 6.30 0.077 m' m' m' m' m' m'
d Pek. Closed Jongkok Toto/setara bh 1.00 0.080 bh bh bh bh bh bh
e Pek. Floor drain Stainlessteel bh 1.00 0.004 bh bh bh bh bh bh
f Pek. Kran air 3/4" Ex. Lokal bh 1.00 0.004 bh bh bh bh bh bh
g Pek. Pegadaan bak air & gayung Ex. Lokal bh 1.00 0.030 bh bh bh bh bh bh
h Pek. Septictank gorong-gorong Ø100 cm Ex. Lokal unit 1.00 0.609 unit unit unit unit unit unit
KUMMULATIVE s.d MINGGU LALU TERCAPAI MINGGU INI KUMMULATIVE s.d MINGGU SAAT INI MINGGU 1
VOLUME
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
NO. ITEM PEKERJAAN SPESIFIKASI BOBOT PERSENTASE
REAL RENCANA REAL RENCANA REAL RENCANA REAL RENCANA REAL RENCANA REAL KUMMULATIVE
RENCANA KERJA
Sat. Vol. LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN
A PEKERJAAN PERSIAPAN
1 Pek. Pembersihan lahan ls 1.00 0.426 ls ls 1.000 ls ls 0.426 1.000 ls 0.000 ls 0.426 0.000 0.000%
2 Pek. Pagar keliling site Seng bjls, 2 m m' 72.00 2.643 m' m' 72.000 m' 48 m' 2.643 1.762 72.000 m' 48.000 m' 2.643 1.762 66.667%
3 Pek. Gudang & bangsal m2 20.00 1.290 m2 m2 20.000 m2 m2 1.290 20.000 m2 0.000 m2 1.290 0.000 0.000%
4 Pek. Papan nama proyek ls 1.00 0.061 ls ls 1.000 ls 1.000 ls 0.061 0.061 1.000 ls 1.000 ls 0.061 0.061 100.000%
5 Pek. Mobilisasi dan Demobilisasi ls 1.00 1.297 ls ls 0.108 ls 0.108 ls 0.140 0.140 0.108 ls 0.108 ls 0.140 0.140 10.769%
6 Pek. Pengukuran dan bowplank m' 70.00 0.908 m' m' 70.000 m' m' 0.908 70.000 m' 0.000 m' 0.908 0.000 0.000%
7 Pek. Pengadaan air kerja ls 1.00 0.061 ls ls 0.007 ls 0.007 ls 0.007 0.007 0.007 ls 0.007 ls 0.007 0.007 0.656%
8 Pek. Listrik kerja ls 1.00 0.365 ls ls 0.039 ls 0.039 ls 0.039 0.039 0.039 ls 0.039 ls 0.039 0.039 3.935%
9 Pek. SLO Instalasi Listrik 4400 Va ls 1.00 0.066 ls ls 0.071 ls ls 0.005 0.071 ls 0.000 ls 0.005 0.000 0.000%
10 Pek. Laporan & dokumentasi ls 1.00 0.535 ls ls 0.058 ls 0.058 ls 0.058 0.058 0.058 ls 0.058 ls 0.058 0.058 5.759%
11 Pek. Pengurusan Perizinan ls 1.00 0.670 ls ls 0.223 ls ls 0.223 0.223 ls 0.000 ls 0.223 0.000 0.000%
C PEKERJAAN SHELTER
1 Pekerjaan Tanah & Pondasi
a Pek. Galian pondasi m3 4.27 0.036 m3 m3 m3 m3 m3 m3
b Pek. Urugan pasir, 5 cm m3 0.42 0.007 m3 m3 m3 m3 m3 m3
c Pek. Pas. Batu kosong m3 0.85 0.042 m3 m3 m3 m3 m3 m3
d Pek. Pondasi batu gunung camp 1:5 m3 2.04 0.191 m3 m3 m3 m3 m3 m3
e Pek. Pondasi rollag bata m3 0.55 0.042 m3 m3 m3 m3 m3 m3
f Pek. Urugan kembali galian m3 1.28 0.004 m3 m3 m3 m3 m3 m3
2 Pek. Beton
a Pek. Sloef 15/20 cm, camp 1:2:3 m3 0.44 0.308 m3 m3 m3 m3 m3 m3
b Pek. Rabat beton teras 5 cm m3 0.88 0.093 m3 m3 m3 m3 m3 m3
c Pek. Kolom 15/15 cm, camp 1:2:3 m3 0.47 0.484 m3 m3 m3 m3 m3 m3
d Pek. Ringbalk 15/20 cm, camp 1:2:3 m3 0.44 0.436 m3 m3 m3 m3 m3 m3
e Pek. Lisplank beton 10/25 cm, camp 1:2:3 m3 0.44 0.436 m3 m3 m3 m3 m3 m3
f Pek. Plat dak atap, camp 1:2:3 m3 1.70 1.811 m3 m3 m3 m3 m3 m3
3 Pek. Dinding & pintu
a Pek. Pas. Dinding batu bata, camp 1:5 m2 66.36 0.969 m2 m2 m2 m2 m2 m2
b Pek. Plesteran dinding batu bata, camp 1:5 m2 132.72 0.749 m2 m2 m2 m2 m2 m2
