Introduction
Catalogue
2. Installation
3. Operation
4. Maintenance
Address: Bldg. A, Zhongbo Industry Zone, No. 10, High-Tech 6th Road, Jiangxia District, Wuhan,
Hubei, China (Mainland)
Wuhan Nobeth Machinery Manufacturing Co., ltd
One button, fully operation
Main function:
2. Installation:
Address: Bldg. A, Zhongbo Industry Zone, No. 10, High-Tech 6th Road, Jiangxia District, Wuhan,
Hubei, China (Mainland)
Wuhan Nobeth Machinery Manufacturing Co., ltd
One button, fully operation
Gas system
Safety devices
This boiler use full lift spring-loaded safety valve, the safety valve
should be installed in the exhaust pipe, exhaust pipe should be
through a safe place, and have sufficient flow area to ensure the
smooth flow of the exhaust, and exhaust pipe should be fixed.
3) Sewage pipe
Address: Bldg. A, Zhongbo Industry Zone, No. 10, High-Tech 6th Road, Jiangxia District, Wuhan,
Hubei, China (Mainland)
Wuhan Nobeth Machinery Manufacturing Co., ltd
One button, fully operation
5) Boil out
Operation:
Address: Bldg. A, Zhongbo Industry Zone, No. 10, High-Tech 6th Road, Jiangxia District, Wuhan,
Hubei, China (Mainland)
Wuhan Nobeth Machinery Manufacturing Co., ltd
One button, fully operation
Fireman should have passed the examination, the holder can operate
independently.
6) Start boiler
When you first start the boiler or for some reason when you
restart the boiler after shutdown, the following should be
checked and ready:
7) Normal operation
Address: Bldg. A, Zhongbo Industry Zone, No. 10, High-Tech 6th Road, Jiangxia District, Wuhan,
Hubei, China (Mainland)
Wuhan Nobeth Machinery Manufacturing Co., ltd
One button, fully operation
Pot temperature
Water table
Rinse water table at least once per shift to keep the water level
glass clean, ensure that the visual part of the water table is
clear, the water level is correct and reliable, if found that the
glass gasket leaks or steam leakage, should be tightened or
replaced litter.
Pressure gauge
Pressure controller
Sewage
Address: Bldg. A, Zhongbo Industry Zone, No. 10, High-Tech 6th Road, Jiangxia District, Wuhan,
Hubei, China (Mainland)
Wuhan Nobeth Machinery Manufacturing Co., ltd
One button, fully operation
8) Emergency shutdown
Other exceptions.
3. Maintenance
Address: Bldg. A, Zhongbo Industry Zone, No. 10, High-Tech 6th Road, Jiangxia District, Wuhan,
Hubei, China (Mainland)
Wuhan Nobeth Machinery Manufacturing Co., ltd
One button, fully operation
1) Check flame monitor with a dry cloth and gently rub the
fireside surface of the detector.
2) Open the door and check the smoke hole, cleaning the
combustion chamber, smoke pipe and flue fouling.
Address: Bldg. A, Zhongbo Industry Zone, No. 10, High-Tech 6th Road, Jiangxia District, Wuhan,
Hubei, China (Mainland)
Wuhan Nobeth Machinery Manufacturing Co., ltd
One button, fully operation
Fuel Gas
Description of Causes Related Solutions
Malfunction
1.Burning program
1. Press the reset
controller malfunction
button;
light is on;
2.Automatic switch
2. Repair or change
doesn't work;
new one;
3.Electromotor is
broken;
4. Control Circuit
interruption;
1. The burner motor 3. Repair or change
5.Electric control
can't start(Check the new one;
connector between
voltage, fuse, 4. Find the
the burner and the
thermorelay and zero interruption point;
main fuel gas valve is
line firstly.). 5. Check and re-install;
loose;
6. Inspect and adjust
6. The high/low
pressure valve or
pressure switch of gas
change new one;
is broken;
7. Change new one;
7. The wind pressure
8. Clear or change new
switch is broken;
one;
8. Leakage of valve;
9. Check the tube or
9. Fuel gas conveying
the emergency cut-off
interruption.
valve.
1. Air pressure switch 1. Turn down or
is broken or on high change new one;
2. Electric motor stops set point;
working. 2. Blockage of air 2.Clear;
pressure switch;
3. Flame detector is 3. Check or change
Address: Bldg. A, Zhongbo Industry Zone, No. 10, High-Tech 6th Road, Jiangxia District, Wuhan,
Hubei, China (Mainland)
Wuhan Nobeth Machinery Manufacturing Co., ltd
One button, fully operation
pressure switch is
broken or leaked;
8. The blowing 8. Change new one;
machine motor is
overloaded and stops
working;
9. The quality of the 9. Adjust in time.
gas isn't good.