c Pek. Acian dinding m2 132.72 0.522 m2 m2 m2 m2 m2 m2
d Pek. Pintu besi + gembok unit 1.00 0.443 unit unit unit unit unit unit
e Pek. Pintu KM, Aluminium unit 1.00 0.025 unit unit unit unit unit unit
4 Pek. Lantai
a Pek. Urugan tanah bawah lantai m3 2.97 0.051 m3 m3 m3 m3 m3 m3
b Pek. Urugan pasir bawah lantai m3 0.65 0.011 m3 m3 m3 m3 m3 m3
c Pek. Lantai keramik 30x30 cm unpolish m2 5.42 0.102 m2 m2 m2 m2 m2 m2
d Pek. Lantai keramik 30x30 cm KM unpolish m2 1.93 0.036 m2 m2 m2 m2 m2 m2
5 Pek. Pengecatan
a Pek. Pengecatan dinding bata & lisplank vinitex/setara m2 148.40 0.641 m2 m2 m2 m2 m2 m2
b Pek. Waterprofing dak atap & lisplank No Drop/Aquaproff/setara m2 35.20 0.262 m2 m2 m2 m2 m2 m2
6 Pek. Elektrikal
a Pek. Lampu penerangan TL 2x18 Watt Philips/setara bh 2.00 0.045 bh bh bh bh bh bh
b Pek. Lampu pijar 5 Watt Philips/setara bh 1.00 0.011 bh bh bh bh bh bh
c Pek. Lampu kapsul automatic 18 Watt Philips/setara bh 1.00 0.080 bh bh bh bh bh bh
d Pek. Saklar ganda Panasonic/setara bh 1.00 0.004 bh bh bh bh bh bh
e Pek. Saklar tunggal Panasonic/setara bh 1.00 0.003 bh bh bh bh bh bh
f Pek. Stop kontak biasa Panasonic/setara bh 6.00 0.028 bh bh bh bh bh bh
g Pek. Terminal stop kuningan 6 lubang NYY 3x6 mm2 bh 2.00 0.043 bh bh bh bh bh bh
h Pek. AC Split wall 1/2 PK 220 VAC + timer + stop kontak Panasonic/setara unit 2.00 1.360 unit unit unit unit
unit unit
Pek. Exhaust fan type wall mounted fan 30x30 cm + timer
i National, KDK, Setara unit 2.00 0.378 unit unit unit unit
+ stop kontak unit unit
j Pek. Instalasi titik lampu NYY 3 x 4 mm2 titik 4.00 0.168 titik titik titik titik titik titik
k Pek. Instalasi stop kontak NYY 3 x 6 mm2 in conduit titik 6.00 0.257 titik titik titik titik titik titik
l Pek. Tray indoor
l.1 Pek. Kabel tray 300x50 mm Ex. Lokal m' 7.00 0.112 m' m' m' m' m' m'
l.2 Pek. Cross tray 300x50 mm Ex. Lokal bh 3.00 0.014 bh bh bh bh bh bh
l.3 Pek. Tray ladder 300x50 mm Ex. Lokal m' 2.40 0.168 m' m' m' m' m' m'
m Pek. Tray outdoor
m.1 Pek. Kabel tray outdoor 300x50 mm Ex. Lokal m' 5.50 0.088 m' m' m' m' m' m'
m.2 Pek. Tiang penopang tray, pipa galvanis 3" Ex. Lokal ls 1.00 0.061 ls ls ls ls ls ls
n Pek. Panel listrik Schnider/setara set 1.00 1.601 set set set set set set
o Pek. Rak panel indoor, custom set 1.00 0.709 set set set set set set
p Pek. Bak kontrol unit 1.00 0.054 unit unit unit unit unit unit
7 Pek. Mekanikal Plumbing
a Pek. Penyambungan air bersih ke jaringan desa Wavin/setara ls 1.00 0.183 ls ls ls ls ls ls
b Pek. Pipa PVC AW 3/4", air bersih Wavin/setara m' 4.50 0.012 m' m' m' m' m' m'
c Pek. Pipa PVC AW 3", air bekas & air kotor Wavin/setara m' 6.30 0.077 m' m' m' m' m' m'
d Pek. Closed Jongkok Toto/setara bh 1.00 0.080 bh bh bh bh bh bh
e Pek. Floor drain Stainlessteel bh 1.00 0.004 bh bh bh bh bh bh
f Pek. Kran air 3/4" Ex. Lokal bh 1.00 0.004 bh bh bh bh bh bh
g Pek. Pegadaan bak air & gayung Ex. Lokal bh 1.00 0.030 bh bh bh bh bh bh
h Pek. Septictank gorong-gorong Ø100 cm Ex. Lokal unit 1.00 0.609 unit unit unit unit unit unit